Chairman: Doctor: Ambulance: Secretary: Gardai: Other: The Club will comply with Schedule 3 of the Safety, Health and Welfare at Work Act 2005 by:

Size: px
Start display at page:

Download "Chairman: Doctor: Ambulance: Secretary: Gardai: Other: The Club will comply with Schedule 3 of the Safety, Health and Welfare at Work Act 2005 by:"

Transcription

1 SAFETY STATEMENT SECTION 20 SAFETY, HEALTH AND WELFARE AT WORK ACT 2005 CLUB NAME: ADDRESS: This Safety Statement is our programme in writing to manage health and safety. It is aimed at protecting our employees from accidents and ill-health while at work. We will provide a safe place of work for our employees and those affected by our work and will provide any guards, protective equipment, information, training and supervision necessary to protect our employees. This Safety Statement is available to employees. We will update it as necessary and review it at least once a year. EMERGENCY CONTACTS Chairman: Doctor: Ambulance: Secretary: Gardai: Other: GENERAL PRINCIPLES OF PREVENTION THIRD SCHEDULE The Club will comply with Schedule 3 of the Safety, Health and Welfare at Work Act 2005 by: (1) The avoidance of risks. (2) The evaluation of unavoidable risks. (3) The combating of risks at source. (4) The adaptation of work to the individual, especially as regards the design of the (Club) place of work, the choice of work equipment and the choice of systems of work, with a view, in particular, to alleviating monotonous work and work at a predetermined work rate and to reducing the effect of this work on health. (5) The adaptation of the place of work to technical progress. (6) The replacement of dangerous articles, substances or systems of work by safe or less dangerous articles, substances or systems of work. (7) The giving of priority to collective protective measures over individual protective measures. (8) The development of an adequate prevention policy in relation to safety, health and welfare at work, which takes account of technology, organisation of work, working conditions, social factors and the influence of factors related to the working environment. (9) The giving of appropriate training and instructions to employees.

2 EXPLANATORY NOTE The Club shall identify the hazards in the place of work under its control. Each identified hazard shall then be assessed in terms of the risk of injury occurring. Following the identification of the hazards and assessment of the risks associated with the hazards adequate control measures must be identified. The following is an accepted method of classifying the risk which the identified hazard may present. HIGH = e.g. Risk of Death, Amputation, Fall from Heights MEDIUM = e.g. Back Injury, Temporary Incapacitation LOW = e.g. Slips, Trips and Falls The following proforma is deemed a suitable method for developing the hazard identification and risk assessment section. IDENTIFIED HAZARD RISK ASSESSED CONTROL MEASURES Grass Cutting Machinery High Competent person to operate machinery at all times. All moving parts including P.T.O. and blades to be fully guarded at all times. Electricity Medium RECI qualified electricians to routinely check the integrity of the electrical installation including sockets, light fittings and cabling. Permanent Goal Posts Low Routinely inspect for damage and repair as necessary.

3 IDENTIFIED HAZARD RISK ASSESSED CONTROL MEASURES. Page of

4 IDENTIFIED HAZARD RISK ASSESSED CONTROL MEASURES. SIGNED: NAME: POSITION HELD: DATE: Page of

5 IDENTIFIED HAZARD RISK ASSESSED CONTROL MEASURES Ride On Mower High All moving parts to be fully guarded Including cutters Floodlights Low Safe means of access such as M.E.W.P. to be used to work on lights to top of light standards M.E.W.P. to be used only if tested & examined and operated by a trained person with a FAS Safe Pass. Teleporters Medium To be operated only by a FAS approved operator. Scoreboard Low Keep existing platform clean and tidy Spoilheap Low Provide temporary fence around Spoilheap. Parking Area Low Maintain in clean and tidy condition Goalposts Low Routinely inspect for damage & repair as necessary Fencing to Pitch Low Routinely inspect & maintain as is Gates Low Routinely check hinges& mountings for damage. Ladders Medium Use only aluminium ladders in good condition hold ladder at bottom - never use a ladder alone. Strimmer Medium P.P.E. incl. eye protection, ear Protection to be worn by operative Electricity Medium R.E.C.I. qualified electricians to routinely check the integrity of electrical installation incl. sockets light fittings & cabling both in Clubhouse and externally in grounds. ELCB s fitted to all socket outlets to be regularly tested. Overhead ESB Lines No risk here Head Protection Low Safety helmets to be provided & worn for any construction activity none at present. Eye Protection Low Safety glasses to be worn provided & worn for chipping, cutting of hedges or driving nails or strimming. Hearing Protection Low Ear defenders to be provided for operating mower if R/A determines 85 DBA noise level. Scaffolding Low-Not Applicable To be erected only by a FAS certified scaffolder. 200 Zoonotic Disease/ Low Suitable protective gloves to be Infection Control provided for refuse disposal & manual work around hedgerows.

