1 Sports Network Needs Analysis Report Point England Reserve Parks, Sport and Recreation (PSR)

2 [Pt England Reserve] 2 P a g e

3 1 Document control 1.1 Document history Version Date Update by Update details Judi Longdill Document Creation Paul Dabbs Executive summary updated Paul Dabbs Document updated 1.2 Associated documents Version Date Document name and storage location Quantifying the Supply and Demand for Winter Sports fields in the Auckland Region 1.3 Distribution Title Name 1.4 Document review Role Name and signature Date Principal Sports Parks Advisor Grant Jennings Comments: 3

4 Point England Reserve s Role in the Sportsfield Network Executive summary Point England Reserve is a large reserve located on the banks of the Tamaki Estuary at 254 Point England Road, Point England. It provides for both active and passive recreation. There are six full sized sports fields on the southern side of the reserve. Formed walkways through the reserve provide access to the Wai-o-taiki Nature Reserve and through to Tahuna Torea Reserve. The Sports fields a. Winter use The winter playing capacity (useable hours) of the six fields has been assessed at 44hrs per week. The six fields are all soil based. Currently none of the fields has floodlighting. Five of the six fields are assigned to football and one to rugby league. In addition to the six main fields, the current configuration allows four junior fields and a practice to be provided. Playing capacity on these fields is not factored into the calculations provided below. b. Summer use There are four cricket / kilikiti wickets at Point England Reserve. Kilikiti is an important element of Pacific Island culture with many teams and competitions church based. The nature of the game and how it is played means that many sports parks are either too small or unsuitable due to the close proximity of residential neighbours. Winter sports field provision in central east Auckland Auckland Council has undertaken significant demand analysis in recent years quantifying the demand for winter sports fields to This study divided the Auckland Region into 67 geographic analysis areas, with Point England Reserve located within the Panmure Glen Innes analysis area. The 2025 projections for Central East Auckland below shows the projected capacity shortfall based on 2014/15 field capacities including Point England Reserve Capacity surplus / shortfall in FFE hours per week Year Weekend Weekday Full week Sports Infrastructure Development (SID) (Short term) - Central East Auckland This programme in Central east Auckland aims to deliver hours per week playing capacity by This figure includes the planned upgrade of one of the Point England Reserve fields to sand carpet and floodlights. If the six Point England Reserve fields were not available, the total would be reduced by 55 hours per week, comprising 44 hours of current capacity reduction and 11 hours that would be provided through the SID Programme and sportfield upgrades. 4

5 If only some of the Point England Reserve fields were available, the loss of playing capacity would be broadly proportionate to the amount of land available, acknowledging that the present configuration also provides four junior football fields and a practice field, which may not be available with a tighter configuration. Options for further capacity increase beyond 2025 Central East Auckland A significant shortfall is expected beyond 2025 increasing to 139 hrs of additional hours required between 2025 and An assessment of the potential for additional capacity increase across the 17 Auckland Council owned sports parks in Central East Auckland shows that many of the parks have been, or will be through the SID programme, developed to capacity. There may be potential for artificial turf to be installed in some parks, although this is becoming increasingly difficult. Potential future capacity from sand carpet and floodlight upgrades is: Sports Park Area Potential project Additional capacity hours per week Comments Total potential capacity excluding Point England Reserve 76 Point England Panmure 5 x sand + lights 60 Total potential capacity including Point England 136 Alternatives for summer sport As noted earlier Point England Reserve has 4 wickets used extensively for kilikiti and cricket. There is no potential within existing sports parks for wickets displaced from Point England Reserve. Ethnic projections for the Maungakiekie-Tamaki show the Pacific Island population increasing by 42%, from 19,450 in 2013 to 27,700 by This indicates a likely increasing demand for kilikiti wickets in the area. Summary Providing Point England Reserve is retained, the additional capacity at this and other sports parks within Central East Auckland could, when fully developed with optimal infrastructure, meet projected demand to If Point England Reserve is no longer available, additional capacity in other sports parks within Central East Auckland will meet projected winter demand until around 2033/34 with the projected shortfall growing to around 130 playable hours per week by There is no potential within existing sports parks for summer wickets displaced from Point England Reserve to be relocated for either capacity or size and scale reasons. 5

6 1. Background Point England Reserve is a large reserve located on the banks of the Tamaki Estuary at 254 Point England Road, Point England. It provides for both active and passive recreation. There are six full sized sports fields on the southern side of the reserve. Formed walkways through the reserve provide access to the Wai-o-taiki Nature Reserve and through to Tahuna Torea Reserve. The purpose of this report is to assess the impact on the sports field network and sporting activities should the sports fields no longer be available for use. 2. The Sports fields The six fields are all soil based. Currently none of the fields is floodlit. a. Winter use The winter playing capacity of the six fields has been assessed at: 44 full field equivalent (FFE) hours per week, comprising, o 36 hours for weekend play (mainly competition games) o 8 hours for midweek use This is the level of play the fields can withstand during a normal winter without sustaining long term damage. Currently 5 of the 6 fields are assigned to football and 1 to rugby league. Auckland Football Federation and Auckland Rugby League schedule competition games on the fields at weekends. College Sport uses all 5 football fields one afternoon a week for their girls football competition. In addition to the six main fields, the current configuration allows four junior fields and a practice to be provided. Playing capacity on these fields is not factored into the calculations provided below. b. Summer use There are four cricket / kilikiti wickets at Point England Reserve. The wickets are used extensively both during the week and at weekends, mainly for cricket and kilikiti. Summer 2015/16 use of wickets at Point England Reserve Wicket 2015 Use 1 Auckland University Cricket Club training Auckland University Cricket Club midweek twilight cricket competition Auckland Cricket Association weekend games Counties Manukau Kilikiti Association competition Eagles Kilikiti summer tournament Ellerslie Rugby League Club pre-season training 6

