1 Eversurce Energy Emergency Respnse Prgram New Hampshire Electric Operatins EP-NHE-PLN-2000 Revisin 0 Apprval: Signature: Dean C. Desautels Name: Dean C. Desautels Date: 03/05/2015 Title: Manager-Emergency Preparedness Effective Date: 03/05/2015 Applicability: NH Electric Ensure yu are using the current revisin by verifying it against the cntrlled electrnic cpy lcated in the Emergency Respnse Prgram Dcumentatin Ltus Ntes Database.

2 New Hampshire Electric Operatins Intentinally Blank Eversurce EP-NHE-PLN f 76 Rev 0

3 Table f Cntents New Hampshire Electric Operatins PROMULGATION OF THE PLAN INTRODUCTION Purpse Scpe Situatin Overview Planning Cnsideratins Terminlgy Supprting NU Emergency Respnse Dcumentatin STRATEGY FOR EMERGENCY OPERATIONS Guiding Principles Use f the Incident Cmmand System Cre Capabilities Eversurce Readiness Cnditins Declaratin f an (ERP) Event Incident Cmmand Center (ICC) Activatin Ntificatin Operatinal Stages Service Restratin ORGANIZATION AND ASSIGNMENT OF RESPONSIBILITIES General Overview IMT Organizatin and Respnsibilities Operatins Sectin Planning Sectin Lgistics Sectin Finance and Administratin Sectin Cmmunicatins Liaisn POLICY, COORDINATION, AND COMMAND Emergency Event Oversight, Crdinatin, Management and Supprt Incident Management Team and Executive Leadership Relatinship During an Emergency INFORMATION COLLECTION, ANALYSIS, AND DISSEMINATION Operatinal Infrmatin and Situatinal Awareness COMMUNICATIONS Cmmunicatin Objectives Cmmunicatins with External Stakehlders Event Ntificatin, Situatin Reprts, Status Reprts, and Incident Actin Plans Operatinal Cmmunicatins ADMINISTRATION AND FINANCE Finance/Administratin ADVANCE PLANNING, TRAINING, AND EXERCISING Planning Eversurce EP-NHE-PLN f 76 Rev 0

4 New Hampshire Electric Operatins 8.2 Training and Exercises PLAN DEVELOPMENT AND MAINTENANCE Develpment Maintenance Recrds Management Tracking f Internal and External Regulatins, Cmmitments, and Crrective Actins AUTHORITIES AND REFERENCES Eversurce Requirements State Requirements Federal Requirements References RECORD OF CHANGES Revisin RECORD OF DISTRIBUTION Tables Table 1 - Readiness Cnditins Table 2 - ERP Event Levels Table 3 - ICS Terminlgy Table 4 - ICS Hierarchy Figures Figure 1. NH Electric Operatins Service Territry Map... 8 Figure 2. NH Electric Operatins IMT Organizatin Chart Figure 3. Example f Operatins Sectin IMT Structure Figure 4. Example f Planning Sectin IMT Structure Figure 5. Example f Lgistics Sectin ICS Structure Figure 6. NH Electric Operatins Public Infrmatin Team ICS Rles Figure 7. Liaisn Officer Emergency Event Rles Figure 8. Emergency Preparedness Cycle f Cntinuus Imprvement Attachments Attachment 1 NHE ICC Facilities Attachment 2 Incident Cmmand System Eversurce EP-NHE-PLN f 76 Rev 0

5 New Hampshire Electric Operatins PROMULGATION OF THE PLAN As the President f NH Electric Operatins, I hereby authrize the NH Electric Operatins Emergency Respnse Plan dated March 5, The Plan prvides fr NH Electric Operatins respnse t emergency situatins and ther incidents cnsistently and effectively within Eversurce Energy in rder t prtect lives, public health, safety, and prperty; t restre essential services; and t enable and assist with ecnmic recvery. Threats t ur business and cntinuity f service t ur custmers are cnstantly evlving. Eversurce remains prepared at all times t anticipate, prepare fr, respnd t and recver frm all manner f threat r hazard t ur business. The purpse f this All-Hazards is t utline and assign respnsibilities fr crdinatin f effrts acrss the rganizatin in respnse t these risks. Thrugh crdinated actin, we leverage ur cmpany resurces fr a fast, efficient, and effective mitigatin and respnse apprach t all manner f threat. We understand that timely and accurate infrmatin fr ur custmers and ther stakehlders is just as imprtant as a safe and prmpt restratin f service. This plan utlines extensive measures and prcesses t create and flw imprtant planning infrmatin t ur critical stakehlders. We are prepared t wrk effectively with Federal, State and Lcal gvernments t effect a swift and crdinated respnse t all manner f threat. Thrugh this plan, I empwer the NH Electric Operatins rganizatins t take the necessary actins and expend apprpriate resurces t effectuate a prmpt and cmplete respnse t all hazards that can present themselves frm time t time. Because the threats we face are cnstantly evlving, I charge the rganizatin with adapting this plan ver time in respnse t these emerging threats and t plan, prepare, train, practice, and cntinually imprve ur respnse capabilities fr the benefit f ur custmers and stakehlders. The Senir Vice President, Emergency Preparedness, Eversurce, n behalf f the President, is hereby authrized t activate the Emergency Crdinatin Team at any time deemed necessary t supprt an Incident Management Team. The Plan assigns varius planning and preparedness tasks t Eversurce rganizatins. This Prmulgatin shall be effective upn its signing and shall remain in full frce and effect until amended r rescinded. William J. Quinlan William J. Quinlan President, NH Electric Operatins March 5, 2015 Eversurce EP-NHE-PLN f 76 Rev 0

6 New Hampshire Electric Operatins Intentinally Blank Eversurce EP-NHE-PLN f 76 Rev 0

7 1. INTRODUCTION 1.1 Purpse 1.2 Scpe New Hampshire Electric Operatins The NH Electric Operatins (ERP) prvides a cmprehensive verview f hw NH Electric Operatins addresses situatins that have the ptential t adversely affect electric service t its custmers. The bjective f the ERP and assciated dcumentatin (prcedures, plicies, and ther supprting dcumentatin) is t utline a systematic and rganized apprach t prepare fr, and respnd t, emergency events causing pwer utages r ther disruptins f NH Electric Operatins distributin system, including thse caused by transmissin system r generatin issues. This ERP applies t emergency events caused by, but nt limited t, severe weather, flding, civil disturbance, fire, explsin, r ther majr disruptin f the distributin system r any ther instance fr which the Incident Cmmander determines that additinal assistance r crdinatin is needed. The ERP describes the plicies and cncepts f peratins that guide hw NH Electric Operatins plans fr and addresses emergency situatins. The ERP and assciated dcumentatin apply t NH Electric Operatins persnnel and any staff f Eversurce Energy Service Cmpany (EESCO), affiliate cmpany emplyees, mutual aid resurces, cntractrs, r ther persnnel wrking at the directin f r under the authrity f NH Electric Operatins. See Sectin 10.1, Eversurce Requirements, n page 67 fr a cmplete list f related dcuments. The Cmpany makes all reasnable effrts t restre service t its custmers within the shrtest time practical cnsistent with applicable law, this plan, including the plan s targets, and safety, as determined by NH Electric Operatins. During an Emergency Event this includes, at a minimum, implementing all applicable cmpnents f the ERP related t restratin f service. 1.3 Situatin Overview Eversurce Energy (frmerly Nrtheast Utilities) was frmed in 1966 when three utility cmpanies, The Cnnecticut Light and Pwer Cmpany (CL&P), Western Massachusetts Electric Cmpany (WMECO), and The Hartfrd Electric Light Cmpany (HELCO) were affiliated under as subsidiaries f a single crprate entity. The system was the first new multistate public utility hlding cmpany system created since the enactment f the Public Utility Hlding Cmpany Act f HELCO was incrprated int CL&P in In 1967, the Hlyke Water Pwer Cmpany jined the cmpany and, in 1992, Public Service Cmpany f New Hampshire (PSNH) was acquired. In 2012, the cmpany acquired NSTAR, and at that time, NSTAR electric and gas cmpanies als became perating cmpanies. Nrtheast Utilities was rebranded Eversurce Energy in February f NH Electric Operatins has delivered electric service t hmes, neighbrhds, and businesses fr mre than 88 years. With apprximately 1,400 emplyees, NH Electric Operatins is New Hampshire's largest electric utility, serving mre than 500,000 business and residential custmers in 211 municipalities in New Hampshire. See the figure NH Electric Operatins Service Territry Map n the next page fr a map f the NH Electric Operatins Service Territry. Eversurce EP-NHE-PLN f 76 Rev 0

