1 CITY OF RICHMOND, VIRGINIA DEPARTMENT OF PUBLIC WORKS TRANSPORTATION ENGINEERING DIVISION Road Diet - Improve Bicycle Accommodations Charity Street to Azalea , UPC CITY PROJECT NO. 09, AWARD NO. 009/009 INDEX OF SHEETS SITE Title 9 INTERSTATE 9 INTERSTATE INTERSTATE 9 0 Lic. 0 0 CITY OF RICHMOND INTERSTATE INTERSTATE 9 INTERSTATE DRAWING NO: O-88 LOCATION MAP August, 0 0 HERE AND 0 Microst Corporatio South th Street Suite 00 Richmond, VA

2 See Route Information on Back Stop# 9 Exist. Prop. Legend General Abbreviations General Notes Existing Sign Summary Regulatory Sign Summary Warning Sign Summary RIGHT-OF-WAY/PROPERTY LINE FACE OF CURB BUILDING FLEXIBLE DELINEATOR DUMPSTER PAD SIGN DOUBLE SIGN DOUBLE LINE STOP LINE CROSSWALK CROSSBIKE ACCESSIBLE CURB RAMP ACCESSIBLE PARKING ADJ APPROX BWLL DYCL EX EXIST MAX MIN NIC NTS SWEL SWLL TYP ADJUST APPROXIMATE BROKEN LANE LINE DOUBLE CENTER LINE EXISTING EXISTING MAXIMUM MINIMUM NOT IN CONTRACT NOT TO SCALE SOLID EDGE LINE SOLID LANE LINE TYPICAL. CONTRACTOR SHALL CONTACT MISS UTILITY AT 8, , OR NO LESS THAN HOURS PRIOR TO EXCAVATION AND SHALL NOT DISTURB THE SOIL UNTIL DIG TICKET HAS BEEN PROCESSED.. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA STANDARDS AND LOCAL REQUIREMENTS.. ACCESSIBLE ROUTES, PARKING SPACES, RAMPS, SIDEWALKS AND WALKWAYS SHALL BE CONSTRUCTED IN CONFORMANCE WITH THE FEDERAL AMERICANS WITH DISABILITIES ACT AND WITH STATE AND LOCAL LAWS AND REGULATIONS (WHICHEVER ARE MORE STRINGENT).. WORK WITHIN THE LOCAL RIGHT-OF-WAY SHALL CONFORM TO CITY OF RICHMOND STANDARDS.. UPON AWARD OF CONTRACT, CONTRACTOR SHALL MAKE NECESSARY CONSTRUCTION NOTIFICATIONS AND APPLY FOR AND OBTAIN NECESSARY PERMITS, AND POST BONDS ASSOCIATED WITH THE WORK INDICATED ON THE DRAWINGS, IN THE SPECIFICATIONS, AND IN THE CONTRACT DOCUMENTS. DO NOT CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS, AND FIRE HYDRANTS, WITHOUT APPROPRIATE PERMITS.. TRAFFIC SIGNAGE AND PAVEMENT MARKINGS SHALL CONFORM TO THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.. CONTRACTOR SHALL DISPOSE OF DEMOLITION DEBRIS IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, ORDINANCES AND STATUTES. 8. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE. M.U.T.C.D. Number Desc. STOP M.U.T.C.D. Number R- R- R- R- R- R-0a SPEEDING R-(M) $00 ADDITIONAL R-0 FINE R- R-a Desc. P M.U.T.C.D. Number Desc. M.U.T.C.D. Number W- W- W-8L W-V W-8R W- W- W- W- W-8 Desc. South th Street Suite 00 Richmond, VA VAN-ACCESSIBLE PARKING FIRE HYDRANT 9. DAMAGE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO OWNER. 0. THIS PROJECT IS NOT SUBJECT TO THE CITY OF RICHMOND STORMWATER MANAGEMENT PERMIT (RSMP) AS THERE IS NO LAND DISTURBANCE. R- R-8 RESERVED PARKING W- W- S TRAFFIC SIGNAL SIGNALED INTERSECTION UTILITY POLE MATCHLINE. CONTRACTOR SHALL PHASE WORK TO MINIMIZE TIME BETWEEN REMOVING EXISTING MARKINGS AND TRAFFIC CONTROL DEVICES AND INSTALLATION OF NEW MARKINGS AND TRAFFIC CONTROL DEVICES.. CONTRACTOR SHALL SEAL ALL ASPHALT AND REPAIR SURFACES AS NECESSARY ALONG BIKE LANES WHERE MINOR CRACKS AND JOINTS IMPEDE NORMAL BICYCLE FLOW. LARGE SURFACE REPAIRS OR LAND DISTURBANCE ACTIVITIES, IF REQUIRED, SHALL BE PERFORMED UNDER SEPARATE CONTRACT. PLEASE NOTIFY CITY ENGINEER WHERE MAJOR PAVEMENT REPAIRS ARE REQUIRED.. CONTRACTOR SHALL INSPECT ALL STOP BARS AT SIDE STREET INTERSECTIONS. ALL STOP BARS SHALL BE REFRESHED TO FULL VISIBILITY. IF A STOP BAR SHOWS SIGNS OF WEAR OR MISSING PAINT IT SHALL BE REPLACED IN ITS ENTIRETY. R- R-08 R-L R8-a P W- W-a BRIDGE TRAFFIC LEFT LANE W- W-a BRIDGE MILE. ALONG AREAS WITH NEW PARKING STRIPING, CONTRACTOR SHALL ENSURE EXISTING SKIPS HAVE BEEN ACCURATELY ERADICATED.. CONTRACTOR SHALL INSPECT EXISTING PAVEMENT MARKINGS TO REMAIN ALONG CORRIDOR. INCOMPLETE OR WORN MARKINGS SHALL BE ERADICATED AND REPAINTED.. ALL UTILITY POLES AND SIGNAL POLES ARE TO REMAIN AND BE PROTECTED DURING CONSTRUCTION. IF POLE-MOUNTED SIGNS ARE SHOWN TO BE REMOVED, CARE SHALL BE TAKEN TO PROTECT POLE DURING REMOVAL OF SIGN. R-R R-L R8-a(M) R8-b PDURING CHURCH ACTIVITIES PASSENGER LOADING ONLY W8-0 W-pL W9-(MOD) W-pR Layout and Materials. DIMENSIONS ARE FROM THE FACE OF CURB, FACE OF BUILDING, FACE OF WALL, AND CENTER LINE OF PAVEMENT MARKINGS, UNLESS OTHERWISE NOTED. R-R R9- W9-L W-pR. PROPOSED BOUNDS AND ANY EXISTING PROPERTY LINE MONUMENTATION DISTURBED DURING CONSTRUCTION SHALL BE SET OR RESET BY A PROFESSIONAL LICENSED SURVEYOR. R-LR R0-e W9-xx W-pL. ALL CONCRETE IF NOT SPECIFICALLY CALLED OUT SHALL BE A MINIMUM OF,000 PSI. Maintenance Traffic EXCEPT R-bP R0- BICYCLES W0- W-9p. THE PURPOSE OF THESE NOTES IS TO DESCRIBE GENERAL TRAFFIC OPERATION DURING CONSTRUCTION. IT IS NOT INTENDED TO PROVIDE ALL DETAILS RELATED TO MAINTENANCE OF TRAFFIC.. ALL MAINTENANCE OF TRAFFIC OPERATIONS AND MATERIALS SHALL MEET THE REQUIREMENTS OF THE VIRGINIA WORK AREA PROTECTION MANUAL, AUGUST 0, AND PART IV OF THE MUTCD, INCLUDING ALL CHANGES AND REVISIONS TO DATE FOR THESE DOCUMENTS.. CONSTRUCTION WARNING SIGNS SHALL BE PLACED IN THE ADVANCE WARNING AREA AND THE TERMINATION AREA OF THE WORK ZONE. CONTRACTOR SHALL PROVIDE SIGNS AND ANY NECESSARY STANDS