Monthly Construction Plan Project Status Report Report Date: 3/7/2014

Size: px
Start display at page:

Download "Monthly Construction Plan Project Status Report Report Date: 3/7/2014"

Transcription

1 Monthly Construction Plan Report Report Date: 3/7/2014 Company EAI EMI ELL ENOI EGSL ETI EGSL/ELL ELL/ENOI ALL General Major Updates Corrected duplicate CP number. Two projects completed. Corrected Driver description for one project. Two projects cancelled and to be moved outside 10 year plan to Area. Corrected breaker number in project description for one project. No major changes No major changes No major changes No major changes No major changes No major changes No major changes Sectionalized report to reflect full ten-year plan. Construction Plan (CP), Horizon Plan (HP), Area s, and Previously Completed s. Report now also includes MISO proposed project designations. Report will be used to replace the former Construction Plan and subsequent updates posted on OASIS going forward Latest report is considered to be the most current updated Construction Plan Highlights Page 1 of 33

2 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 11-EAI-003-CP N/A Pre-Planned Fordyce: Relocate capacitor bank to 115 kv bus. Install switch on line side of capacitor bank. EAI Summer 2014 Approved Complete In-service 6/1/14 2/18/14 N/A Yes N/A 11-EAI-007-CP N/A Pre-Planned Hot Springs Hamilton (Albright) - Carpenter Dam: Construct new 115 kv Line and convert Mountain Pine South to ring bus EAI Summer 2015 Approved Scoping Outage scheduling requirements at MT. Pine South will require the ISD to move to 6/1/16 from 12/31/15. The Albright Substation is projected to be completed by Summer /1/16 Planned NCLL until project completed N/A 11-EAI-008-CP N/A Pre-Planned 11-EAI-016-CP 4663 Appendix B Pine Bluff Voltage Support : Phase 2 Woodward: Construct 230 kv ring bus and construct new White Bluff to Woodward 230 kv line EAI Summer 2015 Proposed & In ISES- Reconfiguration of the 161kV Bus EAI Summer 2018 Proposed & In Scoping New line scope under review. Summer 2016 Planned NCLL until project completed N/A Scoping not required. Will be moved beyond 10 year plan ( area) Summer 2018 N/A N/A 11-EAI-017-CP N/A Pre-Planned White Bluff: Reconfigure 500 kv Station and construct 230 kv ring bus EAI Summer 2015 Proposed & In Scoping Scope under review. ISD to align with 11-EAI-008-CP. 6/1/16 Planned NCLL until project completed N/A 11-EAI-025-CP N/A Pre-Planned Norfork-Calico Rock : Upgrade 161 kv Line EAI Summer 2016 Proposed & In Scoping Scope under review TBD N/A N/A 11-EAI-027-CP N/A Pre-Planned 12-EAI-001-CP N/A Pre-Planned AECC L&D 2 to Gillett: Construct new 115 kv Line EAI Summer 2016 Approved Scoping Routing of new line in progress. River Crossing presenting challenges with USACE. APSC hearing held. Calico Rock-Melbourne - Upgrade 161kV Line EAI Winter 2014 Approved Design SWPPP and hwy permits in place. Environmental mitigation starting mid- February 6/1/16 Planned NCLL until project completed Ritchie 230/115 AT1 ftlo Stuttgart Ricuskey - Almyra 115 kv Winter 2014 N/A SAGMEL_ISDEL, MELBCR_ANOFS 12-EAI-003-CP 4660 Appendix A Woodward-115 kv Bus Reconfiguration EAI Summer 2016 Proposed & In Scoping Scope under review 6/1/16 Planned NCLL until project completed N/A 12-EAI-005-CP N/A Pre-Planned Camden McGuire - Camden North 115kV Line: Construct New Line EAI Summer 2014 Approved Construction Construction began August Section where ROW challenges continuing and may negatively impact project schedule and ISD. 6/1/14 N/A Camden Maguire - Smackover 115 kv FTLO Woodward - Rison 115 kv 12-EAI CP N/A Pre-Planned LV Bagby to Macon Lake: Construct new 230 kv line and operate at 115 kv EAI Summer 2014 Approved Construction Foundation work has begun. 6/1/14 N/A N/A 12-EAI CP N/A Pre-Planned Macon Lake to Reed: Construct new 230 kv line and operate at 115 kv EAI Summer 2017 Approved Scoping CECPN received August /1/17 N/A N/A 12-EAI-016-CP 4657 Appendix A HS EHV-HS Industrial: Upgrade Terminal Equipment EAI Summer 2015 Proposed & In Scoping Under Review Summer 2015 N/A HSEHSI_ARKCP 12-EAI-017-CP 4658 Appendix A HS Industrial-HS Union Carbide: Upgrade Terminal Equipment EAI Summer 2015 Proposed & In Scoping Under Review Summer 2015 N/A HSEHSI_ARKCP 12-EAI-018-CP 4659 Appendix A HS Union Carbide-HS East: Upgrade Terminal Equipment EAI Summer 2015 Proposed & In Scoping Under Review Summer 2015 N/A HSEHSI_ARKCP 12-EAI-019-CP 4665 Appendix B Mabelvale: Replace Autos EAI Summer 2019 Proposed & In Scoping Under Review Summer 2019 N/A MABXF1_MAXF2 CP s Page 2 of 33

3 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 12-EAI-021-CP 4662 Appendix B Mayflower - Reconfigure 500 kv bus (eliminate breaker failure impact on autos) EAI Winter 2017 Proposed & In Scoping PM&C scoping to begin second half 2013 Winter 2017 N/A MAYXF1_XF2 12-EAI-023-CP N/A Pre-Planned Woodward to Pine Bluff Watson Chapel: Rebuild line to 230 kv construction and operate at 115 kv. EAI Summer 2014 Approved Construction CECPN approved 11/19/2013. Outage scheduling conflicts with other projects may impact projected ISD. 6/1/14 N/A N/A 12-EAI-027-CP 4661 Appendix B Malvern South: Add 10.2 MVAR Capacitor Bank EAI Summer 2017 Proposed & In Scoping Summer 2017 N/A N/A 12-EAI-035-CP N/A Pre-Planned Beebe: Install 21.6 MVAR capacitor bank (Formerly Ward Substation) EAI Summer 2015 Proposed & In Scoping PM&C scoping to begin first quarter 2014 Summer 2015 N/A N/A 12-EAI-040-CP TBD Appendix A Load Growth Cofer Road New Substation EAI 2015 Proposed & In 13-EAI-003-CP N/A Pre-Planned Monticello East to Reed: Construct new 115 kv transmission line. Construct to 230 kv but operate at 115 kv. EAI Summer 2020 Proposed & In Scoping Scoping Property has been purchased. Schedule has been baselined through definition phase. Route study complete. Governance and CECPN approvals required. 13-EAI-010-CP TBD Appendix A Load Growth Lawson Road: Build new substation EAI 2014 Approved Scoping Substation projected to be completed by 6/1/14. Distribution line work will continue until the fall of N/A N/A Reed Substation 6/1/17 Line 6/1/20 N/A Dumas - Reed 115 kv ftlo El Dorado - Sterlington 500 kv 2014 N/A N/A 13-EAI-011-CP TBD Appendix A Load Growth H.S. Albright: New Distribution Substation EAI 2015 Approved Scoping Site purchase complete N/A N/A 14-EAI-002-CP N/A Pre-Planned Transmission Service Hot Springs Transmission Service: McCrory-Bailey: Upgrade line to 100C EAI Summer 2014 Approved Design/Scoping Being worked in association with NERC Alert Summer 2014 N/A Bailey - McCrory 161 kv ftlo Sans Soucci - Shelby 500 kv 14-EAI-005-CP 4664 Appendix B Holland Bottoms - Beebe: Build new 161kV line, Install 161/115kV auto EAI Summer 2019 Proposed & In Scoping Construction alternatives under review Summer 2019 N/A 14-EAI-008-CP N/A Pre-Planned Transmission Service Haskell to Woodlawn 115 kv line - Upgrade line EAI Winter 2014 Approved Design/Scoping execution plan completed. In process of ordering long lead time material. Winter 2014 N/A Haskell - Woodlawn 115 kv ftlo White Bluff - Keo 500 kv; Haskell - Woodlawn 115 kv ftlo Sheridan - Mabelvale 500 kv 14-EAI-009-CP N/A Pre-Planned Enhanced Transmission Reliability Kings River (SWEPCO Tie) - Tap Osage Creek to Berryville 161 kv and Osage Creek to Grandview 161 kv lines EAI Summer 2016 Proposed & In Scoping AEP required to obtain approval from the APSC. Begin work after line and station approved by the commission. Summer 2016 N/A N/A 14-EAI-017-CP N/A Pre-Planned Driver kv Substation: Construct new substation and loop in and out of San Souci to Shelby 500 kv line EAI Summer 2015 Approved Design ed ISD TBD based on customer inputs and requirements TBD N/A N/A 14-EAI-018-CP TBD Appendix A Load Growth Macedonia: Build New 115 kv Substation EAI 2015 Approved Scoping Under Review 2015 N/A N/A 14-EAI-019-CP TBD Appendix A Load Growth Pin Oak Road: Build new substation EAI 2015 Approved Scoping cancelled by Distribution 2015 N/A N/A Planning 14-EAI CP TBD Appendix A EAI Underrated Breaker : Carpenter 115 kv B1686-TCO EAI Winter 2016 Proposed & In Scoping Under Review Winter 2016 N/A N/A N/A 14-EAI CP TBD Appendix A EAI Underrated Breaker : P.B. 34 & Main 115 kv B0957-CBO EAI Winter 2014 Proposed & In Scoping Under Review Winter 2014 N/A N/A N/A 14-EAI CP TBD Appendix A EAI Underrated Breaker : P.B. Dierks 115 kv B0938-CBO EAI Winter 2014 Proposed & In Scoping Under Review Winter 2014 N/A N/A N/A CP s Page 3 of 33