6 NAMED HAZARDS RISK OF INJURY PRECAUTIONS NEEDED TO AVOID INJURY Clubhouse Generally Low Maintain in present state of repair and decoration. Boot Scraper Medium-Tripping Replace missing brush head to scraper. Construction Generally Low no construction S.H. & WW. (Construction) N/A at present in progress Regulations S.I. No. 504 of applies when applicable Manual Handling Low Risk assessment shows no need for manual handling training. Clubhouse High Opening window sections as required 1 st Floor by conditions of fire safety certificate Windows to be fully monitored & supervised by Habitable Rooms competent personnel during use of the relevant room rooms to be locked otherwise. Traffic Medium Adequate number of trained personnel to be in charge of all parking of vehicles in club grounds. Reversing of large vehicles to be limited to that supervised by a banksman. First -Aid Low Adequate & suitable supplies to be maintained in First-Aid box. Working Alone Low Club officials will daily monitor work place. Tractor High Needs to be under control of qualified personnel at all times. SIGNED: CHAIRMAN: DATE:

Risk Assessment for Beacon Cricket Club

Risk Assessment for Beacon Cricket Club Assessment for Beacon Cricket Club Ground & Pavilion (Sheet 1 of 2) Use of motorised heavy roller, mowing equipment, strimmer and other equipment Stones/glass thrown up by machinery Manual handling Access

More information

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY Approved by the Trustees: November 2016 Health and Safety Policy Introduction The main piece of health and safety legislation is the Health and Safety

More information

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of

More information

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA

CONSTRUCTION HEALTH AND SAFETY MANAGEMENT SYSTEM BASELINE HIRA RECOMMENDED ADDITIONAL CONTROLS TASK / ACTIVITY/ EQUIPMENT/ FACILITY HAZARDS UNWANTED EVENT MINIMUM CONTROLS REQUIRED RISK NO. LIKELI-HOOD CONSE-QUENCE RISK VALUE Project Risk Assessment Page 1 of 16 All

More information

B S Glass Ltd Safety procedures- outsourced Workplaces

B S Glass Ltd Safety procedures- outsourced Workplaces B S Glass Ltd Jan 17 B S Glass Ltd Safety procedures- outsourced Workplaces Index - - - - - - - - Page No On Site safety - - - - - - - - - - - - - - - - - - - Content 3. 1.00 Health and Safety Mission

More information

Hautbois Risk Assessment

Hautbois Risk Assessment Hautbois Risk Assessment Activity: Estate Assessor: Rachel Jarman Date: January 2012 Tech Advisor: Martin Review Date: January 2013 Page: 1 of 8 Description: The Hautbois Estate comprises 28 acres of parkland,

More information

Example of an Occupational Health Risk Assessment

Example of an Occupational Health Risk Assessment SITE: ASSESSMENT DATE: EQUIPMENT/ AREA/TASK: Floor Manual ASSESSED BY: TASK/ EQUIPMENT floor manual sorting HAZARD RISK PERSONS RATING EXISITING CONTROL MEASURES AT RISK S L R FURTHER ACTION REQUIRED R

More information

QUEENSLAND UNIVERSITY OF TECHNOLOGY

QUEENSLAND UNIVERSITY OF TECHNOLOGY QUEENSLAND UNIVERSITY OF TECHNOLOGY SITE SPECIFIC SAFETY MANAGEMENT PLAN FOR SAMFORD HOUSE SAMFORD ECOLOGICAL RESEARCH FACILITY SAMFORD VALLEY 2007 Dylan Randall SN: 06305466 dylan.randall@student.qut.edu.au

More information

Contractor / Exhibitor Handbook

Contractor / Exhibitor Handbook Contractor / Exhibitor Handbook Health and Safety This booklet outlines the basic rules that must be followed by contractors and other visitors working on Live Promotions Events sites. The contractors

More information

Pre-control risk estimate. Likelihood Risk

Pre-control risk estimate. Likelihood Risk Activity Consequence s mitigation measures Site Access & Egress Slips, trips & falls al injury by falling. Sprains & broken bones. Site operatives 3 4 12 Ensure access to site is kept clear of plant &

