Hong Kong Construction Week Health and Safety as an Enabler for Success: Lessons from London 2012

Size: px
Start display at page:

Download "Hong Kong Construction Week Health and Safety as an Enabler for Success: Lessons from London 2012"

Transcription

1 1

2 Hong Kong Construction Week Health and Safety as an Enabler for Success: Lessons from London 2012 Melodie Gilbert Head of ill health prevention - ODA Senior Partner, Park Health & Safety Partnership 2

3 260Ha complex, contaminated site in an urban area 3

4 That temporarily became. 4

5 Creating the largest new urban park in Europe for 150 years 5

6 April

7 Cleaning 2m tonnes of soil to prepare the site 7

8 13km of tunnels for underground power lines 8

9 2 in every 3 spent on infrastructure 9

10 Large temporary structures and temporary seating 10

11 Iconic buildings challenging to construct 11

12 Venues and Park on time and under budget 12

13 Building Europe s largest housing complex 13

14 Off Park Games and training venues - Legacy 14

15 15

16 London days of sport and culture 205 nations competing 17,000 athletes and officials 7.7 million tickets Four billion watching worldwide 800,000 daily on public transport Greatest show on earth! 16

17 Celebrating everyone's success 17

18 Timeline and current progress / / / Bid and Planning Demolish Dig Big Build Test events Olympic & Paralympic Games Deconstruction / Transformation Legacy 18

19 Relevance to All Projects Design Groundworks Infrastructure Buildings Landscaping Large project but range of sizes of contractors Legal framework Safety, health, well-being central to our effort 19

20 20

21 Themes 1. Planning 2. Leadership 3. Engagement 4. Health like Safety 21

22 Objective 1 To stage an inspirational Olympic Games and Paralympic Games for the athletes, the Olympic Family and the viewing public Existing BOA Sponsors British Olympic Foundation (BOF) London Assembly Community Engagement Group LSDC ondon Sustainable Development Commission) Visit London London Commercial Groups IOC (International Olympic Committee) IPC (International Paralympic Committee) IPSFs (International Paralympic Sports Federations) NPCs (National Paralympic Committees) NGBs (National Governing Bodies - Disability) BPA (British Paralympic Association) Objectives IFs (International Federations) NOCs (National Olympic Committees) NGBs (National Governing Bodies) Objectives Objective 3 To maximise the economic, social, health and environmental benefits of the Games for the UK, particularly through regeneration and sustainable development in East London TOP Sponsors (The Olympic Programme) GLA Local Sponsors 1. Partners 2. Supporters 3. Suppliers Media (Greater London Authority) BOA (British Olympic Association) 2.7 Deliver a viable London Olympic Institute Objectives 4.1 Secure UK Olympic and Paralympic athletes success in the Games 4.9 Promote, through sport, the Olympic ideals across the 2012 programme 3.2 Maximise the economic, social, health and environmental benefits the Games bring to London and all Londoners Maximise the employment and skills benefits for Londoners arising from Games-related business Maximise the wider economic benefits of the Games to London, including those for tourism and business promotion Maximise cultural benefits to Londoners from hosting the Games and the Cultural Olympiad Maximise social benefits to Londoners, including in health, education and volunteering, of hosting the Games Ensure that the Games contribute to Sustainable Communities priorities, including the London Thames Gateway Agree and promote sustainable development and procurement policies, including commitments to sustainable energy and waste management goals Promote London s image as a leading world city to an international audience Ensure London s diverse communities are engaged with and benefit from changes and opportunities arising from hosting the Games in London 4.5 Maximise increase in London participation at community and grassroots level in all sport and across all groups 4.7 Implement viable legacy use for Olympic sports facilities in London LDA BOA Board and NOC London Development Agency Olympic Opportunity Team (OOT) LOCOG Board LOCOG (London Organising Committee of the Olympic and Paralympic Games) 1.1 Deliver an inspirational environment and experience for athletes and provide a first class experience for the Olympic family and spectators 1.2 Meet IOC and IPC needs and specifications, including venue overlays 1.3 Ensure effective and efficient planning and operation of the Olympic and Paralympic Games (including security, transport, technology, health, volunteering and accessibility) 1.4 Maximise audience size at venues 1.5 Secure support and engagement across all sections of the UK public 1.6 Deliver effective media presentation and maximise global audience size 1.7 Communicate Olympic values across the world, particularly amongst young people 1.8 Stage inspiring ceremonies and cultural events 1.9 Deliver an operating surplus from the Olympic Games and Paralympic Games 1.10 Operate sustainable and environmentally responsible Olympic Games and Paralympic Games Commission for a Sustainable London 2012 (CSL) OBSG Sustainability Group Executive Management Board Olympic Communications Group (OCG) Lord Moynihan Boris Johnson London Coordination Working Group (LCWG) The Five Boroughs Greenwich Hackney Newham Tower Hamlets Waltham Forest All other London Boroughs Lord Coe Programme Vision Nations and Regions Group (NRG) Objectives Olympic Board Steering Group LDA London Development Agency Olympic Land Team (OLT) 2.1 Assemble and remediate land for Games venues ODA (Olympic Delivery Authority) 2.2 Create infrastructure and facilities associated with Games venues to time and agreed budget in accordance with the principles of sustainable development 2.3 Deliver Olympic and Paralympic venues to time, to design and building specification and to agreed budget, providing for agreed legacy use 2.5 Deliver necessary transport infrastructure for Games, and devise and implement effective transport plans which provide for legacy use 2.6 Deliver agreed sustainable legacy plans for the Olympic Park and all venues John Armitt Olympic Board (OBSG) Provide the Olympic Board with collective advice and assurance on the progress of the Olympic Programme Take decisions on cross stakeholder issues, where appropriate, and refer more important matters to the Olympic Board for decision GOE Sports Venues Legacy Group (OB) Legacy Owners / Operators e.g. LVRPA Lea Valley Regional Park Authority UEL University of East London UDC Urban Development Corporation PMO VERSION JUNE 2008 DRAFT Olympic Projects Review Group (OPRG) To host an inspirational, safe and inclusive Olympic and Paralympic Games and leave a sustainable legacy for London and the UK Olympic Park Senior Officers Group OB/ OBSG Secretary Olympic Park Regeneration Steering Group Tessa Jowell Olympic Programme Managers Network (OPMN) Regional Development Agencies Regional Sports Boards Sport England Sports Council Northern Ireland Sports Council Wales Sport Scotland Olympic Security Directorate Partnerships UK English Partnerships GOE OB/OBSG Oversight and Assurance ODA Planning Committee ODA Board OLD (Olympic Lottery Distributor) Objectives UK Sport Objective 2 To deliver the Olympic Park and all venues on time, w agreed budget and to specification, minimising the cal public funds and providing for a sustainable legacy Programme Board CLM (Delivery Partner) SCDL (Stratford City Developments Limited) DCMS Board DCMS (GOE) Dept for Culture, Media & Sport - Government Olympic Executive 2.4 Secure smooth flow of public funds to the ODA 3.1 Maximise the economic, social, health and environmental benefits the Games bring to the UK and all sections of the UK population Maximise the employment and skills benefits for the UK arising from Games-related business Maximise the wider economic benefits of the Games across the UK, including those for tourism and business promotion Maximise cultural benefits from hosting the Games and the Cultural Olympiad Maximise social benefits, including in health, education and volunteering, of hosting the Games Ensure that the Games contribute to Sustainable Communities priorities, including the wider Thames Gateway Agree and promote sustainable development and procurement policies, including commitments to sustainable energy and waste management goals Promote positive images of the UK to an international audience Ensure the UK s diverse communities are engaged with, and benefit from, changes and opportunities arising from hosting the Games in the UK 4.2 Maximise British athlete success in the Olympic and Paralympic Games through investing funds in, and supporting, our most talented athletes 4.3 Secure long-term benefits to elite sport competitors particularly in Olympic and Paralympic sports 4.4 Maximise increase in UK participation at community and grass-roots level in all sport and across all groups 4.6 Implement viable legacy use for Olympic sports facilities outside London 4.8 Work with those in other countries, particularly those in development, to promote sport excellence and participation MPS (Metropolitan Police Service) BLL Village (Bovis Lend Lease) Home Office Construction Delivery Construction Industry Construction Contractors Designers Legacy Trust UK Arts Councils Visit Britain BBC ED(OPG) Economic Development (Olympic and Paralympic Games) Funders Group NAO (National Audit Office) Transport Delivery Partners Transport for London (TfL) Network Rail British Airports Authority (BAA) Highways Authority (HA) Tubelines Cabinet Office Parliament ONS (Office of National Statistics) Df (Department f DCM (Department for & Sp CL (Communitie Govern HM Tre D (Departmen DC (Department Schools an De (Department fo Food and R FC (Foreig Commonwe Oth Govern Depart (Offic C PAC (Public Accoun Committee) Objective 4 To achieve a sustained improvement in UK sport be during and after the Game both elite performance particularly in Olympic a Paralympic sports an grassroots participation 22