TO ENSURE AN UNRESTRICTED VIEW OF THE WARNINGS.. CONSTRUCTION IS ALLOWED MONDAY THROUGH SATURDAY DURING THE CONTRACT PERIOD. NO SUNDAY CLOSURES WILL BE ALLOWED UNLESS DIRECTED BY THE CITY TRANSPORTATION ENGINEER. R- R0-a R- R0-b R- R0- EMERGENCY SIGNAL W0- M.U.T.C.D. Number Sign Summary Desc. M.U.T.C.D. Number Desc.. ALONG ALL PROJECT ROADWAYS, NO TEMPORARY LANE CLOSURES OR FLAGMEN OPERATIONS ARE PERMITTED BETWEEN THE HOURS OF :00 AM TO 9:00 AM AND :0 PM TO :00 PM, MONDAY THROUGH FRIDAY, OR AS DIRECTED BY THE PROJECT ENGINEER. R- R0- BIKE M-. LANE CLOSURES WILL NOT BE PERMITTED ON HOLIDAYS OR ON THE DAY BEFORE OR AFTER, UNLESS OTHERWISE DIRECTED BY THE CITY TRANSPORTATION ENGINEER.. CONTRACTOR MUST SUBMIT THE MAINTENANCE OF TRAFFIC PLAN TO THE CITY TRAFFIC ENGINEER TWO WEEKS IN ADVANCE OF CONSTRUCTION FOR REVIEW AND APPROVAL. DO NOT R- R0-R ENTER BIKE M- 8. CONTRACTOR MUST MAINTAIN SAFE ACCESS TO ALL DRIVEWAYS AND MAINTAIN PEDESTRIAN ACCESS AT THE INTERSECTIONS. 9. ALL WORK WITHIN FEET OF THE OUTSIDE EDGE OF PAVEMENT SHALL BE SIGNED. UNDER NO CIRCUMSTANCE WILL CONCURRENT WORK LEFT AND RIGHT OF ANY LANE OF TRAFFIC BE ALLOWED. 0. NO TEMPORARY TRAFFIC CONTROL MEASURES WILL BE ALLOWED TO BE PLACED WITHIN THE RIGHT OF WAY PRIOR TO THE START OF CONSTRUCTION.. ANY FLAGGERS USED DURING CONSTRUCTION SHALL BE STATE CERTIFIED. CERTIFICATION SHALL BE AVAILABLE ON SITE AT ALL TIMES.. THE SIGNING, BARRICADING, PAVEMENT MARKING, AND OTHER TRAFFIC CONTROLS MAY BE CHANGED DURING THE PROJECT WHEN DEEMED NECESSARY BY THE CITY FOR BEST INTEREST OF THE GENERAL PUBLIC AND THE SAFE AND ORDERLY FLOW OF TRAFFIC.. FAILURE TO PROVIDE TEMPORARY TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH THE VIRGINIA WORK AREA PROTECTION MANUAL SHALL RESULT IN IMMEDIATE CORRECTIVE MEASURES BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE CITY. City Richmond DPW (Related to Work within ROW). ALL WORK IN THE STREETS AND SIDEWALKS SHALL BE PERFORMED UNDER A PERMIT AND MONITORED BY THE PERMIT INSPECTOR.. WORK SHALL NOT COMMENCE UNTIL THE PERMIT INSPECTOR HAS BEEN NOTIFIED, A PRE-CONSTRUCTION CONFERENCE HELD, AND MISS UTILITY CLEARS.. ANY DISTURBED SIDEWALK OR CURB SHALL BE REPAIRED AND REPLACED IN ACCORDANCE WITH CITY STANDARDS AS SHOWN ON THE PLANS. Existing Conditions Information BASE PLAN: THE PROPERTY LINES AND OTHER EXISTING CONDITIONS SHOWN ARE BASED ON INFORMATION COMPILED FROM CITY OF RICHMOND GIS AND AERIAL PHOTOGRAPHY. THEY ARE NOT WARRANTED TO BE EXACT. FIELD VERIFICATIONS OF PAVEMENT WIDTHS AND EXISTING SIGNAGE LOCATIONS WERE PERFORMED BY VHB IN AUGUST 0 AND AGAIN IN JANUARY 0. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF ACTUAL SITE CONDITIONS DIFFER FROM THOSE SHOWN ON PLANS. R- R0- TRUCKS R-a PROHIBITION AHEAD ON R- BROOK ROAD Williamsburg Road R-V(M) No Thru R- Trucks Local Deliveries Only TRUCKS PROHIBITED R-V ON BROOK ROAD R- MILE AHEAD R-R R- R-L R- TO REQUEST GREEN WAIT ON RAIL ROAD CROSSING TRACKS D- M- D- M-L TRANSIT SYSTEN I- (N) M-R STOP# ridegrtc.com 8-GRTC (8) P NO PARKING BUS STOP I- (O) M-L For Information Call 8-GRTC No Parking Towing Enforced M- M-R 0 M- M- M- M- R M-8 OM-L M-9 S- - Bike Lanes 00% Package August, 0 Legend and General Notes Document Use. THESE PLANS AND CORRESPONDING CADD DOCUMENTS ARE INSTRUMENTS OF PROFESSIONAL SERVICE, AND SHALL NOT BE USED, IN WHOLE OR IN PART, FOR ANY PURPOSE OTHER THAN FOR WHICH IT WAS CREATED WITHOUT THE EXPRESSED, WRITTEN CONSENT OF VHB. ANY UNAUTHORIZED USE, REUSE, MODIFICATION OR ALTERATION, INCLUDING AUTOMATED CONVERSION OF THIS DOCUMENT SHALL BE AT THE USER'S SOLE RISK WITHOUT LIABILITY OR LEGAL EXPOSURE TO VHB.. CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS, SPECIFICATIONS, AND DATA FILES THAT ARE OBTAINED FROM THE DESIGNERS, BUT SHALL VERIFY LOCATION OF PROJECT FEATURES IN ACCORDANCE WITH THE PAPER COPIES OF THE PLANS AND SPECIFICATIONS THAT ARE SUPPLIED AS PART OF THE CONTRACT DOCUMENTS. M- S- M- C.00. SYMBOLS AND LEGENDS OF PROJECT FEATURES ARE GRAPHIC REPRESENTATIONS AND ARE NOT NECESSARILY SCALED TO THEIR ACTUAL DIMENSIONS OR LOCATIONS ON THE DRAWINGS. THE CONTRACTOR SHALL REFER TO THE DETAIL SHEET DIMENSIONS, MANUFACTURERS' LITERATURE, SHOP DRAWINGS AND FIELD MEASUREMENTS OF SUPPLIED PRODUCTS FOR LAYOUT OF THE PROJECT FEATURES. Lic. 0 9.

3 Azalea Azalea Watkins Street C.0 C.0 C.0 C.0 C.0 C.0 C.0 Westbrook Westbrook Lorraine Warren Westminster Westminster Windsor Stanhope Bellevue Bellevue Amherst Nottoway Claremont Claremont Greycourt Fauquier Avondale W Laburnum W Laburnum South th Street Suite 00 Richmond, VA Wilmington Walton C.0 C.0 C.0 Confederate Palmyra Melrose Westwood Westwood Rennie Rennie Whitby Road C.0 C.0 C.09 W Brookland Park Boulevard W Brookland Park Boulevard Sherwood Sherwood Hammond Edgehill Road C.0 C.0 Dubois Overbrook Road Overbrook Road N Lombardy Street W Graham Road Feet N Lombardy Street Roberts Street C.0 C.0 N Lombardy Street Admiral Street School Street School Street Sledd Street C.08 C.08 Oak Street Webster Street Oak Street Mitchell Street C.09 N Belvidere Street - Bike Lanes C.00 00% Package August, 0 Overall Existing Conditions Plan Lic. 0 9.

