Roadway Capital Improvement Program Public Works Engineering and Highway Construction May 2018 Monthly Report

Size: px
Start display at page:

Download "Roadway Capital Improvement Program Public Works Engineering and Highway Construction May 2018 Monthly Report"

Transcription

1 LOCATION TYPE DIST NAME From: % ADA INVEST Dean Rd - Curb Improvements Blanchard Trl SR 50 0 TBD TBD TBD J. Naditz ADA INVEST Forsyth Rd - Curb Improvemen Muskogee St Hanging Moss Rd 0 TBD TBD TBD J. Naditz ADA INVEST Forsyth Rd - Raised Median Dominion Ave 0 TBD TBD TBD J. Naditz ADA INVEST Hiawassee Rd - Curb ImprovemBalboa Dr Clarcona Ocoee Rd 0 TBD TBD TBD J. Naditz ADA INVEST Hiawassee Rd - Raised MedianAlta Westgate Dr Anoka Dr 0 TBD TBD TBD J. Naditz ADA INVEST Lancaster Rd - Median Refuge Voltaire Dr 0 TBD TBD TBD J. Naditz ADA 3 Bumby & Raeford 100 Apr 2018 Mar 2018 Apr 2018 J. Naditz ADA 6 Canada Dr/Carrier Ave 100 May 2018 Apr 2018 May 2018 J. Naditz ADA 2 Davar Ave Crossings 100 Apr 2018 Mar 2018 Apr 2018 J. Naditz ADA 1 Dr. Phillips/Winderwood 20 Sep 2018 May 2018 Sep 2018 J. Naditz ADA 4 Forest Ridge - Willow Brook 25 Jul 2018 Apr 2018 Jul 2018 J. Naditz ADA 1 Hawkstone Drive gap 100 Apr 2018 Apr 2018 Apr 2018 J. Naditz ADA 3 Orange Peel Villas 100 Apr 2018 Mar 2018 Apr 2018 J. Naditz ADA 1 Parkview Pt at Orangewood Bv 100 Apr 2018 Apr 2018 Apr 2018 J. Naditz ADA 4 Spring Lake Subdivision 0 May 2018 Apr 2018 May 2018 J. Naditz ADA 5 Sussex Rd at Percival Dr 100 Apr 2018 Mar 2018 Apr 2018 J. Naditz ADA 2 Sweetwater CC 10 Jul 2018 May 2018 Jul 2018 J. Naditz ADA 4 Willow Brook Subdivision Phases 1, 2 & Apr 2018 Mar 2018 Apr 2018 J. Naditz Bridge 5 INVEST Buck Rd Bridge Dean Rd Rouse Rd Neg 85 May 2018 Oct 2023 Oct 2024 R. Ng Bridge 3,5 Bates Rd Bridge Goldenrod Rd Chickasaw Trl Design 60 Aug 2018 TBD TBD R. Ng Bridge 6 I Drive Pedestrian Bridge OC Convention Center Hyatt Regency 99 May 2018 Jul 2015 May 2018 J. Naditz Bridge 2 Sherry Dr Bridge Replacement.5mi W of Forest City Rd 0 Jan 2019 Apr 2018 Jan 2019 J. Naditz Comm. Dev 1 East Bay Streets - Section 2 Christopher St, Saba St, Trumbo St, E Bay St. Permitting 99 TBD TBD TBD R. Ng Comm. Dev 6 Holden Heights - Phase 4 18th-20th St, Miller Av, Conroy St, Woods St. 0 Aug 2019 Feb 2018 Aug 2019 J. Naditz Comm. Dev 6 Lake Mann Sidewalk N Ortman Dr, Bayshore Dr, W. Central Bv, Ferguson D Design 95 May 2018 Dec 2018 Feb 2019 M. Chaudhry EPD 3 Keystone Dr Baffle Box Keystone Dr Design 95 May 2018 Jan 2019 Sep 2019 A. Azim EPD 3 Lake Anderson Alum Treatment Anderson Road E of Conway Garden Rd 99 May 2018 Jan 2017 May 2018 J. Naditz EPD 3 Lake Jennie Jewel - West Lobe S. Summerlin Ave E of Orange Ave Study 100 Oct 2015 TBD TBD A. Azim EPD 3 Lake Jennie Jewel Gatlin Inter-Conn Gatlin Ave W of Summerlin Ave Study 90 TBD TBD TBD A. Azim EPD 1 Sandy Shores Dr Sandy Shores Dr ROW 20 TBD TBD TBD A. Azim EPD 3 Summerlin Ave Baffle Boxes S. Summerlin Ave N of Galin Ave Bid 100 Mar 2018 Sep 2018 May 2019 A. Azim Intersection 4 INVEST Avalon Park Blvd Realignment N of one way pair ROW 45 Mar 2018 Oct 2018 Oct 2019 J. Sloman Intersection 5 INVEST University Blvd Forsyth Rd Design 0 Apr 2019 Oct 2019 Oct 2020 J. Sloman Intersection 2 Belco Dr Pine Hills Rd Design 0 TBD TBD TBD TBD Intersection 5 Corporate Blvd Alafaya Trl Design 100 Jun 2018 Aug 2020 Aug 2021 J. Sloman For information on projects in construction phase call Public Works Highway ruction at (407) For projects in all other phases contact Public Works Engineering Division at (407) of 5

