1 Elmont, New York December 2008 A B

2 ACKNOWLEDGEMENTS Prepared By: Empire State Development NYS Racing & Wagering Board With The Assistance Of : FXFOWLE Planners & Architects,LLP 1

3 TABLE OF CONTENTS EXECUTIVE SUMMARY...5 INTRODUCTION...9 Project Mission Site Understanding SITE ANALYSIS...13 Site Elements Site Access Regional Influences Site Infrastructure Recent Plans for the Area: Elmont Vision Plan Site A and B Opportunities and Constraints FUTURE CONSIDERATIONS FOR BELMONT PARK...51 Redevelopment of the Belmont Park Area Belmont Park as a Community Asset Empire Zone Program Video Lottery Terminals NEXT STEPS...53 Economic Analysis/Fiscal Impact Study Gaming Analysis Prepare RFP STAKEHOLDER AND DEVELOPER OUTREACH...19 Stakeholder Meetings/Outreach for Public Input Objectives and Criteria for Evaluation Developer Outreach SITE A REDEVELOPMENT OPTIONS...25 Site A Overview Site A Circulation Site A Option 1: Racino (Stand Alone) Site A Option 2.1: Small Hotel (Stand Alone) with VLTs in Grandstand Site A Option 2.2: Large Hotel (Stand Alone) with VLTs in Grandstand Site A Option 3.1: Small Hotel with Racino Site A Option 3.2: Large Hotel with Racino SITE B REDEVELOPMENT OPTIONS...39 Site B Overview Site B Circulation Site B Option 1: Lifestyle Retail with Small Hotel Site B Option 2: Big Box Power Retail Center with Sports Facility Option Site B Option 3: Retail with Senior Housing EVALUATION OF LAND USE OPTIONS...49 Evaluation of Site A and Site B 2

4 LIST OF FIGURES REDEVELOPMENT STUDY FIGURES Figure 1: Figure 2: Figure 3: Figure 4: Figure 5: Figure 6: Figure 7: Figure 8: Figure 9: Figure 10: Figure 11: Figure 12: Figure 13: Figure 14: Figure 15: Figure 16: Figure 17: Figure 18: Figure 19: Figure 20: Figure 21: Figure 22: Figure 23: Figure 24: Figure 25: Figure 26: Figure 27: Figure 28: Figure 29: Figure 30: Figure 31: Figure 32: Figure 33: Figure 34: Figure 35: Figure 36: Site Understanding Site Elements Regional Understanding Site A Opportunities and Constraints Site B Opportunities and Constraints Assessment Of Uses in Response to Criteria for Evaluation Developers Assessment of Development Viability Site A Circulation Stand Alone Racino Precedent Option 1: Site Plan Option 1: Perspective Small Hotel Precedent Option 2.1: Site Plan Option 2.1: Perspective Option 2.1 with VLTs in Grandstand: Perspective Large Hotel Precedent Option 2.2: Site Plan Option 2.2: Perspective Option 2.2 with VLTs in Grandstand: Perspective Small Hotel with Racino Precedent Option 3.1: Site Plan Option 3.1: Perspective Large Hotel with Racino Precedent Option 3.2: Site Plan Option 3.2: Perspective Site B Circulation Lifestyle Retail Precedent Option 1: Site Plan Option 1: Perspective Big Box Retail and Sports Facility Precedent Option 2: Site Plan Option 2: Perspective Senior Housing Precedent Option 3: Site Plan Option 3: Perspective Assessment of Land Use Options in Response to Criteria for Evaluation 3

5 4

6 EXECUTIVE SUMMARY

7 EXECUTIVE SUMMARY As directed by Governor David A. Paterson, in October 2008, Empire State Development (ESD) and the New York State Racing & Wagering Board (RWB) have explored redevelopment options for two parcels at Belmont Park, totaling 36 acres. The objective has been to work with stakeholders to define a range of possible options for these parcels that will create new jobs, generate additional tax revenue, and bolster economic development in Elmont, Bellerose, Floral Park, Queens Village and surrounding communities. In response, ESD, RWB and their consultant, FXFOWLE Architects and Planners, have performed the following tasks: Analyzed the two sites at Belmont Park in regard to regional and local opportunities and constraints Identified and conducted stakeholder interviews with elected officials, technical advisers, and community representatives with regard to defining opportunities for redevelopment Defined criteria for evaluation in response to the Governor s request Synthesized stakeholder feedback to formulate a wide range of development options Evaluated stakeholder options in the context of evaluation criteria Solicited developer input from members of the development community involved with similar development projects in Long Island and Queens to help evaluate viability of land-use options Defined viable development options for each development site in response to stakeholder interests and developer input Prepared graphic presentations that included precedents, site plans and a 3-D sketch for each option Evaluated each plan in response to the identified evaluation criteria Identified next steps and recommendations for future initiatives at Belmont Park This report is a summary of the findings. The following are potential land-use options for the two development sites: Site A Options: Option 1: Racino (Stand Alone) (240,000 sf) Option 2.1: Small Hotel (Stand Alone) with VLTs in Grandstand (130,000 sf) Option 2.2: Large Hotel (Stand Alone) with VLTs in Grandstand (300,000 sf) Option 3.1: Small Hotel with Racino (370,000 sf) Option 3.2: Large Hotel with Racino (540,000 sf) In general, Site A options are defined by a hotel and racino. A racino is a facility in which Video Lottery Terminals (VLTs) are located, and is usually implemented in correlation with a horse racing venue. A racino can also be referred to as a VLT facility. Both of the hotel and racino uses in Site A options create jobs, reinforce the interests of a majority of the stakeholders and enable a sustainable, pedestrian-friendly environment. Site B Options: Option 1: Lifestyle Retail with Small Hotel (355,500 sf) Option 2: Big Box Retail (with Sports Facility Option) (280,000 sf) Option 3: Mixed-Use Retail with Senior Housing (463,500 sf) Site B redevelopment options include retail uses, a small hotel, senior housing, and some recreational opportunities. These uses maximize economic benefits, address community interests and create a lively urban center. Both Site A and Site B options aim to transform the vacant parking lot parcels into vibrant destination centers. The redevelopment of the sites under any of these options can help revitalize Belmont Park and the surrounding neighborhoods, creating healthy, thriving communities. 6

8 SITE A REDEVELOPMENT OPTIONS EXISTING GRANDSTAND RACINO INCORPORATED IN BASE OF GRANDSTAND RACINO INCORPORATED IN BASE OF GRANDSTAND RACINO SURFACE SMALL HOTEL LARGE HOTEL SURFACE EXISTING EXISTING Option 1: Racino (Stand Alone) Option 2.1: Small Hotel (Stand Alone) with VLTs in Grandstand Option 2.2: Large Hotel (Stand Alone) with VLTs in Grandstand EXISTING GRANDSTAND EXISTING GRANDSTAND STRUCTURED (LOWER TWO LEVELS) COMBINED SMALL HOTEL WITH RACINO STRUCTURED (LOWER TWO LEVELS) COMBINED LARGE HOTEL WITH RACINO EXISTING EXISTING Option 3.1: Small Hotel with Racino Option 3.2: Large Hotel with Racino 7

9 SITE B REDEVELOPMENT OPTIONS SMALL HOTEL SMALL SCALE RETAIL RETAIL RETAIL BIG BOX RETAIL TOWNHOUSES SURFACE NEIGHBORHOOD PARK SURFACE NEIGHBORHOOD/ RECREATIONAL PARK SURFACE APARTMENTS NEIGHBORHOOD PARK Option 1: Lifestyle Retail with Small Hotel Option 2: Big Box Power Retail Center with Sports Facility Option Option 3: Mixed-Use Retail with Senior Housing 8

10 INTRODUCTION

11 INTRODUCTION PROJECT MISSION As directed by Governor David A. Paterson, Empire State Development (ESD) and the New York State Racing & Wagering Board (RWB) have explored redevelopment options for two parcels at Belmont Park, totaling 36 acres. The mission, as defined by the Governor, is to work with stakeholders to define a range of possible options for these parcels that will create new jobs, generate additional tax revenue, and bolster economic development in Elmont, Bellerose, Floral Park, Queens Village and surrounding communities. In response to the Governor s initiative, ESD, RWB and their consultant, FXFOWLE Architects LLP, have analyzed both sites and met with local elected officials, community leaders and technical advisory groups to define redevelopment options. Additionally, the team has also sought input from developers who have worked on Long Island and Queens to ascertain both long-term and short-term redevelopment potential. The timeline below is a summary of the planning process. OCTOBER 24th OCTOBER 30th NOVEMBER 5th NOVEMBER 13th NOVEMBER 21st NOVEMBER 25th DECEMBER 5th DECEMBER 10th DECEMBER 18th DECEMBER 23rd DECEMBER 31st Meeting with NYRA Governor Paterson s Announcement ESD/RWB Kick-off FXFOWLE Kick-off Site Analysis Stakeholder Meeting: Elected Officials Stakeholder Input Stakeholder Meetings: Technical Advisory Group Civic Leaders Public Meeting with NYRA Stakeholder Meeting: Queens BP and CB 13 Draft Report Progress Meeting Interim Review of Draft Report Final Report Final Report to ESD/RWB Final Report to FOB & Governor 10