4 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 14-EAI CP TBD Appendix A EAI Underrated Breaker : L.R. Hindman 115 kv B0988-CBO EAI Winter 2014 Proposed & In Scoping Under Review Winter 2014 N/A N/A N/A 14-EAI CP TBD Appendix A EAI Underrated Breaker : L.R. Industrial 115 kv B0591-CBO EAI Winter 2014 Proposed & In Scoping Under Review Winter 2014 N/A N/A N/A 14-EAI CP TBD Appendix A EAI Underrated Breaker : L.R. Alexander 115 kv B0639-CBO EAI Winter 2014 Proposed & In Scoping Under Review Winter 2014 N/A N/A N/A 14-EAI CP TBD Appendix A EAI Underrated Breaker : Searcy Price 115 kv B5310-ICBO EAI Winter 2014 Proposed & In Scoping Under Review Winter 2014 N/A N/A N/A 14-EAI CP TBD Appendix A EAI Underrated Breaker : McAlmont 115 kv B0980-CO EAI Winter 2014 Proposed & In Scoping Under Review Winter 2014 N/A N/A N/A 14-EAI CP TBD Appendix A EAI Underrated Breaker : Jacksonville North 115 kv B3621-CBO EAI Winter 2015 Proposed & In Scoping Under Review Winter 2015 N/A N/A N/A 14-EAI CP TBD Appendix A EAI Underrated Breaker : Couch 115 kv B3860- CBO EAI Winter 2016 Proposed & In Scoping Under Review Winter 2016 N/A N/A N/A 14-EAI-021-CP N/A Pre-Planned Transmission Service Trumann Substation - Add Capacitor Bank EAI Winter 2014 Approved Scoping Under Review. ed ISD currently expected to move from Winter 2014 to Summer Summer 2015 N/A N/A 14-EAI CP TBD Appendix A EAI SPOF s: Modify relaying at White Bluff 500 kv EAI Summer 2015 Proposed & In Scoping Summer 2015 N/A N/A N/A 14-EAI CP TBD Appendix A EAI SPOF s: Modify relaying at ISES 500/161 kv EAI Summer 2015 Proposed & In Scoping Summer 2015 N/A N/A N/A 14-EAI CP TBD Appendix A EAI SPOF s: Modify relaying at Mabelvale 500 kv EAI Summer 2015 Proposed & In Scoping Summer 2015 N/A N/A N/A 14-EAI CP TBD Appendix A EAI SPOF s: Modify relaying at El Dorado 500 kv EAI Summer 2015 Proposed & In Scoping Summer 2015 N/A N/A N/A 14-EAI CP TBD Appendix A EAI SPOF s: Modify relaying at Hot Springs 500 kv EAI Summer 2015 Proposed & In Scoping Summer 2015 N/A N/A N/A CP s Page 4 of 33

5 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 14-EAI-023-CP TBD Appendix A Customer Driven AECC Shaw POD (Woodlawn Expansion) EAI 2014 Approved Scoping Under Review. ed ISD Spring Spring 2015 N/A N/A 14-EAI-025-CP TBD Appendix A Customer Driven Smackover Industrial 115 kv Substation: Construct new substation EAI Spring 2016 Proposed & In Design Baseline schedule has been cancelled due to ROW issues. Progress has been made with ROW to be obtained by Customer. ISD not final due to waiting on Customer performed tasks. 5/1/2016 N/A N/A N/A 14-EAI-024-CP TBD Appendix A Customer Driven Benton West 115 kv Substation: Construct new substation EAI Spring 2014 Approved Complete In-service 5/1/2014 1/17/14 N/A Yes N/A 11-EGL-007-CP 4602 Appendix B Moril to Delcambre 138 kv line: Upgrade station equipment EGSL Summer 2016 Proposed & In Scoping Summer 2016 N/A 11-EGL CP N/A Pre-Planned Mossville to Canal - Phase 2: Upgrade 69 kv Line EGSL Winter 2014 Proposed & In Design/Scoping Winter 2014 N/A N/A 11-EGL-017-CP 4608 Appendix B Five Points to Line 281 Tap to Line 247 Tap- Upgrade 69 kv line EGSL Summer 2019 Proposed & In Planning Summer 2019 N/A N/A 12-EGL-004-CP 4603 Appendix B McManus to Brady Heights - Upgrade 69 kv line EGSL Winter 2016 Proposed & In Planning Winter 2016 N/A N/A 12-EGL-010-CP N/A Pre-Planned New Iberia: Add kv transformer EGSL Summer 2015 Proposed & In Scoping Summer 2015 N/A N/A 12-EGL-015-CP N/A Pre-Planned Economic Willow Glen to Conway - Construct new 230 kv line EGSL Spring 2014 Approved Construction The project is being constructed in two phases. The East Phase is complete from Conway to the new Brittany Substation. The wetlands permit is still pending approval by the Corps. ROW acquisition is 80% complete on the west phase. 13-EGL-002-CP N/A Pre-Planned Lake Arthur 69 kv: Move normally open point EGSL Summer 2015 Proposed & In Scoping Non-Capital. Switching Only Required 10/1/14 N/A Wyandotte - Conway ftlo St. Gabriel - AAC Corp 230 kv; Licar - Belle Helene 230 kv FTLO Coly - Vignes 230 kv; Licar - Belle Helene 230 kv ftlo Willow Glen - Waterford 500 kv; St. Gabriel - AAC Corp 230 kv ftlo of Waterford Nuclear UN 3 Summer 2015 N/A N/A CP s Page 5 of 33

6 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 14-EGL-001-CP N/A Pre-Planned Longfellow to Cade Switch - Move Normally Open Point EGSL Summer 2015 Proposed & In Scoping Non-Capital. Switching Only Required Summer 2015 N/A N/A 14-EGL-002-CP 4611 Appendix B Flannery Area Construct new kv Substation Also reconfigure 69 kv lines 340 and 749 EGSL Summer 2020 Proposed & In Scoping Summer 2020 N/A N/A 14-EGL-003-CP N/A Pre-Planned Willow Glenn: Upgrade kv single phase transformer bank with 1200 MVA single phase bank EGSL Summer 2016 Proposed & In Scoping Summer 2016 Planned NCLL until project completed N/A 14-EGL-004-CP 4606 Appendix B Fancy Point: Add 2nd kv, 1200 MVA transformer EGSL Summer 2017 Proposed & In Scoping Summer 2017 Planned NCLL until project completed Fancy Auto 500/230 kv for the loss of McKnight-Coly 500 kv 14-EGL-005-CP 4625 Appendix A Nelson: Upgrade kv single phase transformer bank with 1200 MVA transformer bank EGSL Winter 2015 Approved Scoping 6/1/2015 N/A Nelson AT1 500/230 (ftlo) Hartburg 500kv - Cypress Nelson At 1 500/230kV ftlo Nelson Unit 14-EGL-006-CP N/A Pre-Planned LeBlanc - New Cap Bank #1 EGSL Summer 2015 Proposed & In Scoping Summer 2015 N/A N/A 14-EGL-007-CP 4610 Appendix B Chlomal to Lacassine - Upgrade Line EGSL Winter 2019 Proposed & In Scoping Winter 2019 N/A N/A 14-EGL-008-CP 4609 Appendix B Krotz Springs - New Cap Bank EGSL Summer 2019 Proposed & In Scoping Summer 2019 N/A N/A 14-EGL-016-CP 4604 Appendix B Port Hudson to Zachary REA 69 kv Line Reconductor EGSL Summer 2017 Proposed & In Scoping Summer 2017 N/A N/A CP s Page 6 of 33

7 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 14-EGL-017-CP 4605 Appendix A Crown Zellerbach Area: Construct new kv substation on the Fancy Point to Waterloo 230 kv line EGSL Summer 2017 Proposed & In Scoping Summer 2017 N/A N/A 14-EGL-018-CP 4607 Appendix B Port Hudson Substation: Replace (2) kv autos with 200 MVA units EGSL Summer 2017 Proposed & In Scoping Summer 2017 N/A N/A 14-EGL-019-CP N/A Pre-Planned Mud Lake 230 kv Substation: Loop Sabine to Big kv Line into new Mud Lake 230 kv substation and add (2) 230 kv capacitor banks at Mud Lake EGSL Fall 2016 Approved Scoping Fall 2016 N/A N/A 14-EGL-020-CP 4719 Appendix A Transmission Service PPG to Rosebluff 230 kv Line: Upgrade line to increase capacity EGSL Summer 2015 Approved Scoping New Summer 2015 N/A PPG to Rosebluff 230 kv for the loss of Hartburg to Cypress 500 kv 14-EGL CP TBD Appendix A EGSL SPOF s: Modify relaying at Willow Glen 500 kv EGSL Summer 2015 Proposed & In Scoping Summer 2015 N/A N/A N/A 14-EGL CP TBD Appendix A EGSL SPOF s: Modify relaying at Fancy Point 500kV EGSL Summer 2015 Proposed & In Scoping Summer 2015 N/A N/A N/A 14-EGL-023-CP 4720 Appendix A Customer Driven Michigan 230 kv substation: Construct new Michigan 230 kv substation and cut in to the Nelson to Verdine 230 kv line EGSL Summer 2015 Approved Scoping Summer 2015 N/A N/A 14-EGL CP TBD Appendix A EGSL Underrated Breaker : Jaguar 69 kv CO EGSL Winter 2016 Proposed & In Scoping Under Review Winter 2016 N/A N/A N/A 14-EGL CP TBD Appendix A EGSL Underrated Breaker : Jaguar 69 kv CO EGSL Winter 2016 Proposed & In Scoping Under Review Winter 2016 N/A N/A N/A 14-EGL CP TBD Appendix A EGSL Underrated Breaker : Blount 69 kv TC EGSL Winter 2016 Proposed & In Scoping Under Review Winter 2016 N/A N/A N/A 14-EGL CP TBD Appendix A EGSL Underrated Breaker : Coly 230 kv C EGSL Winter 2016 Proposed & In Scoping Under Review Winter 2016 N/A N/A N/A CP s Page 7 of 33

8 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 14-EGL CP TBD Appendix A EGSL Underrated Breaker : Coly 230 kv C EGSL Winter 2016 Proposed & In Scoping Under Review Winter 2016 N/A N/A N/A 14-EGL-025-CP TBD Appendix A Customer Driven Boxwood 230 kv Substation: Cut-in new substation on the Willow Glen to Brittany 230 kv line EGSL Winter 2014 Approved Construction Winter 2014 N/A N/A 11-EGL-010-CP N/A Pre-Planned Sorrento Upgrade 138/115 kv Auto and upgrade Gonzales - Sorrento 138 kv Line EGSL/ELL Summer 2014 Approved Construction Detailed design complete. Auto transformer has been ordered. Construction has begun on Gonzales to Sorrento line. 6/1/14 N/A SREGON_WGWAT 10-ELL-008-CP N/A Pre-Planned Southeast LA Coastal Improvement Plan: Phase 3 Construct Oakville to Alliance 230kV Line Add kv Autotransformer at Alliance Substation ELL Summer 2013 Approved Scoping Routing challenges continue to delay start of ROW acquisition. Alliance kv auto installation completed. ed ISD currently moved from 6/1/14 to 6/1/15 to reflect uncertainty on ROW and DOTD permit to build line along Hwy 23. schedule will be adjusted once ROW acquisition can begin. In a 9/18/13 meeting to discuss the hwy 23 route, Parish officials requested Entergy to revisit the back levee route in conjunction with the planned levee expansion by the USACE with the understanding that the Parish will provide access roads and other facilities needed to locate the line between the canal and the back levee. This option is being evaluated and will need approvals/permits from the USACE and Parish. Awaiting conditional permit approval from USACE on the hwy 23 route. Meetings were held with Parish officials again on 2/10/14 and they took the action to discuss the back levee option with the USACE. 6/1/15 Planned NCLL until project completed Valentine - Clovelly ftlo Ninemile 230/ ELL-009-CP N/A Pre-Planned 11-ELL-001-CP N/A Pre-Planned Enhanced Transmission Reliability Golden Meadow to Leeville 115 kv - Rebuild/relocate 115 kv transmission line Iron Man to Tezcuco 230 kv line - Construct new line ELL Summer 2015 Approved Design/Construction Iron Man substation placed in service (1/10/12) and included in models. Tezcuco Substation expansion completed and placed into service 4/24/12. Permitting and ROW acquisition complete, vegetation clearing in progress. ELL Spring 2014 Approved Design ed ISD has been changed to 5/31/15 from 5/31/14 due to delays in USACE permitting and ROW acquisition. USACE permit was finally received in January 2014 and expropriation and ROW acquisition was completed in 4Q 2013, however an appeal of the court decision has occurred and delaying access to that portion of the line route. Preparations are underway to begin construction of driveway pads needed for the transmission line structures. 5/31/15 Planned NCLL until project completed N/A 5/31/14 N/A N/A CP s Page 8 of 33