4 Azalea Watkins Street South th Street Suite 00 Richmond, VA Azalea - Azalea to Watkins Street Westbrook Feet - Bike Lanes Match Line - See C.0 00% Package August, 0 Westbrook Lorraine Existing Conditions Plan Azalea to Lorraine Lic. 0 C.0 - Westbrook to Lorraine 9.

5 Westminster South th Street Suite 00 Richmond, VA Match Line - See C.0 Warren Westminster Windsor - Warren to Winsor Bellevue Feet Match Line - See C.0 - Bike Lanes 00% Package August, 0 Stanhope Bellevue Amherst Existing Conditions Plan Warren to Amherst Lic. 0 C.0 - Stanhope to Amherst 9.

6 Claremont South th Street Suite 00 Richmond, VA Match Line - See C.0 Nottoway Claremont Greycourt Avondale - Nottoway to Avondale W Laburnum Feet Match Line - See C.0 - Bike Lanes 00% Package August, 0 Avondale Fauquier W Laburnum Existing Conditions Plan Nottoway to W Laburnum Lic. 0 C.0 - Avondale to W Laburnum 9.

7 Walton South th Street Suite 00 Richmond, VA Match Line - See C.0 Wilmington Confederate Palmyra - Wilmington to Palmyra Melrose Westwood Westwood Match Line - See C.0 - Bike Lanes Feet 00% Package August, 0 Existing Conditions Plan Wilmington to Westwood C.0 Lic. 0 - Melrose to Westwood 9.

8 Rennie South th Street Suite 00 Richmond, VA Match Line - See C.0 Rennie - Rennie W Brookland Park Boulevard Match Line - See C.0 - Bike Lanes Feet 00% Package August, 0 Whitby Road W Brookland Park Boulevard For W Brookland Park Boulevard Design See C.09 Existing Conditions Plan Rennie to W Brookland Park Blvd Lic. 0 C.0 - Whitby Road to W Brookland Park Boulevard 9.

9 Sherwood Hammond South th Street Suite 00 Richmond, VA Match Line - See C.0 Sherwood - Sherwood to Hammond Edgehill Road Overbrook Road Match Line - See C.0 - Bike Lanes Feet 00% Package August, 0 Dubois Overbrook Road Existing Conditions Plan Sherwood to Overbrook Road Lic. 0 C.0 - Edgehill Road to Overbrook Road 9.

10 rdy Street N Lombardy Street Roberts Street South th Street Suite 00 Richmond, VA Match Line - See C.0 W Graham Road N Lombardy Street - W Graham Road to Roberts Street School Street Feet Match Line - See C.08 - Bike Lanes School Street 00% Package August, 0 Existing Conditions Plan W Graham Road to Admiral Street Admiral Street Lic. 0 C.0 - Admiral Street 9.

11 Oak Street Sledd Street South th Street Suite 00 Richmond, VA School Street Match Line - See C.0 Webster Street - School Street to Webster Street Chamberlayne Oak Street Mitchell Street Feet - Bike Lanes Match Line - See C.09 00% Package August, 0 Existing Conditions Plan School Street to Webster Street Webster Street Lic. 0 C.08 - Oak Street to Webster Street 9.

12 k Road South th Street Suite 00 Richmond, VA W Brookland Park Boulevard W Brookland Park Boulevard For Design See C.0 W Brookland Park Boulevard at Chamberlayne Feet - Bike Lanes Match Line - See C.08 W Charity Street 00% Package August, 0 Existing Conditions Plan W Brookland Park Blvd C.09 Lic. 0 - Webster Street to W Charity Street N Belvidere Street 9.

13 dy ar mb Lo re St er es tre et W Graha m Road ok Road Overbro C.0 ue Sherwood ark Bo ulevar d W Bro okland P Rennie od Aven Westwo Walton Melrose Overbrook Road Dubois A venue Sherwoo d d ulevar Park B o C.09 okland W Bro C.0 0 EALTH OF V W N F ES INIA IRG Lic. 0 SI O G N A L EN ER Street ad Whitby Ro venue Rennie A ue od Aven Westwo venue Palmyra A e Confeder ate Avenu C.0 NE Mitchell lvi d Az al ea Aven ue nue W Laburnu nue venue Greycourt A Claremont A ve Nottoway Av enue Amherst Ave e Bellevue Ave nu Stanhope Ave nue Windsor Westminster Warren Lorraine Westbrook F Avondale COMM O t School Street Street Be W Laburnum Claremont Bellevue Westminster Westbrook Watkins Street Azalea m C.0 PRO School Stre e treet N et Admiral S Roberts t tree r N u et o ks e bst e W 8 0. C C q au tre 9.0 v A ier ys d oa kr Oa C 8 0. Bro C.0 e u en rd ba C.0 C.0 m Lo treet C.0 eet et C.0 Edgehill Road Wilmington C.0 C.0 N C.0 Str tre ys d ar mb Lo C.0 C.0 Hammond Oak S dd Sle N C.0 C.0 South th Street Suite 00 Richmond, VA Feet - Bike Lanes 00% Package I 9. August, 0 Overall Pavement Marking and Signage Plan et e Str C.00

14 Azalea Watkins Street South th Street Suite 00 Richmond, VA Pavement Marking Legend Description Color BIKE LANE BUFFER HELMETED BICYCLIST SYMBOL AND ARROW SHARED LANE MARKING BICYCLE DETECTOR PAVEMENT MARKING CROSSBIKE GREEN Azalea BIKE LANE CROSSING WITHOUT CONFLICT PAINT SOLID LINE (") 8 DOUBLE SOLID LINE (" EACH) 9 BIKE LANE STOP BAR (") 0 VEHICULAR STOP BAR (") PAVEMENT ARROW - Azalea to Watkins Street CROSSWALK LANE MARKING - 0' DASH, 0' GAP (" THICK) LANE MARKING - ' DASH, ' GAP (" THICK) BIKE LANE YIELD LINE SOLID LINE (") PARKING ALLOWED WITHIN HATCHED AREAS Westbrook Match Line - See C.0 - Bike Lanes VEHICLE DIRECTIONAL ARROW (NOT PAINTED) VEHICLE PAVEMENT ARROW (PAINTED) Feet 00% Package August, 0 Westbrook Lorraine Pavement Marking and Signage Plan Azalea to Lorraine Lic. 0 C.0 - Westbrook to Lorraine 9.

15 Westminster South th Street Match Line - See C Suite 00 Richmond, VA Pavement Marking Legend Description Color BIKE LANE BUFFER HELMETED BICYCLIST SYMBOL AND ARROW Warren Westminster Windsor 8 9 SHARED LANE MARKING BICYCLE DETECTOR PAVEMENT MARKING CROSSBIKE BIKE LANE CROSSING WITHOUT CONFLICT PAINT SOLID LINE (") DOUBLE SOLID LINE (" EACH) BIKE LANE STOP BAR (") GREEN 0 VEHICULAR STOP BAR (") - Warren to Winsor PAVEMENT ARROW CROSSWALK LANE MARKING - 0' DASH, 0' GAP (" THICK) LANE MARKING - ' DASH, ' GAP (" THICK) BIKE LANE YIELD LINE Bellevue SOLID LINE (") PARKING ALLOWED WITHIN HATCHED AREAS VEHICLE DIRECTIONAL ARROW (NOT PAINTED) VEHICLE PAVEMENT ARROW (PAINTED) Feet Stanhope Bellevue 0 Amherst Match Line - See C.0 - Bike Lanes C.0 00% Package August, 0 Pavement Marking and Signage Plan Warren to Amherst Lic. 0 - Stanhope to Amherst 9.