23 Organisational Structure IOC BOA GLA LOCOG GOVT Olympic Board LOCOG Olympic Delivery Authority Delivery Partner Supply Chain 23

24 Enabling The steps to a better job Designing out risks Planning the work Health and safety Supervision Effective management 24

25 Enabling Reducing risk = certain outcomes No surprises, no disruption Keep the work flowing Recruitment and retention Reputation of all concerned 25

26 Enabling Defining Health and Safety Tell me what you want to do, want to achieve working together we ll work out how to do it safely and without risk to health. That s modern Health and Safety. The ODA build for London 2012 was on time, on budget and high quality. 26

27 ODA Standards 27

28 Leadership Programme SH&E Leadership Team (SHELT) ODA Delivery Partner Senior Executives Project Directors (Tier 1s) Project Leadership Teams Supply Chain and Project Managers 28

29 Leadership Programme SHELT I belong to the team that will create the healthiest, safest and greenest Olympic and Paralympic Games 29

30 30

31 Common Standards Increase standardisation on good practice Describe purpose and expectation Subject / topic specific Identified from good practice or from incidents Set minimum requirements 31

32 Visual Standards 32

33 Worker Engagement Every available mechanism HS&E Standard requires arrangements on every project inc. TU recognition Inductions Daily Activity Briefings (DABs) mandatory Safety Stand-downs Take time for safety Management and Supervision - contact Verbal and written communications Climate Survey for feedback and action Issue of Trust 33

34 34

35 Culture Climate Survey Project action plans Near miss reporting Behaviours 35

36 Worker Engagement Reward and Recognition Breakfast Vouchers, Badges, etc etc You said, we did boards Supervisors Course badges, posters Annual Awards 36

37 37

38 Safety Performance 80M hours worked 30 periods of > 1M hours without a reportable injury 2 periods of > 3M hours without a reportable injury 5 periods of > 2M hours without a reportable injury British Safety Council Sword of Honour AFR is lower than all-uk employment AFR is 1/3 construction level 1 case of reportable ill health 38

39 HEALTH 39 11th March Oct 08 39

40 Extent of the challenge Internationally we kill just short of 2 million people yearly through work related ill health 1 death every 10 minutes Based on figures published by ILO in