9 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 11-ELL CP N/A Pre-Planned NE Louisiana Improvement - Phase 2 Oak Ridge to new Dunn Substation - Construct new 115 kv Line (1272 ACSS) Add 115 kv breakers at Dunn Add 115 kv, 32.4 MVAR capacitor bank at Dunn ELL Summer 2014 Approved Construction WRP package was sent to DC on 12/17/13. It will take days for review by the approving agency in DC. At Dunn, site work is 100% complete and foundation work is 80% complete. At Oak Ridge, foundation work is 100% complete. ROW acquisition is about 97% complete. ROW clearing in progress( 94% completed and on schedule). 12/19/14 N/A Swartz - Alto for the loss of Perryville - Baxter Wilson 500 kv 11-ELL-004-CP N/A Pre-Planned Northeast LA Improvement Phase 3 Upgrade Sterlington to Oakridge to Dunn 115 kv Line ELL Summer 2015 Proposed & In Design/Scoping Scoping underway. Summer 2014 N/A STOAK_PVBW 11-ELL CP N/A Pre-Planned Generation Interconnection NM6: Modify Ninemile switchyard for interconnection ELL Winter 2014 Approved Construction New transmission line for new generator 6A was energized on 1/24/14 and for 6B on 1/31/14. Backfeed for generator 6A has been completed in Feb Gen 6C remains on track for Early finish of April of 2014; Late target finish of Dec /8/2014 (6A&6B) 12/1/2014 (6C) 11-ELL-012-CP N/A Pre-Planned Valentine to Clovelly 115 kv upgrade ELL Summer 2015 Approved Design now in design phase. team and stakeholders are reviewing options for exposure during construction outages. N/A Summer 2015 Planned NCLL until project completed Valentine - Clovelly ftlo Ninemile 230/115, Valentine - Clovelly ftlo Waterford - Ninemile 230 kv N/A 12-ELL-004-CP TBD Appendix A Load Growth Schriever: Construct new 230 kv substation ELL 2017 Proposed & In Scoping Under Review 2017 N/A N/A 13-ELL-004-CP N/A Pre-Planned Minden Improvement Ph. 1-Place cap bank at Minden REA ELL Summer 2015 Proposed & In Scoping Will require co-ordination with Lagen on final design and operation Summer 2015 N/A N/A 14-ELL-001-CP 4612 Appendix B Norco 115 kv Substation: Add 30.5 MVAR Capacitor Bank ELL Summer 2017 Proposed & In Scoping Scoping estimated to begin in 2015 Summer 2017 N/A N/A 14-ELL-006-CP 4639 Appendix B Ninemile to Harvey2 115 kv: Reconductor line and change station limiting elements ELL Summer 2020 Proposed & In Scoping moved from Horizon Plan to Construction Plan Summer 2020 N/A 14-ELL CP TBD Appendix A ELL Underrated Breaker : Waterford 230 kv S1745-CO ELL Winter 2016 Proposed & In Scoping Under Review Winter 2016 N/A N/A N/A 14-ELL CP TBD Appendix A ELL Underrated Breaker : Waterford 230 kv S1754-CO ELL Winter 2016 Proposed & In Scoping Under Review Winter 2016 N/A N/A N/A 14-ELL CP TBD Appendix A ELL Underrated Breaker : Ninemile 115 kv S6342- CO ELL Winter 2016 Proposed & In Scoping Under Review Winter 2016 N/A N/A N/A CP s Page 9 of 33

10 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 14-ELL CP TBD Appendix A ELL SPOF s: Modify relaying at Ninemile 230 kv ELL Summer 2015 Proposed & In Scoping New Summer 2015 N/A N/A N/A 14-ELL CP TBD Appendix A ELL SPOF s: Modify relaying at Southport 230 kv ELL Summer 2015 Proposed & In Scoping New Summer 2015 N/A N/A N/A 14-ELL CP TBD Appendix A ELL SPOF s: Modify relaying at Labarre 230 kv ELL Summer 2015 Proposed & In Scoping New Summer 2015 N/A N/A N/A 14-ELL CP TBD Appendix A ELL SPOF s: Modify relaying at Harrahan 230 kv ELL Summer 2015 Proposed & In Scoping New Summer 2015 N/A N/A N/A 14-ELL CP TBD Appendix A ELL SPOF s: Modify relaying at Paris 230 kv ELL Summer 2015 Proposed & In Scoping New Summer 2015 N/A N/A N/A 14-ENO CP TBD Appendix A ELL SPOF s: Modify relaying at Market Street 230 kv ENOI Summer 2015 Proposed & In Scoping New Summer 2015 N/A N/A N/A 14-ELL-014-CP TBD Appendix B Gypsy: Add (2) 50 MVAR Capacitor Banks ELL Summer 2016 Proposed & In Scoping New Summer 2016 N/A N/A 14-ELL-015-CP TBD Appendix B Gypsy: Change kv autotransformer tap settings ELL Summer 2016 Proposed & In Scoping New Non-Capital. Tap adjustments only. Summer 2016 N/A N/A 14-ELL-016-CP TBD Appendix A Customer Driven Haute 115 kv Substation: Construct new substation and cut into existing Lutcher to Belle Point 115 kv line ELL Summer 2014 Approved Design EPC 6/1/2014 N/A N/A N/A 14-ELL-017-CP TBD Appendix A Customer Driven Derrick 230 kv Substation: Construct new 230 kv substation and cut into Iberville to Chenago 230 kv line ELL Fall 2014 Approved Construction EPC 10/1/2014 N/A N/A N/A 14-ELL-012-CP TBD Appendix B Ninemile to Derbigny: Upgrade 230 kv line ELL/ENOI Summer 2016 Proposed & In Scoping New Summer 2016 N/A N/A CP s Page 10 of 33

11 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 14-ELL-013-CP TBD Appendix B Ninemile to Napoleon: Upgrade 230 kv line ELL/ENOI Summer 2016 Proposed & In Scoping New Summer 2016 N/A N/A 11-EMI-002-CP N/A Pre-Planned Baxter Wilson to S.E. Vicksburg - Upgrade 115 kv line EMI Summer 2015 Approved Design Work orders have been written, and detailed design, engineering and material procurement is underway Summer 2015 N/A BWLVKS_VKSW 11-EMI-007-CP 4613 Appendix B Breakers at Hollandale and Belzoni Tap SS (close normally-open point) EMI Summer 2019 Proposed & In Scoping need date has moved to Summer 2019 Summer 2019 N/A N/A 12-EMI-001-CP 4614 Appendix B Franklin - McComb build new 115 kv line (constructed to 230 kv) Also upgrade all substation elements along Tylertown to McComb 115 kv line to provide a minimum 1000A rating. EMI Summer 2018 Proposed & In Scoping need date being accelerated from Summer 2020 to Summer Summer 2018 N/A Brookhaven - Mallalieu 115 kv for the loss of Franklin - Bogalusa 500 kv 12-EMI-004-CP TBD Appendix B Load Growth Henderson Road: Build new substation EMI 2018 Proposed & In Scoping Under Review 2018 N/A N/A 14-EMI-002-CP N/A Pre-Planned Bozeman Rd to Tinnin Rd 230kV: Build new 230kV line from Bozeman Road to GASES-Ray Braswell 230kV and add new breaker station EMI Summer 2017 Proposed & In Scoping Summer 2017 N/A N/A 14-EMI-003-CP N/A Pre-Planned Natchez Improvement Phase 1: Baxter Wilson to Natchez SES 115kV Build new 115kV line rated 260MVA (230kV constructed) EMI Summer 2018 Proposed & In Scoping Summer 2018 N/A N/A 14-EMI-004-CP 4615 Appendix B McAdams: Add 3rd kV autotransformer EMI Summer 2020 Proposed & In Scoping Summer 2020 N/A N/A 14-EMI-005-CP N/A Pre-Planned Enhanced Transmission Reliability Vicksburg Area Improvement : Build new 115kV switching station and rebuild E.Vicksburg-R.Braswell 115kV and SE Vicksburg-new switching station. Upgrade station equipment at SE Vicksburg and Bovina EMI Summer 2018 Proposed & In Scoping Summer 2018 N/A N/A CP s Page 11 of 33

12 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 14-EMI-006-CP N/A Pre-Planned Horn Lake Substation: Upgrade 115 kv switch J0966 LAB to 1200 A. EMI Summer 2014 Proposed & In Scoping Grid turned work over to Construction to perform. Will perform final scope within 30 days, and begin detailed engineering and material procurement. Summer 2014 N/A N/A 14-EMI CP TBD Appendix A EMI Underrated Breaker : Rex Brown 115 kv J6797-CO EMI Winter 2015 Proposed & In Scoping Under Review Winter 2015 N/A N/A N/A 14-EMI CP TBD Appendix A EMI Underrated Breaker : Rex Brown 115 kv J7497-CO EMI Winter 2015 Proposed & In Scoping Under Review Winter 2015 N/A N/A N/A 14-EMI CP TBD Appendix A EMI Underrated Breaker : Rex Brown 115 kv J9732-CO EMI Winter 2015 Proposed & In Scoping Under Review Winter 2015 N/A N/A N/A 14-EMI CP TBD Appendix A EMI Underrated Breaker : Rex Brown 115 kv J9742-CO EMI Winter 2015 Proposed & In Scoping Under Review Winter 2015 N/A N/A N/A 14-EMI CP TBD Appendix A EMI Underrated Breaker : Rex Brown 115 kv J9743-CO EMI Winter 2015 Proposed & In Scoping Under Review Winter 2015 N/A N/A N/A 14-EMI CP TBD Appendix A EMI Underrated Breaker : Rex Brown 115 kv J9759-CO EMI Winter 2015 Proposed & In Scoping Under Review Winter 2015 N/A N/A N/A 14-EMI CP TBD Appendix A EMI Underrated Breaker : Rex Brown 115 kv J9753-CO EMI Winter 2016 Proposed & In Scoping Under Review Winter 2016 N/A N/A N/A 14-EMI CP TBD Appendix A EMI Underrated Breaker : Greenville 115 kv J9942-CO EMI Winter 2016 Proposed & In Scoping Under Review Winter 2016 N/A N/A N/A 12-ENO-001-CP TBD Appendix A Load Growth Midtown: Add 230 kv distribution transformers ENOI 2014 Approved Construction Construction in progress 4/1/14 N/A N/A 14-ENO CP TBD Appendix A ENOI Underrated Breaker : Claiborn 115 kv N0143-ICBO ENOI Winter 2014 Proposed & In Scoping Under Review Winter 2014 N/A N/A N/A 14-ENO CP TBD Appendix A ENOI Underrated Breaker : Claiborn 115 kv N0123-ICBO ENOI Winter 2014 Proposed & In Scoping Under Review Winter 2014 N/A N/A N/A 14-ENO-002-CP TBD Appendix B Market Street Substation: Upgrade bus and jumpers ENOI Summer 2018 Proposed & In Scoping New Summer 2018 N/A N/A CP s Page 12 of 33