2 LOCATION TYPE DIST NAME From: % Intersection 4 Curameng Dr Dean Rd. Bid 100 Jun 2018 Jun 2018 Apr 2019 J. Sloman Intersection 5 Econlockhatchee Trl Lake Douglas Pl Design 100 Apr 2018 Oct 2018 Oct 2019 J. Sloman Intersection 3 Gatlin Ave Kennedy Ave Design 100 Oct 2015 Oct 2018 May 2019 J. Sloman Intersection 6 John Young Pkwy Americana Blvd Design 0 Apr 2019 Oct 2019 Oct 2020 J. Sloman Intersection 4 Moss Park & Innovation Way Moss Park Innovation Way 50 Aug 2018 Nov 2017 Aug 2018 J. Naditz Intersection 5 North Tanner Rd Lake Pickett Rd 99 Jun 2018 Sep 2017 Jun 2018 J. Naditz Intersection 1 Orangewood Blvd Gateway Ave Design 5 Feb 2019 TBD TBD J. Sloman Intersection 2 Powers Dr North Ln Design 100 Apr 2018 Apr 2021 Apr 2022 J. Sloman Intersection 1 Roberson Rd Windermere Rd Design 100 Dec 2017 TBD TBD J. Sloman Intersection 2 Sadler Rd US 441 Design 95 Jun 2018 Feb 2019 Feb 2020 J. Sloman Intersection 6 Texas Ave Rio Grande Ave Design 0 Apr 2019 Oct 2019 Oct 2020 J. Sloman Intersection 1 Tilden Rd - Tiny Rd Debut Ln Nesting Ln Design 35 Nov 2018 TBD TBD J. Sloman Intersection 5 University Blvd Dean Rd Neg 50 May 2018 Jan 2022 Jan 2024 C. Evangelo Intersection 1 Vineland Ave SR 535 Design 100 May 2018 Aug 2019 Aug 2020 J. Sloman Intersection 1 Wallace Rd Dr. Phillips Bid 0 Oct 2018 Nov 2018 Jul 2019 J. Sloman Intersection 4 Waterford Lakes Lake Cypress Cir Design 0 Apr 2019 Oct 2019 Oct 2020 J. Sloman Lighting 6 INVEST Rio Grande Oak Ridge Rd Ole Heritage Dr Design 50 May 2018 Dec 2017 Apr 2018 F. Yokiel Lighting 2 Apopka Blvd US 441 Piedmont Wekiva Rd Design 0 TBD TBD TBD F. Yokiel Lighting 2 Apopka Vineland Rd A.D.Mims Clarcona-Ocoee Rd Design 25 Jul 2018 TBD TBD F. Yokiel Lighting 4 Avalon Park Blvd Timber Springs Blvd SR 50 Design 0 TBD TBD TBD F. Yokiel Lighting 4 Avalon Park Blvd Crown Hill BLvd Timber Springs Blvd Design 10 Jun 2018 TBD TBD F. Yokiel Lighting 1 C.R. 535 (Phase IV) Buena Vista Dr Apopka Vineland Rd Design 100 Dec 2017 TBD TBD F. Yokiel Lighting 1 CR 535 Lake Sheen Reserve Chase Rd Design 0 TBD TBD TBD F. Yokiel Lighting 1 CR 535 (Phase II) Buena Vista Dr Lake Sheen Reserve Design 0 TBD TBD TBD F. Yokiel Lighting 6 Destination Pkwy Tradeshow Blvd East of Lake Cay Design 0 TBD TBD TBD F. Yokiel Lighting 6 Destination Py Shingle Creek John Young Py Design 0 Jul 2018 TBD TBD F. Yokiel Lighting 4 Innovation Way S Alafaya Trl SR 528 Design 0 TBD TBD TBD F. Yokiel Lighting 4 Lake Underhill Rd Rouse Rd Alafaya Trl Design 0 TBD TBD TBD F. Yokiel Lighting 2 Mt. Plymouth Rd Kelly Park Rd Seminole County Line Design 0 TBD TBD TBD F. Yokiel Lighting 1 Palm Pkwy Apopka Vineland Rd Central Florida Pkwy Design 100 Jun 2018 TBD TBD F. Yokiel Lighting 2 Piedmont Wekiva Rd Orange Blossom Tr Semoran Blvd Design 50 Jun 2018 TBD TBD F. Yokiel Lighting 2 Rock Springs Rd Welch Rd Ponkan Rd Design 25 Jun 2018 TBD TBD F. Yokiel Lighting 4 Rouse Rd Lake Underhill Rd SR 50 Design 0 TBD TBD TBD F. Yokiel Lighting 4 Wetherbee Rd Orange Ave Boggy Creek Rd Design 0 TBD TBD TBD F. Yokiel Lighting 1 Wildwood Ext (Darryl Carter) International Dr Lake St TBD TBD TBD Traffic Eng For information on projects in construction phase call Public Works Highway ruction at (407) For projects in all other phases contact Public Works Engineering Division at (407) of 5

3 LOCATION TYPE DIST NAME From: % Lighting 1 Wildwood Ext (Darryl Carter) Lake St Palm Py TBD TBD TBD Traffic Eng Median Tree 4 Alafaya Trl Northhampton Ave Golfway Blvd 80 Nov 2019 Sep 2017 Nov 2019 J. Cummings Median Tree 4 Alafaya Trl Golfway Blvd Lake Underhill Rd 80 Nov 2019 Sep 2017 Nov 2019 J. Cummings Median Tree 4 Alafaya Trl Avalon Park Blvd Northampton Ave 80 Nov 2019 Sep 2017 Nov 2019 J. Cummings Median Tree 4 Alafaya Trl Lake Underhill Rd SR Sep 2019 Jan 2018 Sep 2019 J. Cummings Median Tree 1 Apopka Vineland Rd Darlene Dr Sand Lake Rd 90 Apr 2019 Jan 2017 Apr 2019 J. Cummings Median Tree 1 Apopka Vineland Rd Sand Lake Rd Wallace Rd 90 Apr 2019 Jan 2017 Apr 2019 J. Cummings Median Tree 2 Apopka Vineland Rd Wallace Rd Conroy-Windermere Rd 90 Apr 2019 Jan 2017 Apr 2019 J. Cummings Median Tree 2 Pine Hills Rd Clarcona-Ocoee Rd Beggs Rd. 90 Nov 2019 Oct 2017 Nov 2019 J. Cummings Median Tree 5 Rouse Road SR 50 Corporate Blvd Design 100 TBD TBD TBD J. Cummings Median Tree 3 Valencia College Ln William C Coleman Dr Econlockhatchee Trl Design 100 TBD TBD TBD J. Cummings Ped Safety 5 INVEST University Blvd Sr 436 Forsyth Rd Design 0 Sep 2018 Sep 2018 Aug 2019 F. Yokiel Ped Safety 2 INVEST Clarcona-Ocoee US 441 E. of Pine Hills Rd Study 0 Mar 2018 Jun 2019 May 2020 Ped Safety 5 INVEST Dean Rd Blanchard Trl SR 50 Study 100 Mar 2018 Mar 2019 Feb 2020 Ped Safety 5 INVEST Forsyth Rd Muskogee St Hanging Moss Rd Study 100 Sep 2017 Jan 2018 Dec 2019 Ped Safety 6 INVEST Hiawassee Rd Balboa Dr Clarcona Ocoee Rd Study 100 Sep 2017 Oct 2018 Sep 2019 Ped Safety 3 INVEST Lancaster US 441 Orange Av Study 100 Jan 2018 Jan 2019 Dec 2019 Ped Safety 2 INVEST Rock Springs Rd Sand Piper Faye St Study 100 Sep 2017 Oct 2018 Sep 2019 Ped Safety 6 Oak Ridge Pedestrian Safety Ph 1 Millenia Blvd JYP Neg 40 May 2018 Feb 2021 Aug 2022 A. Azim Ped Safety 6 Oak Ridge Pedestrian Safety Ph 2 JYP OBT Neg 40 May 2018 TBD TBD A. Azim Ped Safety 6 Pine Hills Rd SR 50 Bonnie Brae Cir Study 99 Apr 2018 TBD TBD J. Marks Ped Safety 5 UCF Area Pedestrian Safety Alafaya Trl University & McCulloch RFP 60 May 2018 May 2020 May 2021 C. Evangelo Ped Safety 6 Universal Blvd Pedestrian Safety Action SR 528 Sand Lake Rd Data 50 May 2018 N/A N/A F. Yokiel Roadway 2 All American Boulevard Clarcona-Ocoee Rd Kennedy Blvd ROW 64 Jan 2019 Jul 2019 Jul 2021 J. Sloman Roadway 1 Avalon Road RCA (CR 545) Florida's Turnpike SR 50 RCA 55 Jul 2018 TBD TBD B. Hardy Roadway 1 Avalon Road Segment 1 Old YMCA Rd Schofield Rd Design 100 Aug 2017 TBD TBD K. Leeming Roadway 1 Avalon Road Segment ' Marina Bay Dr Old YMCA Rd Design 95 May 2018 Jun 2018 Dec 2019 K. Leeming Roadway 1 Avalon Road Segment ' N Flamingo Crossings1600' S Marina Bay Dr Design 95 May 2018 Jun 2018 Dec 2019 K. Leeming Roadway 1 Avalon Road Segment ' S Flamingo Crossings1300' N Flamingo Crossing Design 95 May 2018 Jun 2018 Dec 2019 K. Leeming Roadway 4 Boggy Creek Rd - North South Access Rd Wetherbee Rd 29 Jun 2019 Jul 2017 Jun 2019 J. Naditz For information on projects in construction phase call Public Works Highway ruction at (407) For projects in all other phases contact Public Works Engineering Division at (407) of 5

