1 SEPARATION SYSTEMS The L.P. Separator (MBD-1600) is a 3-phase separator that receives bulk production from the L.P. Header (GAY-1500), I.P. Separator Oil dump and the H.P. Separator Oil Dump. Gas is discharged to the Compressor 1 st Stage Suction Scrubber. Oil is dumped to the Heater Treater (NBK-300) but can be directed to the Wet Oil Tank (ABJ-1800). Water is dumped to the Water Skimmer (MBM-4000) but can be directed to the Wet Oil Tank (ABJ-1800). The I.P. Production Separator, MBD-1200 is a 3-phase separator that receives bulk production from the I.P. Header (GAY-1200). Gas is discharged to the Compressor 1 st Stage Suction Scrubber. Oil is dumped to the Heater Treater (NBK-300) but can be directed to the L.P. Separator (MBD-1600) or the Wet Oil Tank, (ABJ-1800). Water is dumped to the Water Skimmer (MBM-4000). The H.P. Production Separator (MBD-1100) is a 3-phase separator which receives flow from the H.P. Header (GAY-1000). Gas is discharged to the Compressor 1 st Stage Suction Scrubber but can be directed to either of the Bi-Directional Pipelines (KAA-1370/1380). Oil is dumped to the Heater Treater, (NBK-300) but can be directed to the L.P. Separator (MBD-1600) or the Wet Oil Tank, (ABJ-1800). Water is dumped to the Water Skimmer, (MBM-4000). The Test Separator (MBD-2100) is a 3-Phase separator that is designed to test the well stream of a single well. The operator must manually switch the well stream to the Test Header (GAY-2000) to direct the well stream to the Test Separator. Gas is discharged to the Compressor 1 st Stage Suction Scrubber but can be directed to either of the Bi-Directional Pipelines (KAA-1370/1380). Oil is dumped to the Heater Treater, (NBK-300) but can be directed to the L.P. Separator (MBD-1600) or the Wet Oil Tank, (ABJ-1800). Water is dumped to the Water Skimmer, (MBM-4000). The Gas Filter (MAK-8500) is a 2-phase vessel which receives flow from the discharge of the Gas Compressor but can receive flow from the Bi-Directional Pipeline (KAA-1350) Buy Back line. Gas is discharged to the Gas Lift Header and the Departing Gas Lift Pipelines, KAH-1400 / KAH Liquids from the Gas Filter are dumped to the L.P. Header, (GAY-1500). Rev: 1 Date: 3/13/17 Page 1 of 8 VR 272 A

2 A. PRE-STARTUP PROCEDURE NOTICE: Refer to Preliminary Considerations in SECTION 3, PART A before beginning any start-up procedures. 1. L.P. Separator, MBD-1600 and L.P. Header, GAY-1500 Gas discharge PC/PCV Oil dump LC/LCV s Water dump LC/LCV 2. I.P. Separator, MBD-1200 and I.P. Header, GAY-1200 Oil dump LC/LCV Water dump LC/LCV 3. H.P. Separator, MBD-1100 and H.P. Header, GAY-1000 Gas discharge PC/PCV Oil dump LC/LCV Water dump LC/LCV Rev: 1 Date: 3/13/17 Page 2 of 8 VR 272 A

3 4. Test Separator, MBD-2100 and Test Header, GAY-2000, (if the Test System will receive flow) Gas discharge PC/PCV Oil dump LC/LCV Water dump LC/LCV 5. Gas Filter, MAK-8500 Liquid dump LC/LCV Rev: 1 Date: 3/13/17 Page 3 of 8 VR 272 A

4 B. START-UP PROCEDURES 1. L.P. Separator, MBD-1600 be bypassed for start-up (flag device as appropriate) on the Upstairs Control Panel b. Pull the Pull to Reset relay to reset the L.P. Separator safety devices on the Upstairs Control Panel 2. I.P. Separator, MBD-1200 be bypassed for start-up (flag device as appropriate) on the Master Control Panel b. Pull the Pull to Reset relay to reset the I.P. Separator safety devices on the Master Control Panel Rev: 1 Date: 3/13/17 Page 4 of 8 VR 272 A

5 3. H.P. Separator, MBD-1100 be bypassed for start-up (flag device as appropriate) on the Master Control Panel b. Pull the Pull to Reset relay to reset the H.P. Separator safety devices on the Master Control Panel 4. Test Separator, MBD-2100 (if the Test System will receive flow) be bypassed for start-up (flag device as appropriate) on the Master Control Panel b. Pull the Pull to Reset relay to reset Test Separator safety devices and open inlet SDV on the MCP 5. Gas Filter, MAK-8500 be bypassed for start-up (flag device as appropriate) on the Master Control Panel/Gas Filter Panel b. Pull the Pull to Reset relay on the Gas Filter Panel to reset the Gas Filter safety devices and open inlet SDV Rev: 1 Date: 3/13/17 Page 5 of 8 VR 272 A