7 Summer 2015/16 use of wickets at Point England Reserve (cont) Wicket 2015 Use 2 Auckland University Cricket Club training Counties Manukau Kilikiti Association competition Eagles Kilikiti competition Rock of All Ages Kilikiti training weekdays and weekends Top Flight Football Academy junior training 3 Counties Manukau Kilikiti Association competition Eagles Kilikiti competition Rock of All Ages Kilikiti training Presbyterian Church of Aotearoa Kilikiti training and competition 4 Auckland University Cricket Club training Auckland University Cricket Club midweek twilight cricket competition Auckland Cricket Association weekend games Eagles Kilikiti tournament and training As shown in the table above Point England Reserve is a key kilikiti park. Kilikiti is an important element of Pacific Island culture with many teams and competitions church based. Tournaments usually run all day for several days and attract very large crowds. Teams usually train intensively for several months prior to tournaments. The nature of the game and how it is played means that many sports parks are either too small or unsuitable due to the close proximity of residential neighbours. With the growth of summer sport it is becoming increasingly difficult to accommodate kilikiti needs. 3. Winter sports field provision in central east Auckland Auckland Council has undertaken significant demand analysis in recent years to quantify the demand and supply of sports fields across the region, with the 2014 Supply and Demand Study quantifying the demand for winter sports fields to This study divided the Auckland Region into 67 geographic analysis areas, with Point England Reserve located within the Panmure Glen Innes analysis area. Sports fields are not evenly distributed around the region nor does the distribution match the distribution of demand. Fields are managed as a network and it is accepted that a capacity shortfall in one area can be accommodated by a capacity surplus in another area providing the travel distance or time is not too great. The aim is to provide capacity within a 15 minute peak time drive, although it is acknowledged that, especially within in the central isthmus, this is not always achievable. The southern motorway is a major physical barrier that separates the eastern and western areas of the central isthmus. Six analysis areas make up the wider central eastern area Ellerslie, Remuera, Eastern Bays, Meadowbank St Johns, Panmure Glen Innes and Mt Wellington Mt Richmond. 7

8 Although peak demand travel time between fields in distant areas exceeds 15 minutes the six areas can be considered as a wider network, providing it is accepted that some players will have to travel further. In Central East Auckland there are: 19 sports parks available for community use in winter 17 of these sports parks are owned and managed by Auckland Council 2 sports parks College Rifles Park and Bill McKinlay Park are owned and/or managed by sports club trusts The 17 parks contain 64 fields of varying sizes equivalent to full size fields In 2014, the sports fields provided for 869 hours play per week, comprising 257 hours per week for weekend play (mainly competition) and 612 hours mid week (mainly for training). Note these figures do not include weather related closures. The Point England Reserve fields contribute 44 hours of this playing capacity per week, comprising 36 hours for weekend play and 8 hours for mid week play Projected Supply and Demand Central East Auckland Future demand for sports fields will be impacted by population growth, any changes in sport participation levels and the way winter sport is played. The 2025 projections provided by Auckland Transport Model, Scenario I, Version 8b, November 2013 and used in the 2014 Supply and Demand Study, were based on provision in the Proposed Unitary Plan for intensification in the east of the central isthmus under the medium population growth scenario. The growth projections were from a 2006 base and made no account for the 2013 census. The ART Model did not reflect political decisions made through the Proposed Auckland Unitary Plan. Once capacity added in the 2014/15 year through the Sports Field Capacity Development (SFCD) Programme is included, the 2025 projections for Central East Auckland were for a weekly capacity: shortfall of -252 hours per week, comprising: o shortfall of -140 hours for weekend play o shortfall of -112 hours for weekday play 5. Updated demand modelling Central East Auckland Further modelling has been undertaken to review projections for 2025 and calculate projected demand in 2035 and The basis of this modelling is: Participation rates will remain as projected for 2025 with demand from 2025 and 2045 based on population growth only Demand is based on winter sport and a similar mix of codes as in

9 Winter sport will continue to be played in the same manner as currently, i.e., field sizes, game lengths, training requirements and the timing of each code s playing season will continue as now School demand for community fields will continue at 2014 levels Updated medium growth population projections from Auckland Transport Model Scenario I, Version 9, August These projections re-base forecasts to 2013 estimated residential populations, resulting in an increase of around 2% in the 2013 baseline population for the central east area. Whilst the overall regional population projections remain similar to the previous Model Version there are differences in the spread of growth around the region, including the Central East area where the updated projections are for a 2025 active age (5 to 49 years) population of 97,930, down from 106,568 under the earlier projections. Population projections have been adjusted for the population ageing factor by applying New Zealand Statistics updated Census Area Unit (CAU) projections by age and sex 2013(base) 2043 across the Auckland Transport Model projections. There are a number of limitations to the updated sports field supply and demand modelling: The August 2015 population forecasts are based on 2013 Estimated Residential Population as at June 2013 these figures include an estimate for those people overseas on census night. The November 2013 forecasts did not include these people and therefore generally understated the base line population, by around 2%. The analysis areas used in the 2014 supply and demand study were based on aggregated Census Area Units The updated Auckland Transport Model projections are not provided at CAU level, rather only on Transport Zones the boundaries of which do not always align to the supply and demand study analysis area boundaries Where transport zone boundaries do not exactly align to analysis area boundaries the projected population has been apportioned to the analysis areas based on an estimation of the geographical size of the area and whether the area is residential or not The updated population ageing effect adjustment could only be done at analysis area level, not CAU as previously Special Housing Areas (SHA) regulated since the population projections were run in August 2015 may not be included if the level of intensification and growth was not already included in later years Due to these changes and limitations the projections in this report are indicative only 9

10 and 2045 Population Projections Central East Auckland The table below shows the active age population projections through to These show an increase of 53.4% or 42,748 on the 2014 estimated population Year Active age population / estimate / projection % change on 2014 base 2014 baseline 79, based on previous projections 106, % 2025 based on updated projections 97, % , % , % and 2045 Projected Demand Central East Auckland Projected demand based on the above population projections is for: Year Weekend play Hours per week Weekday play Hours per week Full week Hours per week 2025 based on previous projections based on updated projections and 2045 Projected Capacity Surplus / Shortfall Central East Auckland The table below shows the projected capacity surplus / shortfall based on 2014 field capacities (including Point England Reserve) and updated to include capacity increase projects undertaken through the Sports Field Capacity Development (SFCD) Programme since Capacity surplus / shortfall in FFE hours per week Year Weekend Weekday Full week 2025 based on previous projections based on updated projections Sports Infrastructure Development (SID) Programme - Central East Auckland The SFCD Programme was updated in 2015 to reflect the outcome of the 2014 supply and demand study. This programme, now called the Sports Infrastructure Development (SID) Programme aims to deliver hours per week playing capacity by This figure includes the planned upgrade of one of the Point England Reserve fields to sand carpet and floodlights. This capacity is supplemented by a further 48 hours of community access on the two artificial turfs at Ngahue Reserve negotiated with Oceania Football, resulting in a total addition of hours. 10