4 LOCATION TYPE DIST NAME From: % Roadway 4 Boggy Creek Rd - South Osceola County Line SR 417 (Greene Way) Design 95 Jun 2018 Jun 2019 Jan 2021 R. Ng Roadway 3 Chickasaw Trl. Extension SR North Design 90 Jun 2018 TBD TBD A. Azim Roadway 1 Connector Rd (Fenton St) Apopka Vineland Rd Hilton Driveway Design 95 Jun 2018 Nov 2018 Nov 2020 C. Evangelo Roadway 1 Connector Rd (Fenton St) Hilton Driveway Palm Py 0 TBD TBD TBD J. Naditz Roadway 5 Dean Rd University Blvd McCulloch Rd RCA 100 Sep 2014 TBD TBD C. Evangelo Roadway 6 Destination Pkwy IB/IIA Tradeshow Blvd E. of Lake Cay 70 Jul 2018 Jan 2017 Jul 2018 J. Naditz Roadway 3 Econlockhatchee Trl Lake Underhill Rd N. of SR 408 Design 95 Jan 2019 Jul 2019 Jul 2021 C. Evangelo Roadway 2 Edgewater Dr Pine Hills Rd Clarcona-Ocoee Rd Design 100 Feb 2015 TBD TBD J. Sloman Roadway 1 Ficquette Rd Seg G,H-1 & H-2 S of Ingelnook Dr S of Reams Rd Neg 100 Feb 2018 Feb 2022 Feb 2024 A. Azim Roadway 5 Ft. Christmas Rd Safety Improv N of Lk Pickett Rd 2000 ft north Design 95 May 2018 Jan 2019 Jul 2019 A. Azim Roadway 1 Hamlin Groves Trail Extension N of Independence Tiny Rd 0 TBD May 2018 TBD J. Naditz Roadway 6 Holden Ave John Young Pkwy Orange Blossom Trl Design 90 Apr 2018 Sep 2018 Sep 2020 C. Evangelo Roadway 6 I Drive Transit Lanes Destination Pkwy Sand Lake Rd Design 60 Jul 2018 Mar 2019 Mar 2021 C. Evangelo Roadway 4 Innovation Way & SR 528 Innovation Way SR Apr 2018 Jul 2016 Apr 2018 J. Naditz Roadway 4 Innovation Way 3B Moss Park 1200' East 80 Jun 2018 Jun 2017 Jun 2018 J. Naditz Roadway 1 International Dr Westwood Blvd S Westwood Blvd N 96 Jun 2018 Sep 2015 Jun 2018 J. Naditz Roadway 6 John Young/Sand Lk Interchange Commodity Cr Florida's Turnpike 50 Oct 2019 Aug 2016 Oct 2019 J. Naditz Roadway 2 Kennedy Boulevard-East E. of Forest City Rd Wymore Rd Design 90 May 2019 Nov 2021 Nov 2023 J. Sloman Roadway 2 Kennedy Boulevard-West W. of Forest City Rd 2300 E. of Fores City Rd Design 90 May 2019 Nov 2019 Nov 2021 J. Sloman Roadway 3,4 Lake Underhill Rd E. of Econlockhatchee Tr W. of Rouse Road Design 60 Jan 2019 Mar 2021 Mar 2023 A. Azim Florida Turnpike Roadway 4 Orange Avenue Osceola County Line Enterprise Overpass RCA 44 Jun 2018 TBD TBD B. Hardy Roadway 1 Porter Rd Avalon Rd Hamlin Groves Trl 85 Aug 2018 Feb 2017 Aug 2018 J. Naditz Roadway 1 Reams Rd Summerlake Park Blvd Taborfield Ave RCA 95 Apr 2018 TBD TBD B. Hardy Roadway 1 Reams Rd Taborfield Ave Delmar Ave 48 Jan 2019 Jul 2017 Jan 2019 J. Naditz Roadway 5 Richard Crotty Parkway - Seg 1A Semoran Blvd Goldenrod Rd Design 90 Jul 2018 Oct 2019 Oct 2021 R. Ng Roadway 3 Richard Crotty Parkway - Seg1B Goldenrod Rd Harrell Rd Design 90 Jul 2018 TBD TBD R. Ng Roadway 3,5 Richard Crotty Parkway - Seg 2 Harrell Rd Dean Rd Design 91 Apr 2018 TBD TBD R. Ng Roadway 1 Sand Lake Rd. Apopka-Vineland Rd. Turkey Lake Rd. RFP 0 Jul 2018 TBD TBD C. Evangelo Roadway 4 Sunbridge Parkway Osceola County Line SR528 RCA 98 May 2018 TBD TBD B. Hardy Roadway 4 Sunbridge Parkway Aerospace Py N of Wewahootee Rd Design 60 Jun 2018 TBD TBD K. Leeming Roadway 4 Taft-Vineland Road - Seg 1 Orange Blossom Tr Bachman Rd. Design 90 Jul 2018 Mar 2019 Mar 2021 R. Ng Roadway 4 Taft-Vineland Road - Seg 2 Bachman Rd Orange Ave Design 90 Jul 2018 TBD TBD R. Ng Roadway 6 Texas Avenue-North S. of Americana Blvd S. of Holden Ave. Design 95 May 2018 Nov 2018 Nov 2020 A. Azim Roadway 6 Texas Avenue-South S. of Oak Ridge Rd S. of Americana Blvd Design 95 May 2018 TBD TBD A. Azim For information on projects in construction phase call Public Works Highway ruction at (407) For projects in all other phases contact Public Works Engineering Division at (407) of 5

