Emerson Circle Entrance

Size: px
Start display at page:

Download "Emerson Circle Entrance"

Transcription

1 Emerson Circle Entrance It is not clear that there is a park in this location without a sign. Access from Emerson Circle: The present sloped granite curb does not provide access immediately at the park entry. Use of the driveway curb-cut presently provides access to the park. The existing playground in this area even facing south is in dense shade. Opening up the tree canopy would add a more pleasant lighter shade and would beneit the existing trees. The existing play equipment no longer meets safety standards. Existing benches appear to be able to be restored in place. Comment: With a little more light, the intimate corner of the park could be a very pleasant area for more quiet play for 2-5 year old s, a special area for only more active play or a community area if the Tennis court area became a multisport area with the entrance on the eastern end of the court area.

2 Emerson Circle Entrance & Existing Playground The far eastern corner of this area slopes up 5 to 6 feet from the edge of the play equipment. Most of the trees that shade the park appear to be outside of the park boundaries on the property between the park and the street. Inaccessible crushed stone path at existing tennis court. Existing tree at the top of the rip-rap slope is in marginal condition. Inaccessible crushed stone path at existing tennis court.

3 Emerson Circle Entrance, Existing Tennis court & access to upper Basketball Court The feeling of seclusion has allowed kids to tag the existing wood fence in this area. Access from Emerson Circle becomes crushed stone before the entry to the tennis court and transitions back to bituminous briely at tight corner between the tennis court and the wood fence. The existing access up the railroad tie and asphalt walk is irregular and inconsistent. Drainage issues are noticeable, stone dust has washed-out over this corner of the tennis court.

4 Area West of Tennis court & access to upper Basketball Court Existing adult exercise station and remnants of an old stone wall. Drainage issues are noticeable, stone dust has washed-out over this corner of the path. Exposed bedrock and erosion of stone dust path from storm water drainage off of existing basketball court.

5 Middlebury Lane & the Basketball Court Panorama image: Middlebury Lane sidewalk to the fence on the North-west side of the park. Middlebury Lane sidewalk. Without any signage the park s identity is solely expressed by the two basketball hoops. Access to the sidewalk from the street may require modifying the sloped granite curb to allow for a handicap ramp. Alternately, access to the sidewalk would be from the adjacent driveway curb cuts. Accessible grade from sidewalk elevation 94.0 Grade at North edge of Basketball court elevation 87.0 Existing slope 12.5%, accessible slope 1:12 or 8.3% In order to provide an accessible route from Middlebury Lane a walkway at 8.3%, the minimum length of the walk would be 94 feet. Existing drinking fountain, no longer working.

6 Upper Basketball Court The existing drinking fountain is 3 + above the north edge of the basketball court. Rail-road tie steps to tennis court along the fence. This area creates almost an overlook over the basketball court. Large boulders at edge of the park.

Niantic Center Elementary School

Niantic Center Elementary School Niantic Elementary School is located in the Northwest corner of the intersection of West Main Street and East Pattagansett Road, as so noted on the Facility Location Map. location Overview: The site is

More information

Town of Sudbury Capital Improvement Budget Request FY2018 Form A

Town of Sudbury Capital Improvement Budget Request FY2018 Form A Town of Sudbury Capital Improvement Budget Request FY2018 Form A Department/Committee: Park and Recreation Item/Project Name: Featherland Multisport Court Reconstruction Initial Year of Request: 2017 Estimated

More information

RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found

RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found on Sheet 1. RC-67M note Construct curb ramps with a minimum

More information

Sidewalk Accessibility Checklist

Sidewalk Accessibility Checklist Starting Address: Ending Address: Date: Sidewalk Accessibility Checklist Please indicate your experience with any barriers you encountered when using the sidewalks in your neighborhood. 1. Did you have

More information

Parking. Parking 11/27/2012. On street parking. Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way.

Parking. Parking 11/27/2012. On street parking. Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way. Parking On street parking Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way. At-grade parking lot Parking garages SITE Parking 90 degree (20 x 9 stalls)

More information

COPE PARK MASTER PLAN

COPE PARK MASTER PLAN COPE PARK MASTER PLAN CBJ Parks & Recreation Department is in the process of creating a Master Plan for the Cope Park Area. New restrooms are designated to be constructed in the park in the next year.

