1 SEA BREEZE Sea Breeze is a Self-installing Gravity Base System (GBS) WTG foundation for Any existing or projected Turbine for Waters Depths up to 60m. 1
2 SEA BREEZE Sea Breeze is designed in every aspect by Ocean Energy & Resource (Ocean) to save its owners and operators money. Sea Breeze is substantially cheaper to manufacture and deploy than comparable systems, but more than that its simple design philosophy offers huge flexibility in operation and location. Sea Breeze s design offers further ongoing advantages once in operation by reducing medium and long term cost through its ease of maintenance and its ability to be simply redeployed or recovered back to shore for refit or major repair thus maximizing economical service life. Ocean Energy & Resource Ltd Castlegate Business Park Portskewett Caldicot NP26 5AD United Kingdom Telephone: +44 (0) info@oceanresource.co.uk 2018 Ocean Energy & Resource Ltd Note: Sea Breeze is subject to patents and copyright wholly owned or controlled by Ocean Energy & Resource Ltd and Mr David Bone, Inventor. 2
3 Contents Introduction...Page 04 Description... Page 04 Production... Page 05 Partners...Page 07 Installation... Page 08 Redeployment...Page 09 About Ocean...Page 10 Introduction 3
4 Sea Breeze is a Self-installing Gravity Base (GBS) foundation system suitable for the largest wind turbine towers sited in waters up to 60m. The Sea Breeze design concept can support any size of both 2 and 3 bladed offshore WTGs as well as future Vertical Axis Wind Turbines (VAWTs). The Sea Breeze foundation is specifically designed for low cost series production using prefabrication and assembly line methods, with full onshore build and commissioning of the turbine prior to deployment. The gravity base itself is formed of three cylindrical cellular caissons constructed in reinforced concrete. The unique design permits the completely assembled Wind Turbine Generator (WTG) to be towed as a self-floating unit to its offshore location where it is deployed in a single operation within in a few hours. Once installed at its operating location Sea Breeze provides a high-integrity and stable foundation for the specified WTG. It complies with all relevant offshore Codes and Standards exhibiting industry standard factors of safety against sliding, bearing and overturning. As a gravity base design; expensive piling with its associated environmental problems is obviated. The Sea Breeze footpads are purpose designed to suit the site seabed conditions and may incorporate steel skirts or other foundation enhancements as required. Where necessary, provision is made to provide protection against scour. Description The Sea Breeze Gravity Base Structure (GBS) comprises a post-stressed and reinforced concrete tower (the sub-structure tower) located in the centre of a symmetrical group of three cylindrical multi-cellular hollow reinforced concrete caisson structures of proven design. These cells form a wide relatively shallow base for the WTG structure once installed and provide buoyancy during transport and installation. The cells are each sub-divided into discreet groups to provide for damage stability and differential ballasting during installation and set-down. The cell groups are tested for watertight integrity during construction. Each cell is fitted with a ballast system designed to allow careful control of the descent through the water column during installation and to permit the operation to be reversed if required. 4
5 The three caissons are linked by diametric walls having full moment connection with the central poststressed concrete tubular column which in turn supports the steel wind turbine tower (WTG Support Tower). The base of the steel turbine tower is connected to. A boat landing platform and ladder to the tower access platform just below the main flange allow access into the tower through a standard door. The Sea Breeze GBS and its turbine is a self-floating structure designed to withstand the environmental forces of towage and installation. When deballasted its inherent buoyancy is used to aid these operations. This means that no specialised vessels or heavy-lift facilities are required during installation thus dramatically reducing costs and project risk whilst increasing project flexibility. Once installed on location, in-place stability is provided by the on-bottom weight of the combined structure The submerged weight of the gravity base together with the weight of the steel tower and WTG and associated equipment weights and loadings are transferred to the seabed soil foundation via a patented system of detachable footpads each tailored to meet a specific site s characteristics in relation to level and seabed conditions. The use of these footpads also simplifies later removal of the platform at the end of its field life. If required, steel skirts are used to obviate liquefaction effects and mobilise stronger soils beneath the upper mobile soil layers. In certain conditions suction pile hybrids may be applicable. Once Sea Breeze is commissioned, routine servicing and maintenance will be much lower than that required for steel piles or steel jackets as concrete is stable in seawater requiring only inspection from time to time. Moreover, Sea Breeze has the huge advantage that at any time it can be easily recovered back to shore for major maintenance, such as gearbox, generator or blade replacement all at a fraction of typical offshore maintenance costs. Fabrication and Assembly Sea Breeze will be constructed using assembly line mass production techniques sited on a quayside or dock area. Bulk materials for the concrete element of the caissons will be delivered by truck or ship and likewise all other components necessary for the complete assembly of the Sea Breeze WTG Foundation will be prefabricated on or off site and be delivered for final assembly. A computer controlled batching plant will ensure the highest quality. The foundation structure will be assembled on a slipway ready. Once complete the Sea Breeze will be launched and then towed and secured at the fitting-out quay. The turbine and associated equipment and systems will be brought to site again either by boat or road and will be fitted to the foundation unit. Following fit-out full power testing and commissioning will be implemented. Testing will include all ballasting and installation systems.. 5
6 Typically the same dock will be used for the delivery by ship of turbine towers, nacelles and blades. A permanent crane will be used for both unloading of components and commissioning. Sea Breeze can be fitted with the turbine blades inshore thus further reducing the complexity of offshore operations. This is the preferred installation option and it should be noted that our hydrodynamic analysis (using verified software) and model testing demonstrate that the installation loads encountered during transport and installation are considerably lower than operational design loads. If, however, client planning precludes this option the blades may be installed offshore without the use of heavy lift vessel using proven offshore lifting techniques. 6