More information

Kettleshulme Parish Council Risk Assessment 2015 Kettleshulme Memorial Hall

Kettleshulme Parish Council Risk Assessment 2015 Kettleshulme Memorial Hall HAZARD IDENTIFICATION AND CONTROL MEASURES: Step 1 Identify significant hazards Step 2 Identify who might be harmed and how Step 3 Identify precautionary measures already in place List of significant hazards

More information

Working Safely on Overhead Lines

Working Safely on Overhead Lines A practical guide to Working Safely on Overhead Lines W.S. ON OVERHEAD LINES.indd 1 17/12/07 10:58:31 A practical guide to Working Safely on Overhead Lines National Grid Eakring Technical Training Centre

More information

COGPOLY39 Meet safety, health and environmental requirements in the workplace

COGPOLY39 Meet safety, health and environmental requirements in the workplace Meet safety, health and environmental requirements in the workplace Overview This unit is for those with responsibilities for meeting safety, health and environment requirements in the workplace. It is

More information

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS Project: (insert Client) Replacement/ Repair of high level light units/ high

More information

Safety at Work. Rules for Staying Alive

Safety at Work. Rules for Staying Alive Safety at Work Rules for Staying Alive Safety at Work Rules for Staying Alive Introduction The purpose of Dana Gas Rules For Staying Alive is to address the key causes of deaths in our industry. These

More information

Specialists Window Cleaning Induction

Specialists Window Cleaning Induction Specialists Window Cleaning Induction Mobile Tower Scaffolds Mobile tower scaffolds are used on flat firm, stable ground to access higher levels. They have toe boards, mid rails & guard rails to prevent

More information

Safe Work Method Statement (SWMS)

Safe Work Method Statement (SWMS) Safe Work Method Statement (SWMS) Organisation Details : Organisation Name Northern Plumbing Contact ABN 17 15 41 4 Position Director Address 47 Thomas Street Edgeworth 85 Phone Number 0411 10 4 Project

More information

Suitability of Work Equipment

Suitability of Work Equipment These regulations came into effect on the 5th December 1998 and replace PUWER 1992. They cover almost all equipment used at work, including tool box tools such as hammers, knives etc. They also cover machinery

More information

Risk Assessment Code of Practice

Risk Assessment Code of Practice 1. Introduction Risk Assessment Code of Practice The Management of Health and Safety at Work Regulations 1999 requires employers to carry out an assessment of the significant risks to the health and safety

More information

Work at height Policy

Work at height Policy Work at Policy Introduction This policy procedure outlines the Forces responsibility to provide guidance to all police officers and staff when working at. Many serious incidents involving working at occur

More information

Method Statement Author

Method Statement Author Plan Bee Limited 3.3 Etna Industrial estate Clamp Road Motherwell Scotland ML2 7XQ Tel: 01698580572 Method Statement Method Statement Details Method Statement Number 7 Method Statement Date Monday 3rd

More information

PERSONAL PROTECTIVE EQUIPMENT GUIDANCE

PERSONAL PROTECTIVE EQUIPMENT GUIDANCE Legislation requires a workplace to identify and assess significant hazards (via a risk assessment) associated with workplace activities. The purpose of the assessment is to enable a valid decision about

More information

Safe Work Method Statement

Safe Work Method Statement Company Name: Safe Work Method Statement Site Address: Other Details: Contractor: Activity/Trade: Electrician Date: TASKS List the tasks required to perform the activity in sequence carried out. Entry

More information

Working at Height - MEWPS & Ladders. Your company details Address Tel: Fax: Mobile:

Working at Height - MEWPS & Ladders. Your company details Address Tel: Fax: Mobile: Project/Contract Contractor Site Address Project Start Date Expected Duration Projected Completion Date Your company details Address Tel: Fax: Mobile: Document Author Authorised by Name Title Signature

More information

METHOD STATEMENT. Temporary Installation of Mobile Disco. Version 1.0 Dated 19th December Published by Andy Przybyla. Document Ref: APDJ004

METHOD STATEMENT. Temporary Installation of Mobile Disco. Version 1.0 Dated 19th December Published by Andy Przybyla. Document Ref: APDJ004 METHOD STATEMENT Temporary Installation of Mobile Disco Version 1.0 Dated 19th December 2014 Published by Andy Przybyla Document Ref: APDJ004 Attack the Dance Floor 2014 Content Section 1 - Scope of Work