8 New Hampshire Electric Operatins Figure 1. NH Electric Operatins Service Territry Map Eversurce EP-NHE-PLN f 76 Rev 0

9 1.4 Planning Cnsideratins New Hampshire Electric Operatins This ERP prvides the verall framewrk fr preparedness and respnse and a high-level verview f each functin. The plan is implemented by specific plicies, prcedures, guidelines, handbks, jb aids, and s n. The ERP dcumentatin and ther supprting dcumentatin detail specific actins and respnsibilities fr functins and rganizatins necessary fr effectively respnding t an emergency event. Emplyees use these dcuments t guide their specific actins cnsistent with their training. The NH Electric Operatins distributin system is susceptible t the effects f certain emergency events, disasters and, depending n the nature f the event, the effects can be mitigated due t the design and engineering f the system. The impact f emergency events can vary widely in scpe and severity, frm an event that is lcally islated and impacts very few custmers fr a shrt perid f time t an event that is gegraphically widespread and causes utages affecting many custmers. These are sme f the planning cnsideratins used in the design f the plan and the supprting implementatin dcuments: 1.5 Terminlgy An emergency incident r disaster can ccur at any time f the day r night, weekend, r hliday, with little r n warning. Nt all utage-related events r incidents require the full activatin f this Plan. The Incident Cmmander can declare activatin f the Plan either befre an emergency event ccurs r after, based upn the timing and predicted severity. Event Levels 3, 4, and 5 require full activatin f the Incident Management Team (IMT) and all functins are crdinated thrugh an Incident Cmmand Center (ICC). The Operatinal Perid fr extended emergencies that require 24-hur peratins is divided int tw peratinal shifts f 12 hurs each starting at 0600 and 1800 with a turnver perid that begins 30 minutes befre each shift starts. All emplyees in the NH Electric Operatins rganizatin are familiar with this plan and their specific emergency jb psitin respnsibilities when the Plan is activated. In additin, NH Electric Operatins cnducts training and exercises t ensure all emplyees are aware f the general framewrk fr respnding t emergency events, per the requirements f PUC 300 Rules fr Electric Service. NH Electric Operatins respnse is based n the availability f resurces. If resurce requirements warrant, Affiliate Cmpany, mutual assistance and cntractr assistance are requested. The NH Electric Operatins ERP is based upn the implementatin activities f the Natinal Incident Management System (NIMS) and uses the Incident Cmmand System (ICS.) This alignment assists in the de-centralizatin and recentralizatin f cmmand and cntrl thrughut an emergency event in rder t prvide ptimum and efficient respnse and utilizatin f resurces. [NH PUC ] During and after catastrphic events, nrmal emergency services within the affected area can be verwhelmed and essential cmmunity services might be unavailable. The cmmn definitins, abbreviatin, and acrnyms used in all f the Eversurce All Hazards Emergency Respnse Prgram dcumentatin, including the NHE ERP, are described in Guideline EP-GDL-3000, Eversurce ERP Glssary. 1.6 Supprting NU Emergency Respnse Dcumentatin The Eversurce All Hazards Emergency Respnse Prgram dcumentatin, including all assciated Annexes and Appendixes are available frm the Eversurce Intranet in the Eversurce ERP Dcumentatin Library. Eversurce EP-NHE-PLN f 76 Rev 0

10 New Hampshire Electric Operatins Intentinally Blank Eversurce EP-NHE-PLN f 76 Rev 0

11 2. STRATEGY FOR EMERGENCY OPERATIONS New Hampshire Electric Operatins Authrity fr the perfrmance and directin f actins under this ERP is delegated by the President f NH Electric Operatins t the Incident Cmmander (IC) and ther psitins identified in this dcument. Pursuant t this delegatin, the IC has the authrity t manage the verall emergency respnse fr NH Electric Operatins and is expected t prvide peridic updates t senir management, including the President f NH Electric Operatins. The IC infrms the President (in a timely manner) f any actins r develpments that culd require extensive resurces frm ther Eversurce perating cmpanies r culd reasnably cause significant reputatinal r financial risk t the cmpany. The President in turn infrms and cnsults with Eversurce Executive Oversight Grup (EOG). The strategy t address strm events begins by understanding and analyzing ptential weather events befre they ccur. It is expected that the develpment f an apprpriate plan begins befre the interruptins ccur. Once the event ccurs, the restratin recvery is predicated n knwing the causes and understanding the magnitude f the prblems. This is btained by early and strategic damage assessment. Executin f the apprpriate plan, and btaining the resurces and supprt systems needed, are essential t effect the prmpt restratin f electric service t ur custmers. Given the brad authrity granted t the IC in this plan, the IC shuld cnsult peridically with the President f NH Electric Operatins t seek input n verall directin, plicy advice cncerning bjectives r any necessary authrizatin fr specific exceptins t his authrity. The IC and the executive leadership team must effectively cmmunicate during an emergency event, particularly whenever significant changes ccur. Shuld any f the fllwing situatins ccur, the IC infrms the executive leadership team immediately and prvides it with all available infrmatin abut the incident: A fatality r life threatening injury t a NH Electric Operatins emplyee, EESCO r affiliate emplyee, cntractr, r mutual assistance crew member A fatality r life threatening injury t anyne pssibly invlving any part f NH Electric Operatins system, staff r entity wrking n behalf f NH Electric Operatins A fatality r a life threatening injury t a member f the public, which culd have been caused by the NH Electric Operatins infrastructure Any event that culd ptentially cause significant harm t NH Electric Operatins r EESCO, its staff, r system Any ther unfreseen event that the IC shuld reasnably deem f significant cncern as t affect the cmpany r that culd trigger high level, external stakehlder interest (regulatry, plitical, cmmunity, media, and s n). 2.1 Guiding Principles NH Electric Operatins has the respnsibility t establish and ensure the safety and security f all participants f the emergency restratin effrt. This is achieved by cmmunicating guidelines during strm events and the reinfrcement f safe wrk practices by the restratin crews. Each participant is respnsible fr his/her wn safety and NH Electric Operatins management is respnsible fr ensuring all participants wrk in a safe manner and that prmpt crrective actin is taken whenever unsafe cnditins are bserved r reprted. Eversurce EP-NHE-PLN f 76 Rev 0

12 New Hampshire Electric Operatins The nging readiness f the emergency respnse participants is maintained thrugh training in cllabratin with frmal perating plicies and prcedures and thrugh participatin in scheduled drills. Jb assignments and prficiency f the assciated skills are critical t the framewrk f the ERP. Participants, whether perfrming their rutine assignments during the restratin effrt r perfrming infrequent duties as their emergency assignments dictate, are expected t perfrm at the same standard f excellence: We cnsider public safety and the safety f ur wrkers and ther respnders ur highest cre value. We ensure ur Incident Management Teams fllw a frmal Incident Cmmand System (ICS) and each psitin and functin within the structure has a clearly defined rle and understd authrity. We ensure that ur emplyees are trained and exercised in their assigned emergency rles. We set reasnable expectatins with ur stakehlders and deliver results that are cnsistent with r in excess f thse expectatins. We partner with ur municipalities t identify and understand their pririties and integrate them int ur restratin plans. We prvide ur cmmunities with accurate, timely, and cnsistent infrmatin. We cmplete an initial damage assessment and prvide a glbal restratin prjectin within 48 hurs after a strm has left ur service territry. We ensure that sufficient numbers f qualified resurces are secured in a timely manner t supprt an efficient restratin prcess. We take the necessary actins t prtect the envirnment. We use available technlgy t autmate restratin prcesses and use ur leadership capabilities t efficiently manage available resurces. We use every pprtunity t cllect feedback and measure ur perfrmance t ensure cntinuus imprvement. We are cmmitted t mitigating the vulnerability f ur distributin infrastructure t weather events. 2.2 Use f the Incident Cmmand System The ICS is a cmpnent f the Natinal Incident Management System (NIMS), an emergency management dctrine used acrss the United States t crdinate emergency preparedness and incident management and respnse amng the public (Federal, Tribal, state, and lcal gvernment agencies) and private sectrs. [NH PUC (b)] It prvides fr a standardized, n-scene, all-hazards incident management apprach that: allws fr the integratin f facilities, equipment, persnnel, prcedures, and cmmunicatins, perating within a cmmn rganizatinal structure enables a crdinated respnse amng varius jurisdictins and functinal agencies, bth public and private establishes cmmn prcesses fr planning and managing resurces ICS is flexible and can be used fr events f any type, scpe, r cmplexity. ICS allws Eversurce t adpt an integrated rganizatinal structure t match the cmplexities and demands f single r multiple events. The range f these events can vary frm a minr facility emergency t a majr lss f systems, equipment, persnnel, r infrmatin. ICS is als emplyed by ffsite respnse rganizatins that Eversurce interfaces with during an emergency, thereby enhancing the crdinatin f all emergency respnders. Eversurce EP-NHE-PLN f 76 Rev 0

13 New Hampshire Electric Operatins ICS is based n a mdel adpted by the fire and rescue cmmunity. ICS is used by all levels f gvernment, as well as by many nn-gvernmental rganizatins and the private sectr. ICS is typically structured t facilitate activities in five majr functinal areas: Cmmand, Operatins, Planning, Lgistics, and Finance/Administratin. It is pssible that all f the functinal areas might nt be used based n the needs f the incident Incident Cmmand Incident Cmmand is respnsible fr verall management f the emergency and ccurs at the IMT level. An IC is designated and has the authrity t cmmit and btain resurces necessary t meet priritized needs. The IC als has the authrity t issue assignments that invlve the cmmitment f human and material resurces and t expend funds t meet emergency needs. Cmmand Staff and General Staff assignments are delegated and assigned by the IC as required. ICS Cmmand and General Staff psitins are described in further detail belw Nn-Incident Cmmand System Rles 2.3 Cre Capabilities Emergency respnse is als perfrmed by persnnel within Eversurce (fr example, Facilities, Stres, Transprtatin, and s n) that are nt actually assigned ICS jb psitins during an emergency because their emergency rles and respnsibilities generally parallel their nrmal (blue sky) rganizatinal rles and respnsibilities. Specific day-t-day tasks and activities that d nt cntribute directly t the emergency respnse effrts can be suspended temprarily r redirected fr the duratin f the event. Capabilities are identified as the ability t achieve a specific utcme with an applicable cmbinatin f planning, rganizatin, resurces, and trained and exercised persnnel. Cre Capabilities are a list f capabilities needed cllectively by NH Electric Operatins t prepare fr, respnd t, and recver frm events and incidents causing pwer utages and ther disruptins t the electric distributin system. NH Electric Operatins Cre Capabilities are: 1. Cmmunity Preparedness The cntinuus effrt t assist the cmmunities and the State t be fully aware, trained, and practiced n hw t prepare fr and, as apprpriate, crdinate respnse t, events that have the ptential t impact the NH Electric Operatins system. 2. Risk Management The cntinuus prcess f managing the likelihd f an adverse event and its impact n the NH Electric Operatins system thrugh a series f mitigatin and preparedness actins. 3. Training, Qualificatins, and Exercises The prcess f transferring required knwledge and skills needed fr NH Electric Operatins t perfrm activities and tasks supprting the ERP capabilities, and f verifying individual and rganizatinal cmpetencies f these capabilities. 4. Incident Cmmand Effectively direct and cntrl event activities by using the ICS cnsistent with NH Electric Operatins plicies and prcedures. 5. Planning Cllect, display, and evaluate event infrmatin and crdinate the develpment f applicable Incident Actin Plans (IAPs.) 6. Damage Assessment Cnduct NH Electric Operatins system damage assessments t accurately determine the significance f the event, lcatins f damage and damaged equipment, access restrictins, and ther infrmatin needed t estimate the time necessary fr repair and effectively chse a restratin strategy. Eversurce EP-NHE-PLN f 76 Rev 0