41 The Nature of Construction High mortality - High hazard industry Large burden of occupational illness Safety understanding and performance increasing Knowledge and understanding of occupational health still poor 41

42 If you always do, what you ve always done Health perceived as difficult compared with other topics Latency - causes not obvious Interventions not perceived as easy Traditional approach - domain of the medical profession Nurse led Central first aid room Reactive service Focussed on the worker 42

43 The Challenge...we need to break the chain 43

44 A New Vision and Strategy Managing the impact of work on health through an occupational hygiene led workplace focussed ill health prevention programme Managing the impact of health on work through a nurse led worker focussed clinical service Promoting wellbeing by using the workplace as a venue to promote healthy lifestyles 44

45 Workplace - Health Risk Register 45

46 WORKPLACE keep it simple RAG systems Enabling safe handling of contaminated land Enabling quieter operations to be carried out away from high noise levels 46

47 Workplace measurable outcomes Health Impact Frequency Rating AFR = safety, EIR = environment, health Health impacts not near miss/not accident or incident? Fatality Occupational Disease Signs of Ill-health Health Impacts 47

48 Workplace auditing improvements Occupational Health Maturity Matrix A maturity rating and specific implementation plan to drive occupational health improvement 48

49 Worker - emergency response Rapid emergency response is vital within the first 10 minutes Coordinated site wide response Nurses with A&E skills Signed agreement with London Ambulance Service Only 25% of all site call outs referred 49

50 Worker - clinical services Health Surveillance Pre-placement screening Safety Critical Medical Questionnaire D&A Testing Treatment Service 50

51 Wellbeing Quarterly themes, monthly campaigns Excellent comms materials Always delivered as outreach Always a worker and workplace focus Lifestyle screening Health promotion Linked with safety 51

52 Independent Evaluation Detailed cost-benefit analyses show that the net cost of OH was less than zero! Clinical service 1 invested : 5.96 saved in reduced production costs Preventative service 1 invested : 7.27 saved in reduced sickness absence Case studies saved production costs: From 1 spent : 65 saved to 1 spent : 238 saved 52

53 Summary SAFETY Leadership:- Define what good looks like Enabling: - Strategies that stand up to scrutiny Use every avenue for worker engagement Remember the power of reward and recognition HEALTH Risk management drives the process - health like safety Health surveillance is a monitoring tool not a solution in itself Simple outputs that empower people to make the right choices Scalable and Affordable - not one size fits all 53

54 Learning Legacy Independent evaluations Case studies Tools and products 54

55 55

2012 Olympic and Paralympic Games: The Transport Security Challenge. London TravelWatch 6 th

2012 Olympic and Paralympic Games: The Transport Security Challenge. London TravelWatch 6 th 2012 Olympic and Paralympic Games: The Transport Security Challenge London TravelWatch 6 th th July 2010 Stephen Thomas Assistant Chief Constable The Games Contents The Transport Challenge Summer of Celebration

More information

London 2012 Olympic and Paralympic Games : Legacy

London 2012 Olympic and Paralympic Games : Legacy London 2012 Olympic and Paralympic Games : Legacy Sir Jonathan Stephens KCB Former Permanent Secretary, Department for Culture, Media and Sport (DCMS) Day Month Year Name job title Olympic and Paralympic

More information

London Organising Committee of the Olympic Games and Paralympic Games. 14 June 2010

London Organising Committee of the Olympic Games and Paralympic Games. 14 June 2010 London Organising Committee of the Olympic Games and Paralympic Games 14 June 2010 London 2012 Olympic and Paralympic Games Volunteer Protocol Title This document shall be known as the London 2012 Olympic

More information

London March Donna Taylor Head of Accommodation. 13th

London March Donna Taylor Head of Accommodation. 13th London 2012 13th March 2008 Donna Taylor Head of Accommodation The Olympic and Paralympic Games An event like no other An exceptional set of associated values A unique opportunity to be involved in making

More information

Procuring the Games. A review of LOCOG s procurement. January Published by the Commission for a Sustainable London

Procuring the Games. A review of LOCOG s procurement. January Published by the Commission for a Sustainable London Procuring the Games A review of LOCOG s procurement January 2010 Published by the Commission for a Sustainable London 2012 www.cslondon.org Introduction RAG Status: Green 1 Aim of the review 1.1 The Commission

More information

ADDRESS TO THE FOUNDATION FOR SCIENCE AND TECHNOLOGY JULY 9

ADDRESS TO THE FOUNDATION FOR SCIENCE AND TECHNOLOGY JULY 9 ADDRESS TO THE FOUNDATION FOR SCIENCE AND TECHNOLOGY JULY 9 Rt Hon Tessa Jowell MP Minister for Olympics and London Introduction Earlier this month I visited Vancouver, host city for the 2010 Winter Olympics.

More information

School Games EXECUTIVE SUMMARY YEAR 1 August 2012

School Games EXECUTIVE SUMMARY YEAR 1 August 2012 School Games EXECUTIVE SUMMARY YEAR 1 August 2012 1 EXECUTIVE SUMMARY Background The School Games is a competitive school sport programme designed to motivate and inspire millions of young people across

More information

London 2012 Olympics The Green Build. Rachel Krzeminski Aggregate Industries UK Ltd

London 2012 Olympics The Green Build. Rachel Krzeminski Aggregate Industries UK Ltd London 2012 Olympics The Green Build Rachel Krzeminski Aggregate Industries UK Ltd Aggregate Industries UK Ltd Aggregate Industries is an international aggregates, construction and building materials group

