1 ------CHUG POWERING ALASKA'S futulle March 15, 2018 ELECTRONICALLY FILED WITH RCA Regulatory Commission of Alaska 701 W. 8 th Avenue, Suite 300 Anchorage, AK Subject: Tariff Advice N ; Annual Update to the G&T Loss Factor Commissioners: The tariff filing described below is hereby transmitted to you for filing in compliance with the Alaska Public Utilities Commission Act and Sections 3 AAC AAC of the Alaska Administrative Code. The purpose of this filing is to revise 's (Chugach) Operating Tariff to update its generation and transmission (G&T) loss factor based on calendar-year 2017 operating results. TARIFF SHEET NUMBER CANCELS SHEET NUMBER SCHEDULE OR ORIGINAL REVISED ORIGINAL REVISED RULE NUMBER th Revision th Revision Calculation of th Revision th Revision G&T Losses This filing is not for a new service, will not result in the termination of an existing service, conflict with any other schedule or rate contained in Chugach s operating tariff, or in any other way adversely impact customers or the public. The loss factor is used for the allocation of system costs between G&T and Distribution functions in Chugach s cost of service studies, fuel and purchased power rate adjustment processes, and determination of losses applied to transmission wheeling transactions. Approximately 68,000 Chugach retail members (81,200 retail metered locations) and Seward Electric System (Seward) are impacted by this filing. Chugach s total revenues associated with electric service are projected to be $206 million in calendar year If approved, the updated loss factor will decrease G&T cost responsibility to Seward by approximately $24,000 and Chugach retail will increase by approximately $24,000. In addition, there is no rate impact on third party transmission customers since Chugach is not changing its transmission wheeling rates. The update has no impact on Chugach s system revenue. The updated G&T loss factor is percent, based on 2017 operating results, as measured at generation. This compares with loss factors of percent and percent based on 2016 and 2015 operating results, respectively. Since 2012 (excluding 2017 results), Chugach s loss factor has 5601 Electron Drive, P.O. Box Anchorage, Alaska (907) Fax (907) (800) info@chugachelectric.com

2 Commissioners March 15, 2018 Page 2 of 3 averaged percent, with a high of percent in 2012 and a low of percent in Previous G&T loss factors are summarized below: Table 1: Summary of Previous G&T Loss Factors (measured at generation) Test Year Percent Test Year Percent Tariff Sheet Nos and summarize the calculations and resulting G&T and Distribution loss percentages based on calendar year 2017 operating results. Supporting data are included on Attachments I and II. Compliance with U (12) The G&T loss factor was calculated in accordance with the methodology contained in the stipulation between Chugach, Homer Electric Association, Inc. (HEA) and Matanuska Electric Association, Inc. (MEA) and accepted by the Commission in Docket U (12). Pursuant to this order, preliminary 2017 test year loss factor calculations and supporting work papers were provided to HEA, MEA and the Attorney General s office for review and comment. Preliminary calculations and work papers were also provided to Golden Valley Electric Association, Inc., Anchorage Municipal Light & Power and Seward. A meeting was held on February 27, 2018, to review the calculations and discuss preliminary results with the other Railbelt utilities. Based on input from the other utilities and subsequent discussion, no changes to the calculation were required. The only modification to the 2017 test year loss calculation, was the addition of Hane Substation under the Distribution Substation Deliveries section on Attachment I. Hane Substation was added to Chugach s system in February Chugach is not aware of any outstanding issues associated with this year s update. Description of Tariff Changes Tariff Sheet 103.4: Updated to reflect actual 2017 energy flows entering and leaving the Chugach system. Tariff Sheet 103.5: Updated to reflect the proposed G&T loss factors as measured at both generation and delivery. This sheet also summarizes retail distribution loss activity during 2017.

3 Commissioners March 15, 2018 Page 3 of 3 Chugach requests that the updated loss factor become effective May 1, Questions regarding the filing should be directed to Jean Kornmuller, Manager Regulatory Affairs, at Sincerely, CHUGACH ELECTRIC ASSOCIATION, INC. Arthur W. Miller Vice President, Regulatory and External Affairs P.O. Box Anchorage, Alaska Telephone: Arthur_Miller@chugachelectric.com Attachments cc: J. Foutz, City of Seward (electronic) D. Bishop, M. Grassi, D. Heckman, Golden Valley Electric Association, Inc. (electronic) A. Henderson, A. Thuya, Anchorage Municipal Light and Power (electronic) T. Clark, E. Jenkin, Matanuska Electric Association, Inc. (electronic) J. Patras, M. Peery, Homer Electric Association, Inc. (electronic)

4 RCA 8 15 th Revision Sheet No Canceling 14 th Revision Sheet No CALCULATION OF CHUGACH G&T LOSSES 2017 Test Year Description Q1-17 Q2-17 Q3-17 Q4-17 Total Energy Entering System Beluga Power Plant 43, , , , ,960.2 IGT Power Plant Fire Island Wind (IGT Bkr 532) 10, , , , ,785.6 Southcentral Power Project 358, , , , ,273,869.2 Quartz Creek Substation 72, , , , ,097.7 AML&P Plant 2 22, , , , ,157.6 Teeland Substation 88, , , , ,869.1 University Substation Bkr , ,397.2 Douglas Substation Cooper Lake Power Plant 7, , , , ,729.5 AML&P to ITSS , , , ,796.6 Total Energy Entering System 605, , , , ,366,741.6 Energy Leaving System Quartz Creek Substation Daves Creek Substation 15, , , , ,802.7 Douglas Substation 105, , , , ,518.9 AML&P Plant 2 1, , ,525.2 ITSS to AML&P 23, , , , ,574.3 Teeland Substation 60, , , , ,857.3 University Substation Bkr , , , , ,956.9 Power Plant Station Service Totals 15, , , , ,047.5 Distribution Substation Deliveries 319, , , , ,154,825.2 Total Energy Leaving System 594, , , , ,336,133.1 Gross Energy Losses 10, , , , ,608.5 Less Transformer Losses 1, , , , ,344.0 Net G&T Losses 8, , , , ,264.5 Tariff Advice No.: Effective: May 1, 2018 Issued by: P.O. Box , Anchorage, Alaska By: Lee D. Thibert Title: Chief Executive Officer