More information

Hazard Management Making your workplace safer

Hazard Management Making your workplace safer Hazard Management Making your workplace safer A Guide to Hazard Identification, Risk Assessment, Control and Reviewing 1 What is a hazard? A hazard is something which has the potential to harm the health,

More information

2.0 Management Systems and Documentation

2.0 Management Systems and Documentation SHE Rules BOW142.3 1.0 Introduction This document details the safety, health and environment rules that apply to anyone accessing Arqiva sites and describes the standards of performance expected. This

More information

Working safely in an engineering environment

Working safely in an engineering environment Unit 001 Working safely in an engineering environment Level: 2 Credit value: 5 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to work

More information

S31 Opening Statement Working at Height

S31 Opening Statement Working at Height S31 Opening Statement Working at Height Falls from height are by far the most common cause of workplace deaths and one of the main causes of major injury in the workplace. Latest figures reveal that 46

More information

TRADE AREA: ELECTRICAL INDUSTRY

TRADE AREA: ELECTRICAL INDUSTRY TRADE AREA: ELECTRICAL INDUSTRY Some possible workplace hazards and possible ways for Host employers and Apprentices/Trainees in controlling these hazards. What are possible hazards? What could be possible

More information

APPENDIX A: Risk Assessment for all activities at Farm

APPENDIX A: Risk Assessment for all activities at Farm APPENDIX A: Risk Assessment for all activities at Farm Sheet No...of...... Drafted by Nick Laister Date of Revision: January 08 Location: Southcombe, Chipping Norton Heading: General Organisation L C R

More information

FIRE HYDRANT TESTING METHOD STATEMENT.

FIRE HYDRANT TESTING METHOD STATEMENT. SUBJECT: TASK: FIRE HYDRANT INSPECTION & TESTING. 1. Location....1 2. The Scope of Works.... 1 3. Description of Task.... 1 4. Access & Egress to & from Work Area.... 2 5. Safety Hazard Identification....

More information

RISK ASSESSMENT Installation of electrically operated service lifts (non passenger type)

RISK ASSESSMENT Installation of electrically operated service lifts (non passenger type) RISK ASSESSMENT 2011 WALLINGTON LIFT MAINTENANCE CO LTD Installation of electrically operated service lifts (non passenger type) 1 1 L a k e s i d e, W a l l i n g t o n, S u r r e y, S M 6 7 J Y T e l

More information

(Health, Safety, and Welfare)

(Health, Safety, and Welfare) An Appreciation of The Construction (Health, Safety, and Welfare) Regulations 1996 Course Notes Mark Mallen Health and Safety Manager Fenlock Hansen Ltd October 2002 The Construction Regs 1996: Version

More information

Job Hazard Analysis Analysis by:

Job Hazard Analysis Analysis by: Job Analysis Possible s or Task Machinery e.g. Mowers Chainsaws Grinders Floor polisher Power tools Weed trimmers Sweepers Snow blowers Hedge trimmer Tiller Auto scrubbers Burnishers Ford tractor Sand

More information

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS NPTC Registered Charity No. 1096429 NATIONAL AGRICULTURAL CENTRE STONELEIGH PARK, WARWICKSHIRE CV8 2LG Tel: 024 7669 6553 Fax: 024 7669 6128 Email: information@nptc.org.uk LEVEL 2 CERTIFICATE OF COMPETENCE

More information

How severely could the risk hurt someone?

How severely could the risk hurt someone? Safe Work Method Statement No: WMS-08 Task: Install Drainage This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT INTRODUCTION Cwmni CYNNAL recognises that accidents can arise from working at height. Falls from height can be a cause of injury and absence

More information

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE JOB NO: PROJECT: DATE: SWMS NO: SWMS 002 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: STUMP REMOVAL SUPERVISED BY: REVISION DATE: April 2016 MINIMUM PERSONAL PROTECTIVE EQUIPMENT

More information

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 PERSONNEL DIVISION REVIEWED AUTUMN 1999 CONTENTS Page 1 INTRODUCTION 1

More information

Pocklington Town Council Risk Assessment Christmas Festival Wednesday Assessor: Gordon Scaife Date

Pocklington Town Council Risk Assessment Christmas Festival Wednesday Assessor: Gordon Scaife Date Activity: Christmas Festival Wednesday Assessor: Gordon Scaife Date 16/07/2018 5 December Completed: Persons At Risk: PTC Staff, Volunteers & Public Reference: 180716 Public Events Review Date: 16/07/2019

More information

Potential hazards People at risk and how? Actions already in place Further action required Action by

