1 The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, APRIL 26, 2017 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m. Present: Absent: Mary Schumacher, Vice-Chair Jamie Mathews Courtney Bird Betsy Gladfelter Steve Patton, Alternate Jennifer McKay, Administrator Russell Robbins, Kristin Alexander, Maurie Harlow-Hawkes, Mark Gurnee, Alternate Ms. Schumacher opened the meeting at 7:02 p.m. MINUTES 4/12/2017 Mr. Patton: Move to adopt the minutes as corrected. OTHER BUSINESS Boy Scout Troop 40 requesting to camp at the Souza parcel April Ms. McKay: This is their annual boy scout outing on the Souza parcel. I recommend that the Board grant approval. Ms. Gladfelter: Move to grant approval for this request. Mr. Mathews: Second. REQUEST FOR CONTINUANCE UNDER DETERMINATION OF APPLICABILITY Ken & Lorraine Montouri, Lot 7H, Pine Bank Road, North Falmouth, MA For permission to construct a new 3-bedroom single-family house with attached garage, deck, porches with stairs, install walkways, landscape walls, Title 5 sewage disposals system, utilities, dry wells, gravel driveway and the associated clearing, excavating, grading and landscaping. Ms. McKay: Please table the vote. Ms. Gladfelter: Move to table the vote. Mr. Mathews: Second. Ms. Gladfelter: Move to untable the vote. Mr. Mathews: Second. Ms. McKay: The applicant has requested a continuance until May 17,

2 Mr. Bird: At the request of the applicant I move to continue the hearing until May 17, Gregory Nicoll, Maker Lane road layout including 19 Wood Neck Rd, 6 Maker Lane, 5 Maker Lane and 3 Maker Lane, Falmouth, MA For permission to grade and level a section of Maker Lane, add 2-inch dense grade, pitch grade to a 32-ft drainage swale to be installed, pave Maker Lane entrance and to conduct tree pruning at 19 Wood Neck Rd. Ms. McKay: The applicant has requested a continuance until May 3, Mr. Mathews: At the request of the applicant I move to continue the hearing until May 3, REQUEST FOR A CONTINUANCE UNDER A NOTICE OF INTENT Shirley Rothwell, 28 Drift Road, West Falmouth, MA For permission to install a new Title 5 sewage disposal system within naturally vegetated resource area and buffer, to construct a new 6-ft x 12-ft deck, expand existing deck, install an underground electric line and the associated clearing, excavating, grading and landscaping. Ms. McKay: The applicant has requested a continuance until May 24, Mr. Bird: At the request of the applicant I move to continue the hearing until May 24, John Zizza, 82 Waterside Drive, North Falmouth, MA For permission to relocate six (6) large boulders within an area of stones to open up three channels between 20-ft and 40-ft wide through the boulder field for small craft navigation into Megansett Harbor. Ms. McKay: The applicant has requested a continuance until May 24, Ms. Gladfelter: At the request of the applicant I move to continue the hearing until May 24, Ms. Gladfelter: Is this the second continuance? Ms. McKay: Yes. Salt Pond Area Bird Sanctuaries, Inc. & Quissett Harbor House Land Trust, Inc., 48 & 71 Quissett Harbor Road, Falmouth, MA For permission to conduct maintenance activities to preserve the cultural and natural resources at the Knob through trail and access maintenance, erosion control, vegetation management and the associated clearing, excavating, grading and landscaping. Ms. McKay: The applicant has requested a continuance until May 3, Mr. Bird: At the request of the applicant I move to continue the hearing until May 3, Mr. Mathews: Second. 2

3 REQUESTS FOR DETERMINATION OF APPLICABILITY James O Connor, 221 Sippewissett Road, Falmouth, MA For permission to vista prune. Ms. McKay: Jurisdiction: within 100-ft resource area buffer to coastal bank and in land subject to coastal storm flowage (flood zone A). This property was issued an Order of Conditions for house construction around For compliance, I had reviewed with Mr. O Connor in 1999 and discussed the requirements and allowances under vista pruning. The O Connor s are applying for around their 4 th RDA for vista pruning. They have been maintaining their view corridor as permitted over the years and are once again asking to vista prune using Seaside Arborists (Steven Buckhoff). Staff recommends a negative 2 (under the State and the bylaw). Resource area boundaries are not confirmed by this RDA. Mr. Mathews: Move to accept staff s recommendation. Stephen Hixon, 250 Acapesket Road, East Falmouth, MA For permission to replace