12 FIGURE 1: SITE UNDERSTANDING SITE UNDERSTANDING Queens Village The two parcels designated for development, Site A and Site B, are located within the boundaries of Belmont Park, in the southernmost portion of the Park area. Belmont Park is located within the unincorporated community of Elmont in the Town of Hempstead in Nassau County. The western border of the Belmont Park and the western borders of Sites A and B abut the Nassau County border. Queens County is directly west of the sites. (See Figure 1) Site A, totaling approximately 8 acres, is bordered by Hempstead Turnpike to the south and by the Cross Island Parkway to the west. It is directly adjacent the racetrack Grandstand and the open space/park that is associated with the racetrack. Queens County SITE A (8 ACRES) Nassau County Elmont City Boundary Site B, totaling approximately 28 acres, is bordered by Hempstead Turnpike to the north, by the Cross Island Parkway to the west and by single family residential neighborhoods to the east. Cambria Heights Queens/Nassau County LIne 800 2,300 Belmont Park Boundary SITE B (28 ACRES) Elmont N feet 11

13 12

14 SITE ANALYSIS

15 SITE ANALYSIS A site analysis of the two parcels was conducted to help understand site elements, infrastructure and access issues, regional influences, and the major opportunities and constraints that are likely to shape development options. SITE ELEMENTS Within Belmont Park and the surrounding area, there are a range of site elements that influence both Site A and Site B. Figure 2 locates the elements listed below: 11a Av Jamaica Av A enue TO GRAND CENTRAL PKWY 10b 7c Cross Island Parkway ay 6b 14a 12 8c FIGURE 2: SITE ELEMENTS TO NASSAU 11b 10c Racetrack Grandstand ( +/- 120 in height) Belmont Open Space/Park Training Area Horse Stables and Racetrack Worker Housing Parking Vehicular Access Single Family Residential Cross Island Parkway Major Local Roads LIRR Stations LIRR Train Tracks Retail Corridors Schools Queens Village Bus Depot 13b TO JAMAICA 13c 8d 10a 15 8b 9 11c SITE A SITE B a 8a 7a Hempstead Turnpike TO SOUTH STATE PKWY 7b 5 6c 4 13a Elmont Road N Plainfield Avenue 14b 14c TO HEMPSTEAD feet SITE ACCESS Transit Both regionally and locally, Sites A and B are well served by mass transit. There are three Long Island Rail Road (LIRR) stops within one mile of the two sites: Belmont Park, Queens Village, and Bellerose. However, the closest station, Belmont Park, is a spur of the Hempstead Branch of the LIRR, and provides only limited service during racing season. Both Nassau County and Queens County bus lines serve Site A and Site B, including the N1, N2, N3, N6, Q110 and Q2. These bus lines stop in close proximity to the sites. Pedestrian In general, pedestrian access to the two sites is limited because Hempstead Turnpike is a car-dominated and pedestrian unfriendly roadway. However, walking distances to nearby transit stations and retail centers are manageable and vary from a half mile to a mile. In addition, Site A has easy access to the pedestrian bridge that connects the Belmont Station LIRR platform to the Racetrack. Vehicular In addition to being near mass transit, the sites are also well served by major and minor vehicular roadways. The sites are bisected by Hempstead Turnpike, and are bordered to the west by the Cross Island Parkway. These major roads provide regional access to Hempstead, Jamaica Station, JFK Airport, and the Throgs Neck Bridge. 14

16 FIGURE 3: REGIONAL UNDERSTANDING Island Pkwy tr al n ho Jeriic Cross de Tpke Floral Park Floral Park Hempstead Floral Park Queens County Bellerose J.H.S. 109 Branch Nassau County Floral Park Bellerose Elementary School 1M ile Queens Village South Floral Park h ranc ad B pste Hem Belmont Park St. Joachim & Anne P.S. 34 Belmont Park Racetrack N 1 N N 2 3 Q2 P.S. 134 Floral Park Memorial High School N 6 Commercial Core St. Vincent De Paul Elmont Memorial Library Regional Retail Hempstead Tpke Elmont Union Free School Clara H. Carlson School tr d Broadway Park Beth David Cemetery N 0 1/4mi 1/2mi miles E Cambria Heights Elmont Elmont Cemetery North Valley Stream Elmont Memorial Hig School lm on Law & Government High School E.S. 147 nd Pkwy Cross Islan P.S. 136 Gotham Avenue School Meacham A Av ve Q110 lvd is B Lew Electricity and Gas The Long Island Power Authority provides both electric and gas service for the sites, which if development takes place will require upgraded and expanded service. si P.S. 33 ve A s nci Water Service and Supply The Water Authority of West Nassau County provides water service for Belmont Park. To ensure that an adequate supply will exist for new development, the developer of the sites will need to work with the Water Authority of West Nassau County and the Nassau County Department of Public Works. ill H d nch n Bra Port Fra SITE INFRASTRUCTURE an Gr C Northeast To New Hyde Park, Mineola North To Northern State Pkwy, LIE, Throgs Neck Bridge 1/4 Additional regional influences include corridor retail along major roads, numerous parks and open spaces, institutions and schools. (See Figure 3) e Beyond the transit stations and roadways that allow regional connections, there is a variety of regional elements that influence development on Site A and Site B. These include numerous neighborhood retail nodes as well as regional retail areas. Regional retail areas contain largescale commercial uses such as big-box retail. The commercial core closest to Site A and Site B is located at the southwest corner of Hempstead Turnpike and Elmont Road, where there are plans to develop the former Argo Theater site into a large food and grocery center. The nearest regional retail area occurs east of the sites along Hempstead Turnpike and contains a Home Depot, Marshall s and an Office Max. Other regional shopping destinations within a five-to-six mile radius of the sites include Greenacres Mall and Roosevelt Field Mall. P kw y REGIONAL INFLUENCES Sewage and Drainage A sewer line currently exists underneath Site A. However, development on Sites A and B will require upgrades to any existing sewer and drainage system, and will require working with Nassau County Department of Public Works to provide an adequate drainage system. The area surrounding Belmont Park has been prone to flooding in past storms. Create mixed-use development -Hotel/convention center -Retail -Recreation Redevelop parking area south of Hempstead Turnpike Create gateway to Elmont Improve streetscape along Hempstead Turnpike Encourage Belmont-oriented businesses, activities and uses RECENT PLANS FOR AREA: ELMONT COMMUNITY VISION PLAN (2008) ZONING In June 2008, the Elmont Community Vision Plan was published, setting forth a series of goals and objectives for the community. During the Vision Plan s conception, the total amount and location of land available for development in Belmont Park was not known. Therefore though the Vision Plan specifically addresses Belmont Park, it only looks at Site B. The objectives stated by the Vision Plan for this area included: Under existing zoning, Belmont Park is designated for residential use. The Elmont Community Vision Plan proposes a new zoning district for the area, the Belmont Special Use District, that would allow Belmont Park to be rezoned and developed in a coordinated matter. The proposed special use district would also allow a mix of uses beyond residential that could lead to economic growth. 15 erso Jeff

17 Site B Opportunities and Constraints (See Figure 5) FIGURE 5: SITE B OPPORTUNITIES & CONSTRAINTS 1 Adjacent Single Family Residential Housing Provides a street grid that allows for potential connections Front-yard conditions on Huntley Road and rear-yard conditions on Wellington Street Setback or landscaping may be required to appropriately buffer existing residential neighborhoods from Site B Hempstead Turnpike SITE A 9 8a 6 2 Dense Tree Cover Creates a buffer from Cross Island Parkway and Hempstead Turnpike 7a New York State Empire Zone Allows for certain tax benefits subject to requirements Potential to change borders of zone or move to Site A Future status of Empire Zone program is under consideration Site B Existing Circulation Vehicular access is maintained on the northern and western borders of Site B Tunnel allows for vehicular access between sites- must be maintained Tunnel allows for pedestrian access between sites- may be relocated Various access points allow for efficient circulation Various egress points allow for efficient circulation- must be maintained Access to Site B from Hempstead Turnpike is limited because of non-signalized intersection Site B Land Use Restrictions Site B has no land use restrictions. 1c 8b Cross Island Parkway 3 Empire Zone 4 SITE B 28 ACRES 7b c 1a 1b 7c 8d N feet 17

