Intersection. Shoulder? Speed Limit. Stop Signs. Paved/ Wide
|
|
- Shauna Barber
- 6 years ago
- Views:
Transcription
1 FMPO Road Inventory (July 2010) 1 ame From To Area Ash Llano St Chaco St Aztec * 25 Llano St, Chaco St Sidewalks along Senior Center Ash Chaco St M 516 Aztec 25 Chaco St, M 516 Bike lanes on west side Blanco US 550 Mesa Verde Aztec 25 US 550, Church, Mesa Verde Blanco Mesa Verde E Urban Limit Sidewalks end E of Mesa Verde; school sidewalk ends Aztec 25 Mesa Verde at Rio Grande; road becomes dirt E of Swire Chaco St M 516 Park Ave Ash, Park M 516 On bridge: 1 lane E, sidewalk on S side; after bridge: sidewalks are on both sides & 2 way traffic; paved Aztec * 25 shoulders could become bike lanes Chaco St Park Ave US 550 Aztec 25 Park US 550 (Main St) Signed bike lane CR 3008 CR 3000 CR 3009 Aztec 25 CR 3000, CR 3009 Light Plant Road M 516 Riverside Dr M 516 Pedestrian bridge across Animas River connects Aztec 25 Riverside and Hartman Parks Lovers Lane Mesa Verde Clark Ave Mesa Verde,. Rio Grande sidewalk at Mesa Verde; sidewalk ends at. Rio Aztec * 25 Grande; Lovers Lane ends at Clark McCoy US 550 End of Route US 550 *Sidewalks both sides end of school; difficult to make Aztec * 25 right turn on McCoy from southbound US 550 Mesa Verde Zia Chuska Aztec 25 Zia Mesa Verde Chuska Blanco Aztec 25 Chaco, Blanco Mesa Verde Blanco US 550 Aztec * 25 Blanco, US 550 Sidewalks along E. side after Blanco M 173 US 550 CR 2950 US 550 At Sabena: (+) speed increases to 55 & ( ) speed Aztec 45 decrease to 35; cannot turn onto Sabena from either direction of M 173; speed ( ) decreases at east arterial to 25 and increases to 35 at flat top M 173 CR 2950 M 575 orth end of proposed "bypass" would end in vicinity of Aztec 55 CR 2950 M 516 CR 350 Oliver Dr Aztec 55* CR 350, Oliver (+) Speed decrease to 45 near CR 3050 M 516 Oliver Dr Lt Plant Rd Lt Plant Rd, Oliver ( ) 45mph speed at Mesa Dr; (+) 40mph speed E of Aztec 40* Oliver M 516 Lt Plant Rd Ruins Rd Aztec 40 Lt Plant Rd, Ruins Rd M 516 Ruins Rd US 550 Aztec 35 Ruins Rd, Chaco (B), US 550 M 574 CR 3095 CR 3072 Residential development along W side between CR Aztec & CR 3092 (Flora Vista) M 574 CR 3072 M 516 M 516 Sidewalks on E side only & ends after school; Aztec * 30* sidewalks present at school crossing zone for Koogler Jr. High; (+) speed inc to 50 at CR 3072; ( ) speed decrease to 30 at Aquapure Plant Oliver Ave End of Route/Waste M 516 M 516 Sidewalks on W side only at San Juan Co government Water Treatment Plant buildings Aztec * 25 Oliver/M 282 M 516 Aztec Airport M 516 Sidewalk along W side between Hermosa and Mesilla Aztec * 25 Park Ave Rio Grande Ave Chaco St S. Rio Grande, Hartman Pl, Zia, Aztec * 25 Chuska, Chaco Rio Grande Ave Blanco St US 550 Aztec 25 Blanco, Lovers Lane, US 550 Ruins Rd M 516 Aztec City Limits 3 way stop at CR 2900/ park entrance M 516 otes Sidewalk along W side up to RV park. Sidewalks present after Buckelew Lane; route popular w/ cyclists Aztec * * * 30 S Rio Grande Ave Aztec City Limits CR 3008 Aztec City limits/ CR 3009: ( ) speed increases to 45 & Aztec 45* (+) decrease to 25; CR 3008: ( ) decrease to 35 S Rio Grande Ave US 550 Aztec City Limits US 550 Sidewalk along S. side end at Ute Ave; dirt "frontage road" along side of road could become Aztec * 25 pedestrian/bike path. Bike Lanes narrow US 550 Aztec City Limit MP 159 Aztec 45 Bypass proposed near Race track/ MP 159 US 550 MP 159 S. Rio Grande Aztec 35 Speed limit decreases to 35 after MP 159 US 550 S. Rio Grande Church At S. Rio Grande: (+)Speed decrease to 30; ( ) speed Aztec 30 increase to 45
2 FMPO Road Inventory (July 2010) 2 ame From To Area US 550 Church M 516 Chaco, M 516 (+) Speed decrease to 25 at Church; ( ) Speed inc to Aztec at Zia US 550 M 516 M 173 M 516 (+) Speed inc to 45 at El Sol Ave; ( ) speed decrease to 35 at city limits (Sabena); Sabena: sidewalks begin on Aztec * 35* the ( ) and ends on (+) Zia St Ash St Mesa Verde Ave Ash (2way), Park, Main (US 550) Mesa Verde Sidewalks present between Ash & Church, sidewalks only on S side between Park and Main and no Aztec * 25 sidewalks E of Church Calle del Rio So. Church St US 550 Bloomfield 25 US 550 Public Works bldg near So. Church/ Calle E Blanco/CR 4899 US 550 Fleming Saiz US 550 E. Blanco designated as alternate route to US 64; 25 Bloomfield 35/ 25 mph between US550 and Executive; no sidewalk at Saiz; Speed changes to 35 east of Executive E Blanco/CR 4899 Fleming US 64 Bloomfield * 40 Kirby, US 64 Sidewalk E of Kirby ewby Lane US 64 West Blanco Bloomfield 25 US 64 So. Church St US 64 Calle del Rio Bloomfield 25 US 64 US 550 Avery Lane San Juan River Bloomfield 50 US 550 San Juan River US 64 Bloomfield 50 US 64 Speed limit decreases to 35 after mp 151 US 550 US 64 W Blanco Blvd Bloomfield 30 US 64, Blanco US 550 W Blanco Blvd Arizona / CR 4900 Blanco Sidewalks end along E side, sidewalks on W side Bloomfield * 45 continue to City Hall US 550 Arizona / CR 4900 Aztec city limits Bloomfield 55 ( ) Speed limit decreases to 45 at city limits US 64 CR 5500 Ferrari Bloomfield 55* CR 5500 speed limit decrease to 45 after mp 62 US 64 Ferrari Church Speed decreases to 40 at city limits; sidewalks