6 6. Continue to monitor bypassed safety devices and reset as they come in service 7. Immediately begin using Normal Operating Procedures to continue monitoring system REFER TO: SECTION 5, PART D Rev: 1 Date: 3/13/17 Page 6 of 8 VR 272 A

7 C. SHUT-DOWN PROCEDURES WARNING: If complete process shut-down is required in order to shutdown the desired separation system, REFER TO: SECTION 4 NOTICE: Refer to Preliminary Considerations in SECTION 4, PART A before beginning any shut-down procedures. 1. Shut-down and isolate minor components that discharge to the separation system, and are not capable of being diverted to another separation system a. Manually activate the liquid dump to lower the vessel liquid level. Use caution not to lower the level far enough to trip the LSL (if applicable) b. Use LO/TO procedure to shut-down and isolate liquid dump from discharging to separation system WARNING: The Separation System must be returned to service to accept discharge before high liquid level or additional shutdowns will be required. 2. Place the separation system safety devices that are likely to trip and cause a process shutdown in bypass and flag 3. If possible, divert flow from inputs to alternate systems WARNING: The capacity of any alternate system should be verified before adding any additional inflow. a. Open the manual valve to divert flow to alternate system b. Slowly close manual valve to isolate flow away from separation system to be shutdown c. Monitor system accepting diverted flow to ensure operation within safe parameters Will level or pressure control devices require adjustment? Will new operating ranges need to be established? Rev: 1 Date: 3/13/17 Page 7 of 8 VR 272 A

8 4. If necessary, manually activate liquid dumps in separation system vessels before isolating all system input CAUTION: Pay special attention to the levels in the minor components that were isolated and/or shutdown, the liquids dumped from this separation systems before final shut-down may have an effect on the liquids sent to those vessels later. 5. Shut-down facility inputs that flow to the separation system and will not be diverted a. Platform Wells REFER TO: SECTION P1, PART C b. Incoming/Bi-Directional Pipelines REFER TO: SECTION P2, PART C 6. Isolate the separation system a. Close all inlet manual valves to separation system b. Close gas discharge manual valves from system components c. Close oil & water dump manual valves from system components 7. Flag shut-down components as Out of Service 8. Open the manual gas relief/vent valve to bleed components to the relief system 9. Open the manual liquid drain valve to drain remaining liquid 10. Verify components are bled to 0 psig 11. Continue to monitor the other in service systems for safe operating parameters 12. Continue to monitor liquid level in other minor isolated components so appropriate action can be taken as necessary NOTICE: If shut-down was performed as preparation for maintenance work, or if the cause of the shutdown requires corrective action/repair, continue with Lock Out/Tag Out (LO/TO) Procedures REFER TO: Fieldwood Safe Work Practices for LO/TO (Section D Chapter 5) (can be found on the Fieldwood SEMS Portal) Rev: 1 Date: 3/13/17 Page 8 of 8 VR 272 A

SECTION P4 SEPARATION SYSTEMS

SECTION P4 SEPARATION SYSTEMS SEPARATION SYSTEMS The H.P. Separation System begins with the H.P. Production Header (GAY-1000). This header directs flow to the H.P. Production Separator (MBD-1000). Gases from the H.P. Production Separator

More information

SECTION P4 SEPARATION SYSTEMS

SECTION P4 SEPARATION SYSTEMS SEPARATION SYSTEMS The #1 Separator, MBD-0100 is a 3-phase separator which receives flow from the Incoming Pipeline, KAQ 0290. Gas from the Separator is directed to Fuel Gas Scrubber, and Gas Compressor

More information

SECTION P4 SEPARATION SYSTEMS

SECTION P4 SEPARATION SYSTEMS SEPARATION SYSTEMS The platform has a Separation System which consists of a Test Separator (MBD-100). The gas, oil and water discharges to the Departing Bulk Oil Pipeline (KAH-1200). Rev: 1 Date: 7/31/12

More information

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501).

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501). SEPARATION SYSTEMS The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501). The Header System is designed to collect and direct the well stream to the corresponding

More information

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM GAS DEHYDRATION SYSTEM High pressure and compressed gases flow through the Gas Scrubber (MBF-4540) to the Glycol Contactor (MAF-0900). In the Contactor, gas flows through trays, contacting the lean glycol

More information

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM GAS DEHYDRATION SYSTEM High pressure and compressed gases flow to the Glycol Contactor (MAF-3110). In the Contactor, gas flows through trays, contacting the lean glycol that is flowing across the trays

More information

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM GAS DEHYDRATION SYSTEM High pressure gases from the Gas Compressors (CBA-4070/4020) flow to the Glycol Contactor (MAF-1150). In the Contactor, gas flows through trays, contacting the lean glycol that is

More information

GAS COMPRESSION SYSTEM

GAS COMPRESSION SYSTEM GAS COMPRESSION SYSTEM The gas compression system at HI 376 A consists of two natural gas turbine-driven Compressors (CBA-4020/4070). Both Compressors are needed for the volume of gas being compressed.