14 New Hampshire Electric Operatins 7. Incident Cmmand Center Management Prvide NH Electric Operatins crdinatin fr event management by activating and perating the ICC fr a pre-planned r n-ntice event. ICC management includes: ICC and Reginal Emergency Operatins Center (EOC) activatin, ntificatin, staffing, and deactivatin; management, directin, cntrl, and crdinatin f respnse and recvery activities; crdinatin f effrts amng gvernments at each level and amng lcal, reginal, State EOCs; crdinatin f public infrmatin; and maintenance f the infrmatin and cmmunicatin necessary fr crdinating respnse and recvery activities. See Attachment 1, NH Electric Operatins ICC Facilities fr mre infrmatin n the primary and alternate ICC facilities. 8. Respnse & Restratin Prepare fr, initiate, and sustain repair, replacement, r ther activities needed t restre the NH Electric Operatins distributin system t nrmal perating cnditin. This cnsists f eliminating identified threats t public safety, remving electric hazards, restring critical facilities, and perfrming bulk restratin t custmers. 9. Resurce Management (Lgistics) Identify, rder and acquire, mbilize/n-bard, accurately track and recrd, reassign, and recver and dembilize NH Electric Operatins, Eversurce Energy, mutual aid, cntracted, and vendr resurces thrughut all event management phases. (NOTE: Resurces include material, equipment, and persnnel.) 10. Public Infrmatin and Cmmunicatins Develp, crdinate, and disseminate infrmatin t the public, state and municipal fficials, and NH Electric Operatins and Eversurce emplyees acrss all jurisdictins and disciplines effectively under all hazard cnditins. 11. Wrker Health and Safety Ensure adequate trained and equipped persnnel and resurces are available at the time f an event t prtect the safety and health f NH Electric Operatins and Eversurce emplyees, mutual aid, and cntracted wrkers. 12. Financial Tracking and Reprting Accurately accunt fr persnnel time; cllecting cst data; perfrming cst effectiveness analysis; prviding cst estimates and cst saving recmmendatins; administering financial matters pertaining t vendr cntracts, leases, and fiscal agreements; and managing and directing all administrative matters pertaining t cmpensatin fr injury and claims-related activities. 2.4 Eversurce Readiness Cnditins Eversurce has established a systematic apprach t mnitring, assessing, and preparing fr events that have the ptential t impact ne r mre business units, emplyees, r custmers. This apprach includes activities frm day-t-day hazard mnitring thrugh full activatin f all necessary persnnel t supprt respnse and recvery fr any type f emergency. This apprach uses predefined Readiness Cnditins t clearly cmmunicate each perating cmpany s readiness psture. See Table 1 - Readiness Cnditins n page 16. Each entity determines its wn current Readiness Cnditin and it is cmmn t have different Readiness Cnditins based n the same emergency (fr example, a hurricane) due t differences f ptential impact t each State. Eversurce EP-NHE-PLN f 76 Rev 0

15 New Hampshire Electric Operatins Readiness Cnditin NORMAL Everyday peratins are being perfrmed. Emplyees are perfrming day-t-day rutine peratins and maintaining situatinal awareness by bserving the changing and predicted weather cnditins and the news fr any emergency that culd adversely affect Eversurce peratins Readiness Cnditin - MONITORING Everyday peratins are being perfrmed, but cnditins are develping r exist (fr example, a ptential heat wave, trpical strm, r nr easter) that culd present a ptential risk t Eversurce in the near future. Thugh the cnditins currently pse n immediate threat, a heightened level f situatinal awareness (internal and external) and mnitring are implemented with mre frequent cmmunicatins taking place amng decisin makers. If it is determined that escalating emergency cnditins are likely, a cmmunicatin is sent t the NH Electric Operatins rganizatin and lcal authrities t update them abut this cnditin Readiness Cnditin - WARNING General everyday peratins are being perfrmed, but cnditins are develping r are sn t exist that have a relatively high level f prbability f impacting sme r all f the Eversurce service area. Sme day-t-day tasks and peratins might be suspended r redirected. Mbilizatin f internal resurces and acquisitin/mbilizatin f (sme) external resurces are cnsidered and culd begin. Affected IMTs, ICCs, and/r Reginal EOCs can be partially r fully activated in accrdance with each rganizatin s plan. Ntificatin/partial activatin f the ECT is cnsidered. Fr events that culd have peratinal r business functinality impact at ne r mre facilities r lcatins, but are nt primarily transmissin r distributin system disruptin events, activatin f an Eversurce IMT is cnsidered and, under the directin f the Vice President-NH Electric Operatins r designee , telephne, r ther cmmunicatin methds are used t ntify key emergency respnse persnnel t prepare t be activated. Cmmunicatin requirements with the New Hampshire Public Utility Cmmissin (NHPUC) are als evaluated Readiness Cnditin EMERGENCY Emergency event cnditins are imminent and it has been predicted that they culd cause r have caused significant impact. Typically, the Readiness Cnditin is escalated t Emergency when it appears imminent that 10,000 r mre NH custmers are likely t be ut f electric service Based n the ptential Emergency Level, the fllwing situatins can ccur: Mbilizatin f internal resurces and acquisitin/mbilizatin f external resurces ccur as needed. One r mre perating cmpany r reginal IMT are activated. An ICC and ne r mre Reginal EOCs are activated. The Emergency Crdinatin Team is (might be) activated and an emergency-specific initial meeting f the Eversurce EOG culd be scheduled. Eversurce EP-NHE-PLN f 76 Rev 0

16 New Hampshire Electric Operatins Table 1 - Readiness Cnditins Readiness Cnditin Nrmal Mnitring Warning Emergency Situatinal awareness f resurces and systems X X X X Mbilizatin f resurces 0 0/X X Activatin f Incident Management Teams Activatin f Emergency Crdinatin Team Ntificatin/ Standby Ntificatin/ Standby Activatin f Executive Oversight Grup Ntificatin 0 X - Likely 0 Pssible 2.5 Declaratin f an (ERP) Event NH Electric Operatins Emergency Preparedness (EP) rganizatin cntinuusly mnitrs weather and ther system cnditins t identify pssible threats t the electrical system. When a threatening frecast r a weather alert abve predetermined levels is identified, initial preparatins are made t ensure the ability t restre utages that might ccur n the NH Electric Operatins system. Cnference Calls are schedule with NH Electric Operatins and Eversurce leadership, as apprpriate. Additinally, r autmatic call alert ntificatins are sent t ntify members f the IMT and ther key individuals f the ptential risk. If an emergency incident r event is likely that culd cause significant utages r damage t the distributin system, the President r a Vice President r designee declares an ERP Event, indicating a frmal initiatin f the ERP. When an ERP Event is declared, the ICC is activated. See Attachment 1, NH Electric Operatins ICC Facilities, fr a descriptin f primary and alternate ICC lcatins. In general, the ICC prepares fr activatin when it is anticipated that there culd be 200 r mre utage trubles and 10,000 r mre custmers withut electric service. When pssible, advance warning advisries are issued by NH Electric Operatins Emergency Preparedness prir t the declaratin f an emergency. When mre than 10,000 custmers are affected, the NH PUC Directr, Electric Divisin and NH PUC Directr, Safety Divisin are ntified, as well as when the ICC pens and clses. [NH PUC 306] A Wide Scale Emergency, is an event that, by the frces f nature, accident, r an intentinal act results in, r is expected t result in: a lss f electric service t 10% r mre f the cmpany s ttal number f electric custmers r 40,000 custmers, whichever is less and the restratin f electric service t these custmers takes mre than 24 hurs; r the federal, state, r lcal gvernment declaring an fficial state f emergency in the cmpany s service territry and the emergency invlves an interruptin f electric service. [NH PUC ] Upn declaratin f an ERP Event the NH Electric Operatins Emergency Respnse Organizatin is activated. T the extent necessary, nrmal cmpany peratins are curtailed r suspended until the emergency cnditin is terminated. Table 2 - ERP Event Levels indicates the ERP Event Levels that the State f New Hampshire (per PUC 300 Rules fr Electric Service) references fr reprting. [NH PUC (g)] X 0/X Eversurce EP-NHE-PLN f 76 Rev 0

17 Table 2 - ERP Event Levels New Hampshire Electric Operatins Event Level % Custmers Out Outage Duratin (Hrs.) 2.6 Incident Cmmand Center (ICC) Activatin 5 2 <12 4 > > > > The NH Electric Operatins ICC is a dedicated facility that is designed t assist management in taking prmpt and effective actins t mitigate the cnsequences f an emergency. NH Electric Operatins mnitrs its electric system by way f 24 hur cverage thrugh the Electric System Cntrl Center (ESCC), System Operatins Center (SOC) and n-call persnnel until such time as an incident r emergency event warrants activatin f the IMT rganizatin. The NH Electric Operatins ICC is activated cnsistent with the Emergency Advisry Levels r as deemed necessary by the NH Electric Operatins EP rganizatin and/r the VP f NH Electric Field Operatins, specific respnse prcedure r when an incident's size and cmplexity requires representatin in the NH Electric Operatins ICC by rganizatins t supprt expanded peratins. The ICC can act as the Incident Cmmand Pst (ICP) t direct the actins f the IMT and t crdinate with ther Eversurce crprate rganizatins and federal, state and lcal agencies and fficials. As an integral element f the ICS, an ICP prvides the IC and Cmmand Staff a centralized lcatin fr planning respnse peratins, managing all emergency resurces cmmitted t the incident, and cmmunicating with respnse elements. The ICC, when activated as the ICP, perates arund-the-clck until the event has terminated and the IC makes the determinatin t clse the ICC and return t nrmal peratins. Transfer f cmmand nrmally takes place at 12-hur intervals until the event has been declared clsed. The ICC supprts the NH Electric Operatins IC in preparatin and respnse t an emergency. Representatives frm supprt rganizatins assemble as necessary t crdinate respnse with the IC, Cmmand Staff and General Staff. The ICC peratin is based n use f the ICS and is designed t functin at a level cnsistent with the size and cmplexity f an event. Staffing f the NH Electric Operatins ICC is dictated by the size and cmplexity f the event. The level f activity, and the number and skills f staff required t carry ut thse activities vary. The activatin f the ICC can ccur when intelligence data indicates actual r ptential incidents r events culd grw beynd the capability f managing the emergency event in the System Operatins Center (SOC). Activatin f the ICC is initiated thrugh the Emergency Preparedness rganizatin t affected persnnel and assigned management staff. Selectin f persnnel and rganizatins required t supprt the peratin are determined by the IC. The required supprt staff is alerted by the IC t reprt t the ICC t fulfill their assigned emergency rles and initiate staffing f their assigned functinal areas. Ntificatins f ICC activatin are als made t the fllwing entities / rganizatins: NH Electric Operatins Executive Management SOC NH Electric Operatins persnnel Eversurce EP-NHE-PLN f 76 Rev 0