18 SITE A & B OPPORTUNITIES & CONSTRAINTS Site A Opportunities and Constraints (See Figure 4) 1 Racetrack and Field Could serve as open space with a bucolic atmosphere when races are not taking place Focus of activity during large racing events Gated off from the surrounding community Largely underutilized: not being used for recreation purposes or for economic benefit for a large portion of the year 5 FIGURE 4: SITE A OPPORTUNITIES & CONSTRAINTS Grandstand (+/- 120 feet in height) Serves as an architectural icon for the community of Elmont and Belmont Park Grandstand height allows for views to and from Site A Belmont Open Space/Park Includes park and open space amenities such as active green space, picnic benches and gathering areas for Belmont Park uses Could provide pedestrian-friendly features and allows for pedestrian connections to Site A 11a SITE A 8 ACRES 4 5 LIRR Belmont Station & Platform/Pedestrian Bridge Could provide an integral transit and pedestrian connection to the site Allows for opportunity to create 365-day transit service as infrastructure is already in place (currently the Belmont spur is utilized only part-time) Bus Staging Area Allows for efficient bus transit to and from site Cross Island Parkway Site A Existing Circulation Gateway 3 exists as a main entry into Site A Vehicular access is maintained on the northern and eastern borders of Site A Tunnel allowing for vehicular access between sites- must be maintained Tunnel allowing for pedestrian access between sites- may be relocated Various access points allow for efficient circulation Various egress points allow for efficient circulation Access to Site A from Hempstead Turnpike is limited 11b 12 GATEWAY SITE B 9 Hempstead Turnpike Site A Land Use Restrictions Site A may only be used for operation of Video Lottery Terminals (VLT), hotel, resort and spa facilities; or for any other use that is complementary to horse racing and parimutuel wagering. N feet 16

19 18

20 STAKEHOLDER AND DEVELOPER OUTREACH

21 STAKEHOLDER AND DEVELOPER OUTREACH STAKEHOLDER MEETINGS / PLANNING PROCESS A public input process was initiated in order to fully understand community issues and to explore redevelopment options for the site. Meetings were held on November 21st and November 25th at the Elmont Memorial Library in Elmont, New York with elected officials, a technical advisory group, civic group leaders and residents. A meeting was also held on December 5th with the Queens Borough President and Community Board 13, as the two parcels available for development at Belmont Park are located just east of the Queens County boundary line. All of the stakeholders involved in the public process for this redevelopment study are listed below: Elected Officials and their Representatives (November 21: 1pm-3pm) New York State Senate New York State Assembly County Representatives Mayoral Leaders Town of Hempstead Queens Borough President* November 21st Stakeholder Meeting Technical Advisory Group (November 25: 3pm-5pm) LIRR Nassau County Town of Hempstead New York State Department of Transportation Long Island Regional Council Regional Plan Association** Community (November 25: 6pm-8pm) Civic Group Representatives Residents Community Board 13* * A separate meeting was held with Queens Borough President and Community Board 13 District Manager on December 5th. ** RPA was contacted separately. November 25th Stakeholder Meeting 20

22 The challenges and opportunities for Site A and Site B, as well as a list of possible redevelopment uses for the two sites, were discussed with the various stakeholders and are listed in the sections below. Please note, a racino is listed as one of the possible uses identified by the stakeholders and is a term used repeatedly in this document. A racino is defined as a facility in which Video Lottery Terminals (VLTs) are located, and is usually implemented in correlation with a horse racing venue. A racino can also be referred to as a VLT facility. Challenges Substandard conditions in surrounding areas, including racetrack housing Safety and security Pedestrian safety due to high traffic volumes on Hempstead Turnpike Proximity to single family residential housing on eastern edge of Site B Flooding and drainage issues Isolation of Belmont Park from surrounding community Need for open space Need for family-oriented retail Opportunities Create job opportunities and tax relief for surrounding community Enhance LIRR service at the Belmont Station to 365-days a year Create gateway entrance into Nassau County Build upon equine history using Belmont Park as cultural resource Make sites a destination Integrate pedestrian friendly features/streetscaping on Hempstead Turnpike Create a walkable community/environment Possible Redevelopment Uses for Site A and Site B Transportation center (lirr + bus hub) Racino (4500 VLT stations plus amenities) Lifestyle retail center Mixed-use residential/office room hotel/conference center facility room hotel (minimal amenities) Senior housing Neighborhood retail center Outlet retail center Big-box power retail center Open space/park Recreational/entertainment complex Horse racing museum/historic center Medical arts/professional office Corporate office park Equine uses/equine learning center Green technology/development park Workforce housing Community youth facility University research campus 21

23 CRITERIA FOR EVALUATION Based on the key findings of the site analysis and the stakeholder input, a set of Criteria for Evaluation was created. Positive economic benefits for state and community Economically viable Buildable without public subsidy Creates destination opportunities Complements racing culture of Belmont Park Supports pedestrian friendly environment Supports sustainable development and planning ESD, RWB and the consultants undertook an evaluation process to determine the best uses for Site A and Site B. The Criteria for Evaluation listed above were utilized to assess each possible use, identifying the 10 uses with the highest ratings: 1. Transportation center ( lirr + bus hub) 2. Racino (4500 station plus amenities) 3. Lifestyle retail center 4. Mixed-use residential/office room hotel conference center facility room hotel (minimal amenities) 7. Senior housing 8. Neighborhood retail center 9. Outlet retail center* 10. Big-box power retail center FIGURE 6: ASSESSMENT OF USES IN RESPONSE TO CRITERIA FOR EVALUATION 4-Excellent 3-Good 2-Fair 1-Poor 0-None DEVELOPMENT USES Transportation Center (LIRR+Bus Hub) (1) Racino (4500 VLT Stations plus Amenities) Lifestyle Retail Center Mixed Use/Residential/Retail/Office (2) Room Hotel/Conference Facility (3) Room Hotel (Minimal Amenities) Senior Housing Neighborhood Retail Center Outlet Retail Center (4) Big-Box Power Retail Center Open Space/Park (5) Recreational/Entertainment Complex Horse Racing Museum/Historic Center Medical Arts/Professional Office Corporate Office Park Equine Uses/Equine Learning Center Green Technology Development Park Workforce Housing (6) Community/Youth Facility University Research Campus EVALUATION CRITERIA Postitive Economic Benefits for State/Community Economically Viable (Based on Developer Input) Can Be Built Without Public Subsidy Reinforces Stakeholder Interests Creates Destination Opportunities Complements Racing Culture of Belmont Park Supports Pedestrian Friendly Environment Supports Sustainable Development and Planning TOTALS Notes (1) Assumes that transit improvements would be made at the existing station (off-site) (2) Residential assumes senior housing (3) Large hotel requires adjacency to LIRR and transit hub (4) Retail radius restrictions for outlets limit viability (5) Local stakeholders want neighborhood parks and more access to Belmont open space (6) Local stakeholders do not want housing that will add to school population * Retail radius restrictions for outlets limit viability. 22

24 DEVELOPER OUTREACH Beyond using the Criteria for Evaluation to recognize the best uses for the site, ESD, RWB and the consultants reached out to members of the development community to understand the economic feasibility of the different possible uses presented by the stakeholders. This provided information on market realities, which are integral to the success of any redevelopment on the sites. The summary of the development community s assessment of viable uses for the sites is represented in Figure 7. In addition, the following are the different challenges and opportunities identified by the developers: Challenges Radius restrictions prevent outlet retail opportunities (development too close in distance to Green Acres Mall, Queens Center and Roosevelt Field Mall) Lack of 365-day LIRR service at the Belmont Station Large hotel may not be economically viable Lifestyle center may not be economically viable Opportunities Create 365-day LIRR service at Belmont Station VLT facility may be economically viable (economic and gaming analyses recommended) Senior housing has strong economic future Mixed-use center may be economically viable and creates a walkable community Small hotel may be economically viable Large hotel may be economically viable, especially if LIRR service in place Big box retail may be economically viable FIGURE 7: DEVELOPER ASSESSMENT OF DEVELOPMENT VIABILITY Site A Site B Racino or VLT Facility Rm Economy Hotel (with racino) Rm Economy Hotel (Alone) Rm Hotel/Conf Center (with racino) Rm Hotel/Conf Center (Alone) Rm Econ Hotel/Longstay Resid Hotel Senior Housing Big Box Power Retail Center Medium Density Workforce Housing Mixed Use Hsg/Retail/Prof Office Lifestyle Retail Center (Mini-Box) Outlet Retail Center Sports Family Entertainment Center Rm Hotel/Conf Center (Alone) Professional Office Rm Hotel/Conf Center 5-Immediate Potential 4-Excellent 3-Good (Long Term) 2-Fair 1-Poor 0-None Development Groups Notes Developer A Lifestyle Retail is not viable Developer B Large Hotel Unlikely (Not a Travel Destination) Developer C Outlet Retail Unlikely (radius restrictions) Developer D = - - Financing Concerns Developer E Possible Long Term Office Potential Developer F Multi-Hotel Village Concept with VLT's Developer G Financing Concerns (Demand for Super Big-Box) Developer H LIRR Service to Belmont Essential to Area Developer I Developer J Developer K Hotel needs to be subsidized & Big Demand for VLT's Developer L Strongly suggests market analysis for proposed uses Developer M Large Hotel Only Possible with Casino (Financing) Developer N Sr Hsg- Strong Future Totals From a developer s perspective, the following are the most viable options: Racino or VLT facility room economy hotel (with racino) room economy hotel (alone) room hotel/conference center (with racino) room hotel/conference center (alone) room economy hotel/long stay residential hotel Senior housing Big box power retail center Medium density workforce housing Mixed use housing/retail/professional office Lifestyle retail center Outlet retail center* * Retail radius restrictions for outlets limit viability. 23