Potential hazards People at risk and how? Actions already in place Further action required Action by Risk Assessment Flat Roof Repair Prepared by Oracle Managed Services For: BAM FM On: 24/02/2017 Review date: N/A Potential hazards People at risk and how? Actions already in place Further action required

More information

RISK ASSESSMENT AND MANAGEMENT PLAN

RISK ASSESSMENT AND MANAGEMENT PLAN RISK ASSESSMENT AND MANAGEMENT PLAN A well - defined Risk Management Plan is made as follows: STEP 1: Define the Projects/Tasks Site Clearing Excavation Raft RCC slab Block work / plastering External plastering

More information

BALLYMORE EUSTACE GAA CLUB BALLYMORE EUSTACE JUVENILE HURLING AND FOOTBALL CLUB BALLYMORE EUSTACE LADIES FOOTBALL CLUB SAFETY STATEMENT

BALLYMORE EUSTACE GAA CLUB BALLYMORE EUSTACE JUVENILE HURLING AND FOOTBALL CLUB BALLYMORE EUSTACE LADIES FOOTBALL CLUB SAFETY STATEMENT BALLYMORE EUSTACE GAA CLUB BALLYMORE EUSTACE JUVENILE HURLING AND FOOTBALL CLUB BALLYMORE EUSTACE LADIES FOOTBALL CLUB SAFETY STATEMENT SAFETY, HEALTH AND WELFARE AT WORK ACT 2005 1 CLUB NAME: Ballymore

More information

HS26 Working at Height Policy and Procedure

HS26 Working at Height Policy and Procedure HS26 Working at Height Policy and Procedure HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 1 of 8 1. Scope This policy applies to all staff, students and visitors to The Shared Learning

More information

Staff Contractors. Public. Staff Contractors

Staff Contractors. Public. Staff Contractors 1. Vehicle movements In conjunction with the vehicle driver, venue management and the client, our staff should ensure the safe parking of vehicles for loading and unloading purposes. Depending upon circumstances

More information

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control This document is a guideline only. Employers have a responsibility of assessing all applicable occupational health and safety legislation, for the tasks they are performing. Businesses in this industry

More information

Safety Checklist for Events Held at Hillbrook

Safety Checklist for Events Held at Hillbrook Safety Checklist for Events Held at Hillbrook Hazards/ Issues or Tasks 1. EVENT ACCESS AND EGRESS Entry / Exit areas are kept clear and accessible. For an evening event, that you have appropriate Lighting.

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT EXCAVATION OR TRENCHING Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

RISK ASSESSMENT, DISASTER MANAGEMENT AND SAFETY MEASURES. A well - defined Risk Management Plan is made as follows:

RISK ASSESSMENT, DISASTER MANAGEMENT AND SAFETY MEASURES. A well - defined Risk Management Plan is made as follows: RISK ASSESSMENT, DISASTER MANAGEMENT AND SAFETY MEASURES A well - defined Risk Management Plan is made as follows: STEP 1: Define the Projects/Tasks Site Clearing Excavation Raft RCC slab Block work /

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT WATER PUMP - PETROL Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

CLUB RISK ASSESSMENT TEMPLATE

CLUB RISK ASSESSMENT TEMPLATE CLUB / VENUE (Guidance for clubs to adapt for their own use) 1. ALL AREAS Slips, trips and falls injury from slips trips and falls from uneven or damaged surfaces, holes etc. External ground surfaces,

More information

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN JOB NO: PROJECT: DATE: 1/1/2018 SWMS NO: SWMS 001.1 PREPARED BY: LUKE BLINCO REVISED BY: ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: MINIMUM PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIREMENTS

More information

Work At Height Health & Safety Management Standard Issue 3 (April 2011)

Work At Height Health & Safety Management Standard Issue 3 (April 2011) Work At Height Health & Safety Management Standard Issue 3 (April 2011) Introduction This document contains corporate standards and guidance on the management of risks arising from work at height. It is

More information

Prevention of Falls and Working at Heights

Prevention of Falls and Working at Heights Workplace Safety Schools Cleaning Prevention of Falls and Working at Heights It is the policy of the Company to avoid working at heights above 2 metres wherever practical. When avoidance is not an option,

More information

Part 3. Safe Hospitality. Safety, Health & Welfare in Hotels, Restaurants, Catering & Bars. Part 3 - Bars