7 Partners To ensure that Ocean has the resources, capability and facilities to produce and deliver Sea Breeze in partnership with offshore wind farm developers, Ocean has engaged the following companies: Interserve plc is one of the world's foremost support services and construction companies. Based in the UK and listed in the FTSE 250 index with gross revenue of 2.3 billion and a workforce of over 50,000 people worldwide. Interserve focuses on framework agreements, private finance initiative (PFI) projects and long-term maintenance contracts. Interserve has a progressive approach, working in true partnership and forming long-term relationships with clients and supply chains through each stage of the project life cycle. In addition, Interserve's specialist business RMD Kwikform is a global leader in formwork, false work and associated safety and access equipment. These systems, all created by their own design engineers, provide moulding forms and temporary support during the creation of substantial concrete structures. The key benefit is that they enable construction processes to be designed optimally, providing added value to customers that can be measured - such as lowest in-use cost and reduced construction cycles. RMD Kwikform as partners in the Sea Breeze JV, provides expert knowledge on pre-cast concrete construction. 7
8 Tow Out & Installation Sea Breeze is towed out using two offshore tugs (around 4500 HP and 1500 HP non-oil industry tugs). The second tug provides redundancy for safety purposes and is also used to assist with positioning and installation. Once on location Sea Breeze is manoeuvered and secured into its operational position. The ballasting system is connected and tested and once commissioned the unit is installed by controlled ballasting. The installation vessels control the plan position of the Sea Breeze during installation. Position control will be effected by DGPS at the surface and high frequency sonar transponders subsea. Position will be visually checked by ROV throughout the operation. 8
9 The procedures are well understood and have been developed and used by Ocean personnel on many occasions. Only seawater ballast is used during this procedure thus avoiding the cost of expensive solid ballasting operations. When the GBS descends below the surface, the descent is controlled and the tower remains vertical throughout using a reusable buoyancy frame. The foundation can easily be held just off the sea bed to ensure accurate placement. Once the GBS has settled on the sea bed in the desired position it is fully ballasted with sea water. Seabed preparation is generally not necessary and several structures exist using the technology applied in this application. If scour protection is required following installation then, this can be provided with rock dump/scour mats or artificial seaweed. At this point, the installed WTG, tower and foundation are secure. Subsequent operations may follow on immediately or can be implemented later in accordance with overall wind farm planning. From now on all tie-in and commissioning work attaching the WTG to the grid is carried out from the work platform at the top of the sub-structure tower (approximately 10 metres above MSL) with vessel support. Temporary power when unmanned is supplied from a generator/battery to support navigation, aircraft warning and tower internal lights when manned. Redeployment The removal and redeployment process is essentially the reverse of installation. Decommissioning costs are therefore relatively light. Furthermore, the ease of removal offers the opportunity to implement major repairs or refit/modernisation can be implemented inshore at lower cost and greater flexibility. Patented techniques permit easy and safe deballasting. Typical Specification WTG Size- Water Depth - Central Column height- Foundation Base - Caisson Diameter- 6.2 MW 60m Maximum 10m above Mean Sea Level (MSL) 55m outer diameter 22m 9
10 About Ocean Energy & Resource Ltd Ocean Energy & Resource Ltd (Ocean) has gained unsurpassed experience in subsea and ocean engineering worldwide, providing a wide range of complex and innovative engineering to the offshore petrochemical, energy and defence industries building, installing, maintaining and operating these systems on a turnkey basis. Ocean understands the issues in building offshore wind farms and know that the designs offered on these pages, when utilised will completely re-write the accepted economics of developing, commissioning and operating a wind farm. We offer simple innovative and radical solutions to the complex issues involved, driving maximum cost efficiency in construction, servicing, maintenance and ultimately disposal. The purpose of Ocean s offshore energy products is to completely Re-Engineer the economics of offshore wind energy. Ocean s products have the potential to generate enormous additional profits for the power companies that deploy them because in the first instance they drastically reduce the installation and near term costs of establishing wind farms. Ocean understands that offshore wind energy quickly needs profitability without subsidy to garner public support and be fully sustainable. Ocean s products will also generate and deliver their power far more cost effectively over the medium and long terms, prolonging the useful life and ongoing viability through much cheaper servicing and maintenance, thus ensuring that the operator, consumer and taxpayer receives the best possible value and maximum sustainability of supply. Telephone: +44 (0) info@oceanresource.co.uk 2018 Ocean Energy & Resource Ltd Note: Sea Breeze is subject to patents and copyright wholly owned or controlled by Ocean Energy & Resource Ltd and Mr David Bone, Inventor. 10
OCEAN BREEZE. Ocean Breeze is a Deeper Water Wind turbine Foundation System for The Largest Wind Turbine Towers Sited in Waters up to 200m
OCEAN BREEZE Ocean Breeze is a Deeper Water Wind turbine Foundation System for The Largest Wind Turbine Towers Sited in Waters up to 200m Ocean Energy & Resource Ltd 1 OCEAN BREEZE Ocean Breeze is designed
More informationSEA MET. Sea Met is a Re-Usable Self Installing Meteorological Mast for Water Depths up to 60m OCEAN ENERGY & RESOURCE LTD
SEA MET Sea Met is a Re-Usable Self Installing Meteorological Mast for Water Depths up to 60m OCEAN ENERGY & RESOURCE LTD 1 SEA MET Sea Met is designed in every aspect by Ocean Energy and Resource Ltd
More informationInnovative and Robust Design. With Full Extension of Offshore Engineering and Design Experiences.