16 Match Line - See C.0 Nottoway Claremont Claremont Greycourt Avondale South th Street Suite 00 Richmond, VA Pavement Marking Legend Description Color BIKE LANE BUFFER HELMETED BICYCLIST SYMBOL AND ARROW SHARED LANE MARKING BICYCLE DETECTOR PAVEMENT MARKING CROSSBIKE GREEN BIKE LANE CROSSING WITHOUT CONFLICT PAINT SOLID LINE (") DOUBLE SOLID LINE (" EACH) BIKE LANE STOP BAR (") VEHICULAR STOP BAR (") PAVEMENT ARROW - Nottoway to Avondale CROSSWALK LANE MARKING - 0' DASH, 0' GAP (" THICK) LANE MARKING - ' DASH, ' GAP (" THICK) BIKE LANE YIELD LINE W Laburnum SOLID LINE (") PARKING ALLOWED WITHIN HATCHED AREAS VEHICLE DIRECTIONAL ARROW (NOT PAINTED) VEHICLE PAVEMENT ARROW (PAINTED) Feet Match Line - See C.0 - Bike Lanes 00% Package August, 0 Avondale Fauquier W Laburnum Pavement Marking and Signage Plan Nottoway to W Laburnum Lic. 0 C.0 - Avondale to W Laburnum 9.

17 Walton South th Street Suite 00 Richmond, VA Match Line - See C Pavement Marking Legend Description Color BIKE LANE BUFFER HELMETED BICYCLIST SYMBOL AND ARROW SHARED LANE MARKING BICYCLE DETECTOR PAVEMENT MARKING Wilmington Confederate Palmyra CROSSBIKE BIKE LANE CROSSING WITHOUT CONFLICT PAINT SOLID LINE (") DOUBLE SOLID LINE (" EACH) BIKE LANE STOP BAR (") VEHICULAR STOP BAR (") PAVEMENT ARROW GREEN - Wilmington to Palmyra CROSSWALK LANE MARKING - 0' DASH, 0' GAP (" THICK) LANE MARKING - ' DASH, ' GAP (" THICK) BIKE LANE YIELD LINE 0 Melrose Westwood Westwood Match Line - See C.0 - Bike Lanes SOLID LINE (") Feet 00% Package August, 0 Pavement Marking and Signage Plan Wilmington to Westwood PARKING ALLOWED WITHIN HATCHED AREAS VEHICLE DIRECTIONAL ARROW (NOT PAINTED) VEHICLE PAVEMENT ARROW (PAINTED) C.0 Lic. 0 - Melrose to Westwood 9.

18 Rennie South th Street Match Line - See C Suite 00 Richmond, VA Pavement Marking Legend Description Color BIKE LANE BUFFER HELMETED BICYCLIST SYMBOL AND ARROW SHARED LANE MARKING BICYCLE DETECTOR PAVEMENT MARKING CROSSBIKE GREEN BIKE LANE CROSSING WITHOUT CONFLICT PAINT Rennie SOLID LINE (") DOUBLE SOLID LINE (" EACH) BIKE LANE STOP BAR (") VEHICULAR STOP BAR (") PAVEMENT ARROW - Rennie CROSSWALK LANE MARKING - 0' DASH, 0' GAP (" THICK) LANE MARKING - ' DASH, ' GAP (" THICK) BIKE LANE YIELD LINE SOLID LINE (") PARKING ALLOWED WITHIN HATCHED AREAS VEHICLE DIRECTIONAL ARROW (NOT PAINTED) VEHICLE PAVEMENT ARROW (PAINTED) Whitby Road 0 Boulevard W Brookland Park Boulevard W Brookland Park For W Brookland Park Boulevard Design See C.09 Match Line - See C.0 - Bike Lanes Feet C.0 00% Package August, 0 Pavement Marking and Signage Plan Rennie to W Brookland Park Blvd Lic. 0 - Whitby Road to W Brookland Park Boulevard 9.

19 Sherwood Hammond South th Street Match Line - See C.0 0 Suite 00 Richmond, VA Pavement Marking Legend Description Color BIKE LANE BUFFER HELMETED BICYCLIST SYMBOL AND ARROW SHARED LANE MARKING Sherwood 8 9 BICYCLE DETECTOR PAVEMENT MARKING CROSSBIKE BIKE LANE CROSSING WITHOUT CONFLICT PAINT SOLID LINE (") DOUBLE SOLID LINE (" EACH) BIKE LANE STOP BAR (") GREEN 0 VEHICULAR STOP BAR (") PAVEMENT ARROW - Sherwood to Hammond CROSSWALK LANE MARKING - 0' DASH, 0' GAP (" THICK) LANE MARKING - ' DASH, ' GAP (" THICK) BIKE LANE YIELD LINE Edgehill Road SOLID LINE (") Overbrook Road PARKING ALLOWED WITHIN HATCHED AREAS VEHICLE DIRECTIONAL ARROW (NOT PAINTED) VEHICLE PAVEMENT ARROW (PAINTED) Feet 0 Match Line - See C.0 - Bike Lanes 00% Package August, 0 Dubois 0 Overbrook Road Pavement Marking and Signage Plan Sherwood to Overbrook Road Lic. 0 C.0 - Edgehill Road to Overbrook Road 9.

20 rdy Street Match Line - See C.0 N Lombardy Street 0 0 Roberts Street 0 South th Street Suite 00 Richmond, VA Pavement Marking Legend Description Color BIKE LANE BUFFER HELMETED BICYCLIST SYMBOL AND ARROW SHARED LANE MARKING BICYCLE DETECTOR PAVEMENT MARKING CROSSBIKE GREEN W Graham Road N Lombardy Street BIKE LANE CROSSING WITHOUT CONFLICT PAINT SOLID LINE (") DOUBLE SOLID LINE (" EACH) BIKE LANE STOP BAR (") VEHICULAR STOP BAR (") PAVEMENT ARROW - W Graham Road to Roberts Street CROSSWALK LANE MARKING - 0' DASH, 0' GAP (" THICK) LANE MARKING - ' DASH, ' GAP (" THICK) BIKE LANE YIELD LINE School Street SOLID LINE (") PARKING ALLOWED WITHIN HATCHED AREAS VEHICLE DIRECTIONAL ARROW (NOT PAINTED) VEHICLE PAVEMENT ARROW (PAINTED) Feet Match Line - See C.08 - Bike Lanes School Street 00% Package August, 0 Admiral Street Pavement Marking and Signage Plan W Graham Road to Admiral Street Lic. 0 C.0 - Admiral Street 9.

21 Sledd Street 0 Match Line - See C.0 School Street 0 0 Webster Street South th Street Suite 00 Richmond, VA Pavement Marking Legend Description Color BIKE LANE BUFFER HELMETED BICYCLIST SYMBOL AND ARROW SHARED LANE MARKING BICYCLE DETECTOR PAVEMENT MARKING CROSSBIKE GREEN BIKE LANE CROSSING WITHOUT CONFLICT PAINT SOLID LINE (") DOUBLE SOLID LINE (" EACH) BIKE LANE STOP BAR (") VEHICULAR STOP BAR (") PAVEMENT ARROW - School Street to Webster Street CROSSWALK LANE MARKING - 0' DASH, 0' GAP (" THICK) LANE MARKING - ' DASH, ' GAP (" THICK) BIKE LANE YIELD LINE SOLID LINE (") Oak Street Mitchell Street Chamberlayne Match Line - See C.09 - Bike Lanes PARKING ALLOWED WITHIN HATCHED AREAS VEHICLE DIRECTIONAL ARROW (NOT PAINTED) VEHICLE PAVEMENT ARROW (PAINTED) Feet 00% Package August, 0 Oak Street Webster Street 0 Pavement Marking and Signage Plan School Street to Webster Street Lic. 0 C.08 - Oak Street to Webster Street 9.