25 24

26 SITE A REDEVELOPMENT OPTIONS

27 SITE A REDEVELOPMENT OPTIONS SITE A OVERVIEW In general, Site A options include, either alone or in combination: a racino, a small hotel, a large hotel and parking. As represented in Figure 6 (page 22), the racino and hotel uses are highly responsive to the Criteria for Evaluation. Both a racino and hotel bring income into the community, are economically viable, and reinforce the interests of the majority of the stakeholders. Each option is characterized by a pedestrian friendly environment and sustainable urban design principles, offering walkable entertainment centers. A racino may entail the need for increased security, which would be addressed during Site A implementation. In all of the redevelopment options, Site A is transformed from a vacant parking lot into a 24-hour vibrant destination center. The synergies between this new center and the existing racetrack can act as a catalyst for revitalization for Belmont Park, as well as the surrounding neighborhoods. SITE A LAND USE OPTIONS Development options for Site A are described in detail in the following sections and are listed below: Option 1: Racino (Stand Alone) Option 2.1: Small Hotel (Stand Alone) with VLTs in Grandstand Option 2.2: Large Hotel (Stand Alone) with VLTs in Grandstand Option 3.1: Small Hotel with Racino Option 3.2: Large Hotel with Racino Site A: Existing Conditions 26

28 SITE A CIRCULATION Cross Island Parkway FIGURE 8: SITE A CIRCULATION The proposed circulation for Site A first and foremost maintains access on the north and east edges of the site. In addition, new circulation elements for the site are introduced, such as a new traffic signal at the intersection of Hempstead Turnpike and the entry to Site A. A new road is proposed within the boundaries of Site A that loops around the perimeter of the site, allowing for efficient access around the site without entering the formal Belmont Park roadway network. Service loading and entry to parking occurs along the west edge of the site. Lastly, a green space is proposed to buffer the site from Hempstead Turnpike, creating a gateway into Elmont and Nassau County from the west. OFF-SITE GRANDSTAND The proposed circulation plan and the gateway green for Site A remain in place in for each of the redevelopment options since these elements provide a sound planning framework for all the options. In each option, new development can easily access the Cross Island Parkway and the Hempstead Turnpike from the southern end of the site. SERVICE & SITE A: 6 BUILDABLE ACRES PRIMARY ENTRANCE STREET DIRECTION EDGE GATEWAY GREEN OFF-SITE Hempstead Turnpike SIGNALIZED INTERSECTION GATED ENTRY N feet 27

29 FIGURE 9: STAND ALONE RACINO PRECEDENT Finger Lakes Gaming and Racetrack: Farmington, NY FIGURE 10: OPTION 1: SITE PLAN Cross Island Parkway OFF-SITE 80,000 SF 228 SPACES GRANDSTAND RACINO 240,000 SF 2 FLOORS BRIDGE TO GRANDSTAND Aerial of Finger Lakes with Site A Overlay SURFACE 68,000 SF 195 SPACES GATEWAY GREEN OFF-SITE 108,000 SF 308 SPACES Hempstead Turnpike N Birds-eye View of Finger Lakes Site Floor Plan of Finger Lakes Gaming Room feet SITE A: OPTION 1: RACINO (STAND ALONE) Option 1 for Site A proposes a stand-alone racino with Video Lottery Terminals (VLTs). The racino brings revenues into Elmont and the surrounding community and is seen as complementary to the horse racing uses taking place in the adjacent racetrack. The proposed racino occupies 240,000 square feet on the northern portion of the site, in close proximity to the Grandstand. The racino would include amenities such as a cafe/restaurant and a bar and lounge area. New parking is proposed on the southern portion of the site. This option assumes that racino parking demands can utilize off-site existing parking lots within Belmont Park, so that the racino and racetrack can coexist compatibly. (See Figures 10 and 11) A precedent for a stand-alone racino adjacent to a racetrack is Finger Lakes Gaming and Raceway in Farmington, New York. Finger Lakes Gaming occupies a 60,000 square foot building pad with a 27,000 square foot gaming floor, and includes a food court and sports bar. The facility contains 990 VLTs, allowing approximately 29 square feet per VLT. In looking at the Finger Lakes Gaming facility as well as other VLT facilities in New York, the average square footage per VLT was determined to be 28 square feet. This average was utilized in all redevelopment options with VLT facilities in this Redevelopment Study. (See Figure 9) 28

30 Floor Area Summary FIGURE 11: OPTION 1: PERSPECTIVE Racino 240,000 SF (2 120,000 SF per floor) 28 SF per VLT 4,500 VLTs Surface Parking 68,000 SF 195 spaces (assumes shared parking) RACINO EXISTING GRANDSTAND Existing Surface Parking 188,000 SF 536 spaces SURFACE EXISTING 29

31 Cross Island Parkway FIGURE 12: SMALL HOTEL PRECEDENT Fairfield Inn: Jamaica, New York FIGURE 13: OPTION 2.1: SITE PLAN OFF-SITE 80,000 SF 228 SPACES GRANDSTAND VLT ON GROUND LEVEL (OPTIONAL) 240,000 SF SURFACE 123,000 SF 330 SPACES 4 FLRS FUNCTION/ BASE 6 FLRS SMALL HOTEL 130,000 SF ROOMS Aerial of Fairfield Inn with Site A Overlay GATEWAY GREEN OFF-SITE 108,000 SF 308 SPACES Hempstead Turnpike N Exterior of Fairfield Inn Site feet SITE A: OPTION 2.1: SMALL HOTEL (STAND ALONE) WITH VLTS IN GRANDSTAND Option 2.1 for Site A proposes a stand alone small hotel with the option to place VLTs in the ground level of the Grandstand. The small hotel provides accommodations and limited meeting/banquet space for people visiting the racetrack as well as for the surrounding community. The hotel occupies 130,000 square feet on four to six floors, with a ground level lobby and function space. Surface parking to support the hotel uses is located on the northern portion of the site. With VLTs in the ground level of the Grandstand, climatization of the VLT area is required. Parking demands for VLTs in the Grandstand can use existing parking lots within Belmont Park. (See Figures 13,14 and 15) A precedent for a small stand alone hotel is Fairfield Inn in Jamaica, New York. This hotel includes 110 rooms on five floors with a small meeting room. (See Figure 12) 30

32 FIGURE 14: OPTION 2.1: PERSPECTIVE FIGURE 15: OPTION 2.1 WITH VLTS IN GRANDSTAND: PERSPECTIVE SMALL HOTEL SURFACE EXISTING GRANDSTAND SMALL HOTEL SURFACE RACINO INCORPORATED IN BASE OF GRANDSTAND EXISTING EXISTING Floor Area Summary Hotel 130,000 SF rooms (4 to 6 floors) Existing Surface Parking 188,000 SF 536 spaces Surface Parking 123,000 SF 330 spaces VLTs on Grandstand Ground Level (Optional)(See Figure 15) 240,000 SF 28 SF per VLT 4,500 VLTs 31

33 FIGURE 16: LARGE HOTEL PRECEDENT New York LaGuardia Airport Marriott: East Elmhurst, New York Cross Island Parkway FIGURE 17: OPTION 2.2 SITE PLAN OFF-SITE 80,000 SF 228 SPACES GRANDSTAND VLT ON GROUND LEVEL (OPTIONAL) 240,000 SF SURFACE 123,000 SF 330 SPACES FUNCTION/ BASE 8 FLRS LARGE HOTEL 300,000 SF ROOMS Aerial of Marriott with Site A Overlay GATEWAY GREEN OFF-SITE 108,000 SF 308 SPACES Hempstead Turnpike N Interior and Exterior of Marriott Hotel feet SITE A: OPTION 2.2: LARGE HOTEL (STAND ALONE) WITH VLTS IN GRANDSTAND Option 2.2 proposes a stand-alone large hotel on Site A with the option to place VLTs in the ground level of the Grandstand. The large hotel provides accommodations and meeting/banquet space for people visiting the racetrack as well as for the surrounding community. If LIRR service is expanded at Belmont Station, a large hotel could also be used by people flying into and out of John F. Kennedy Airport and LaGuardia Airport, as the site would maintain easy public transit access to these airports. The hotel occupies 300,000 square feet on eight floors, with a ground level lobby and function space. Surface parking to support the hotel uses is located on the northern portion of the site. With VLTs in the ground level of the Grandstand, climatization of the VLT area is required. Parking demands for VLTs in the Grandstand can use existing parking lots within Belmont Park. (See Figures 17, 18 and 19) A precedent for a large stand alone hotel is the New York LaGuardia Airport Marriott in East Elmhurst, New York. This hotel includes 430 guest rooms, 23 meeting rooms, a grand ballroom, an on-site lounge, a restaurant and a coffee shop. (See Figure 16) 32

34 FIGURE 18: OPTION 2.2: PERSPECTIVE FIGURE 19: OPTION 2.2 WITH VLTS IN GRANDSTAND: PERSPECTIVE LARGE HOTEL SURFACE EXISTING GRANDSTAND LARGE HOTEL SURFACE RACINO INCORPORATED IN BASE OF GRANDSTAND EXISTING EXISTING Floor Area Summary Hotel 300,000 SF rooms (8 floors) Existing Surface Parking 188,000 SF 536 spaces Surface Parking 123,000 SF 330 spaces VLTs on Grandstand Ground Level (Optional)(See Figure 15) 240,000 SF 28 SF per VLT 4,500 VLTs 33