More information

WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS

WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS The Wellheads, Flowlines and Gas Lift Injection Systems are designed to facilitate production from the reservoir to the platform s process systems. New

More information

NORMAL OPERATING PROCEDURES Operating Parameter Information

NORMAL OPERATING PROCEDURES Operating Parameter Information Operating Parameter Information Each operator performing the normal operating procedures (routine checks) of the facility should be familiar with the current normal operating parameters of all systems

More information

OPERATING PROCEDURES

OPERATING PROCEDURES OPERATING PROCEDURES 1.0 Purpose This element identifies Petsec s Operating Procedures for its Safety and Environmental Management System (SEMS) Program; it applies to all Petsec operations. Petsec is

More information

Start up XXX from normal shutdown Introduction

Start up XXX from normal shutdown Introduction Start up XXX from normal shutdown Introduction This procedure describes how to start a XXX after it has been shutdown normally, meaning there is a liquid and gas inventory in the unit. Task Criticality

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves Tools Required: Flow Meter Pressure gauge Holding valve test block Wrenches for installation of

More information

Central Washington University

Central Washington University Central Washington University Lockout / Tagout (LOTO) Program Plan prepared by: Central Washington University Office of Environmental Health & Safety 400 East University Way Ellensburg, WA 98926 P: 509-963-2252

More information

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N) 1 APPLICABILITY Exhibit 4 Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N) Definitions common to all certification and test procedures

More information

NGP-250/500 Nitrogen Generator Quick Start Guide

NGP-250/500 Nitrogen Generator Quick Start Guide NGP-250/500 Nitrogen Generator Quick Start Guide Version: A July 2013 Potter Electric Signal Company, LLC 5757 Phantom Dr., Suite 125 P. O. Box 42037 Hazelwood, MO 63042 Phone: (314) 595-6900 Document

More information

From the Choke KO drum, the gas passes through another gas/gas exchanger - the 'LTS Pre-cooler'.

From the Choke KO drum, the gas passes through another gas/gas exchanger - the 'LTS Pre-cooler'. Refer to Figures: 16 & 17 as you read on. Wet, natural gas direct from the wellstreams, at about 1600 Psi, is first pre-cooled and separated from liquids in an 'Intermediate Separator' and cooled in a

More information

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289 3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS Item #31289 The EASTWOOD 3 GALLON, OILLESS PANCAKE COMPRESSOR, with an Integral Air Regulator, efficiently supplies all compressed air requirements for

More information

Copeland Discus with CoreSense Diagnostics January 2011

Copeland Discus with CoreSense Diagnostics January 2011 Copeland Discus with CoreSense Diagnostics January 2011 Slide 1 1/27/2011 5:48 PM Discus with CoreSense Diagnostics Case Studies Supermarket In Columbus, Ohio Saves $4,500 With Discus with CoreSense Diagnostics

More information

Frequently Asked Questions Directive 056 Facilities Technical

Frequently Asked Questions Directive 056 Facilities Technical Frequently Asked Questions Directive 056 Facilities Technical October 2017 This document clarifies and supports some of the technical requirements related to Directive 056: Energy Development Applications

More information

OPERATION MANUAL NTF-15

OPERATION MANUAL NTF-15 OPERATION MANUAL NTF-15 Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81235-00 (Rev B) TABLE

More information

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS WIDDER TOOLS HPIC-10000-D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS Description: The WIDDER Hydrostatic Test Systems C Series is a portable, selfcontained, air driven hydrostatic

More information

Bobtail DOT 407 / 412 Vacuum

Bobtail DOT 407 / 412 Vacuum PROCO INCORPORATED AUGER OPERATION Manual Bobtail DOT 407 / 412 Vacuum Vacuum Tank Operation This vacuum tank has been built for Dot work. Extreme care must be exercised regarding product handling. The

More information

Lockout - Tagout. Control of Hazardous Energy OSHA Standard

Lockout - Tagout. Control of Hazardous Energy OSHA Standard Lockout/Tagout Lockout - Tagout Control of Hazardous Energy OSHA Standard 1910.147 What Is Lockout/Tagout? Referred to as LOTO Blocks the flow of energy from power source to the equipment Provides means

More information

OPERATION MANUAL NTF-60 Plus

OPERATION MANUAL NTF-60 Plus OPERATION MANUAL NTF-60 Plus Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81264-00 (Rev A)

More information

Lockout / Tag out Program

Lockout / Tag out Program Lockout / Tag out Program Presented by DOSHTI www.doshti.com You will learn Purpose of Lockout- Tag out Requirements for LOTO Types of Hazardous Energy Procedures for LOTO The OSHA Standard for the Control

More information

from Thames Cryogenics Ltd Total Cryogenic Solutions Cryogenic Cluster Day 22/09/2010

from Thames Cryogenics Ltd Total Cryogenic Solutions Cryogenic Cluster Day 22/09/2010 from Thames Cryogenics Ltd Total Cryogenic Solutions Cryogenic Cluster Day 22/09/2010 Dewar vessel noun. A container with an evacuated space between two walls, capable of maintaining its contents at a

More information

Kelsow Work Instruction. Subsea Well Control Hydraulic Panel Operation

Kelsow Work Instruction. Subsea Well Control Hydraulic Panel Operation Kelsow Work Instruction Subsea Well Control Hydraulic Panel Operation Table of Contents Overview............................................................................ 2 Hydraulic Panel Isolation...........................................................