three 15-ft pilings with three 30-ft pilings. Ms. McKay: Jurisdiction: on coastal bank, bank of salt pond, in salt marsh, BVW/freshwater wetland, land under the ocean, land under salt pond, land containing shellfish, land subject to coastal storm flowage (flood zone A) and within 100-ft resource area buffer to coastal bank, inland bank, bank of salt pond, land under the ocean, land containing shellfish, salt marsh and BVW/freshwater wetland. The existing dock is in the footprint as approved under DEP However the existing jet-ski float was not approved under the expired OOC and must be removed prior to the piling replacement. The 35-ft buffer strip requirement under DEP does not exist. The vegetation is cleared into the wetland resource area. There are also two large cedars (11- inch and 13-inch) that were cut without a permit. The new owner is being told that a Notice of Intent will have to be filed to correct all wetland violations or enforcement action will be required. Staff recommends a positive 3 (under the State and the bylaw) to replace the pilings. Resource area boundaries are not confirmed by this RDA. Mr. Bird: Move to accept staff s recommendation. Sippewissett Highlands Beach Trust (c/o Larry Sheehan), Lot A, Sippewissett Road (Map A), Falmouth, MA For permission to erect two kayak racks on a cobblestone area. Ms. McKay: Jurisdiction: within coastal dune 100-ft resource area buffer to coastal bank, coastal dune, salt marsh, coastal beach, land under the ocean, land containing shellfish, BVW/freshwater wetland and in land subject to coastal storm flowage (flood zone V). On 4/13/17 staff met on-site with Larry Sheehan, representing the Sippewissett Highlands Beach Trust to review the kayak area. The proposal was scaled and shown in bare, cobble area landward of the beach. Minimal vegetation shall need to be pruned within the rack footprint and the access path shall be from the beach, not across the vegetated coastal dune area. The rack post supports shall be inserted into PVC sleeves to allow for removal in case of a storm event. This installation will be the same as when the Trust installed kayak racks in 2012; that set up was installed and maintained as approved and is working well. The Trust is making attempts to keep water crafts off vegetated coastal dune areas. Staff recommends a negative 2 (under the State and the bylaw). Resource area boundaries are not confirmed by this RDA. 3

4 Ms. Gladfelter: Move to accept staff s recommendation. Mr. Mathews: Second. Gregory Nicoll, Maker Lane road layout including 19 Wood Neck Rd, 6 Maker Lane, 5 Maker Lane and 3 Maker Lane, Falmouth, MA For permission to grade and level a section of Maker Lane, add 2-inch dense grade, pitch grade to a 32-ft drainage swale to be installed, pave Maker Lane entrance and to conduct tree pruning at 19 Wood Neck Rd. The hearing is continued until May 3, Harold Sears, 17 Fells Road, Falmouth, MA For permission to replace the existing wood timber retaining wall with a cut stone wall in the same location and dimensions. Ms. McKay: Jurisdiction: on coastal bank and within 100-ft resource area buffer to coastal bank, inland bank, bank of salt pond, land under the ocean, land containing shellfish, salt marsh, BVW/freshwater wetland and in land subject to coastal storm flowage (flood zone V). The house has been in existence since before the wetland regulations and there is a clear path for access to the wall. No trees or vegetation to be removed except for invasive plant species growing over and through the wall. Staff recommends a negative 2 (under the State and the bylaw). Resource area boundaries are not confirmed by this RDA. Mr. Mathews: Move to accept staff s recommendation. Patricia & Bruce Stivaletta, 65 Deacons Avenue, Falmouth, MA For permission to repair the marine railway consisting of two 20-ft length rails with two new 20-ft rails pre-constructed rails consisting of 6-inch x 6-inch pressure treated members attached to the rails at 5-ft intervals. Ms. McKay: Jurisdiction: in land under the ocean, rocky intertidal, land under salt pond, within 100-ft resource area buffer to coastal bank, bank of salt pond, land under the ocean, land containing shellfish and in land subject to coastal storm flowage (flood zone V & A). The railway has been in existence since before wetland regulations and the Stivaletta s have filed for repairs for structures on the properties over the years. Mr. Stivaletta explained the