More information

Strategic Plan Update

Strategic Plan Update Archery GB 2017 Membership Conference The Future of our Sport Strategic Plan Update 2016-2020 Neil Armitage Chief Executive Vision Achieve. Grow. Believe. Mission Lead, grow and promote archery to create

More information

PSA Delivery Agreement 22:

PSA Delivery Agreement 22: PSA Delivery Agreement 22: Deliver a successful Olympic Games and Paralympic Games with a sustainable legacy and get more children and young people taking part in high quality PE and sport October 2007

More information

2013 BALFOUR BEATTY LONDON YOUTH GAMES

2013 BALFOUR BEATTY LONDON YOUTH GAMES BALFOUR BEATTY LONDON YOUTH GAMES ANNUAL REPORT 201 3 CONTENTS CHAIRMAN S INTRODUCTION Page 2 FACT AND FIGURES OVERVIEW Page 3 LONG-TERM STRATEGY Page 4 BUILDING THE PATHWAY Page 5 VOLUNTEERING Page 6

More information

Bringing projects to life

Bringing projects to life Bringing projects to life James Bulley, Paul May and Jonathan Branson played a key role in leading the delivery and operation of our venues for the London 2012 Games. They gave me complete confidence that

More information

2015/16 Annual review of Sport and Recreation New Zealand

2015/16 Annual review of Sport and Recreation New Zealand 2015/16 Annual review of Sport and Recreation New Zealand Report of the Government Administration Committee Contents Recommendation 2 Introduction 2 Financial performance 2 The Rio de Janeiro Olympics,

More information

WINNER S CASE STUDY. BNFL Award 2012 Olympic Delivery Authority

WINNER S CASE STUDY. BNFL Award 2012 Olympic Delivery Authority Category Winner BNFL Award 2012 Olympic Delivery Authority Sponsor Overview London s successful bid for the 2012 Olympic and Paralympic Games created the need for a major regeneration and construction

More information

MINISTERIAL WRITTEN STATEMENT. Tuesday 5 November 2013 SPORTING LEGACY

MINISTERIAL WRITTEN STATEMENT. Tuesday 5 November 2013 SPORTING LEGACY Ministerial Support Team 4th Floor 100 Parliament Street London SW1A 2BQ T: 0207 211 6288 www.gov.uk/dcms MINISTERIAL WRITTEN STATEMENT Tuesday 5 November 2013 SPORTING LEGACY Parliamentary Under Secretary

More information

Canadian Sport Tourism Alliance Congress Ottawa

Canadian Sport Tourism Alliance Congress Ottawa Canadian Sport Tourism Alliance 2013 Congress Ottawa CSTA Sustainable Sport Event Template Thank you: Funding in part by the Ontario Trillium Foundation Transfer of Knowledge leadership: Eric Savard, CSTA

More information

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015 // RoWSaF Making roads safer for road workers rowsaf.org.uk Working in partnership with clients, industry and key stakeholders to improve worker safety Often working close to live traffic, activities conducted

More information

Certification, CSR & Sustainability Lessons from the Vancouver 2010 Olympic & Paralympic Winter Games

Certification, CSR & Sustainability Lessons from the Vancouver 2010 Olympic & Paralympic Winter Games Certification, CSR & Sustainability Lessons from the Vancouver 2010 Olympic & Paralympic Winter Games Linda Coady Distinguished Fellow, Liu Institute for Global Issues BC Coastal Forest Sector Controversies

More information

Learning Objectives. Sustainable Development: The Making of the Queen Elizabeth Olympic Park. John Charles Hopkins, ASLA, University of Pennsylvania

Learning Objectives. Sustainable Development: The Making of the Queen Elizabeth Olympic Park. John Charles Hopkins, ASLA, University of Pennsylvania Sustainable Development: The Making of the Queen Elizabeth Olympic Park John Charles Hopkins, ASLA, University of Pennsylvania ASLA 2012 Annual Meeting and EXPO Learning Objectives 1. How London's Olympic

More information

TENNIS QUEENSLAND STRATEGIC PLAN. to 2020

TENNIS QUEENSLAND STRATEGIC PLAN. to 2020 TENNIS QUEENSLAND STRATEGIC PLAN to 2020 Queensland tennis is delivered by an extraordinary community of passionate people; volunteers, operators, officials, coaches and administrators. With assistance

More information

Executive Summary. Introduction. A sustainable social legacy

Executive Summary. Introduction. A sustainable social legacy Introduction The Olympic Games generates lots of enthusiasm and great expectations. More than simply a sporting event, hosting the greatest show on earth is seen by some as a once in a lifetime opportunity

More information

Birmingham Connected. Edmund Salt. Transportation Policy Birmingham City Council

Birmingham Connected. Edmund Salt.   Transportation Policy Birmingham City Council Birmingham Connected Edmund Salt Transportation Policy Birmingham City Council www.birmingham.gov.uk/connected Birmingham Connected the story so far Broadly following EU Guidance We ve done all of this

More information

Principles guiding Sport NI investment in Sporting Clubs and Sporting Winners objectives.