along Bloomfield * 40* side after Ferrari Lon US 64 Church US 550 S Bloomfield * 35 US 550 S Sidewalk. side only US 64 US 550 S US 550 (First St) Bloomfield * 35 US 550 S, First St Sidewalks present on both sides after US 550 S US 64 US 550 (First St) MP 66 (approx) Bloomfield 45 US 550 (First) West Blanco ewby Lane Ruth Lane Bloomfield * 25 ewby Lane Side walks on south side West Blanco Ruth Lane Frontier St Bloomfield 25 Frontier, Chaparral West Blanco Frontier St US 550 Bloomfield 25 Frontier US 550 CR 3000 Morningstar Dr CR 350 CR 350 Speed limit increases to 45 near milepost 9 speed limit County 35* decrease to 35 at 3692 CR 350 US 64 CR 390 US 64 1 mi before CR 390 speed limit decrease to 45 and County 55* then to 35; pedestrian sidewalk near CR 390 CR 350 CR 390 CR 3000 County 50* CR 3000 Speed decrease to 35 near CR 3315 CR 350 CR 3000 CR 3520 County 35 CR 3000, CR 3520 CR 350 CR 3520 M 516 County 35 CR 3520, CR 3050 M 516 CR 3535 M 516 End of Route County 35 M 516 CR 390 Andrea Dr CR 350 (+) Speed decrease to 35 near CR 5569; ( ) speed County 45* CR 350 decrease to 35 at Andrea Dr CR 3940 Morningstar Dr CR 3934 County 25 Morningstar Dirt road no travel lanes indicated CR 5500 US 550 US 64 US 550 US 64 ( ) speed decrease to 50 at CR 5190; ( ) decrease to County 55* 35 1 mi before CR 5510 CR 6100 CR 6400 US 64 front rd County 45 * US 64 Stop sign for w bound, and a yield sign for e bound CR 6100 US 64 CR 6675 County * 45 CR 6675 Gravel shoulder CR 6100 CR 6675 CR 6400 CR 6675 Speed increases to 45 at CR 6285; sidewalks at County * 35* Kirtland H.S. school zone, wide gravel shoulders CR 6100/ M 489 US 64 (w end) US 64 (e end) County 55 US 64 (west and east end) CR 6200 US 64 Twin Peaks Twin Peaks US 64 Gravel shoulder, speed decreases to 30 in residential County * 45* section near CR 6193 CR 6400 CR 6100 US 64 County 40 CR 6100, US64 CR 6500 US 64 Twin Peaks County 40 Twin Peaks US 64 CR 6575 CR 6100 US 64 CR 6100, US64 Possible need for sidewalk/bike path. Elementary County * 30 School at north end and Kirtland HS at CR 6100 intersection. Wide gravel shoulders. CR 6675 CR 6100 US 64 County 35 US 64 CR 6100 otes
3 FMPO Road Inventory (July 2010) 3 ame From To Area CR 6700 US 64 (w end) US 64 (e end) County 40 US 64 (west and east end) M 170 CR 1424 M 574 County 55 M 371 CR 7100 Old Fruitland Hwy/R 36 County 45* M 371 Old Fruitland Hwy/R Murray Dr/M County 45 Old Aztec Hwy/ CR M 516 CR 3590 M County Old Aztec Hwy/ CR CR 3590 CR County Twin Peaks Rd/ CR Troy King Rd CR County 55 Twin Peaks Rd/ CR CR 6200 CR 6500 CR County 45* US 550 M 173 CR 2390 County 45* US 550 CR mi S of Col State Line County 65* Murray otes ( ) Extra truck lane on hill; speed inc to 60 at top of hill Designated as bike route Speed drops to 35 in residential section, no shoulder near CR 6483 (+) Speed increases to 55 near CR 2930 (mp 161); ( ) speed decrease to 45 near mp 163 (+) Speed increases to 65 at CR 2390; (+) speed decrease to 50 at mp 173; ( ) speed decrease to 55 S of Animas River bridge (mp 169) US 550 MPO Boundary Avery Lane (Bloomfield city limits) County 70 US 64 CR 6893 CR 6700 County 60 CR 6893 = west boundary of MPO US 64 CR 6700 CR 6800 County 60 CR 6800 US 64 CR 6800 M 489 (CR 6100) CR 6800, CR 6500 Speed limit increases to 50 then to 60 west of CR 6200; pedestrian traffic present on shoulders; safety County 45* corridor US 64 Andrea Dr CR 5569 Andrea Speed decreases to 45 mph 2 blocks before and after County 55 Andrea Dr. US 64 CR 5569 CR 5500 County 45 CR 350/ CR 5500 US 64 MP 66 CR 4899 Sidewalks end; speed increase to 55; (+) 2 lanes to 1 County * 55 lane US 64 CR 4899 CR 4800 County 45* Speed drops to 45 between CR's US 64 CR 4800 CR 4785 (+) 2 lanes because hill climb County 55? 20th Municipal Dr Sunset Farmington 35 * Municipal Stop is 3 way (W bound 20th does not stop) 20th Sunset Dustin Farmington 35 Sunset, Dustin 20th Dustin Butler Farmington 35 Dustin, Butler 20th Butler Sullivan Farmington 35 Butler, Knudsen, Sullivan 20th Sullivan Farmington Farmington 35 Sullivan, Farmington 20th Farmington Hutton Farmington 35 Hutton, Farmington, Fairview 20th Hutton M 516/Main St Hutton, Clayton, M 516 (E Farmington 35 Main) 24th Glade Sunset Farmington 25 Glade, Municipal, Sunset School zone/crossings at 24th/ Sunset 30th Piñon Hills Blvd Municipal Dr Farmington 45 Piñon Hills Blvd Speed decrease to 30 at Municipal Dr. 30th Municipal Dr Sunset Farmington 30 Sunset 30th designated as bike route from Municipal to Main 30th Sunset Dustin Farmington 30 Sunset Dustin Transition from 2 to 4 lanes at Sunset 30th Dustin Butler Farmington 30 Dustin, Butler 30th Butler Knudsen Butler After Butler: speed increases to 35 & sidewalks only on Farmington * 35* north side 30th Knudsen Sullivan Farmington * 35 Sullivan 30th Sullivan Farmington Farmington * 35 Sullivan After Sullivan: Sidewalk on south side ends 30th Farmington Hutton Farmington 35 Transition from 2 to 4 lanes at Hutton 30th Hutton College College Parking lanes both sides of 30th b/w Hutton and Farmington 30 College 30th College Tulane Farmington 35 College Land use chg res to com E of Tulane 30th Tulane M 516/Main St Farmington 35 M 516/ Main St.