More information

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights

More information

Minimum Standards for Driveway Construction Village of Bear Creek

Minimum Standards for Driveway Construction Village of Bear Creek Minimum Standards for Driveway Construction Village of Bear Creek An exception to the following requirements may only be granted by city council. The needs of each drainage system are considered independently,

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

River Road Healthy Neighborhood Walkabout October 15, 2016

River Road Healthy Neighborhood Walkabout October 15, 2016 River Road Healthy Neighborhood Walkabout October 15, 2016 Conversation and Questions: A. What are the best things about your neighborhood? B. In what areas does your neighborhood need improvement? C.

More information

ADA Training Standard Plans

ADA Training Standard Plans ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb

More information

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements INCORPORATE FEATURE PAVIN IN CROSSWALK AND INTERSECTION FIELDS Identifies high-priority pedestrian areas and create a station identity through colorful and interesting patterns ADD CURB EXTENSIONS Extending

More information

Right-of-Way Standards

Right-of-Way Standards City of Ketchum P.O. Box 2315 480 East Ave. N. Ketchum, ID 83340 Right-of-Way Standards Effective July 2015 Introduction A public right-of-way is defined as improved or unimproved public property dedicated

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN DESIGN DETAILS 135 AREA CHARACTER East Grand Forks a city of 7,501 people is located across the

More information

GENERAL LEGEND 12"CMP

GENERAL LEGEND 12CMP PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET

More information

Right-of-Way Standards

Right-of-Way Standards City of Ketchum P.O. Box 2315 480 East Ave. N. Ketchum, ID 83340 Right-of-Way Standards Effective July 2015 Introduction A public right-of-way is defined as improved or unimproved public property dedicated

More information

WALKABILITY CHECKLIST How walkable is your community?

WALKABILITY CHECKLIST How walkable is your community? WALKABILITY CHECKLIST How walkable is your community? Everyone benefits from walking and other forms of active transportation. These benefits include: improved fitness, cleaner air, reduced risks of certain

More information

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES 092775000 Carson City ADA Transition Plan 2015-03-25 Carson City ADA Transition Plan.docx March 2015 APPENDIX This page intentionally left blank.

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

Portage Bay Park Design Commission Review 4: 90% Design Development January 5, 2017

Portage Bay Park Design Commission Review 4: 90% Design Development January 5, 2017 to be updated to reflect base bid condition Portage Bay Park Design Commission Review 4: 90% Design Development January 5, 2017 Previous Site Plan POTENTIAL PARK CONNECTION & MID-BLOCK CROSSING BOAT STREET

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

Survey Style - Borders

Survey Style - Borders Style - Borders 0.25 Point 0.50 Point 1.00 Point 1.50 Point 2.00 Point 2.50 Point 3.00 Point 3.50 Point Double Line Located in: ArcGIS\Bin\Styles\.style Version: ArcGIS 9.0 1 Style - Colors Bedrock 1 Elevation

More information

Operating Plan 8a Bruce County Rail Trail Section 8 Saugeen Rail Trail to Saugeen Concession 6

Operating Plan 8a Bruce County Rail Trail Section 8 Saugeen Rail Trail to Saugeen Concession 6 Operating Plan 8a Bruce County Rail Trail Section 8 to Saugeen Concession 6 To develop and open the section of Non-Motorized trail (Part of Section 8) which runs from the South boundary of the (west side

More information

Fill in the rating for each section. Total up the ratings to see how your neighbourhood scores overall for walkability.