5 RCA 8 15 th Revision Sheet No Canceling 14 th Revision Sheet No CALCULATION OF CHUGACH G&T LOSSES 2017 Test Year 1 Description Q1-17 Q2-17 Q3-17 Q4-17 Total Chugach Retail Distribution Losses Retail Receipts at Transmission Substation 319, , , , ,154,825.2 Less: Chugach House Power 1, , ,289.5 Net Receipts 318, , , , ,150,535.7 Retail Sales at Delivery 306, , , , ,105,531.4 Losses 11, , , , ,004.3 Add: 1/2 House Power ,144.8 Adj. Retail Dist. Losses 11, , , , ,149.1 At Delivery 3.885% 4.316% 4.383% 4.514% 4.265% At Transmission Substation 3.747% 4.145% 4.205% 4.327% 4.098% Adjustment of G&T Losses for House Power G&T Deliveries 334, , , , ,214,627.6 Net G&T Losses 8, , , , ,264.5 Add: 1/2 House Power ,144.8 Adjusted G&T Losses 9, , , , ,409.2 At Delivery 2.818% 1.840% 2.116% 2.153% 2.257% At Generation 2.740% 1.806% 2.072% 2.107% 2.207% R R 1 G&T loss factor effective for the allocation of actual costs beginning January 1, Tariff Advice No.: Effective: May 1, 2018 Issued by: P.O. Box , Anchorage, Alaska By: Lee D. Thibert Title: Chief Executive Officer

6 PRELIMINARY Values used in calculation not rounded; data formatted to show the nearest tenth of a MWh. Measurement Point Source 1 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Total 2017 Energy Entering System Beluga Power Plant Beluga 13.8 BKR 126 S ,553.4 Beluga 13.8 BKR 226 S ,213.6 Beluga 13.8 BKR 326 S , , , , , ,727.0 Beluga 13.8 BKR 526 S 13, , , , , , , , , , , , ,396.7 Beluga 13.8 BKR 626 S , ,144.6 Beluga 13.8 BKR 726 S 0.0 2, , , , , ,925.0 Beluga 13.8 BKR 826 S Total Beluga Power Plant 13, , , , , , , , , , , , ,960.2 IGT Power Plant IGT 13.8 BKR 426 S IGT 13.8 BKR 726 S IGT 13.8 BKR 1326 S Total IGT Power Plant Fire Island Wind (IGT Bkr 532) M 3, , , , , , , , , , , , ,785.6 SPP Unit No. 1 / 10 S 18, , , , , , , , , , , , ,767.5 Unit No. 2 / 11 S 22, , , , , , , , , , , , ,965.5 Unit No. 3 / 12 S 22, , , , , , , , , , , , ,478.9 Unit No. 4 / 13 S 22, , , , , , , , , , , , ,073.1 ML&P Share O 38, , , , , , , , , , , , ,584.1 Gross Generation 124, , , , , , , , , , , , ,273,869.2 Quartz Creek Substation Soldotna 115 SldQtzLn M 34, , , , , , , , , , , , ,097.7 Total Quartz Creek Substation 34, , , , , , , , , , , , , Source of Data: M: Metered data. S: SCADA interval data. O: Non-interval data Test Year G&T Loss Factor_Monthly 2017 Attachment I Page 1 of 6

7 PRELIMINARY Values used in calculation not rounded; data formatted to show the nearest tenth of a MWh. Measurement Point Source 1 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Total 2017 AML&P Plant 2 Plant Yard S 8, , , , , , , , , , , , ,157.6 Total AML&P Plant 2 8, , , , , , , , , , , , ,157.6 University Substation University Bkr 152 Import S ,397.2 Total University Bkr 152 Import ,397.2 Teeland Substation Teeland 115 kv T1 M 0.0 1, ,847.3 Teeland M 20, , , , , , , , , , , , ,021.9 Total Teeland Substation 20, , , , , , , , , , , , ,869.1 Douglas Substation Douglas GVEA M Total Douglas Substation Cooper Lake Power Plant Chugach CLPP M 4, , , , , , ,729.5 Total Cooper Lake Power Plant 4, , , , , , ,729.5 AML&P to ITSS S , , , ,796.6 Total Energy Entering System 209, , , , , , , , , , , , ,366, Source of Data: M: Metered data. S: SCADA interval data. O: Non-interval data Test Year G&T Loss Factor_Monthly 2017 Attachment I Page 2 of 6

8 PRELIMINARY Values used in calculation not rounded; data formatted to show the nearest tenth of a MWh. Measurement Point Source 1 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Total 2017 Energy Leaving System Quartz Creek Substation Soldotna 115 SldQtzLn M Total Quartz Creek Substation Daves Creek Substation Daves Ck 115 BKR 952 M 5, , , , , , , , , , , , ,802.7 Total Daves Creek Substation 5, , , , , , , , , , , , ,802.7 Douglas Substation Douglas GVEA S 24, , , , , , , , , , , , ,936.3 Douglas 115 MEA S 1, , , , , , , , , , , , ,582.7 Total Douglas Substation 26, , , , , , , , , , , , ,518.9 AML&P Plant 2 Plant Yard S , ,525.2 Total AML&P Plant , ,525.2 ITSS to AML&P S 6, , , , , , , , , , , , ,574.3 Teeland Substation Teeland 115 kv T1 M 18, , , , , , , , , , , , ,196.5 Teeland M Teeland 34.5 kv Bkr 332 M 1, , , , , , , , , , , , ,652.2 Total Teeland Substation 20, , , , , , , , , , , , ,857.3 University Substation University Bkr 152 Export S 27, , , , , , , , , , , ,956.9 Total University Bkr 152 Export 27, , , , , , , , , , , , Source of Data: M: Metered data. S: SCADA interval data. O: Non-interval data Test Year G&T Loss Factor_Monthly 2017 Attachment I Page 3 of 6

9 PRELIMINARY Values used in calculation not rounded; data formatted to show the nearest tenth of a MWh. Measurement Point Source 1 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Total 2017 Power Plant Station Service - Includes Generation Step-up (GSU) transformers losses Beluga Station Service O 1, , , , , , , , , , , , ,955.3 CLPP Station Service O ,280.3 IGT Station Service O ,140.1 SPP Station Service O 3, , , , , , , , , , , , ,671.7 Total Station Service 5, , , , , , , , , , , , ,047.5 Distribution Substation Deliveries Univ1132 S 12, , , , , , , , , , , , ,365.1 Univ1232 S 7, , , , , , , , , , , , ,071.1 Univ1332 S 4, , , , , , , , , , , , ,665.9 Univ 1536 S , , , ,482.1 Beluga S ,094.7 Beluga M , ,193.5 IGT S ,719.4 IGT S 1, , , , , , , ,684.5 IGT S 13, , , , , , , , , , , , ,449.5 IGT S 9, , , , , , , , , , , ,747.1 IGT S 7, , , , , , , , , , , , ,005.1 IGT S 6, , , , , , , , , , , , ,536.8 Indian 212 M ,515.4 Girdwood 422 S 1, , , , , ,855.7 Girdwood 322 S 1, , , , ,049.9 Portage 422 S ,175.5 Postmark S 4, , , , , , , , , , , , ,266.2 Hope S ,015.3 Summit M Daves Creek M ,871.3 Retherford (Net of 138kV breakers) S 40, , , , , , , , , , , , ,710.3 Hane S 0.0 1, , , , , , , , , , , ,101.4 FIW Station Service S Total Distribution Substation 115, , , , , , , , , , , , ,154,825.2 Total Energy Leaving System 207, , , , , , , , , , , , ,336,133.1 Gross Energy Losses 2, , , , , , , , , , , , , Source of Data: M: Metered data. S: SCADA interval data. O: Non-interval data Test Year G&T Loss Factor_Monthly 2017 Attachment I Page 4 of 6

