Osceola County Expressway Authority. Alternatives Public Meeting
|
|
- Arline Lynch
- 6 years ago
- Views:
Transcription
1 Osceola County Expressway Authority Alternatives Public Meeting
2 Alternatives Public Meeting
3 Alternatives Public Meeting
4 Wheelchair-Accessible Walkway this Way
5 Wheelchair-Accessible Walkway this Way
6 Contact Information Paul Cherry, P.E. Consultant Project Manager Kimley-Horn and Associates, Inc Wekiva Way, Suite 200 West Palm Beach, FL Ph: (561) Jeff Jones, AICP Executive Director Osceola County Expressway Authority 1 Courthouse Square Kissimmee, FL Ph: (407) osceolaxway@osceola.org
7 Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. To express concern(s), please contact the following: Vianed Aldebol Osceola County Expressway Authority 1 Courthouse Square, Suite 100 Kissimmee, FL Ph: (407) vianed.aldebol@osceola.org
8 PD&E Study Proposed Schedule ACTIVITY Begin Study Kickoff Meeting Public Input Develop Build Alternatives Alternatives Public Meeting Public Hearing No-Build and Build Alternatives Presented Recommended Alternative No-Build or Build Alternative is Recommended Study Complete Final Decision by OCX
9 2040 OCX Master Plan Osceola Parkway Extension O sceola Parkw ay 27 Poinciana Parkway I-4 Segment Poinciana Parkway NE Connector Expressway Southport Connector Expressway
10 BOGGY CREEK RD (NORTH) Alternatives Public Meeting 2012 Feasibility Study Corridors CORRIDOR A 0 1,000 2,000 Feet Orange County Osceola County BUENAVENTURA BLVD E OSCEOLA PKWY BOGGY CREEK RD (WEST) CORRIDOR C-1 GREAT OAKS BLVD MORNINGSIDE DR LAKE VISTA DR BOGGY CREEK RD (EAST) EAST LAKE RD FISH CAMP RD CORRIDOR B CORRIDOR C-2 CORRIDOR C TINDALL ACRES RD HILLIARD ISLE RD
11 No. Western Alternatives Alt. 1 Alt. 2 Alt. 3 Alt. 4 Alt. 5 1 Meets Purpose and Need of the project YES YES YES YES YES Provides a transportation system for future 2 development YES YES YES YES YES Directly impacts homes within Wyndham Lakes, 3 requiring relocations YES NO YES NO NO Directly impacts the Boggy Creek Enclave and 4 Ward Road PD (under construction) and homes on Ward Road YES YES NO NO YES Provides direct access to the Orlando Airport 5 from SR 417 Connector YES YES NO NO YES Requires service road on both sides of OPE to 6 provide property access NO NO YES YES NO 7 Community impacts HIGH HIGH HIGH HIGH LOW Wetland impacts HIGH HIGH HIGH HIGH HIGH Impacts to Boggy Creek waterway HIGH HIGH HIGH HIGH MODERATE Western Alternatives Matrix Conservation easement impacts HIGH HIGH HIGH HIGH HIGH Number of potential relocations Requires Ward Road intersection relocation YES YES YES YES NO Requires relocation and reconstruction of Boggy Creek Road NO NO YES YES NO Estimated construction/engineering cost $254,720,000 $279,380,000 $327,180,000 $339,870,000 $232,440,000 Estimated right of way cost $115,618,000 $69,165,000 $128,360,000 $91,265,000 $67,670,000 TOTAL WESTERN PROJECT COST $370,338,000 $348,545,000 $455,540,000 $431,135,000 $300,110,000