Fill in the rating for each section. Total up the ratings to see how your neighbourhood scores overall for walkability. WALKABILITY CHECKLIST How walkable is your community? Everyone benefits from walking and other forms of active transportation. These benefits include: improved fitness, cleaner air, reduced risks of certain

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) DRAFT SEPTEMBER 23, 14 1 Washington Street Typical Block Downtown Typical Block: DOWNTOWN (Observer Highway - 8th Street) New crosswalks

More information

ENGINEERING AND PUBLIC WORKS. Transportation Improvements: Santa s Village Road (MR15) Public Meeting

ENGINEERING AND PUBLIC WORKS. Transportation Improvements: Santa s Village Road (MR15) Public Meeting ENGINEERING AND PUBLIC WORKS Transportation Improvements: Santa s Village Road (MR15) Public Meeting March 22, 2018 Agenda Welcome and Introductions Fred Jahn: Commissioner of Engineering and Public Works

More information

ADA COMPLIANCE CHECKLIST (RESTAURANT) Meet Fail N/A. Parking Lot

ADA COMPLIANCE CHECKLIST (RESTAURANT) Meet Fail N/A. Parking Lot ADA COMPLIANCE CHECKLIST (RESTAURANT) Parking Lot Tow away warning at entrance to lot Accessible spaces - minimum 1, and at least 1 for each 25 spaces (e.g., 26 spaces requires 2 accessible spaces) Accessible

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

Segment Number Quick Pathways Accessibility Tool. Name of Street: Segment Identification:

Segment Number Quick Pathways Accessibility Tool. Name of Street: Segment Identification: Quick Pathways Accessibility Tool Name of Street: Segment Identification: Date of survey: / / Name of surveyor(s): About this assessment: QPAT UIC Dept. of Disability and Human Development Page 1 of 15

More information

S T A T I O N A R E A P L A N

S T A T I O N A R E A P L A N The Circulation and Access Plan describes vehicle, pedestrian, and transit improvements recommended within the Concept Plan. In order to create and sustain a vibrant business district that provides pedestrian-friendly

More information

CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1"=40' Scale FOR REVIEW

CONTRACT 6 WATER SYSTEM CONSTRUCTION EASTHAM, MASSACHUSETTS GENERAL NOTES AND LEGEND. MARK DATE DESCRIPTION Approved by 1=40' Scale FOR REVIEW Drawing file: I:\Eastham.217\Phase 1 - Eastham Water System\217-1401.06 Contract 6 Phase I WM\01 CAD\06 CONTRACT WATER DESIGN I.dwg Plot : Nov 13,2014-8:24am. GENERAL NOTES AND LEGEND Drawing file: I:\Eastham.217\Phase

More information

SECTION VII ROADWAY AND SITE IMPROVEMENTS

SECTION VII ROADWAY AND SITE IMPROVEMENTS SECTION VII ROADWAY AND SITE IMPROVEMENTS TOC-VII.1 of 4 TABLE OF CONTENTS ROADWAY AND SITE IMPROVEMENTS No. Title I-1 Alley Intersection (Commercial Areas) I-2 Valley Gutter For 90 Intersection I-3 Typical

More information

Clarkson Walkability Audit: Results and Recommendations Summary

Clarkson Walkability Audit: Results and Recommendations Summary Clarkson Walkability Audit: Results and Recommendations Summary The following document was prepared by the Region of Peel and includes a summary of comments made by participants during our breakout discussion

More information

Burke Road North Tennis Facility Audit

Burke Road North Tennis Facility Audit Burke Road North Tennis Facility Audit Document number 000209 Client / Site Location Auditor Tennis Victoria Off the Boulevard East Ivanhoe VIC 3079 Andrew Sodomaco Audit date 30 Aug 2015 Site summary

More information

White Mountain Lakes County Recreation Improvement District Community Town Hall April 27, 2017 WELCOME

White Mountain Lakes County Recreation Improvement District Community Town Hall April 27, 2017 WELCOME White Mountain Lakes County Recreation Improvement District Community Town Hall April 27, 2017 WELCOME INTRODUCTIONS: Jason Whiting, Board of Directors Brandt Clark, Deputy County Attorney Melissa Buckley,

More information

Traffic Impact Memorandum. May 22, 2018

Traffic Impact Memorandum. May 22, 2018 BISHOP PROFESSIONAL DEVELOPMENT BUILDING Proposed Land-use Change & Parking Modification 3601 SW 31st Street Topeka, Kansas 66614 CFS Project No. 185077 Traffic Impact Memorandum May 22, 2018 Prepared