18 New Hampshire Electric Operatins New Hampshire Department f Hmeland Security and Emergency Management (HSEM) and state regulatry agencies 2.7 Ntificatin The Vice President f Electric Field Operatins, r his r her designee, maintains the current list f ICC persnnel, bth primary and alternate. In the event that Energy Park is t be evacuated and an emergency has been declared, all members f the ICC are ntified by telephne, , r pager. Depending n the nature f the declared emergency, it might be necessary t ntify the lcal authrities f the circumstances fr the relcatin. If, fr example, a threat by a terrrist grup r disturbed individual were the cause f the evacuatin, plice prtectin culd be cnsidered at the alternate lcatin. Additinally, the State f New Hampshire Public Utilities Cmmissin and the State Office f Emergency Management shuld be made aware f the mve Emergency Respnse Organizatin Assignments Persnnel are identified and trained t fill key emergency respnse rles. A database is maintained by the EP rganizatin t ensure the rsters fr such psitins are always filled. Systems are established t direct individuals during the declaratin f an ERP event. Emergency respnse is a crprate respnsibility and a respnsibility f every Eversurce emplyee. Preparedness is fundamental t the prmpt and effective respnse t an emergency event. All emplyees have a cntinuing bligatin t be prepared and t respnd t emergency events as directed by management. As part f preparedness and respnding t emergency events, NH Electric Operatins has established this ERP and assciated dcumentatin t ensure that apprpriate resurces and persnnel are available and trained t supprt recvery and restratin peratins during an emergency event. Emplyees are trained n and have been assigned emergency respnse rles that are activated when a majr event ccurs. Fr purpses f this ERP, an emergency respnse rle is defined as a rle r task that a persn perfrms during emergency cnditins, which is different frm their nrmal wrk activities. Other persnnel have a single rle during an emergency event that des nt change frm their day-t-day respnsibilities. When an emergency event with the ptential fr severe impact is anticipated, the cmpany declares an ERP Event and all persnnel are cnsidered essential, unless therwise excused. Emplyees are required t make themselves available fr mbilizatin calls in the event they are needed t reprt t their assigned areas. The cmpany uses a variety f cmmunicatins methds (pagers, , vic , and, if necessary, public media) t bradcast this declaratin as sn as the decisin is made. Emplyees are expected t check these varius cmmunicatins channels with reasnable frequency t ensure they are aware when such a declaratin ccurs. Emplyees shuld listen fr bradcast messages indicating that the cmpany is mbilizing fr an event that has the ptential t impact ur service territry. All emplyees must keep their cntact infrmatin up-t-date in cmpany directries. Emplyees unable t reprt t wrk due t hme, family, r persnal emergency cnditins must immediately cntact their supervisr. Plicies addressing reprting t wrk, release frm wrk, release frm strm assignment, failure t reprt and timekeeping during severeimpact strms and ther emergencies can be fund in the relevant cmpany plicy dcumentatin. Eversurce EP-NHE-PLN f 76 Rev 0

19 2.8 Operatinal Stages New Hampshire Electric Operatins An emergency event can be segmented int phases r stages chrnlgically t assist in the crdinatin f actins and resurces. In general, these segments include: Pre-Event Preparedness Mbilizatin and Initial Respnse Sustained Actins Dembilizatin and Pst-Event Analysis and Reprting Pre-Event Preparedness T ensure capability fr immediate respnse t pwer utages caused by severe weather r ther disruptins, several elements are set in place prir t an actual emergency. These elements can include, but are nt limited t: Ntificatins are made t persnnel cncerning their assigned event reprting lcatins. Cntact lists are updated fr state and municipal fficials. Equipment needed fr pwer restratin is identified and, if pssible, pre-psitined at key pints within the service territry. Staging areas fr management teams and wrk crews are established. Cntracts are set in place fr utside line, service, and tree crews and ther essential resurces. Mutual Aid Agreements thrugh Edisn Electric Institute (EEI) and membership in Reginal Mutual Assistance Grups (RMAGs), such Nrth Atlantic Mutual Aid Grup (NAMAG). Cntract weather frecasting services are secured t prvide weather frecasting service, with ntificatin f any severe frecasts that have the ptential t adversely impact the distributin system. Cmmunicatin materials are prepared in advance n key tpics, pints-f-cntact, and basic facts explaining strm restratin activities and pririties. The Custmer Care rganizatin is prepared t elevate t the emergency respnse level. Assessment f the availability f the fllwing resurces: Line Resurces (including cntractr and/r mutual aid) Vegetatin Management Resurces Service Resurces Call Center staff Supprt Resurces, such as Damage Assessment Patrllers, Wire Guards, and s n Mbilizatin and Initial Respnse T ensure effective and efficient respnse t emergency events caused by severe weather r ther disruptins, several elements are cnsidered, including, but nt limited t: Establishment f ICS Structure Activatin f the ICC IMT persnnel ntificatin Assessment f resurce needs and availability Decentralizatin f system peratins Damage assessment planning Eversurce EP-NHE-PLN f 76 Rev 0

20 New Hampshire Electric Operatins Municipal and ther stakehlder utreach Ntificatin f apprpriate State fficials Cnference Calls There are three types f cnference calls that are used during an emergency event: Preparatin Calls EP rganizatin cnducts preparatin calls when the need t implement the preparatins strategy is apparent r imminent. This call is held with a brader grup including Directrs, Reginal Operatins Managers, and ther key persnnel frm supprt rganizatins. Incident Cmmand Calls The IC cnducts peridic peratins calls t review prgress n the IAP, and refine r adjust the IAP based n changing cnditins and current infrmatin, and t address tactical decisins, emergent issues, and requests fr supprt. Sectin (Functin) Calls Each Sectin Chief, r designee, cnducts functin specific calls (Operatins, Planning, Lgistics, Cmmunicatins, and s n), as apprpriate, t crdinate and update pririties, tasks, and deliverables t ensure cnsistency and alignment with the current guidance and plan. The wner f each type f call cmmunicates the type f call t the affected audience in advance f the call when pssible. Additinally, NH Electric Operatins participates in Eversurce system calls when an event impacts multiple gegraphic areas r entities Sustained Actins (Restratin) Sustained Actins generally cvers the activities required t return the electric distributin system t nrmal cnfiguratin and peratins Dembilizatin and Pst-Event Analysis and Reprting Dembilizatin and pst-event analysis and reprting ccur when restratin has been cmpleted, all resurces are dembilized; the ERP is deactivated; and blue sky peratins are resumed. It is during this perid that NH Electric Operatins gathers infrmatin, cnducts incident reviews, analyzes data, develps after-actin reprts, perfrms pst-event reprting t State fficials, and identifies imprvements t be implemented. A pst-strm critique r de-brief prcess is perfrmed t capture strengths, weaknesses, and lessns learned. All grups invlved in the restratin are requested t supply input during the prcess. Administrative updates are made t cntact lists and prcedures t ensure readiness fr the next emergency r event. Pst-incident evaluatins cmmnly knwn as Lessns Learned and After-Actin Reviews, cntribute t cntinuus emergency preparedness and respnse imprvements. Bth activities are likely t imprve when feedback recmmendatins are linked and incrprated int the plan and assciated supprt dcumentatin. The EP rganizatin is respnsible t ensure pst-incident evaluatins are perfrmed. Each area f the respnse rganizatin is respnsible fr participating in pst-incident perfrmance reviews. These meetings identify respnse activities and pprtunities fr imprvements. Participants and representatives frm each business unit f the respnse rganizatins are invited t discuss lessns learned and t identify imprvement pprtunities. Eversurce EP-NHE-PLN f 76 Rev 0

21 2.9 Service Restratin New Hampshire Electric Operatins During significant events, there are different strategies that can be emplyed t efficiently utilize resurces t ensure public safety and expedite the restratin f electric service t critical facilities and custmers. The availability f several restratin strategies is necessary because a variety f factrs, including: the severity f damage n the system; the gegraphic scpe f the damage; the impact the event has n critical facilities and rad accessibility; and the need t utilize mutual aid crews, influence the best way t respnd t an emergency event Majr Strm Restratin Philsphy and Pririties The electric system restratin prcess begins with a full evaluatin and assessment f the system s cnditin. Cnsistent with NH Electric Operatins verall rutine philsphy the mst imprtant pririty in strm restratin is fr public and emplyee safety. The first pririty in a strm restratin effrt is n the vital public safety functin f clearing dwned electric wires. Restratin Pririties: 1. Public Safety The de-energizing, cutting clear r securing f live distributin lines that pse an immediate threat t public safety r the cutting clear f wires that blck radways impairing the ability fr emergency respnse vehicles t respnd r fr municipal agencies t clear the radways. 2. Electric Infrastructure The restratin f transmissin lines and substatins that supply the distributin system. 3. Critical Infrastructure The restratin f service t critical facilities such as plice and fire statins, hspitals, schls, water supply and sewage treatment facilities, shelters and nursing hmes. 4. Circuit Backbnes The re-energizing f circuit backbne lines which are the main surce f pwer t reach the distributin line lateral feeders. 5. Lateral Feeders The restratin f lines serving large blcks f custmers and/r whle neighbrhds t maximize the restratin f pwer t the highest number f custmers in the minimum amunt f time. 6. Transfrmers/Secndary Circuits The restratin f lcalized secndary vltage lines serving a limited number r small number f custmers. 7. Individual Services The IC balances the use f available resurces with the impact based upn the freging pririties t ptimize the verall respnse. There is n steadfast rule regarding hw t evaluate the pririties at any given mment because circumstances are cnstantly changing, which require time-specific resurce allcatin. The IC takes int cnsideratin a variety f factrs, in additin t the pririty f the underlying affected custmers, when assigning wrk using a truble-rder based restratin strategy. These factrs and exigent circumstances can include, but are nt limited t: the type f wrk necessary t address the truble rder and the type f resurces available, the prximity f available crews, the specific needs f the respnse (particularly as it relates t the need fr specialized equipment), the ptential Eversurce EP-NHE-PLN f 76 Rev 0