Part 3. Safe Hospitality. Safety, Health & Welfare in Hotels, Restaurants, Catering & Bars. Part 3 - Bars Part 3 Safe Hospitality Safety, Health & Welfare in Hotels, Restaurants, Catering & Bars SHOULD BE READ IN CONJUNCTION WITH Part 1 - General Contents SHOULD BE READ IN CONJUNCTION WITH Part 1 - General

More information

LADDERS FIXED AND PORTABLE

LADDERS FIXED AND PORTABLE CONTRACTOR WHS HAZARD STANDARD LADDERS FIXED AND PORTABLE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

PERSONAL PROTECTIVE EQUIPMENT

PERSONAL PROTECTIVE EQUIPMENT 13.0 The purpose of this program is to ensure that, where applicable, the appropriate and necessary personal protective equipment (PPE) is selected and provided to employees to protect from illness or

More information

Waste Industry Safety & Health

Waste Industry Safety & Health Waste Industry Safety & Health A practical pocket guide for the Waste industry Supported by: Delivering the Solution Together Introduction The Waste Industry Safety and Health (WISH) forum is supporting

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE OF MOWERS ASSESSMENT SCHEDULE

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE OF MOWERS ASSESSMENT SCHEDULE NPTC Registered Charity No. 1096429 STONELEIGH PARK, WARWICKSHIRE CV8 2LG Tel: 024 7685 7300 Fax: 024 7669 6128 Email: information@nptc.org.uk LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE OF MOWERS

More information

SAFE SYSTEM OF WORK PLAN (SSWP)

SAFE SYSTEM OF WORK PLAN (SSWP) SAFE SYSTEM OF WORK PLAN (SSWP) BUILDING AND MONUMENT MAINTENANCE Safe System of Work Plan (SSWP) Guidelines The Safe System of Work Plan (SSWP) complements the Safety Statement required under the Safety,

More information

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives

More information

ADRAIN SAFETY MANAGEMENT LTD. MCN Ltd RISK ASSESSMENT SHEET

ADRAIN SAFETY MANAGEMENT LTD. MCN Ltd RISK ASSESSMENT SHEET Description of task: ADRAIN SAFETY MANAGEMENT LTD. MCN Ltd SHEET Manual Handling of Loads Number of operatives Exposed : 4-6 Operatives 1. Muscle strains/ sprains/torn ligaments 2. Fractures from dropped

More information

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee. Working at Height Policy and Procedures Author: Beth Webster Assistant Safety Advisor Authorised by: Issued by: John Stephenson Safety Office On behalf of School Safety Committee Review Date: NO LATER

More information

New Hire Safety Orientation. Welcome to Flexicrew, our number one priority is you and your safety.

New Hire Safety Orientation. Welcome to Flexicrew, our number one priority is you and your safety. New Hire Safety Orientation Welcome to Flexicrew, our number one priority is you and your safety. 1 New Employee Responsibilities As a contract worker with Flexicrew Staffing, I understand by signing this

More information

Management of risk. Definition of terms. Managing risks. Risk

Management of risk. Definition of terms. Managing risks. Risk Definition of terms Risk Management of risk Risk is the possibility that harm (death, injury or illness) might occur when exposed to a hazard. A hazard is anything with the potential to cause injury or

More information

SAFE WORK METHOD STATEMENT SWMS No Version

SAFE WORK METHOD STATEMENT SWMS No Version SAFE WORK METHOD STATEMENT SWMS No Version Company Name: Hunter Readymixed Concrete Pty Ltd 00 004 Location: Thornton Cessnock Tea Gardens Gateshead ABN: 6 076 08 695 SWMS Developed By: Duane Harrison

More information

Important Safety Information Enclosed

Important Safety Information Enclosed Important Safety Information Enclosed ShedBoss Safety Pack NOTE: ENSURE YOUR CONSTRUCTION CREW RECEIVES THIS PACK TO COMPLY WITH SAFE WORK AUSTRALIA CODE OF PRACTICE www.shedboss.com.au Important Safety

More information

Safe Work Procedure for installation of external cladding

Safe Work Procedure for installation of external cladding Safe Work Procedure for installation of external cladding This procedure has been formulated to cover safe systems of work for the installation of external cladding. This instruction will be used to reduce

More information

Safe Work Method Statement

Safe Work Method Statement TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Working at eight SWMS No. 16 Authorized and email Signed by the (Managing

More information

LIMITED RISK ASSESSMENT FOR STUDIOS

LIMITED RISK ASSESSMENT FOR STUDIOS TtTEDDINGTON TEDDINGTON STUDIOS LIMITED RISK ASSESSMENT FOR STUDIOS Production Title:... Production Company:... Date/s in Studio:... EDITION (5) June 2003 Ray Gearing. Studio Manager RISK ASSESSMENT FOR