5 LOCATION TYPE DIST NAME From: % Roadway 3 Valencia College Lane Goldenrod Rd William C. Coleman Dr Design 100 Apr 2015 TBD TBD A. Azim Roadway 1 Vineland Ave Fairfield Inn Driveway Queen of Universe Church Design 30 Jun 2018 Aug 2018 Mar 2019 K. Leeming Sidewalk INVEST Dominion Ave Forsyth Rd Dorris Dr 0 TBD TBD TBD J. Naditz Sidewalk 3 INVEST Holden Ave Judy Ct. Raymar Dr. Design 60 Sep 2018 Mar 2019 Aug 2019 M. Chaudhry Sidewalk 6 INVEST Little Egypt Design 90 May 2018 Dec 2018 Aug 2019 M. Chaudhry Sidewalk 1 INVEST Overland Rd Beggs Rd Clark St. Design 0 Mar 2019 Dec 2019 Jun 2020 M. Chaudhry Sidewalk 2 INVEST Round Lake Rd King Ave Sadler Ave Design 50 Oct 2018 Apr 2019 Nov 2019 M. Chaudhry Sidewalk 6 Brittany Rd Dardanelle Dr Continental Blvd 100 Mar 2018 Jan 2018 Mar 2018 J. Naditz Sidewalk 2 Dr. Love Road - North Side 90' E of Michelle Ave Lockhart Elem. School Bid 50 Jun 2018 Jul 2018 Dec 2018 M. Chaudhry Sidewalk 6 Edgebrook Dr Brookgreen Ave Harcourt Ave 0 Jun 2018 May 2018 Jun 2018 J. Naditz Sidewalk 6 Eiffel Dr Brittany Rd Chantelle Rd 100 Apr 2018 Mar 2018 Apr 2018 J. Naditz Sidewalk 6 Fontainebleu Dr Brittany Rd Chantelle Rd 100 May 2018 Apr 2018 May 2018 J. Naditz Sidewalk 5 Moselle Avenue - West Side Old Cheney Hwy Turin St Bid 50 Jun 2018 Jul 2018 Dec 2018 M. Chaudhry Sidewalk 3 Nela Avenue - South Side Orange Ave Matchett Rd 0 TBD TBD TBD J. Naditz Sidewalk 4 S. Alafaya Trail - West Side Lake Underhill Rd Existing N. of 408 Design 95 Jun 2018 TBD TBD M. Chaudhry Sidewalk 4 S. Alayafa Trail - West Side Ex 1050' S of Curry Ford RdEx 650' S of Curry Ford Rd Design 95 Jun 2018 TBD TBD M. Chaudhry Sidewalk 2 S. Binion Road Ocoee Apopka Road Trail Magnolia Hold 0 TBD TBD TBD M. Chaudhry Sidewalk 6 Savoy Dr Continental Blvd Chantelle Rd 0 TBD TBD TBD J. Naditz Sidewalk 1 Sea Harbor Drive - West Side Academic Dr International Dr Hold 0 TBD TBD TBD M. Chaudhry Sidewalk 2 Suncrest Dr/Rossman Dr-N Side Dead End Ext 255 LF W of OBT Hold 0 TBD TBD TBD M. Chaudhry Sidewalk 6 Tavendale Dr Harcourt Ave Belvidere St 0 TBD TBD TBD J. Naditz Trails 6 Shingle Creek Trail Ph 1 Seg 1 Sand Lake Rd Destination Pkwy 5 Dec 2018 Feb 2018 Dec 2018 J. Naditz Trails 6 Shingle Creek Trail Ph 1 Seg 2 Destination Pkwy SR 528 Design 95 Jan 2019 Aug 2021 Aug 2022 J. Sloman Trails 1 Shingle Creek Trail Ph 1 Seg 3 SR 528 Taft-Vineland Rd Design 90 Dec 2018 Aug 2020 Aug 2021 J. Sloman Trails 1 Shingle Creek Trail Ph 2 Taft-Vineland Rd Town Loop Blvd. Design 99 Jul 2018 TBD TBD J. Sloman Trails 1 Shingle Creek Trail Ph 3 Town Loop Blvd. Osceola County Line Design 30 Sep 2018 TBD TBD J. Sloman For information on projects in construction phase call Public Works Highway ruction at (407) For projects in all other phases contact Public Works Engineering Division at (407) of 5