35 Cross Island Parkway FIGURE 20: SMALL HOTEL WITH RACINO PRECEDENT Vernon Downs Racino and Hotel: Vernon, New York FIGURE 21: OPTION 3.1: SITE PLAN RACINO HOTEL OFF-SITE 80,000 SF 228 SPACES GRANDSTAND 4 FLRS RACINO 240,000 SF FLOORS 3 & 4 VLT DROP OFF FUNCTION/ BASE 6 FLRS BRIDGE TO GRANDSTAND STRUCTURED 240,000 SF 660 SPACES FLOORS 1 & 2 SMALL HOTEL 130,000 SF ROOMS Aerial of Vernon Downs Racino and Hotel with Site A Overlay GATEWAY GREEN OFF-SITE 108,000 SF 308 SPACES Hempstead Turnpike N Vernon Downs Hotel Exterior Vernon Downs Restaurant and Bar feet SITE A: OPTION 3.1: SMALL HOTEL WITH RACINO Option 3.1 proposes a small hotel with a racino facility for Site A. Similar to Option 2.1, the hotel occupies 130,000 square feet on four to six floors, with a ground level lobby and function space. However, in this option the small hotel is directly connected to a new racino on the northern portion of the site. This option requires two levels of structured parking located below the racino. Hotel patrons can enter the hotel from a front door drop off area or from the structured parking. Racino customers can either enter directly into the racino through a central drop off area or from the structured parking, or could access the facility through an escalator/passageway from the small hotel. Customers could also enter the racino via an elevated bridge from the Grandstand. As the hotel patrons and racino customers may be two different user groups, hotel patrons who do not want to use the VLTs could use the hotel and amenities while remaining completely separated from the racino. Possible hotel amenities include a restaurant, bar, banquet and meeting rooms, and spa facilities. (See Figures 21 and 22) A precedent for a small hotel with a racino facility is Vernon Downs Racino and Hotel in Vernon, New York. This hotel and racino are adjacent to Vernon Downs Racetrack. At Vernon Downs, the hotel and racino are in close proximity to each other but are located in two separate structures. The hotel includes 173 guest rooms, some meeting and banquet facilities, a restaurant and bar, and pool and spa facilities. (See Figure 20) 34

36 Floor Area Summary FIGURE 22: OPTION 3.1: PERSPECTIVE Racino 240,000 SF (2 120,000 SF per floor) 28 SF per VLT 4,500 VLTs Hotel 130,000 SF rooms (4-6 floors) COMBINED SMALL HOTEL WITH RACINO STRUCTURED (LOWER TWO LEVELS) EXISTING GRANDSTAND Structured Parking 240,000 SF (2 120,000 SF per floor) 660 spaces Existing Surface Parking 188,000 SF 536 spaces EXISTING 35

37 FIGURE 23: LARGE HOTEL WITH RACINO PRECEDENT Dover Downs Hotel and Casino: Dover, Delaware Cross Island Parkway FIGURE 24: OPTION 3.2: SITE PLAN OFF-SITE 80,000 SF 228 SPACES GRANDSTAND BRIDGE TO GRANDSTAND RACINO 240,000 SF FLOORS 3 & 4 VLT DROP OFF STRUCTURED 240,000 SF 660 SPACES FLOORS 1 & 2 FUNCTION/ BASE 8 FLRS LARGE HOTEL 300,000 SF ROOMS Aerial of Dover Downs Hotel and Casino with Site A Overlay GATEWAY GREEN OFF-SITE 108,000 SF 308 SPACES Hempstead Turnpike N Birds-eye view of Dover Downs Exterior of Dover Downs Hotel feet SITE A: OPTION 3.2: LARGE HOTEL WITH RACINO Option 3.2 proposes a large hotel with a racino facility for Site A. The hotel occupies 300,000 square feet on eight floors, with a ground level lobby and function space. The large hotel is directly connected to a new racino on the northern portion of the site, with two levels of structured parking located below the racino. Hotel patrons can enter the hotel from a front door drop off area or from the structured parking. Racino customers can either enter directly into the racino through a central drop off area or from the structured parking, or could access the facility through an escalator/passageway from the large hotel. Customers could also enter the racino via a elevated bridge from the Grandstand. As the hotel patrons and racino customers may be two different user groups, hotel patrons who do not want to use the VLTs could use the hotel and amenities while remaining completely separated from the racino. (See Figures 24 and 25) A precedent for a large hotel with a racino is Dover Downs Hotel and Casino in Dover, Delaware. The hotel and casino complex is adjacent to Dover Downs Racetrack and includes multiple bars and restaurants, entertainment venues and spa amenities. (See Figure 23) 36

38 Floor Area Summary FIGURE 25: OPTION 3.2: PERSPECTIVE Racino 240,000 SF (2 120,000 SF per floor) 28 SF per VLT 4,500 VLTs Hotel 300,000 SF rooms (8 floors) COMBINED LARGE HOTEL WITH RACINO STRUCTURED (LOWER TWO LEVELS) EXISTING GRANDSTAND Structured Parking 240,000 SF (2 120,000 SF per floor) 660 spaces Existing Surface Parking 188,000 SF 536 spaces EXISTING 37

39 38

40 SITE B REDEVELOPMENT OPTIONS

41 SITE B REDEVELOPMENT OPTIONS SITE B OVERVIEW Based on the Criteria for Evaluation, the most appropriate uses for Site B include: retail uses, a small hotel, senior housing and the opportunity for sports recreation facilities. Similar to the redevelopment options for Site A, the program elements in each Site B option provide economic benefits, are economically viable, and meet the majority of stakeholder and community interests. In addition, the different options are physically designed to be walkable, lively destination centers. Small-scaled retail uses, large-scale commercial uses, recreational facilities and mixeduse housing all work together to create an urban core, giving the surrounding community a place to live, work and play. Site B also offers open space amenities. Each option includes not only a gateway green at the northern end of the site, but also a neighborhood park at the southern end of the park where picnic areas or playing fields can be incorporated. SITE B LAND USE OPTIONS Development options for Site B are described in detail in the following sections and are listed below: Option 1: Lifestyle Retail with Small Hotel Option 2: Big Box Retail (with Sports Facility Option) Option 3: Mixed-Use Retail with Senior Housing Site B: Existing Conditions 40

42 FIGURE 26: SITE B CIRCULATION SITE B CIRCULATION Site B includes vehicular access easements that must be maintained. These access areas are kept in place in the proposed circulation plan for Site B at the north and west edges of the site. New circulation elements proposed include a traffic signal at the intersection of Hempstead Turnpike and the entry to Site B to allow westbound traffic to enter the site, and a new road that follows the western boundary of Site B. Another new road is proposed at the northern portion of the site alongside a gateway green that buffers the site from Hempstead Turnpike and provides a landmark space for the Elmont community and Nassau County. These two roads allow for efficient access to all portions of the site as well as to the Cross Island Parkway and Hempstead Turnpike. In addition to the new roads, a fifteen-foot wide landscaped area is proposed along the east boundary of the site to buffer any new development from the existing single family residences at this location. Lastly, the circulation plan for Site B allows for a neighborhood park at the southern tip of the site. The proposed circulation plan and the gateway green for Site A remain in place in for each of the redevelopment options since these elements provide a sound planning framework for all the options. The neighborhood park at the southern tip of the site stays in place, but changes in size according to the various program needs for each option. Cross Island Parkway GATEWAY GREEN SITE B: 22 BUILDABLE ACRES 15 BUFFER Hempstead Turnpike STREET DIRECTION EDGE SIGNALIZED INTERSECTION GATED ENTRY NEIGHBORHOOD PARK N feet 41

43 FIGURE 27: LIFESTYLE RETAIL PRECEDENT FIGURE 28: OPTION 1: SITE PLAN The Shops at Atlas Park: Glendale, New York GATEWAY GREEN He mp ste ad Tur n pik e HOTEL 112,500 SF 150 ROOMS 4 FLRS 10,000 SF 23,000 SF 90,000 SF Cross Island Parkway 20,000 SF 20,000 SF Exterior of Atlas Park RETAIL 243,000 SF 365,000 SF 1,050 SPACES Aerial of Atlas Park with Site B Overlay SITE B: OPTION 1: LIFESTYLE RETAIL CENTER WITH SMALL HOTEL Option 1 presents lifestyle retail with a small hotel for Site B. This option is envisioned as a mixed-used commercial development that combines the traditional retail functions of a shopping mall with leisure amenities such as movie theaters and restaurants, along with a small hotel that can support the retail uses. Option 1 includes 243,000 square feet of retail, a four story,150-room hotel, and surface parking. Some of the smaller stand alone retail pads can be used by family-oriented restaurants. The retail and parking areas both have direct access to Hempstead Turnpike and the Cross Island Parkway via the new road on the western border of the site. (See Figures 28 and 29) A relevant design precedent for Option 1 is The Shops at Atlas Park development in Glendale, New York. This walkable shopping/lifestyle center includes over 30 retail stores, a movie theater complex with multiple restaurants, and a large food market. The development also includes public spaces such as plazas and green spaces that act as central nodes for the complex. (See Figure 27) 42 NEIGHBORHOOD PARK N feet 400