22 New Hampshire Electric Operatins cnsequences f delaying the restratin (such as, medical hardships r an ut-f-service sewage treatment plant), and the time necessary t restre the custmer Decentralizatin System Operatins Center (SOC) Event In a smaller Level 5 event, the SOC Shift Supervisr r Manager ften assumes the rle f IC; decentralizing the respnse frm the SOC is nt necessary. Cmmnly, the IC fulfills many f the ICS rles in a Level 5 event, but he r she can fill such rles with ther individuals as necessary. In general, the IC directs the respnse frm the SOC, which acts as the effective Incident Cmmand Pst. Reginal Event If an event is frecast t r expands t invlve several lcatins within a single Regin, the Reginal EOC activates and staffs Restratin Management Teams (RMTs). Each RMT includes an Operatins Crdinatr, a System Operatr / Authrized Persn, and OMS Analyzer/Mdeler. The SOC transfers cntrl t ne r mre RMTs within the Reginal EOC. The Operatins Branch Directr crdinates restratin activities amng all the RMTs activated within his r her regin. Planning and Lgistics supprt is prvided by the Reginal Planning and Lgistics Branch Directrs in crdinatin with the ICC staff. The SOC r the ICC acts as the ICP fr a Reginal Event. NH-Wide Event If the event expands t r invlves multiple areas acrss several r all Regins where additinal resurces are needed, the ICC becmes the ICP with a full activatin f the IMT. At the Reginal level, additinal RMTs can be activated. The SOC transfers cntrl f a specific area t each RMT as crdinated thrugh the Operatins Sectin Chief and Reginal Operatins Branch Directr. Each additinal RMT receives its Planning, Lgistics, and Cmmunity Liaisn supprt thrugh the EOC Planning and Lgistics persnnel Restratin Strategies Different types f events necessitate strategies that are designed t ptimize the use f resurces t manage the impact and duratin f the event. The develpment and utilizatin f multiple strategies is recgnitin f the fact that n tw events are the same, prviding the flexibility t adapt the respnse t meet the bjectives f the particular event. Due t the size and diversity f NH Electric Operatins service territry, ne r mre f the fllwing strategies can be emplyed in parallel during an event t maximize the event respnse and utilizatin f available resurces. This decisin is made by the IC, relying n infrmatin prvided by the Planning and Operatins Chief and is based n the predicated amunt f damage n the system and the available resurces, fcusing n ptimizing the use f resurces and minimizing the impact f the event n custmers. Event-Based Strategy Outage event-based strategy is mst frequently applied during smaller t medium emergency events (Event Levels 5 and 4 r during the final stages f restratin in Level 3 r greater), where the number f truble rders is mdest and manageable. It can als be useful during larger events where there is nt a significant amunt f physical damage experienced by the system (fr example, lcalized lightning events). It is als useful befre r while an initial damage assessment is being undertaken. Eversurce EP-NHE-PLN f 76 Rev 0

23 New Hampshire Electric Operatins The Event-Based strategy relies upn addressing specific truble rders in a priritized manner. Using this strategy, rutine, day-t-day restratin prcesses used t predict, lcate, and repair faulty equipment r line sectins are utilized. The Outage Management System (OMS) facilitates the priritizing f truble rders in a variety f ways. An Event-Based restratin strategy is very effective when the physical damage is nt substantial and when the number f truble rders allws efficient priritizatin. The effectiveness f this type f restratin strategy hwever, can be diminished when the physical damage is substantial in a specific gegraphic area, because the time necessary t restre a specific truble rder is nt easily incrprated int the analysis that priritizes and assigns wrk. Cnsequently, during significant events where there is widespread damage resulting in a large number f truble rders with physical damage, a Circuit-Based r Hybrid restratin strategy might be mre apprpriate t ptimize the restratin effrt. Circuit-Based Strategy A Circuit-Based strategy is mst frequently applied during very large emergency events (Event Levels 2 and 1) where the number f truble rders is significant and the damage is widespread and extensive. The magnitude and breadth f damage realized by these types f emergency events (such as, trnades, trpical strms, ice strms, and hurricanes), requires rebuilding entire circuits r prtins f circuits, making ther restratin strategies usually less efficient. A Circuit-Based restratin strategy can als be apprpriate where there are a significant number f breaker lckuts that make an area-based strategy less effective. A Circuit-Based restratin strategy fcuses n restring a priritized set f circuits. This apprach can rely upn a pre-established priritizatin taking int accunt the pririty guidelines. Mrever, a Circuit-Based restratin strategy is flexible and can fcus n restring circuit backbnes initially and then switch t restre all laterals and services. Crdinatin with the Transmissin Liaisn takes place as required develping an integrated sequence f circuits t restre. Using this strategy, and the infrmatin captured in OMS, truble rders are gruped by circuit and assigned based n their pre-established pririty. A team lead is assigned respnsibility fr all truble rders fr a particular circuit. Typically, restratin begins at the substatin and restratin is accmplished sectin by sectin. This lcal cntrl allws the team leader t direct multiple resurce types, including; damage assessrs, first respnders, and line crews. Hybrid Strategy The Hybrid Strategy is mst frequently applied during medium t larger emergency events (Event Levels 3 and greater), where the number f truble rders is significant and therefre less manageable n a discrete basis. It is useful during larger events where there is a significant amunt f physical damage experienced n the system. It incrprates a cmbinatin f bth Event-based and Circuit-based strategies in the same gegraphic area. This type f restratin strategy capitalizes n directing multiple resurce types, including damage assessrs, first respnders, and line crews under ne authrity, thereby, ptimizing their effrts and reducing the verall duratin f the emergency event External Resurce Acquisitin Based n the resurce needs and availability assessment cnducted by the Planning Sectin Chief, the IC determines the external resurces required fr respnding t an emergency event and crdinates acquisitin with the Lgistics Sectin Chief. Eversurce EP-NHE-PLN f 76 Rev 0

ESF #5 Emergency Management Annex (1.0)

ESF #5 Emergency Management Annex (1.0) ESF #5 Emergency Management Annex (1.0) DCCCD Emergency Management Apprval and Implementatin Dallas Cunty Cmmunity Cllege District Emergency Supprt Functin #5 Emergency Management Annex This Emergency

More information

Emergency Support Function (ESF) 9 Search and Rescue Unit

Emergency Support Function (ESF) 9 Search and Rescue Unit Emergency Supprt Functin (ESF) 9 Lead Crdinating Organizatin: Supprt Organizatin: Escambia Cunty Fire Rescue Divisin City f Pensacla Fire Department Escambia Search and Rescue, Inc Suthwest Panhandle Search

More information

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill. OBJECTIVE 32: UNANNOUNCED EXERCISE OR DRILL OBJECTIVE Demnstrate the capability t carry ut emergency respnse functins in an unannunced exercise r drill. INTENT This bjective is derived frm NUREG-0654,

More information

Process Safety Management Program for Contractors

Process Safety Management Program for Contractors Page 1 f 7 Sect: 1.0 Purpse This sectin cntains requirements fr Ardent (Cntract Emplyer) and ur subcntractrs fr assisting ur clients in preventing r minimizing the cnsequences f catastrphic releases f

More information

Document Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE

Document Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE Dcument Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE Dcument Number PO-WHS-03 Dcument Status Authr Manager Human Resurces August 2012 Apprving Authrity Management Cmmittee August 2012

More information

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS This Infrmatin Sheet prvides guidance n what t cnsider when undertaking an Out f Hurs Wrking risk assessment and deciding the cntrls

More information

2. For the tenth absence and all absences thereafter, a student s absences from school are considered excused for the following reasons:

2. For the tenth absence and all absences thereafter, a student s absences from school are considered excused for the following reasons: 6.004. Plicy Cncerning Schl Attendance and Truancy 6.004. Plicy Cncerning Schl Attendance and Truancy Cperative Educatinal Services (C.E.S.) believes that regular schl attendance is essential fr an effective

More information

A template mass rescue operations plan

A template mass rescue operations plan The Internatinal Maritime Rescue Federatin Mass Rescue Operatins Prject: A template mass rescue peratins plan Cntents This paper prvides a template fr a mass rescue peratins plan. 1 Overview 1.1 Fr a general

More information

18. DISASTER AND EMERGENCY PLANNING

18. DISASTER AND EMERGENCY PLANNING 18. DISASTER AND EMERGENCY PLANNING Intrductin All cmmunities within the state f Arizna are vulnerable t the adverse effects f peacetime r wartime disasters. T reduce the lss f life, scial disruptin, and

More information

STATEMENT OF SAFETY & HEALTH RESPONSIBILITIES Administrative Practice

STATEMENT OF SAFETY & HEALTH RESPONSIBILITIES Administrative Practice STATEMENT OF SAFETY & HEALTH RESPONSIBILITIES Administrative Practice The effective management f safety requires a clear delineatin f all lines f authrity within the rganizatin. There must be a clear understanding

More information

Kilkivan State School Executive Summary

Kilkivan State School Executive Summary Kilkivan State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Kilkivan State Schl frm 17 t 18 August 2015. It prvides an evaluatin f the schl s perfrmance

More information

Roosevelt County ARES/RACES Emergency Communication Plan

Roosevelt County ARES/RACES Emergency Communication Plan 12/25/10 Rsevelt Cunty ARES/RACES Emergency Cmmunicatin Plan This dcument is a guide that cntains the minimum infrmatin needed t prvide ARES/RACES supprt t a served agency in an emergency. This emergency

More information

IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC

IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC OBJECTIVE 14: IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC OBJECTIVE Demnstrate the capability and resurces t implement