Innovative and Robust Design by VL Offshore With Full Extension of Offshore Engineering and Design Experiences www.vloffshore.com Y Wind Semi Designed by VL Offshore The Y Wind Semi platform (foundation)
More informationField Development & Construction
Field Development & Construction Michael Cowie Technical Director Ecosse Subsea Systems Ltd Ambient Lifting: A Real Alternative to Heavy Lift Vessels 4 th February 2016, AECC, Michael Cowie Presentation
More informationExamining the merits of jack up platforms as foundations for the offshore wind industry
Examining the merits of jack up platforms as foundations for the offshore wind industry By 20 May 2011 1 ABSTRACT A new type of offshore wind foundation has emerged from the offshore oil fields and is
More informationOffshore // Marine // Subsea Cable solutions that thrive under pressure
Offshore // Marine // Subsea Cable solutions that thrive under pressure Underwater and pressure resistant cables and harnesses for your needs For over 40 years Habia Cable has developed and manufactured
More informationOur Company. Sail with us into calm waters! -
Rudder Systems Our Company The company MM-Offshore GmbH is one of the major designing and producing ship s equipment supplier in the international shipbuilding market. With our experience of more than
More informationSustainable Installation & Maintenance Methods Keith McDermott Commercial Director for Tidal Energy Mike Wilson - Managing Director Mike Wilson
Sustainable Installation & Maintenance Methods Keith McDermott Commercial Director for Tidal Energy Mike Wilson - Managing Director Mike Wilson Managing Director Ecosse Subsea Systems Ltd Personnel ESS
More informationFully Submersible Heavy Lift Vessel
Fully Submersible Heavy Lift Vessel Arnbjorn Joensen Aberdeen Maritime Branch (28th January 2015) PRESENTATION Introduction to the Subsea Deployment Vessel Installation method Tank test video Potential
More informationV MW Offshore leadership
V120-4.5 MW Offshore leadership OptiSpeed allows the rotor speed to vary within a range of approximately 60 per cent in relation to nominal rpm. Thus with OptiSpeed, the rotor speed can vary by as much
More informationROV Development ROV Function. ROV Crew Navigation IRATECH SUB SYSTEMS 2010
IR AT EC H SU B SY ST EM S 20 10 Remotely Operated Vehicle ROV INTRODUCTORY 2008 2008 1 KEY POINTS ROV Introductory ROV Development ROV Function Types of ROV ROV Crew Navigation ROV Components 2 ROV Development
More informationThe Benefits Of Composite Materials In Deepwater Riser Applications. 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd
The Benefits Of Composite Materials In Deepwater Riser Applications 26 th March 2015 Hassan Saleh Senior Engineer 2H Offshore Engineering Ltd Composite Benefits and Challenges Composite Materials offer
More informationOFFSHORE WIND: A CRASH COURSE
OFFSHORE WIND: A CRASH COURSE OFFSHORE WIND: DEFINED OFFSHORE WIND: Construction of wind farms in bodies of water to generate electricity from wind. Unlike the typical usage of the term offshore in the
More informationWIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE
WIND TURBINE SHUTTLE HUISMAN PRODUCT BROCHURE WIND TURBINE HUTTLE TABLE OF CONTENTS 01 DESCRIPTION 03 1.1 Vessel General 03 1. Purpose of the Vessel 0 1.3 High Workability 0 1. Installation Scenarios 05
More informationOur Company. Sail with us into calm waters! -
Rudder Systems Our Company The company MM-Offshore GmbH is one of the major designing and producing ship s equipment supplier in the international shipbuilding market. With our experience of more than
More informationThe SDS Skip. Subsea Deployment Systems Ltd.