More information

Successful Implementation of Dry Gas Seal in High Pressure Recycle gas Compressor at Hydrocracker & Effect of Gas composition on DGS Performance

Successful Implementation of Dry Gas Seal in High Pressure Recycle gas Compressor at Hydrocracker & Effect of Gas composition on DGS Performance Successful Implementation of Dry Gas Seal in High Pressure Recycle gas Compressor at Hydrocracker & Effect of Gas composition on DGS Performance Why - Dry Gas Seal??? M&I shutdown and Catalyst replacement

More information

Offshore Equipment. Yutaek Seo

Offshore Equipment. Yutaek Seo Offshore Equipment Yutaek Seo Flash Gas Compressor (East spar) Dehydration NGL recovery Slug catcher Separator Stabilization Booster compressor Gas export compression (Donghae-1 Platform) May 7 th Gas

More information

F All types of inert gas systems are to comply with the following:

F All types of inert gas systems are to comply with the following: (1974) (Rev.1 1983) (Rev.2 1987) (Rev.3 May 1998) (Corr. Sept 2001) (Rev.4 May 2004) (Rev.5 Nov 2005) (Rev.6 May 2012) (Rev.7 May 2015) Inert Gas Systems.1 General Requirements.1.1 All types of inert gas

More information

Lockout/Tagout Training Overview. Safety Fest 2013

Lockout/Tagout Training Overview. Safety Fest 2013 Lockout/Tagout Training Overview Safety Fest 2013 Purpose of Lockout/Tagout The standard covers the servicing and maintenance of machine and equipment in which the unexpected energization or start up of

More information

Facilities Design Shift Horizontal Equipment in Oklahoma Scott King

Facilities Design Shift Horizontal Equipment in Oklahoma Scott King Facilities Design Shift Horizontal Equipment in Oklahoma Scott King Facilities Review in Oklahoma Identified areas for improvement Design criteria is outdated for play types Vertical separation, cannot

More information

Standard Operating Procedures

Standard Operating Procedures Standard Operating Procedures Ken Hufford Risk Management Professionals 949/282-0123 www.rmpcorp.com RMP Risk Management Professionals RMP Risk Management Professionals Disclaimer Regarding this Presentation

More information

Case History. Kinetics Controls & Innovation Ltd

Case History. Kinetics Controls & Innovation Ltd Case History The Operations Team for Customer have a requirement to place temporary isolations on an 18 spool piece on K-3110 1 st stage compressor pipe work and a vertical 12 spool on 1 discharge Header

More information

EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM

EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM 1.0 OBJECTIVE To study the response of gas pressure control using PID controller. 2.0 INTRODUCTION TO THE APPARATUS a) The process plant consists of two air vessels

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION TECHNICAL INFORMATION Installation, Operation, and Maintenance Balston 75-96 and 75-98 Nitrogen Generation System Tower Pressure Gauge 5'-1" 3'-6" 7'-4" 6'-10 1/2" PLAN VIEW Figure 1 - Balston 75-96 and

More information

Marschalk Model # 94000

Marschalk Model # 94000 Marschalk Model # 94000 12-volt DC Portable oil-less Air Compressor Operation Manual 27250006 REV 1 9/13/05 Table of Contents CHAPTER 1: SYSTEM DESCRIPTION... 5 FUNCTION AND THEORY... 5 SYSTEM COMPONENTS...

More information

Copyright, 2005 GPM Hydraulic Consulting, Inc.

Copyright, 2005 GPM Hydraulic Consulting, Inc. Troubleshooting and Preventive Maintenance of Hydraulic Systems Learning to Read the Signs of Future System Failures Instructed by: Al Smiley & Alan Dellinger Copyright, 2005 GPM Hydraulic Consulting,

More information

FAULT CODE TROUBLESHOOTING INDEX

FAULT CODE TROUBLESHOOTING INDEX FAULT CODE TROUBLESHOOTING INDEX 1. Display indicates Change Filters 2. Display indicates Drip Tray Full Continuous Alarm will Sound 3. Display indicates Cold Fault 4. Display indicates Hot Fault 5. Display

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION TECHNICAL INFORMATION Installation, Operation, and Maintenance Balston Model 75-77 Nitrogen Generator Figure 1-75-77 Overall Dimensions These instructions must be thoroughly read and understood before