More information

REGIONAL SWIMMING HUB STRATEGIC OVERVIEW

REGIONAL SWIMMING HUB STRATEGIC OVERVIEW REGIONAL SWIMMING HUB STRATEGIC OVERVIEW Updated 1 May 2017 P a g e 1 INDEX EXECUTIVE SUMMARY THE REQUIREMENT THE SOLUTION LAYING THE FOUNDATION THE GOALS THE IMPLEMENTATION POSITION DESCRIPTION HUB HEAD

More information

First Aid Policy Version 2.0

First Aid Policy Version 2.0 First Aid Plicy Versin 2.0 Cntents Definitins Page 3 Ratinale & Scpe Page 3 Guiding Principles Page 3 Relevant Legislatin Page 3 Plicy Statements Page 4 1. Respnse t injuries and illness Page 4 2. First

More information

OPERATIONAL SYSTEM DESCRIPTION

OPERATIONAL SYSTEM DESCRIPTION NATIONAL INTER-AGENCY INCIDENT MANAGEMENT SYSTEM (NIIMS) OPERATIONAL SYSTEM DESCRIPTION POSITION DESCRIPTIONS & PROCEDURES MANUAL FOR GENERAL USE TABLE OF CONTENTS INTRODUCTION TO NIIMS 3 ICS OPERATING

More information

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p Exercise 2: Reviewing the Wrkplace Inspectin Checklist (30 min) p. 19-20 Part One: Behaviurs vs. Cnditins (15 min) Wrking individually: Think f 3 r 4 incidents that have ccurred r have the ptential t ccur

More information

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE Are the emplyees r cntractrs wh wrk in yur facility expsed t cnfined space hazards? Have yu cnducted a thrugh assessment f yur facility

More information

Construction Design and Management

Construction Design and Management Cnstructin Design and Management GUIDANCE ON THE CONSTRUCTION PHASE PLAN Veritas Cnsulting Safety Services 42 Haslucks Crft, Shirley, Slihull, B90 2EQ Tel: 0121 249 1281 Mb: 07814 203 977 www.veritas-cnsulting.c.uk

More information

Assistant Coach 2013/14 ANZ Championship Season. Position Description

Assistant Coach 2013/14 ANZ Championship Season. Position Description Assistant Cach 2013/14 ANZ Champinship Seasn Psitin Descriptin Reprts t: Netball Nrthern Zne High Lcatin: Must be based in Perfrmance Manager Auckland Emplyee Name: Date: PURPOSE: The Nrthern Mystics Assistant

More information

Ipswich Central State School Executive Summary

Ipswich Central State School Executive Summary Ipswich Central State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Ipswich Central State Schl frm 8 t 11 September 2015. It prvides an evaluatin f

More information

E25 FATIGUE MANAGEMENT

E25 FATIGUE MANAGEMENT E25 FATIGUE MANAGEMENT PURPOSE AND SCOPE This Prcedure prvides the requirements and guidance needed t manage fatigue fr Laing O Rurke railway peratins. It will need t be read in cnjunctin with the rail

More information

Visit Leader Emergency Action Card

Visit Leader Emergency Action Card Visit Leader Emergency Actin Card If an Establishment decides t adpt this card, it shuld be carried by all staff accmpanying a visit. It is recmmended that this is printed, laminated, and als placed in

More information

SINGLE INDUSTRY SPOKESPERSON PROTOCOL FOR GAS IN VICTORIA

SINGLE INDUSTRY SPOKESPERSON PROTOCOL FOR GAS IN VICTORIA SINGLE INDUSTRY SPOKESPERSON PROTOCOL FOR GAS IN VICTORIA PREPARED BY: Media and Crprate Affairs UPDATED: 7 July 2016 Cntents 1 Intrductin... 3 2 Backgrund... 3 3 Objective... 3 4 Criteria fr activating

More information

2017 Active Allegheny Grant Program Program Guidelines

2017 Active Allegheny Grant Program Program Guidelines Redevelpment Authrity f Allegheny Cunty Nte: Fr infrmatin purpses nly. Prgram guidelines subject t change prir t next funding cycle. 2017 Active Allegheny Grant Prgram Prgram Guidelines Intrductin The

More information

Users Requirements Statement

Users Requirements Statement Mnday, March 29, 2004 http://www.prjectdevelper.cm Cntents Agreement s Purpse... 2 Applicatin s Descriptin... 2 Applicatin s Input/Output Summary... 4 Business Rules... 8 Applicatin Develpment Cmpletin

More information

WASHINGTON TOWNSHIP FIRE DISTRICT TOWNSHIP OF WASHINGTON

WASHINGTON TOWNSHIP FIRE DISTRICT TOWNSHIP OF WASHINGTON WASHINGTON TOWNSHIP FIRE DISTRICT TOWNSHIP OF WASHINGTON GLOUCESTER COUNTY, NEW JERSEY Bard f Fire Cmmissiners P.O. Bx 653 Turnersville, N.J. 08012-0653 DISTRICT OFFICE (856) 863-4000 FAX: (856) 589-0239

More information

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success)

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success) ELLERSLIE AFC OPERATIONAL PLAN (Game Develpment and Ftball Success) Ellerslie AFC has a reputatin thrughut the Auckland ftball cmmunity as a family-friendly club that prvides an enjyable and rewarding

More information

CITY OF SACRAMENTO. Regulatory Compliance Program

CITY OF SACRAMENTO. Regulatory Compliance Program CITY OF SACRAMENTO Regulatry Cmpliance Prgram Tpic: Ergnmics Prgram Effective Date: 05/19/09 Frm: T: Human Resurces Department Risk Management Divisin Department Directrs/Divisin Managers Supersedes: 03/03

More information

DRAFT Active Transportation Work Plan

DRAFT Active Transportation Work Plan DRAFT Active Transprtatin Wrk Plan T achieve the visin and gals utlined in the Plicy Framewrk SCAG will adpt the Active Transprtatin Wrk Plan which is based n plicies and gals frm the 2012 RTP/SCS. The

More information

THE FOOTBALL ASSOCIATION DISCIPLINE PROCESS FOR SMALL-SIDED FOOTBALL

THE FOOTBALL ASSOCIATION DISCIPLINE PROCESS FOR SMALL-SIDED FOOTBALL THE FOOTBALL ASSOCIATION DISCIPLINE PROCESS FOR SMALL-SIDED FOOTBALL Intrductin Implementing an effective disciplinary prcess is an imprtant factr fr all frmats f ftball, helping t establish a quality,

More information

Positive Handling Policy

Positive Handling Policy Hillcrest Children s Services Jubilee Schl Psitive Handling Plicy Lcal Prcedure Owner: Tim Rgers Issue date: September 2016 Review date: September 2017 Linked with lcal prcedures: Anti Bullying Behaviur

More information

Nowra Brickworks Quarry

Nowra Brickworks Quarry Suth Cast Cncrete Crushing and Recycling Pllutin Incident Respnse Management Plan Nwra Brickwrks Quarry Intrductin The bject f this respnse plan is t ensure cmprehensive and timely cmmunicatin abut a pllutin

More information

Mount Gravatt State School Executive Summary

Mount Gravatt State School Executive Summary Munt Gravatt State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Munt Gravatt State Schl frm 27 t 29 April 2015. It prvides an evaluatin f the schl

More information

Emergency Response Plan

Emergency Response Plan Emergency Respnse Plan Dc N. EMP-PDR-01 Emergency Respnse Plan Effective April 30, 2018 Emera New Brunswick Cntrlled Cpy 16 Uncntrlled if Printed PUBLIC Page 1 f 53 Emergency Respnse Plan Dc N. EMP-PDR-01

More information

CSI School Safety Survey Questions

CSI School Safety Survey Questions Safe Schls Plan 2015-16 CSI Schl Safety Survey Questins Des yur schl have a schl safety plan? N Check all that apply: The Schl Safety Plan is psted fr viewing in ur schl The Schl Safety Plan has been shared

More information

First Aid Policy. North Halifax Grammar School. Approved by: Principal. Date approved: November Next review: Autumn Term 2020.

First Aid Policy. North Halifax Grammar School. Approved by: Principal. Date approved: November Next review: Autumn Term 2020. Nrth Halifax Grammar Schl First Aid Plicy Apprved by: Principal Date apprved: Nvember 2017 Next review: Autumn Term 2020 Plicy wner: Schl Welfare Officer Created April 2014 General The Academy is required

More information

GROVE SCHOOL BIRMINGHAM CITY COUNCIL E-SAFETY POLICY FOR SCHOOLS

GROVE SCHOOL BIRMINGHAM CITY COUNCIL E-SAFETY POLICY FOR SCHOOLS GROVE SCHOOL BIRMINGHAM CITY COUNCIL E-SAFETY POLICY FOR SCHOOLS 1. Intrductin 1.1 The gverning bdy f Grve Schl has adpted this plicy t help the schl meet its respnsibilities fr safeguarding and educating

More information

CSUCI Emergency Management Plan Sections Guide

CSUCI Emergency Management Plan Sections Guide CSUCI Emergency Management Plan Sectins Guide Sectin 1: CSUCI Campus Emergency Management Plan Sectin 2: Emergency Mgmt. Rster (alternate EOC lcatins) Emergency Operatins Sectin Assignments Sectin 3: Appendices

More information

Note: Other Divisions (ex: Research Operations) may have additional or more stringent requirements in addition to this procedure.