The SDS Skip SUBSEA SKIP An alternative to enhance the recovery of structures, spool pieces, mattresses etc. during decommissioning work Can be used to transport complex structures or spool pieces to field
More informationCharlottetown Marine Terminal Pipeline Decommissioning Project Description
Charlottetown Marine Terminal Pipeline Decommissioning Project Description 69 Marr Road Unit B Rothesay NB, E2E 3J9 Tel (506) 848-1920 Fax (506) 848-1929 Charlottetown Marine Terminal Pipeline Decommissioning
More informationDevelopment of a New Deep-Water Riser System. Daniel Karunakaran Subsea 7
Development of a New Deep-Water Riser System Daniel Karunakaran Subsea 7 Introduction Grouped SLOR TM is an open bundle riser solution developed by Subsea 7 and 2H Offshore Array of close standing SLOR
More informationDesign of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras
(Refer Slide Time: 00:32) Design of Offshore Structures Prof. S. Nallayarasu Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 1 Concepts of Fixed Offshore Platform
More informationINSPECTION & NON-DESTRUCTIVE TESTING
INSPECTION & NON-DESTRUCTIVE TESTING Stork delivers experienced and efficient Inspection and NDT solutions; as a tailored package or a standalone service. WWW.STORK.COM 1 GLOBAL SERVICE WITH A LOCAL PRESENCE
More informationEXPERIMENTAL INVESTIGATIONS OF BARGE FLOATER WITH MOONPOOL FOR 5 MW WIND TURBINE
EXPERIMENTAL INVESTIGATIONS OF BARGE FLOATER WITH MOONPOOL FOR 5 MW WIND TURBINE 1 MR. G.VIJAYA KUMAR, 2 DR. R. PANNEER SELVAM 1 M.S. Research Scholar, Department of Ocean Engineering, IIT Madras, Chennai,
More informationFully Submersible Heavy Lift Vessel
Fully Submersible Heavy Lift Vessel Arnbjorn Joensen Oil and Gas Authority (OGA) (15th February 2016) CONTENT Leadon structures demobilisation Competitiveness (case studies) Decommissioning options Installation
More informationMinimal Structures for Marginal Nova Scotia Developments
Minimal Structures for Marginal Nova Scotia Developments May 12, 2009 Cameron Dunn Martec is a member of the Lloyd s Register Group 1 2 Minimal Structures Project NSDOE working to make the Nova Scotia
More informationA NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING
A NEW APPROACH TO BUCKLING DETECTION IN OFFSHORE PIPELINE LAYING By Marian Copilet, Durham Pipeline Technology Ltd., Gateshead, UK & Prof. Ernie Appleton, University of Durham 1. ABSTRACT This paper discusses
More informationG+ Global offshore wind health and safety organisation
G+ Global offshore wind health and safety organisation 2016 incident data report www.gplusoffshorewind.com About the G+ Global offshore wind health and safety organisation The primary aim of the G+ is
More informationPile Gripper Systems
Pile Gripper Systems Accurate positioning and restraint of offshore construction piles + + Accurate handling of piles up to 8.0m in diameter + + Pile positioning and adjustment within large envelopes +
More informationsarens
sarens group www.sarens.com Sarens Climbing Tower SCT The SARENS CLIMBING TOWER is designed for lifting heavy loads in the construction, petrochemical and offshore industries. The system is suited to using
More informationTEPZZ A_T EP A1 (19) (11) EP A1 (12) EUROPEAN PATENT APPLICATION
(19) TEPZZ 55475 A_T (11) EP 2 554 752 A1 (12) EUROPEAN PATENT APPLICATION (43) Date of publication: 06.02.2013 Bulletin 2013/06 (21) Application number: 11176100.3 (51) Int Cl.: E02D 7/06 (2006.01) E02D
More informationProduct highlights Variable frequency and thrust
Innovative engineering for extreme global environments FT550 - VIBROCORER The 3rd generation FT550 lightweight variable frequency high power vibrocorer leads the market in its technical innovation and
More informationTARPON A Minimal Facilities Platform
TARPON A Minimal Facilities Platform Contents Introduction TARPON Description TARPON Features TARPON Benefits TARPON Proofs TARPON Typical Installation Options Design Codes & Certification Novel Application
More informationProtection for Vessels Engaged in Servicing Submarine Cables
Protection for Vessels Engaged in Servicing Submarine Cables Proposed Amendments to COLREGS Brief to Navigation Safety Advisory Council November 28, 2012 Tampa, FL Dr. Ronald J. Rapp TE SubCom and Representing
More informationTechnology and innovation challenges for UK Offshore Wind Energy Andrew Scott
Technology and innovation challenges for UK Offshore Wind Energy Andrew Scott Offshore Wind Operations/Science Meets Industry, Bergen 2013 10 September 2013 2013 Energy Technologies Institute LLP The information
More informationDevelopment of Self-Installing Deepwater Spar. Ashit Jadav February 2017
Development of Self-Installing Deepwater Spar Ashit Jadav February 2017 Contents Introduction & Background ACE Spar breakdown Installation Sequence Main particulars, Hull design and Weight control Stability
More informationOffshore wind power in the Baltic sea
Offshore wind power in the Baltic sea Conditions for profitability Henrik Malmberg 2014-09-27 Content BACKGROUND... 2 PURPOSE... 2 ABOUT THE AUTHOR... 2 RELEVANT ISSUES... 3 WIND CONDITIONS AND ENERGY
More informationThree Lines of Defence
Three Lines of Defence 1. Prevent Grounding of Drifting Vessels 2. Contain Pollutants inside Damaged Hull 3. Remove Pollutants from Sunken Ship This is Miko Marine Miko Marine AS (Miko) is an innovative
More information35 years of unparalleled support to the offshore oil and gas industry.