13 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 11-ETI-003-CP N/A Pre-Planned Deweyville (JNEC) - Add 69 kv capacitor bank ETI Winter 2014 Proposed & In Design/Scoping Facilities owned by JNEC. Entergy and JNEC are working to establish final projected in-service date. expectations are 2014 Winter. Winter 2014 N/A N/A 11-ETI-018-CP N/A Pre-Planned Construct new China to Amelia 230kV line ETI Summer 2016 Approved Design/Scoping CCN application filed on July 19, Expansion of Amelia to both reterminate existing lines and terminate new line from China as well. is on track for a Summer 2016 ISD. Line route expected to be finalized by April 1, Open meeting with PUCT on March 6 for final CCN order. Summer 2016 N/A N/A 11-ETI-023-CP N/A Pre-Planned Orange County 230kV : Construct new Chisholm Road 230 kv substation, Construct new line from Hartburg to Chisholm Road, add 2nd Hartburg kv auto ETI Summer 2017 Proposed & In Design/Scoping The CCN process for this line targeted to start in mid - late summer of Presently evaluating Chisholm Road substation sites. Line routing will begin once an adequate site is located. Summer 2017 N/A Hartburg - Inland Orange 230 kv for the loss of Hartburg - Cypress 500 kv; Hartburg 500/230 kv Auto for the loss of Hartburg - Cypress 500 kv 11-ETI-026-CP 4622 Appendix B Upgrade Splendora to Apollo 138 kv Line ETI Summer 2019 Proposed & In Scoping Scoping to begin in 2016 Summer 2019 N/A N/A 11-ETI-033-CP N/A Pre-Planned Toledo Bend to Leach 138 kv - Upgrade line ETI Fall 2014 Proposed & In Scoping Scoping to begin in early Fall 2014 N/A LCHTOL_GRICR TBLCH_MTOHTB 11-ETI-037-CP 4618 Appendix B Construct new China to Stowell 138 kv line ETI Summer 2018 Proposed & In Scoping Scoping to begin in 2015 Summer 2018 N/A N/A 11-ETI-039-CP N/A Pre-Planned Upgrade Jacinto - Splendora 138 kv Line ETI Summer 2015 Proposed & In Scoping Scoping to begin in early Summer 2015 N/A Jacinto - Splendora 138 kv ftlo China - Dayton 230 kv 11-ETI-042-CP N/A Pre-Planned New 50.2 MVAR Cap Bank at Parkway 138kV (Formerly expand Cap Bank at New Caney 138kV) ETI Summer 2014 Proposed & In Scoping Scoping underway Summer 2014 N/A N/A 12-ETI-006-CP 4620 Appendix B Kolbs 230 kv - Add capacitor bank ETI Summer 2018 Proposed & In Scoping Scoping to begin in early Summer 2018 N/A N/A 12-ETI-007-CP N/A Pre-Planned Alden 138 kv Substation: Add Capacitor Bank ETI Summer 2015 Proposed & In Scoping Scoping to begin in early Summer 2015 N/A N/A CP s Page 13 of 33

14 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 12-ETI-009-CP 4616 Appendix B Sabine: Upgrade terminal equipment (Sabine to Big 3 line) ETI Summer 2017 Proposed & In Scoping Summer 2017 N/A Sabine - Big Three 230 kv ftlo Hartburg - Nelson 500 kv 12-ETI-017-CP 4621 Appendix B Gulfway 230 kv substation: Upgrade equipment on VFW Park 230 kv line bay ETI Summer 2018 Proposed & In Scoping Summer 2018 N/A N/A 12-ETI-018-CP TBD Appendix B Load Growth Forest: Add distribution transformers at new substation ETI 2016 Proposed & In Scoping Under Review 2016 N/A N/A 13-ETI-006-CP N/A Pre-Planned Magnolia Groveton: Add 25.1 MVAR Cap Bank ETI Summer 2015 Proposed & In Scoping Scoping to begin in early Summer 2015 N/A N/A 13-ETI CP N/A Pre-Planned 13-ETI CP N/A Pre-Planned Ponderosa to Grimes: Construct new 230 kv Line Add kv Auto at Grimes Add kv Auto at Ponderosa ETI Summer 2016 Approved Scoping The CCN application was submitted August 19, ly in working with the Texas Public Utility Commission on line routing. Conroe to Ponderosa 138 kv line: Upgrade Line ETI Summer 2016 Approved Scoping Being worked in conjunction with Ponderosa to Grimes 230kV Summer 2016 N/A GRIMTZ_WDN GRIMZ_GRICRO Mt. Zion to Grimes ftlo Grimes - Bentwater 138 kv Summer 2016 N/A N/A 13-ETI CP N/A Pre-Planned Pansy to Lovells Lake 69 kv line: Upgrade line to 100 deg design ETI Summer 2014 Proposed & In Design/Scoping Scoping underway Summer 2014 N/A N/A 13-ETI CP N/A Pre-Planned Lovells Lake to Texas Hillebrandt 69 kv line: Upgrade line to 100 deg design ETI Summer 2014 Proposed & In Design/Scoping Scoping underway Summer 2014 N/A N/A 13-ETI CP N/A N/A South Beaumont to Texas Hillebrandt 69 kv line: Upgrade line to 100 deg design ETI Summer 2014 Proposed & In Design/Scoping Scoping underway Summer 2014 N/A N/A 13-ETI-011-CP N/A Pre-Planned Lewis Creek to Egypt 138 kv line: Reconductor ETI Summer 2014 Proposed & In Design/Scoping Scoping underway Summer 2014 N/A N/A 13-ETI-012-CP N/A Pre-Planned 13-ETI-013-CP 4617 Appendix B Construct new Porter to Forest 138 kv transmission line - Construct new line from Porter to Oakridge area and tie into de-energized line Terminate line 403 into Forest 138 kv substation ETI Summer 2016 Proposed & In Egypt to Panorama 138 kv Line: Reconductor line ETI Summer 2017 Proposed & In Design/Scoping The site for the Forest station has been identified. The CNN is schedule to start in the next few months. Option to acquire Forest Site obtained. Environmental assessment has begun. Site visit for Forest SS completed Summer 2016 N/A N/A Design/Scoping Summer 2017 N/A N/A CP s Page 14 of 33

15 Monthly Construction Plan Report Entergy Final Construction Plan Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 13-ETI-014-CP 4623 Appendix B Panorama to Longmire 138 kv Line: Reconductor ETI Summer 2019 Proposed & In Scoping Summer 2019 N/A N/A 13-ETI-021-CP TBD Appendix B Load Growth Dishman: Construct new substation ETI 2017 Proposed & In Scoping Under Review 2017 N/A N/A 14-ETI CP 4619 Appendix B Raywood Area Improvements Add 2nd kv Auto at Raywood ETI Summer 2018 Proposed & In Scoping Summer 2018 N/A N/A 14-ETI CP 4624 Appendix B Raywood Area Improvements Construct 2nd Raywood to Daisetta 69 kv line (extend line 440 approximately 2.2 miles to Daisetta substation) ETI Summer 2019 Proposed & In Scoping Summer 2019 N/A N/A 14-ETI-004-CP N/A Pre-Planned Leach 138 kv Substation: DTEC add 138 kv breakers (To accommodate DTEC/TEXLA Tie to close normally open point) ETI Fall 2014 Proposed & In Scoping Scoping underway Fall 2014 N/A Leach to Newton Bulk ftlo Cypress to Hartburg 500 kv 14-ETI-005-CP TBD Appendix A Load Growth Parkway: Construct new substation ETI 2014 Proposed & In Scoping Under Review 2014 N/A N/A 14-ETI CP TBD Appendix A ETI SPOF s: Modify relaying at Sabine 230/138 kv ETI Summer 2015 Proposed & In Scoping Summer 2015 N/A N/A N/A 14-ETI CP TBD Appendix A ETI SPOF s: Modify relaying at VFW Park 230 kv ETI Summer 2015 Proposed & In Scoping Summer 2015 N/A N/A N/A 14-ETI-007-CP TBD Appendix A Customer Driven Nederland 230 kv Substation: Construct new substation ETI Fall 2014 Approved Design/Construction 10/1/2014 N/A N/A N/A 14-ETI-008-CP TBD Appendix A Customer Driven Petry Woods 138 kv Substation: Construct new substation ETI Summer 2014 Approved Construction 6/30/2014 N/A N/A N/A 14-ETI-009-CP TBD Appendix A Customer Driven Ranchland 69 kv Substation: Construct new substation ETI Winter 2014 Approved Design 12/1/2014 N/A N/A N/A CP s Page 15 of 33

16 Monthly Construction Plan Report Entergy Final Construction Plan (HORIZON PLAN PROJECT LISTING) Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 11-EAI-015-HZ 4669 Appendix C Jim Hill Area Upgrades Doniphan (AECI New Sub) - Datto 161 construct new line EAI Summer 2020 Conceptual Conceptual Conceptual Summer EAI-021-HZ 4675 Appendix C Trumann-Trumann West- Upgrade 161 kv Line EAI Summer 2021 Conceptual Conceptual Conceptual Summer EAI-014-HZ 4666 Appendix C Mabelvale-Bryant: Reconductor 115kV line EAI Summer 2020 Conceptual Conceptual Conceptual Summer EAI-033-HZ 4667 Appendix C Hergett: Add 36 MVAR Capacitor Bank EAI Summer 2020 Conceptual Conceptual Conceptual Summer EAI-034-HZ 4668 Appendix C Jonesboro to Jonesboro SPA reconductor line EAI Summer 2020 Conceptual Conceptual Conceptual Summer EAI-001-HZ 4676 Appendix C Pine Bluff McCamant- Pine Bluff East: Reconductor line EAI Summer 2021 Conceptual Conceptual Conceptual Summer EAI-002-HZ 4677 Appendix C Pine Bluff Watson Chapel - Pine Bluff South: Rebuild line to 230 kv construction and operate at 115 kv EAI Summer 2021 Conceptual Conceptual Conceptual Summer EAI-005-HZ 4678 Appendix C Bryant: Install 21.6 MVAR capacitor bank EAI Summer 2021 Conceptual Conceptual Conceptual Summer EAI-003-HZ 4674 Appendix C Ulm: Add 21.4MVAR capacitor Bank EAI Summer 2021 Conceptual Conceptual Conceptual Summer EAI-006-HZ 4681 Appendix C Beebe - Garner: Build new 161kV line, Build new 161kV Garner sub - tap Copper Springs-Searcy S. line section EAI Summer 2021 Conceptual Conceptual Conceptual Summer EAI-007-HZ 4682 Appendix C Wynne S: Install 24 MVAR capacitor bank EAI Summer 2022 Conceptual Conceptual Conceptual Summer EAI-010-HZ 4670 Appendix C West Memphis - Add 2nd kv auto EAI Summer 2020 Conceptual Conceptual Conceptual Summer EAI-011-HZ 4671 Appendix C El Dorado - Add 2nd kv auto (utilize auto removed from Mabelvale) EAI Summer 2020 Conceptual Conceptual Conceptual Summer EAI-012-HZ 4672 Appendix C McNeil - Add 2nd kv auto (utilize auto removed from Mabelvale) EAI Summer 2020 Conceptual Conceptual Conceptual Summer EAI-013-HZ 4673 Appendix C West Memphis to West Memphis Polk 161 kv line - Upgrade line EAI Summer 2020 Conceptual Conceptual Conceptual Summer EAI-014-HZ 4679 Appendix C Bauxite - Install two (2) MVAR capacitor banks EAI Summer 2021 Conceptual Conceptual Conceptual Summer EAI-015-HZ 4680 Appendix C Haskell - Install 21.6 MVAR capacitor bank EAI Summer 2021 Conceptual Conceptual Conceptual Summer 2021 HP s Page 16 of 33