22 Road South th Street Suite 00 Richmond, VA W Brookland Park Boulevard W Brookland Park Boulevard Pavement Marking Legend Description Color BIKE LANE BUFFER HELMETED BICYCLIST SYMBOL AND ARROW For Design See C.0 SHARED LANE MARKING BICYCLE DETECTOR PAVEMENT MARKING CROSSBIKE GREEN BIKE LANE CROSSING WITHOUT CONFLICT PAINT SOLID LINE (") 8 DOUBLE SOLID LINE (" EACH) 9 BIKE LANE STOP BAR (") 0 VEHICULAR STOP BAR (") W Brookland Park Boulevard at PAVEMENT ARROW CROSSWALK LANE MARKING - 0' DASH, 0' GAP (" THICK) LANE MARKING - ' DASH, ' GAP (" THICK) BIKE LANE YIELD LINE SOLID LINE (") PARKING ALLOWED WITHIN HATCHED AREAS Chamberlayne VEHICLE DIRECTIONAL ARROW (NOT PAINTED) VEHICLE PAVEMENT ARROW (PAINTED) Feet - Bike Lanes Match Line - See C.08 W Charity Street 00% Package August, 0 Pavement Marking and Signage Plan W Brookland Park Blvd Chamberlayne Pkwy C.09 Lic. 0 - Webster Street to W Charity Street N Belvidere Street 9.

23 .' * * * ' (MIN.) CAP STEEL PIPE POST TYPICAL SIGN " DIA. STEEL POST (PAINT COLOR SELECTED BY ARCHITECT) LANDSCAPED AREA REFLECTIVE WRAP " DIAMETER SAFE-HIT POST. TYPE CHANNELIZER STYLE. KORMAN PRODUCT PRSHSMA SURFACE MOUNT BASE WITH PIN-LOCK. KORMAN PRODUCT PRSHSMA--BL " " MIN. SURFACE MOUNT WITH PART EPOXY 8.00' 0 PROP CURB OR SWL '-0" '-0" '-0" " ' (TYP.) 0" '-8" " ' (TYP.) " PAINT ' ' ' '-0" '-" '-0" 8'-0" '-0" " LENGTH AS REQUIRED (SEE STRIPING PLAN) '-9" " PAINT '-0" " (TYP.) " '-0" PAINTED STOP LINE South th Street Suite 00 Richmond, VA " " OR " DIA. CONCRETE SUPPORT NOTES.00' " PAINT (TYP.) " LANE " PAINT * * THIS DIMENSION SHALL BE A MINIMUM OF ' FOR ACCESSIBLE SIGNAGE. THIS DIMENSION SHALL BE A MAXIMUM OF 8' FOR ACCESSIBLE SIGNAGE.. UNLESS OTHERWISE NOTED, POSTS TO BE INSTALLED ' FROM BEGINNING AND END OF EACH BIKE LANE BUFFER AND 0' ON CENTER IN AREAS INDICATED ON PLANS. POSTS SHALL NOT BE INSTALLED IN BUS STOP AREAS.. SAFE-HIT POST AND REFLECTIVE WRAP TO BE SAME COLOR. MATCH OR BASED ON PAVEMENT MARKING COLOR OF BUFFER. NOTES:. SEE MUTCD FIGURE B- FOR MORE INFORMATION. NOTES. PAVEMENT MARKINGS TO BE INSTALLED FOR ON SITE WORK IN LOCATIONS SHOWN. Sign Post - Type 'A' N.T.S. Source: VHB REV LD_0 / Vertical Flexible Delineator N.T.S. Source: Korman Signs Inc. Lane Reduction Arrow N.T.S. Source: MassDOT PM- / Painted Pavement Markings - On Site N.T.S. Source: VHB REV LD_ / ' MAX. " MIN. PERPENDICULAR CROSSWALK EDGE ADJACENT LADDER PAINTED CROSSWALK. SEE NOTE. " PAINT LINE " (TYP.) " MIN. - Bike Lanes GREEN PAINT TO MATCH CITY OF RICHMOND STANDARDS ' (TYP.) Bike Sign N.T.S. Source: VHB NOTES ' MAX. " MIN. WIDTH TO MATCH BIKE LANE. REFER TO PLANS. PERPENDICULAR CROSSWALK EDGE 00% Package August, 0. TWENTY-FOUR INCH (") LINES SHALL BE APPLIED IN ONE APPLICATION. NO COMBINATION OF LINES (TWO - INCH LINES, ETC) WILL BE ACCEPTED.. LONGITUDINAL LINES TO BE PARALLEL TO CURBLINE. Details. ALL LINES TO BE THE SAME LENGTH AND PROPERLY ALIGNED.. WHERE ADJACENT TO LADDER PAINTED CROSSWALK, CROSSBIKE STRIPE THICKNESS AND SPACING SHALL MATCH CROSSWALK AND PROVIDE " SEPARATION MINIMUM BETWEEN CROSSBIKE AND CROSSWALK. Crossbike N.T.S. Source: VHB Crosswalk N.T.S. Source: City Charlotte, NC 0. NOTES. SIGN SHALL BE CORRUGATED PLASTIC OR APPROVED EQUAL. C.0 Bike Sign. MOUNT SIGN TO VERTICAL FLEXIBLE DELINEATOR IN A MANNER THAT DOES NOT INHIBIT NORMAL VEHICLE OR BIKE FLOW. MOUNTING HARDWARE SHALL BE PER MANUFACTURER'S RECOMMENDATIONS. Lic. 0 N.T.S. Source: VHB 9.