11 If the six Point England Reserve fields were not available, the total would be reduced by 55 hours per week to hours, comprising 44 hours current capacity and 11 hours that would be provided through the SID Programme. If only some of the Point England Reserve fields were available, the loss of playing capacity would be broadly proportionate to the amount of land, acknowledging that the present configuration also provides four junior football fields and a practice field, which may not be available with a tighter configuration. SID Programme (including Point England Reserve) Year Sports Park Project Full week 2017 Colin Maiden Park 2 fields sand carpet + floodlights Orakei Domain 1 field sand carpet Crossfield Reserve 1 field floodlights Point England Reserve 1 field sand carpet + floodlights Colin Maiden Park 4 fields sand carpet + floodlights Colin Maiden Park 3 fields sand carpet + floodlights Ellerslie Domain 1 x half field lights Shore Rd Reserve 2 new fields sand carpet + floodlights Mt Wellington WM 2 fields sand carpet + floodlights Sir Wolf Fisher Park 1 field sand carpet + floodlights Thomas Bloodworth New DTA sand carpet + lights Hamlin Park 1.5 fields floodlights Liston Park 2.5 fields sand carpet + floodlights 31 Total in SID Programme including Pt England Total excluding Pt England current and planned capacity Ngahue Reserve Community access to 2 artificial turf fields developed by Oceania Football 48* Total capacity increase including Pt England * Total capacity increase excluding Pt England *Note: At the time the programme was developed community access to Ngahue Reserve was expected to be 21 hours per week, resulting in provision of hours capacity against a shortfall of 252 hours. 10. Planned capacity increase versus projected shortfall Central East Auckland a. Retention of Point England Reserve Based on the current SID Programme, retention of Point England Reserve and updated 2025 projections, planned capacity increase projects will provide sufficient capacity until around 2031/32. At that time a further: 40 hours will be required by hours will be required by

12 b. Point England Reserve not available If Point England Reserve was not available for community sport, based on the SID Programme and updated 2025 projections, planned capacity increase projects will provide sufficient capacity to around 2027/28. At that time a further: 95 hours will be required by hours will be required by 2045 Year Shortfall capacity SID including Pt England Net surplus / shortfall SID excluding Pt England Net surplus / shortfall previous projections updated projections additional additional Options for further capacity increase Central East Auckland An assessment of the potential for additional capacity increase across the 17 Auckland Council owned sports parks in Central East Auckland shows that many of the parks have been, or will be through the SID programme, developed to capacity with sand carpet fields and floodlights. There may be potential for artificial turf to be installed in some parks, although this is becoming increasingly difficult. Potential future capacity from sand carpet and floodlight upgrades is: 136 hours per week if Point England Reserve is retained 76 hours if Point England Reserve is no longer available Further options for increasing capacity (excludes current SID Programme and artificial turf) Sports Park Area Potential project Additional capacity FFE Comments Bert Henham Mt Wellington 1 x sand carpet 6 Hamlin Park Mt Wellington 0 In SID programme McManus Park Mt Wellington 0.25 x sand + lights 2 May not be cost effective Mt Richmond Mt Wellington 1 x sand + lights 11 Sir Wolf Fisher Panmure 0 In SID programme Mt Wellington WM Panmure 1 x lights 5.5 Is premier no 1 field Mt Wellington WM Panmure 3.25 sand + lights 31.5 Thompson Park Mt Wellington 1.5 x sand; 1 x lights 10 Crossfield Park Eastern Bays 5 x lights 10 All fields included as sand and high capacity although not lit.? cost effectiveness of lighting Ellerslie Domain Ellerslie 0 Fields already high capacity Glover Park Eastern Bays 0 Full developed Liston Park Panmure 0 In SID programme Madills Farm Eastern Bays 0 Fields already sand, further 12

13 lighting considered difficult Michaels Ave Ellerslie 0 Fully developed Orakei Domain Eastern Bays 0 In SID programme Shore Road Remuera 0 In SID programme Thomas Bloodworth Remuera 0 In SID programme Sports Park Area Potential project Additional capacity FFE Comments Colin Maiden St Johns 0 In SID programme Total potential capacity excluding Pt England Reserve 76 Point England Panmure 5 x sand + lights 60 Total potential capacity including Point England Meeting projected shortfall with further capacity increase projects Providing Point England Reserve is retained the additional capacity this and other sports parks within Central East Auckland could provide when fully developed with sand carpet and floodlights will meet projected demand to If Point England Reserve is no longer available, additional capacity in other sports parks within central east Auckland will meet projected winter demand until around 2033/34 with the projected shortfall growing to around -130 hours by Impact of developing all fields to sand carpet and floodlights Net shortfall before further capacity added Pt England retained Pt England not available updated Net shortfall after further capacity added Pt England retained Pt England not available Artificial turf fields Artificial turf fields could be developed to accommodate the -130 hour projected shortfall. For planning purposes, artificial turf fields are allocated a 40 hour per week capacity for community use. The -130 hour shortfall has been based on all fields being upgraded to sand carpet and floodlights at an average capacity of 18 hours per week. Each artificial turf will therefore provide an additional 22 hours per week. On this basis 6 artificial turf fields would be needed. This would make a total of 9 artificial turf fields, or 15% of the full field equivalent fields in the Central East Area. 13

14 14. Alternatives for summer sport As noted earlier Point England Reserve has 4 wickets used extensively for kilikiti and cricket. As the table below shows all sports parks large enough to cater for kilikiti are already being fully utilised for cricket and/or kilikiti or other summer codes. There is no potential within existing sports parks for wickets displaced from Point England Reserve. Potential for cricket and kilikiti wickets on large parks Area Sports Park Current summer use Comment St Johns Colin Maiden Park 5 wickets, 3 cricket nets No further space Ellerslie Michaels Avenue 3 cricket wickets No further space Eastern Bays Orakei Domain 3 cricket wickets, lacrosse No further space Remuera Shore Rd + extension 2 cricket wickets No further space Eastern Bays Crossfield Reserve 4 baseball diamonds No further space Eastern Bays Glover Park 4 cricket wickets, athletics No further space Panmure Mt Wellington WM 5 cricket & 1 kilikiti wickets No further space Ethnic projections for the Maungakiekie-Tamaki show the Pacific Island population increasing by 42%, from 19,450 in 2013 to 27,700 by This indicates a likely increasing demand for kilikiti wickets in the area. 14

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants IPWEA Conference: 7 June 11 June 2015 Abstract AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants The AMETI project is a package of multi-modal transport