17 Monthly Construction Plan Report Entergy Final Construction Plan (HORIZON PLAN PROJECT LISTING) Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 14-EAI-016-HZ 4683 Appendix C Woodlawn to Bauxite 115 kv line - Upgrade line EAI Summer 2022 Conceptual Conceptual Conceptual Summer EGL-018-HZ 4630 Appendix C Francis to Marydale: Upgrade 69 kv line EGSL Winter 2023 Conceptual Conceptual Conceptual Winter EGL-010-HZ 4626 Appendix C Meaux to Abbeville - Upgrade Meaux Line bay bus EGSL Summer 2020 Conceptual Conceptual Conceptual Summer EGL-011-HZ 4627 Appendix C Longfellow to Cade Switch - Construct new 69kV parallel line from New Iberia to Line 625A Tap Point. EGSL Summer 2022 Conceptual Conceptual Conceptual Summer EGL-012-HZ 4628 Appendix C LeBlanc - New Cap Bank #2 EGSL Summer 2022 Conceptual Conceptual Conceptual Summer EGL-013-HZ 4631 Appendix C Serpent 69 kv Substation: Upgrade Lacassine to Carter 69kV conductor. EGSL Winter 2023 Conceptual Conceptual Conceptual Winter EGL-014-HZ 4632 Appendix C Kaplan to Hunter - Upgrade Line EGSL Summer 2024 Conceptual Conceptual Conceptual Summer EGL-015-HZ 4629 Appendix C Transmisison Reliability - Meeting Meaux to Abbeville - Reconductor Line EGSL Summer 2022 Conceptual Conceptual Conceptual Summer 2022 HP s Page 17 of 33

18 Monthly Construction Plan Report Entergy Final Construction Plan (HORIZON PLAN PROJECT LISTING) Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 13-ELL-005-HZ 4633 Appendix C Vienna to Ruston Frazier Road 115 kv Line 173: Upgrade metering CTs at Ruston ELL Summer 2020 Conceptual Conceptual Conceptual Summer ELL-006-HZ 4634 Appendix C Ninemile to Westwego 115 kv: Reconductor Line ELL Summer 2020 Conceptual Conceptual Conceptual Summer ELL-002-HZ 4635 Appendix C Sterlington 115 kv Substation: Upgrade jumpers on the Sterlington to Walnut Grove 115 kv line (line 107) ELL Summer 2020 Conceptual Conceptual Conceptual Summer ELL-003-HZ 4636 Appendix C Bayou Verret 230 kv Substation : Add 40.7 MVAR Capacitor Bank ELL Summer 2020 Conceptual Conceptual Conceptual Summer ELL-004-HZ 4637 Appendix C Amite kv Auto: Change tap to ELL Winter 2020 Conceptual Conceptual Conceptual Winter ELL-005-HZ 4638 Appendix C North Louisiana Improvement Phase 4 Sacksonia to Winnsboro: Construct New 115 kv Line ELL Summer 2021 Conceptual Conceptual Conceptual Summer ELL-007-HZ 4640 Appendix C Ramsay 230 kv Substation: Add 40.7 MVAR Capacitor Bank ELL Winter 2023 Conceptual Conceptual Conceptual Winter ELL-011-HZ TBD TBD Mandeville Substation: Add 43.2 MVAR, 230 kv capacitor bank ELL Summer 2020 Conceptual Conceptual Conceptual Summer ELL-010-HZ TBD TBD Bogalusa Substation: Add 43.2 MVAR, 230 kv capacitor bank ELL Summer 2024 Conceptual Conceptual Conceptual Summer 2024 HP s Page 18 of 33

19 Monthly Construction Plan Report Entergy Final Construction Plan (HORIZON PLAN PROJECT LISTING) Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 11-ETI-002-HZ 4652 Appendix C Reconductor Sabine to Port Neches Bulk (Line 515) ETI Summer 2024 Conceptual Conceptual Conceptual Summer ETI-016-HZ 4654 Appendix C Add 2nd Cypress Auto 500/138kV ETI Summer 2024 Conceptual Conceptual Conceptual Summer ETI-019-HZ 4648 Appendix C Cut Line 871 Jacinto to Splendora 138 kv line into the Cleveland 138 kv substation. ETI Summer 2023 Conceptual Conceptual Conceptual Summer ETI-038-HZ 4653 Appendix C Reconductor Sabine to Port Neches Bulk (via Linde Line 516) ETI Summer 2024 Conceptual Conceptual Conceptual Summer ETI-040-HZ 4655 Appendix C Helbig to Chisolm Road - Reconductor with ACCC ETI Summer 2024 Conceptual Conceptual Conceptual Summer ETI-001-HZ 4649 Appendix C Winshire 69 kv: Add capacitor bank ETI Summer 2023 Conceptual Conceptual Conceptual Summer ETI-008-HZ 4643 Appendix C Upgrade Apollo to Porter 138 kv ETI Summer 2021 Conceptual Conceptual Conceptual Summer ETI-010-HZ 4651 Appendix C Buna: Add capacitor bank ETI Summer 2023 Conceptual Conceptual Conceptual Summer ETI-014-HZ 4647 Appendix C Amelia to Helbig: Reconductor Line ETI Summer 2022 Conceptual Conceptual Conceptual Summer 2022 HP s Page 19 of 33

20 Monthly Construction Plan Report Entergy Final Construction Plan (HORIZON PLAN PROJECT LISTING) Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 13-ETI-007-HZ 4656 Appendix C Western Region Reliability Improvement Plan Phase 3 Final Construct new Cypress to Jacinto 230 kv Line with series compensation ETI Summer 2024 Conceptual Conceptual Conceptual Summer ETI-015-HZ 4644 Appendix C Eastgate 138 kv Substation: Add 37.7 MVAR Capacitor Bank ETI Summer 2021 Conceptual Conceptual Conceptual Summer ETI-016-HZ 4646 Appendix C Ponderosa to Fish Creek 138 kv: Reconductor ETI Summer 2022 Conceptual Conceptual Conceptual Summer ETI-018-HZ 4650 Appendix C Dobbins 138 kv Substation: Add 25.1 MVAR capacitor bank ETI Summer 2023 Conceptual Conceptual Conceptual Summer ETI-020-HZ 4645 Appendix C Transmission Reliability-Meeting Jacinto to Cleveland 138 kv Line: Upgrade line bay risers at both Jacinto and Cleveland ETI Summer 2021 Conceptual Conceptual Conceptual Summer ETI-002-HZ 4641 Appendix C Carroll St - Neches Line 1 ETI Summer 2020 Conceptual Conceptual Conceptual Summer ETI-003-HZ 4642 Appendix C Carroll St - Neches line 2 ETI Summer 2020 Conceptual Conceptual Conceptual Summer 2020 HP s Page 20 of 33

21 Monthly Construction Plan Report PREVIOUSLY COMPLETED PROJECTS Construction Plan Designation Driver Name Company Comments ed ISD Actual ISD Mitigation Plan if required AFC Model? 10CP-EAI CP-EAI CP-EAI CP-EAI CP-EAI-005 Hamlet 161 kv Substation: Install 161 kv Breaker on Conway Industrial Line Gillette 115 kv Substation: Install 10.8 MVAR Capacitor Bank Conway West - Donaghey 161 kv Line: Reconductor with 666 ACSS Sarepta (NW Louisiana/South Arkansas Voltage Support Plan) Add 10.8 MVAR capacitor bank at Emerson 115 kv substation Danville 161 kv Substation: Upgrade Terminal Equipment to match or exceed Magazine line ratings EAI Summer 2009 Approved Complete In-service 12/4/09 12/4/09 Complete Yes EAI Summer 2009 Approved Complete In-service 7/1/09 5/16/09 Complete Yes EAI Summer 2009 Approved Complete In-service 3/24/09 Complete Yes EAI Summer 2009 Approved Complete In-service 12/31/09 10/8/09 Complete Yes EAI Fall 2009 Approved Complete In-service 8/14/09 8/14/09 Complete Yes 10CP-EAI-006 Donaghey - Conway South 161 kv Line: Reconductor with 666 ACSS 10CP-EAI Transmission Service SMEPA (Plum Point): * Dell - Manilla 161kV Line: Upgrade to at least 247MVA 10CP-EAI Transmission Service SMEPA (Plum Point): * Manilla - Monette 161kV Line: Upgrade to at least 247MVA 10CP-EAI Transmission Service SMEPA (Plum Point): * Jonesboro North - Paragould South 161kV Line: Upgrade to at least 247MVA 10CP-EAI Transmission Service SMEPA (Plum Point): * Jonesboro North - Jonesboro 161kV Line: Upgrade to at least 247MVA 10CP-EAI-008 Beebe 115 kv Substation: Install 21.6 MVAR Capacitor Bank 10CP-EAI-009 Melbourne - Sage 161 kv Line: Upgrade line to at least 1200 A 10CP-EAI-010 Warren East 115 kv Substation: Install 10.8 MVAR Capacitor Bank 10CP-EAI-011 Parkin to Twist 161 kv - Replace line trap at Parkin (increase rating of line segment) 10CP-EAI Transmission Service Transmission Service (OG&E) Upgrade ANO - Russelville North 161 kv Line to 546 MVA 10CP-EAI Transmission Service Transmission Service (OG&E) Upgrade Russelville East - Russelville South 161 kv Line to 448 MVA EAI Spring 2010 Approved Complete In-service 4/21/10 Complete Yes EAI Spring 2010 Approved Complete In-service 4/5/10 4/2/10 Complete Yes EAI Spring 2010 Approved Complete In-service 12/26/08 12/22/08 Complete Yes EAI Spring 2010 Approved Complete In-service 5/29/09 5/14/09 Complete Yes EAI Spring 2010 Approved Complete In-service 1/8/10 1/9/10 Complete Yes EAI Summer 2010 Approved Complete In-service 6/1/10 4/21/10 Complete Yes EAI Summer 2010 Approved Complete In-service 6/1/10 6/19/10 Complete Yes EAI Summer 2010 Approved Complete In-service 8/6/10 7/18/10 Complete Yes EAI Winter 2010 Approved Complete In-service 12/31/10 12/22/10 Complete Yes EAI Summer 2010 Approved Complete In-service 6/1/10 5/18/10 Complete Yes EAI Summer 2010 Approved Complete In-service 9/30/10 8/12/10 Complete Yes 10-EAI-013-CP 10CP-EAI-014 Osage Creek-Grandview New Line Build new 161 kv (At Least 1200 A) line from Grandview (Planned SPA 161 kv Substation tapped on the Eureka - Table Rock 161 kv Line) to Osage Creek Harrison East to Everton Road 161 kv Line: Upgrade Harrison East Terminal Equipment to 1200 A EAI Summer 2011 Approved Complete In-service 12/15/11 11/28/11 Complete Yes N/A EAI Winter 2009 Approved Complete In-service 12/15/09 12/15/09 Complete Yes 10CP-EAI Transmission Service Transmission Service (Aquila) Upgrade Hot Springs - Bismark 115 kv Line to 176 MVA 10-EAI CP 10-EAI CP Holland Bottoms (Cabot EHV): Construct new 500/161/115 kv substation Phase 1 s Tap the Keo - ISES 500 kv Line Tap the Cabot - Jacksonville North 115 kv Line Install 500 kv and 115 kv Busses and a 600 MVA 500 kv / 115 kv Autotransformer Holland Bottoms (Cabot EHV): Construct new 500/161/115 kv substation Phase 2 s Install 161 kv Bus and a 600 MVA 500 kv / 161 kv Autotransformer 10CP-EAI Transmission Service Transmission Service (Aquila) Upgrade Bismark - Alpine 115 kv Line to 176 MVA 10CP-EAI Transmission Service Transmission Service (Aquila) Upgrade Alpine - Amity 115 kv Line to 176 MVA EAI Winter 2011 Approved Complete In-service 6/1/11 10/20/10 Complete Yes EAI Summer 2011 Approved Complete In-service 12/31/11 1/6/12 Complete Yes N/A EAI Summer 2012 Approved Complete In-service 6/1/12 5/23/12 Complete Yes N/A EAI Winter 2011 Approved Complete In-service 2/28/11 3/2/11 Complete Yes EAI Winter 2011 Approved Complete In-service 3/31/11 3/22/11 Complete Yes Completed s Page 21 of 33