Principles guiding Sport NI investment in Sporting Clubs and Sporting Winners objectives. Enjoy Engage Excel Principles guiding Sport NI investment in Sporting Clubs and Sporting Winners objectives. Page 1 of 8 1. Background 1.1. This paper outlines a number of proposals that aim to contribute

More information

Agreement between. The London Organising Committee of the Olympic Games and Paralympic Games. and

Agreement between. The London Organising Committee of the Olympic Games and Paralympic Games. and LOCOG: taking action to ensure respect for workers rights in global supply chains Agreement between The London Organising Committee of the Olympic Games and Paralympic Games and Trades Union Congress on

More information

Westminster s Joint Health and Wellbeing Strategy

Westminster s Joint Health and Wellbeing Strategy Westminster s Joint Health and Wellbeing Strategy 2013 2016 Response from Sustrans General comments From a strategic perspective, Sustrans welcomes the Health and Wellbeing Strategy s focus on encouraging

More information

University of Leeds Travel Plan

University of Leeds Travel Plan University of Leeds Travel Plan 2015-2018 Contents 1: Introduction 1.1 What is a Travel Plan? 1.2 Why do we need one? 1.3 Sustainability Strategy 2: Overview 2.1 The bigger picture 2.2 The City scale 2.3

More information

Overview of the Tokyo 2020 Games Sustainability Plan

Overview of the Tokyo 2020 Games Sustainability Plan Overview of the Tokyo 2020 Games Sustainability Plan June 2018 The Tokyo Organising Committee of the Olympic and Paralympic Games 1 The Sustainability Concept of the Tokyo 2020 Games Be better, together

More information

British Universities & Colleges Sport International Strategy

British Universities & Colleges Sport International Strategy British Universities & Colleges Sport International Strategy 2012-15 Executive Summary BUCS seeks to adopt an approach to international influencing which is developed across four key areas : International

More information

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

Understanding UK Sport s role. May 2018

Understanding UK Sport s role. May 2018 Thank you for visiting UK Sport s Public Consultation on its future funding strategy which will come into effect in April 2021 post the Tokyo Games. We want to ensure that the strategic review for our

More information

DCMS s aim is to improve the quality of life for all through cultural and sporting activities, support the pursuit of excellence, and champion the

DCMS s aim is to improve the quality of life for all through cultural and sporting activities, support the pursuit of excellence, and champion the Our Promise for 2012 How the UK will benefit from the Olympic Games and Paralympic Games DCMS s aim is to improve the quality of life for all through cultural and sporting activities, support the pursuit

More information

Strategic Plan for Sevens Rugby. September 2006

Strategic Plan for Sevens Rugby. September 2006 Strategic Plan for Sevens Rugby September 2006 Introduction The promotion of Sevens has been instrumental in taking Rugby to new territories and regions. The continued growth of Sevens would help achieve

More information

Clubs: Strategic Outcomes.

Clubs: Strategic Outcomes. Clubs: Strategic Outcomes Landscape 1,270 affiliated clubs 120,000 affiliated athletes (up from 98k in 2009) age 11 + Estimated the same number of volunteers working in clubs 65% off track clubs Majority

More information

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland Walking and Cycling Action Plan Summary A Catalyst for Change The Regional Transport Strategy for the west of Scotland 2007-2021 Strathclyde Partnership for Transport Contents Purpose...2 Issues, Constraints

More information

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

UK/JAPAN SEASON OF CULTURE

UK/JAPAN SEASON OF CULTURE UK/JAPAN SEASON OF CULTURE 2019-20 November 2017 KEY FACTS ABOUT JAPAN Has the world s 3 rd largest economy, accounting for around 6% of global GDP 1,300 Japanese companies have a presence in the UK, employing

More information

World Rowing s Strategic Framework

World Rowing s Strategic Framework World Rowing s Strategic Framework World Rowing s Strategic Framework Fédération Internationale des Sociétés d Aviron (FISA) Guiding Principles FISA was formed in 1892 and is the first international sport

More information

COUNTY SPORTS PARTNERSHIP (CSP) CORE SPECIFICATION INTERPRETATION GUIDE

COUNTY SPORTS PARTNERSHIP (CSP) CORE SPECIFICATION INTERPRETATION GUIDE COUNTY SPORTS PARTNERSHIP (CSP) CORE SPECIFICATION INTERPRETATION GUIDE Sport England has worked closely with a working group from the County Sports Partnership Network (CSPN) to develop a process and

More information

UK Sport Consultation - Call for Evidence: Submission by the Sport and Recreation Alliance

UK Sport Consultation - Call for Evidence: Submission by the Sport and Recreation Alliance UK Sport Consultation - Call for Evidence: Submission by the Sport and Recreation Alliance The Sport and Recreation Alliance The Sport and Recreation Alliance believes that the power of sport and recreation

More information

London 2012 Stewarding Update. 1 st March 2012 Eileen Williams City Operations Manager Olympic Park

London 2012 Stewarding Update. 1 st March 2012 Eileen Williams City Operations Manager Olympic Park London 2012 Stewarding Update 1 st March 2012 Eileen Williams City Operations Manager Olympic Park Agenda Steward requirements Internal Venue Event Services External To Venue City Operations - Last Mile

More information

Planning for tennis in your Local Government Area. A resource from Tennis Australia

Planning for tennis in your Local Government Area. A resource from Tennis Australia Planning for tennis in your Local Government Area A resource from Tennis Australia Part 1 July 2016 ABOUT THIS RESOURCE This resource forms part of Tennis Australia's Local Government Engagement Program.

More information

TENNIS VICTORIA STRATEGIC PLAN TO 2020

TENNIS VICTORIA STRATEGIC PLAN TO 2020 TENNIS VICTORIA STRATEGIC PLAN TO 2020 MESSAGE FROM OUR PRESIDENT AND CEO We are pleased and privileged to present Tennis Victoria s Strategic Plan to 2020. We acknowledge and thank all of the organisation

More information

DOE Climate Change Proposals

DOE Climate Change Proposals DOE Climate Change Proposals Sustrans response to Proposals for Taking Forward NI Climate Change Legislation January 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

Games. Emergency Preparedness for Industry and Commerce Council. Resort Municipality of Whistler Sharon Fugman, Manager 2010 Winter Games

Games. Emergency Preparedness for Industry and Commerce Council. Resort Municipality of Whistler Sharon Fugman, Manager 2010 Winter Games Whistler and the 2010 Winter Games Emergency Preparedness for Industry and Commerce Council Resort Municipality of Whistler Sharon Fugman, Manager 2010 Winter Games May 26, 2010 0 Introduction Today s

More information

Loughborough Flames: Lighting the way towards London Honour the past, but look to the future

Loughborough Flames: Lighting the way towards London Honour the past, but look to the future ITEM 06 ADDITIONAL INFORMATION Loughborough Flames: Lighting the way towards London 2012 Honour the past, but look to the future This statement captures the essence of the Loughborough Flames project.