Note: Other Divisions (ex: Research Operations) may have additional or more stringent requirements in addition to this procedure. Regulatin: Reference: Title: Hazardus Materials Spill Respnse Plicy Plicy Number: Effective Date: Next Review Date: 75.27 August 2012 March 2018 Prcedure Statement: This plicy will cver the accidental

More information

Mudgeeraba State School Executive Summary

Mudgeeraba State School Executive Summary Mudgeeraba State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Mudgeeraba State Schl frm 16 t 20 July 2015. It prvides an evaluatin f the schl s perfrmance

More information

Owner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013

Owner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013 Well Shut-in Practice - Attachment 1 Practice Owner: USA Divisin Safety Revisin N: 00 Date last revised: 01/14/2013 1.0 Applicability This practice applies t all Encana Oil & Gas (USA) Inc. (Encana) emplyees

More information

Student Name: Application for Employment-Based Field Practicum. DEPARTMENT of SOCIAL WORK

Student Name: Application for Employment-Based Field Practicum. DEPARTMENT of SOCIAL WORK DEPARTMENT f SOCIAL WORK Student Name: Applicatin fr Emplyment-Based Field Practicum Directins: The field educatin prcess is a partnership invlving the scial wrk prgram, field educatin Prgram, scial wrk

More information

Referee Mentor Handbook

Referee Mentor Handbook Referee Mentr Handbk Referee Mentr Handbk 2011-2012 1 The AYSO Natinal Office TEL: (800) 872-2976 FAX: (310) 525-1155 www.ays.rg All rights reserved. 2011 American Yuth Sccer Organizatin Reprductin in

More information

Hambledon State School Executive Summary

Hambledon State School Executive Summary Hambledn State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Hambledn State Schl frm 9 t 11 September 2015. It prvides an evaluatin f the schl s perfrmance

More information

URGENT MEDICAL DEVICE RECALL : /29/ C Z

URGENT MEDICAL DEVICE RECALL : /29/ C Z Custmer Cde Number: ##### Custmer Address City, State, Zip Cuntry Attentin: Risk Management Attentin: Reference: URGENT MEDICAL DEVICE RECALL March 09, 2012 Risk Management, Operating Rm Directr, Operating

More information

Guidance on Exception Reporting for Educational and Clinical Supervisors and Leads

Guidance on Exception Reporting for Educational and Clinical Supervisors and Leads Guidance n Exceptin Reprting fr Educatinal and Clinical Supervisrs and Leads Exceptin Reprting is the mechanism used by dctrs t infrm the emplyer when their day-t day wrk varies significantly and/r regularly

More information

Selection Policy for Badminton Australia Support Structure (BASS) and National Squad.

Selection Policy for Badminton Australia Support Structure (BASS) and National Squad. Selectin Plicy fr Badmintn Australia Supprt Structure (BASS) and Natinal Squad. Prgram Outline The main purpse f the Badmintn Australia s (BA) High Perfrmance (HP) prgram is t achieve internatinal success.

More information

Kingsthorpe State School Executive Summary

Kingsthorpe State School Executive Summary Kingsthrpe State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Kingsthrpe State Schl frm 7 t 11 May 2015. It prvides an evaluatin f the schl s perfrmance

More information

STATE OF NORTH CAROLINA Office of the State Auditor

STATE OF NORTH CAROLINA Office of the State Auditor STATE OF NORTH CAROLINA Office f the State Auditr Beth A. Wd, CPA State Auditr 2 S. Salisbury Street 20601 Mail Service Center Raleigh, NC 27699-0601 Telephne: (919) 807-7500 Fax: (919) 807-7647 Internet

More information

Charter School Annual Site Visit Report Charter School Office BRONX COMMUNITY CHARTER SCHOOL ANNUAL SITE VISIT REPORT APRIL 2010

Charter School Annual Site Visit Report Charter School Office BRONX COMMUNITY CHARTER SCHOOL ANNUAL SITE VISIT REPORT APRIL 2010 Charter Schl Annual Site Visit Reprt Charter Schl Office 2009-2010 BRONX COMMUNITY CHARTER SCHOOL ANNUAL SITE VISIT REPORT APRIL 2010 CHARTER SCHOOL OFFICE 52 Chambers Street, New Yrk, NY 10007 Part 1:

More information

Emergency Response Policy and Procedure

Emergency Response Policy and Procedure Emergency Respnse Plicy and Prcedure Table f Cntents EMERGENCY RESPONSE POLICY... 2 1. POLICY STATEMENT... 2 1.1 Purpse... 2 1.2 Scpe... 2 1.3 Overview... 2 1.4 Definitins... 3 2. RESPONSIBILITIES... 3

More information

Understanding IRB Office of Research Integrity

Understanding IRB Office of Research Integrity Understanding IRB Office f Research Integrity Federal Definitins Research: A systematic investigatin, including research develpment, testing and evaluatin, designed t develp r cntribute t generalizable

More information

Occupant Emergency Plans

Occupant Emergency Plans Occupant Emergency Plan Guide Occupant Emergency Plans Develpment, Implementatin, and Maintenance Develpment, Implementatin, and Maintenance Occupant Emergency Plans September 2007 Nvember 2007 Occupant

More information

Currimundi Special School Executive Summary

Currimundi Special School Executive Summary Currimundi Special Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Currimundi Special Schl frm 8 t 10 September 2015. It prvides an evaluatin f the schl

More information

Plain Language Summary

Plain Language Summary Pennsylvania Envirnmental Quality Bard New Regulatins fr Oil and Gas Well Casing and Cementing (Amendments t Chapter 78) Plain Language Summary In this dcument, the wrds rules and regulatins have the same

More information

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3 Supplement t Plicy 7 - Rep Hckey Date Revised: July 2017 Versin 1.3 1 Table f Cntents Table f Cntents 1 Rep Tryut Prcedure Guidelines 2 Intrductin: 2 Rep Tryut Objectives: 2 Purpse f Player Evaluatin and

More information

benecosmavericks NETBALL SELECTION POLICY 2018 / 2019

benecosmavericks NETBALL SELECTION POLICY 2018 / 2019 Purpse and scpe f plicy benecsmavericks NETBALL SELECTION POLICY 2018 / 2019 This plicy sets ut hw players are selected int the benecsmavericks Academy training and cmpetitin Squads. These squads are part

More information

Cycling Strategy Group. Terms of Reference

Cycling Strategy Group. Terms of Reference Cycling Strategy Grup Terms f Reference 1. Cntext In May 2014 the Ecnmic and Envirnmental Wellbeing Scrutiny and Plicy Develpment Cmmittee cncluded its Cycling Inquiry. It set ut an ambitius visin fr cycling

More information

American Water Works Association. Organizational & Technical Strategic Data Management Assessment Request for Proposal

American Water Works Association. Organizational & Technical Strategic Data Management Assessment Request for Proposal American Water Wrks Assciatin Organizatinal & Technical Strategic Data Management Assessment Request fr Prpsal 08/01/2018 1 Overview 1.1 Abut AWWA The American Water Wrks Assciatin (AWWA) is an internatinal,

More information

Swim Around Lido Key Saturday, April 22, 2017 Race and Safety Plan

Swim Around Lido Key Saturday, April 22, 2017 Race and Safety Plan Swim Arund Lid Key Saturday, April 22, 2017 Race and Safety Plan This dcument utlines the details abut the race and safety plans fr ur 7-mile pen water race n Lid Key, Flrida. It cntains the fllwing: Race

More information

Field Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work.

Field Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work. Field Instructin 10.3 Specialised Insulated Plant fr Vegetatin Management Purpse This instructin utlines the minimum requirements and safe apprach distances (SADs) fr specialised insulated plant peratrs

More information

Equipment Strategy for Post Type High Voltage Current Transformers and Metering Units

Equipment Strategy for Post Type High Voltage Current Transformers and Metering Units ASM-STR-A2281256 Versin: 2.0 Equipment Strategy fr Pst Type High Vltage Current Transfrmers and Equipment Strategy fr Pst Type High Vltage Current Transfrmers and Metering Units Current versin: 20/06/2018

More information

Ayios Nikolaos Primary School s Attendance Policy

Ayios Nikolaos Primary School s Attendance Policy Attendance Plicy 1 1. Every Child Matters Ayis Niklas Primary Schl s Attendance Plicy ANPS Attendance Plicy links directly t the Every Child Matters utcme f Enjying and Achieving. Whilst children are in

More information

Kennecott Utah Copper Corporation Safety and Health Standards

Kennecott Utah Copper Corporation Safety and Health Standards Revisin N. 3 12/2004 Page 1 f 7 Kennectt Utah Cpper Crpratin Safety and Health Standards Standard N.: 16.4 CRANES AND HOISTS 16.4.1 INTRODUCTION 16.4.1.1 The purpse f this standard is t prvide requirements

More information

Revision: 05/20/15. To provide procedures for the safe and effective use of technical rope rescue equipment during emergency operations.

Revision: 05/20/15. To provide procedures for the safe and effective use of technical rope rescue equipment during emergency operations. Revisin: Fire Chief: Eric Thmpsn PURPOSE T prvide prcedures fr the safe and effective use f technical rpe rescue equipment during emergency peratins. POLICY This plicy is designed t prvide general guidelines

More information

Who s Your School Breakfast Star? Writing Contest Official Rules

Who s Your School Breakfast Star? Writing Contest Official Rules Wh s Yur Schl Breakfast Star? Writing Cntest Official Rules Abut the Writing Cntest As part f SNA s Natinal Schl Breakfast Week 2013, students will have the pprtunity write abut a special breakfast with

More information

Demonstrate the adequacy of vehicles, equipment, procedures, and personnel for transporting contaminated, injured, or exposed individuals.

Demonstrate the adequacy of vehicles, equipment, procedures, and personnel for transporting contaminated, injured, or exposed individuals. OBJECTIVE 20: MEDICAL SERVICES - TRANSPORTATION OBJECTIVE Demnstrate the adequacy f vehicles, equipment, prcedures, and persnnel fr transprting cntaminated, injured, r expsed individuals. INTENT This bjective

More information

Topic Sheet No. 5 Safe rigging of rope access equipment

Topic Sheet No. 5 Safe rigging of rope access equipment Dc. N.: HS-085ENG Date f Issue: 16/05/17 Issue N.: 001 Page 1 f 5 Tpic Sheet N. 5 Safe rigging f rpe access A tpic sheet prepared by IRATA Internatinal (2017) SAFETY AND HEALTH TOPIC SHEET NO. 5: SAFE

More information

Go Ride A Wave - Employment Information Sheet (V13)

Go Ride A Wave - Employment Information Sheet (V13) G Ride A Wave - Emplyment Infrmatin Sheet (V13) Welcme t G Ride A Wave! Established in 1987, G Ride A Wave (GRAW) is an industry leader in utdr adventure educatin and recreatin. The cmpany perates in tw

More information

Experience and technical knowledge of Lifeguarding or similar public safety roles. Demonstrate an ability to operate SLSNSW radio network.