35 years of unparalleled support to the offshore oil and gas industry. Offshore Construction Commercial Diving Cable Laying Remotely Operated Vehicles (ROV s) Marine Services I.R.M. ABOUT US CCC (Underwater
More informationUNDERWATER SERVICES COMPANY PROFILE
UNDERWATER SERVICES COMPANY PROFILE irov Underwater Services is an Italian Independent H i g h l y S p e c i a l i z e d C o m p a n y p r o v i d i n g underwater technology and ROV assistance to Salvage
More informationProtectingpipelinesfor
24 Protectingpipelinesfor Michael Paulin, Damien Humby and Joseph Cocker, INTECSEA Canada, and Glenn Lanan, INTECSEA Inc., describe the process of trenching for the protection of pipelines in ice environments.
More informationGERMAN RENEWABLE SHIPBROKERS S GERMAN RENEWABLE VESSEL PORTFOLIO ANY VESSEL ANYTIME
GERMAN VESSEL PORTFOLIO ANY VESSEL ANYTIME YOU THINK OFFSHORE WE FOLLOW YOUR THOUGHTS! A vessel for construction works at sea? An installation vessel for wind turbine generators or a sale and purchase
More informationCarnegie Wave Energy Limited
Carnegie Wave Energy Limited Mr Kieran O Brien Executive Director European Business Development Copyright Carnegie Wave Energy Limited 2015 1 Disclaimer The information contained herein has been prepared
More informationOFFSHORE WIND ACCELERATOR (OWA) Access Competition. Competition Overview and Technical Specification
OFFSHORE WIND ACCELERATOR (OWA) Access Competition Competition Overview and Technical Specification In partnership with In collaboration with Supported by Version 1.0. Wednesday 29 September 2010. Offshore
More informationV MW. Exceptional performance and reliability at high-wind-speed sites. vestas.com
V90-3.0 MW Exceptional performance and reliability at high-wind-speed sites vestas.com We deliver on the promise of wind power SUPERIOR YIELD AT HIGH-WIND-SPEED SITES High standards for weight and performance
More informationChallenges of up-scaling to a grid connected array. PECC Energy Transition June Arturo Troncoso, Director CWE Chile
Challenges of up-scaling to a grid connected array PECC Energy Transition 2013-2014 24 June 2014 Arturo Troncoso, Director CWE Chile Copyright Carnegie Wave Energy Limited 2014 1 Disclaimer The information
More informationThe WindFloat Project. Hamburg, September 2016
The WindFloat Project Hamburg, September 2016 WindFloat Atlantic: a step change in turning floating wind commercial Technical Performance Competitive LCOE Bankability 2 WindFloat Atlantic: overall description
More informationSensor Platform Project Marine Trials Bidders Conference. Fundy Ocean Research Center for Energy fundyforce.ca
Sensor Platform Project Marine Trials Bidders Conference Fundy Ocean Research Center for Energy fundyforce.ca 1 Project Team FORCE OceanWorks International Preliminary Design, Operational Procedures Murray
More informationOffshore Pipeline Installation SEABED INTERVENTION THE GAME-CHANGING EFFECT DISRUPTION TO HEAVY LIFTING HOW DO YOU MAKE THE SEABED?
OSI 2016 VOLUME 9 ISSUE 1 OSI VOL. 9 ISSUE 1 2016 i n d u s t r y DECOMMISSIONING THE GAME-CHANGING EFFECT DISRUPTION TO HEAVY LIFTING OFFSHORE-INDUSTRY.EU SEABED INTERVENTION HOW DO YOU MAKE THE SEABED?