4 FMPO Road Inventory (July 2010) 4 ame From To Area 38th Dustin Butler Wide outside lanes, sidewalks & school zone at Ladera Farmington * 25 Dustin, Buena Vista Elementary Airport Main Apache Farmington 30 Apache Airport Apache Municipal Apache Sidewalk along E. side after Apache, speed limit Farmington * 30 decreases to 25 mph at Municipal Annex Andrea US 64 Wildflower Pkwy Wildflower Pkwy US 64 ( ) speed decrease to 35 before Rosewood Trail; ( ) Farmington 45* speed increases to 45 after road to schools Apache US 64 avajo Prep US 64, avajo Prep* Sidewalk continuous along S side, sidewalk missing along side at trailer park; 2nd lane ( ) begins 1 block Farmington * 40 W of avajo Prep stoplight Apache avajo Prep Airport avajo Prep*, Airport (+) Speed changes from 40 to 30 before avajo Prep; Farmington 30* Stoplight serves avajo Prep and Wal Mart Apache Airport Auburn Farmington 30 Auburn Airport Apache Auburn Dustin Farmington 30 Auburn Orchard, Dustin Apache Dustin Butler Farmington 30 Dustin, Butler Arrington Airport Wall Airport, Auburn(4), Behrend, Speed limit decreases to 25 mph E of Auburn Farmington 30* Orchard, Wall Auburn Ave US 64/Broadway Apache Farmington 25 Arrington, Apache US 64/Broadway, Main St Sidewalks at Arrington, shared median Auburn Ave Apache Glade Sidewalks along W side between avajo & Glade, Farmington * 30 Apache, avajo paved shoulder along eastside Auburn Ave S Murray Piñon St Murray, Piñon arrow, discontinuous bike lanes between Murray and Farmington * 25 Piñon Auburn Ave S Piñon St US 64/Broadway Farmington 25 Piñon US 64/Broadway Bike lanes end S of Piñon Beckland Dr M 516/E Main End of Route Country Club, Windsor M 516/ Main St. Sidewalks continuous along side and only partial Farmington * 25 sidewalks on S side; parking lanes on both sides Behrend Piñon St US 64/Broadway Piñon, Maple US 64/Broadway Sidewalks W side only until Elm & are discontinuous Farmington * * 25 between Elm and Broadway; wide driving lanes could could be realocated into bike lanes Behrend US 64/Broadway Apache Apache US 64/Broadway, Main St On street diagonal parking both sides b/w Broadway Farmington 25 and Arrington Brookside Glade/Auburn 20th Sidewalks along E side; wide shoulders along W side, Farmington * * * 30 bike lane may be located on eastside. Butler US 64/Broadway San Juan Farmington 35 US 64/Broadway, San J. Butler San Juan E Main St Farmington 30 E Main St, San Juan Butler E Main St Vine/Apache Farmington 30 E. Main, Vine/ Apache 1 lane each dir north of Vine/ Apache Butler Vine/Apache Ute Farmington 30 Vine/Apache, Ute Butler Ute 20th Farmington 30 Ute, 20th School zone/crossings at McKinley School Butler 20th 30th Farmington 30 20th, 30th 2 lanes in each direction north of 23rd St Butler 30th Mesa Verde Farmington * 35 30th Bike lane along E. side Butler Mesa Verde Sunrise Pkwy Sunrise Pkwy Sidewalks end of Carlton, bike lanes along both sides Farmington * * 40 of Mesa Verde Butler Sunrise Pkwy Piñon Hills Blvd Farmington 40* Piñon Hills Blvd Sunrise Pkwy Speed (+) decreases to 30 before Piñon Hills Blvd Butler S Murray Sycamore Farmington * * 25 Murray Sidewalks along both sides north of Sycamore Butler S Sycamore end of Rd Farmington * 25 Sidewalks on E. side between Willow & Sycamore Carlton Murray US 64/Broadway Parking lanes between bike lanes and curbs, sidewalks Farmington * * 30 Murray, US 64/Broadway along eastside Carlton 30th Butler 30th, Butler Speed humps located on Carlton to cut down on cut Farmington 25 thru traffic (30th to Butler) Cliffside Fairview Hutton Farmington 25 Hutton Cliffside Hutton M 516/Main St Hutton, ( ) direction only at Cherry E. Main St double stripe, wide lane Ok for bike route Farmington 30 Hills College 30th Windsor Dr 30th, Windsor 2 lanes of intersection; Southbound 2 lanes near Farmington 35 intersection with 30th College Windsor Dr Piñon Hills Blvd Farmington * 35 Piñon Hills Blvd, Windsor Sidewalks near San Juan College only College Piñon Hills Blvd Piedra Vista H.S. Farmington * 35 Piñon Hills Blvd College Piedra Vista H.S. Sandalwood Farmington 35 otes
5 FMPO Road Inventory (July 2010) 5 ame From To Area College Sandalwood Hood Mesa Trail Farmington 35 Cooper Butler Fairgrounds Butler, Mesa Verde, Santiago, Cooper becomes 15th E of Fairgrounds (Cooper & 15th Farmington 25 Fairgrounds could be bike route, as alt to 20th) Crestwood Dr Thomas Foothills Farmington 30 Foothills Dustin Apache Ute Farmington 30 Ute Apache Dustin Ute 20th Farmington 30 Ute 20th Dustin 20th 30th Farmington 30 20th, 30th Dustin S US 64/ Bloomfield Hwy Southside River Rd US 64/Bloomfield Hwy, So side Farmington 35 River Rd English Gila Largo Farmington * 25 Largo Sidewalks only on E. side between 516 & Largo English Largo M 516/E Main St Farmington * 30 Largo E Main St. Sidewalk along E side English M 516/E Main St Piñon Hills Blvd E Main St, Piñon Hills Blvd Retail entrances to Target and Wal Mart; serves Farmington 25 residential neighborhood north of Arctic St Fairgrounds Main St Cooper Wide outside lanes speed limit decreases to 30 mph at Farmington * 35* Main, Cooper the Aquatic Center Fairview Main St 20th Farmington 30* Main 20th School zone along 15th (15mph) Fairview 20th Cliffside Farmington 25 Cliffside 20th Farmington Ave Main St 20th Farmington 30 Main St, 20th Farmington Ave 20th 30th 30th 20th ( ) Sidewalks only along Library (+) Sidewalks only Farmington * 30 along developed lots Foothills Dr Piñon Hills Blvd Crestwood Farmington 35 Piñon Hills Blvd Parking lane on both sides Foothills Dr Crestwood Holmes Farmington * 35 Crestwood Dr. ( ) Sidewalk only along west side Foothills Dr Holmes Hood Mesa Holmes (+) Bike lane ends, wide shoulder begins, opposite for negative direction, Bike route signs of Holmes speed limit increases to 45 mph after Antelope Junction Farmington * * 35* Gila St M 516/E Main St English English E Main St Sidewalk along West side to Washington; Gila unpaved except section at shop center east of M 516 Farmington * 25 Glade 30th Auburn/Brookside Farmington 30* 30th, Municipal, Auburn Speed decreases