6 Orange County State Road Projects CONSTRUCTION LOCATION TYPE DIST NAME From: % Roadway 1,2,3, 4,5,6 I-4 Special Use/Express Lanes Osceola County Line SR 434 Seminole County ruction Dec 2021 Feb 2015 Dec 2021 FDOT Roadway 1 Interstate 4 Beyond the Ultimate Osceola County Line E. of SR 528 Design Jul 2019 TBD TBD FDOT Roadway 1 Interstate 4 Beyond the Ultimate W. of SR 528 W. of SR 528 Beachline Design Jul 2019 TBD TBD FDOT Roadway 1 SR 50 (Colonial Dr) W4A SR 429 (W. Beltway) West Oaks Mall ruction May 2018 Jul 2014 May 2018 FDOT Roadway 1 SR 417 International Dr John Young Pkwy Design Oct 2019 May 2020 Dec 2021 CFX Roadway 1 SR 417 John Young Pkwy Landstar Blvd. Design Oct 2019 May 2020 Dec 2021 CFX Roadway 1 SR 528 I-4 Turnpike ruction Oct 2018 Sep 2015 Aug 2018 FDOT Roadway 2,6 SR 423 (John Young Pkwy) SR 50 Shader Rd ruction May 2020 Jan 2018 May 2020 FDOT Roadway 2 SR 429 CR 535 Florida's Turnpike Design Oct 2020 TBD TBD CFX Roadway 2 SR 429 Florida's Turnpike West Rd Design Oct 2019 TBD TBD CFX Roadway 2 SR 429 West Rd CR 437A Design Oct 2020 TBD TBD CFX Roadway 2 SR 434 (Forest City Rd) Edgewater Dr Seminole County Line Design Jul 2019 TBD TBD FDOT Roadway 2 US 441/SR 500/Orange Blossom Tr N. of Jones Ave S. of Wadswort Rd Design Aug 2018 TBD TBD FDOT Roadway 2 US 441/SR 500/Orange Blossom Tr E. of Lake Doe Cove E. of SR 429 Design Jun 2018 TBD TBD FDOT Roadway 2 Wekiva Parkway W. of Old McDonald Rd E. of Wekiva Park Rd ruction Jun 2020 Oct 2017 Jun 2020 CFX Roadway 3 SR 414 Maitland Blvd. I-4 Maitland Ave. Letting Jul 2018 TBD TBD FDOT Roadway 3 SR 527 (Orange Avenue) N. of Holden Ave S. of Lake Gatlin Rd ruction Mar 2018 Dec 2016 Mar 2018 FDOT Roadway 3 SR 551 (Goldenrod Rd) SR 408 SR 50 Design Apr 2021 TBD TBD FDOT Roadway 3 SR 552 (Curry Ford Rd E. of SR 436 SR 551 (Goldenrod Rd) ruction Jul 2017 May 2016 Jul 2017 FDOT Roadway 4 SR 15 (Hoffner Ave) SR 436 (Semoran Blvd) Conway Rd ruction May 2019 Aug 2015 May 2019 FDOT Roadway 4 SR 15 (N. of Hoffner Ave) Lee Vista Blvd SR 436 (Semoran Blvd.) ruction May 2019 Aug 2015 May 2019 FDOT Roadway 4 SR 15 (US 17/92) S. of SR 423 Lee Rd S. of CR 428 Lake Ave ruction Aug 2019 Aug 2015 Aug 2019 FDOT Roadway 4 US 441 S. of Taft Vineland Rd Beechline Expressway (528) ruction Jul 2017 Oct 2016 Jul 2017 FDOT Roadway 4 SR 408 Extension SR 50 E. of SR 417 E. of Alafaya Tr ruction Oct 2019 Oct 2017 Oct 2019 CFX Roadway 4 SR 417 Landstar Blvd. Boggy Creek Rd Design Oct 2019 May 2020 Dec 2021 CFX Roadway 4 SR 417 Boggy Creek Rd Narcoossee Rd Design May 2022 TBD TBD CFX Roadway 4 SR 417 Narcoossee Rd SR 528 Design May 2022 TBD TBD CFX Roadway 4 SR 528 SR 436 (Semoran Blvd) Goldenrod Rd Negotiations TBD TBD TBD CFX Roadway 4 SR 528 Goldenrod Rd SR 417 Hold Jul 2020 TBD TBD CFX Roadway 4 SR 91 (Fl Turnpike) Osceola County Line Beach Line Expressway/SR 528 ruction Jun Apr 2017 Jun 2021 Turnpike Roadway 4,5 Beach Line Expressway/SR58 Turnpike/SR 91 E. of McCoy Rd Design Dec 2020 Jul 2018 Dec 2020 FDOT Roadway 4,5 SR 50 Avalon Park Blvd Chuluota Rd Prelim Design Dec 2017 TBD TBD FDOT Roadway 5 SR 50 Chuluota Rd SR 520 Design Dec 2017 TBD TBD Turnpike Roadway 5 SR 414/Maitland Blvd. I-4 Maitland Ave Design Oct 2015 TBD TBD FDOT Roadway 5 SR 417 Econlockhatchee Tr Orange County Line ruction TBD TBD TBD CFX Roadway 5 SR 408 SR 417 Alafaya Tr ruction Oct 2019 Oct 2017 Oct 2019 CFX Roadway 5 SR 408 Extension SR 50 SR 520 PD&E Jul 2018 TBD TBD CFX Roadway 6 SR 408 Good Homes Rd Hiawassee Rd ruction Aug 2018 TBD TBD CFX Roadway 6 SR 435 (Kirkman Rd) N of SR 482 S of 408 Design Mar 2019 TBD TBD FDOT Roadway 6 SR 482 (Sand Lake Rd) W. of International Dr Universal Blvd ruction Jun 2020 Oct 2016 Jun 2020 FDOT Roadway 6 SR 482 (Sand Lake Rd) W. of Universal Blvd W. of John Young Pkwy ruction Jun 2020 Jul 2017 Jun 2020 FDOT Roadway 6 SR 482 (Sand Lake Rd) W. of John Young Pkwy E. of Florida Turnpike (Interchange) ruction Jun 2020 Oct 2016 Jun 2020 FDOT Roadway 6 SR 50 (Colonial Dr) SR 500/US 441/17-92 Shine Ave ruction Jun 2017 Jun-16 Jun-17 FDOT Roadway 6 SR 408 Widening Good Homes Rd E. of Hiawassee Rd Design Dec 2015 Jun 2016 May-17 CFX Information displayed on this page originates from the Florida Department of Transportation, the Turnpike Enterprise and the Central Florida Expressway Authority. 1 of 1

Roadway Capital Improvement Program Public Works Engineering and Highway Construction February 2018 Monthly Report

Roadway Capital Improvement Program Public Works Engineering and Highway Construction February 2018 Monthly Report Public Works Engineering and Highway ruction TYPE DIST NAME LOCATION % ADA 5 Arbor Ridge 100 Jan 2018 Jan 2018 Jan 2018 J. Naditz ADA 3 Bumby & Raeford 100 Jan 2018 Jan 2018 Jan 2018 J. Naditz ADA 6 Canada

More information

Orange County, Florida Public Works Department's 10-Year Roadway Program

Orange County, Florida Public Works Department's 10-Year Roadway Program Project Name 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Alafaya Tr (Avalon Park Bv to Mark Twain Bv) 5062 Right-of-Way Acquisition 5062 Construction All American Bv (Edgewater Dr to Forest City

More information

TRANSPORTATION ELEMENT. (Section 9J-5.019) GOALS, OBJECTIVES POLICIES

TRANSPORTATION ELEMENT. (Section 9J-5.019) GOALS, OBJECTIVES POLICIES TRANSPORTATION ELEMENT (Section 9J-5.019) GOALS, OBJECTIVES GOAL 1 To facilitate a balanced multi-modal transportation system that encourages increased mobility options, and provides for energy efficient

More information

MetroPlan Orlando Travel Time Study & Benefit Cost Analysis

MetroPlan Orlando Travel Time Study & Benefit Cost Analysis GMB Engineers & Planners, Inc. & MetroPlan Orlando MetroPlan Orlando Travel Time Study & Benefit Cost Analysis Travel Time Studies and Benefit Cost Analysis for Signal Retiming Projects covering Orange,

More information

DRAFT SR 429 & CR 435 INTERCHANGE STUDY. Prepared For: Florida Department of Transportation District Five

DRAFT SR 429 & CR 435 INTERCHANGE STUDY. Prepared For: Florida Department of Transportation District Five DRAFT SR 429 & CR 43 INTERCHANGE STUDY Prepared For: Florida Department of Transportation District Five September 2, 24 Table of Contents Introduction... 2 Future Design Traffic Characteristics... 3 Future

More information

DIRECTIONS ARE FROM ESPN S WIDE WORLD OF SPORTS TM COMPLEX

DIRECTIONS ARE FROM ESPN S WIDE WORLD OF SPORTS TM COMPLEX ESPN s Wide World of Sports Complex HP Fieldhouse (COURTS 1-6) Jostens Center (COURTS 7-12) Page 1 700 South Victory Way Kissimmee, FL 34747 (407) 828-3267 Traveling Westbound on I-4 Take I-4 to exit 65/old

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North

More information

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Florida Department of TRANSPORTATION 2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Mike Dew, Secretary FLORIDA S CONTINUED GROWTH Florida has currently

More information

Frequently Asked Questions

Frequently Asked Questions Why is this roadway needed? Can't SR 50, University Boulevard and Aloma Avenue be widened instead of building this road? The need for this roadway was identified and determined through the East Orange

More information

7.0 Preferred Alternative with Service Road Concept

7.0 Preferred Alternative with Service Road Concept .0 Preferred Alternative with Service Road Concept This section evaluates the traffic operations for all of the study years for the Build conditions as related to the Preferred Alternative with Service