More information

Complete Streets Funding Program Project Prioritization Plan

Complete Streets Funding Program Project Prioritization Plan Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path

More information

FGM ARCHITECTS Estimate of Probable Construction Cost Jun 14, 2016 PADDLE TENNIS HUT CONCEPTUAL PLAN / OPTION 1 FGM#:

FGM ARCHITECTS Estimate of Probable Construction Cost Jun 14, 2016 PADDLE TENNIS HUT CONCEPTUAL PLAN / OPTION 1 FGM#: PADDLE TENNIS HUT CONCEPTUAL PLAN / OPTION 1 FGM#: 16-2186.01 1.0 SITE DEVELOPMENT 1.1 Site Demolition 1 allowance 7,000 1.2492 8,745 1.2 Stormwater System exist impervious, volume control re 1 allowance

More information

Portland Peninsula Sidewalk and Ramp Inventory

Portland Peninsula Sidewalk and Ramp Inventory Portland Peninsula Sidewalk and Ramp Inventory Conducted June and July of 2008 By Anne Krikorian and Ryan Carmichael Performed under the authority of: Greater Portland Council of Governments And with the

More information

Incentive Zoning. Zoning Ordinance Advisory Committee June 21, Pam Thompson, Senior Planner, Sustainable Development and Construction

Incentive Zoning. Zoning Ordinance Advisory Committee June 21, Pam Thompson, Senior Planner, Sustainable Development and Construction Incentive Zoning Zoning Ordinance Advisory Committee June 21, 2018 Pam Thompson, Senior Planner, Sustainable Development and Construction Presentation Overview Stakeholder questions Updated charts Design

More information

Cross Street Corridor Non-Motorized Enhancement Project Project Description

Cross Street Corridor Non-Motorized Enhancement Project Project Description Cross Street Corridor Non-Motorized Enhancement Project Project Description A cooperative study of the Cross Street neighborhood was completed in May 2002 by the City of Ypsilanti, the Depot Town Downtown

More information

Standards vs. Guidelines. Public Right-of Way Accessibility Guidelines (PROWAG)

Standards vs. Guidelines. Public Right-of Way Accessibility Guidelines (PROWAG) www.access-board.gov Public Right-of Way Accessibility Guidelines (PROWAG) Juliet Shoultz, P.E Transportation Systems Engineer US Access Board Standards vs. Guidelines Guidelines are developed by the Access

More information

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions Module 3 & Other Purpose: Allow pedestrians to transition between the street and sidewalks, islands, etc. Typically installed at: Intersections (1 ramp at each end of each crosswalk) Mid-block crossings

More information

Cyril Cummins Reserve Facility Audit

Cyril Cummins Reserve Facility Audit Cyril Cummins Reserve Facility Audit Document number 000211 Client / Site Location Auditor Tennis Victoria 67 Liberty Parade Bellfield VIC 3081 Andrew Sodomaco Audit date 30 Aug 2015 Site summary Total

More information

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS 01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS Existing Bus Stop Existing US101 On-ramp Existing POC Old Redwood Highway Rich Street City ROW Environmental Study Limit Industrial Way NO DESIGNATED

More information

ST. MARY S COUNTY DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION MANUAL OF DESIGN AND CONSTRUCTION STANDARDS TABLE OF CONTENTS

ST. MARY S COUNTY DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION MANUAL OF DESIGN AND CONSTRUCTION STANDARDS TABLE OF CONTENTS ST. MARY S COUNTY DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION MANUAL OF DESIGN AND CONSTRUCTION STANDARDS TABLE OF CONTENTS STANDARD NUMBER TITLE R/1-R/5..... RURAL PUBLIC ROAD I....RURAL PUBLIC ROAD

More information

Public Meeting #1 Comment Summary

Public Meeting #1 Comment Summary Public Meeting #1 Comment Summary October 2017 The Westerly Creek to Toll Gate Creek Trail Connector project s first public meeting was held on October 17, 2017 at EcoTech Institute in Aurora. This meeting

More information

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA June 13, 2016 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 959811 RE: Fire Station 14 (DR16-128) Dear Mr.