24 EXISTING ROAD SECTION MEDIAN VARIES EXISTING ROAD SECTION EXISTING CURB Prile View - Existing EXISTING CURB VEHICULAR DRIVEWAY WIDTH VARIES " SKIPS ' DASH, ' GAP PROPOSED ROAD SECTION PROPOSED ROAD SECTION CURBLINE ' BIKE LANE ' BUFFER 8' PARKING TRAVEL LANE VARIES MEDIAN VARIES TRAVEL LANE VARIES 8' PARKING ' BUFFER ' BIKE LANE '-' BIKE LANE SEE PLAN South th Street Suite 00 Richmond, VA EXISTING CURB Prile View - Proposed * EXISTING CURB '-' BUFFER SEE PLAN ' ' MIN. ' ' (TYP) FLEXIBLE DELINEATOR TO MATCH BUFFER COLOR. Bike Lane Driveway Crossing N.T.S. FLEXIBLE DELINEATOR TO MATCH BUFFER COLOR. Source: VHB ' (TYP) BIKE TRAVEL LANE BUFFER 0' (TYP) PARKING SPACES VEHICULAR TRAVEL LANE VEHICULAR TRAVEL LANE PARKING SPACES BUFFER BIKE TRAVEL LANE EXISTING CURB CURBLINE VEHICULAR DRIVEWAY WIDTH VARIES SEE CROSSBIKE DETAIL FOR ADDITIONAL INFORMATION ' (TYP) '-' BIKE LANE SEE PLAN W9-(MOD) Bike Lane Ends Warning Sign 0/ N.T.S. Source: NCUTCD -BIK-0 EXISTING CURB ' ' 8' TRAVEL LANE VARIES MEDIAN VARIES TRAVEL LANE VARIES 8' ' ' '-' BUFFER SEE PLAN Typical Roadway Dimensions and Section Plan View - Proposed * * Note:. SECTION IS TYPICAL AND MAY NOT REPRESENT ACTUAL FIELD DIMENSIONS. ADJUST VEHICULAR TRAVEL LANES AS NEEDED TO MATCH PAVEMENT WIDTH. ALL BIKE LANES SHALL BE ' MINIMUM. ' ' MIN. ' FLEXIBLE DELINEATOR TO MATCH BUFFER COLOR. Bike Lane Street Crossing N.T.S. Source: VHB N.T.S. Source: VHB '-' '-' THERMOPLASTIC (TYP)' " SINGLE PAINTED LINE THERMOPLASTIC SHARED LANE MARKING. FIGURE 9C-9 PER MUTCD STANDARDS REFER TO STRAIGHT ARROW DIMENSIONS SHOWN IN DETAIL ON PLANS. '-0" - Bike Lanes ' 90 ' 0' (TYP) '-0" ' (TYP) VEHICULAR TRAVEL LANE '-' BIKE TRAVEL LANE " " THERMOPLASTIC HELMETED BICYCLIST SYMBOL PER MUTCD STANDARDS '-0" 00% Package August, 0 Details FLEXIBLE DELINEATOR TO MATCH BUFFER COLOR. 0" '-" W9-XX Bike Merge Warning Sign 0/ N.T.S. Source: NCUTCD -BIK-0 Bike Lane Buffer Striping N.T.S. Source: VHB Shared Lane Marking N.T.S. Source: VHB Helmeted Bicyclist and Arrow N.T.S. Source: VHB C.0 Lic. 0 9.

CITY OF RICHMOND, VIRGINIA BIKE LANE

CITY OF RICHMOND, VIRGINIA BIKE LANE CITY OF RICHMOND, VIRGINIA DEPARTMENT OF PUBLIC WORKS TRANSPORTATION ENGINEERING DIVISION BIKE LANE VHB PROJECT NO. 9. INDEX OF SHEETS JAMES RIVER Title SITE Lic. CITY OF RICHMOND NAVTEQ AND Microst Corporati

More information

CITY OF RICHMOND, VIRGINIA

CITY OF RICHMOND, VIRGINIA CITY OF, VIRGINIA DEPARTMENT OF PUBLIC WORKS TRANSPORTATION ENGINEERING DIVISION Main Street and Franklin Street STATE PROJECT NO. EN-7-9, P0, C50, UPC 068 CITY PROJECT NO. 065 AWARD NO. 50009 INDEX OF

More information

CITY OF RICHMOND, VIRGINIA

CITY OF RICHMOND, VIRGINIA CITY OF RICHMOND, VIRGINIA DEPARTMENT OF PUBLIC WORKS TRANSPORTATION ENGINEERING DIVISION Bikeway / Trail - Installation Bike Lanes Throughout the City Between Dock Street and Main Street U000-27-R44,

More information

SECTION TRAFFIC REGULATIONS

SECTION TRAFFIC REGULATIONS SECTION 01550 TRAFFIC REGULATIONS PART 1 - GENERAL 1.01 OBJECTIVES A. The Contractor shall provide for safe movement of vehicular, bicycle and pedestrian traffic, including persons with disabilities in

More information

0 CITY OF SANTA ANA 0

0 CITY OF SANTA ANA 0 : A traffic control plan (Plan) is required whenever work is to be performed within the public right-of-way and is deemed necessary by the City of Santa Ana's (City) Traffic Engineer. Work cannot start

More information

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS DEPARTMENT OF ENVIRONMENTAL SERVICES ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS MAY 2017 Table of Contents 1. General... 2 2. Design Criteria... 3 3. Marking Plan Preparation... 4 Exhibits... 5 MK

More information

APPENDIX G SIGNAGE AND STRIPING SUPPLEMENT

APPENDIX G SIGNAGE AND STRIPING SUPPLEMENT APPENDIX G SIGNAGE AND STRIPING SUPPLEMENT DOUGLAS COUNTY SIGNAGE AND STRIPING SUPPLEMENT TO DOUGLAS COUNTY ROADWAY DESIGN & CONSTRUCTION STANDARDS UPDATED MAY 2018 TABLE OF CONTENTS 1.00: GENERAL REQUIREMENTS...

More information

CHAPTER 1 STANDARD PRACTICES

CHAPTER 1 STANDARD PRACTICES CHAPTER 1 STANDARD PRACTICES OBJECTIVES 1) Functions and Limitations 2) Standardization of Application 3) Materials 4) Colors 5) Widths and Patterns of Longitudinal Pavement Marking Lines 6) General Principles

More information

Appendix Work Zone Traffic Control

Appendix Work Zone Traffic Control ppendix Work Zone Traffic Control The purpose of this appendix is to present basic guidelines for work zone traffic control and to supplement the Highway Work Zone Safety Checklist. This appendix presents

More information

l Civil Engineering Group of PSRA Techn ical Plan Review Team. '\J \

l Civil Engineering Group of PSRA Techn ical Plan Review Team. '\J \ GOVERNMENT OF THE DISTRICT OF COLUMBIA District Department of Transportation Public Space Regulation Administration PSRA.. *.. d ~ oc == *. * GENERAL TRAFFIC CONTROL PLAN (TCP) SUBMITTAL GUIDELINES 18

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

2017 Temporary traffic control guidelines for pedestrians. v.2

2017 Temporary traffic control guidelines for pedestrians. v.2 2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

ADA PRESENTATION (CURB RAMPS)

ADA PRESENTATION (CURB RAMPS) ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly

More information

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions This treatment provides a transition from two-way separated bike lanes to one-way

More information

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS 'HYHORSPHQW (QJLQHHULQJ 5LFKDUGV %OYG UG )ORRU 6DFUDPHQWR &$ Phone: 916-808-8300 Fax: 916-808-1984 (QJLQHHULQJ 6HUYLFHV 'LYLVLRQ CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

More information

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION A draft traffic control plan, consistent with the following applicable conditions, must be included in every permit application submitted to the City of

More information

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 2011 Edition - Revision 2 Page 275 Section 2G.01 Scope CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 01 Preferential lanes are lanes designated for special traffic uses such as high-occupancy vehicles

More information

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION ATTACHMENT NO. 11 RRLRT No. 2 TECHNICAL COMMITTEE: TOPIC: Railroad / Light Rail Transit Technical Committee Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police

More information

NO PARKING ZONE, YELLOW CURB (OPTIONAL) Z 8 20 MIN. 8 Z (SEE SHEET 2) 4" WHITE "X" (TYP.),(OPTIONAL) TYPE I NO PARKING ZONE, YELLOW CURB (OPTIONAL) Z 8 20 20 ALL SPACES 22 MIN., 26 MAX. EACH Z TYPE II

More information

City of Turlock Traffic Calming Program

City of Turlock Traffic Calming Program Table of Contents Introduction... 3 Definitions... 3 Purpose... 3 Goals and Objectives... 3 Policy Statements... 4 Minimum Qualifying Criteria... 6 Traffic Calming Request Process... 7 Step No. 1: Complete

More information

Bases, Ballasts, and Paving

Bases, Ballasts, and Paving Sections Included In This Standard: 1.1 Paving and Surfacing 1.2 Protection of the Work 1.3 Repair of Pavement 1.4 Pavement Marking 1.1 PAVING AND SURFACING A. DESIGN REQUIREMENTS 1. Applicable Design

More information

Revisions to Larimer County Urban Area Street Standards (2016 Update)