work as primarily by hand. Divers will cut out the 20-ft rotted section of rail, remove the pieces via a crane located in the upland, remove rotted creosote timbers that supported the rails and replace the timbers in the same footprint. The tidal floor consists of layers of small cobble rocks. Staff recommends a negative 2 (under the State and the bylaw). Resource area boundaries are not confirmed by this RDA. Mr. Bird: Move to accept staff s recommendation. Mr. Patton: Second. Cynthia Maddox, 78 Bay Road, North Falmouth, MA For permission to pump, fill and abandon the existing cesspools and install a new Title 5 sewage disposal system. Ms. McKay: Jurisdiction: within 100-ft resource area buffer to coastal bank, inland bank, land under waterbodies, isolated land subject to flooding and BVW/freshwater wetland. Staff met with Tom Bunker to discuss placement of leach field. It shall be reconfigured to preserve certain trees and mitigation shall be proposed closer to wetland resource areas in disturbed areas. A revised plan was submitted showing the reconfigured leach field and mitigation trees and shrubs are required for compensation. Standard conditions shall be followed for survival of the mitigation plantings. Staff 4

5 recommends a negative 2 (under the State and the bylaw). Resource area boundaries are not confirmed by this RDA. Ms. Gladfelter: Move to accept staff s recommendation. Charles Matteo, 77 Miami Avenue, East Falmouth, MA For permission to replace the existing 4-ft x 14-ft wood stairway and 4-ft x 4-ft wood landing. Ms. McKay: Jurisdiction: on coastal bank, inland bank, bank of salt pond, in land under the ocean within 100-ft resource area buffer to land containing shellfish, salt marsh, BVW/freshwater wetland and in land subject to coastal storm flowage (flood zone A). This work was approved under an RDA approved in 2014 but has not been done and the RDA has expired. NOTE: Requirements under the last RDA - Cinder blocks were required for removal from the bottom of the bank by no later than May 14, The cinder blocks are still present and the owner has been told to remove them immediately. The tree replacement was planted in May of 2014, but is gone and filled in with grass - also to be replaced now or no later than May 15, Cedar saplings (2) have been removed near and on the coastal bank replacement required. Invasive vines could be removed but paths through the naturally vegetated buffer have been established no further cutting allowed. Staff recommends a negative 2 (under the State and the bylaw). Resource area boundaries are not confirmed by this RDA. Mr. Bird: Move to accept staff s recommendation. Thomas & Karen Tierney, 167 Nobska Road, Woods Hole, MA For permission to conduct yearly maintenance on the existing sandplain grassland meadow approved under DEP Ms. McKay: Jurisdiction: on coastal bank and within 100-ft resource area buffer to coastal bank, inland bank, land under waterbodies, BVW/freshwater wetland, coastal dune and in land subject to coastal storm flowage (flood zone A). This had been a project originally approved by the Commission in 2004 to create an assemblage of sandplain grassland species within an area of nonnative grasses and invasive plants. The Tierney s have committed to this maintenance over the years. The current situation on-site appears to be successful. While many of the native species are not up yet, the base plant community of native grasses appears to be doing quite well with very few invasive species present. To my knowledge, this is the only sandplain grassland in Falmouth created on private property of reasonable size that has been successful. I recommend approval for continued maintenance for the control and removal of invasive plant species. Staff recommends a negative 2 (under the State and the bylaw). Resource area boundaries are not confirmed by this RDA. Mr. Bird: Move to accept staff s recommendation. CONTINUED REQUESTS FOR DETERMINATION OF APPLICABILITY Ken & Lorraine Montouri, Lot 7H, Pine Bank Road, North Falmouth, MA For permission to construct a new 3-bedroom single-family house with attached garage, deck, porches with stairs, install walkways, landscape walls, Title 5 sewage disposals system, utilities, dry wells, gravel driveway and 5