to 25 E of Municipal Dr. Hood Mesa Trail Piñon Hills Blvd Anasazi Trail Farmington 25 Piñon Hills Blvd Dirt road Hood Mesa Trail College Foothills Farmington 35 College Dirt road Hutton Main St 20th Farmington 30 Main St, 20th Crosswalk at Animas Elementary Hutton 20th Cliffside Farmington 30 20th orth and South bike lanes end at Cliffside Hutton Cliffside 30th Farmington 30 30th Two lanes orth bound (climbs hill) Hutton S US 64/Bloomfield Hwy Southside River Rd US 64/Bloomfield Hwy, So side River Rd orth of Maple speed decreases to 30 & sidewalks both sides to Southside River Rd; park lane/ shoulder Farmington * * 35* between bike lane & curb Hydro Plant Rd Murray McCormick School Rd arrow lanes and very little room between road of edge Farmington * 25 Murray, McCormick School Rd and residential fences Lake St Murray Piñon St Farmington * 25 Murray, Piñon Sidewalk begins 1/2 block S of Piñon (E side only) Lake St Piñon St US 64/Broadway Piñon, Maple US 64/Broadway Sidewalk only on East side, discontinuous sidewalks Farmington * 25 orth of Maple Lake St US 64/ Broadway Main St US 64/Broadway, Main St Farmington 25 Lakewood Foothills Hood Mesa Farmington 35 Largo St M 516/E Main St English E Main St Farmington * 25 Largo St English Rail Road English Farmington * * 25 Main St US 64/Broadway Airport Farmington 30 US 64/Broadway, Airport Main St Airport Lake St Farmington 30 Airport, Lake Main St Lake St Schwartz Farmington 30 Lake, Schwartz Main St Schwartz Auburn Schwartz, Auburn Farmington 30 otes Difficult for orth bound Lake to make right on red to Main because steep hill for E bound Main vehicles Planter strip median along Largo; back entrance to mall Parking lanes between bike lanes & curbs; sidewalks, bike lanes, & median end E of Kayenta ( ) Speed decreases to 25 mph, (+) Speed increases to 30 mph
6 FMPO Road Inventory (July 2010) 6 ame From To Area Main St Auburn Orchard Auburn, Locke, Behrend, Allen, On street parking both sides of street begins East. of Farmington 25 Orchard Auburn and goes to Wall/Miller Main St Orchard Miller Orchard, Court* Pedestrian crossing light at Court Ave., bulbouts for on Farmington 25 street parking Main St Miller Butler Farmington 35 Butler Speed inc to 30 E of Miller Main St Butler Scott Farmington 35 Butler, Scott Main St Scott Farmington Scott, Farmington ( ) Speed limit drops to 35 west of Sullivan; 2 lanes Farmington 35 each dir west of Fairgrounds Main St Farmington San Juan Blvd Farmington 35 Farmington, San Juan Main St San Juan Blvd Browning Pkwy Farmington 35 Browning Pkwy, San Juan Blvd E. Main becomes 516 at Browning Pkwy Malta Rd. US 64/Bloomfield Hwy Southside River Rd US 64/Bloomfield Hwy, So side River Rd Sidewalks West. side only Brenna orth to Southside River Rd; ( ) bike lane ends South of Brittany & (+) bike Farmington * * 30 lane cont to Southside River Marseille Blvd M 516/E Main St Martello M 516/ E Main St Partial sidewalk E side only; access to Saddleback Farmington * 25 Park & Sheriff's Rodeo Grounds McCormick School Rd Murray US 64/Broadway Murray, US 64/ Broadway For South bound McCormick, difficult to see west bound traffic on Murray; sidewalks both sides South of Farmington * 25 Hydro, discontinuous. orth of Hydro Miller E. Piñon St US 64/Broadway Cedar St. E. Piñon, US 64/Broadway At Cedar St (where Miller jogs to the W) stop only for S Farmington 30 * bound traffic Miller Murray E. Piñon St Murray, Piñon St, US Sidewalks only on East side at park, sidewalks both Farmington * 30 64/Broadway sides of bridge Municipal Dr Airport Dr Glade Rd Sidewalk East side only, wide outside lane, 25 mph Farmington * * 35* speed limit near City Hall/Annex, ield at avajo Municipal Dr Glade Rd 20th 20th 3 way stop at 20th (no stop for westbound traffic along Farmington 35 * 20th); 2 lanes orth bound Municipal Dr 20th 30th Farmington 25 20th, 30th Parking along both sides of street Murray Dr/ M 5001 US 64/W Main W Piñon St Piñon/ Hwy 371 (+) speed limit drops to 40 before Piñon/ 371 Farmington 45* Murray Dr/ M 5001 W Piñon St Miller Piñon/ Hwy 371, ( ) speed limit drops to 40 before Piñon/ 371, sidewalk Farmington * 45* side only between Piñon & Miller Murray Dr/ M 5001 Miller Bloomfield Hwy Miller, McCormick School Rd, Bloomfield Hwy otes Sidewalk both sides E of Miller; speed limit drops to 35 E of Hydro Plant Rd (speed inc to 45 E of at Bloomfield Hwy); part of Safety Corridor Farmington 35* avajo St E Butler Vine Ave Farmington 25 Butler, Vine avajo St E Vine Ave Main St Farmington 25 Vine, Main Shopping center at avajo/ Main avajo St W Auburn Municipal Dr Farmington 25 Municipal, Auburn avajo St W Municipal Dr 4 Corners Airport Farmington 45 Municipal Dr ( ) 2nd lane is a hill climb/ passing lane M 170 US 64 Piñon Hills Blvd US 64, Piñon Hills Blvd Sidewalk only on w side (ends at industry); sidewalks Farmington * 45 both sides in residence area M 170 Piñon Hills Blvd CR 1424 Piñon Hills Blvd Sidewalks and shared median end before Coyote; Farmington * 45* speed inc to 55 of Idlewild M 516 US 64 E Main St (Browning Pkwy) US 64, Wildflower Pkwy, Morningstar, MOC entrance, E Curbed median from bridge to E. Main Farmington 45 Main M 516 Browning Pkwy 20th Farmington 35 20th, Browning Pkwy Curb planter islands M th 30th 20th, Plaza, Herrera, Cliffside, Landscape median planters Farmington 35 30th M th Largo Farmington 35 30th, Largo M 516 Largo Beckland Farmington 35 Largo, Beckland Mall entrance at Beckland M 516 Beckland Shop Center Farmington 35 Beckland, Shop Center Mall entrance at Shopping Center M 516 Shop Center English Farmington 35 English, Shop center M 516 English Piñon Hills Blvd Farmington * * 45 English, Piñon Hills Blvd M 516 Piñon Hills Blvd Villa View Piñon Hills Blvd, Villa View ( ) 2 > 3 lanes ; sidewalk begins & wide shoulder ends // (+) 3 > 2 lanes ; sidewalk ends & wide shoulder Farmington 45 begins