Revisions to Larimer County Urban Area Street Standards (2016 Update) 1.9.2 B 1-18 Street Construction Policy 1.14 (new) 1-29 Complete Streets in Fort Collins 4.1.1 04-01 General 4.1.3 04-01 Capacity and Safety Issues 4.1.3 B 04-02 Pedestrian Traffic Considerations 4.1.4

More information

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017 Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017 Purpose of Meeting Why are we here? Project Recap/Updates Project Limits/Segments Road Diet Concept Lessons Learned

More information

Application for Temporary Street/Sidewalk Closure Permit

Application for Temporary Street/Sidewalk Closure Permit Application for Temporary Street/Sidewalk Closure Permit Please Return To: City of Charlottesville Department of Neighborhood Development Services P.O. Bo 911, City Hall Charlottesville, VA 22902 Telephone

More information

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION 2011 Edition Page I-1 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION 01 Traffic control devices shall be defined as all signs, signals, markings, and other devices used to regulate, warn, or guide

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL SECTION 900 TRAFFIC CONTROL STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL Section Number Title 901 GENERAL 902 MATERIALS, EQUIPMENT, AND

More information

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need

More information

SOUTH MAIN STREET ROUTE 28

SOUTH MAIN STREET ROUTE 28 PLOTTED 10/0/016 10:4:46 AM \\vhb\proj\worcester\1148.00\cad\ts\planmisc\aerial Crossing\Aerial Crossing Plan View.dwg 1 0 NO REVISIONS AND RECORD OF ISSUE HORIZ. SCALE VERT. SCALE ROUTE 8 ENGINEER CHECKED

More information

Ohio Department of Transportation Edition of the OMUTCD It s Here!

Ohio Department of Transportation Edition of the OMUTCD It s Here! Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director 2012 Edition of the OMUTCD It s Here! June 6, 2012 Here are reasons why we have a Manual of Uniform Traffic Control Devices

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY 4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Development Engineering 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 Engineering Services Division REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Phone: 916-808-8300 Fax: 916-808-1984 Preparation

More information

(This page left intentionally blank)

(This page left intentionally blank) (This page left intentionally blank) 2011 Edition - Revision 1 Page 553 Section 5A.01 Function CHAPTER 5A. GENERAL 01 A low-volume road shall be defined for this Part of the Manual as follows: A. A low-volume

More information

COMPLETE STREETS DURING CONSTRUCTION

COMPLETE STREETS DURING CONSTRUCTION COMPLETE STREETS DURING CONSTRUCTION MAINTAINING ACCESSIBILITY FOR ALL Presented by Robbie Burgess, P.E., PTOE Associate Principal Construction Services Manager Howard Stein Hudson rburgess@hshassoc.com

More information

NO LATER THAN ONE WEEK BEFORE YOUR PROPOSED CLOSURE START DATE

NO LATER THAN ONE WEEK BEFORE YOUR PROPOSED CLOSURE START DATE Application for Temporary Street/Sidewalk Closure Permit Please submit approimately one week before proposed closure. Please Return To: City of Charlottesville Department of Neighborhood Development Services

More information

Traffic Control Devices

Traffic Control Devices 533372 Highway Engineering Traffic Control Devices Traffic Control Devices o The media by which traffic engineers communicate with drivers o Every traffic law, regulation, or operating instruction must

More information

City of Margate, Florida. Neighborhood Traffic Management Manual

City of Margate, Florida. Neighborhood Traffic Management Manual City of Margate, Florida Neighborhood Traffic Management Manual Table of Contents Page No. I. INTRODUCTION... 1 II. TRAFFIC CALMING REQUEST AND PROCESSING PROCEDURES... 2 1. COMPLETE AND SUBMIT PROJECT

More information

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS 1.0 INTRODUCTION 1.1 Purpose The Southern California Regional Rail Authority (SCRRA) is the designated track owner of the Metrolink

More information

Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE

Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE ADA Ramp Construction Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE Agenda Opening Statements/Welcome PROWAG, ADAAG, INDOT and DPW Standards Inspector

More information

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018 REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL Ginger Quinn & Paul Kelley April 11, 2018 ADA & District Traffic Engineer Added in various sections Work Zone Pedestrian and Bicycle Guidance document VDOT

More information

PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES TABLE OF CONTENTS

PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES TABLE OF CONTENTS 2006 Edition Page TC9-1 PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES TABLE OF CONTENTS SECTIONS CHAPTER 9A. Section 9A.01 Section 9A.02 Section 9A.03 Section 9A.04 Section 9A.05 Section 9A.06 Section

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

PUBLIC WORKS DEPARTMENT SIGN AND MARKING PROCEDURES AND GUIDELINES

PUBLIC WORKS DEPARTMENT SIGN AND MARKING PROCEDURES AND GUIDELINES PUBLIC WORKS DEPARTMENT SIGN AND MARKING PROCEDURES AND GUIDELINES 2015 FORWARD The Revised Code of Washington (RCW) 47.36, Traffic Control Devices, requires the Washington State Department of Transportation

More information

TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS

TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS PART 5. TRAFFIC CONTROL DEVICES FOR LOW VOLUME ROADS TABLE OF CONTENTS Chapter 5A. GENERAL Page Section 5A.1 Function............................................................... 5A-1 5A.2 Application............................................................

More information

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Page 634 2009 Edition Notes for Figure 6H-1 Typical pplication 1 Work eyond the Shoulder 1. If the work space is in the median of a divided

More information

Tract or Parcel Project Name PCN Checked By Date

Tract or Parcel Project Name PCN Checked By Date Tract or Parcel Project Name PCN Checked By Date City of Escondido Public Works Department Signing & Striping Plan Review Checklist The following checklist is a guideline for new CIP and development construction

More information

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT

Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT OVERVIEW This chapter describes a cohesive set of strategies to create a bicycle boulevard, namely to make streets safer and more efficient for bicycle

More information

MUTCD Part 6: Temporary Traffic Control

MUTCD Part 6: Temporary Traffic Control MUTCD Part 6: Temporary Traffic Control OMUTCD English units are preferred. OHIO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES TABLE OF CONTENTS PREFACE INTRODUCTION TABLE OF CONTENTS PART 1. GENERAL Chapter

More information

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE Virginia Supplement to the 2009 MUTCD Revision 1 Page TC-3-1 PART 3. MARKINGS CHAPTER 3A. GENERAL PAGE Section 3A.01 Functions and Limitations Section 3A.02 Standardization of Application Section 3A.03

More information

Military Road Safety Improvements

Military Road Safety Improvements Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and

More information

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need

More information

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones Designing Pedestrian Facilities for Accessibility Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in s Maintenance of Accessible Features Title II (28 CFR 35.133(a))

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan

Appendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan Appendix A Knoxville TPO Greenway Signage Guidelines 75 Overview: Adequate signing and marking are essential on shared-use paths, especially to alert bicyclists to potential conflicts and to convey regulatory

More information

ADA Operations Contact Info

ADA Operations Contact Info Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us

More information

SCOPE Application, Design, Operations,

SCOPE Application, Design, Operations, SCOPE Application, Design, Operations, Maintenance, etc.: Typical Traffic Control Signals Pedestrian Hybrid Beacons Emergency Vehicle One-Lane/Two-Way Facilities, Freeway Entrance Ramps, and Movable Bridges

More information

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions Section 3A.04 Colors Markings shall be yellow, white, red, or blue, or purple. The colors for markings shall conform to the standard highway colors. Black in conjunction with one of the above colors shall

More information

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 6H. TYPICAL APPLICATIONS 2006 Edition Page 6H-1 CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. Standard: The