More information

DIRECTIONS ARE FROM DISNEY S WIDE WORLD OF SPORTS TM COMPLEX

DIRECTIONS ARE FROM DISNEY S WIDE WORLD OF SPORTS TM COMPLEX PAGE ONE Disney s Wide World of Sports Complex Milkhouse (COURTS 1-6) Jostens Center (COURTS 7-12) 700 South Victory Way Kissimmee, FL 34747 (407) 828-3267 Traveling Westbound on I-4 Take I-4 to exit 65/old

More information

Technical Report 3: Plan Development & Cost Feasible Projects Adopted -January 2016 Updated August 2016

Technical Report 3: Plan Development & Cost Feasible Projects Adopted -January 2016 Updated August 2016 2040 Long Range Transportation Plan Technical Report 3: Plan Development & Cost Feasible Projects Adopted -January 2016 Updated August 2016 315 East Robinson Street, Suite 355, Orlando, FL 32801 407-481-5672

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 Rick Scott Governor Carlos Lopez-Cantera Lt. Governor Ryan E. Matthews Interim Secretary

More information

CFI TEAM AVAILABLE PROPERTIES

CFI TEAM AVAILABLE PROPERTIES Type Photo Location Bldg Northwest Orange County 3122 Shader Rd Center, Bldg 2 Available Properties for or Rate/ 82,137 C 20,162 2,016 April 1 Block 28 3 1 Class III Front - $5.75 NNN $1.20 End cap unit;

More information

CFI TEAM AVAILABLE PROPERTIES

CFI TEAM AVAILABLE PROPERTIES Type Photo Location Bldg Northwest Orange County 3122 Shader Rd Shader Industrial Park 2515 Shader Rd Center, Bldg 2 Available Properties for or Rate/ 82,137 C 20,162 2,016 Feb 1 Block 28 3 1 Class III

More information

2017 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON, AMELIA ISLAND August 10-13, 2017

2017 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON, AMELIA ISLAND August 10-13, 2017 Florida Department of TRANSPORTATION 2017 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON, AMELIA ISLAND August 10-13, 2017 Mike Dew, Secretary FLORIDA S CONTINUED GROWTH Florida has

More information

Jul y 18, L D C I t e m #8 S U M M A R Y. Overview. Existing Code Shortcomings

Jul y 18, L D C I t e m #8 S U M M A R Y. Overview. Existing Code Shortcomings Jul y 18, 2017 Staff Report to the Municipal Planning Board L D C 2 0 1 7-00230 I t e m #8 MAJOR THOROUGHFARE P LAN LDC REVISION S U M M A R Y Owner N/A Applicant City of Orlando Project Planner John Rhoades

More information

Orlando International Airport (MCO) transfers

Orlando International Airport (MCO) transfers Orlando International Airport (MCO) transfers The following are a list of the towns that are within the allowable radius of 50 miles to/from Orlando International Airport. Pricing for additional miles

More information

LIST OF PRIORITY PROJECTS 2020/ /35

LIST OF PRIORITY PROJECTS 2020/ /35 LIST OF PRIORITY PROJECTS 2020/21-2034/35 Adopted June 10, 2015 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information

October FREEWAY REPORT K-Factor Report Event Management Travel Time Reliability Average Speeds/Volumes Crash Report Data ARTERIAL REPORT

October FREEWAY REPORT K-Factor Report Event Management Travel Time Reliability Average Speeds/Volumes Crash Report Data ARTERIAL REPORT I N S I D E T H I S E D I T I O N FREEWAY REPORT K-Factor Report Event Management Average Speeds/Volumes Crash Report Data ARTERIAL REPORT Arterial Issues Arterial Equipment Status Preemption/TSP Throughput

More information

(This page intentionally left blank.)

(This page intentionally left blank.) (This page intentionally left blank.) LYNX 2030 VISION FINAL Technical Memorandum #5: Supporting and Circulator Networks Prepared for Central Florida Regional Transportation Authority (LYNX) 455 N. Garland

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five DISTRICT FIVE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Five. In fiscal years 2014 and 2015, current Turnpike projects total over $330

More information

LIST OF PRIORITY PROJECTS

LIST OF PRIORITY PROJECTS LIST OF PRIORITY PROJECTS THROUGH 2013/14 Adopted August 27, 2008 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part

More information

Orange County s Transportation Planning and Multimodal Corridor Plan

Orange County s Transportation Planning and Multimodal Corridor Plan Orange County Transportation Planning Division Orange County s Transportation Planning and Multimodal Corridor Plan Presentation to UCF LIFE November 11, 2014 Alissa Barber Torres, Ph.D., AICP, PLS Presentation

More information

UNFUNDED PRIORITY PROJECTS

UNFUNDED PRIORITY PROJECTS UNFUNDED PRIORITY PROJECTS THROUGH 2012/13 Adopted August 22, 2007 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part

More information

Technical Report 3: Plan Development & Cost Feasible Projects Adopted -January 2016 Updated June 2017

Technical Report 3: Plan Development & Cost Feasible Projects Adopted -January 2016 Updated June 2017 2040 Long Range Transportation Plan Technical Report 3: Plan Development & Cost Feasible Projects Adopted January 2016 Updated June 2017 315 East Robinson Street, Suite 355, Orlando, FL 32801 4074815672

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1 Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1 June 8, 2017 Meeting Agenda Study Overview Community Survey Existing Conditions Access Management Potential Safety Countermeasures Potential

More information

Waterford Lakes Small Area Study Report

Waterford Lakes Small Area Study Report Waterford Lakes Small Area Study Report Orange County District 4 Prepared for: Orange County Public Works Department Traffic Engineering Division 4200 S. John Young Parkway Orlando, FL 32839-9205 Prepared

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

I 595 Express Corridor Improvements Project. February 2014 Update

I 595 Express Corridor Improvements Project. February 2014 Update I 595 Express Corridor Improvements Project February 2014 Update PROJECT COMPONENTS Reversible Express Lanes Direct Connect to Florida s Turnpike Open Road Tolling SR 84 Continuous Connection Florida s

More information

Stormwater Management Division

Stormwater Management Division Stormwater Management Division Report Preparation By: Stormwater Management Division Staff M. Krishnamurthy Joe Walter Frank Fortunato Digital Rainfall Data can be obtained from: 4200 S. John Young Parkway

More information

2017 Progress Report 10/1/2016-9/30/2017

2017 Progress Report 10/1/2016-9/30/2017 Progress Report 10/1/2016-9/30/ Best Foot Forward for Pedestrian Safety Report for October 1, 2016 September 30, Annual Report Summary Best Foot Forward (BFF) s first enforcement operation launched in

More information

CARRIE WOODELL, MPA, CFCM, CPPO, C.P.M., CPPB, APP, 400 E

CARRIE WOODELL, MPA, CFCM, CPPO, C.P.M., CPPB, APP, 400 E PROCUREMENT DIVISION CARRIE WOODELL, MPA, CFCM, CPPO, C.P.M., CPPB, APP, Manager 400 E South Street 2 nd Floor * Reply To: Post Office Box 1393, Orlando, FL 32802-1393 PH: 407-836-5664 FAX: 407-836-5899