7 FMPO Road Inventory (July 2010) 7 ame From To Area M 516 Villa View Country Club Farmington 45 Villa View, Country Club M 516 Country Club CR 350 Country Club, CR until McKinsey; 55 to CR 350; 45 mph zone in Flora Farmington 45* Vista near CR 350 Orchard E Piñon St US 64/Broadway Piñon, Maple, Elm Broadway/US 64 Sidewalks both sides north of Elm only no sidewalks Farmington * 25 from E Piñon to Elm Orchard US 64/Broadway Apache St Arrington (4) US 64/Broadway, Main St, On street parking both sides between Arrington & Farmington 25 Apache Broadway Orchard Apache St Ute Apache, Comanche, Ute On street parking both sides between Arrington & Farmington 25 Broadway Piñon Hills Blvd M 170 W 30th Farmington 45* M mph at approach to M 170 Piñon Hills Blvd W 30th Butler Farmington 50* 45 mph at 30th Piñon Hills Blvd Butler College Farmington 50 College 45 mph zone near College Blvd Piñon Hills Blvd College English College, English Rd Wide shoulder curbed to be dedicated right if/when Farmington * 50 English continues north Piñon Hills Blvd English Foothills 50/ English, Foothills Dr 30 mph zone north of Foothills Farmington 30 Piñon Hills Blvd Foothills M 516/Main St Farmington 30 Foothills, M 516/Main St. Piñon St US 64/Murray Lake St US 64/ Murray 2lns to 1 lane W of Lake, speed drops to 35 before Farmington * 30 Lake, sidewalk S side only Piñon St Lake St Drake Stop/ yield for pedestrian sidewalks at Hosp Park Lot Farmington 20 * Piñon St Drake Orchard Farmington 35 Piñon St Orchard S Miller Farmington 35 Miller Piñon St S Miller US 64/Broadway Farmington 35 S Miller, US 64/Broadway San Juan Blvd Butler Scott Farmington 40 Butler, Scott San Juan Blvd Scott Main St Farmington 40 Scott, Main St Sandalwood College English Farmington 30 College, English Sandstone US 64 So Side River Rd Farmington 30 US 64, Southside River Rd Scott Broadway San Juan Blvd Farmington 35 Broadway, San Juan otes Could use "Caution: Pedestrian crossing" signs for motel customers between Scott and Broadway Scott San Juan Blvd Main St Farmington * 30 San Juan, Main St Bike lane South bound direction only So Side River Rd US 64/ Broadway Sandstone Farmington 35 US 64/Broadway So Side River Rd Sandstone M 516/ Browning Farmington 35 M 516/ Browning Sullivan San Juan Main St San Juan Main St Sidewalk West side only from San Juan to 1/2 block Farmington * 35 before Main Sullivan Main St 15th Main St, 15th Light traffic on Sullivan between 20th & Main could Farmington 35 make outside lanes bike/ park lane Sullivan 15th 20th Farmington 35 15th, 20th Sullivan 20th 30th Farmington 35* 20th, 30th Speed limit is 25 between. Cliffside & 30th Sunset Ave 20th 30th 30th 20th Sidewalks at 20th/Sunset & at 24th/Sunset near Farm Farmington 30 HS Sunset Ave 30th Twilight Farmington 25* 30th, 38th Speed drops to 20 at 33rd, intersection at Twilight Troy King Rd US 64 Cardinal US 64 Sidewalks East side from US 64 to Cardinal, partial sidewalks along West side; 2/2 to 1/1 before Cardinal Farmington * 35 Troy King Rd Cardinal Twin Peaks Rd/ CR 6480 Twin Peaks Speed increases to 45 and paved shoulders begin Farmington * 45* orth of Eagle Twin Peaks Rd/ CR M 170 Troy King Rd M 170 (La Plata hwy.) ( ) direction has additional hill climbing lane, 55 drops 6480 Farmington 55* to 45 approx 1 mi West of 170 US 64 M 489 (CR 6100) M 170 Farmington 50 M 170 US 64 M 170 Murray Dr/M 5001 Farmington 45* M 170, Apache, Murray Dr Speed drops to 40 mph West of Murray US 64 Murray Dr/M 5001 W Main St Murray Dr, Westside (for Wal ( ) speed limit 40 at W. Main Farmington 40 Mart), W Main US 64 Murray Dr/M 5001 Browning Pkwy Farmington 45 Browning Pkwy, Murray Most of US64 w/in MPO is Safety Corridor US 64 Browning Pkwy Andrea Dr 45/ Browning Pkwy, Andrea 45 increases to 55 after Madison; rough shoulders Farmington * 55
8 FMPO Road Inventory (July 2010) 8 ame From To Area US 64/ Broadway W Main St Auburn US 64/ Broadway Auburn Behrend US 64/ Broadway Behrend Miller US 64/ Broadway Miller Butler/Piñon St US 64/ Broadway Butler/Piñon St Scott Ave US 64/ Broadway Scott Murray Dr/M 5001 Farmington * * 35* Farmington 25* Farmington 25 Farmington * * 35* Farmington * 35 Farmington * 45 Ute St Gladeview Dustin Farmington 25 Gladeview, Dustin Ute St Dustin Butler Farmington 25 Dustin Butler Wall Ave Main St Apache St* Farmington 25 Main, Apache W Main, Airport, Lake, Schwartz, Auburn Auburn, Behrend Behrend, Orchard, Miller Miller, Butler/Piñon St Butler/Piñon St, Scott Ave Scott, So Side River Rd, Murray Dr Wildflower Mesa Dr Wildflower Pkwy Mesa View Jr. High Wildflower Pkwy Farmington 25 Wildflower Pkwy M 516/Browning Wildflower Mesa Dr Farmington 35 M 516/ Browning Pkwy Wildflower Pkwy Wildflower Mesa Dr Andrea Dr Farmington 35 Windsor Dr College Blvd Beckland Dr 25/ Beckland, Kingsway College Farmington 30 otes Sidewalks discontinuous at vacant parcels; wide outside lane could become bike lane?; ( ) 35 between Auburn & Schwartz (+) Speed reduces to 25 and ( ) Speed inc to 35 at Auburn; Bulbouts for on street parking begin at Auburn Bulbouts for on street parking ( side begins W of Miller, S side begins W of Commercial lane); pedestrian crossing sign at Commercial Speed increases to 35 E of Miller, no South side sidewalks E of Vine, extra lane on orth side between Butler & Hill could be used as bike lane Sidewalks not continuous only at some developed parcels Wide shoulder south of Animas River eed sidewalks if you want to encourage kids to walk to school Sidewalks at Beckland and at Kingsway
MPO POLICY COMMITTEE AGENDA
MPO POLICY COMMITTEE AGENDA August 25, 2016 1:30 p.m. Executive Conference Room Farmington City Hall 800 Municipal Drive Farmington, New Mexico AGENDA FARMINGTON METROPOLITAN PLANNING ORGANIZATION POLICY
More informationTECHNICAL SUPPLEMENT 3: BUSINESS AND NEIGHBORHOOD ACCESS
TECHNICAL SUPPLEMENT 3: BUSINESS AND NEIGHBORHOOD ACCESS Albuquerque Rapid Transit Project Prepared for: Prepared by: Parsons Brinckerhoff, Inc. August 2015 with the ART System The proposed Albuquerque
More informationMETROPOLITAN TRANSPORTATION PLAN OUTREACH: INTERACTIVE MAP SUMMARY REPORT- 10/03/14
METROPOLITAN TRANSPORTATION PLAN OUTREACH: INTERACTIVE MAP SUMMARY REPORT- 10/03/14 INTRODUCTION This document summarizes the results of the online interactive mapping exercise implemented by MIG for the