6 the associated clearing, excavating, grading and landscaping. The hearing is continued until May 17, REQUESTS FOR HEARINGS UNDER A NOTICE OF INTENT Seascape Association, Inc. (c/o Timothy Gallagher), A Beach, Waterside Drive (Map 04-02A A), North Falmouth, MA For permission to maintain vegetative cover, vista prune, control invasive plants, install native trees and shrubs and the associated landscaping. Ms. McKay: No comment at this time. Timothy Gallagher (Association member) I m here to get back the intent to do vista pruning. We got approval in February of 2015 and did it. We needed to apply again and also need to plant trees. We hope you will allow vista pruning on the beach and that we maintain the boardwalk. Attachment A is the list of all we want done. There are two maps attached an existing conditions map and the updated map is our proposal. We have outlined the area of vista pruning. The area to the north is where we want to remove invasive plants and replace them with native species. We will plant 3 new trees one in the northeast corner of the property and the other 2 are on the southern side of the boardwalk. The locations have been staked and approved by Mark. We have hired Hamilton Landscaping to do the work. Ms. McKay read the statement re invasive plant control from the application. What does maintain mean? Mr. Gallagher: We want to plant bayberry bushes and many more native grasses. Ms. McKay read the last sentence in the section. You actually want to maintain the height of the bushes to 5-ft. Mr. Gallagher: We will leave alone anything outside the vista corridor if not invasive. Ms. McKay: Please take that last sentence out. Prior to removing the invasives you will have a site visit with Mark and I so we can work with you on identifying the invasives and what kind of plants to plant. Mr. Gallagher: We will plant the trees right away, but there will be no pruning until the fall. Ms. McKay: A Special Condition will be that you meet with staff and Hamilton Landscaping before you do any work. Mr. Patton: No questions or comments. Mr. Mathews: No questions or comments. Ms. Gladfelter: I m glad the trees are going in first. If you have a different contractor for some reason you must get approval from administration. Mr. Gallagher: Not a problem. Mr. Bird: The trees you re putting in were supposed to be put in 4 years ago. Why were they not? Mr. Gallagher: Two died and one wasn t put in. There is no water on property and that s the problem. This time we will carry buckets if necessary. Hamilton Landscaping will help us with it. They will also dig a good size hole and fill it with good dirt. Ms. Gladfelter: Move to close the hearing and take it under advisement. Salt Pond Area Bird Sanctuaries, Inc. & Quissett Harbor House Land Trust, Inc., 48 & 71 Quissett Harbor Road, Falmouth, MA For permission to conduct maintenance activities to preserve the cultural and natural resources at the Knob through trail and access maintenance, erosion control, vegetation management and the associated clearing, excavating, grading and landscaping. Ms. McKay: The hearing is continued until May 3,

7 The hearing occurred before the Clarke Trust hearing. Town of Falmouth DPW (c/o Raymond Jack), Menauhant Road (Map ), East Falmouth, MA For permission to widen the inlet at the Bournes Pond bridge to increase tidal flushing and improve water quality and aquatic habitat. The activities include widening the inlet from 50-ft to 90-ft by removing 12,600 sf of coastal bank & barrier beach east of the inlet, install a new two-span bridge, dredge approximately 5,800 cy of material and nourish adjacent beaches and dunes, reposition the eastern inlet jetty to the eastern side of the new inlet, extend the western side jetty along the inlet by 25-ft, remove an existing 25-ft jetty on the beach west of the inlet, provide a public fishing platform adjacent to the bridge and the associated clearing, excavating, grading and landscaping. Ms. McKay: Would you please table this hearing. Ms. Gladfelter: Move to table the hearing. Mr. Mathews: Second. Ms. Gladfelter: Move to untable the hearing. Virginia Valiela (Water Quality Management Committee) This is a complicated project. Jessica Janney of GHD Engineering will make the presentation. Jessica Janney (GHD) presented the plan and abutter s cards. A summary of the project follows: Tidal restoration project with increased habitat for shellfishery and eelgrass No negative impact to existing eelgrass beds or shellfish resources Widening inlet will remove 50% of target nitrogen reduction load half way to TMDL compliance Widening inlet from 50 to 90 does not increase