More information

Orlando Regional REALTOR Association Monday Morning Quarterback - 06/26/ /02/2011 Lake, Orange, Osceola & Seminole Counties

Orlando Regional REALTOR Association Monday Morning Quarterback - 06/26/ /02/2011 Lake, Orange, Osceola & Seminole Counties Monday Morning Quarterback - 6/6/ - 7// Sales Total 55 Under $5k Single Family Homes $K to $K 895 $K to $5K Short Sales / Bank Owned 8 Active Listings Short Sales / Bank Owned Months of Inventory,6,99

More information

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No. SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: 432639-1-22-02 ETDM No.: 14308 Newsletter 3 - March 2019 Incluye versión en español

More information

Gandy Connector: Travel Demand. Policy Committee August 2013

Gandy Connector: Travel Demand. Policy Committee August 2013 Gandy Connector: Travel Demand Policy Committee August 2013 What options to the Gandy Elevated Lanes exist? What are the current conditions? Who s using Gandy Blvd? What s currently planned? What s been

More information

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017 1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO

More information

Monday Morning Quarterback Summary

Monday Morning Quarterback Summary Summary Jun, 8 Single-family existing homes Sales of single-family homes increased to 7 during the week of Jun, from the week prior The median price of single family homes decreased to $6,, a change of

More information

Lee County Department of Transportation

Lee County Department of Transportation Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE New Updates & Revisions September 3 rd, through September 9 th, 2015

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE November 9 November 15, 2017 Update: 11/9/17 3:45 p.m. New Pass, Bridge

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

Hidden Oaks Elementary School

Hidden Oaks Elementary School Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street Welcome and Introduction Sign-in and comment sheets Restrooms and exits Meeting agenda and timeline Meeting goals / expectations Provide input to guide study recommendations Actively participate throughout

More information

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES Table 2: Non-Strategic Intermodal System (Non-SIS) Project Priorities FDOT Item- Phases

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

Brief Description of Construction Contact Department Letters. still in design tbd Drainage Chad Allen-Eng

Brief Description of Construction Contact Department Letters. still in design tbd Drainage Chad Allen-Eng Projects Report Starting Mar 05-11, 2018 Road Closures Shad Oaks at S. Woodrow Lane will be closed to install a turn lane between hours 8 P.M. and 6 A.M. beginning 03-12-18 to 04-13-2018. Lane Closures

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Over the last several years, the Waterford Lakes area has experienced increased congestion due to a substantial increase in residential and commercial development. The current Existing and Future Conditions

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

The current document is revised based on the comments received on:

The current document is revised based on the comments received on: General Overview 1 Introduction Over the last several years, the Waterford Lakes area has experienced increased congestion due to a substantial increase in residential and commercial development. The current

More information

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects Printed 6/9/15 Project I-4 - widen to 1 lanes (Managed Use Lanes) Part of the I-4 Beyond the Ultimate project SR 47 - widen from 4 to 6 lanes (including ramps) Saxon Blvd - ramp and roadway improvements

More information

Reams Road RCA Study. Board of County Commissioners Public Hearing

Reams Road RCA Study. Board of County Commissioners Public Hearing Reams Road RCA Study Board of County Commissioners Public Hearing April 24, 2018 Presentation Overview Study Overview Existing Conditions Development of Alternatives Preferred Alternative Public Involvement

More information

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II) Presentation to the CNRC Board of Directors Regular Meeting March 11, 2015 1 Agenda Preferred Alternate Refinement for University Avenue, 3rd Street, and Beverly Avenue Intersection Improvements validate

More information

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE Red denotes new funding in FDOT WP since last year. SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) DRAFT 2016 TRANSPORTATION PROJECT PRIORITIES FY 2017-FY 2021 A(1). STRATEGIC INTERMODAL SYSTEM

More information

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system Purpose + Need I-29 NW Barry Road 64/68/72 MAIN STREET Connect: < Strengthen the spine of our regional transportation system Leavenworth Road Parallel Parkway State Avenue 18th Street Expressway Shawnee

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

2. TRANSPORTATION ELEMENT.

2. TRANSPORTATION ELEMENT. 2. TRANSPORTATION ELEMENT. The purpose of this element is to assist in establishing an adequate transportation system within the City and to plan for future motorized and non-motorized traffic circulation

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Freeway ramp intersection study

Freeway ramp intersection study Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

2015 Reciprocal Clubs

2015 Reciprocal Clubs Audubon CC *Bear's Paw CC Bentley Village Bonita National Colony Bay Club Commons Club at the Brooks *Copperleaf at the Brooks Coral Oaks Golf Course Country Club of Naples Countryside G&CC Cross Creek

More information

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access COMMUNITY MEETING Project Update March 15, 2010 Purcellville, Virginia OVERVIEW Project need / objectives Project recap Design elements Proposed improvements Summary of project benefits / next steps PROJECT

More information

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare

More information

Osceola County Expressway Authority. Alternatives Public Meeting

Osceola County Expressway Authority. Alternatives Public Meeting Osceola County Expressway Authority Alternatives Public Meeting Alternatives Public Meeting Alternatives Public Meeting Wheelchair-Accessible Walkway this Way Wheelchair-Accessible Walkway this Way Contact

More information

West End Connectivity Master Plan

West End Connectivity Master Plan West End Connectivity Master Plan Office of Commissioner Juan C. Zapata District 11 Page 1 of 13 Juan C. Zapata MIAMI- DADE COUNTY COMMISSIONER Introduction I am pleased to announce the West End Connectivity

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun Jul

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax. ROAD WATCH UPDATE June 15, 2018

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax. ROAD WATCH UPDATE June 15, 2018 Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE June 15, 2018 New Update: Landscape: Lee County Department of Transportation

More information

Semoran Blvd. Transit Study. June 1, 2017 Gateway Guardian Public Safety Meeting Residence Inn, Orlando, FL

Semoran Blvd. Transit Study. June 1, 2017 Gateway Guardian Public Safety Meeting Residence Inn, Orlando, FL Semoran Blvd. Transit Study June 1, 2017 Gateway Guardian Public Safety Meeting Residence Inn, Orlando, FL I-4 Study Area 23 Miles along SR 436 Regional and gateway corridor Connects 7 jurisdictions 11

More information

Sloat Blvd. Pedestrian Safety Improvement Project

Sloat Blvd. Pedestrian Safety Improvement Project Sloat Blvd. Pedestrian Safety Improvement Project Department of Public Works Project team and background Budget Schedule Scope of work Sloat Blvd - Everglade Drive Sloat Blvd - Forest View Drive Sloat

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 17 August 23, 2017 Traffic Maintenance: Signal Maintenance Bonita

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE October 12 October 18, 2017 Gunnery Road and 8th Street SW Intersection