More information

BICETSER RUFC HEALTH & SAFETY POLICY

BICETSER RUFC HEALTH & SAFETY POLICY BICESTER RUGBY FOOTBALL CLUB HEALTH & SAFETY POLICY 2016 HEALTH & SAFETY POLICY HEALTH AND SAFETY POLICY Health and Safety Policy Statement In accordance with the regulations detailed under the Management

More information

HEALTH & SAFETY HANDBOOK. Venues/HSE/08/16

HEALTH & SAFETY HANDBOOK. Venues/HSE/08/16 HEALTH & SAFETY HANDBOOK Venues/HSE/08/16 CONTENTS Emergency Numbers 1 HSE Policy Statement 2 Introduction 3 Site Access 4 Permit to Work 5 Personal Protection Equipment 6 HSE Communication 7 Workplace

More information

Morden Hall DHQ. Please record any problems or concerns you have about the DHQ so the Maintenance Team can deal with them

Morden Hall DHQ. Please record any problems or concerns you have about the DHQ so the Maintenance Team can deal with them Morden Hall DHQ To Hall Users, please complete the form below as it will allow the District to monitor the use of the hall, act as a prompt for local Heath & Safety issues and allows users to report defects

More information

RISK INFORMATION SCHOOLS SCHOOL GROUNDS MAINTENANCE

RISK INFORMATION SCHOOLS SCHOOL GROUNDS MAINTENANCE The Risk Information contained in this paper is intended to assist schools in establishing safe procedures for maintaining school grounds. Schools owe a duty of care to employees and students to keep them

More information

Contractor/Visitor Safety Orientation UNBC

Contractor/Visitor Safety Orientation UNBC Contractor/Visitor Safety Orientation UNBC 3333 University Way, Prince George, BC V2N 4Z9 Revised: October 2015 For All Emergencies call Security 250-960-7058 ***DO NOT DIAL 911*** Important UNBC Telephone

More information

QCF Unit and Assessment Specification

QCF Unit and Assessment Specification QCF Unit and Assessment Specification Unit title Ofqual Unit code Working Safely in an Engineering Environment L/600/5781 SQA Unit code FT2R 60 SSC Ref Unit 78 History of changes Publication date: March

More information

What is an induction? Contribute to OH&S Processes

What is an induction? Contribute to OH&S Processes What is an induction? Session 2 Contribute to OH&S Processes Types of Induction New Employee Induction Site Inductions Equipment Inductions Activity 2.1 Induction Description What is a Hazard? Session

More information

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS) WHS 017 - WHS 017 Hazard Register - Version 5.0 April 20 Doc No: WHS 017 Effective Date: 04/04/20 1 WORKING WITH EARTHMOVING PLANT/ TRUCKS/SITE VEHICLES COLLISIONS OTHER PLANT EQUIPMENT SITE VEHICLES PERSONNELL

More information

To comply with the OHS Act, the responsible manager must carry out and document the following:

To comply with the OHS Act, the responsible manager must carry out and document the following: Owner: Manager Health, Wellbeing and Safety Last Update: 10 January 2018 Contents 1. Purpose... 1 2. Minimum Compliance Requirements... 1 3. Definitions... 2 4. Legislative requirements under the OHS Act

More information

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

Safety Risk Assessment Working at Height: Mobile Tower Scaffold Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees Mark Bloxidge H&S Manager 0208 821 5197 Working at height from Mobile Tower B Contractors/Sub contractors

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy It is the policy of Riverside to create a safe environment and to encourage ways of working which will ensure the safety of children, employees and all other persons who come onto

More information

RULES FOR HUNTER TRIALS

RULES FOR HUNTER TRIALS Revised edition: 2017 RULES FOR HUNTER TRIALS PONY CLUB WESTERN AUSTRALIA 1 TABLE OF CONTENTS SECTION 1: Introduction... 3 Governing Rules... 3 Origin & Aim... 4 SECTION 2: General Regulations... 5 Chapter

More information

Health & Safety Plan `

Health & Safety Plan ` Rolleston Men s Shed Charitable Trust Health & Safety Plan ` 54 Dynes Rd Rolleston Ph. (03) 347-3173 Cell: 027 430-3076 E-mail: rollyshed@xtra.co.nz Version 3 15/12/2016 Page 1 of 20 TABLE OF CONTENTS