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

ADDENDUM NUMBER ONE (1) For

ADDENDUM NUMBER ONE (1) For ADDENDUM NUMBER ONE (1) For OCCOQUAN REGIONAL PARK MULTIPURPOSE TRAIL Recreation Trails Program (RTP) Federal Highway Administration (FHWA) CFDA Number: 20.219 State Project Number: VRT-301 In Lorton,

More information

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018 El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives

More information

Traffic Control Inspection Checklist Segment:

Traffic Control Inspection Checklist Segment: Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS PUBLIC WORKS DEPARTMENT 2015 REVISION 1-2016 REVISION SUMMARY - MARCH 2016 Introduction 1.05 - Specifications for Traffic Control Devices Temporary Traffic

More information

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1 WHITE EPOXY REFLECTORIZED PAVEMENT STRIPES, 20 MILS ITEM 685.11 (FT) CL STATION ALIGN FROM TO SIDE DESCRIPTION FACTOR LENGTH (FT) E 18+62 62 18+79.19 RT STOP BAR 6 16.6 99.4 E 18+55 00 20+08.00 LT B KE

More information

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: CHAPTER 6H. TYPICAL APPLICATIONS Chapter 6G contains discussions of typical temporary traffic control activities. Chapter 6H presents typical applications for

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES

WORK ZONE TRAFFIC CONTROL PROCEDURES WORK ZONE SETUP / REMOVAL WORK ZONE TRAFFIC CONTROL PROCEDURES When installing a work zone, install the advance warning signs on all approaches prior to installing the traffic control devices. Perform

More information

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. 15-031 WHEREAS, Transportation Code Division II, Section 909 authorizes the Director of Transportation to install and permit

More information

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE May 2006 Street and Utility Repairs Work Area Protection Guide TABLE OF CONTENTS 1. Introduction... 1 2. Typical Applications... 11 2.1 Use of Hand-Signaling

More information

TEMPORARY OCCUPANCY PERMITS. Street Space, Additional Street Space and Temporary Occupancy Permits PUBLIC WORKS CODE : ARTICLE 15, SEC.

TEMPORARY OCCUPANCY PERMITS. Street Space, Additional Street Space and Temporary Occupancy Permits PUBLIC WORKS CODE : ARTICLE 15, SEC. TEMPORARY OCCUPANCY PERMITS Street Space, Additional Street Space and Temporary Occupancy Permits PUBLIC WORKS CODE : ARTICLE 15, SEC. 724 Difference between the 3 permits. Who would apply for the permit?

More information

F L E T C H E R A V E N U E

F L E T C H E R A V E N U E Jan. 29, 2014 Introduction F L E T C H E R A V E N U E FDOT Local Agency Program (LAP) Project FPN: 428214-1-58-01 CIP 63090 Hillsborough County, Traffic Engineering, PWD Stake holders and partners are

More information

Traffic Calming Policy

Traffic Calming Policy City of Friendswood Traffic Calming Policy May 2012 Community Development Department Table of Contents Title Page Table of contents... 1 Background and History... 2 Purpose and Goals... 2 City Procedure

More information

SECTION 3 STREET DESIGN

SECTION 3 STREET DESIGN 3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

Pedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team

Pedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team Impact of the New MUTCD on Pedestrians and Bicyclists Bruce Friedman and Scott Wainwright FHWA MUTCD Team Development of the 2009 MUTCD NPA published in the Federal Register on January 2, 2008 Received

More information

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS 4901 GENERAL: These criteria shall be adhered to for the design of all publiclyfinanced or privately-financed traffic signal systems to be installed in the

More information

Chapter V TRAFFIC CONTROLS. Tewodros N.

Chapter V TRAFFIC CONTROLS. Tewodros N. Chapter V TRAFFIC CONTROLS www.tnigatu.wordpress.com tedynihe@gmail.com Lecture Overview Traffic markings Longitudinal markings Transverse markings Object markers and delineator Traffic signs Regulatory

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

Temporary Traffic Control for Highway Work Zones

Temporary Traffic Control for Highway Work Zones Temporary Traffic Control for Highway Work Zones MONTHLY DELMARVA MISS UTILITY MEMBER MEETING MARCH 20, 2014 PRESENTED BY: Adam Weiser, P.E. PTOE Safety Programs Manager Delaware Department of Transportation

More information

INTERSECTION WITH RIGHT TURN TAPER

INTERSECTION WITH RIGHT TURN TAPER (TYP.) TAPER 4" BROKEN INTERSECTION WITH RIGHT TURN TAPER 4" SOLID WHITE 4" BROKEN ARROW & LEGEND MARKINGS (SEE NOTE 2) INTERSECTION WITH RIGHT TURN LANE Notes: 1. Paint intersection tapers greater than

More information

On Monday, December 12, 2011, you will be briefed on Pavement Markings. The material is attached for your review.

On Monday, December 12, 2011, you will be briefed on Pavement Markings. The material is attached for your review. Memorandum CITY OF DALLAS DATE December 9, 2011 TO subject Honorable Members of the Transportation & Environment Committee: Linda Koop (Chair), Sheffie Kadane (Vice Chair), Pauline Medrano, Vonciel Jones

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT 5.1 General items 5.1.1 Alignment Are the roadworks located safely with respect to horizontal and vertical alignment? If not, does works signing cater for this?

More information

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS

STAKING TRAFFIC CONTROL SIGNAL SYSTEMS Locating the components of a traffic control signal is not an exact science; many factors influence the location of the components. These factors include: lane widths, radii, pedestrian curb ramp requirements,

More information

Minnesota Manual on Uniform Traffic Control Devices

Minnesota Manual on Uniform Traffic Control Devices Minnesota Manual on Uniform Traffic Control Devices MN MUTCD January 2014 MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES MN MUTCD January 2014 Minnesota Department of Transportation Office of Traffic,

More information

MEMORANDUM Ashford Dunwoody Road: Request to waive right of way dedication requirements of Sec

MEMORANDUM Ashford Dunwoody Road: Request to waive right of way dedication requirements of Sec MEMORANDUM To: From: Mayor and City Council Michael Smith, Public Works Director Date: October 13, 2014 Subject 4400 Ashford Dunwoody Road: Request to waive right of way dedication requirements of Sec.

More information

Pedestrian Accommodation in Work Zones:

Pedestrian Accommodation in Work Zones: Pedestrian Accommodation in Work Zones: A Field Guide February 2018 Work Zone Safety Consortium This material is based upon work supported by the Federal Highway Administration Grant Agreement DTFH61-13-H-00025

More information

Paul Vraney Bureau of Project Development 02/11/2016

Paul Vraney Bureau of Project Development 02/11/2016 Paul Vraney Bureau of Project Development 02/11/2016 ADA background & alterations definition Design considerations Provide sufficient layout data Curb ramp selection Maximum curb ramp and gutter slopes

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

Work Zone Traffic Safety

Work Zone Traffic Safety Work Zone Traffic Safety Summary The Hazard: death or serious injury from being struck by vehicles or equipment in work zones. Who is at risk: streets/highways, utilities and other public works department

More information

Section 9A.07 Meaning of Standard, Guidance, Option, and Support

Section 9A.07 Meaning of Standard, Guidance, Option, and Support 2012 Edition Page 895 PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES CHAPTER 9A. GENERAL Section 9A.01 Requirements for Bicyclist Traffic Control Devices 01 General information and definitions concerning

More information

Road Usage Permit Application Form

Road Usage Permit Application Form 15/06/2012 Road Usage Permit Application Form City Yards 1495 Hardy Street Kelowna, BC V1Y 7W9 Tel: (250) 469-8600 Fax: (250) 862-3330 PERMITS WILL BE APPROVED OR DECLINED WITHIN 5 BUSINESS DAYS. WORK

More information