Monthly Long Term Transmission Plan Project Status Report

Monthly Long Term Transmission Plan Project Status Report Operating Company EAI EMI ELL ENOI ETI ALL General Major Updates See Note Below See Note Below See Note Below See Note Below See Note Below See Note Below Incorporated the changes associated with the upload.

More information

Monthly Long Term Transmission Plan Project Status Report

Monthly Long Term Transmission Plan Project Status Report Operating Company EAI EMI ELL ENOI ETI ALL Major Updates 2 projects in service No major changes 1 project in service No major changes 3 projects in service 6 projects in service Entergy 11-EAI-015 4669

More information

ATC Year Asessment Network Project List

ATC Year Asessment Network Project List Project Berryville substation: loop in 3124 (Paris - Albers) into new Berryville substation 2017*** 2015 5 T-D interconnection Planned Targeted A 4358 Blaney Park 69-kV Substation: Reconfiguration 2015

More information

FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009

FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009 FINAL FACILITY STUDY KV1C Transformer Addition at Badwater Substation 2009-T1 November 17, 2009 I. Introduction In October 2008, Western Area Power Administration (Western) received a Transmission Queue

More information

Connection Engineering Study Report for AUC Application: Fortis Okotoks 678S and High River 65S Upgrades

Connection Engineering Study Report for AUC Application: Fortis Okotoks 678S and High River 65S Upgrades Connection Engineering Study Report for AUC Application: Fortis Okotoks 678S and High River 65S Upgrades Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta), in its capacity as the legal

More information

Sponsored By: Support From:

Sponsored By: Support From: Sponsored By: Support From: A voluntary association of local governments, H-GAC provides a regional forum for cooperative action. Created by Texas, role defined by State and local governments: Area Agency

More information

Diamond Springs Parkway Project

Diamond Springs Parkway Project Diamond Springs Parkway Project Public Information Meeting, Monday, March 18, 2013 330 Fair Lane, Building A, Placerville County Board of Supervisors Meeting Room, 6:30 8:00 p.m. PRESENTED BY: County of

More information

2018 & 2022 Final LCR Study Results LA Basin and San Diego-Imperial Valley Areas

2018 & 2022 Final LCR Study Results LA Basin and San Diego-Imperial Valley Areas 2018 & 2022 Final LCR Study Results LA Basin and San Diego-Imperial Valley Areas David Le Senior Advisor - Regional Transmission Engineer Stakeholder Conference Call April 13, 2017 LA Basin Area Loads

More information

SERTP - 1 st Quarter Meeting

SERTP - 1 st Quarter Meeting 2018 SERTP SERTP - 1 st Quarter Meeting First RPSG Meeting & Interactive Training Session March 29 th, 2018 Associated Electric Cooperative, Inc. Corporate Headquarters Springfield, MO 1 2018 SERTP Process

More information

Frequently Asked Questions (FAQ)

Frequently Asked Questions (FAQ) Frequently Asked s (FAQ) Study Process... 2 Rapid Transit Service and Operations... 5 Public Consultation... 8 Business Impacts... 8 Design and Property Impacts... 9 Construction Impacts...12 Traffic,

More information

PREVIOUS CROSS COUNTRY STATE CHAMPIONS Boys

PREVIOUS CROSS COUNTRY STATE CHAMPIONS Boys PREVIOUS CROSS COUNTRY STATE CHAMPIONS Boys 2018 6A Bentonville 5A Lake Hamilton 4A Huntsville 3A Cave City 2A Ouachita 2017 7A Bentonville 5A Maumelle 4A Cave City 2A Ouachita 2016 7A Rogers 5A Maumelle

More information

System Operating Limit Definition and Exceedance Clarification

System Operating Limit Definition and Exceedance Clarification System Operating Limit Definition and Exceedance Clarification The NERC-defined term System Operating Limit (SOL) is used extensively in the NERC Reliability Standards; however, there is much confusion

More information

Interconnection Feasibility Study Report Request # BHCT-G5

Interconnection Feasibility Study Report Request # BHCT-G5 Interconnection Feasibility Study Report Request # BHCT-G5 100 MW Generator at Airport Tap in Pueblo, Colorado Executive Summary Black Hills Corporation Transmission Planning July 7, 2009 Black Hills Corporation

More information

Capital Metro Downtown Multimodal Station

Capital Metro Downtown Multimodal Station Capital Metro Downtown Multimodal Station Open House December 11, 2015 Project Goals & Objectives 1 2 3 4 Address near- and long- term MetroRail operational needs Address existing safety issues and modal

More information

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system Purpose + Need I-29 NW Barry Road 64/68/72 MAIN STREET Connect: < Strengthen the spine of our regional transportation system Leavenworth Road Parallel Parkway State Avenue 18th Street Expressway Shawnee

More information

System Operating Limit Definition and Exceedance Clarification

System Operating Limit Definition and Exceedance Clarification System Operating Limit Definition and Exceedance Clarification The NERC defined term System Operating Limit (SOL) is used extensively in the NERC Reliability Standards; however, there is much confusion

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

2010 LHSAA FOOTBALL PLAYOFF BRACKETS - CLASS 5A BI-DISTRICT 11/12 1 Dutchtown * Covington 27

2010 LHSAA FOOTBALL PLAYOFF BRACKETS - CLASS 5A BI-DISTRICT 11/12 1 Dutchtown * Covington 27 2010 LHSAA FOOTBALL PLAYOFF BRACKETS - CLASS 5A 1 Dutchtown * 35 32 Covington 27 16 Carencro * 14 17 Brother Martin 35 9 Ponchatoula * 21 24 Westgate OT 28 8 Higgins * 44 25 Denham Springs 14 5 Jesuit

More information

COMMONWEALTH OF MASSACHUSETTS ENERGY FACILITIES SITING BOARD DEPARTMENT OF PUBLIC UTILITIES NOTICE OF ADJUDICATION NOTICE OF PUBLIC COMMENT HEARING

COMMONWEALTH OF MASSACHUSETTS ENERGY FACILITIES SITING BOARD DEPARTMENT OF PUBLIC UTILITIES NOTICE OF ADJUDICATION NOTICE OF PUBLIC COMMENT HEARING COMMONWEALTH OF MASSACHUSETTS ENERGY FACILITIES SITING BOARD DEPARTMENT OF PUBLIC UTILITIES NOTICE OF ADJUDICATION NOTICE OF PUBLIC COMMENT HEARING EFSB 17-05/D.P.U. 18-18/18-19 Vineyard Wind LLC Notice

More information

2008 LHSAA FOOTBALL PLAYOFF BRACKETS - CLASS 5A

2008 LHSAA FOOTBALL PLAYOFF BRACKETS - CLASS 5A 2008 LHSAA FOOTBALL PLAYOFF BRACKETS - CLASS 5A 1 West Monroe * 56 32 Scotlandville 34 16 Northshore * 12 17 St. Thomas More 34 9 C.E. Byrd * 13 24 Airline 0 8 Ouachita Parish * 21 25 Sulphur 0 5 Thibodaux

More information

5.0 Roadway System Plan

5.0 Roadway System Plan Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,

More information

Why do we need a Gondola?