12 Central Alternative Matrix No. Consideration Central Alternative 1 1 Meets Purpose and Need of the project YES 2 Provides a transportation system for future development YES 3 Provides an interchange with Medical City Drive YES 4 Utilities available in the R/W within the Poitras property owned by City of Orlando and GOAA YES 5 Community Impacts MEDIUM 6 Scrub impacts MEDIUM 7 Number of residential relocations 1 8 Conservation easement impacts HIGH 9 10 Estimated construction/engineering cost $69,380,000 Estimated right of way cost $22,360, TOTAL CENTRAL PROJECT COST $91,740,000
13 Eastern Alternatives Matrix No. Eastern Alternatives Alt. 1 Alt. 2 Alt. 3 Alt. 4 Alt. 5 1 Meets Purpose and Need of the project YES YES YES YES YES 2 Provides a transportation system for future development YES YES YES YES YES 3 Desirable geometric alignment POOR POOR GOOD GOOD GOOD 4 Compatibility with Northeast District Master Plan POOR POOR GOOD GOOD GOOD Connectivity to Northeast Connector Expressway and eastern extension of Osceola Parkway POOR POOR GOOD GOOD GOOD Community impacts HIGH MEDIUM MEDIUM MEDIUM MEDIUM Wetland impacts within Split Oak NONE LOW LOW LOW MODERATE Wetland impacts outside of Split Oak HIGH HIGH MODERATE HIGH HIGH Scrub impacts LOW LOW MODERATE MODERATE HIGH Number of residential relocations Conservation easement impacts HIGH HIGH HIGH HIGH HIGH Passes through south portion of Eagle Creek Village currently zoned for conservation. YES YES YES YES YES Estimated construction/engineering cost $164,710,000 $156,850,000 $137,150,000 $158,570,000 Estimated right of way & mitigation cost $84,730,000 $84,550,000 $64,485,000 $64,200,000 TOTAL EASTERN PROJECT COST $249,440,000 $241,400,000 $201,635,000 $222,770,000 $158,960,000 $44,565,000 $203,525,000
14 190'± Typical Sec on Alterna ve Osceola Parkway Extension from Exis ng Osceola Parkway to the SR 417 Connector (Not a Tolled Facility) Proposed R/W 12' Shoulder 10' Paved 8' Shoulders 4' Paved 49' 24' 44' 24' 49' 190'± 12' Shoulder 10' Paved Proposed R/W
15 260 ± Typical Sec on Alterna ve Osceola Parkway Extension from SR 417 Connector to Narcoossee Road with Noise Barrier/Privacy Wall (Tolled Facility) Privacy Wall Option Noise Wall Option 15 Landscape Buffer Proposed L/A R/W 12 Shoulder 10 Paved 8 Shoulders 4 Paved 8 Shoulders 4 Paved /- 12 Shoulder 10 Paved 5 Proposed L/A R/W
16 400 ± Typical Sec on Alterna ve Osceola Parkway Extension from Narcoossee Road to Future Northeast Connector (Tolled Facility) Fence Fence Proposed R/W 26' 50' Multiuse Trail Transit Corridor Proposed L/A R/W 12' Shoulder 10' Paved 94' 24' 88' 24' 94' 400' +/- 8' Shoulders 4' Paved 12' Shoulder 10' Paved Proposed L/A R/W
17 250 ± Typical Sec on Alterna ve SR 417 Connector from Osceola Parkway Extension to SR 417 Within Ward Road Corridor (Tolled Facility) Fence Fence Proposed L/A R/W 12' Shoulder 10' Paved 8' Shoulders 4' Paved 8' Shoulders 4' Paved 60' 24' 84' 24' 60' 250'± 12' Shoulder 10' Paved Proposed L/A R/W
18 450 ± Typical Sec on Alterna ve SR 417 Connector from Osceola Parkway Extension to SR 417 (within Boggy Creek Road Corridor) Fence Fence Proposed R/W 12' Shoulder 5' Paved 12' Shoulder 10' Paved 102' 60' 24' 84' 24' 60' 102' Proposed Boggy Creek Frontage Road (Non-tolled) 36' 14' Proposed L/A R/W 8' Shoulders 4' Paved 8' Shoulders 4' Paved Expressway Connector (Tolled) 450'± 12' Shoulder 10' Paved Proposed L/A R/W 14' 36' Proposed Boggy Creek Frontage Road (Non-tolled) 12' Shoulder 5' Paved Proposed R/W
SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.
SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017 SR 9/I-95 Interchange at PD&E Study Presentation
More informationMDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida
MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida Citizens Advisory Committee Meeting March 13, 2018 ETDM NUMBER: 11482 MDX WORK
More informationPublic Involvement Kickoff Meeting. April 29, 2015
Public Involvement Kickoff Meeting April 29, 2015 Title VI Compliance The Florida Department of Transportation complies with various non-discrimination laws and regulations, including Title VI of the Civil
More informationPRFSC Feb 2017 Meeting Minutes
PRFSC Feb 2017 Meeting Minutes On Tuesday February 7,2017 PRFSC hosted Atlee Mercer, Chairman of the Osceola Expressway Authority as our guest speaker. He spoke on the topic of plans for future Poinciana
More informationMalabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)
Malabar Road (SR 514) PD&E Town of Malabar Briefing (July 17, 2017) 1 Agenda Project limits and briefing focus PD&E process and project status Public and agency project comments Review Recommended Alternatives:
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationTRANSPORTATION COMMISSION Agenda Staff Report
TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED
More informationState Road (S.R.) 61 (U.S. 319) FPID s and
State Road (S.R.) 61 (U.S. 319) FPID s 220496 2 22 01 and 219747 2 22 01 Crawfordville Highway Conceptual Design and Environmental Reevaluation May 6, 2014 END PROJECT PROJECT LOCATION/LIMITS Project Limits:
More informationPRESENTATION OUTLINE
November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL
More informationDIRECTIONS ARE FROM DISNEY S WIDE WORLD OF SPORTS TM COMPLEX
PAGE ONE Disney s Wide World of Sports Complex Milkhouse (COURTS 1-6) Jostens Center (COURTS 7-12) 700 South Victory Way Kissimmee, FL 34747 (407) 828-3267 Traveling Westbound on I-4 Take I-4 to exit 65/old
More informationFlorida Department of Transportation
RICK SCOT l GOVERNOR ~ ~~ Florida Department of Transportation 3400 West Commercial Boulevard Fort Lauderdale, Florida 33309-3421 ANANTH PRASAD, P.E. SECRETARY Mr. Joseph Baird County Administrator 1801
More informationSent via Addition of fence standards. If I can be of assistance, please contact me at
December 5, 2017 Sent via email: ronaldhood.clcfd@yahoo.com Ronald Hood Crescent Lakes Common Facilities District Board of Supervisors DEPARTMENT OF COMMUNITY DEVELOPMENT Dave Tomek Administrator Joe Johnston
More informationClearlake Road (State Road 501) Project Development & Environment (PD&E) Study
Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project
More informationFrequently Asked Questions
Why is this roadway needed? Can't SR 50, University Boulevard and Aloma Avenue be widened instead of building this road? The need for this roadway was identified and determined through the East Orange
More informationFor sale 20 ACRE PASTURE/HOME SITE
For sale 20 ACRE PASTURE/HOME SITE Indiantown, fl 3500 SW CORPORATE PKWY, SUITE 202 PALM CITY, FL 34990 772 287-4690 - 772 287-9643 (Fax) PROPERTY INFORMATION LOCATION: SW Fox Brown Road Indiantown, FL
More informationDiamond Springs Parkway Project
Diamond Springs Parkway Project Public Information Meeting, Monday, March 18, 2013 330 Fair Lane, Building A, Placerville County Board of Supervisors Meeting Room, 6:30 8:00 p.m. PRESENTED BY: County of
More information3.0 Future Conditions
3.0 Future Conditions In order to be able to recommend appropriate improvements to the transportation system of the Town, it is important to first understand the nature and volume of traffic that is expected
More informationCFI TEAM AVAILABLE PROPERTIES
Type Photo Location Bldg Northwest Orange County 3122 Shader Rd Center, Bldg 2 Available Properties for or Rate/ 82,137 C 20,162 2,016 April 1 Block 28 3 1 Class III Front - $5.75 NNN $1.20 End cap unit;
More informationBoard of Supervisors February 27, 2017
: Traffic Analysis Results & Draft Conceptual Plan Board of Supervisors February 27, 2017 Transportation Solutions Building Better Communities Presentation Overview Background Summary of Traffic Analysis
More informationSR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.
SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: 432639-1-22-02 ETDM No.: 14308 Newsletter 3 - March 2019 Incluye versión en español
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More informationLIST OF PRIORITY PROJECTS 2020/ /35
LIST OF PRIORITY PROJECTS 2020/21-2034/35 Adopted June 10, 2015 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part
More informationCFI TEAM AVAILABLE PROPERTIES
Type Photo Location Bldg Northwest Orange County 3122 Shader Rd Shader Industrial Park 2515 Shader Rd Center, Bldg 2 Available Properties for or Rate/ 82,137 C 20,162 2,016 Feb 1 Block 28 3 1 Class III
More informationRoundabout Feasibility Memorandum
Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01
More information7.0 Preferred Alternative with Service Road Concept
.0 Preferred Alternative with Service Road Concept This section evaluates the traffic operations for all of the study years for the Build conditions as related to the Preferred Alternative with Service
More informationUNFUNDED PRIORITY PROJECTS
UNFUNDED PRIORITY PROJECTS THROUGH 2012/13 Adopted August 22, 2007 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part
More informationDIRECTIONS ARE FROM ESPN S WIDE WORLD OF SPORTS TM COMPLEX
ESPN s Wide World of Sports Complex HP Fieldhouse (COURTS 1-6) Jostens Center (COURTS 7-12) Page 1 700 South Victory Way Kissimmee, FL 34747 (407) 828-3267 Traveling Westbound on I-4 Take I-4 to exit 65/old
More informationUS 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)
US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations
More information12/13/2018 VIA
12/13/2018 VIA EMAIL Daniel Abbes, Assistant Planner City of Sacramento community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: Bruceville Apartments (P18-073) Dear Mr.
More informationFM #: ETDM #: 11241
SR 826/Palmetto Expressway PD&E Study From SR 93/I 75 to the Golden Glades Interchange FM #: 418423 1 22 01 ETDM #: 11241 Agency/ Kick Off Meeting October 27, 2011 2 Location Map From SR 93/I 75 to Golden
More informationWELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.
City of Carlsbad Pedestrian Master Plan: WELCOME WELCOME Please Sign In Provide Input at Flip Charts Review Boards Presentation of Draft Plan Thank you for joining us at the Second Public Workshop for
More informationDeLand. DeBary. Sanford/SR 46. Lake Mary. Longwood Altamonte Springs. Maitland. Winter Park/Park Avenue
P DeLand system map 2-hour off-peak service in each direction Up to 3-car train set 30-minute peak service in each direction from: 5:30 am 8:30 am 3:30 pm 6:30 pm P DeBary P PHASE 2 Sanford/SR 46 P Lake
More informationLIST OF PRIORITY PROJECTS
LIST OF PRIORITY PROJECTS THROUGH 2013/14 Adopted August 27, 2008 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part
More informationThis chapter describes the proposed circulation system and transportation alternatives associated with
5.0 Circulation 5.1 OVERVIEW This chapter describes the proposed circulation system and transportation alternatives associated with West Landing, and summarize the information contained in the Existing
More informationPublic Hearing October 21, 2014 University of North Florida Adam W. Herbert University Center Alumni Drive Jacksonville, FL 32224
- Project Development & Environment Study from SR 9B to SR 202 (JTB Blvd.) Duval County, Florida Financial Project ID: 209301-3-22-01 Public Hearing October 21, 2014 University of North Florida Adam W.
More informationSW Citrus Boulevard and SW 69 th Street Palm City, FL Located just South of the I-95 Overpass on the West side of SW Citrus Boulevard
LOCATION: SW Citrus Boulevard and SW 69 th Street Palm City, FL 34990 Located just South of the I-95 Overpass on the West side of SW Citrus Boulevard SIZE: 166.89+/- Acres FRONTAGE: 1,766 feet on SW Citrus
More informationJoshua Jester, E.I., Florida Department of Transportation, District One
MEMORANDUM To: From: Joshua Jester, E.I., Florida Department of Transportation, District One Michael Garau, P.E., Kimley-Horn and Associates, Inc. Date: October 5, 2018 Subject: at Gulfstream Avenue Intersection
More informationPhone: Fax: Project Reference No. (to be filled out by MassHighway):
Massachusetts Highway Department District 3 Project Need Form (PNF) This form is intended to provide preliminary information about the proposed project. It is not expected that all information that is
More informationBicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)
Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed
More informationSECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED
2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION The City of Starke is currently a bottleneck for traffic traveling along U.S. 301 in Bradford County. Local urban traffic combined with increasing
More informationPROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia
PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1
More informationI-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.