More information

Report Subject: Boxing participation and social class

Report Subject: Boxing participation and social class Report Subject: Boxing participation and social class briefing paper Background For many years, research has highlighted variations in the levels of sports participation across different socioeconomic

More information

Cultural Tourism Getting Started, Factsheet 5: London 2012 Opportunities

Cultural Tourism Getting Started, Factsheet 5: London 2012 Opportunities Cultural Tourism Getting Started, Factsheet 5: London 2012 Opportunities Published by Audiences London May 2010 As part of the Wish you were here Cultural Tourism Symposium for the Arts and Heritage in

More information

Safe Speed programme ATTACHMENT 1. Randhir Karma, Group Manager Network Management and Safety

Safe Speed programme ATTACHMENT 1. Randhir Karma, Group Manager Network Management and Safety Safe Speed programme ATTACHMENT 1 Randhir Karma, Group Manager Network Management and Safety 1 Why Safe Speeds? AT s strategic context National guidance AT has embraced Vision Zero principles and recognises

More information

Strategic Plan Basketball in Victoria:

Strategic Plan Basketball in Victoria: EP64949 placed pages.indd 21/11/12 2:14 PM - 1 - Strategic Plan 2013-2016 Basketball in Victoria: The world s best sporting community EP64949 placed pages.indd 21/11/12 2:14 PM - 2-2 EP64949 placed pages.indd

More information

CITY OF VANCOUVER ADMINISTRATIVE REPORT

CITY OF VANCOUVER ADMINISTRATIVE REPORT CITY OF VANCOUVER A14 ADMINISTRATIVE REPORT Report Date: March 17, 2009 Contact: Dave Rudberg Contact No.: 604.296.2860 RTS No.: 07659 VanRIMS No.: 01-1000-00 Meeting Date: March 24, 2009 TO: FROM: SUBJECT:

More information

Local Sustainable Transport Fund

Local Sustainable Transport Fund I II III Sustainable travel in Greater Manchester: The journey to a low carbon economy Greater Manchester has a vision of sustainable commuting at the heart of its blueprint for a low carbon economy, as

More information

Do you have the energy, drive and passion to deliver transformational growth in cricket participation?

Do you have the energy, drive and passion to deliver transformational growth in cricket participation? Job Title: Responsible to: Contract: Location: Head of Participation CEO Full-time, permanent Edinburgh Do you have the energy, drive and passion to deliver transformational growth in cricket participation?

More information

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION 1 PURPOSE 1.1 To provide the following information and supporting evidence for the Member decision (reference

More information

July 2016 JD No 6 Post No 6 JOB DESCRIPTION

July 2016 JD No 6 Post No 6 JOB DESCRIPTION NORTH EAST OF SCOTLAND TRANSPORT PARTNERSHIP JOB DESCRIPTION POST TITLE : CYCLING DEVELOPMENT OFFICER (FIXED TERM) SALARY GRADE : Grade I ( 25,970-27,521.69) The North East of Scotland Transport Partnership

More information

Olympic Games and Regeneration

Olympic Games and Regeneration Olympic Games and Regeneration 2007-12 Standard Note: SN/SC/3742 Last updated: 7 February 2012 Author: Christopher Barclay Science and Environment Section The bid for the Olympic Games 2012 was based on

More information

Report by the Comptroller and. SesSIon february 2010

Report by the Comptroller and. SesSIon february 2010 Report by the Comptroller and Auditor General HC 298 SesSIon 2009 2010 26 february 2010 Preparations for the London 2012 Olympic and Paralympic Games: Progress report February 2010 Our vision is to help

More information

Progress with the Road Investment Strategy

Progress with the Road Investment Strategy Report by the Comptroller and Auditor General Department for Transport and Highways England Progress with the Road Investment Strategy HC 1056 SESSION 2016-17 22 MARCH 2017 4 Key facts Progress with the

More information

Swim Ireland Strategic Plan

Swim Ireland Strategic Plan Toe in the water. Face in the water. Staying afloat. Touching the bottom. One length without stopping. Fifty lengths without stopping.. 3 3 We exist to encourage participation, develop excellence and regulate

More information

All change. Snapshot Review. A snapshot review of sustainability and transport across the London 2012 programme. June 2010

All change. Snapshot Review. A snapshot review of sustainability and transport across the London 2012 programme. June 2010 Snapshot Review All change A snapshot review of sustainability and transport across the London 2012 programme June 2010 Published by the Commission for a Sustainable London 2012 www.cslondon.org 1 Summary

More information

1. UK policy context

1. UK policy context 1. UK policy context 2. Political leadership The Mayor s Vision My vision to create Healthy Streets aims to reduce traffic, pollution and noise, create more attractive, accessible and people-friendly streets

More information

The role of the university in creating a legacy strategy Mike Emmerich Chief Executive, New Economy

The role of the university in creating a legacy strategy Mike Emmerich Chief Executive, New Economy The role of the university in creating a legacy strategy Mike Emmerich Chief Executive, New Economy 10 December 2013 Manchester s Sporting Heritage What is Manchester known for? The role of football and