Why do we need a Gondola? Why do we need a Gondola? Volume Translink buses serve 25,000 transit trips a day on and off Burnaby Mountain. To serve this volume, a bus leaves the bus loop at the top of the mountain every 90 seconds

More information

Infrared Thermography Inspection Guidelines. Date Issued:

Infrared Thermography Inspection Guidelines. Date Issued: Infrared Thermography Inspection Guidelines Date Issued: 2002 01 29 Created By: Approved By: L. Henderson G. Durnford Table Of Contents Table Of Contents...i POLICY STATEMENT...1 APPLICABLE INTERNATIONAL

More information

Project Single Points of Failure

Project Single Points of Failure Project 2015-10 Single Points of Failure Bill Harm, NERC & Regional Coordination RSCS meeting September 15, 2017 Agenda Drafting Team Members Project 2015 10 Background Proposed Revisions Implementation

More information

------CHUG POWERING ALASKA'S futulle

------CHUG POWERING ALASKA'S futulle ------CHUG POWERING ALASKA'S futulle March 15, 2018 ELECTRONICALLY FILED WITH RCA Regulatory Commission of Alaska 701 W. 8 th Avenue, Suite 300 Anchorage, AK 99501 Subject: Tariff Advice N. 454-8; Annual

More information

Site C Clean Energy Project

Site C Clean Energy Project Site C Clean Energy Project Regional Community Liaison Committee Project Briefing January 31, 2018 2 Construction update Construction schedule Construction schedule updated following the Provincial government

More information

1200 MW Wind Generation: 20 Year Transmission Development Plan - Exploratory Study

1200 MW Wind Generation: 20 Year Transmission Development Plan - Exploratory Study Engineering Support Services for: 1200 MW Wind Generation: 20 Year Transmission Development Plan - Exploratory Study Manitoba Hydro 820 Taylor Ave. Winnipeg, MB R3C 0J1 CANADA Attention: David Jacobson

More information

REDWOOD CITY STREETCAR - ALTERNATIVES ANALYSIS

REDWOOD CITY STREETCAR - ALTERNATIVES ANALYSIS REDWOOD CITY STREETCAR - ALTERNATIVES ANALYSIS The purpose of this document is to ennumerate the analysis of alternatives for a streetcar along the Broadway Corriodor of Redwood City. The six alternatives

More information

Appendix D: Concept Screening

Appendix D: Concept Screening Concept Description Concept #1 Route 288 Roadway Widening This concept consists of constructing a third lane on northbound and southbound Route 288 between Powhite Parkway and US 360. This improvement

More information

Monitoring of Real-Time SOL and IROL Exceedances

Monitoring of Real-Time SOL and IROL Exceedances APPLICABILITY: Reliability Coordinator I. Purpose Provide the Reliability Coordinator System Operators (RCSO) with established procedures for monitoring System Operating Limits (SOL) and Interconnection

More information

ARKANSAS ACTIVITIES ASSOCIATION

ARKANSAS ACTIVITIES ASSOCIATION ARKANSAS ACTIVITIES ASSOCIATION Regulations Governing Interscholastic Competition Including Regional and State Meets 2011 GOLF This brochure is provided for member schools participating in interscholastic

More information

I-40 Maumelle New Interchange and new 2-lane facility 48 $10.4 $29.8 Highest. Full ITS Implementation 55 $63.3 $144.5 Highest

I-40 Maumelle New Interchange and new 2-lane facility 48 $10.4 $29.8 Highest. Full ITS Implementation 55 $63.3 $144.5 Highest PROJECT PRIORITIES: FREEWAYS 92 Freeway System ITS 60 $2.3 $2.3 Highest 94 Freeway System ITS 60 $7.9 $10.2 Highest 65 North Cabot Interchange - Hwy 38 State Hwy 367 and State Hwy 38 US Hwy 67 / 167 New

More information

Community Task Force March 14, 2018

Community Task Force March 14, 2018 Community Task Force March 14, 2018 Welcome and Introductions Project Partners Regional Transportation District (RTD) City of Aurora Colorado Department of Transportation (CDOT) Denver Regional Council

More information

Decommissioning Regulatory Process

Decommissioning Regulatory Process Decommissioning Regulatory Process Deanna Toy June 27, 2018 Diablo Canyon Decommissioning Engagement Panel 1055 Monterey St. San Luis Obispo County Government Building June 27, 2018 Safety Moment AED CPR

More information

STCP 01-1 Issue 005 Operational Switching

STCP 01-1 Issue 005 Operational Switching STCP 01-1 Issue 005 Operational Switching STC Procedure Document Authorisation Party National Grid Electricity Transmission plc Name of Party Representative Signature Date Formatted: Font: Arial Bold,

More information

TVPPA Lineman Apprenticeship Program

TVPPA Lineman Apprenticeship Program Self-Study Modules Unit 1 Unit 2 Unit 3 Unit 4 Lineman Apprenticeship Program Skills Labs Pre-Apprentice Assessment Digger Derrick Training Fundamentals Lab 1 Construction Lab 2 Operations Lab 3 Underground

More information

AHSCA HALL OF FAME BALLOT

AHSCA HALL OF FAME BALLOT ARKANSAS HIGH SCHOOL COACHES ASSOCIATION 3920 Richards Road North Little Rock, Arkansas 72117 office 501-955-2500 fax 501-955-2600 TO: AHSCA Members FROM: Joey Walters, Ed. D. RE: 2011 Hall of Fame Honorees

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Fairfax Alliance for Better Bicycling. Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Fairfax Alliance for Better Bicycling February 28, 2019 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Nancy Smith, Public Relations Manager FAM Construction Chris Wells,

More information

MEMORANDUM. To: 1.0 PURPOSE

MEMORANDUM. To: 1.0 PURPOSE MEMORANDUM To: Scott Holland, Elements Architecture From: Brian Grover, Dudek Date: July 16, 2014 1.0 PURPOSE In response to the November 4, 2013 request (RE: Incomplete Application Southern California

More information

Hidden Oaks Elementary School

Hidden Oaks Elementary School Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

2013 SERTP. Welcome. SERTP nd Quarter Meeting. Preliminary Expansion Plan Meeting

2013 SERTP. Welcome. SERTP nd Quarter Meeting. Preliminary Expansion Plan Meeting Welcome SERTP 2013 2 nd Quarter Meeting Preliminary Expansion Plan Meeting 1 The SERTP process is a transmission planning process. Please contact the respective transmission provider for questions related

More information

Regulations Governing Interscholastic Competition. This brochure is provided for member schools participating in interscholastic tennis by the

Regulations Governing Interscholastic Competition. This brochure is provided for member schools participating in interscholastic tennis by the ARKANSAS ACTIVITIES ASSOCIATION Regulations Governing Interscholastic Competition 2014 TENNIS This brochure is provided for member schools participating in interscholastic tennis by the Arkansas Activities

More information

Utilities, Inc. of Florida

Utilities, Inc. of Florida Florida Public Service Commission RATE CASE OVERVIEW J A N U A R Y 2 0 1 7 Application for increase in water and wastewater rates in Charlotte, Highlands, Lake, Lee, Marion, Orange, Pasco, Pinellas, Polk,

More information

2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power

2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power 2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power Special Reliability Assessments Deeper focus on issues identified in Long-Term Reliability Assessment

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

2009 LHSAA FOOTBALL PLAYOFF BRACKETS - CLASS 5A

2009 LHSAA FOOTBALL PLAYOFF BRACKETS - CLASS 5A 2009 LHSAA FOOTBALL PLAYOFF BRACKETS - CLASS 5A 1 ARCH. RUMMEL * 10 32 CAPTAIN SHREVE 3 16 JESUIT * 27 17 AIRLINE 7 9 BARBE * 57 24 S. TERREBONNE 22 8 HAHNVILLE * 38 25 LAGRANGE [OT] 32 5 S. LAFOURCHE

More information

STCP 01-1 Issue 008 Operational Switching

STCP 01-1 Issue 008 Operational Switching STCP 01-1 Issue 008 Operational Switching STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc Scottish

More information

APPENDIX E GRADE CROSSING LOCATIONS

APPENDIX E GRADE CROSSING LOCATIONS APPENDIX E GRADE CROSSING LOCATIONS 1 2 3 Citrus Avenue Riverside County and City Palmyrita Avenue Columbia Avenue MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3 027303M 1. Existing

More information

sdfghjklzxcvbnmqwertyuiopasdfghjklzxcvbnmqw ertyuiopasdfghjklzxcvbnmqwertyuiopasdfghjklzx

sdfghjklzxcvbnmqwertyuiopasdfghjklzxcvbnmqw ertyuiopasdfghjklzxcvbnmqwertyuiopasdfghjklzx qwertyuiopasdfghjklzxcvbnmqwertyuiopasdfghjkl DRAFT zxcvbnmqwertyuiopasdfghjklzxcvbnmqwertyuiop asdfghjklzxcvbnmqwertyuiopasdfghjklzxcvbnmq wertyuiopasdfghjklzxcvbnmqwertyuiopasdfghjklz xcvbnmqwertyuiopasdfghjklzxcvbnmqwertyuiopa

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

CS10 # Network Safety Performance Objectives (2016)

CS10 # Network Safety Performance Objectives (2016) CS10 #4384287 Network Safety Performance Objectives (2016) Context & Purpose The Horizon Power Network Safety Objectives (2016) (Objective Statement) has been prepared for each of network safety performance

More information

Attachment Pro Forma Pro Forma Regulatory Statements Revised proposed access arrangement information

Attachment Pro Forma Pro Forma Regulatory Statements Revised proposed access arrangement information Attachment Pro Forma Pro Forma Regulatory Statements Revised proposed access arrangement information 14 June 2018 Access arrangement information for the period 1 July 2017 to 30 June 2022 Western Power

More information

MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE/PES TRANSFORMER COMMITTEE MINNEAPLOS, MN OCT 17, 2007

MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE/PES TRANSFORMER COMMITTEE MINNEAPLOS, MN OCT 17, 2007 MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE/PES TRANSFORMER COMMITTEE MINNEAPLOS, MN OCT 17, 2007 8.9 Bushing Subcommittee Fred Elliott, Chair 8.9.1 Introduction/Attendance Fred Elliott - Chair

More information

POW ER EN GIN EER S, LLC Electrical Engineering, Power, Lighting, Technical Studies and Utility Consulting

POW ER EN GIN EER S, LLC Electrical Engineering, Power, Lighting, Technical Studies and Utility Consulting POW ER EN GIN EER S, LLC Electrical Engineering, Power, Lighting, Technical Studies and Utility Consulting 37 Fox Den Road Kingston, MA 02364-2150 (508) 612-0382 Phone (781)936-8641 Fax Dave@PowerEngineersLLC.com

More information

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017 MCA Member Meeting: Tysons Update Fairfax County Department of Transportation November 13, 2017 Presentation Overview Balancing Land Use and Transportation How Are We Doing? Studies and Projects Neighborhood

More information

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville PRESENT Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville PROJECT TEAM REPRESENTATIVES Name Organization Celia McAdam Luke McNeel Caird Leo Heuston Judy Matsui

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT. March 20, 2012

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT. March 20, 2012 ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT March 20, 2012 SIZE OF HIGHWAY SYSTEMS Arkansas 16,416 miles (Arkansas ranks 12 th nationally) Illinois California New York Tennessee 16,161 miles 15,225

More information

Questions & Answers About the Operate within Operate within IROLs Standard

Questions & Answers About the Operate within Operate within IROLs Standard Index: Introduction to Standard...3 Expansion on Definitions...5 Questions and Answers...9 Who needs to comply with this standard?...9 When does compliance with this standard start?...10 For a System Operator

More information

CO RD T14 R118 SEC 9 PT NW1/4NW1/4 AKA TRACT 80 HIGH POINT RANCH PH II RECORD OF SURVEY 2579 STATE HWY 150 S - KNIGHT HOLLOW SUB BLK 1 LT 2

CO RD T14 R118 SEC 9 PT NW1/4NW1/4 AKA TRACT 80 HIGH POINT RANCH PH II RECORD OF SURVEY 2579 STATE HWY 150 S - KNIGHT HOLLOW SUB BLK 1 LT 2 CO RD 173 - T14 R118 SEC 9 PT NW1/4NW1/4 AKA TRACT 80 HIGH POINT RANCH PH II RECORD OF SURVEY 2579 STATE HWY 150 S - KNIGHT HOLLOW SUB BLK 1 LT 2 CO RD 164 - T13 R119 SEC 23 N1/2NW1/4NW1/4NW1/4 154 INDIAN