flooding of residential properties Dredging footprint only increased in the channel and a small section of the pond Beach nourishment mitigates coastal erosion and protects Town infrastructure Ms. McKay (to Ms. Janney) Remember when we talked about the structure unearthed on Menauhant Beach? Have we talked about what we re going to do with the structure? As for having excess dredge spoil material - there may not be any. James McLoughlin (Town Engineer) We are still trying to figure out what the structure is. It may have been an outbuilding for another building further north when the road was along the beach. Once we confirm what it is we ll remove it. Ms. McKay: We don t want it buried again. Let s get it out and use the material to build up nice dunes. Not starting the project until 2018 or 19 it gives the Town time to do that. Mark and I looked at the planting plan and have some ideas re the planting. Mr. Bird: The fact of the matter is that sea level rise is an issue, and since we are planning for coastal resiliency why not raise the height of the bridge? It s a lot less expensive to build it higher now. Ms. Janney: I believe it was discussed and it was decided not to raise the bridge height because it would introduce bigger boats. There was a purposeful decision not to do that. Mr. Bird: We re talking about trade-offs here. There are ways to stop the boat problem. Ms. Schumacher: The Selectmen recently created a coastal resiliency committee to develop an action plan that ought to give recommendations about things like bridge height and coastal roads. You won t be doing this while the committee is in process so you might want to consider that possibility. Mr. Bird: The fact that this road has already been moved back means we should be looking at that. It would be prudent to consider raising bridges because of sea level rise. Ms. Schumacher: We should keep in mind that we don t want to continue doing what we ve been doing for years. 7

8 Ms. Valiela: We do take sea level rise seriously, but clearly the neighbors do not want the bridge raised because of increased boat traffic. A study shows that it is now higher than the expected rise. Ms. Schumacher: Do you know when the study was done? Ms. Valiela: In the last couple of years. John Ramsey (Applied Coastal) We did look at sea level rise last year. There are predictions all over the map. We re trying to keep this in context with the road. There are a lot of things to consider including that if we raised the bridge it would have an impact on the salt marsh. Ms. Gladfelter: Once we get to the building years it will be a 5 ½ to 6 million dollar project. Ms. Valiela: The cost of the whole project is 5 ½ million. Ms. Gladfelter: Do you really expect it to take 18months to 2 years? Will the road be closed? Ms. Janney: Yes, the road will be closed. We hope it will be closer to a year or 18 months. Ms. Gladfelter: Is it a double span? Attachment 4 shows the span. The dredge profile when the road is closed you can get in there, but when it s blocked you can t get the dredge in. What s proposed now? You might have a wider inlet, but at some point it might have sand pushed into it. Mr. Ramsey: The first thing is that widening the inlet widens the channel. A strong current pumps sand and a wider channel slows the current. There will be less material going into the entrance with an extended jetty. It won t be any different than what we re dealing with now. If you need a drag line in there to further dredge you won t have to go in as far. Ms. Gladfelter: The purpose of the project is to get more flushing and it s been dredged fairly recently. Mr. Ramsey: It hasn t had to be dredged in a long time. It s pretty stable. Ms. Gladfelter: Some day they might want to put more sand on the beach. Mr. Ramsey: Right now it s stable on the west side. Ms. Gladfelter: These are concerns I have with this project. Mike Kinney (Waterways Committee) Dredging is an issue. Inside dredging is a problem. South facing estuaries have to be dredged every year. We will wait until June to do it. We dredge where boats are. This will not be on a high priority list to be dredged and would have a time of year restriction. If you get to 90, a southeast storm in one day will crowd an entrance. Dredging is a major issue. By widening the entrance and slowing down the flow you have sand coming out the entrance. It will have to be dredged and we don t have a permit to dredge there. It will be