More information

SECTION 14: LANDSCAPING AND BEAUTIFICATION

SECTION 14: LANDSCAPING AND BEAUTIFICATION SECTION 14: LANDSCAPING AND BEAUTIFICATION RULE 14.1 GENERAL PROVISIONS 14.1.1 The rules and guidelines contained in this section have been established to provide proper guidelines for the beautification

More information

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 OVERALL LAND USE CONCEPT Overall Broadway Valdez District: 95.5 acres (35.1 acres right-of ways + 60.4 acres developable land) Plan Subareas:

More information

Community Open House December 13, A project of the Green Infrastructure Center, supported by Skeo Solutions

Community Open House December 13, A project of the Green Infrastructure Center, supported by Skeo Solutions Community Open House December 13, 2011 A project of the Green Infrastructure Center, supported by Skeo Solutions Project Background The Green Infrastructure Center, Inc. (GIC) was formed in 2006 to help

More information

Muizenberg Accessibility: Removing barriers to public spaces.

Muizenberg Accessibility: Removing barriers to public spaces. Muizenberg Accessibility: Removing barriers to public spaces. Refer to SANS 10400-S:2011 Edition 3 of the building code. Note: Facilities that are not in accordance with the requirements of this part of

More information

NORTH LAUDERDALE WALKING AUDIT: VIRTUAL APPENDIX

NORTH LAUDERDALE WALKING AUDIT: VIRTUAL APPENDIX NORTH LAUDERDALE WALKING AUDIT: VIRTUAL APPENDIX TABLE OF CONTENTS VIRTUAL APPENDIX A: WALKING AUDIT FINDINGS... 3 Route 1 Notes... 3 Route 2 Notes... 5 Route 3 Notes... 6 Virtual Audit Notes... 8 VIRTUAL

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 15, 2016 DATE: October 7, 2016 SUBJECT: Adoption of amendments to the Master Transportation Plan (MTP) to create a new Pedestrian

More information

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &

More information

Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version

Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version Microscale Audit of Pedestrian Streetscapes (MAPS), Mini Version Training Manual & Picture Guide Developed by: Carrie Geremia Kelli Cain Revised February 11, 2014 Tool and protocol developed by: James

More information

Active Neighborhood Checklist: Protocol

Active Neighborhood Checklist: Protocol Active Neighborhood Checklist: Protocol Version 2.0 (February 2011) Contact: Christine Hoehner, PhD, MSPH Washington University in St. Louis hoehnerc@wustl.edu or (314) 362-9647 1 Audit Tool - Definition

More information

Q1 What do you think are the most important aspects of the park? Chose all that apply.

Q1 What do you think are the most important aspects of the park? Chose all that apply. Q1 What do you think are the most important aspects of the park? Chose all that apply. Answered: 14 Skipped: 0 Rectangular field Diamond field Basketball court Playground Picnic shelter Trees Amphitheater

More information

EL CERRITO PARKS AND RECREATION FACILITIES MASTER PLAN. COMMUNITY WORKSHOP #2 Group Discussion Summary

EL CERRITO PARKS AND RECREATION FACILITIES MASTER PLAN. COMMUNITY WORKSHOP #2 Group Discussion Summary EL CERRITO PARKS AND RECREATION FACILITIES MASTER PLAN COMMUNITY WORKSHOP #2 Community Workshop #2 was held on January 18, 2018. As the second community meeting for the El Cerrito Parks and Recreation

More information

Windy Ridge Elementary School

Windy Ridge Elementary School Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Sarasota High School June 26, 2018

Sarasota High School June 26, 2018 June 6, 08 June 9, 08 Review of SHS Security & Safety, Community Input & Ideas June 6, 08 Review of Community Concerns and Ideas, Confirm Community Enhancement Priorities July/August, 08 Vacation Application

More information

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes Date of Meeting: June 10, 2010 Location: Ballston Metrorail Station and NRECA Building 4301 Wilson Blvd, Arlington, VA Subject: Ballston Station Multimodal Study Stakeholder Meeting #1 Summary: This first

More information

PUBLIC SERVICE DEPARTMENT

PUBLIC SERVICE DEPARTMENT PUBLIC SERVICE DEPARTMENT Engineering Division 732 City Hall 124 West Michigan Avenue Lansing, Michigan 48933 (517) 483-4455 FAX: (517) 483-6082 http://publicservice.cityoflansingmi.com March 30, 2011

More information

See Figure 38, Existing Nonmotorized Connections.