More information

Arkansas High School Athletic Administrators Association Awards and Past Recipients

Arkansas High School Athletic Administrators Association Awards and Past Recipients Arkansas High School Athletic Administrators Association Awards and Past Recipients State of Arkansas Athletic Director of the Year 2016-17 Stephen Wood, Greenbrier John Utley, Lake Hamilton 2015-16 Kevin

More information

Project Budget and Schedule Status

Project Budget and Schedule Status Item 8 Program Management Project Budget and Schedule Status Transit Project Delivery Finance, Budget & Audit Committee February 20, 2013 Project Schedules Project 2012 2013 2014 2015 2016 2017 2018 2019

More information

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016 Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing May 2016 Overview 10-Year Transit Development Plan Premium Transit Network Columbia Pike service concept Premium amenities

More information

Preliminary 2012 EAI Integrated Resource Plan (IRP) Action Plan

Preliminary 2012 EAI Integrated Resource Plan (IRP) Action Plan Preliminary 2012 EAI Integrated Resource Plan (IRP) Action Plan EAI Stakeholder Meeting July 31, 2012 1 EAI IRP - Action Plan EAI has developed a preliminary action plan for stakeholder review. The action

More information

Where We Live and Work Today

Where We Live and Work Today San Diego Forward: The 2019-2050 Regional Plan Network Concepts Transportation Committee Item 4 October 19, 2018 Where We Live and Work Today 2018 2 2019 Regional Plan Transportation Committee Item 4 October

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

Dallas ISD Procurement Services First Advertising Date

Dallas ISD Procurement Services First Advertising Date Proposal Dallas ISD Procurement First Advertising Date Closing Date Proposed Board Mtg. Date (Unless >$150K) Comments RFP TH-205263 - Mowing Serivces Thursday, April 26, 2018 Wednesday, May 9, 2018 June

More information

OSCILLATION MONITORING SYSTEM AT TVA

OSCILLATION MONITORING SYSTEM AT TVA OSCILLATION MONITORING SYSTEM AT TVA 1 Gary Kobet, Ritchie Carroll, Ryan Zuo Tennessee Valley Authority Mani V. Venkatasubramanian Washington State University PROJECT TEAM WSU Guoping Liu, Qiang Zhang,

More information

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Models: EPS Single Pump EPT Twin Pump EPS-HP EPT-HP Single Pump High Pressure Twin Pump High Pressure

More information

2020 & 2024 LCR Study Draft Results Greater Bay Area

2020 & 2024 LCR Study Draft Results Greater Bay Area 2020 & 2024 LCR Study Draft Results Greater Bay Area Binaya Shrestha Regional Transmission Engineer Lead Stakeholder Meeting March 14, 2019 Greater Bay Area Transmission System & LCR Subareas Contra Costa

More information

Jackson, TN MSA 64,810 62,540 2, Johnson City-Kingsport-Bristol, TN-VA CSA 230, ,020 7,

Jackson, TN MSA 64,810 62,540 2, Johnson City-Kingsport-Bristol, TN-VA CSA 230, ,020 7, Labor Force Estimates - United States & Tennessee Release: 1:30 PM CT on 12/27/2018 November, 2018 preliminary Oct. '18 revised Nov. '17 Seasonally Adjusted* Labor Force Employed Unemployed Rate Rate Change

More information

The Southern New England TARIFF F.C.C. NO. 39 Telephone Company 17th Revised Page 7-25 CANCELS 16th Revised Page 7-25

The Southern New England TARIFF F.C.C. NO. 39 Telephone Company 17th Revised Page 7-25 CANCELS 16th Revised Page 7-25 Telephone Company 17th Revised Page 7-25 CANCELS 16th Revised Page 7-25 7.9 Voice Grade Special Access Service (Cont'd) 7.9.4 Rates and Charges A. Channel Termination USOC Rate Charge Two-wire, T6E2X $23.15(x)

More information

Notice and Agenda of a Meeting of the Board of Directors Capital and Strategic Planning Committee

Notice and Agenda of a Meeting of the Board of Directors Capital and Strategic Planning Committee CAPITAL and STRATEGIC PLANNING Thomas C. Lambert President & CEO COMMITTEE MEMBERS Christof Spieler, Chair Sanjay Ramabhadran Jim Robinson Cindy Siegel Lex Frieden Troi Taylor Notice and Agenda of a Meeting

More information

SH 68. Meeting with Affected Property Owners September 9, 2014

SH 68. Meeting with Affected Property Owners September 9, 2014 SH 68 Meeting with Affected Property Owners September 9, 2014 SH 68 US 83/I-2 TO US 281/I-69C Meeting with Affected Property Owners (MAPO) September 9, 2014 Agenda Open Meeting with Affected Property Owners

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Pre-Application Document Kaweah Project (FERC Project No. 298)

Pre-Application Document Kaweah Project (FERC Project No. 298) TABLE OF CONTENTS Page 3.12 Aesthetic Resources... 3.12-1 3.12.1 Information Sources... 3.12-1 3.12.2 Setting... 3.12-1 3.12.3 Project Facilities... 3.12-2 3.12.4 Previous Visual Resources Assessment...

More information

2014 RNA: Preliminary Results

2014 RNA: Preliminary Results 2014 RNA: Preliminary Results Yachi Lin Kevin DePugh New York Independent System Operator ESPWG/TPAS June 20, 2014 KCC 2014 New York Independent System Operator, Inc. All Rights Reserved. DRAFT FOR DISCUSSION

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

PUBLIC UTILITY COMMISSION OF TEXAS (PUC) DOCKET NO

PUBLIC UTILITY COMMISSION OF TEXAS (PUC) DOCKET NO Application of Oncor Electric Delivery Company LLC to Amend its Certificate of Convenience and Necessity for a Proposed CREZ 138 kv Transmission Line in Ector County, Texas. (Ector County North-Moss CCN)

More information

Power Supply Facilities Failure (Units 3-4 Temporary M/C (A), etc.) March 22, 2013 Tokyo Electric Power Company

Power Supply Facilities Failure (Units 3-4 Temporary M/C (A), etc.) March 22, 2013 Tokyo Electric Power Company < Reference > Power Supply Facilities Failure (Units 3-4 Temporary M/C (A), etc.) March 22, 2013 Tokyo Electric Power Company Occurrence of Events in a Chronological Order At around 6:57 PM on March 18,

More information

Monitoring of Real-Time SOL and IROL Exceedances

Monitoring of Real-Time SOL and IROL Exceedances APPLICABILITY: Reliability Coordinator I. Purpose Provide the Reliability Coordinator System Operators (RCSO) with established procedures for monitoring System Operating Limits (SOL) and Interconnection

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Washington DC Section of ITE Project Briefing

Washington DC Section of ITE Project Briefing Washington DC Section of ITE Project Briefing November 5, 2015 Renée Hamilton, VDOT, Deputy District Administrator I-66 Outside the Beltway Improvement Area Project Location Virginia 2 Purpose and Need

More information

Regulations Governing Interscholastic Competition. This brochure is provided for member schools participating in interscholastic tennis by the

Regulations Governing Interscholastic Competition. This brochure is provided for member schools participating in interscholastic tennis by the ARKANSAS ACTIVITIES ASSOCIATION Regulations Governing Interscholastic Competition 2013 TENNIS This brochure is provided for member schools participating in interscholastic tennis by the Arkansas Activities

More information

STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests

STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission SP Transmission Ltd Scottish

More information

Gas System Restoration and Remediation: Post Katrina. Perry Dufrene Manager, Engineering

Gas System Restoration and Remediation: Post Katrina. Perry Dufrene Manager, Engineering Gas System Restoration and Remediation: Post Katrina Perry Dufrene Manager, Engineering 1 Agenda 1. Overview of ENOI Gas System 2. Impact of Katrina 3. Restoration Progress 2 Overview of ENOI Gas System.

More information

Saunders GS 11 No projects in this category

Saunders GS 11 No projects in this category Table 1 Table 1 Projects $20M Total Project Cost 1,2 Project Final Total In-Service In-Service In-Service 2010 2011 2012 2013 2014 2015 Line Summary Changes from Start In-Service Project 2013 2014 2015

More information

Upper Peninsula Generation Integration Screening Study. September 2016

Upper Peninsula Generation Integration Screening Study. September 2016 Upper Peninsula Generation Integration Screening Study September 2016 ATC voluntarily performed a high level, steady-state screening of transmission facilities in Michigan s Upper Peninsula. This was done

More information

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT Agenda Item #4.2 EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT VTA BOARD WORKSHOP MAY 1, 2015 ABOUT THIS PRESENTATION CONTEXT Existing conditions and planning for growth WHAT IS THE PROJECT? Project alternatives

More information

Third Street Bridge & Corridor Project

Third Street Bridge & Corridor Project Third Street Bridge & Corridor Project Preparation for the FY2018 budget to commence October 1, 2017, includes funding to address a project that has been considered since 1994. The Third Street bridge

More information

Osceola County Expressway Authority. Alternatives Public Meeting

Osceola County Expressway Authority. Alternatives Public Meeting Osceola County Expressway Authority Alternatives Public Meeting Alternatives Public Meeting Alternatives Public Meeting Wheelchair-Accessible Walkway this Way Wheelchair-Accessible Walkway this Way Contact

More information

Project Budget and Schedule Status

Project Budget and Schedule Status Program Management Project Budget and Schedule Status Highway Program Planning & Programming Committee February 20, 2013 Highway Program Project Schedules Project 2010 2011 2012 2013 2015 2016 2017 2018

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION SHA CTP Project No. MO891A21, US 29, Fairland Road to Musgrove Road Interchange Improvement, Design Review

More information

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Interstate 66 Tier 1 Environmental Impact Statement (EIS) WELCOME Welcome to the second Citizen Information Meeting for the Tier 1 Environmental Impact Statement (EIS). As an integral part in the environmental study process, the study team is seeking your comments

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection REPORT FOR ACTION Road Alterations - Wellington Street, Church Street, and Front Street Intersection Date: November 1, 2016 To: Toronto and York Community Council From: Director, Public Realm Section,

More information

2007 LHSAA GIRLS BASKETBALL PLAYOFF BRACKETS CLASS 5A

2007 LHSAA GIRLS BASKETBALL PLAYOFF BRACKETS CLASS 5A 1-1 Southwood* 61 5-4 Destrehan 28 2-2 Lafayette* 65 6-3 Thibodaux 49 3-1 Dutchtown* 65 7-4 John McDonogh 16 4-2 Northshore* 72 8-3 Bonnabel 50 5-1 John Ehret* 43 1-4 Ruston 46 6-2 South Lafourche* 47

More information

DEKALB COUNTY. 22. Priority Projects for DeKalb County

DEKALB COUNTY. 22. Priority Projects for DeKalb County DEKALB COUNTY 2 0 1 4 T R A N S P O R T A T I O N P L A N 22. Priority s for DeKalb County Following the completion of the project prioritization metrics, each project was able to be compared to other

More information