More information

WELLINGTON S FUTURE FOOTBALL HUB

WELLINGTON S FUTURE FOOTBALL HUB WELLINGTON S FUTURE FOOTBALL HUB APPLICATION BY AND SUPPORTED BY ARTIFICIAL FOOTBALL TURF AT HUTT CITY S MEMORIAL PARK APPLICATION FOR FUNDING TO PUB CHARITY - JULY 2011 Early artist s impression of turf

More information

Redevelopment Principles & Sports Proposals Conflict With Local Needs

Redevelopment Principles & Sports Proposals Conflict With Local Needs Colchester Borough Council : Colchester Northern Gateway Public Consultation Representations Submitted on Behalf of the Colchester Gladiators American Football Club Redevelopment Principles & Sports Proposals

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

DYNAMIC LANES FOR AUCKLAND

DYNAMIC LANES FOR AUCKLAND Dynamic Lanes for Auckland MENEZES M. and INMAN R. Page 1 DYNAMIC LANES FOR AUCKLAND Authors: INMAN, Robert BA (Hons) Previously Auckland Transport Senior Traffic Engineer Now Aurecon Robert.Inman@aurecongroup.com

More information

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road) 21 Pitt Street PO Box 6345, Auckland 1141, New Zealand T: +64 9 300 9000 // F: +64 9 300 9300 E: info@beca.com // www.beca.com Auckland Council Private Bag 92300 Victoria Street West Auckland 1142 15 August

More information

Regional Cycle Programme Update

Regional Cycle Programme Update Agenda Item 10 (ii) Regional Cycle Programme Update Glossary Auckland Council Auckland Transport Cycle Action Auckland New Zealand Transport Agency Regional Cycle Network (AC) (AT) (CAA) (NZTA) (RCN) Executive

More information

Report to COUNCIL for decision

Report to COUNCIL for decision 17 152 Title: Section: Prepared by: Olympic Pool Business Case Community & Recreation Andrew White (Community & Recreation Manager) Meeting Date: 18 May 2017 Legal Financial Significance = Medium Report

More information

Hockey New Zealand Facility Strategy Update

Hockey New Zealand Facility Strategy Update Hockey New Zealand Facility Strategy Update June 2016 Acknowledgements The authors wish to thank all of the individuals and organisations that participated in the consultation and those who have given

More information

Using smartphones for cycle planning Authors: Norman, G. and Kesha, N January 2015

Using smartphones for cycle planning Authors: Norman, G. and Kesha, N January 2015 Using smartphones for cycle planning Authors: Norman, G. and Kesha, N January 2015 Abstract There has been an inherent lack of information available to transport and urban planners when looking at cycle

More information

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

Epping Forest Council Playing Pitch Strategy. PROJECT DETAILS Epping Forest District Council ENGLAND AND WALES CRICKET BOARD DATA APPENDICES

Epping Forest Council Playing Pitch Strategy. PROJECT DETAILS Epping Forest District Council ENGLAND AND WALES CRICKET BOARD DATA APPENDICES PROJECT DETAILS CLIENT NAME ASSIGNMENT TITLE PURPOSE OF REPORT Epping Forest District Council ENGLAND AND WALES CRICKET BOARD DATA APPENDICES Summary update: All cricket sites assessed Received responses

More information

APPELLANT S STATEMENT OF CASE

APPELLANT S STATEMENT OF CASE TOWN & COUNTRY PLANNING ACT 1990 (AS AMENDED) APPEAL BY FOCUS INTERNATIONAL CHRISTIAN CENTRE (FICC) AGAINST REFUSAL OF PLANNING PERMISSION BY THE LONDON BOROUGH OF HILLINGDON PLANNING PERMISSION IS SOUGHT

More information

1. Executive summary Purpose Objectives Strategy: Specific priorities 4

1. Executive summary Purpose Objectives Strategy: Specific priorities 4 HORSERACE BETTING LEVY BOARD BUSINESS PLAN 2018/2019 CONTENTS 1. Executive summary 1 2. Purpose 2 3. Objectives 3 4. Strategy: Specific priorities 4 5. Income 5.1 New Levy mechanism 5 5.2 Bank interest

More information

General Manager, Parks, Recreation and Culture. Request for Upgrades to Bridgeview Park Ball Diamonds

General Manager, Parks, Recreation and Culture. Request for Upgrades to Bridgeview Park Ball Diamonds Corporate NO: F003 Report COUNCIL DATE: January 15, 2007 FINANCE COMMITTEE TO: Mayor & Council DATE: January 11, 2007 FROM: General Manager, Parks, Recreation and Culture FILE: 6140-20/B SUBJECT: Request

More information

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE Rugby Football Union 1 INTRODUCTION The last 15 years has seen major innovations in the development of artificial turf surfaces for sport. Most significant for

More information

Walking the Talk: Sustainable Transport and Urban Design in Four New Zealand Cities

Walking the Talk: Sustainable Transport and Urban Design in Four New Zealand Cities Walking the Talk: Sustainable Transport and Urban Design in Four New Zealand Cities INTRODUCTION Pilot study on sustainable transport and urban design at local government level Giving focus to further

More information

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. TRANSPORT AND ACCESS EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. Whilst there are some walking facilities within

More information

Corporate. Report COUNCIL DATE: April 24, 2006 NO: F015 FINANCE COMMITTEE. TO: Finance Committee DATE: April 19, 2006 FILE: /B FROM:

Corporate. Report COUNCIL DATE: April 24, 2006 NO: F015 FINANCE COMMITTEE. TO: Finance Committee DATE: April 19, 2006 FILE: /B FROM: Corporate NO: F015 Report COUNCIL DATE: April 24, 2006 FINANCE COMMITTEE TO: Finance Committee DATE: April 19, 2006 FROM: SUBJECT: General Manager, Finance, Technology & HR; General Manager, Parks, Recreation

More information

V I C TO R I A N R U G B Y FA C I L I T I E S DEVELOPMENT PLAN

V I C TO R I A N R U G B Y FA C I L I T I E S DEVELOPMENT PLAN V I C TO R I A N R U G B Y FA C I L I T I E S DEVELOPMENT PLAN V R U B o a r d a n d C o m m u n i t y P r e s e n t a t i o n M o n d a y 2 1 st N o v e m b e r 2 0 1 6 Project objectives 1. Research

More information

Identify the priorities in the new Derry City and Strabane District based on the two previously produced PPS strategies