10 PRELIMINARY Values used in calculation not rounded; data formatted to show the nearest tenth of a MWh. Measurement Point Source 1 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Total 2017 Less Transformer Losses University (w/ Station Load) O ,022.0 Beluga O Indian O Girdwood O Portage O Hope O Summit Lake O Daves Creek O International O ,966.3 Total Transformer Losses ,344.0 Net G&T Losses 2, , , , , , , , , , , , , Source of Data: M: Metered data. S: SCADA interval data. O: Non-interval data Test Year G&T Loss Factor_Monthly 2017 Attachment I Page 5 of 6

11 PRELIMINARY Values used in calculation not rounded; data formatted to show the nearest tenth of a MWh. Measurement Point Source 1 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Total 2017 Chugach Retail Distribution Losses Retail Trans SS 115, , , , , , , , , , , , ,154,825.2 Less: Chugach House Pwr. O ,289.5 Net Receipts 114, , , , , , , , , , , , ,150,535.7 Retail Delivery O 110, , , , , , , , , , , , ,105,531.4 Losses 4, , , , , , , , , , , , ,004.3 Add: 1/2 House Power ,144.8 Adj. Retail Dist. Losses 4, , , , , , , , , , , , ,149.1 At Delivery 4.189% 3.735% 3.695% 3.901% 5.538% 3.498% 5.564% 3.422% 4.205% 4.586% 4.719% 4.254% 4.265% At Transmission Substation 4.028% 3.608% 3.572% 3.761% 5.257% 3.386% 5.279% 3.314% 4.042% 4.393% 4.515% 4.088% 4.098% Adjustment of G&T Losses for House Power G&T Deliveries SES 5, , , , , , , , , , , , ,802.3 RETAIL 115, , , , , , , , , , , , ,154,825.2 Total Deliveries 120, , , , , , , , , , , , ,214,627.6 Net G&T Losses 2, , , , , , , , , , , , ,264.5 Add: 1/2 House Power ,144.8 Adjusted G&T Losses 2, , , , , , , , , , , , ,409.2 At Delivery 2.172% 2.552% 3.761% 1.369% 2.222% 1.942% 1.977% 1.615% 2.777% 1.514% 2.790% 2.106% 2.257% At Generation 2.126% 2.489% 3.625% 1.351% 2.174% 1.905% 1.939% 1.590% 2.702% 1.492% 2.714% 2.063% 2.207% 1 Source of Data: M: Metered data. S: SCADA interval data. O: Non-interval data Test Year G&T Loss Factor_Monthly 2017 Attachment I Page 6 of 6

12 2017 Transformer Loss Calculations - Chugach Retail System Transformer Size (MVA) No Load Loss (MW) Full Load Loss (MW) Annual (MWh) Load Factor Transformer Losses at Load Factor (MW) Annual Losses (MWh) Beluga , % Beluga , % Daves Creek , % Girdwood , % Hope , % Indian , % Portage , % Summit % UVSS , % , UVSS Station Service Load % International T , % International T , % Total 5, MWh readings obtained from high side of the transformer. Excluded are MWh generated by IGT Test Year G&T Loss Factor Xfmr_Losses 3/15/2018 Attachment II Page 1 of 1

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report Billing Budgeted Billed Dollar Percent Month Revenues Revenues Variance Variance Jan 2018 11,943,180.68 12,697,662.47 754,481.79

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun Jul

More information

JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY

JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY Ridership Report JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY July July 2013 Total MNR System Ridership was 7.346 million vs. 7.439 million in July 2012, a decrease of 92,959 passengers

More information

2018 HR & PAYROLL Deadlines

2018 HR & PAYROLL Deadlines th (by payment date) EPAF 3rd PARTY FEEDS WTE Approval 2018 HR & PAYROLL s Normal Payroll day s 2017 B1-26 3 * 13-Dec-17 15-Dec-17 n/a n/a n/a 28-Dec-17 29-Dec-17 11:00 AM 16-Dec-2017 29-Dec-2017 JAN 2018

More information

Order No. 55/18 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, April 26, 2018

Order No. 55/18 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, April 26, 2018 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, 2018 BEFORE: Larry Ring, Q.C., Panel Chair Marilyn Kapitany, B.Sc.(Hon), M.Sc., Vice Chair Carol Hainsworth, C.B.A., Member Susan

More information

Ensuring Reliability in ERCOT

Ensuring Reliability in ERCOT Ensuring Reliability in ERCOT Beth Garza Director, ERCOT IMM bgarza@potomaceconomics.com 512-225-7077 February 27, 2018 2 Data Comparisons ERCOT Population (million) 24 80 Germany Annual electricity consumption

More information

Rural Energy Conference Planning the Construction of Lake Dorothy Hydro By Tim McLeod President Alaska Electric Light and Power

Rural Energy Conference Planning the Construction of Lake Dorothy Hydro By Tim McLeod President Alaska Electric Light and Power Rural Energy Conference Planning the Construction of Lake Dorothy Hydro By Tim McLeod President Alaska Electric Light and Power Under the provisions of the its tariff, a utility is obligated to provide

More information

Personnel Benchmarking Author: Ed Rehkopf

Personnel Benchmarking Author: Ed Rehkopf Author: Ed Rehkopf 2009 Club Resources International Table of Contents Background.................................. 1 Purpose.................................... 1 Sources of Information............................

More information

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( ) Wisconsin 511 Traveler Information 211 Annual Usage Summary January 3, 212 Overall to-date Summary 36 months of operation 1,16,63 total calls the 1 Million mark was passed on December 3, 212 3,627,527

More information

Please be advised that pursuant to section 49(8) of the Oil and Gas Activities Act, General Order is hereby terminated.