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More information5 Roadway Plan 5.1 OVERVIEW
5 Roadway Plan 5.1 OVERVIEW Changes in the Federal Transportation bill (MAP-21) now stress that MPOs reconsider the prioritization of future roadway plans and projects. In years past, new road improvements
More informationUDC Street Cross Sections
UDC Street Cross Sections Local Street - Downtown Local Street Mountable Curb Local Street Vertical Curb Alley Major Arterial Minor Arterial Residential Lane Residential Collector Residential Collector
More informationDuwamish Way-finding and CTR Report
V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail
More informationMerrick and Memorial Neighborhood Study 5/14/2014 Public Meeting
Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting Study Area April 9 Public Meeting Comments Summary Pedestrian Safety - A Walking Neighborhood Pedestrian traffic is very difficult A need
More informationMeadow Woods Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete
More informationRE: Minor Betterments Projects near William Walker Elementary
Washington County Department of Land Use and Transportation Operations & Maintenance Division Attn: Minor Betterments Program Coordinator 1400 SW Walnut Street, MS 51 Hillsboro, OR 97123 lutops@co.washington.or.us
More informationCOWETA HIGH SCHOOL AND EAST HIGHWAY 51
COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationBicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)
Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed
More informationDRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections
Roadway Cross-Sections Medford s roadway cross-section standards apply to new and reconstructed roads. The crosssections take into consideration roadway function and operational characteristics, including
More informationFOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)
FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights
More informationLong Island Rail Road Expansion Project Floral Park to Hicksville
Long Island Rail Road Expansion Project Floral Park to Hicksville Final Environmental Impact Statement Appendix 1-D Complete Streets Policy Checklist April 2017 0902ML PIN: Project Location: 18A-4 Floral
More informationSeattle Department of Transportation (SDOT) Preliminary Responses to Madison-Miller Community List of Site-Specific Concerns
Seattle Department of Transportation (SDOT) Preliminary Responses to Madison-Miller Community List of Site-Specific Concerns Background In July 2002 SDOT staff met with a small group of community residents
More informationUPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS
UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS SUMMARY REPORT: COMMUNITY UPDATE MEETING February 6, 2014 6 8:30 p.m. Roosevelt Middle School Library 3366 Park Blvd, San Diego
More informationCity of Seattle Edward B. Murray, Mayor
City of Seattle Edward B. Murray, Mayor Department of Transportation Scott Kubly, Director Eastlake Community Council 117 E Louisa St. #1 Seattle, WA 98102-3278 January 28, 2016 RE: Roosevelt to Downtown
More informationSouder, Miller & Associates 401 W. Broadway Farmington, NM
Souder, Miller & Associates 401 W. Broadway Farmington, NM Purpose: To solicit public input before the preparation of construction documents for Foothills Drive from Holmes Drive to 300 north of the intersection
More informationPEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES
PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility
More information01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS
01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS Existing Bus Stop Existing US101 On-ramp Existing POC Old Redwood Highway Rich Street City ROW Environmental Study Limit Industrial Way NO DESIGNATED
More informationMONTGOMERY METROPOLITAN PLANNING ORGANIZATION (MPO) BICYCLE AND PEDESTRIAN PLAN
MONTGOMERY METROPOLITAN PLANNING ORGANIZATION (MPO) BICYCLE AND PEDESTRIAN PLAN May 22, 2012 TIMELINE May 1 May 15: Bicycle and Pedestrian Subcommittee Review of Draft Bicycle and Pedestrian Plan May 24:
More informationRIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community
Riverside Station A green, transit-oriented community October 6, 2011 TONIGHT S AGENDA: 1. Project Update (5 min.) 2. Master Plan Update (10 min.) 3.Traffic Plan Update (10 min.) Questions & Answers MASTER
More informationSouthside Pilot Proposal
To improve bicycle access and mobility to UC Berkeley, Downtown Berkeley, and the Southside area, a pilot project could include a two-way parking-protected cycle track. Turn pockets and island bus stops
More informationTown of Bethlehem. Planning Assessment. Bethlehem Town Board
Town of Bethlehem US 9W Corridor Transportation Planning Assessment Presented e to: Bethlehem Town Board June 2009 Overview Study Background Route 9W Corridor Conditions and Improvements Selkirk Bypass
More information2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage
2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000
More informationAppendix B - Street Sections
Appendix B - Street Sections 6TH STREET CORRIDOR PLAN STREET SECTIONS The street sections in Appendix B include recommended improvements to streets for North Glenwood. They include existing conditions
More informationWork Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager
Agenda Item # 4 Work Session Meeting Date September 8, 2015 Prepared By Approved By Daryl Braithwaite Public Works Director Suzanne R. Ludlow City Manager Discussion Item Background Temporary Neighborhood
More informationWindy Ridge Elementary School
Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More informationNJDOT Complete Streets Checklist
Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip
More informationState Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway
State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,
More informationImplementation challenge 2: Is there room for Complete Streets? Does street classification enable Complete Streets?