Identify the priorities in the new Derry City and Strabane District based on the two previously produced PPS strategies DERRY CITY AND STRABANE DISTRICT COUNCIL-PLAYING PITCH STRATEGIES PRIORITY UPDATE REPORT The and District Council (DCSDC) Playing Pitch Strategies update report provides an update on progress against the

More information

Draft Western District Plan

Draft Western District Plan Powered by TCPDF (www.tcpdf.org) Draft Western District Plan Submission_id: 31596 Date of Lodgment: 15 Dec 2017 Origin of Submission: Online Organisation name: Football NSW Organisation type: Peak Body

More information

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT One Size Doesn t Fit All S Corbett, C Chenery Page 1 ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT Authors/Presenters: Sam Corbett, Principal Transport

More information

Seal Extension Guidelines. Asset Management and Systems

Seal Extension Guidelines. Asset Management and Systems Seal Extension Guidelines 1. Guideline Definitions AADT - Annual Average Daily Traffic is measured at regular annual (or greater) intervals and adjusted for seasonal effects, using an approved traffic

More information

Summary of Athletic Field Analysis Findings

Summary of Athletic Field Analysis Findings Summary of Athletic Field Analysis Findings Baseball/softball 1: Mercer Island city has one of the highest ratios (0.46) of baseball/softball fields per 1,000 residents compared with other municipal jurisdictions

More information

FYLDE PLAYING PITCH STRATEGY DRAFT STRATEGY & ACTION PLAN MAY Integrity, Innovation, Inspiration

FYLDE PLAYING PITCH STRATEGY DRAFT STRATEGY & ACTION PLAN MAY Integrity, Innovation, Inspiration DRAFT MAY 2016 Integrity, Innovation, Inspiration 1-2 Frecheville Court off Knowsley Street Bury BL9 0UF T 0161 764 7040 F 0161 764 7490 E mail@kkp.co.uk www.kkp.co.uk CONTENTS ABBREVIATIONS... 1 PART

More information

THE HOCKEY STRATEGY. UPDATED March 2012

THE HOCKEY STRATEGY. UPDATED March 2012 THE HOCKEY STRATEGY UPDATED March 2012 1 CURRENT SITUATION SWOT Hockey has great potential with some unique strengths and competitive advantages...we must play to our strengths SWOT Strengths Global sport,

More information

Director of Operations and Environmental Services. Manager, Infrastructure and Capital Projects

Director of Operations and Environmental Services. Manager, Infrastructure and Capital Projects TOWN OF AJAX REPORT REPORT TO: SUBMITTED BY: PREPARED BY: General Government Committee Dave Meredith Director of Operations and Environmental Services Catherine Bridgeman Manager, Infrastructure and Capital

More information

BEFORE THE ENVIRONMENT COURT

BEFORE THE ENVIRONMENT COURT 1991 BEFORE THE ENVIRONMENT COURT I MUA I TE KOOTI TAIAO O AOTEAROA ENV-2018-AKL-000078 Under the Resource Management Act 1991 ( the Act ) In the matter of a direct referral of an application for resource

More information

Appendix N(b): Portishead Station Outline Travel Plan

Appendix N(b): Portishead Station Outline Travel Plan Portishead Branch Lane (MetroWest Phase 1): Environment Impact Assessment Appendix N(b): Portishead Station Outline Travel Plan Prepared for West of England Councils September 2017 1 The Square Temple

More information

Discussion Paper Men s and Boy s Competition Review 26 May 2017

Discussion Paper Men s and Boy s Competition Review 26 May 2017 BACKGROUND As we enter into the third year of the Men s National Premier League (NPL) three-year licence period, and having launched the Women s NPL off the back of last year s Women s and Girl s Competition

More information

Walking Action Plan

Walking Action Plan Walking Action Plan 2007-2012 Making walking a more attractive choice Find out more: phone 09 379 2020 or visit www.aucklandcity.govt.nz Contents 1 About the walking action plan 1 2 Programme funding and

More information

HAMPSHIRE CRICKET BOARD STRATEGY

HAMPSHIRE CRICKET BOARD STRATEGY HAMPSHIRE CRICKET BOARD STRATEGY 2014-2017 Growing and improving the game, to provide a cricketing future for all. Hampshire ecricket Board oad 2014-2017 Introduction The Hampshire Cricket Board Ltd is

More information

Making Dublin More Accessible: The dublinbikes Scheme. Martin Rogers Colm Keenan 13th November 2012

Making Dublin More Accessible: The dublinbikes Scheme. Martin Rogers Colm Keenan 13th November 2012 : The dublinbikes Scheme Martin Rogers Colm Keenan 13th November 2012 Modal Splits for Dublin 2001-2011 Dublin Mode Share Summary - Persons Crossing Canal Cordon 07.00-10.00 Year Total All PT % Car % Walk

More information

Bus and Transit Lane Review Update

Bus and Transit Lane Review Update Board Meeting / 25 February 2013 Agenda Item no.8(i) Bus and Transit Lane Review Update Glossary Auckland Transport New Zealand Transport Agency Transit Two Transit Three (AT) (NZTA) (T2) (T3) Executive

More information

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY HAMILTON BIKING PLAN 2015-2045 OUR VISION: A BIKE FRIENDLY CITY INTRODUCTION Biking as a travel option is experiencing a resurgence internationally and in New Zealand, growing as a familyfriendly and healthy

More information

New Zealand Rugby League Facility Strategy. Prepared for New Zealand Rugby League

New Zealand Rugby League Facility Strategy. Prepared for New Zealand Rugby League New Zealand Rugby League Facility Strategy Prepared for New Zealand Rugby League A Report by Active Insight Ltd October 2015 Document Control Document Reference New Zealand Rugby League Facility Strategy

More information

Synthetic Turf Playing Field New Site Options. Park Board Committee Meeting October 2, 2017

Synthetic Turf Playing Field New Site Options. Park Board Committee Meeting October 2, 2017 Synthetic Turf Playing Field New Site Options Park Board Committee Meeting October 2, 2017 Index 1. Recommendation 2. Background: Strategic Alignment 3. Background: Synthetic Turf Field Facts 4. Background:

More information

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements POLICY REPORT Report Date: April 23, 2018 Contact: Lon LaClaire Contact No.: 604.873.7722 RTS No.: 9944 VanRIMS No.: 08-2000-20 Meeting Date: May 16, 2018 TO: FROM: SUBJECT: Standing Committee on Policy