More information

MLS Series Liquid Level Switches. Installation and Operations Manual Section 15

MLS Series Liquid Level Switches. Installation and Operations Manual Section 15 MLS Series Liquid Level Switches Installation and Operations Manual 00-02-0730 2012-11-11 Section 15 In order to consistently bring you the highest quality full featured products, we reserve the right

More information

M-06 Nitrogen Generator (Nitrogen Making Machine)

M-06 Nitrogen Generator (Nitrogen Making Machine) Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains

More information

Avenger Model 33M Installation & Operation Instructions

Avenger Model 33M Installation & Operation Instructions Avenger Model 33M Installation & Operation Instructions Manufacturing Contact Information A+ Corporation, LLC Call for expert product application assistance: 41041 Black Bayou Rd. Gonzales, LA 70737 Phone:

More information

1020 Industrial Drive, Orlinda, TN fax

1020 Industrial Drive, Orlinda, TN fax Operation Manual Tank Distribution System A-UPT Series 615-654-4441 sales@specialtyh2o.com 615-654-4449 fax TABLE OF CONTENTS Section 1 GENERAL 1.2 Warnings and Cautions... 1 1.2 Theory of Operation...

More information

MOL LNG Transport (Europe) Ltd File: 02 Checklists 6 pages Rev. No. 1 Loading Plan Part Two (2) (Line UP) Loading Plan Part Two (2) (Line Up)

MOL LNG Transport (Europe) Ltd File: 02 Checklists 6 pages Rev. No. 1 Loading Plan Part Two (2) (Line UP) Loading Plan Part Two (2) (Line Up) Loading Plan Part Two (2) (Line Up) Arm Cool Down; Line Cool Down Line Up: Set up the port manifold as follows:. Open 20% No.1 tank filling valve CL100 Open 20% No. 2 tank filling valve CL200 Open 20%

More information

Safety Manual: Hazardous Energy. January, 2017

Safety Manual: Hazardous Energy. January, 2017 Safety Manual: Hazardous Energy January, 2017 9.0 Hazardous Energy Introduction Energized equipment in the workplace pose a significant risk of injury and death. If the unexpected energization or start-up

More information

Caltec. The world leader in Surface Jet Pump (SJP) and compact separation systems for upstream oil and gas production enhancement

Caltec.   The world leader in Surface Jet Pump (SJP) and compact separation systems for upstream oil and gas production enhancement Caltec brings simple passive technology that enables oil and gas operators to harness the kinetic energy of the production process to enhance their production, extending economic field life and reducing

More information

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Models: EPS Single Pump EPT Twin Pump EPS-HP EPT-HP Single Pump High Pressure Twin Pump High Pressure

More information

2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate.

2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate. Goals for Gas Absorption Experiment: 1. Evaluate the performance of packed gas-liquid absorption tower. 2. Determine how the mass transfer rate is affected by gas flow rate and liquid flow rate. 3. Consider

More information

JORDAIR/BAUER Service Manual

JORDAIR/BAUER Service Manual JORDAIR/BAUER Service Manual Breathing Air Compressor Maintenance Log Doc. ServiceManual Page - 1 SAFETY RELEASE-2016 The following document is prepared to ensure safety of operators and service technicians.

More information

LO/TO LOCKOUT/TAGOUT PROGRAM

LO/TO LOCKOUT/TAGOUT PROGRAM LO/TO LOCKOUT/TAGOUT PROGRAM April 2017 CONTENTS Section 1: Introduction...1 Section 2: Purpose... 1 Section 3: Application... 1 Section 4: Definitions... 2 Section 5: Roles and Responsibilities... 4 Section

More information

Job Sheet 1. Geothermal Energy

Job Sheet 1. Geothermal Energy Job Sheet 1 Geothermal Energy OBJECTIVES In this job sheet, you will become familiar with the training system components. You will operate your training system in heating and cooling mode and observe the

More information

DESIGN DATA. Dry 105a. September 5, 2008

DESIGN DATA. Dry 105a. September 5, 2008 September 5, 2008 Dry 105a 1. Description Dry and Preaction Systems require a dependable source of clean dry air under the proper pressure. The air supply must be adequate to restore normal air pressure

More information

OPERATING INSTRUCTIONS Pressure Control System PCS-20 through PCS-100

OPERATING INSTRUCTIONS Pressure Control System PCS-20 through PCS-100 107 W. Main Street Worthington, PA 16262 Phone: 724.297.3416 Fax: 724.297.5189 http://www.airtak.com OPERATING INSTRUCTIONS Pressure Control System PCS-20 through PCS-100 12-2007 TABLE OF CONTENTS PAGE

More information

ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION

ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION ECONORESS ELECTRONIC EPS & EPT - ENHANCED PRESSURISATION SET INSTALLATION OPERATION & MAINTENANCE DOCUMENTATION OCT2010 STOKVIS ENERGY SYSTEMS 96R WALTON ROAD EAST MOLESEY SURREY KT8 0DL TEL: 020 87833050