Implementation challenge 2: Is there room for Complete Streets? Does street classification enable Complete Streets? 1 Do we have to widen roads to fit everything? 2 There s room; it needs to be recaptured
More informationMAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report
Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction
More informationAppendix C. TRAFFIC CALMING PROGRAM TOOLBOX
Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police
More informationPRESS RELEASE San Joaquin Council of Governments
PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,
More informationThis page intentionally left blank.
This page intentionally left blank. COMMUNITY Glenpool Community Overview Glenpool Glenpool is a city of nearly 12,000 residents located in Tulsa County southwest of Tulsa and Jenks. The city is growing
More informationThis page intentionally left blank.
This page intentionally left blank. Community Plan Catoosa Community Overview Catoosa Catoosa is a city of just over 7,000 residents adjacent to the northeast border of Tulsa. The city contains two major
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets Division BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic and parking modifications to install
More informationPlease note that specific recommendations and maps for some of the priority areas are still in development and are not highlighted in this memo.
16 North Carroll Street, Suite 730 Madison, WI 53703 608.663.8080 www.tooledesign.com MEMORANDUM Date: September 11, 2013 To: MMS Steering Committee Members & MPO Staff From: Tom Huber & Kevin Luecke Re:
More informationTRASBURG RANSPORTATION
TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION
More informationPRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationHospital Link Project Project Update September 2017
Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More informationDRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan
5 System Components Wakefield Street Photo Simulation showing Sharrows Introduction The Master Plan identifies various system components that, together, create a comprehensive greenway system. These components
More informationBroad Street Bicycle Boulevard Design Guidelines
Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified
More informationSan Rafael School District. Task Force Meeting Notes. November 5, 2012
San Rafael School District Task Force Meeting Notes November 5, 2012 Attendees (8) Wendi Kallins Program Director for Safe Routes to Schools; Laura Kelly Volunteer Liaison for Safe Routes to Schools; Leslie
More informationAgenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationIf a person walks within this focus area, these are examples of the places he or she could walk to or from:
Portland Hillsdale Hillsdale Portland The Hillsdale focus area is located in the City of Portland. It is situated approximately three miles from the City of Portland s downtown, 5.5 miles from the City
More informationFoothill Expressway Improvements Between El Monte and San Antonio
Foothill Expressway Improvements Between El Monte and San Antonio June 29, 2017 - Los Altos Community Meeting Introduction Project Background Agenda Visit Stations: Provide Input and Ask Questions Reconvene:
More informationCity of Wilsonville 5 th Street to Kinsman Road Extension Project
City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour
More informationCONTENTS EXECUTIVE SUMMARY 1
CONTENTS CHAPTER PAGE EXECUTIVE SUMMARY 1 1 ISSUES AND PURPOSE OF THE ANALYSIS 2 1.1 Background 2 1.2 Analysis Area 2 1.3 Issues and Observations 3 1.4 Project and Public Meetings 3 2 LIST OF PREFERRED
More informationCity of Wausau Wausau Center Urban Design and Transportation Master Plan. Design Workshop // October 18, 2018
City of Wausau Wausau Center Urban Design and Transportation Master Plan Design Workshop // October 18, 2018 Design Workshops // October 15-18 Workshop Study Evaluate circulation and parking patterns around
More informationRoundabouts are good for business
Roundabouts are good for business What is a roundabout Rules 0f Roundabouts 1. Slow down when approaching a roundabout 2. Yield to vehicles in the roundabout 3. When clear, proceed right into the roundabout
More informationSummary: Mercer County Princeton Avenue & Spruce Street Study January 2009
Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street
More informationClarkson Walkability Audit: Results and Recommendations Summary
Clarkson Walkability Audit: Results and Recommendations Summary The following document was prepared by the Region of Peel and includes a summary of comments made by participants during our breakout discussion
More informationUS 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015
US 278 Corridor Concept Presentation Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015 Thanks to our Partners Atlanta Regional Commission Georgia Department
More informationCity of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE
Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway
More informationSITE OBSERVATION FORM
Sequential # Site ID: Sequential Number in pencil Injury Site B. Additional Site D. Additional Site E. Site type will be completed by the Study Coordinator after the Observation Form is completed. SITE
More informationThis page intentionally left blank.