More information

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016 Ministry of Education Flat Bush School Notice of Requirement Integrated Transportation Assessment Report February 2016 TDG Ref: 12988-2 151105 ita flat bush.docx Ministry of Education Flat Bush School

More information

LONDON BOROUGH OF BARNET DRAFT STAGE D PLAYING PITCH STRATEGY DECEMBER 2016 DRAFT VERSION 8

LONDON BOROUGH OF BARNET DRAFT STAGE D PLAYING PITCH STRATEGY DECEMBER 2016 DRAFT VERSION 8 LONDON BOROUGH OF BARNET DRAFT STAGE D PLAYING PITCH STRATEGY DECEMBER 2016 DRAFT VERSION 8 PREPARED BY Strategic Leisure TABLE OF CONTENTS 1. EXECUTIVE SUMMARY 1 2. INTRODUCTION AND CONTEXT 9 INTRODUCTION

More information

WANAKA SWIMMING FACILITIES STATEMENT OF PROPOSAL

WANAKA SWIMMING FACILITIES STATEMENT OF PROPOSAL WANAKA SWIMMING FACILITIES STATEMENT OF PROPOSAL 17 October 2014 Contents Executive Summary Background National Guidelines The Status Quo Issue One Timing Issue Two Location Issue Three Size Issue Four

More information

Woking Playing Pitch & Outdoor Facilities Strategy Action Plan Appendix 2

Woking Playing Pitch & Outdoor Facilities Strategy Action Plan Appendix 2 Woking Playing Pitch & Outdoor Facilities Strategy Action Plan Appendix 2 Indicative time frames of Actions Ongoing and very important; to be addressed in short term (within 2 years) 1 Important: to be

More information

Transport Assessment. Curtis Street Plan Change

Transport Assessment. Curtis Street Plan Change Transport Assessment Curtis Street Plan Change Transport Assessment for Curtis Street Plan Change i Contents 1. Introduction... 1 2. Existing Conditions... 2 2.1 Location... 2 2.2 Study Area... 3 2.3

More information

SMARTTRACK RIDERSHIP ANALYSIS

SMARTTRACK RIDERSHIP ANALYSIS SMARTTRACK RIDERSHIP ANALYSIS EXECUTIVE SUMMARY Prepared for the City Manager, City of Toronto by: Eric J. Miller, Ph.D. Professor, Department of Civil Engineering Director, Transportation Research Institute

More information

CITYOF BRAMPTON SPORTS FIELD RAIN OUT PROTOCOL

CITYOF BRAMPTON SPORTS FIELD RAIN OUT PROTOCOL CITYOF BRAMPTON SPORTS FIELD RAIN OUT PROTOCOL The criteria used by Parks staff to determine if a sports field is judged to be unplayable is: RECTANGULAR SPORTS FIELDS: CLAY BALL DIAMONDS: CRICKET & BALL

More information

About the AMETI transport projects

About the AMETI transport projects bout the METI transport projects The uckland Manukau Eastern Transport Initiative (METI) is a group of transport projects for the southeast (,,, Howick and ). ims Give people better transport choices by

More information

Introduction... 6 Objective... 7 Role of Local Government in Sport and Recreation... 7 Scope... 8 Methodology... 8 Legislative Reference...

Introduction... 6 Objective... 7 Role of Local Government in Sport and Recreation... 7 Scope... 8 Methodology... 8 Legislative Reference... Page 2 Page 3 CONTENTS Executive Summary... 1 Key Findings... 2 Meeting Community Needs...3 Economic Opportunities...3 Financial Considerations...3 Recommendations... 4 Summary... 5 Introduction... 6 Objective...

More information

RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS

RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS TRANSPORT FOR LONDON RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS SUPPORTING TECHNICAL DOCUMENTATION TRAFFIC IMPACT REPORT Neil Georgeson July 2014 This report examines the traffic impacts that potential

More information

2017 SKILL ACQUISITION PROGRAM STRUCTURE DOCUMENT

2017 SKILL ACQUISITION PROGRAM STRUCTURE DOCUMENT 2017 SKILL ACQUISITION PROGRAM STRUCTURE DOCUMENT Contents Executive Summary... 3 2017 SAP Structure... 4 2017 SAP Competition Management and Operations... 7 2017 SAP Financial Model... 13 Version 1, issued

More information

Sustainability. Summary Multi-faceted project to increase opportunities for participation and improve the sustainability of the facility.

Sustainability. Summary Multi-faceted project to increase opportunities for participation and improve the sustainability of the facility. Inspired Facilities CASE STUDY THEMES Multi-sports Increasing capacity Sustainability PROJECT SUMMARY Summary Multi-faceted project to increase opportunities for participation and improve the sustainability

More information

Australian Biathlon Strategic Plan Overview

Australian Biathlon Strategic Plan Overview Australian Biathlon Strategic Plan 2014 2026 Overview Australian Biathlon Strategic Plan 2014-2026 (Approved 19 April 2016) 2 Table of Contents Introduction Strategic Focus updated for the remainder of

More information

Parks & Recreation Department. Date to Committee: November 14, 2012 Date to Council: November 26, 2012

Parks & Recreation Department. Date to Committee: November 14, 2012 Date to Council: November 26, 2012 Page 1 of Report PR-36-12 TO: Community Services Committee Parks & Recreation Department SUBJECT: Opportunities for a Permanent Cricket Field Report Number: PR-36-12 File Number(s): 930-01 Report Date:

More information

Bristol City Council has produced a draft Bristol Transport Strategy document.