More information

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology

Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology Reduce Turnaround Duration by Eliminating H 2 S from Flare Gas Utilizing VaporLock Scrubber Technology Jim Woodard Vice President of Sales Bryant Woods Lead Project Engineer 4/3/18 Page 1 Objectives Impact

More information

TEST BENCH FOR SAFETY VALVES

TEST BENCH FOR SAFETY VALVES TEST BENCH FOR SAFETY VALVES 1) Hydro panel : This Panel possesses This Bench Contains One Panel and One Reservoir. 1 No. Monobloc Version : Single Phase AC, 50 Hz Type of Duty :S1 (Continuous) Class of

More information

ENVIRONMENTAL CONTROL SYSTEM (ECS)

ENVIRONMENTAL CONTROL SYSTEM (ECS) ENVIRONMENTAL CONTROL SYSTEM (ECS) DESCRIPTION AND OPERATION The ECS system comprises the following subsystems: bleed air management, environmental control unit (ECU) temperature control air distribution

More information

Critical Systems Inc. Work Instruction Template. Doc Number: CSI Delatech 6/12 Month PM-003 WORK INSTRUCTION

Critical Systems Inc. Work Instruction Template. Doc Number: CSI Delatech 6/12 Month PM-003 WORK INSTRUCTION Pg. 1 of 5 WORK INSTRUCTION APPROVALS All approvals are maintained and controlled in the [Document Control System] system. Please refer to the [Document Control System] system for the current controlled

More information

INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May

INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May INSTRUCTION MANUAL FOR MODEL 7360V VERTICAL CURING CHAMBER Revision E May 2015 98-0520 S/N 2001 N. Indianwood Ave. Tulsa, Oklahoma 74012 U.S.A. TEL: (918) 250-7200 FAX: (918) 459-0165 E-mail: chandler.sales@ametek.com

More information

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary?

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary? What is Lockout? Lockout means to physically neutralize all energies in a piece of equipment before beginning any maintenance or repair work. Lockouts generally involve: Stopping all energy flows (for

More information

Reclaim Basic Set Up

Reclaim Basic Set Up This purpose of the document is to simplify the set up and understand the Gas Services reclaim system functions. The Gas Services Reclaim Manual is to be used for reference, maintenance, and servicing.

More information

Technical Information

Technical Information Technical Information Installation, Operation, Installation, Operation and Maintenance and Maintenance Manual Manual Balston Model 75700-K728 Nitrogen Generator Figure 1-75700-K728 Overall Dimensions These

More information

BUBBLER CONTROL SYSTEM

BUBBLER CONTROL SYSTEM BUBBLER CONTROL SYSTEM Description: The HDBCS is a fully automatic bubbler system, which does liquid level measurements in water and wastewater applications. It is a dual air compressor system with, air

More information

Overview. OPIPOH10 - SQA Unit Code HG Operate an Oil and Gas Process ( Gas Treatment)

Overview. OPIPOH10 - SQA Unit Code HG Operate an Oil and Gas Process ( Gas Treatment) OPIPOH10 - SQA Unit Code HG21 04 Overview This process involves the removal of impurities from the gas stream to reach the specified quality. The process boundary is from the inlet such as separator, compressor

More information

EXECUTIVE SHIP MANAGEMENT PTE LTD M 24 Q 4 SINGAPORE QI 19 Page 1 of 5 (9/05 Rev 2) Decision. Implement

EXECUTIVE SHIP MANAGEMENT PTE LTD M 24 Q 4 SINGAPORE QI 19 Page 1 of 5 (9/05 Rev 2) Decision. Implement SINGAPORE QI 19 Page 1 of 5 RISK ASSESSMENT Ships Name Ships No Work Activity Activity / Operation Analyse/review/Assess WHAT IF? MAIN AIR COMPRESSOR OVERHAUL Possible Consequence / Hazard / Impact Monitor

More information

SERVICE MANUAL No. I-0043

SERVICE MANUAL No. I-0043 Bettis Canada Ltd. 4112 91A Street Edmonton, Alberta, Canada T6E 5V2 Tel: (403) 450-3600 Fax: (403) 450-1400 SERVICE MANUAL No. I-0043 Edmonton GAS/HYDRAULIC ADDITIONAL COMPONENTS CUSTOMER: P.O.#: W.O.#:

More information

Portable Oil Lube Air Compressors

Portable Oil Lube Air Compressors Portable Oil Lube Air Compressors 8003631 8003632 0410149 8018968 8018940 Owner s Manual Read and understand operating instructions before use Safety definitions The information listed below should be