More information

Active Travel Strategy Dumfries and Galloway

Active Travel Strategy Dumfries and Galloway Active Travel Strategy Dumfries and Galloway Our Active Travel Strategy The agreed Interventions for Dumfries and Galloway Council s Local Transport Strategy includes an action to Develop an Active Travel

More information

Nick Webborn OBE Chair

Nick Webborn OBE Chair Nick Webborn OBE Chair Nick Webborn, Professor of Sport and Exercise Medicine at the University of Brighton, is one of the leading sports medicine specialists in the UK, with a particular expertise in

More information

The 2012 Cultural Olympiad

The 2012 Cultural Olympiad The 2012 Cultural Olympiad From initial planning to final delivery and beyond February 2014 Moira Sinclair Executive Director, Arts Council England Olympic Ideals Olympism is a philosophy of life, exalting

More information

High Performance Playbook

High Performance Playbook High Performance Playbook 2016 2020 Introduction to the Playbook World Rugby s Strategic Plan 2016-2020 guides the organisation towards its vision of A sport for all, true to its values via the mission

More information

London 2012 Olympic and Paralympic Games

London 2012 Olympic and Paralympic Games London 2012 Olympic and Paralympic Games Connecting the Olympic Games The story from Celebration to Implementation Jon Osbiston MAPM 2012 Venue Management BT London 2012 Delivery Programme You may have

More information

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes 1 Making the economic case for active travel Active travel and economic performance: A What Works review of evidence from cycling and walking schemes Active Travel Toolkit Slide Pack July 2017 Active travel

More information

PASTA City case study London Borough of Newham

PASTA City case study London Borough of Newham PASTA City case study London Borough of Newham Richard Wadey & Julian Sanchez BUILDING THE LIVEABLE AND HEALTHY CITY THE EGG Congress Centre, Brussels 18 November 2015 *This project has received funding

More information

Department for Transport

Department for Transport Improving UK evidence on health and environmental (low carbon) behaviours John Cummings Department for Transport 4 th November, 2015 CYCLING AND WALKING POLICY TEAM, OFFICIAL, 1st DRAFT 1 Walking and cycling

More information

London Cycle Network Annual Report 2000

London Cycle Network Annual Report 2000 London Cycle Network Annual Report 2000 A cycle network for London by 2005 A cycle network for London by 2005 The London Cycle Network will: provide local links between residential neighbourhoods, railway

More information

The Cultural Olympiad Beyond London and 2012

The Cultural Olympiad Beyond London and 2012 The Arts, Them and Us Creating a more equitable system of subsidised culture Institute of Cultural Capital, Liverpool 13 May 2014 The Cultural Olympiad Beyond London and 2012 Dr Beatriz Garcia Head of

More information

Introduction QUADRENNIAL PLAN

Introduction QUADRENNIAL PLAN 2017-2020 QUADRENNIAL PLAN Introduction We are pleased to present to you in this leaflet Olympic Solidarity (OS) s objectives, budgets and programmes established for the 2017-2020 quadrennial plan. The

More information

Towards a one planet 2012

Towards a one planet 2012 London 2012 Sustainability Plan November 2007 Towards a one planet 2012 A4 brochure spread examples Introduction 1 2 Contents Introduction 4 Climate change 14 Waste 24 Biodiversity 30 Inclusion 38 Healthy

More information

Glasgow Health Walks Social Return on Investment Analysis

Glasgow Health Walks Social Return on Investment Analysis Making an impact Glasgow Health Walks Social Return on Investment Analysis Summary Report July 2013 For every 1 invested in Health Walks, 8 of benefits were generated for society Introduction Paths for

More information

Olympic Route Network

Olympic Route Network Olympic Route Network Will Miller TfL Surface Transport Games Team Today... Olympic Route Network Measures & Games lanes Engagement Programme Impacts Road Events Local Area Traffic Management & Parking

More information

The One Path Initiative

The One Path Initiative About Sustrans 2017, Livia Lazar/Sustrans, all rights reserved Sustrans is the charity making it easier for people to walk and cycle. We are engineers and educators, experts and advocates. We connect people

More information

What did the World Student Games do for Sheffield? The 1991 Games as the catalyst for the regeneration of Sheffield

What did the World Student Games do for Sheffield? The 1991 Games as the catalyst for the regeneration of Sheffield What did the World Student Games do for Sheffield? The 1991 Games as the catalyst for the regeneration of Sheffield Peter Taylor Emeritus Professor Sheffield Hallam University England Why host a major

More information

Developing Junior Golf in Scotland

Developing Junior Golf in Scotland Developing Junior Golf in Scotland our strategy 2010 2014 Contents Foreword...4 A Message from the First Minister...5 Background and Context...6 Resourcing clubgolf...7 Player Pathway...8 Coach Pathway...9

More information

NIHR what s new. HSR UK Conference Dr Louise Wood Director of Science, Research & Evidence Department of Health & Social

NIHR what s new. HSR UK Conference Dr Louise Wood Director of Science, Research & Evidence Department of Health & Social NIHR what s new HSR UK Conference 2018 Dr Louise Wood Director of Science, Research & Evidence Department of Health & Social Care @klouisewood Impact of the first ten years of NIHR History of NIHR establishment

More information

TO: FROM: SUBJECT: RECOMMENDATION

TO: FROM: SUBJECT: RECOMMENDATION February 8, 2018 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: United 2026 Bid (FIFA) Training Site Agreement RECOMMENDATION A. THAT the