Please be advised that pursuant to section 49(8) of the Oil and Gas Activities Act, General Order is hereby terminated. January 23, 2018 Enforcement File: 2017-264FSJ Predator Oil BC Ltd. 1500, 250-2nd Street, SW Calgary, Alberta T2P 0C1 Attention: Brian Stasiak, Regulatory Coordinator Re: General Order 2017-102 Dear Brian

More information

M A N I T O B A ) Order No. 123/13 ) THE PUBLIC UTILITIES BOARD ACT ) October 22, 2013

M A N I T O B A ) Order No. 123/13 ) THE PUBLIC UTILITIES BOARD ACT ) October 22, 2013 M A N I T O B A ) Order No. 123/13 ) THE PUBLIC UTILITIES BOARD ACT ) BEFORE: Régis Gosselin, B ès Arts, MBA, CGA, Chair Larry Soldier, Member Marilyn Kapitany, B.Sc. (Hon), M.Sc., Member CENTRA GAS MANITOBA

More information

May 2018 FY Key Performance Report

May 2018 FY Key Performance Report May 20 FY 20 - Key Performance Report Management Notes: The information in this report is based on the FY 20 Operating Budget, Amendment 2, adopted by the Board on January 22, 20. RT s farebox recovery

More information

MAR DASHBOARD MAR. Compliant % Breakdown Mar % Late % On-time MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

MAR DASHBOARD MAR. Compliant % Breakdown Mar % Late % On-time MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Positive Response Compliance 215 Compliant 215 Non-Compliant 216 Compliant 216 Non-Compliant 1% 87% 96% 86% 96% 88% 97% 89% 89% 88% 86% 92% 93% 94% 96% 94% 8% 6% 4% 2% 13% JAN 4% 14% FEB 4% 12% 3% 11%

More information

Wind Resource Assessment for NOME (ANVIL MOUNTAIN), ALASKA Date last modified: 5/22/06 Compiled by: Cliff Dolchok

Wind Resource Assessment for NOME (ANVIL MOUNTAIN), ALASKA Date last modified: 5/22/06 Compiled by: Cliff Dolchok 813 W. Northern Lights Blvd. Anchorage, AK 99503 Phone: 907-269-3000 Fax: 907-269-3044 www.akenergyauthority.org SITE SUMMARY Wind Resource Assessment for NOME (ANVIL MOUNTAIN), ALASKA Date last modified:

More information

Wind Resource Assessment for DEADHORSE, ALASKA

Wind Resource Assessment for DEADHORSE, ALASKA 813 W. Northern Lights Blvd. Anchorage, AK 99503 Phone: 907-269-3000 Fax: 907-269-3044 www.akenergyauthority.org Wind Resource Assessment for DEADHORSE, ALASKA Date last modified: 4/18/2006 Compiled by:

More information

Wind Resource Assessment for KING SALMON, ALASKA

Wind Resource Assessment for KING SALMON, ALASKA 813 W. Northern Lights Blvd. Anchorage, AK 99503 Phone: 907-269-3000 Fax: 907-269-3044 www.akenergyauthority.org Wind Resource Assessment for KING SALMON, ALASKA Date last modified: 4/14/2006 Compiled

More information

Mr. Joseph J. Lhota Chairman Metropolitan Transportation Authority 2 Broadway New York, NY Re: Train On-Time Performance Report 2017-F-8

Mr. Joseph J. Lhota Chairman Metropolitan Transportation Authority 2 Broadway New York, NY Re: Train On-Time Performance Report 2017-F-8 September 27, 2017 Mr. Joseph J. Lhota Chairman Metropolitan Transportation Authority 2 Broadway New York, NY 10004 Re: Train On-Time Performance Report 2017-F-8 Dear Mr. Lhota: Pursuant to the State Comptroller

More information

September 2018 FY Key Performance Report

September 2018 FY Key Performance Report September 20 FY 2019 - Key Performance Report Management Notes: The information in this report is based on the FY 2019 Operating Budget, adopted by the Board on June 11, 20. RT s farebox recovery ratio

More information

10 Mar-7 Club Spring Partners Net BB Tournament 1. ABCD Scramble TBD TBD. 2-Person Teams (scores not postable )

10 Mar-7 Club Spring Partners Net BB Tournament 1. ABCD Scramble TBD TBD. 2-Person Teams (scores not postable ) 2018 Woods Valley Men's Club - Wednesday Schedule 8:00 Shotgun Start @ Woods Valley (Check in and warm up 6:40-7:40) 1 Jan-3 2-Person Odd/Even Combined/NetBB 2 Jan-10 LN/LG @ Twin Oaks due to Randy Jones

More information

Southern Lodging Summit Memphis, TN. Presented by Randy Smith Founder Smith Travel Research

Southern Lodging Summit Memphis, TN. Presented by Randy Smith Founder Smith Travel Research Southern Lodging Summit Memphis, TN Presented by Randy Smith Founder Smith Travel Research Total US - Key Statistics 12-Months Ending July 2012 % Change Hotels 52.3 k Room Supply 1.8 bn 0.4% Room Demand

More information

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN Macroeconomic Research and Statistics Department Vol. XVIl, No.3 March 2018 CONTENTS Preface....01 Bhutan s Key Economic Indicators..02 Table

More information

Wind Resource Assessment for SAINT PAUL, ALASKA

Wind Resource Assessment for SAINT PAUL, ALASKA 813 W. Northern Lights Blvd. Anchorage, AK 99503 Phone: 907-269-3000 Fax: 907-269-3044 www.akenergyauthority.org Wind Resource Assessment for SAINT PAUL, ALASKA Date last modified: 3/1/2006 Compiled by:

More information

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN Department of Macroeconomic Research and Statistics Vol. XVIl, No.9 September 2018 CONTENTS Preface....01 Bhutan s Key Economic Indicators..02

More information

FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009

FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009 FINAL FACILITY STUDY KV1C Transformer Addition at Badwater Substation 2009-T1 November 17, 2009 I. Introduction In October 2008, Western Area Power Administration (Western) received a Transmission Queue

More information

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN

ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN ROYAL MONETARY AUTHORITY OF BHUTAN MONTHLY STATISTICAL BULLETIN Department of Macroeconomic Research and Statistics Vol. XVIl, No.11 November 2018 CONTENTS Preface....01 Bhutan s Key Economic Indicators..02

More information

FREEDOM OF INFORMATION REQUEST

FREEDOM OF INFORMATION REQUEST FREEDOM OF INFORMATION REQUEST REQUEST NUMBER: FOI Request 003905-16 REQUEST DETAILS: As part of my research I am requesting information on the numbers of 'strip searches' that have taken place within

More information

TABLE 1. REAL GDP AND GROWTH RATES IN THE ESCWA REGION AT CONSTANT 1995 PRICES, (Millions of US dollars and percentages) Percentage change

TABLE 1. REAL GDP AND GROWTH RATES IN THE ESCWA REGION AT CONSTANT 1995 PRICES, (Millions of US dollars and percentages) Percentage change TABLE 1. REAL GDP AND GROWTH RATES IN THE ESCWA REGION AT CONSTANT 1995 PRICES, 2001-2004 (Millions of US dollars and percentages) Percentage change Country/area 2000 2001 2002 2003 a/ 2004 b/ 2001 2002