See Figure 38, Existing Nonmotorized Connections. Nonmotorized Connections Existing Nonmotorized Connections Pedestrian, vehicle and bike traffic access and movements are confined primarily to Penny Drive on campus. Due to the steep slope along the length

More information

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Citizen Advisory Committee

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Citizen Advisory Committee Portland - Milwaukie Light Rail Willamette River Bridge Citizen Advisory Committee 05.21.09 Bridge Type Status Update Bicycle Pedestrian Path Width Bridge Type Status Update WRBAC Recommendation: Cable

More information

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee 2100 Clarendon Boulevard, Suite 700, Arlington, VA 22201 TEL 703-228-3525 FAX 703-228-3543 www.arlingtonva.us

More information

City of Margate, Florida. Neighborhood Traffic Management Manual

City of Margate, Florida. Neighborhood Traffic Management Manual City of Margate, Florida Neighborhood Traffic Management Manual Table of Contents Page No. I. INTRODUCTION... 1 II. TRAFFIC CALMING REQUEST AND PROCESSING PROCEDURES... 2 1. COMPLETE AND SUBMIT PROJECT

More information

Raleigh Park Open House #2 Summary (5/23/17)

Raleigh Park Open House #2 Summary (5/23/17) Raleigh Park Open House #2 Summary (5/23/17) Nearly 50 community members participated in an open house meeting about Raleigh Park on 5/23/17. During the meeting, staff presented concepts for changes to

More information

Active Transportation Audit

Active Transportation Audit Intersection: Municipality: Audit Conducted By (Name): Time of Audit: Date and Day of Week: Weather Conditions: Active Transportation Audit A. Pedestrian Facilities Please indicate north direction Street

More information

Introduction. North 12 th Complete Street Project Overview

Introduction. North 12 th Complete Street Project Overview Introduction On Wednesday, March 1, 2017, the City of Sacramento, in partnership with Sacramento Regional Transit District and the Sacramento Housing and Redevelopment Agency, hosted a community outreach

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian

More information

Summary of School Observations and Education and Encouragement Initiatives

Summary of School Observations and Education and Encouragement Initiatives Rye Shared Committee Summary of School Observations and Education and Encouragement Initiatives Presented to the Rye City Council & The Rye City School District Board of Education April 9 th, 2011 1 Why

More information

MAPS DATA DICTIONARIES - ABBREVIATED

MAPS DATA DICTIONARIES - ABBREVIATED MAPS DATA DICTIONARIES - ABBREVIATED 1. Data Entry Dictionary: variable names and item-level coding Route: Destinations and Land Use Section LU1 How is audit information collected? Foot (walked route)

More information

Montmorency Park Facility Audit

Montmorency Park Facility Audit Montmorency Park Facility Audit Document number 000215 Client / Site Location Auditor Tennis Victoria 2 Dobson Road Montmorency VIC 3094 Andrew Sodomaco Audit date 04 Sep 2015 Site summary Total number

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

ACCESSIBLE PUBLIC RIGHTS- OF-WAY FOR PEOPLE WITH DISABILITIES

ACCESSIBLE PUBLIC RIGHTS- OF-WAY FOR PEOPLE WITH DISABILITIES ACCESSIBLE PUBLIC RIGHTS- OF-WAY FOR PEOPLE WITH DISABILITIES Presented by Lois Chaplin Cornell Local Roads Program Bicycle and Pedestrian Specialist Paul Evans New York State DOT Landscape Architecture

More information

Chapter 9 Maintenance

Chapter 9 Maintenance Chapter 9: 9-1.0 Introduction Maintenance The maintenance of bikeways is closely linked to bicyclists safety and the preservation of the bikeway function and investment. Poor maintenance, resulting in