More information

OSHA Compliance Saves Money, See How They Are Connected. Ryan S. Hellman, MS Principal EHS Consultant

OSHA Compliance Saves Money, See How They Are Connected. Ryan S. Hellman, MS Principal EHS Consultant OSHA Compliance Saves Money, See How They Are Connected Ryan S. Hellman, MS Principal EHS Consultant Why Safety? OSHA Regulations Approximately 50 individual OSHA General & Construction Industry Standards

More information

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT Prepared for:- Date:- Work Scheduled:- SCOPE OF WORK Carry out installation of flow meters / pressure sensors. Installation of flow meter procedure

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT AUGER / POST HOLE DIGGER Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-0 Task: Line Marking This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

Risk Controls Proposed: (in hierarchy order from the most preferred control)

Risk Controls Proposed: (in hierarchy order from the most preferred control) are to be assessed and controlled by eliminating or minimising any risks to health and safety. Eliminate - Where the risk to health and safety is removed from the workplace. Minimise - Where the risk cannot

More information

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors Appendix 1 Health & Safety Declaration, Roles and Responsibilities Each exhibitor and Informa appointed contractor must complete the Health and Safety Declaration form provided below to confirm they have

More information

Site Induction Document & Site Rules

Site Induction Document & Site Rules Site Induction Document & Site Rules Event Name Diabetes Professional Conference 2018 Venue Build & Breakdown Times Prepared By Excel London, Halls S19 S23 Build; Mon 12 th March: 09:00 22:00 (space only

More information

Meet Today s Webinar Team

Meet Today s Webinar Team Meet Today s Webinar Team Moderator: Stacy Rose, CSP Stacy is a certified professional with 16 years experience in workplace safety. Stacy holds a bachelor s in industrial engineering and a master s in

More information

OSHA Federal Standards October 1, 2016 September 30, 2017

OSHA Federal Standards October 1, 2016 September 30, 2017 OSHA Federal Standards October 1, 2016 September 30, 2017 29 CFR 1926 SUBPARTS 29 CFR 1926. C M L L E M M E X M MOST FREQUENTLY CITED SERIOUS VIOLATIONS IN CONSTRUCTION 2017.501(b)(13) FALL PROTECTION

More information

COMPLIANCE GUIDELINES FOR. Departmental Health and Safety Inspections

COMPLIANCE GUIDELINES FOR. Departmental Health and Safety Inspections COMPLIANCE GUIDELINES FOR Departmental Health and Safety Inspections CONTENTS 1 INTRODUCTION...1 2 WHY INSPECTION...1 3 OBJECTIVES AND METHODS...2 3.1 Safety Tours...2 3.2 Safety Inspection...2 3.3 Other

More information

1.1 OHS Policy and Responsibilities

1.1 OHS Policy and Responsibilities 1.1 OHS Policy and Responsibilities At Canadian Rope Access Specialists Inc. safety is our primary concern and the health and safety of our employees, clients and contractors is of paramount importance

More information

4 Staff Selection, Appraisal and Development. To prevent harm by identifying and controlling potential hazards.

4 Staff Selection, Appraisal and Development. To prevent harm by identifying and controlling potential hazards. OTAGO POLYTECHNIC MANAGEMENT POLICY Number: MP0403.04 Title: Hazard Management ITPNZ Standard: 4 Staff Selection, Appraisal and Development Chief Executive Approval: Approval Date: 17 Apr 12 Effective

More information

SAFE WORK METHOD STATEMENT 0005 (Hang-On Platform) Part 1 (To be used in conjunction with SWMS 0001 General Site Activities)

SAFE WORK METHOD STATEMENT 0005 (Hang-On Platform) Part 1 (To be used in conjunction with SWMS 0001 General Site Activities) Contractor Company Details: BUILDSAFE SAFE WORK METHOD STATEMENT 0005 (Hang-On Platform) Part 1 (To be used in conjunction with SWMS 0001 General Site Activities) Additional Information (if required):

More information

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Traineeship Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE: DATE: / /

More information

SWS FORESTRY HAZARD IDENTIFICATION & RISK ASSESSMENT Field Based

SWS FORESTRY HAZARD IDENTIFICATION & RISK ASSESSMENT Field Based SWS FORESTRY HAZARD IDENTIFICATION & RISK ASSESSMENT Field Based NAME: SWS Forestry Ltd PERSONS Foresters - See Safety Statement DATE: Feb 2017 RESPONSIBLE: Padraig Egan ADDRESS: Gate Lodge, West Cork

More information