More information

Windy Ridge Elementary School

Windy Ridge Elementary School Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

COMMUNITY MEETING #1 Summary

COMMUNITY MEETING #1 Summary COMMUNITY MEETING #1 Summary October 26, 2016 LOCATION: TIME: ATTENDEES: Dr. Phillips High School Cafeteria 6500 Turkey Lake Road, Orlando, FL 32819 6:00 pm to 8:00 pm 79 citizens Commissioner Scott Boyd,

More information

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018 ^Lee County Jt Southwest T:[o ln Onaa Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE July 19 - July 25, 2018 Sanibel Bridge

More information

WELCOME. City of Eden Prairie West 70 th Street

WELCOME. City of Eden Prairie West 70 th Street WELCOME City of Eden Prairie West 70 th Street Project Schedule Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug >>> May WEST SEGMENT Concept Plan Fall 2014 Plan Development Winter 2014 Summer 2015 Construction

More information

2018 HR & PAYROLL Deadlines

2018 HR & PAYROLL Deadlines th (by payment date) EPAF 3rd PARTY FEEDS WTE Approval 2018 HR & PAYROLL s Normal Payroll day s 2017 B1-26 3 * 13-Dec-17 15-Dec-17 n/a n/a n/a 28-Dec-17 29-Dec-17 11:00 AM 16-Dec-2017 29-Dec-2017 JAN 2018

More information

City of Fairfax, Virginia City Council Work Session

City of Fairfax, Virginia City Council Work Session City of Fairfax, Virginia City Council Work Session Agenda Item # WS 4 City Council Meeting 10/03/2017 TO: FROM: SUBJECT: ISSUE(S): Honorable Mayor and Members of City Council Robert Sisson, City Manager

More information

SDForward.com/networks PHASE YEAR (IN ALL NETWORK CONCEPTS) ESTIMATED CAPITAL COSTS ($2018) MILLIONS* PROJECT NAME

SDForward.com/networks PHASE YEAR (IN ALL NETWORK CONCEPTS) ESTIMATED CAPITAL COSTS ($2018) MILLIONS* PROJECT NAME Bayshore Bikeway Segment 8B: Ada Street to Palomar Street $1.64 Border to Bayshore Bikeway $10.18 Central Avenue Bikeway $4.62 North Park/Mid-City Bikeways: Howard $8.42 North Park/Mid-City Bikeways: Monroe

More information

RIDE III PROPOSED PROJECTS. April 2015

RIDE III PROPOSED PROJECTS. April 2015 RIDE III PROPOSED PROJECTS April 2015 Resurface 100 Miles of Paved Roads RIDE III Pave 100 Miles of Dirt Roads 19 Hwy 9 East Hwy 701 N Widening Conway Perimeter Road Phase II 1 29 Forestbrook Rd SELL Hwy

More information

Study Update. October 11, 2017 FDOT District 5

Study Update. October 11, 2017 FDOT District 5 Study Update October 11, 2017 FDOT District 5 1 I-4 Study Area 23 Miles along SR 436 Regional and gateway corridor Connects 7 jurisdictions 11 LYNX routes along and 8 LYNX routes across the corridor 3

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018 Turnpike Projects in Palm Beach County Palm Beach TPA Update September 20, 2018 Agenda Background Funded Projects Future Project Status Widenings Interchanges Express Lanes Phasing 2 Background 45 Miles

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

[THIS PAGE INTENTIONALLY LEFT BLANK]

[THIS PAGE INTENTIONALLY LEFT BLANK] [THIS PAGE INTENTIONALLY LEFT BLANK] TRANSPORTATION ELEMENT TABLE OF CONTENTS Page INTRODUCTION... 1 PURPOSE AND SCOPE... 1 RELATIONSHIP TO OTHER ELEMENTS... 1 EXISTING CONDITIONS ANALYSIS... 2 ROADWAY

More information

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information Volusia Transportation Planning Organization CAC / TCC Project Update Tuesday, May 21, 2013 1 Presentation Outline PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018 BOERNE/KENDALL COUNTY TRANSPORTATION FORUM March 22, 2018 Frontage Road Operational Improvements 2 Frontage Roads Under Construction Fair Oaks Pkwy to Dominion I-10 - Fair Oaks Pkwy to FM 3351 Scope: Convert

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

T Table of Contents Crash Summary by Year and Condition Existing Travel Demand Characteristics... 43

T Table of Contents Crash Summary by Year and Condition Existing Travel Demand Characteristics... 43 T Table of Contents Introduction... 1 1.1 Report Purpose... 1 Existing Conditions... 3 2.1 Introduction to the Study Corridor... 3 2.2 Summary of Transportation Plans... 4 2.3 Land Use... 4 2.3.1 Existing

More information

CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant. February 5, 2013

CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant. February 5, 2013 CARTA East Cooper Transit Service Transportation Committee Town of Mount Pleasant February 5, 2013 Service Overview Study Overview East Cooper Service Analysis Provide additional analysis as a follow up

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY 7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Connectivity. Tier I (0-5 yrs) 44 Issues, Recommendations & Priorities. LENGTH (ft) APPROX COST NO. NAME & DESCRIPTION. Shared Use Path/ Urban Trail

Connectivity. Tier I (0-5 yrs) 44 Issues, Recommendations & Priorities. LENGTH (ft) APPROX COST NO. NAME & DESCRIPTION. Shared Use Path/ Urban Trail C1 Whitefish River - Kay Beller Park to BNSF Loop Extend the along the river between 2nd St and Railway St providing a key connection for multiple trail networks. Include a Bike Channel adjacent to stairs

More information

Project Advisory Group (PAG) Meeting #2 January 31, SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

Project Advisory Group (PAG) Meeting #2 January 31, SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street Project Advisory Group (PAG) Meeting #2 January 31, 2018 Welcome & Introductions AGENDA 1. Where are we at? 2. Project Survey / Virtual Comment Tool / PAG Meeting #1 / Visioning Workshop Corridor Map Exercise

More information

ITEM NUMBER: PROJECT DESCRIPTION:SR 8 (I-10) FROM W OF SR 10 (US 90) TO OCHLOCKONEE RIVER BR. *SIS*

ITEM NUMBER: PROJECT DESCRIPTION:SR 8 (I-10) FROM W OF SR 10 (US 90) TO OCHLOCKONEE RIVER BR. *SIS* PAGE 1 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 10/01/2014 ITEM NUMBER:218946 4 PROJECT DESCRIPTION:QUINCY LOOP NORTH FROM SR 12 TO CR268 SOLOMON DAIRY RD *NON-SIS* DISTRICT:03 COUNTY:GADSDEN TYPE

More information

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor

More information

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

Southwestern RPO Prioritization Local Input Points for Division Needs Funding H172327 US 19 Business paved shoulders; include bicycle lanes and sidewalks. Location: extends 0.9 miles from Junaluska Road in Andrews to US 19/74. $ 6,100,000 9.20 H090251-AC R-3622AC NC 294 (southern

More information