More informationSea-going vessel versus wind turbine
Collision risk at high sea Sea-going vessel versus wind turbine Offshore wind power: Wind turbines off the German coast generally represent obstacles in the traffic routes of ships. What if a large sea-going
More informationThat is why. April 24, 2008
That is why Page 1 Our Vision: Wind, Oil and Gas Page 2 Our Product R&D and manufacture Assembly and testing Sales and planning Transport Installation Maintenance A 100% focused value chain Producing turbines
More informationInnovative Pressure Testing Equipment
Innovative Pressure Testing Equipment Oil & Gas Subsea Universities Nuclear Materials Science Supporting Industry and Research Worldwide www.kwdesign.co.uk Who are KW Designed Solutions? We are industry
More informationAPPENDIX D Oil Loading Pipeline - Options
MAUREEN DECOMMISSIONING PROGRAMME APPENDIX D CONTENTS D.1 Summary of Decommissioning Options Considered 3 D.1.1 D.1.2 D.1.3 Option 1 - Float the Pipeline and Tow it to Shore for Disposal 3 Option 2 Recover
More informationRAMSTM. 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs
RAMS 360 Riser and Anchor-Chain Integrity Monitoring for FPSOs Introduction to RAMS Tritech s RAMS is a 360 anchor-chain and riser integrity monitoring system for Floating Production Storage and Offloading
More informationWind Energy 101 for Southeastern Policy Makers Overview of Wind Energy Development and Potential in the US
Wind Energy 101 for Southeastern Policy Makers Overview of Wind Energy Development and Potential in the US Jim Doane, Senior Engineer March 2012, Charlotte, North Carolina, USA Agenda Introduction to PMSS
More informationCentre of Excellence for Subsea Safety
Centre of Excellence for Subsea Safety Departments nhc training nhc testing nhc consulting nhc emergency Medical Equipment Hyperbaric Welding 07 09 13 15 17 11 Welcome to nhc National Hyperbaric Centre
More informationTOPICS TO BE COVERED
UNIT-3 WIND POWER TOPICS TO BE COVERED 3.1 Growth of wind power in India 3.2 Types of wind turbines Vertical axis wind turbines (VAWT) and horizontal axis wind turbines (HAWT) 3.3 Types of HAWTs drag and
More information2016 OFFSHORE TRAINING AND ASSESSMENT SERVICES
2016 OFFSHORE TRAINING AND ASSESSMENT SERVICES INTRODUCTION ILS is a specialist training and assessment provider operating on a global basis in the offshore oil and gas industry. Our specialist services
More informationTRACK RECORD SEP. 2018
TRACK RECORD SEP. 2018 TABLE OF CONTENTS 1 INTRODUCTION... 3 2 MOTION COMPENSATED GANGWAY... 5 2.1 In operation at Walney Extension... 6 2.2 In operation at Borkum Riffgrund II... 7 3 MOTION COMPENSATED
More informationMulti-Purpose Workboats and Vessels. Marine Engineering and Construction. Salvage and Wreck Removal. Marine Consultancy Services
Multi-Purpose Workboats and Vessels Marine Engineering and Construction Salvage and Wreck Removal Marine Consultancy Services Marine Expertise and Support We are a progressive company with more than 50
More informationINNOVATIVE MOORING SYSTEMS
INNOVATIVE MOORING SYSTEMS VESSEL AUTOMOORING MODULES QUAY AUTOMOORING INSTALLATIONS DOCKLOCK brings mooring to a next level PAGE 2 FOR OVER A CENTURY THE WORLD S LEADING EXPERT IN MOORING, BERTHING AND
More informationPLEM CONTROL SYSTEMS
Optimised PLEM Control Offspring International offers a range of PipeLine End Manifold (PLEM) control systems as part of its integrated CALM buoy and conventional buoy mooring and offloading systems. Available
More informationUnique Group employs over 450 people worldwide through its seven multi-site divisions: Survey Equipment. Marine & Subsea. Diving & Life Support
As an independently owned global company, Unique Group leads the way in providing engineering expertise, sales and rental equipment and the latest technology for the marine, diving, pipeline and subsea
More informationFukushima Floating Offshore Wind Farm Demonstration Project ( Fukushima FORWARD )
Fukushima Floating Offshore Wind Farm Demonstration Project ( Fukushima FORWARD ) - Construction of Phase I - 2MW Downwind-type Floating Wind Turbine Fukushima Mirai Fukushima offshore wind consortium
More informationSafety Zone Application Construction Phase Sheringham Shoal Wind Farm Project
Safety Zone Application Construction Phase Sheringham Shoal Wind Farm Project Classification: Internal Status: Draft Expiry date: 2009-12-18 Page 1 of 19 Title: Safety Zone Application Sheringham Shoal
More informationProduct outline. Titel. BBC-big bubble curtain. Revision: 12/10/2018
Product outline Titel Revision: 12/10/2018 Contents 1. Scope 2 2. Concept 3 3. The Jäger Mare Solutions BBC - Big Bubble Curtain - single or multiple laying principle 4 Since 1942 application-oriented
More informationOFFSHORE SURVEY IN DEVELOPMENT PROJECTS. Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe
OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, Offshore Surveys, Shell Projects & Technology Europe THE PROJECT: GOLDENEYE GOLDENEYE FACTS ST. FERGUS GOLDENEYE PLATFORM Gas Condensate Field
More informationScottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement
SHEPD Section ID 154 Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement Contents Definitions and Abbreviations...