Bristol City Council has produced a draft Bristol Transport Strategy document. Bristol Transport Strategy Summary Document Introduction Bristol City Council has produced a draft Bristol Transport Strategy document. The Strategy fills a gap in transport policy for Bristol. We have

More information

Franklin Sport and Active Recreation Facilities Plan July 2016

Franklin Sport and Active Recreation Facilities Plan July 2016 July 2016 1 Contents 1.0 Introduction... 3 1.1 Purpose of... 3 1.2 Using this Plan... 3 1.3 Methodology... 3 1.4 Limitations... 4 2.0 Facility Hierarchy Definitions... 5 3.0 Our challenges... 6 4.0 Our

More information

2018 NATIONAL TOURNAMENT REVIEW

2018 NATIONAL TOURNAMENT REVIEW 2018 NATIONAL TOURNAMENT REVIEW DISCUSSION DOCUMENT National Tournament Review New Zealand Ultimate is reviewing the structure of the National Tournament programme and this discussion document has been

More information

Springfield/South County Youth Club Soccer Field Guide

Springfield/South County Youth Club Soccer Field Guide Springfield/South County Youth Club Soccer Field Guide 10 February 2017 I. Purpose. Provide a resource for SYC Soccer that institutionalizes field allocation, assignment, and maintenance procedures to

More information

Summary of Proposal to Upgrade Swimming Facilities for the Wanaka Ward

Summary of Proposal to Upgrade Swimming Facilities for the Wanaka Ward Attachment B Summary of Proposal to Upgrade Swimming Facilities for the Wanaka Ward Introduction The Queenstown Lakes District Council is proposing to build an eight lane lap pool and a learners pool costing

More information

About AMETI. Features and benefits. Stage One Panmure complete

About AMETI. Features and benefits. Stage One Panmure complete About AMETI The Auckland Manukau Eastern Transport Initiative (AMETI) is a group of projects that will give residents of South Eastern suburbs improved transport choices and better connect them to the

More information

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION June 2015 CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION Introduction The Alpharetta Downtown Master Plan was developed in the fall

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

BUCS CONFERENCE 2016 FACILITY DEVELOPMENT THE RISE/ROLE OF ARTIFICIAL PITCHES THURSDAY, 14 JULY 2016

BUCS CONFERENCE 2016 FACILITY DEVELOPMENT THE RISE/ROLE OF ARTIFICIAL PITCHES THURSDAY, 14 JULY 2016 BUCS CONFERENCE 2016 FACILITY DEVELOPMENT THE RISE/ROLE OF ARTIFICIAL PITCHES THURSDAY, 14 JULY 2016 History/Origins QPR, Luton, Oldham 1G pitches Not designed for football and created more confusion and

More information

EAST HERTFORDSHIRE DISTRICT PLAN CONSULTATION

EAST HERTFORDSHIRE DISTRICT PLAN CONSULTATION EAST HERTFORDSHIRE DISTRICT PLAN CONSULTATION Stevenage Borough Council representations December 2016 Summary The East Hertfordshire District Plan [EHDP] is the equivalent of the Stevenage Borough District

More information

Phone: Ref No: 06/2018/0884

Phone: Ref No: 06/2018/0884 Development Directorate Preston City Council Town Hall Lancaster Road Preston PR1 2RL FAO Ben Sandover Phone: 01772 533855 Email: david.allen@lancashire.gov.uk Ref No: 06/2018/0884 Date: 20 September 2018

More information

Kings College, Otahuhu Proposed Plan Change. Integrated Transportation Assessment Report

Kings College, Otahuhu Proposed Plan Change. Integrated Transportation Assessment Report Proposed Plan Change Integrated Transportation Assessment Report 23 October 2017 Project: Report title: Document reference: Kings College, Otahuhu Integrated Transportation Assessment Report J00700 Kings

More information

Vision. Mission. Make cricket the leading competitive sport in the Maldives and achieve excellence on the international stage.

Vision. Mission. Make cricket the leading competitive sport in the Maldives and achieve excellence on the international stage. Strat Plan 2014-17.indd 1 1/27/2014 11:01:47 PM Strat Plan 2014-17.indd 2 1/27/2014 11:01:49 PM In 1999 the Cricket Control Board of Maldives embarked on an ambitious cricket development programme under

More information

Document number A Page 1 of 47

Document number A Page 1 of 47 Document number A1581986 Page 1 of 47 Table of Contents 1. Executive Summary... 4 2. Background... 7 3. National Benchmarks for Sport Facilities... 8 4. Current State of Kaikohe Sports and Facilities...

More information

September HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL

September HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL September 2017 HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL Table of Contents EXECUTIVE SUMMARY 3 1. INTRODUCTION 4 2. LOCAL CONTEXT 5 3. OBJECTIVES 7 4. PRIORITIES 8 5. FUNDING OPTIONS

More information

Doncaster Metropolitan Borough Council. Playing Pitch Strategy and Action Plan

Doncaster Metropolitan Borough Council. Playing Pitch Strategy and Action Plan Doncaster Metropolitan Borough Council Playing Pitch Strategy and Action Plan August 2018 Neil Allen Associates Registered Office: 20 Brook Road, Lymm, Cheshire, WA13 9AH A limited company registered in

More information

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

APPENDIX F SUPPLEMENTAL TRAFFIC DATA APPENDIX F SUPPLEMENTAL TRAFFIC DATA Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax: 212 213-3191 www.akrf.com Draft Memorandum To: Michael

More information

Technical note. 1. Introduction

Technical note. 1. Introduction Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this

More information

Item No Halifax Regional Council August 2, 2016

Item No Halifax Regional Council August 2, 2016 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 14.1.5 Halifax Regional Council August 2, 2016 TO: Mayor Savage and Members of Halifax Regional Council SUBMITTED BY: John Traves, Q.C. Acting

More information

5. The speed camera site outside the Parkwood Rest Home opposite Linwood College is a valuable deterrent. The speed camera site should be retained.

5. The speed camera site outside the Parkwood Rest Home opposite Linwood College is a valuable deterrent. The speed camera site should be retained. 27. ALDWINS ROAD SPEED LIMIT General Manager responsible: General Manager City Environment, DDI 941-8656 Officer responsible: Author: PURPOSE OF THE REPORT Unit Manager, Transport and Greenspace Brian

More information

Report Subject: Netball participation and social class

Report Subject: Netball participation and social class Report Subject: Netball participation and social class briefing paper Background For many years, research has highlighted variations in the levels of sports participation across different socioeconomic

More information

Douglas Land Use and Transportation Study

Douglas Land Use and Transportation Study Douglas Land Use and Transportation Study Summary: Key: Yellow Box = key project information Green Box = project recommendations Grey Box = anticipated project outcomes Background: It is an objective of

More information

Note this page is intentionally left blank for page layout purposes

Note this page is intentionally left blank for page layout purposes Note this page is intentionally left blank for page layout purposes Contents 1 Purpose of the Master Plan... 1 2 Development of the Master Plan... 1 3 How the Master Plan fits with other strategic plans

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

Chesterfield Playing Pitch and Outdoor Sports Strategy

Chesterfield Playing Pitch and Outdoor Sports Strategy Chesterfield Playing Pitch and Outdoor Sports Strategy Chesterfield Borough Council September 2014 Neil Allen Associates Registered Office: 20 Brook Road, Lymm, Cheshire, WA139AH A limited company, registered