More information

Delayed Coker Automation & Interlocks

Delayed Coker Automation & Interlocks Delayed Coker Automation & Interlocks a Presented by Mitch Moloney of ExxonMobil @ coking.com April-2005 MJ Moloney - ExxonMobil April-2005 coking.com 0 Automation & Interlocks @ ExxonMobil - Background

More information

FRYSAFE COOKING OIL FILTRATION I&O MANUAL

FRYSAFE COOKING OIL FILTRATION I&O MANUAL INSTALLATION OPERATIONS AND MAINTENANCE FRYSAFE COOKING OIL FILTRATION I&O MANUAL 1365 N. Clovis Avenue Fresno, California 93727 1.559.255.1601 www.lakos.com LS-899B (Rev. 12/16) Table of Contents Introduction

More information

INSTALLATION AND OPERATION MANUAL CHEMICAL BYPASS FEEDER General Instructions Regarding All Models

INSTALLATION AND OPERATION MANUAL CHEMICAL BYPASS FEEDER General Instructions Regarding All Models INSTALLATION AND OPERATION MANUAL CHEMICAL BYPASS FEEDER General Instructions Regarding All Models General Cautions: 1. CAUTION: Do not open under pressure. Close isolation valves and release pressure

More information

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems Name of Property: Address: Phone Number: Inspector: Contract No.: Date: This Report Covers: Monthly Quarterly Annual Other

More information

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS

LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS A. PURPOSE 1 B. FACILITIES STAFF RESPONSIBILITIES 2 C. TRAINING AND RETRAINING of AFFECTED and EUTHORIZED EMPLOYEES 3 NINE POINTS TO REMEMBER 5 LOCKOUT/TAGOUT

More information

High-Pressure Boiler Inspection Procedures: A Complete Checklist

High-Pressure Boiler Inspection Procedures: A Complete Checklist High-Pressure Boiler Inspection Procedures: A Complete Checklist Inspecting high-pressure boilers is a complex process requiring preparation, planning, and a multitude of safety precautions. Regular inspections

More information

Overview. OPIPOH7 - SQA Unit Code HG1X 04. Operate an Oil and Gas Process (Gas Compression)

Overview. OPIPOH7 - SQA Unit Code HG1X 04. Operate an Oil and Gas Process (Gas Compression) OPIPOH7 - SQA Unit Code HG1X 04 Overview This process involves the operation of the compression of gas to a higher pressure for the purpose of gas lift, export, fuel gas, reinjection or fractionation.

More information

Hydraulic Reliability & Preventive Maintenance Report

Hydraulic Reliability & Preventive Maintenance Report Hydraulic Reliability & Preventive Maintenance Report The following is a report of the test, procedures and recommendations for the in-plant press. This information was recorded on May 10 th and 11 th,

More information

AIR CONDITIONING AND PRESSURIZATION CONTROLS AND INDICATORS

AIR CONDITIONING AND PRESSURIZATION CONTROLS AND INDICATORS AIR CONDITIONING AND PRESSURIZATION CONTROLS AND INDICATORS Air conditioning control panel 1 MIN MAX Page 1 Air conditioning control panel 2 MIN MAX Page 2 Air conditioning control panel 3 MIN MAX Page

More information

Pneumatic Conveying Systems Theory and Principles Session 100

Pneumatic Conveying Systems Theory and Principles Session 100 Pneumatic Conveying Systems Theory and Principles Session 100 1 Controls & Instrumentation P = Actual Pressure V = Actual Volume T is Typically Ignored Key Relationship PV/T Terminal Point Any Point Pick

More information

Inert Air (N2) Systems Manual

Inert Air (N2) Systems Manual INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing

More information

Model PSI Compressor with 3-Gallon Air Tank 12VDC

Model PSI Compressor with 3-Gallon Air Tank 12VDC Model 6350 150 PSI Compressor with 3-Gallon Air Tank 12VDC IMPORTANT: It is essential that you and any other operator of this product read and understandd the contents of this manual before installing

More information

Gas Absorption Draft Standard Operating Procedure

Gas Absorption Draft Standard Operating Procedure Gas Absorption Draft Standard Operating Procedure R.C. 9-14 Scope Page 1 Equipment Overview Page 1 Safety Page 2 Operating Procedure Page 4 Equipment Description Page 16 Gas Absorption Experiment Draft

More information

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES NB16 0603 NR Task Group 1 9 16 1. One update by NR task group page 3: 7/17/19 2. Two updates to S6.1 and S6.3 on page 1: 7/19/17 SUPPLEMENT 6 PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES

More information

Installation and User Manual

Installation and User Manual 49124589 Revision A August 2015 PacE Flow Controller Installation and User Manual Save These Instructions Table of contents Table of contents..................................................... 2 INSTALLATION............................................................3

More information

Control & Maintenance. INT69 Diagnose INT69 TM Diagnose. Protect the heart of your system

Control & Maintenance. INT69 Diagnose INT69 TM Diagnose. Protect the heart of your system Control & Maintenance INT69 Diagnose INT69 TM Diagnose Protect the heart of your system R INT69 DIAGNOSE The widely known protective system INT69 and INT69 TM present on all Frascold compressors is now

More information

High Performance Oilless Commercial Refrigerant Recovery Unit. User Manual Rev. 4 November 2010

High Performance Oilless Commercial Refrigerant Recovery Unit. User Manual Rev. 4 November 2010 High Performance Oilless Commercial Refrigerant Recovery Unit User Manual 2090-0217 Rev. 4 November 2010 Introduction Congratulations on your purchase of the STINGER high performance oilless recovery unit.