More information

REPORT ON RED-LIGHT MONITORING SYSTEMS

REPORT ON RED-LIGHT MONITORING SYSTEMS REPORT ON RED-LIGHT TRAFFIC CONTROL SIGNAL MONITORING SYSTEMS Prepared by the New Jersey Department of Transportation November 2011 Executive Summary Public Law 2007, Chapter 348 (P.L. 2007, c.348), signed

More information

Telephone Fax

Telephone Fax John C. Frain Director Regulatory Strategy & Revenue Policy P.O. Box 1475 Baltimore, Maryland 21203-1475 Telephone 410.470.1169 Fax 410.470.8022 www.bge.com john.frain@bge.com December 18, 2018 Via Electronic

More information

NCC Cable System Order

NCC Cable System Order Order # 62508883 Flight s 03/13/18-04/01/18 Syscode 2107 Agency Canal Partners Media System Name Spectrum/DISH- I+ Tampa-St. Pete, FL Advertiser Levine For Governor Phone (301) 951-2620 Credit Update 03/13/18

More information

January 2019 FY Key Performance Report

January 2019 FY Key Performance Report January 2019 FY 2019 - Key Performance Report Management Notes: The information in this report is based on the FY 2019 Operating Budget, adopted by the Board on June 11, 20. RT s farebox recovery ratio

More information

Foreign overnights in the Nordic countries 2015

Foreign overnights in the Nordic countries 2015 Foreign overnights in the Nordic countries 2015 Sources: Statistics Statistics Statistics Statistics July 2016 VISIT FINLAND STATISTICS Contents Foreign overnights in the Nordic countries.4 Overnights

More information

Wind Resource Assessment for CHEFORNAK, ALASKA

Wind Resource Assessment for CHEFORNAK, ALASKA 813 W. Northern Lights Blvd. Anchorage, AK 99503 Phone: 907-269-3000 Fax: 907-269-3044 www.akenergyauthority.org Wind Resource Assessment for CHEFORNAK, ALASKA Date last modified: 3/15/2006 Compiled by:

More information

DEC DASHBOARD. Positive Response Compliance DEC. Compliant Tickets : On-Time Performance Analysis. December % Late.

DEC DASHBOARD. Positive Response Compliance DEC. Compliant Tickets : On-Time Performance Analysis. December % Late. Positive Response Compliance 215 Compliant 215 Non-Compliant 216 Compliant 216 Non-Compliant 1% 87% 96% 86% 96% 88% 97% 89% 97% 89% 98% 88% 97% 86% 96% 92% 97% 93% 97% 94% 97% 96% 97% 94% 97% 8% 6% 4%

More information

JAN DASHBOARD. Positive Response Compliance JAN. Compliant Tickets : On-Time Performance Analysis. January % Late.

JAN DASHBOARD. Positive Response Compliance JAN. Compliant Tickets : On-Time Performance Analysis. January % Late. Positive Response Compliance 216 Compliant 216 Non-Compliant 217 Compliant 217 Non-Compliant 1% 96% 97% 8% 6% 4% 2% 4% 3% FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 8% Late Compliant Tickets : On-Time

More information

Bluetongue Disease (BT)

Bluetongue Disease (BT) Bluetongue Disease (BT) Analysis of ADNS data since 01/2018 Reporting period: 2018-01-01 2018-12-09 Data query: 2018-12-10 AGES DSR Austrian Agency for Health and Food Safety www.ages.at Parameters Data

More information

Chile s 2013 CMM 1.01 Implementation Report

Chile s 2013 CMM 1.01 Implementation Report 1 st Meeting of the Compliance and Technical Committee, Manta, Ecuador: 27-31 January 2014 Chile s 2013 CMM 1.01 Implementation Report Undersecretariat for Fisheries and Aquaculture CHILEAN COMPLIANCE

More information

TEGMA Fall Transportation Symposium

TEGMA Fall Transportation Symposium TEGMA 2017 Fall Transportation Symposium John Wilson Senior Vice President Dairy industry trends 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Million

More information

SUBJECT: AMENDING PORT OF LOS ANGELES TARIFF NO. 4, SECTION THREE, ITEM NO CHARGES FOR PILOTAGE

SUBJECT: AMENDING PORT OF LOS ANGELES TARIFF NO. 4, SECTION THREE, ITEM NO CHARGES FOR PILOTAGE RECOMMENDATION APPROVED; RESOLUTION NO. 17-8115 AND ORDER NO. 17-7222 ADOPTED; BY THE BOARD OF HARBOR COMMISSIONERS June 1,2017 w AMBER M. KLESGES Board Secretary LA THE PORT OF LOS ANGELES Executive Director's

More information

Producer Price Index - Agriculture (PPI-A) (January March 2001)

Producer Price Index - Agriculture (PPI-A) (January March 2001) Producer Price Index - Agriculture (PPI-A) (January March 2001) Introduction The Producer Price Index-Agriculture (PPI-A) gives a measure of the average change in the selling prices which producers receive

More information

2013 SERTP. Welcome. SERTP nd Quarter Meeting. Preliminary Expansion Plan Meeting

2013 SERTP. Welcome. SERTP nd Quarter Meeting. Preliminary Expansion Plan Meeting Welcome SERTP 2013 2 nd Quarter Meeting Preliminary Expansion Plan Meeting 1 The SERTP process is a transmission planning process. Please contact the respective transmission provider for questions related

More information

NY Wind Overview and 2016 Operation

NY Wind Overview and 2016 Operation NY Wind Overview and 216 Operation Tolu Dina Supervisor, Operations Analysis & Services MIWG October 16, 217, Rensselaer, NY DRAFT FOR DISCUSSION PURPOSES ONLY Agenda Overview of NY Wind Wind Curtailment

More information

August 2018 Las Vegas Strip Gaming Revenue Analysis

August 2018 Las Vegas Strip Gaming Revenue Analysis August 2018 Las Vegas Strip Gaming Revenue Analysis Brent Pirosch Director of Gaming Consulting CBRE T: 702.369.4803 brent.pirosch@cbre.com GGG has completed market studies and feasibility studies for

More information

PROPOSED EP BOWLS CALENDAR; January 2019 Version 2 Approved 22 November 2018

PROPOSED EP BOWLS CALENDAR; January 2019 Version 2 Approved 22 November 2018 PROPOSED EP BOWLS CALENDAR; January 2019 Version 2 Approved 22 November 2018 Jan 19 Monday Tuesday Wednesday Thursday Friday Saturday Sunday 1 2 3 4 5 6 Week 1 NEW YEARS DAY EP Bowls Coaching Course EP

More information

Manufacturers Continue Capacity Expansion as Technology Orders Grow

Manufacturers Continue Capacity Expansion as Technology Orders Grow Contact: Penny Brown, AMT, 703-827-5275 pbrown@amtonline.org For Release: October 8th, 2018 Manufacturers Continue Capacity Expansion as Technology Orders Grow Manufacturing technology orders posted an