RIDGELAND AVE OAK PARK AVE AUSTIN BLVD UP-RR BRC-RR ASHLAND AVE Study Area Map I-290 Phase I Study Area 294 UP RR Metra UP-W Illinois Prairie Path 38 Berkeley WOLF RD Hillside MANNHEIM RD Bellwood 290
More informationODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #
More informationSarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016
All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan
More informationExit 13/Golden Triangle Study FREQUENTLY ASKED QUESTIONS
FREQUENTLY ASKED QUESTIONS How will you improve traffic in the Golden Triangle? One main goal of this study is to examine the current traffic patterns of the area and propose ways to improve the traffic.
More informationUS 1 Express Lanes Public Kick-Off Meeting
US 1 Express Lanes Project Development & Environment (PD&E) Study Public Kick-Off Meeting September 7 & 8, 2011 Miami Dade County, Florida 1 Presentation Agenda Introduction to MDX Background to PD&E studies
More informationPreliminary Engineering Study
Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationSan Tomas Expressway
Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San
More informationMcLEAN CITIZENS ASSOCIATION
McLEAN CITIZENS ASSOCIATION RESOLUTION DULLES RAIL SUPPLEMENTAL EIS With ATTACHMENT A - PEDESTRIAN AND BICYCLE ACCESS ISSUES DULLES CORRIDOR RAIL STATIONS IN TYSONS CORNER (Charts - 7 pages) Approved by
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More informationWELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018
WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis
More information2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage
2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000
More informationProject Development & Environment (PD&E) Study Public Hearing January 12 th, 2006
Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006 Public Hearing Regulations Chapter 23 of United States Code 128 Title 40 of the Code of Federal Regulations Parts 1500
More informationCity of Moorhead Committee of the Whole Meeting
City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview
More informationEnvironmental Assessment Findings & Recommendations. Public Hearing November 13, 2014
Environmental Assessment Findings & Recommendations Public Hearing November 13, 2014 Welcome! Welcome and Introductions Project and Environmental Assessment Overview Public Comments Adjourn Purpose of
More informationReams Road RCA Study. Board of County Commissioners Public Hearing
Reams Road RCA Study Board of County Commissioners Public Hearing April 24, 2018 Presentation Overview Study Overview Existing Conditions Development of Alternatives Preferred Alternative Public Involvement
More informationCentral Avenue Corridor Study FPID Number:
Central Avenue Corridor Study FPID Number: 437932-1-18-01 City Commission Presentation 1 March 27, 2018 Meeting Agenda 1. Introductions 2. Project Overview 3. Opportunity for Economic Development 4. Healthy
More informationState Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway
State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,
More informationPlanning & Zoning Commission
Preliminary Plat Westwood, Section 3 Planning & Zoning Commission Planning & Development Department March 21, 2016 Request Subdivide approximately 38.1 acres of previously unplatted property to create
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More informationSt. Francis Drive through the City of Santa Fe Corridor Study
VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City
More informationNEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING
NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING February 13, 2012 This regional transportation plan will: 1. Review existing plans for the cities and counties,
More informationChapter 7 Nonmotorized Facilities
Chapter 7 Nonmotorized Facilities What is in this chapter? This chapter discusses existing and proposed pedestrian and bicycle facilities referred to as nonmotorized facilities along the SR 520 corridor.