More information

Neighborhood Analysis & Improvement Ideas. El Montevideo Neighborhood

Neighborhood Analysis & Improvement Ideas. El Montevideo Neighborhood Neighborhood Analysis & Improvement Ideas El Montevideo Neighborhood El Montevideo Neighborhood Neighborhood Analysis & Improvement Ideas Drachman Institute College of Architecture and Landscape Architecture

More information

All Season Age Friendly Pedestrian Safety and Walkability Checklist *

All Season Age Friendly Pedestrian Safety and Walkability Checklist * FOSTERING AGE FRIENDLY, WALKABLE NEIGHBOURHOODS Walkability is a key component of optimal aging in Age Friendly cities. Walkable neighbourhoods promote physical and mental health and well-being, support

More information

Arts Center Rail Station Accessibility Assessment

Arts Center Rail Station Accessibility Assessment Arts Center Rail Station Accessibility Assessment Joel Anders, Arnaud Huguet, and Alex Poznanski 25 July 2012 Table of Contents EXECUTIVE SUMMARY... 1 MISSION STATEMENT... 2 OVERVIEW... 2 CROSSWALKS AND

More information

Application for Temporary Street/Sidewalk Closure Permit

Application for Temporary Street/Sidewalk Closure Permit Application for Temporary Street/Sidewalk Closure Permit Please Return To: City of Charlottesville Department of Neighborhood Development Services P.O. Bo 911, City Hall Charlottesville, VA 22902 Telephone

More information

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community Riverside Station A green, transit-oriented community October 6, 2011 TONIGHT S AGENDA: 1. Project Update (5 min.) 2. Master Plan Update (10 min.) 3.Traffic Plan Update (10 min.) Questions & Answers MASTER

More information

/ ARLINGTON COUNTY, VIRGINIA

/ ARLINGTON COUNTY, VIRGINIA / ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 24, 2016 DATE: August 11, 2016 SUBJECT: Amendment of the Master Transportation Plan (MTP) Streets Element to include new local

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION TABLE 1A CG-6 CURB AND GUTTER SECTION HORIZONTAL AND VERTICAL CONTROLS CURB AND GUTTER ROADWAYS MAXIMUM 3:1 CUT OR FILL SLOPE CURVE DATA MIN. SIGHT DISTANCE PROJECTED TRAFFIC VOLUME (ADT) MIN. DESIGN SPEED

More information

SITE ASSESSMENT REPORT

SITE ASSESSMENT REPORT SITE ASSESSMENT REPORT July 2012 Prepared For: Grafton School District 1900 Washington Street Grafton, WI 53024 Prepared By: 7711 North Port Washington Road Milwaukee, WI 53217 414.751.7200 www.kapurengineers.com

More information

Field guide for Accessible Public Rights-of-Way Edition

Field guide for Accessible Public Rights-of-Way Edition Field guide for Accessible Public Rights-of-Way 2017 Edition CONTENTS PEDESTRIAN FACILITIES IN THE PUBLIC RIGHT-OF-WAY Pedestrian access routes 3 Components 3 Continuous width 3 Median and pedestrian refuge

More information

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS 001-099 100-199 200-299 Stormwater 300-399 400-499 500-599 600-699 700-799 800-899 Miscellaneous Sewers and Drains Streets Water Structures Earthwork Street Lighting and Traffic Signals Landscape and Irrigation

More information

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

8/31/2016 VIA  . RE: Freeport Arco Fuel Station (P16-039) 8/31/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: Freeport Arco Fuel Station (P16-039)

More information

APPENDIX A Urban Control Zone Corridor Study Reports

APPENDIX A Urban Control Zone Corridor Study Reports APPENDIX A Urban Control Zone Corridor Study Reports California Sites Table A-1. California Study Corridors California Study Corridor County Name Length (miles) State Highway 1 Orange 7.0 State Highway

More information

MARTIN LUTHER KING JR. WAY

MARTIN LUTHER KING JR. WAY OCTOBER 2011 40 Vision and Goals The Martin Luther King, Jr. Way Illustrative Master Plan that follows has been developed through a process of community involvement. It expresses a long term vision for

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information