44 Floor Area Summary FIGURE 29: OPTION 1: PERSPECTIVE Hotel 112,500 SF (4 floors) Retail 243,000 SF RETAIL Surface Parking 1,050 spaces SMALL HOTEL SURFACE NEIGHBORHOOD PARK 43

45 Cross Island Parkway FIGURE 30: BIG BOX RETAIL & SPORTS FACILITY PRECEDENT WalMart Supercenter: Westbury, New York Forekicks Norfolk, Norfolk, Massachusetts FIGURE 31: OPTION 2: SITE PLAN GATEWAY GREEN Hempstead Turnpike SERVICE LANE 30,000 SF Birds-eye View of WalMart Supercenter 120,000 SF 10,000 SF BIG BOX RETAIL OR SPORTS COMPLEX 280,000 SF Birds-eye View of Forekicks Norfolk Site 412,500 SF 1,200 SPACES Aerial of WalMart Supercenter with Site B Overlay SITE B: OPTION 2: BIG BOX POWER RETAIL CENTER (WITH SPORTS FACILITy OPTION) Interior of Forekicks Norfolk Option 2 for Site B proposes big box retail with two large retail pads in the center of the site and smaller retail pads at the north end of the site. The smaller retail uses at the north end of the site act as a front door to the development and can support restaurants and more walkable, smaller-scaled retail. The two large retail pads each occupy 120,000 square feet, with 412,500 square feet of surface parking. This option also shows the opportunity for an indoor sports facility in place of one of the large retail pads. There is a service road between the small and large retail and along the northern edge of the neighborhood park that allows access to Hempstead Turnpike and the Cross Island Parkway. Lastly, the neighborhood park in this option shows a soccer field, as the programming of this park can be related to a potential indoor sports facility. (See Figures 31 and 32) 120,000 SF NEIGHBORHOOD PARK A precedent for Option 2 is the WalMart supercenter in Westbury, New York. This big box center includes WalMart, Costco, Marshalls and Sports Authority, with building pads ranging from 40,000 to 140,000 square feet. A precedent that includes a sports facility is Forekicks Norfolk in Norfolk, Massachusetts, a 85,000 square foot indoor sports complex. (See Figure 30) 44 N feet

46 Floor Area Summary FIGURE 32: OPTION 2: PERSPECTIVE Small Scale Retail 40,000 SF Big Box Retail or Sports Complex 240,000 SF Surface Parking 412,500 SF 1,200 spaces SMALL SCALE RETAIL BIG BOX RETAIL SURFACE NEIGHBORHOOD PARK WITH PLAYING FIELD 45

47 FIGURE 33: SENIOR HOUSING PRECEDENT The Paddock Apartments: Lexington, Kentucky FIGURE 34: OPTION 3: SITE PLAN 23,500 SF Hempstead Turnpike 5,000SF 215,000 SF 605 SPACES 8,000SF 5,000SF 30,000 SF 105,000 SF RETAIL 176,500 SF Exterior of The Paddock Apartments 50,500 SF 140 SPACES TOWNHOUSES 82,000 SF (2 FLRS) APARTMENTS 30,000 SF (3 FLRS) Aerial of WalMart Supercenter with Site B Overlay SITE B: OPTION 3: SENIOR HOUSING WITH RETAIL CENTER Option 3 explores the concept of mixed-use by proposing 176,500 square feet of retail at the north end of the site and 287,000 square feet of senior housing at the south end. The retail development has the potential to support neighborhood retail, restaurants, and professional offices that can serve the region. The senior housing provides a total of 333 units of townhouses and apartments. These units are grouped into three clusters that are built around a common green space and parking to create a village like setting. A club house for social gatherings anchors the southern tip of the development and fronts the neighborhood park. The retail development and each of the housing clusters have direct access to the Cross Island Parkway and Hempstead Turnpike via the new road on the western border of the site. (See Figures 34 and 35) A relevant precedent for the senior housing development shown in Option 3 is The Paddock Apartments in Lexington, Kentucky. This development includes 160 senior housing units and is in close proximity to Kentucky Horse Park. (See Figure 33) 46 35,500 SF 101 SPACES 17,500 SF 50 SPACES Cross Island Parkway NEIGHBORHOOD PARK CLUBHOUSE 20,000 SF TOWNHOUSES 62,000 SF (2 FLRS) APARTMENTS 30,000 SF (3 FLRS) TOWNHOUSES 27,000 SF (2 FLRS) APARTMENTS 36,000 SF (3 FLRS) SENIOR HOUSING 287,000 SF N feet

48 Floor Area Summary FIGURE 35: OPTION 3: PERSPECTIVE Retail 176,500 SF Senior Housing 287,000 SF 333 units 120 Apartment Units (3 floors/building) 213 Townhouses (2 floors each) 20,000 SF Clubhouse RETAIL TOWNHOUSES Surface Parking 318,500 SF 896 spaces SURFACE APARTMENTS NEIGHBORHOOD PARK 47

Executive Summary. Also included is an Appendix that consists of more detailed discussions of the extensive public participation process.

Executive Summary. Also included is an Appendix that consists of more detailed discussions of the extensive public participation process. Executive Summary A. Introduction As a result of issues that have arisen through the historical development of Elmont and Hempstead Turnpike as a primarily automobile-related corridor, the Elmont community

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods N D. Focus Area II Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods Transit Road Focus Area II is located in the Hamlet

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

Comments The Plan for Port Whitby

Comments The Plan for Port Whitby Comments The Plan for Port Whitby April 24th, 2013 Community Meeting #2 Summary Report Prepared by GLPi April 29th, 2013 1 Introduction The purpose of the Port Whitby Secondary Plan Update, Community Improvement

More information

2.0 Ballpark District

2.0 Ballpark District 2.0 Ballpark District 2.1 Introduction The Ballpark District is located in the south central portion of the City of Lake Elsinore, just north of the City limit line in this area. The Ballpark District

More information

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST THE VILLAGE AT PEDESTRIAN CIRCULATION MAIN STREETS NORTH/SOUTH MAIN STREETS EAST/WEST SLIP STREET CREEK SIDE LANE PEDESTRIAN CIRCULATION DESCRIPTION: Circulation through the downtown of is organized by

More information

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS 2014 Peer Chacko, AICP, Assistant Director, City of Dallas Dallas Midtown: Strategic growth area Future transit node 2 Peterson Road Study Area Galleria

More information

Illustrated Principles of Good Planning

Illustrated Principles of Good Planning Illustrated Principles of Good Planning The Miami 21 Zoning Code incorporates time-tested planning principles into the zoning regulations of our City. These are principles that make for better neighborhoods,

More information

Public Meeting #1 January 30, 2018

Public Meeting #1 January 30, 2018 Public Meeting #1 January 30, 2018 Meeting Outline Mayor s Introduction Presentation Q&A Group Activities Wrap-up Presentation Outline Introduction Existing Conditions Market Assessment Break-out Setup

More information

STONY PLAIN ROAD STREETSCAPE

STONY PLAIN ROAD STREETSCAPE Jasper Place Revitalization Strategy: Vision The people involved in the Jasper Place Revitalization Strategy envision: Goal 1: Feeling safe in our community Create a community where feeling safe is common--where

More information

Exit 13/Golden Triangle Study FREQUENTLY ASKED QUESTIONS

Exit 13/Golden Triangle Study FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS How will you improve traffic in the Golden Triangle? One main goal of this study is to examine the current traffic patterns of the area and propose ways to improve the traffic.

More information

Y O R K R O A D. Baltimore, Maryland. ULI Technical Assistance Panel June 18 & 19, York Road Technical Assistance Panel

Y O R K R O A D. Baltimore, Maryland. ULI Technical Assistance Panel June 18 & 19, York Road Technical Assistance Panel Y O R K R O A D Baltimore, Maryland ULI Technical Assistance Panel June 18 & 19, 2013 The York Road TAP Team ULI York Road TAP Chairperson Addison Palmer, STV Incorporated Technical Assistance Panelists

More information

Garden City State Street Corridor Existing Conditions October 2012

Garden City State Street Corridor Existing Conditions October 2012 Garden City State Street Corridor Existing Conditions October 2012 Prepared by Garden City Development Services Leon Letson, Missy Harris & Jenah Thornborrow 6015 Glenwood Street Garden City, Idaho 83714

More information

summary of issues and opportunities

summary of issues and opportunities 1 summary of issues and opportunities EXECUTIVE SUMMARY CHAPTER 2: HISTORY - 3: LAND USE This first chapter is an overview of lessons learned from analysis of the existing conditions on El Camino as well

More information

162 RESIDENTS ATTENDED 2 DAYS OF WORKSHOPS 15 TABLE DISCUSSIONS WHAT WE HEARD. Oakridge Municipal Town Centre Workshops PLANNING PROGRAM

162 RESIDENTS ATTENDED 2 DAYS OF WORKSHOPS 15 TABLE DISCUSSIONS WHAT WE HEARD. Oakridge Municipal Town Centre Workshops PLANNING PROGRAM OAKRIDGE MTC WORKSHOP 2017 CAMBIE CORRIDOR Phase 3 STEP 3: 3: October June 2017 CAMBIE CORRIDOR PLANNING PROGRAM 2 DAYS OF WORKSHOPS 15 TABLE DISCUSSIONS 162 RESIDENTS ATTENDED WHAT WE HEARD Oakridge Municipal

More information

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs

More information

12/13/2018 VIA

12/13/2018 VIA 12/13/2018 VIA EMAIL Daniel Abbes, Assistant Planner City of Sacramento community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: Bruceville Apartments (P18-073) Dear Mr.