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationPublic Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018
Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road
More informationOrange County s Transportation Planning and Multimodal Corridor Plan
Orange County Transportation Planning Division Orange County s Transportation Planning and Multimodal Corridor Plan Presentation to UCF LIFE November 11, 2014 Alissa Barber Torres, Ph.D., AICP, PLS Presentation
More informationOrange County, Florida Public Works Department's 10-Year Roadway Program
Project Name 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Alafaya Tr (Avalon Park Bv to Mark Twain Bv) 5062 Right-of-Way Acquisition 5062 Construction All American Bv (Edgewater Dr to Forest City
More informationAppendix B. Transportation Analysis. B.1 Summary. East Nassau Employment Center DSAP
Appendix B Transportation Analysis B.1 Summary This report presents the transportation analysis completed for the East Nassau Community Planning Area (ENCPA). The ENCPA is defined as 24,000 acres in Nassau
More informationAlternatives Public Workshop
US 1 Express Lanes Project Development & Environment (PD&E) Study Alternatives Public Workshop August 2013 1 Today s Agenda Project Background and Overview Tier 1 Alternatives Development Tier 2 Decision-Making
More informationSliding Hill Road - Widening (UPC )
Sliding Hill Road - Widening (UPC 104957) Scored HB 2 Application Project Application ID: 434 General Project Information Project Title Sliding Hill Road - Widening (UPC 104957) Principal Improvement Highway
More informationR2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects
Printed 6/9/15 Project I-4 - widen to 1 lanes (Managed Use Lanes) Part of the I-4 Beyond the Ultimate project SR 47 - widen from 4 to 6 lanes (including ramps) Saxon Blvd - ramp and roadway improvements
More informationCongress Avenue. Palm Beach MPO Subcommittee Meetings December 2017
1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO
More informationPlant City Walk-Bike Plan
Plant City Walk-Bike Plan Plant City Commute Mode Share 2.2% 1.4% 2.9% Drove alone 10.2% Carpooled Public transportation (0.1%) Walked Used a Bike (0.4%) 82.9% Taxicab, motorcycle, or other means Worked
More informationMeeting Notes. PIM Meeting #1 CTH D Reconstruction Nenno Road to Canadian National Railroad Town of Wayne Washington County
Meeting Notes PIM Meeting #1 CTH D Reconstruction Nenno Road to Canadian National Railroad Town of Wayne Washington County Attendees: Date/Time: Location: See attached sign in sheet October 25, 2017; 6:00
More information6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand
6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION Bicycle and pedestrian travel along and in the vicinity of the corridor is part of the vision of Somerset and Hunterdon counties and the integrated
More informationPresentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information
Volusia Transportation Planning Organization CAC / TCC Project Update Tuesday, May 21, 2013 1 Presentation Outline PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact
More informationBULL CREEK RANCH 1,129± acres Osceola County, FL
enjoy WATERFRONT, RECREATION & beautiful old Florida scenery COME DISCOVER ENDLESS POSSIBILITIES ON BULL CREEK RANCH! Located in the heart of Osceola County s ranch country, Bull Creek Ranch offers all
More informationUS Route 4 Traffic and Pedestrian Improvement Project
Welcome to the public meeting for US Route 4 Traffic and Pedestrian Improvement Project June 5, 2018 Introduction Project Team Town of North Greenbush, Tony Germano, Town Comptroller Lou Desso, Town Supervisor
More informationMORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL WORK SESSION AUGUST 8, 2017
TOWN COUNCIL WORK SESSION AUGUST 8, 2017 ENGAGEMENT SUMMARY OPEN HOUSE #2 OPEN HOUSE #2 31 ATTENDEES! TRANSPORTATION RECOMMENDATIONS 2040 E+C MODELED CONGESTION Committed Projects Aviation Parkway Widening
More information3.9 Recreational Trails and Natural Areas
3.9 Recreational Trails and Natural Areas 3.9.1 Introduction Parks and other recreational facilities such as trails, bicycle routes, and open space are important community resources. This section discusses
More informationJANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO
JANUARY 2017 STUDY UPDATE Logan City, Cache Co., CMPO Purpose of the presentation To provide an update on the status of the Study To present the Study Purpose and Need To present the results of Level 1
More informationEXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP
EXISTING PRIORITIES FUNDED FOR CONSTRUCTION Limits Description Status 1 415489 3 H1865 US HWY 301 FROM SR 674 TO BALM RD Widen 2 lanes to 6 lanes divided County / Construction Programmed 2016 2 405492
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationFlorida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE
1 Florida Department of Transportation District Four I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE Presentation Outline Overview of Planning and Programming I-95 Interchange
More informationPublic Hearing Tarrant County. October 11 th, 2012
Public Hearing Tarrant County October 11 th, 2012 Public Hearing Agenda Welcome and Project Overview Ms. Maribel P. Chavez, P.E. District Engineer Texas Department of Transportation Fort Worth District
More information4.0 Recommended Transportation Plan
4.0 Recommended Transportation Plan The Town wants to provide a multi modal transportation system for its residents in order to provide them with options when making trips. The automobile has always been
More informationIntroduction Parks Open Space Standards Recreation & Open Space Land Use Design Principles
Chapter Seven: Parks, Recreation, & Open Space Chapter Seven: Parks, Recreation, & Open Space Introduction Parks Open Space Standards Recreation & Open Space Land Use Design Principles September 2008 Page
More information4.0 Recommended Transportation Plan
4.0 Recommended Transportation Plan The Town wants to provide a multi modal transportation system for its residents in order to provide them with options when making trips. The automobile has always been
More informationDonald Ballanti, Certified Consulting Meteorologist, Wind Impact Evaluation for the Menlo Park Facebook Campus Project, August 26, 2011.
3.4 WIND Introduction This section describes wind conditions in the Project area and at the Project site. This section provides a general discussion of the relationship between building design and wind
More informationAPPENDIX 9: TOP 25 PROJECT AREAS INFORMATION SHEETS
APPENDIX 9: TOP 25 PROJECT AREAS INFORMATION SHEETS County Location Municipality Type Length (miles) Cost Weber 23rd Street and Grant Ave Ogden, UDOT, UTA Bike lanes, cycle tracks, pedestrian improvements
More informationSECTION 3 STREET DESIGN
3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed
More informationTRANSPORTATION ELEMENT. (Section 9J-5.019) GOALS, OBJECTIVES POLICIES
TRANSPORTATION ELEMENT (Section 9J-5.019) GOALS, OBJECTIVES GOAL 1 To facilitate a balanced multi-modal transportation system that encourages increased mobility options, and provides for energy efficient
More informationTechnical Report 3: Plan Development & Cost Feasible Projects Adopted -January 2016 Updated August 2016
2040 Long Range Transportation Plan Technical Report 3: Plan Development & Cost Feasible Projects Adopted -January 2016 Updated August 2016 315 East Robinson Street, Suite 355, Orlando, FL 32801 407-481-5672
More informationDRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections
Roadway Cross-Sections Medford s roadway cross-section standards apply to new and reconstructed roads. The crosssections take into consideration roadway function and operational characteristics, including
More informationFY Candidate Sidewalk Projects. Sidewalk Advisory Committee
FY 16-17 Candidate Sidewalk Projects Sidewalk Advisory Committee Sidewalk Advisory Committee FY 16-17 Candidate Sidewalk Projects While a sidewalk request may be limited to part of a roadway, the initial
More informationChapter 4.3 Enterprise Elementary. Volusia County MPO. March Page 7.0
Chapter 4.3 Enterprise Elementary Enterprise, FL Volusia County MPO March 2008 Page 7.0 Volusia County MPO Bicycle and Pedestrian School Safety Review Study Introduction Enterprise Elementary School is
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five
DISTRICT FIVE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Five. In fiscal years 2014 and 2015, current Turnpike projects total over $330
More informationNorth Avenue Corridor Study
North Avenue Corridor Study Advisory Committee Meeting #6 July 1, 2014 Agenda Concept Revisions based on Advisory Committee feedback Review of New Concept Scoring & Costs Concept Discussion/Questions Voting:
More informationTrail Feasibility. 1. Introduction FINAL. October What s inside?
VOLUSIA COUNTY MPO CITY OF PORT ORANGE FINAL Trail Feasibility October 2006 What s inside? 1 Introduction 2 Project Purpose & Scope 3 Physical Inventory & Assessment of Right-of- Way 4 Trail Concept Plan
More information