More information

b Number issued 200,000 (marked with * in the attached appendix) Exercise price is as set out in the appendix

b Number issued 200,000 (marked with * in the attached appendix) Exercise price is as set out in the appendix www.sli-systems.com Level 1, EPIC 78 106 Manchester Street Christchurch New Zealand Phone: 0800 754 797 Fax:03 961 3262 22 May 2018 Client Market Services NZX Limited WELLINGTON By NZ MAP NOTIFICATION

More information

2018 Annual Economic Forecast Dragas Center for Economic Analysis and Policy

2018 Annual Economic Forecast Dragas Center for Economic Analysis and Policy 2018 Annual Economic Forecast Dragas Center for Economic Analysis and Policy PRESENTING SPONSOR EVENT PARTNERS 2 The forecasts and commentary do not constitute an official viewpoint of Old Dominion University,

More information

Little Athletics NSW. 2018/2019 Season. Age Group Information Handbook / 1

Little Athletics NSW. 2018/2019 Season. Age Group Information Handbook / 1 Little Athletics NSW Age Group Information Handbook 2018/2019 Season / 1 Little Athletics NSW 2018/19 Season Age Group Information Handbook Introduction From the commencement of the 2018/2019 competition

More information

DATE: FY2016 PB Cycle February PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY End Cost

DATE: FY2016 PB Cycle February PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY End Cost BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE SHIPBUILDING AND CONVERSION, NAVY/BA 5 Auxiliaries, Craft and Prior Year Program Costs BLI: 5139 (Dollars

More information

Groundwater Management Optimization. Dr. Issam NOUIRI

Groundwater Management Optimization. Dr. Issam NOUIRI Tenth Gulf Water Conference, 22-24 April 2012, Doha, Qatar Groundwater Management Optimization by ALL_WATER_gw New problem formulation & additional functionalities. Dr. Issam NOUIRI National Institute

More information

2018 COURT CALENDAR CUMBERLAND COUNTY, PENNSYLVANIA DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

2018 COURT CALENDAR CUMBERLAND COUNTY, PENNSYLVANIA DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2018 COURT CALENDAR 2017 2018 CUMBERLAND COUNTY, PENNSYLVANIA DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Civil Court Last Day for Setting Down Cause For Trial List 8 30 20 Call of Civil Trial

More information

REVENUE & RIDERSHIP REPORT NOVEMBER 2017

REVENUE & RIDERSHIP REPORT NOVEMBER 2017 REVENUE & RIDERSHIP REPORT NOVEMBER 2017 November ridership and revenue 1.9% and 2.2% below budget Depressed ridership last November from a six-day City Transit strike Year-to-date revenue 3.2% and ridership

More information

Nasdaq Dubai AED TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced to the DFM (T+2)

Nasdaq Dubai AED TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced to the DFM (T+2) NasdaqDubai Circular No: 14 /2018 Date of Issue: 13 March 2018 Date of Expiry : Upon issue of replacement Circular Nasdaq Dubai AED TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced

More information

RTC TRANSIT OPERATING STATISTICS RTC RIDE RTC RAPID RTC INTERCITY SIERRA SPIRIT

RTC TRANSIT OPERATING STATISTICS RTC RIDE RTC RAPID RTC INTERCITY SIERRA SPIRIT RTC TRANSIT OPERATING STATISTICS RTC RIDE RTC RAPID RTC INTERCITY SIERRA SPIRIT April 2016 RTC TRANSIT OPERATING STATISTICS REPORT TABLE OF CONTENTS RTC Transit Highlights... Page ii RTC Transit Summary...

More information

FOR SALE BILLBOARD EASEMENT OFF US Laurelwood Rd, Santa Clara, CA 95054

FOR SALE BILLBOARD EASEMENT OFF US Laurelwood Rd, Santa Clara, CA 95054 All Sperry Van Ness Offices Independently Owned & Operated. The information listed above has been obtained from sources we believe to be reliable, however, we accept no responsibility for its correctness.

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 66139-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 63203-E Schedule GS-APS-E Sheet 1 APPLICABILITY The General Service Automatic

More information

City of Palmer Action Memorandum No

City of Palmer Action Memorandum No City of Palmer Action Memorandum No. 18-072 Subject: Authorizing the City Manager to Negotiate and Enter into a Contract with Bering Marine Corporation for the Purchase and Delivery of 100 Tons of Road

More information

Item 5.1 TRANSIT DAY 2018 BUDGET PRESENTATION. Public Works Department TRANSIT

Item 5.1 TRANSIT DAY 2018 BUDGET PRESENTATION. Public Works Department TRANSIT Item 5.1 DAY 2018 BUDGET PRESENTATION Looking Back 2017 accomplishments Comparing with other GTHA agencies 10 year strategy recap HSR Today Strategy year 3 Operating budget Looking Ahead 2018 priorities

More information

WORKFORCE LOCAL AREA EMPLOYMENT STATISTICS (LAUS)

WORKFORCE LOCAL AREA EMPLOYMENT STATISTICS (LAUS) AUGUST 2018 WORKFORCE LOCAL AREA EMPLOYMENT STATISTICS (LAUS) 1,200,000 1,100,000 1,000,000 900,000 Labor Force Employment 1,152,626 1,116,938 800,000 700,000 600,000 500,000 2016 to 2017: 35957 (3.1%)

More information

PUBLIC MEETINGS. Please see the City of Geneva Public Meeting Guide for more information regarding City Council and Committee of the Whole meetings.

PUBLIC MEETINGS. Please see the City of Geneva Public Meeting Guide for more information regarding City Council and Committee of the Whole meetings. PUBLIC MEETINGS Citizens are welcome and encouraged to attend all City of Geneva public meetings. Public meeting guests are also urged to participate in any of the City s many public meetings that take

More information

Goldman Sachs Agricultural Biotech Forum New York, NY. March 7, 2012

Goldman Sachs Agricultural Biotech Forum New York, NY. March 7, 2012 1 Goldman Sachs Agricultural Biotech Forum New York, NY March 7, 2012 2 Forward Looking Statement Warning This presentation contains forward-looking statements about the business, financial condition and

More information

World Wrestling Entertainment, Inc. Key Performance Indicators. Calendar Years: (Data shown is through April 30, 2010)

World Wrestling Entertainment, Inc. Key Performance Indicators. Calendar Years: (Data shown is through April 30, 2010) World Wrestling Entertainment, Inc. Key Performance Indicators Calendar Years: 28-21 (Data shown is through April, 21) June, 21 Basis of Presentation Operating metrics as shown in the following schedules

More information

Active Development Applications Deemed Complete After December 12, 2017 (Effective August 16, 2018)