More information

Inspiring a sporting city... Coventry Sports Strategy

Inspiring a sporting city... Coventry Sports Strategy Inspiring a sporting city... Sports Strategy 2014 2024 1 Foreword We will all know when looks and feels like a successful sporting city... The city was a proud host venue for the London 2012 Olympic Games

More information

St-Anne s Waterford Tennis Club

St-Anne s Waterford Tennis Club St-Anne s Waterford Tennis Club Draft Strategic Plan Presented to Committee and Members 1 Table of Contents Section 1: Insights Page Description 4 Research Insights - Seniors 5 Research Insights - Infrastructure

More information

OUR TRIATHLON VISION

OUR TRIATHLON VISION OUR TRIATHLON VISION 2 INTRODUCTION Triathlon is a fast-growing, modern and dynamic Olympic and Paralympic sport. From the first modern triathlon in San Diego in 1974 the sport has evolved quickly, making

More information

Using the sports club brand to develop and align corporate and community objectives

Using the sports club brand to develop and align corporate and community objectives Using the sports club brand to develop and align corporate and community objectives TO RESERVE A PLACE USE THE ONLINE BOOKING FORM: www.phpactive.org/sectors/isc 1.0 Background The loyalty of fans to their

More information

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY THE VISION OF THE CYCLING CHARTER To realise the full potential of cycling s contribution to the health and wealth of the West Midlands creating more sustainable

More information

OCTOBER 2018 EXECUTIVE SUMMARY

OCTOBER 2018 EXECUTIVE SUMMARY IOC Sustainability Report Sharing progress on our 2020 objectives OCTOBER 2018 EXECUTIVE SUMMARY IOC Sustainability Report: We are pleased to present this executive summary of the first Sustainability

More information

DEVELOPING THE GAME GLOBALLY

DEVELOPING THE GAME GLOBALLY DEVELOPING THE GAME GLOBALLY World Rugby Vision, Mission, Values and Development Priorities World Rugby Vision, Mission, Values and Priorities The World Rugby Vision Rugby a sport for all, true to its

More information

Faster, higher, stronger greener

Faster, higher, stronger greener Faster, higher, stronger greener Sustainability at the 2012 London Olympics International events with a global audience are an ideal vehicle to promote sustainable development. In 1986 the President of

More information

IOC Sustainability Strategy. Executive Summary

IOC Sustainability Strategy. Executive Summary IOC Sustainability Strategy Executive Summary This version was approved by the Executive Board of the International Olympic Committee in December 2016 2 IOC Sustainability Strategy Executive Summary Olympic

More information

Olympic Agenda th IOC Session. 5-6 February 2014

Olympic Agenda th IOC Session. 5-6 February 2014 Olympic Agenda 2020 126 th IOC Session 5-6 February 2014 Five clusters of ideas The uniqueness of the Olympic Games Athletes: at the heart of the Olympic Movement Olympism in action: keep Olympism alive

More information

STRATEGIC PLAN for the participation of the 2012 Australian Olympic Team

STRATEGIC PLAN for the participation of the 2012 Australian Olympic Team AUSTRALIAN OLYMPIC COMMITTEE STRATEGIC PLAN for the participation of the 2012 Australian Olympic Team EXECUTIVE SUMMARY Games of the XXX th Olympiad London, Great Britain 27 July - 12 August 2012 Nick

More information

Annex 1: Indicators from Initial Situation Report not covered by Pre- Games Report

Annex 1: Indicators from Initial Situation Report not covered by Pre- Games Report Annex 1: Indicators from Initial Situation Report not covered by Pre- Games Report The Pre-Games Report supersedes the Initial Situation Report. However, there are some indicators necessary for the Initial

More information

UK Integrated Behaviour Change Programmes

UK Integrated Behaviour Change Programmes UK Integrated Behaviour Change Programmes 17 th November 2009 ACT TDM Summit Conference Daniel Johnson, Transport for London Nicky Ward, Steer Davies Gleave Structure 1. UK travel behaviour change 2. An

More information

Sustainable renewal in the Olympics. A question of legacy.

Sustainable renewal in the Olympics. A question of legacy. Sustainable renewal in the Olympics. A question of legacy. Kate Hughes PhD centenary scholar Leeds Metropolitan University Overview of the presentation Why does the Olympics need sustainable renewal? How

More information

Racecourse Operations Manager. Position Description

Racecourse Operations Manager. Position Description Racecourse Operations Manager Position Description Position Discription Racecourse Operations Manager Position Title: Reports To: Business Unit: Department: Racecourse Operations Manager CEO Pakenham Racing

More information

Strategic Plan. Updated January 2013

Strategic Plan. Updated January 2013 Strategic Plan 2012 2016 Updated January 2013 Introduction WHO WE ARE: Basketball BC is the governing body for basketball in the province of British Columbia WHAT WE DO: Create, guide or support all programs

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

NETBALL TASMANIA STRATEGIC PLAN

NETBALL TASMANIA STRATEGIC PLAN NETBALL TASMANIA STRATEGIC PLAN 2016-2020 Our Values Inclusion We are committed to the principles of respect and equality Integrity We are committed to practices that are safe, fair, transparent and open

More information

Vision Zero Richmond Action Plan

Vision Zero Richmond Action Plan Vision Zero Richmond Action Plan COVER Acknowledgements This Vision Zero Action Plan was prepared by the Safe and Healthy Streets Commission and with numerous partners committed to safety in Richmond,

More information

Strategic Plan. Aorangi Golf Strategic Plan

Strategic Plan. Aorangi Golf Strategic Plan Strategic Plan 2017-2020 Strategic Plan Our Roadmap to 2020: Growing and Supporting the Game of Golf in the Aorangi Region While golf has faced a number of challenges in recent years, the future is looking

More information