Experience and technical knowledge of Lifeguarding or similar public safety roles. Demonstrate an ability to operate SLSNSW radio network. Surf Life Saving Services Pty Ltd Psitin Descriptin Psitin Wrk Lcatin Psitin Descriptin Cmpleted Supervisr Varius Cuncil areas thrughut NSW June 2018 Reprts T: Direct Reprts: Department Crdinatr r Operatins

More information

Health and Safety Policy for Groups Policy

Health and Safety Policy for Groups Policy Wdcraft Flk Plicy Health & Safety fr Grups Plicy Revised by: Debs McCahn & Sarah McGvern February 2013 Health and Safety Plicy fr Grups Plicy Last updated: February 2013 Revised by: Debs McCahn (Membership

More information

WORK HEALTH AND SAFETY POLICY

WORK HEALTH AND SAFETY POLICY Page 1 f 8 WORK HEALTH AND SAFETY POLICY Fairhlme Cllege Twmba ABN 16 917 099 053 CRICOS Prvider Cde 00651J Purpse Scpe References The purpse f this plicy is fr Fairhlme Cllege t wrk twards mitigating

More information

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff FACILITIES MANAGEMENT Ht Wrk Plicy fr Wrk Perfrmed By University Emplyees 03/13/18 - Last Revisin INTENT: The intended purpse f this Plicy is t prvide a safe wrk/learning envirnment in University buildings

More information

RESPIRATORY PROTECTION PROGRAM UW-GREEN BAY

RESPIRATORY PROTECTION PROGRAM UW-GREEN BAY UWGB Respiratry Plan RESPIRATORY PROTECTION PROGRAM UW-GREEN BAY Table f Cntents: I. Purpse II. III. IV. Prgram Administratin Wh Is Cvered Prgram Elements V. Designated Respnsibilities VI. Fit Test Prtcls

More information

Contingency Planning: planning for any event that might happen. Consult event Risk Assessment Form:

Contingency Planning: planning for any event that might happen. Consult event Risk Assessment Form: A MISSING COMPETITOR - EMERGENCY SAFETY PROCEDURES Preparatin and Preventin. All f the guidance recgnises that sund planning and rganisatin, befre the event and n the day, will g a lng way t ensure that

More information

Brook Cricket Club Pirrie Hall, Haslemere Road, Brook, Surrey, GU8 5UJ

Brook Cricket Club Pirrie Hall, Haslemere Road, Brook, Surrey, GU8 5UJ Brk Cricket Club Pirrie Hall, Haslemere Rad, Brk, Surrey, GU8 5UJ www.brkcricketclub.c.uk Safeguarding Children Plicy Guidelines n: 1. Transprt t and frm Matches and Training 2. Managing Children Away

More information

Federal Way City Center Access Study Comment Log Summary

Federal Way City Center Access Study Comment Log Summary Prject verview The City f Federal Way is pursuing the City Center Access prject t find ways t imprve access t Federal Way s City Center and the surrunding area. The City is studying slutins t cngestin

More information

How to Prepare Your Business For an Active Shooter Provided by: SilverStone Group

How to Prepare Your Business For an Active Shooter Provided by: SilverStone Group Hw t Prepare Yur Business Fr an Active Shter Prvided by: SilverStne Grup 11516 Miracle Hills Drive Omaha, NE 68154 Tel: 402-964-5400 Active Shter Guide Training Yur Staff fr an Active Shter Situatin An

More information

Guidelines for Underground Soft Rock Miner Program # Common Core and Specialty Modules

Guidelines for Underground Soft Rock Miner Program # Common Core and Specialty Modules Ministry f Training, Clleges and Universities Ministère de la Frmatin et des Cllèges et Universités Effective: January 1, 2012 Guidelines fr Undergrund Sft Rck Miner Prgram #770130 Cmmn Cre and Specialty

More information

Byfield State School Executive Summary

Byfield State School Executive Summary Byfield State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Byfield State Schl frm 3 t 4 August, 2015. It prvides an evaluatin f the schl s perfrmance

More information

Medibank s Requirements for Recognised Providers

Medibank s Requirements for Recognised Providers Medibank s Requirements fr Recgnised Prviders Intrductin Medibank Private Limited (Medibank) ffers private health insurance prducts under tw different brands, Medibank Private and ahm Health Insurance.

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specificatin Gen DB MF Cnslidatin and Gas Burn Reprt UI/API Dc ID: GNFDMDEHU6BB-46-53 Page 1 f 18 Disclaimer All infrmatin cntained in this draft Business Requirements Specificatin

More information

Kowanyama State School Executive Summary

Kowanyama State School Executive Summary Kwanyama State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Kwanyama State Schl frm 16 t 19 March 2015. It prvides an evaluatin f the schl s perfrmance

More information

Safety in Physical Education Guidance - updated January 2016

Safety in Physical Education Guidance - updated January 2016 Safety in Physical Educatin Guidance - updated January 2016 Cambridgeshire Cunty Cuncil supprts the develpment f physical educatin (PE) and schl sprt as it plays a significant rle in the verall learning

More information

POSITION DESCRIPTION CSCS CLEANER

POSITION DESCRIPTION CSCS CLEANER Name Psitin N. Campus POSITION DESCRIPTION CSCS CLEANER Classificatin Level 1, Step 2 Hurs per Week Emplyment Status Nature f Emplyment Emplyer Cntributin t Superannuatin Wrkplace Agreement Date Last Reviewed

More information

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature Fire Chief Signature Date Effective: 01apr13 Revised: Page: 1 f 5 Purpse: T establish standards fr GFD peratins when facilitatings ice r water rescue incidents,including safety cnsideratins, respnsibility,

More information

SCALES NW BACK SAFETY PROGRAM

SCALES NW BACK SAFETY PROGRAM Purpse This safety prgram is designed t establish clear cmpany gals and bjectives with regard t back safety and will be cmmunicated t all required persnnel. The cmpany will review and evaluate this safety

More information

Dubuque Dream Center DUBUQUE INTENSITY Traveling Basketball Program

Dubuque Dream Center DUBUQUE INTENSITY Traveling Basketball Program Dubuque Dream Center DUBUQUE INTENSITY Traveling Basketball Prgram 1 2 Dubuque Dream Center Intensity Dream Traveling Basketball Prgram Prgram Plices Prcedures & General Infrmatin: Club Objectives: 1.

More information

Training Teams and Selection Criteria:

Training Teams and Selection Criteria: January 17, 2019 Biathln Canada 2019-2020 Training Selectin Criteria Intrductin: The purpse f this dcument is t define the selectin criteria fr athletes t be selected fr a Training. A Training is a grup

More information

Decision Support for Barrier/Dam Modification and Removal: Great Lakes Basin Protocol for Information Sharing, Review and Input

Decision Support for Barrier/Dam Modification and Removal: Great Lakes Basin Protocol for Information Sharing, Review and Input Decisin Supprt fr Barrier/Dam Mdificatin and Remval: Great Lakes Basin Prtcl fr Infrmatin Sharing, Review and Input February 2013 Great Lakes fisheries are a shared resurce. The Great Lakes Fishery Cmmissin

More information

Region V DIVISION OF CA.\lAKIJ.ES SUK

Region V DIVISION OF CA.\lAKIJ.ES SUK Regin V DIVISION OF CA.\lAKIJ.ES SUK Freedm Sprts Cmplex, Sim Jse, Pili, Camarines Sur ' ' * 7 k, : V U.M1 \ i 5 V. C f. 1 W l y lq, DIVISION MEMORANDUM L* flv / 1 N. 0-}'^' s. 2018 c;> qlyh",, 2018 -

More information

Confined Space Entry

Confined Space Entry Cnfined Space Entry What is a Cnfined Space? A space that: Is large enugh and s cnfigured that an emplyee can enter bdily and perfrm wrk; Has limited r restricted means f entry r exit; Is nt designed fr

More information

SETTING UP A CLUB. Westmorland County Football Association Limited. Contacts. Chief Executive Peter Ducksbury

SETTING UP A CLUB. Westmorland County Football Association Limited. Contacts. Chief Executive Peter Ducksbury Westmrland Cunty Ftball Assciatin Limited SETTING UP A CLUB Cntacts Chief Executive Peter Ducksbury Ftball Develpment Officer James Pattisn Assistant Ftball Develpment Officer/ Cmmunity Cach Graeme Blair

More information

Opportunity for Public Participation. Plain Language Summary

Opportunity for Public Participation. Plain Language Summary Opprtunity fr Public Participatin Pennsylvania Envirnmental Quality Bard Prpsed Regulatins fr Oil and Gas Well Casing and Cementing (Amendments t Chapter 78) Plain Language Summary In this dcument, the

More information

Jinibara State School Executive Summary

Jinibara State School Executive Summary Jinibara State Schl Executive Summary 1. Intrductin 1.1 Backgrund This reprt is a prduct f a review carried ut at Jinibara State Schl frm the 13 t 15 Octber 2015. It prvides an evaluatin f the schl s perfrmance

More information

Cricket Australia Position Description

Cricket Australia Position Description Cricket Australia Psitin Descriptin Psitin: Department: Manager: Direct Reprts: Rle Purpse: State Accreditatin Crdinatr WA State Assciatin Events Department Accreditatin Grup Manager and the CA Event Crdinatr

More information

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No.

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No. MEMORANDUM PROJECT: Nrth Santa Mnica Bulevard Resnsturctin Prject N. 1BEVO41000 T: frm: City f Beverly Hills Traffic and Cmmissin Psmas Iteris Date: July,9 2015 Subject: Traffic Mitigatin During NSMB Cnstructin

More information

Position Vacancy for Blue Ventures Expeditions in Timor-Leste

Position Vacancy for Blue Ventures Expeditions in Timor-Leste Blue Ventures Cnservatin Level 2 Annex, Omnibus Business Centre, 39-41 Nrth Rad, Lndn N7 9DP Tel: +44 (0) 20 7697 8598 Fax: +44 (0) 800 066 4032 inf@blueventures.rg www.blueventures.rg Registered charity

More information

HAZWOPER AND HAZWOPER RCRA

HAZWOPER AND HAZWOPER RCRA Reliant Hldings Ltd and Its Affiliants Dc N: SOP-31 Revisin Date: Initial Versin Revisin N. 0 Next Revisin Date: 01-18-18 Preparatin: Safety Mgr Authrity: President Issuing Dept: Safety Page: Page 1 f

More information