Active Development Applications Deemed Complete After December 12, 2017 (Effective August 16, 2018) Page 1 of 6 Ward 1 UHOPA-18-005* ZAC-18-012 235 Main St. W., 22-Dec-17 n/a 19-Jan-18 n/a n/a 20-Jul-18* UHOPA-18-015* ZAC-18-035 Ward 2 UHOPA-17-041* ZAC-17-090 UHOPA-18-004* ZAC-18-009 ZAC-18-013 69 Sanders

More information

Danish gambling market statistics First quarter 2017

Danish gambling market statistics First quarter 2017 Danish gambling market statistics First quarter 2017 6. juni 2017 Danish gambling market statistics 1 Introduction The Danish gambling market underwent a partial liberalisation in 2012, with the markets

More information

Have You Ever Heard the Phrase

Have You Ever Heard the Phrase Setting the Stage with Dairy Outlook Mark Stephenson Director of Dairy Policy Analysis Have You Ever Heard the Phrase! 3M Money Makes Milk! 5M More Money Makes More Milk! 7M Much More Money Makes Much

More information

WIM #37 I-94, MP OTSEGO, MN APRIL 2012 MONTHLY REPORT

WIM #37 I-94, MP OTSEGO, MN APRIL 2012 MONTHLY REPORT WIM #37 I-94, MP 200.1 OTSEGO, MN APRIL 2012 MONTHLY REPORT In order to understand the vehicle classes and groupings the Mn/DOT Vehicle Classification Scheme and the Vehicle Classification Groupings for

More information

WAVE HUB. Dr Mike Patching. A Future for Wave Energy in Cornwall. BEng, PhD, CEng, MEI

WAVE HUB. Dr Mike Patching. A Future for Wave Energy in Cornwall. BEng, PhD, CEng, MEI WAVE HUB A Future for Wave Energy in Cornwall Dr Mike Patching BEng, PhD, CEng, MEI 1 Pelamis - Wave Energy in Action!! 2 Wave Hub - What is it? Simple idea! An area of sea with an electrical cable and

More information

Pennsylvania Gaming Control Board Lawrence Downs Casino and Racing Resort Public Input Hearing

Pennsylvania Gaming Control Board Lawrence Downs Casino and Racing Resort Public Input Hearing Pennsylvania Gaming Control Board Lawrence Downs Casino and Racing Resort Public Input Hearing Lady Luck Casino- Actual Market Impact Lawrence Downs- Expected Market Impact Presented on May 8, 2014 by

More information

ENERGY BILL ORGANIZATION

ENERGY BILL ORGANIZATION 1,2, 1,, 8, 6, 4, 2, 4 4 4 6, 5, 4, 3, 2, 1, 1 Why bother? any facilities don t ever see their bills 6, 4, 2, Disconnect between plant and corporate offices Disconnect between operations and accounting

More information

Nordel GRID DISTURBANCE AND FAULT STATISTICS

Nordel GRID DISTURBANCE AND FAULT STATISTICS Nordel GRID DISTURBANCE AND FAULT STATISTICS Table contents Table contents Page 1 Introduction... 3 1.1 Contact persons... 4 1.2 Guidelines the statistics... 4 1.3 Voltage levels in the Nordel network...

More information

GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORLD AFFAIRS

GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORLD AFFAIRS GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORLD AFFAIRS -- FINAL TOPLINE -- Timberline: 937008 IS: 954 Princeton Job #: 17-02-002 Jeff Jones, Lydia Saad February 1-5, 2017 Results are based on telephone

More information

KC Scout Kansas City s Bi-State Transportation Management Center

KC Scout Kansas City s Bi-State Transportation Management Center KC Scout Kansas City s Bi-State Transportation Management Center Operations Report May 216 This report contains statistical and operational data of activities at the Scout TMC for the period Sunday, May

More information

State of American Trucking

State of American Trucking State of American Trucking October 11, 2018 Rod Suarez Economic Analyst American Trucking Associations rsuarez@trucking.org Business Cycles U.S. Expansions Duration October 1949 - July 1953 May 1954 -

More information

WORKFORCE LOCAL AREA EMPLOYMENT STATISTICS (LAUS)

WORKFORCE LOCAL AREA EMPLOYMENT STATISTICS (LAUS) AUGUST 2016 WORKFORCE LOCAL AREA EMPLOYMENT STATISTICS (LAUS) 1,150,000 1,100,000 1,050,000 1,000,000 950,000 900,000 850,000 800,000 750,000 700,000 Labor Force Employment June 2015 to June 2016: 36,504

More information

2018 Annual Economic Forecast Dragas Center for Economic Analysis and Policy

2018 Annual Economic Forecast Dragas Center for Economic Analysis and Policy 2018 Annual Economic Forecast Dragas Center for Economic Analysis and Policy PRESENTING SPONSOR EVENT PARTNERS 2 The forecasts and commentary do not constitute an official viewpoint of Old Dominion University,

More information

Presented to Idaho Washington Aquifer Collaborative February 11, Spokane River Project License

Presented to Idaho Washington Aquifer Collaborative February 11, Spokane River Project License Presented to Idaho Washington Aquifer Collaborative February 11, 2014 Spokane River Project License Contact Speed Fitzhugh, Spokane River License Manager Telephone - (509) 495-4998 Email - speed.fitzhugh@avistacorp.com

More information

2018 Annual Economic Forecast Dragas Center for Economic Analysis and Policy

2018 Annual Economic Forecast Dragas Center for Economic Analysis and Policy 2018 Annual Economic Forecast Dragas Center for Economic Analysis and Policy PRESENTING SPONSOR EVENT PARTNERS 2 The forecasts and commentary do not constitute an official viewpoint of Old Dominion University,

More information

NEVADA SLOT MACHINES: HISTORICAL HOLD PERCENTAGE VARIATIONS ANNUAL AND MONTHLY HOLD PERCENTAGES, CENTER FOR GAMING RESEARCH, NOVEMBER 2017

NEVADA SLOT MACHINES: HISTORICAL HOLD PERCENTAGE VARIATIONS ANNUAL AND MONTHLY HOLD PERCENTAGES, CENTER FOR GAMING RESEARCH, NOVEMBER 2017 NEVADA SLOT MACHINES: HISTORICAL HOLD PERCENTAGE VARIATIONS ANNUAL AND MONTHLY HOLD PERCENTAGES, 2004-2017 CENTER FOR GAMING RESEARCH, NOVEMBER 2017 Executive Summary Hold percentage the portion of money

More information

NASDAQ DUBAI TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced to the DFM (T+2)

NASDAQ DUBAI TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced to the DFM (T+2) Nasdaq Dubai Circular No : 71/17 Date of Issue : 24 December 2017 Date of Expiry : Upon issue of replacement Circular NASDAQ DUBAI TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2018 For Equities Outsourced

More information

FOR RELEASE: FRIDAY, MARCH 30 AT 5 AM

FOR RELEASE: FRIDAY, MARCH 30 AT 5 AM Interviews with 1,014 adult Americans conducted by telephone by ORC International on March 24-25, 2012. The margin of sampling error for results based on the total sample is plus or minus 3 percentage