More information

Your views are important. Please fill in a form before you leave. Or alternatively

Your views are important. Please fill in a form before you leave. Or alternatively Drum Property Group is delighted to welcome you to this exhibition which sets out our initial proposals for a mixed-use development at Stead s Place, Edinburgh. We are keen to hear the views of local people

More information

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009 Integrated Regional Traffic Management Michael Aherne Technical Director POLIS Conference 2009 M50 finish Public Transport and Pedestrians College Green The Spatial Perspective What Could has

More information

A STRATEGY FOR WORKING WITH CLUBS CLUB WORKING PARTY REPORT

A STRATEGY FOR WORKING WITH CLUBS CLUB WORKING PARTY REPORT CLUB WORKING PARTY REPORT A STRATEGY FOR WORKING WITH CLUBS CLUB WORKING PARTY REPORT WORKING PARTY MEMBERSHIP Donald Macleod Ian Rankin Gordon Thomson Gerry Tosh Alex McQuade Dougie Belmore Colin Thomson

More information

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria, 1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology

More information

SEASONAL POOLS REVIEW AND STRATEGY

SEASONAL POOLS REVIEW AND STRATEGY SEASONAL POOLS REVIEW AND STRATEGY 1 ACKNOWLEDGEMENTS The Seasonal Pools Review and Strategy Project Team acknowledges the input and support from a range of Council staff and representatives from external

More information

Memorandum INTRODUCTION METHODOLOGY. Smart Growth. Bruce Robinson, Transport Advisor, Infrastructure Planning

Memorandum INTRODUCTION METHODOLOGY. Smart Growth. Bruce Robinson, Transport Advisor, Infrastructure Planning Memorandum To: Smart Growth From: Bruce Robinson, Transport Advisor, Infrastructure Planning Subject: Te Tumu Transportation Assessment: Stage 1 Sensitivity Analysis Date: 1 June 2016 INTRODUCTION This

More information

MONASH CROQUET CLUB STRATEGIC PLAN

MONASH CROQUET CLUB STRATEGIC PLAN MONASH CROQUET CLUB STRATEGIC PLAN 2017-2022 Introduction Background Membership Clubrooms Competition Social Play Coaching and Refereeing Future of the Monash Croquet Club Mission Values Member obligations

More information

Archery Australia Board News

Archery Australia Board News Archery Australia Board News MARCH 2014 Special General Meeting A Special General Meeting was held on Sunday 2 March in Melbourne attended by the Board and the Regional Governing Body Presidents or the

More information

Summary Asset transfer from Oxfordshire County Council to the club to provide a dedicated boxing facility. Oxford Boxing Academy

Summary Asset transfer from Oxfordshire County Council to the club to provide a dedicated boxing facility. Oxford Boxing Academy Inspired Facilities Oxford Boxing Academy CASE STUDY THEMES Boxing Asset transfer Increasing opportunities for participation Partnership working PROJECT SUMMARY Summary Asset transfer from Oxfordshire

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

Strategic Plan. Approved: September 2016

Strategic Plan. Approved: September 2016 Strategic Plan 2016 2020 Approved: September 2016 VISION To be the leading university hockey club in Australia for high performance and development, and recognised as one of the most participation-friendly,

More information

Active Travel Strategy Dumfries and Galloway

Active Travel Strategy Dumfries and Galloway Active Travel Strategy Dumfries and Galloway Our Active Travel Strategy The agreed Interventions for Dumfries and Galloway Council s Local Transport Strategy includes an action to Develop an Active Travel

More information

CUERDEN TRANSPORT PROPOSALS

CUERDEN TRANSPORT PROPOSALS 1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This

More information

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT 6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT General Manager responsible: Officer responsible: Author: Jane Parfitt General Manager City Environment DDI 941 8656 Michael Aitken

More information

WOMEN IN RUGBY ACTION PLAN Irish Rugby: Building success, together

WOMEN IN RUGBY ACTION PLAN Irish Rugby: Building success, together WOMEN IN RUGBY ACTION PLAN 2018 23 IRFU WOMEN STRATEGIC IN RUGBY PLAN ACTION PLAN 2018 23 Irish Rugby: Building A game success, for all together 12 OUR VALUES RESPECT INTEGRITY INCLUSIVITY FUN EXCELLENCE

More information

QLDC Council 29 October Report for Agenda Item: 3

QLDC Council 29 October Report for Agenda Item: 3 QLDC Council 29 October 2015 Department: Infrastructure Beach Street Pedestrianisation Purpose Report for Agenda Item: 3 1 The purpose of this report is to obtain Council approval to consult over options

More information

Draft Greater Sydney Region Plan

Draft Greater Sydney Region Plan Powered by TCPDF (www.tcpdf.org) Draft Greater Sydney Region Plan Submission_id: 31452 Date of Lodgment: 15 Dec 2017 Origin of Submission: Online Organisation name: UNSW Sydney Organisation type: Other

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

KING STREET TRANSIT PILOT

KING STREET TRANSIT PILOT STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot HIGHLIGHTS PREVIOUS HIGHLIGHTS TRANSIT RELIABILITY TRANSIT TRAVEL TIMES 85% of streetcars arriving within 4 minutes westbound during

More information

Final Report. Arena Needs Study City of Oshawa. Prepared by: The RETHINK GROUP. October, 2011

Final Report. Arena Needs Study City of Oshawa. Prepared by: The RETHINK GROUP. October, 2011 Final Report Arena Needs Study 2011-2026 City of Oshawa Prepared by: The RETHINK GROUP October, 2011 Table of Contents Table of Contents 1 Summary 3 Page 1.0 Introduction 13 2.0 Supply and Utilization

More information

Measuring and growing active modes of transport in Auckland

Measuring and growing active modes of transport in Auckland AUCKLAND CLIENT TRANSPORT SECTION HEADLINE1 AUCKLAND TRANSPORT JUNE 2017 Measuring and growing active modes of transport in Auckland WAVE 3 1 AUCKLAND TRANSPORT 2 The overall business objective is to:

More information

December Emirates Cricket Board. Job Vacancy Emirates Cricket General Manager. Job Description and Application Process

December Emirates Cricket Board. Job Vacancy Emirates Cricket General Manager. Job Description and Application Process December 2018 Emirates Cricket Board Job Vacancy Emirates Cricket General Manager Job Description and Application Process Background: Emirates Cricket Board (ECB) is the governing body for cricket in the

More information