More information

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses Wyldewood Estates Pre-Application Public Engagement Summary of Issues and Responses March 2016 Executive Summary Morguard Residential Properties has been thoughtfully planning the redevelopment of Wyldewood

More information

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project. TRAVEL PLAN Central European University Campus Redevelopment Project Page 1 Table of Contents Introduction... 3 Background... 7 Building Users... 7 Transportation in Community Consultation... 7 Summary

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Plainfield Gateway. Plainfield Context

Plainfield Gateway. Plainfield Context Plainfield Gateway The western arm of The Campus, much like the Thomas Street Placita eastern arm, must connect residents and workers from the western side of the neighborhood to The Campus and the activity

More information

S T A T I O N A R E A P L A N

S T A T I O N A R E A P L A N The Circulation and Access Plan describes vehicle, pedestrian, and transit improvements recommended within the Concept Plan. In order to create and sustain a vibrant business district that provides pedestrian-friendly

More information

OPEN HOUSE WELCOME Bronte Village Growth Area Review

OPEN HOUSE WELCOME Bronte Village Growth Area Review OPEN HOUSE WELCOME Bronte Village Growth Area Review Bronte Village is a growth area. Learn more! Introduction Bronte Village is a growth area. What is that? Bronte Village is one of six growth areas identified

More information

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary I. LEAD-IN TO SMALL GROUP DISCUSSION, POLLING AND STEERING COMMITTEE/TECHNICAL TASK FORCE DISCUSSION The meeting began

More information

Pocatello Regional Transit Master Transit Plan Draft Recommendations

Pocatello Regional Transit Master Transit Plan Draft Recommendations Pocatello Regional Transit Master Transit Plan Draft Recommendations Presentation Outline 1. 2. 3. 4. What is the Master Transit Plan? An overview of the study Where Are We Today? Key take-aways from existing

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016

Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016 Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016 Agenda 3:00 Opening/Welcome 3:15 Touch Base on Schedule and Milestones Moving Forward 3:20 Review the Overall

More information

5 Circulation & Parking

5 Circulation & Parking 5 Circulation & Parking Downtown Parking & Circulation Strategy. Downtown Wayne has a somewhat disconnected system of local public streets to connect downtown with the residential neighborhoods, and primary

More information

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI) Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI) City of Fort Lauderdale ~ Commission Conference July 10, 2012 Page 1 of 15 A Multi-Agency

More information

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES INNER LOOP EAST TRANSFORMATION PROJECT AIA Rochester Annual Meeting November 13, 2013 Bret Garwood, NBD Erik Frisch, DES Why? We are building a city that encourages walking, biking and enjoying the outdoor

More information

Ann Arbor Downtown Street Plan

Ann Arbor Downtown Street Plan 1 Ann Arbor Downtown Street Plan Public Workshop #1 We know that. 2 Public right-of-way (streets, sidewalks, and alleys) make up 30% of the total District area of downtown. Streets need to provide mobility

More information

Project Narrative. Albuquerque, NM. July 31, 2015

Project Narrative. Albuquerque, NM. July 31, 2015 Project Narrative Albuquerque, NM July 31, 2015 1 Project Identification As the first bus rapid transit (BRT) project in New Mexico, the Albuquerque Rapid Transit (ART) line will run through the heart

More information

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013 Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along

More information

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs

Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs City Council Study Session January 27, 2009 Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs Scope of Work Purpose of Tonight s Meeting Review work to date and direct staff

More information

SPRINGFIELD REVITALIZATION REPORT

SPRINGFIELD REVITALIZATION REPORT SPRINGFIELD REVITALIZATION REPORT August 2015 Homewood Suites Springfield Town Center Promenade 2 SPRINGFIELD OVERVIEW This report covers recent development activity in the Springfield Commercial Revitalization

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME TO OPEN HOUSE # 1 June 14, 2017 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York

More information

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City. A CHANGING CITY By the year 2040, Edmonton will be home to more than 1 million people. To accommodate growth and support a healthy and compact city, we need a new approach to development/redevelopment

More information

integrated action plan

integrated action plan public presentation. june 24, 2009. city of portsmouth, nh islington corridor integrated action plan richardson & associates, landscape architects evan haynes, public arts consultant Islington Street Corridor

More information

Table #6 VISION CHARACTERISTICS

Table #6 VISION CHARACTERISTICS Table #6 VISION White Flint is a place to live, work, play, shop, and walk with sufficient density to encourage quality redevelopment. Vibrant streets and consistent streetscapes are important. CHARACTERISTICS

More information

MIXED USE AND STREETSCAPE INTEGRATION Avondale Will Basil Juliana Zannotto

MIXED USE AND STREETSCAPE INTEGRATION Avondale Will Basil Juliana Zannotto MIXED USE AND STREETSCAPE INTEGRATION Avondale Will Basil Juliana Zannotto Creating new development so that people will stop and see what Avondale has to offer The goal for my project was simple. I wanted

More information

NOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS

NOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS Tahoe Transportation District 128 Market Street, Suite 3F Stateline, NV 89449 Phone: (775) 589-5500 www.tahoetransportation.org Federal Highway Administration 650 Capitol Mall, Suite 4-100 Sacramento,

More information

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES EECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES Topic and Purpose In 2007, the Mayor of Ottawa s Task Force on Transportation suggested adding a

More information

MEETING Agenda. Introductions. Project Overview. Key Study Components. Alternative Station Concepts. Preferred Station Concept. Next Steps.

MEETING Agenda. Introductions. Project Overview. Key Study Components. Alternative Station Concepts. Preferred Station Concept. Next Steps. City GARLAND Council ROADVISION Briefing STUDY VISION STUDY Dallas, TX April 8, 2010 1 1 MEETING Agenda Introductions Project Overview Key Study Components Alternative Station Concepts Preferred Station

More information

5 Transit & Traffic. Overview

5 Transit & Traffic. Overview 5 Transit & Traffic Overview Montgomery Place s roadways and overall traffic circulation are unique in the city due to the narrow streets and avenues with boulevards; however, no sidewalks or curbs in

More information

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations CIRCULATION AND PARKING roads and vehicular traffic The Campus Master Plan updates the campus transportation network through a multi-modal approach that encourages walking and biking while improving vehicular

More information

Thesis Presentation. Moorhead City Walk: A Master Plan to Reimage Moorhead, Minnesota s Urban Core. Brad Garcia Advisors: Jason Kost & Dominic Fischer

Thesis Presentation. Moorhead City Walk: A Master Plan to Reimage Moorhead, Minnesota s Urban Core. Brad Garcia Advisors: Jason Kost & Dominic Fischer Thesis Presentation Moorhead City Walk: A Master Plan to Reimage Moorhead, Minnesota s Urban Core Brad Garcia Advisors: Jason Kost & Dominic Fischer MOORHEAD, MN Red River Center Ave 8 TH St N FARGO, ND

More information

including infrastructure, transit and open space, Open Space changed approximately 50 to approximately 60

including infrastructure, transit and open space, Open Space changed approximately 50 to approximately 60 Draft North Branch Framework Plan s The below table itemizes changes made to the North Branch Industrial Corridor Framework and Design Guidelines. The original draft was posted March 17, 2017. This table

More information

D O W N T O W N B A S E B A L L

D O W N T O W N B A S E B A L L D O W N T O W N B A S E B A L L 1 Urban THREE GENERATIONS 2 Multipurpose 3 Revitalized Urban Bring out the best of San Jose 4 4 th GENERATION BUILDING A CITY PETCO Park San Diego, California THE BEST URBAN

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues 1 Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation The Centennial Neighbourhoods Transportation Management Plan (CNTMP) is being undertaken to support the Secondary

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.