More information

GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORLD AFFAIRS

GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORLD AFFAIRS GALLUP NEWS SERVICE GALLUP POLL SOCIAL SERIES: WORLD AFFAIRS -- FINAL TOPLINE -- Timberline: 937008 JT: 165 Princeton Job #: 18-02-002 Jeff Jones, Lydia Saad February 1-10, 2018 Results are based on telephone

More information

Economic Overview. Melissa K. Peralta Senior Economist April 27, 2017

Economic Overview. Melissa K. Peralta Senior Economist April 27, 2017 Economic Overview Melissa K. Peralta Senior Economist April 27, 2017 TTX Overview TTX functions as the industry s railcar cooperative, operating under pooling authority granted by the Surface Transportation

More information

REVENUE & RIDERSHIP REPORT SEPTEMBER 2018

REVENUE & RIDERSHIP REPORT SEPTEMBER 2018 REVENUE & RIDERSHIP REPORT SEPTEMBER 2018 Year-to-date passenger revenue 1.3% above last year Year-to-date ridership 2.1% below last year 1,500 SEPTA RIDERSHIP PERFORMANCE Average Daily Rides in 000's

More information

African swine fever in domestic pigs and wild boar (ASF)

African swine fever in domestic pigs and wild boar (ASF) African swine fever in domestic pigs and wild boar (ASF) Analysis of ADNS data since 01/2018 Reporting period: 2018-01-01 2018-12-09 Data query: 2018-12-10 AGES DSR Austrian Agency for Health and Food

More information

10 Wed, Mar 6 Club Spring Partners Net BB Tournament 1

10 Wed, Mar 6 Club Spring Partners Net BB Tournament 1 2019 Woods Valley Men's Club - Wednesday Schedule 8:00 Shotgun Start @ Woods Valley (Check in and warm up 6:45-7:30) 1 Wed, Jan 2 2-Person Odd/Even Combined/NetBB 2 Wed, Jan 9 LN/LG @ Mt. Woodson due to

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southern California Edison Company Docket No. ER18- -000 SOUTHERN CALIFORNIA EDISON COMPANY ANNUAL UPDATE FILING OF THE TRANSMISSION

More information

Conseil de développement économique des Territoires du Nord-Ouest Quebec Travel conversion study 2008 Report May 26, 2009

Conseil de développement économique des Territoires du Nord-Ouest Quebec Travel conversion study 2008 Report May 26, 2009 Conseil de développement économique des Territoires du Nord-Ouest Quebec Travel conversion study 2008 Report May 26, 2009 226-388 donald street winnipeg manitoba canada R3B 2J4 204.989.8002 fax 204.989.8048

More information

Calendar On US Federal Reserve Holidays, no settlements will take place for USD.

Calendar On US Federal Reserve Holidays, no settlements will take place for USD. NASDAQ Dubai Notice No: NASDAQ Dubai Trading Holidays and Settlement Calendar 2012 Date of Issue: NASDAQ Dubai TRADING HOLIDAYS AND SETTLEMENT CALENDAR 2012 For Derivatives, Exchange Traded Commodities,

More information

windnavigator Site Analyst Report

windnavigator Site Analyst Report windnavigator Site Analyst Report for Central NY Created for Stephen Meister April 27, 2010 ID NUMBER: N2-128 AWS Truepower, LLC Albany - Barcelona - Bangalore p: +1.518.21.00 e: info@awstruepower.com

More information

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II) Presentation to the CNRC Board of Directors Regular Meeting March 11, 2015 1 Agenda Preferred Alternate Refinement for University Avenue, 3rd Street, and Beverly Avenue Intersection Improvements validate

More information

SEASONAL PRICES for TENNESSEE FEEDER CATTLE and COWS

SEASONAL PRICES for TENNESSEE FEEDER CATTLE and COWS SEASONAL PRICES for TENNESSEE FEEDER CATTLE and COWS Tammy L. McKinley Extension Specialist Agricultural & Resource Economics economics.ag.utk.edu AE16-06 July 2016 TABLE OF CONTENTS Seasonal : Introduction...

More information

September 2017 MLS Statistical Report. Residential Inventory

September 2017 MLS Statistical Report. Residential Inventory September 217 MLS Statistical Report Residential Inventory 2 2 1 1 21 216 217 Summary Inventories: Residential inventory is down 1%, Lots / Land inventory is down 13% and commercial inventory was down

More information

Ventura County Grand Jury

Ventura County Grand Jury Ventura County Grand Jury 2016-2017 May 25, 2017 This page intentionally blank Summary The 2016-2017 Ventura County Grand Jury (Grand Jury) received a complaint regarding the operation of the red light

More information

RTC TRANSIT OPERATING STATISTICS RTC RIDE RTC RAPID RTC INTERCITY SIERRA SPIRIT

RTC TRANSIT OPERATING STATISTICS RTC RIDE RTC RAPID RTC INTERCITY SIERRA SPIRIT RTC TRANSIT OPERATING STATISTICS RTC RIDE RTC RAPID RTC INTERCITY SIERRA SPIRIT September 218 RTC TRANSIT OPERATING STATISTICS REPORT TABLE OF CONTENTS RTC Transit Highlights... Page ii RTC Transit Summary...

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 31330-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 25208-E 25209-E PRELIMINARY STATEMENT Sheet 1 1. Purpose. The purpose

More information

Photo courtesy of Judy Jacobson, Watford City. Cattle Situation and Outlook Ag Lenders Conference

Photo courtesy of Judy Jacobson, Watford City. Cattle Situation and Outlook Ag Lenders Conference Photo courtesy of Judy Jacobson, Watford City Cattle Situation and Outlook Ag Lenders Conference Tim Petry Livestock Economist www.ndsu.edu/livestockeconomics Oct. 31, 2016 AGL16-Outlook 10-31-2016 TO

More information

Recent Events in the Market for Canadian Snow Crab

Recent Events in the Market for Canadian Snow Crab Recent Events in the Market for Canadian Snow Crab Overview The quantity of snow crab produced and exported by Canada increased dramatically through the late 1990s, but has levelled off and remained quite

More information

SWISS reports stable load factors

SWISS reports stable load factors SWISS Corporate Communications Phone: +41 (0)848 773 773 Fax: +41 (0)44 564 2127 communications@swiss.com SWISS.COM Media release Zurich Airport, October 10, 2008 SWISS reports stable load factors SWISS

More information

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK September 2015

STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK September 2015 THOMAS P. DiNAPOLI COMPTROLLER STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 GABRIEL F. DEYO DEPUTY COMPTROLLER DIVISION OF LOCAL GOVERNMENT AND SCHOOL ACCOUNTABILITY

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information