This page intentionally left blank. COMMUNITY Catoosa Community Overview Catoosa Catoosa is a city of just over 7,000 residents adjacent to the northeast border of Tulsa. The city contains two major regional
More informationsection 4 Existing Conditions, Issues, and Options
section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed
More information2.0 Existing Conditions
20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural
More informationProject Fact Sheet. August 1,
Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation
More information9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner
Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner 1 What is MMLOS? Is this a nice place to walk? Is this a nice place to bike? Is transit convenient? Bottom line - Are there options
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationNorth Hampton # 1 AM First Stop 7:40
North Hampton # 1 AM First Stop 7:40 Right onto Route # 1 Right onto Atlantic Avenue (at 2 nd set of lights) Left onto Woodland Road Stop at River Rd and Maple Rd Right onto Maple Rd Stop at # 71-1 st
More informationTunnel Reconstruction Brooklyn CB 1 August 14, 2018
Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of Customers The Service
More informationCommunity Transportation Plan
Community Transportation Plan Appendix A: Traffic Calming CITY OF DECATUR COMMUNITY TRANSPORTATION PLAN Appendix A: City of Decatur City-wide Residential Traffic Calming Program Process & Procedures The
More informationGIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011
The Purpose of GIS Based Network Planning GIS Based Data Collection / Network Planning Healthy Communities Active Transportation Conference Tuesday, May 10, 2011 10:00 AM Norman Cox, LLA, ASLA. Ann Arbor,
More informationSANTA CRUZ/ALAMEDA ROAD CONFIGURATIONS INTERSECTION AND STREET VIEWS
SANTA CRUZ/ALAMEDA ROAD CONFIGURATIONS INTERSECTION AND STREET VIEWS This presentation includes the documentation found in Safety Issues Report sections: 1, 7, 8, 9, 10, 11, 12, and18 The 3 sections of
More informationOff-road Trails. Guidance
Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along
More informationGRANDFORKS MILSPURFEASIBILITYSTUDY. GrandForksandEastGrandForksMPO. FINALReport. August2010
GRADFORKS MILSPURFEASIBILITYSTUDY GrandForksandEastGrandForksMPO FIALReport August2010 Table of Contents Chapter 1: Introduction and Background... 1 Chapter 2: Existing Conditions and Issues Identification...
More informationFM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.
FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m. Introductions Agency Partners H-GAC Missouri City TxDOT Introductions Consulting Team In Association
More informationStation 1: Street & Sidewalk Upgrades
Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO
More informationOrange Center Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete
More informationWater Street Promenade Engineering and Design Services
Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project
More informationTraffic Calming Program Update
Traffic Calming Program Update Background Proposed Traffic Calming Program update Objectives Engagement process Project qualification criteria Device toolbox Other updates and considerations BACKGROUND
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationLawrence Avenue Streetscape Concepts August 30, 2011
Lawrence Avenue Streetscape Concepts August 30, 2011 Neighborhood Context Phase II: River to Western Ave. Phase I: Western Ave. to Clark St. Key Map Lawrence Ave. Existing Streetscape Conditions East of
More informationEXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %
Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south
More informationMemorandum. Sunday, July 13, Saturday, July 19, 2014
Memorandum To: David Lowin, Brooklyn Bridge Park Corporation From: Daniel Schack, AICP, PTP Date: Re: Brooklyn Bridge Park Pier 5/6 Loop Road Traffic Study Project No: 14-01-2407 At the request of Brooklyn
More informationSECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY
SECTION 7 INVEY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY The study corridor includes a total of 19 signalized intersections. Through consultation with Campbell County and the KYTC,
More informationWhat Is a Complete Street?
Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for
More informationCITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study
CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final
More informationHospital Link Project Project Update November 2017
Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationRoute 29 Solutions Projects
Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four
More informationPrince George s County plans, policies, and projects
Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail
More informationWelcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.
Welcome Welcome to the Transportation Master Plan Addendum December 4, 2012 6:00 p.m. to 8:00 p.m. Please sign-in Background PIC#1 Public Information Centre #1 (PIC#1) was held on June 25, 2012. Feedback
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 5, 2017 TO: FROM: ACTION TRANSMITTAL No. 2017-04 Transportation Advisory Board TAC Funding & Programming Committee
More information25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07
25th Avenue Road Diet Project A One Year Evaluation Transportation Fund for Clean Air Project #05R07 Submitted by: The San Francisco Municipal Transportation Agency Dan Provence May 22, 2009 EXECUTIVE
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationDavid G. Roberts, AICP/PP, LLA, RLA Maser Consulting, PA 1
David G. Roberts, AICP/PP, LLA, RLA Maser Consulting, PA 1 In March of 2009, the North Jersey Transportation Planning Authority (NJTPA) awarded Ocean County a $120,000 grant through its Subregional Study
More informationProposed White Flint Separated Bike Lane Network September 2015
Proposed White Flint Separated Bike Lane Network September 2015 Abstract This report includes a proposed separated bike lane network for the White Flint Sector Plan area. Separated bike lanes create a
More informationHELM RANCH ROUND 2 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY
HELM RANCH ROUND 2 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY Tarpey Elementary School, Clovis, CA October 15, 2014 6:30pm-8:30pm OVERVIEW On Wednesday, October 15, 2014, staff from the City of Clovis
More informationPUBLIC NOTICE ON A PROPOSED AMENDMENT TO THE FY SUN CORRIDOR METROPOLITAN PLANNING ORGANIZATION LISTING OF TRANSPORTATION PROJECTS
PUBLIC NOTICE ON A PROPOSED AMENDMENT TO THE FY 2016-2035 SUN CORRIDOR METROPOLITAN PLANNING ORGANIZATION LISTING OF TRANSPORTATION PROJECTS The Sun Corridor Metropolitan Planning Organization (Sun Corridor
More informationTRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN North Central Neighborhood CITY OF SAN MATEO Draft February 2017 Table of Contents Introduction... 1 The Traffic Forum Process... 4 Neighborhood Traffic Issues... 6 Neighborhood Recommendations
More informationCITY OF LANCASTER PROPOSED NEW PROJECTS
CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4
More informationSTREETSCAPE CONCEPTS
STREETSCAPE S CARGO WAY CARGO WAY CYCLE TRACK Streetscape Concepts JENNINGS ST Illustrative Plan EVANS AVE PG&E BAY TRAIL HERON S HEAD PARK The recommended improvements build off the planned improvements
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationVehicular turning and path of travel with a proposed curb bulb on the southwest corner of Mount Diablo Boulevard and Dewing Avenue.
October 3, 2014 James Shively Stantec 100 California Street, Suite 1000, San Francisco CA 94111-4505 Subject: Traffic Study for Proposed Lafayette Chase Bank Dear Mr. Shively: Pursuant to your request,
More information