More information

EVAN GLASS. Montgomery County Council District 5

EVAN GLASS. Montgomery County Council District 5 EVAN GLASS 1. Do you support funding and advancing the Purple Line to groundbreaking as described in the Locally Yes. As a member of the recently convened Purple Line Implementation Advisory Group, I will

More information

Eastern PA Trail Summit October 1, 2018

Eastern PA Trail Summit October 1, 2018 Eastern PA Trail Summit October 1, 2018 WHO WE ARE + WHY + WE RE * HERE * * * * * * Session Goals: Discuss how to coordinate planning and design in small, urbanized towns Consider how to develop alternative

More information

15 April CAMPUS MASTER PLAN UPATE F o c us G r o up M o b ility

15 April CAMPUS MASTER PLAN UPATE F o c us G r o up M o b ility 15 April 2016 CAMPUS MASTER PLAN UPATE F o c us G r o up M o b ility AGENDA What We Heard Campus Framework & Open Space Network Mobility Approach Supporting the Pedestrian Environment Mobility & Sustainability

More information

Public Workshop #2. September 14, 2016

Public Workshop #2. September 14, 2016 Public Workshop #2 September 14, 2016 Agenda Welcome Project Overview Where We Have Been Alternatives for State Street Land Use Street Design Next Steps 2 Project Overview Create a Vibrant State Street

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

CHAPTER 7.0 IMPLEMENTATION

CHAPTER 7.0 IMPLEMENTATION CHAPTER 7.0 IMPLEMENTATION Achieving the vision of the Better Streets Plan will rely on the ability to effectively fund, build and maintain improvements, and to sustain improvements over time. CHAPTER

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

Yonkers Raceway may consider moving track as part of expansion

Yonkers Raceway may consider moving track as part of expansion Yonkers Raceway may consider moving track as part of expansion ALBANY - The owners of Yonkers Raceway are considering various options as they look to develop the 100-acre site that's home to Empire City

More information

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview ATTACHMENT 4 - TDM Checklist TDM Checklist Overview The proposed checklist rates developments on the degree to which they are TDM and transit supportive. Points are assigned based on the level of transit

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

4. Action Plan & Projects

4. Action Plan & Projects 4. Action Plan & Projects 45 46 ACTION PLAN AND PROJECTS The Action Plan organizes the list of transportation projects described in the Mobility Framework Plan section into short-term (0-5 years) and long-term

More information

Stakeholder Meeting Handouts. January 2013

Stakeholder Meeting Handouts. January 2013 January 2013 Stakeholder Meeting Handouts The Case FOR Parking Minimum Requirements Reduce street congestion around the development site Avoid parking spillover Create orderly development patterns Anticipate

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Mainstreet Master Plan Land Use

Mainstreet Master Plan Land Use Mainstreet Master Plan 04 Land Use Top Recommendations Active Uses: Promote active ground-floor uses such as retail, restaurants, galleries and personal services with interactive storefronts for Mainstreet

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

Northside Livable Centers Study

Northside Livable Centers Study Northside Livable Centers Study Advisory Committee Meeting #2 Preferred Conceptual Plan March 2, 2010 AGENDA FOR ADVISORY COMMUNITY WORKSHOP #1 Project Overview and Timeline Planning Area Overview Workshop

More information

The Naples Park Community Plan DRAFT- MARCH 2003

The Naples Park Community Plan DRAFT- MARCH 2003 The Naples Park Community Plan DRAFT- MARCH 2003 prepared by: Dover, Kohl & Partners Town Planning Agnoli, Barber, & Brundage, Inc. Drainage Analysis Hall Planning and Engineering Transportation Planning

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas GLEN EIRA CITY COUNCIL MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas 1 WHAT HAVE WE HEARD? WHAT NOW? Stage one Tell us what you love about your shopping strip November

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

7 NE 145TH STREET STATION TOD POTENTIAL

7 NE 145TH STREET STATION TOD POTENTIAL 7 NE 145TH STREET STATION TOD POTENTIAL Key Findings The 145th Street Station area has limited TOD potential, primarily because of its location in an area that is currently zoned predominantly single-family

More information

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 OVERALL LAND USE CONCEPT Overall Broadway Valdez District: 95.5 acres (35.1 acres right-of ways + 60.4 acres developable land) Plan Subareas:

More information

Chapter 3: Multi-Modal Circulation and Streetscapes

Chapter 3: Multi-Modal Circulation and Streetscapes CHAPTER 3: MULTI-MODAL CIRCULATION AND STREETSCAPES Chapter 3: Multi-Modal Circulation and Streetscapes Overview Streetscape improvements have already been completed for Depot Street between Main Avenue

More information

Site Analysis and Parti Development

Site Analysis and Parti Development Site Analysis and Parti Development 32_43 06.11N, 117_09 25.15W Dean Sartain Assignment # 4 AR 650: Programming Instructor: Mirkovich 1. LOCATION within the city. - The site is located between A St & B

More information

I-20 East Transit Initiative. Stakeholder Advisory Committee Meeting September 9, :00-6:00 PM

I-20 East Transit Initiative. Stakeholder Advisory Committee Meeting September 9, :00-6:00 PM I-20 East Transit Initiative Stakeholder Advisory Committee Meeting September 9, 2010 4:00-6:00 PM Meeting Agenda Introductions Project Background Study Overview Role of the SAC Initial Study Findings

More information

Maryland Stadium Authority to Release Phase Two of the Pimlico Race Course Study

Maryland Stadium Authority to Release Phase Two of the Pimlico Race Course Study to Release Phase Two of the Pimlico Race Course Study Baltimore, MD The (MSA) is pleased to announce that the Phase Two, Pimlico Race Course Study is complete. The study will be available online on Thursday,

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim

Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim Wards 3 and 22 Official Plan Transportation Master Plan Cycling Plan Pedestrian Plan October 2013 ottawa.ca/liveableottawa

More information

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017 Downtown Naples Mobility and Connectivity Study Naples City Council Presentation January 2017 Agenda 1. Introduction 2. Scope Review 3. Project Schedule 4. Existing Conditions 5. Public Charrette 6. Mobility

More information

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors. Lincoln Highway Streetscape Plan Stakeholder Workshop #2 Handout Contents Introduction and Project Vision Planning Principles Specific Recommendations including a Proposed Typical Roadway Section Renderings

More information

Paoli Road Improvement Feasibility Study

Paoli Road Improvement Feasibility Study Paoli Road Improvement Feasibility Study & Public Participation Project March 24, 2015 Prepared for: Tredyffrin Township Prepared by: McMahon Associates, Inc. with Town Planning Partnership, LLC Glackin

More information

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS INTRODUCTION The thoroughfare plan will assist public officials in the development of a specialized system for efficient and safe movement of vehicular traffic while minimizing potential conflicts with

More information

ANGLE LAKE DISTRICT STATION AREA PLAN

ANGLE LAKE DISTRICT STATION AREA PLAN SCHOOL ANGLE LAKE DISTRICT STATION AREA PLAN ADOPTED JULY 2015 TABLE OF CONTENTS Introduction... 1 Existing Conditions... 4 Economic Opportunity... 15 Community Vision... 18 Urban Design Framework... 22

More information

Berkeley Strategic Transportation Plan A-76

Berkeley Strategic Transportation Plan A-76 Berkeley Strategic Transportation Plan A-76 Appendices 1. A Team Effort 2. Where We ve Been A-11 Berkeley Strategic Transportation Plan Alameda County Transportation Plan Alameda County will be served

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

7/23/2017 VIA  . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE NASHVILLE, TENNESSEE EXECUTIVE SUMMARY Executive Summary A world-class multi-modal transportation system is essential to a vibrant city and better quality of life. -Mayor Barry The WalknBike plan aims

More information

Overview. Existing Conditions. Corridor Description. Assessment

Overview. Existing Conditions. Corridor Description. Assessment Overview A study of the 23 rd Street corridor was undertaken to document the existing conditions, analyze traffic operations, and recommend remedies for deficient situations Although 23 rd Street is frequently

More information

WEST CENTRAL DRAFT DISTRICT PLAN SUBMISSION 3 HASSAL ST WESTMEAD

WEST CENTRAL DRAFT DISTRICT PLAN SUBMISSION 3 HASSAL ST WESTMEAD Ref: OBF 170330 LGSC - DDP Sub 30 March 2017 Greater Sydney Commission PO Box 257 PARRAMATTA NSW 2124 Attention: District Commissioner - Professor Edward Blakely Dear Professor Ed Blakeley, WEST CENTRAL

More information

SANTA MONICA BOULEVARD CORRIDOR

SANTA MONICA BOULEVARD CORRIDOR CIRCULATION ELEMENT WHITE PAPER NO. 3 SANTA MONICA BOULEVARD CORRIDOR INTRODUCTION From the 1930s to the beginning of Los Angeles freeway era, Santa Monica Boulevard, (previously Route 66, the Beverly

More information

NEWMARKET UPHAM S CORNER

NEWMARKET UPHAM S CORNER SOUTH STATION Planning Initiative NEWMARKET UPHAM S CORNER COLUMBIA ROAD (P) FOUR CORNERS/GENEVA Working Advisory Group (WAG) Meeting #5 TALBOT AVENUE MORTON STREET BLUE HILL AVE/CUMMINS HWY (P) RIVER

More information

Rochester Area Bike Sharing Program Study

Rochester Area Bike Sharing Program Study roc bike share Rochester Area Bike Sharing Program Study Executive Summary ~ January 2015 JANUARY 2015 8484 Georgia Avenue, Suite 800 Silver Spring, MD 20910 3495 Winton Pl., Bldg E, Suite 110 Rochester,

More information

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith

More information