More informationCathodic Protection Retrofit Options Comparison of Current Distribution
Cathodic Protection Retrofit Options Comparison of Current Distribution 1.0 Introduction There are three basic methods available for the deployment of anode systems when considering an offshore cathodic
More informationOffshore Oil and Gas Platforms for Deep Waters
Offshore Oil and Gas Platforms for Deep Waters Atilla Incecik Department of Naval Architecture, Ocean and Marine Engineering University of Strathclyde, Glasgow, UK (atilla.incecik@strath.ac.uk) Summary
More informationPLEM CONTROL SYSTEMS
PLEM CONTROL SYSTEMS Offspring International offers a range of PipeLine End Manifold (PLEM) control systems as part of its integrated CALM buoy and conventional buoy mooring and offloading systems. Available
More informationVIKING Defence We re right beside you
VIKING Defence We re right beside you VIKING LIFe-SAVING equipment - Protecting people and business 2 Helicopter Rescue VIKING Defence Discover the VIKING advantage Life-saving equipment is serious business,
More informationBERMAD Fire Protection Hydraulic Control Valves
BERMAD Fire Protection Hydraulic Control Valves Control Solutions with the Power to Protect BERMAD - The Company Since its foundation in 1965, BERMAD has focused its efforts on innovation, quality and
More informationPRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction
PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction This lecture deals with the equipment developed and the experience gained during
More informationBRINGING A NEW DIMENSION TO PIPELINE PIGGING. By: David Aitken, Aubin Group, UK
BRINGING A NEW DIMENSION TO PIPELINE PIGGING By: David Aitken, Aubin Group, UK The importance of keeping pipework clear of restrictions and debris to allow maximum flow conditions cannot be emphasised
More informationV MW Versatile megawattage
V80-1.8 MW Versatile megawattage This system features microprocessors that rotate the blades around their longitudinal axes, thus ensuring continuous adjustment to maintain optimal blade angles in relation
More informationThe latest automotive systems require innovative leak test methods and fixturing.
Leak Testing Auto Parts The latest automotive systems require innovative leak test methods and fixturing. In the past, automobile manufacturers only required basic forms of leak testing to check standard
More informationTYPES OF FOUNDATION. Superstructure. Substructure. Foundation
TYPES OF FOUNDATION Introduction: The lowest artificially built part of a structure which transmits the load of the structure to the soil lying underneath is called foundation. The supporting part of a
More informationLearn more at
Bottom Weighted Riser A Novel Design for Re-location and Disconnection Frank Lim and John McGrail 2H Offshore Engineering Ltd. Woking, Surrey, United Kingdom ABSTRACT Flexible pipe risers have limitations
More informationSWAGED CONNECTION SYSTEM FOR STRUCTURAL & PRESSURE TIGHT APPLICATIONS. Providing Total Solutions Through Swaging Technology
SWAGED CONNECTION SYSTEM FOR STRUCTURAL & PRESSURE TIGHT APPLICATIONS Providing Total Solutions Through Swaging Technology STRUCTURAL CONNECTIONS HISTORY The structural connection described in this brochure
More informationKOMPRESSOREN COMPRESSORS KAESER AIR SERVICE Our Services An Overview
KOMPRESSOREN Our Services An Overview Fully equipped 100% quality and service One of the key requirements for any compressed air application is maximum compressed air availability. This is achieved however
More informationComputer Simulation Helps Improve Vertical Column Induced Gas Flotation (IGF) System
JOURNAL ARTICLES BY FLUENT SOFTWARE USERS JA187 Computer Simulation Helps Improve Vertical Column Induced Gas Flotation (IGF) System Computer simulation has helped NATCO engineers make dramatic improvements
More informationULMATEC LAUNCH AND RECOVERY SYSTEMS
M L U NC LAU MS ERY V ECO DR N HA C E AT TE SYS S R LA ULMATEC LAUNCH AND RECOVERY SYSTEMS Ulmatec develops efficient, safe and robust solutions for handling remotely operated vehicles (ROVs) from ships
More informationNotice of operations at London Array Offshore Wind Farm
London Array Ltd. Construction Management Port of Ramsgate Military Road Ramsgate CT11 9LG www.londonarray.com Notice of operations at London Array Offshore Wind Farm Date of Notice: June 19th 2011 Notice
More informationComputational Fluid Dynamics
Computational Fluid Dynamics A better understanding of wind conditions across the whole turbine rotor INTRODUCTION If you are involved in onshore wind you have probably come across the term CFD before
More informationCACTUS MOON EDUCATION, LLC
CACTUS MOON EDUCATION, LLC ENERGY FROM THE WIND WIND ENERGY TECHNOLOGIES EDUCATION MODULE www.cactusmooneducation.com TEACHER S NOTES (wnd01tn) _ Cactus Moon Education, LLC. ENERGY FROM THE WIND WIND ENERGY