More information

MANUAL GAS MANIFOLDS

MANUAL GAS MANIFOLDS MANUAL GAS MANIFOLDS Phoenix Pipeline Products Limited. Unit 8, McKenzie Industrial Park, Tel No.: 44 (0) 161 428 7200 Bird Hall Lane, Fax No.: 44 (0) 161 428 7010 Stockport, Email: info@p3-phoenix.com

More information

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER SUPPLIMENT TO eom IMPORTANT READ THIS MANUAL BEFORE PRODUCT INSTALLATION, OPERATION, INSPECTION & MAINTENANCE Tougher and more rigid guidelines are being established

More information

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply 4.1.1 General The primary function of a system for handling fuel oil is to transfer oil from the storage tank to the oil burner at specified conditions

More information

WHITE PAPER. SmartPlant P&ID Engineering Integrity 10 Example Rules

WHITE PAPER. SmartPlant P&ID Engineering Integrity 10 Example Rules WHITE PAPER SmartPlant P&ID Engineering Integrity 10 Example Rules SmartPlant P&ID Engineering Integrity SmartPlant P&ID Engineering Integrity checks that SmartPlant P&IDs comply with engineering standards

More information

1020 Industrial Drive, Orlinda, TN fax

1020 Industrial Drive, Orlinda, TN fax Operation Manual Ultrafiltration for High Purity Distribution K-A-HPTUF Series 615-654-4441 sales@specialtyh2o.com 615-654-4449 fax TABLE OF CONTENTS Section 1 GENERAL 1.1 Warnings and Cautions... 1 1.2

More information

ONSHORE GAS GATHERING FAQS

ONSHORE GAS GATHERING FAQS ONSHORE GAS GATHERING FAQS These Frequently Asked Questions (FAQs) are intended to clarify, explain, and promote better understanding of the gas gathering line rules. These FAQs are not substantive rules

More information

ATL R/V Atlantis AUXILIARY PLANT OPERATION APPENDIX OPERATING PROCEDURES

ATL R/V Atlantis AUXILIARY PLANT OPERATION APPENDIX OPERATING PROCEDURES 110 AIR CONDITIONING CHILLED WATER PLANT 1. Ensure power to water chiller controller and all fan coil unit controllers is on 2. Ensure chilled water expansion tank level is at its proper level 3. Ensure

More information

XDF BURNERS DUAL FUEL EXCESS AIR BURNER FEATURES DESCRIPTION EXCESS AIR OPERATION

XDF BURNERS DUAL FUEL EXCESS AIR BURNER FEATURES DESCRIPTION EXCESS AIR OPERATION DUAL FUEL EXCESS AIR BURNER MODEL: 3610, 3651 Revision: 0 FEATURES Burns all fuel gases or light oils Nozzle mix design for on ratio control or excess air 350% excess air all sizes on gas or oil Turndown

More information

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution!

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution! Innovating Gas-Lift for Life of Well Artificial Lift Solution The Unconventional Solution! Glenn Wilde Optimum Production Technologies Inc. Revive Energy Corp. Unconventional Oil & Gas Resources Unconventional

More information

2 Sentry MCL Installation, Operation & Maintenance

2 Sentry MCL Installation, Operation & Maintenance Gas Liquid & Slurry Solid & Powder Steam & Water Installation, Operation & Maintenance Manual Original Instructions Liquid Sampling Manual Low-Emission Samplers S-GA-IOM-00249-7 11-17 Sentry MCL 966 Blue

More information

Digester Processes. 1. Raw Sludge Pumping System

Digester Processes. 1. Raw Sludge Pumping System Digester Processes 1. Raw Sludge Pumping System Removes accumulated sludge from the primary clarifiers, pumped through 1 of 2 pipes either 150 or 200mm in diameter (Fig. 1.1). Fig 1.1 Pipes feeding Digesters

More information

CHE Well Testing Package/Service:

CHE Well Testing Package/Service: CHE Well Testing Package/Service: CHE delivers well testing package And services, trailer mounted well testing package and offshore/onshore well testing services with over 10 years experience. Our testing

More information

Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide

Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide Hill PHOENIX Second Nature Medium Temperature Secondary Refrigeration Start-Up Guide Secondary Coolant System Start-Up Procedures June 2006 Produced by the Hill PHOENIX Learning Center DISCLAIMER This

More information