More informationTHE CHALLENGES OF A LARGE-AREA BATHYMETRIC SURVEY
THE CHALLENGES OF A LARGE-AREA BATHYMETRIC SURVEY Agenda: - Introduction - Tender - Project Planning - Survey - Processing - Delivery - Conclusion 2 Introduction We know less of the oceans at our feet,
More informationThe Challenge of Wave Scouring Design for the Confederation Bridge
13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada MARCH 2013 Paper Code. (13 - walsh) The Challenge
More informationLNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN
LNG TANDEM OFFLOADING A KEY ENABLING TECHNOLOGY TO MAKE LNG PRODUCTION OFFSHORE HAPPEN Fabrice Dumortier 1, Jean-Pierre Queau 1, Jean-Robert Fournier 2 1. SBM Offshore 2. SBM Offshore Keywords: 1. LNG;
More informationUMass Boston Waterfront at a glance
UMass Boston Waterfront at a glance Fox Point Pavilion Over the years, the Fox Point Landing has been a rest area, an outdoor classroom and a general meeting place for students, staff and faculty of the
More informationNorway s solution: Hywind- world s first full scale floating turbine Dr. Nenad Keseric Asset Manager/Specialist Statoil ASA MPR RE Operations
Norway s solution: Hywind- world s first full scale floating turbine Dr. Nenad Keseric Asset Manager/Specialist Statoil ASA MPR RE Operations Strategy and Support Leveraging Statoil s offshore oil and
More informationInternal Communication Systems for Maritime Operations. Ensuring safety and efficiency with clear and reliable communications
Internal Communication Systems for Maritime Operations Ensuring safety and efficiency with clear and reliable communications Challenges of Maritime Operations Crew personnel on vessels or offshore environments
More informationFor personal use only
ASX Announcement Thursday 25 th February, 2016 International Conference on Ocean Energy (ICOE) Presentation Please find attached Carnegie Wave Energy s presentation delivered yesterday at the 6th annual
More informationBarging in on Trent. Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab
REQUIRED READING FOR THE GLOBAL OIL AND GAS INDUSTRY SINCE 1975 www.offshore-engineer.com NOVEMBER 2005 Mexico s deep dilemma Tiny Timor joins the fray Double first for Baobab Barging in on Trent PLUS:
More informationACCESS the BLUE ECONOMY ALL OCEANS Engineering Ltd
Subsea Expo 2018 ROV Conference 07.02.2018 ACCESS the BLUE ECONOMY The BLUE ECONOMY - DEFINITION The Blue Economy is a book by Gunter Pauli publish in 2010 based on the idea that he developed in 2004 In
More informationPROVEN, RELIABLE PRODUCTS FROM A TRUSTED PARTNER Samson Heavy-Lift Slings
PROVEN, RELIABLE PRODUCTS FROM A TRUSTED PARTNER Samson Heavy-Lift Slings SAMSON HEAVY-LIFT SLINGS TESTED AND PROVEN TECHNICALLY SOUND Samson s R&D department has performed comprehensive testing of sling
More informationMSC Guidelines for the Review of Oil Spill Response Vessels (OSRV), Lightship and Stability
R. J. LECHNER, CDR, Chief, Tank Vessel and Offshore Division Purpose This Plan Review Guidance (PRG) explains the requirements for seeking plan approval for stability plans and calculations from the Marine
More informationThis project has been withdrawn by the developer. Atlantic Array Wind Farm
This project has been withdrawn by the developer Developer: RWE Site Size: Covering an area of approximately 200km². Atlantic Array Wind Farm Site Location: The wind farm would be located in the Bristol
More informationAUSTAL WIND EXPRESS SERIES
WIND EXPRESS SERIES ABOUT AUSTAL AUSTAL WIND EXPRESS SERIES Austal is the world s leading designer and builder of customised, high performance aluminium vessels for both commercial and defence applications
More informationWave Energy Converters (WECs)
Aquamarine Power Oyster* The Oyster is uniquely designed to harness wave energy in a near-shore environment. It is composed primarily of a simple mechanical hinged flap connected to the seabed at a depth
More informationBACKGROUND TO STUDY CASE
BACKGROUND TO STUDY CASE German Aerospace Center (DLR) is using Andøya Rocket Range for a sounding rocket campaign. On 27th October 2005 a 300 kg payload (SHEFEX) was launched Due do a technical problems
More informationAn Ocean of Possibility
An Ocean of Possibility SPM Offloading Buoy CALM Buoy Orwell Offshore s Catenary Anchor Leg Mooring (CALM) Buoy offers a reliable state-of-the-art solution for loading and offloading crude oil, refined
More informationEXECUTIVE SUMMARY MARINE AGGREGATE DREDGER (MAD) 5600
EXECUTIVE SUMMARY MARINE AGGREGATE DREDGER (MAD) 5600 EXECUTIVE SUMMARY Damen offers a range of trailing suction hopper dredgers, dedicated for aggregate dredging. The innovative standard designs are future
More information