a problem and with the resources we have it won t be on a high priority list. Ms. Gladfelter: Was it part of the comprehensive dredging permit? Ms. McKay: It could have been rolled in. Mr. Kinney: I m talking about between the jetties. Ms. Gladfelter: The bottom line is there will have to be dredging in order to keep this open. There will have to be an annual amount of money to keep this open. Ms. McKay to Ms. Valiela: Will the Town comply with all the monitoring that will have to be done and will there be money dedicated to do this? Where will that money come from? Ms. Valiela: It has to become part of our budget in the future. This is a complicated project. We are aware that this is work that has to be done. Ms. McKay: It will be in the OOC. The Board has had some issues with the Town following through on monitoring after the fact. What is that budget going to be? I d like to see a budget put together by the Water Quality Management Committee. Ms. Valiela: I can t put that together right now, but I am meeting with the Treasurer next week. Ms. McKay: You can get an idea of what the budget is going to be. Ms. Gladfelter: As far as the time of year restrictions - are you considering that only for dredging? Ms. Janney: Mostly for dredging and setting the cofferdams. Ms. Gladfelter: Your time of year restrictions are from 8/31 to 12/31? Ms. Janney: Yes. We will be working outside of restrictions and weather dependent. It will be tricky. The contractor will bid knowing these restrictions. 8

9 Ms. Gladfelter: A shellfish survey was done just within the dredge footprint. But dredging could affect other areas. There is good shellfish on the shelves to the sides. Ms. Janney: There will be a temporary impact. The long term impact to shellfish will be positive. Ms. Gladfelter: You re not saying anything about those flats and that concerns me. I understand what the goal is but I m curious about the historic channel to the west. That has the most erosion wouldn t it be better to have the inlet in that area? Mr. Ramsey: One of the things we re looking at is that after the 1938 hurricane that area eroded very rapidly. When the ebb shoal went away it started eroding. One issue is that the area is armored all along the shoreline. The series of groins trap the sand. Ms. Gladfelter: That s now. For all those years sometimes it was wider and sometimes less wide. Mr. Ramsey: You can maintain the inlet any way you want. They maintained it on the western end during pre-permitting days and everything went the way they wanted. If I said I d like to put the inlet back there I d get killed. We can do something in the future. Ms. Gladfelter: Why are we doing this in the first place? This is to mitigate the nitrogen input. I went through and looked at all these letters from DMF, etc. and several echoed the question aren t we just removing the problem from one place to another? Is it really responsible on our part to do this? I asked the question where is our baseline data? I don t think that s an irresponsible position. How can you show me that it will reduce nitrogen pollution in the pond? Mr. Ramsey: The issue with the whole solution to pollution is not the question here. This happens to be narrower than it wants to be. We are trying to turn it back to what is more akin to what it wants to be. Not trying to make this wide open so we can flush out all the nitrogen, just trying to make it more natural. Ms. Gladfelter: There is a lot more nitrogen in the pond. Ms. Schumacher: The argument in your request is about the nitrogen removal. Ms. Gladfelter: We as community members are putting the nitrogen into the system. You will reduce it in the pond and push it out to other areas. Mr. Ramsey: Nothing is changing. There will be one pulse of increased nitrogen going out in the winter. Ms. Gladfelter: We will be putting nitrogen into the broader environment instead of dealing with it where it is. Mr. Ramsey: This is just one aspect of it. It s not the full solution to the Bournes Pond problem. Mr. Mathews: No questions or comments. Mr. Patton: How will we remove the structures? Ms. McKay: We will work with the Town on that. Ms. Valiela: We will come before you with an NOI. Ms. Gladfelter: Before we get the data? Ms. Valiela: We will get the data to you right away. Ms. Gladfelter: It s also a concern that the TMDL were based on something done 12 years ago. Ms. Valiela: That was set by the DEP and the EPA. Ms. Gladfelter: I have a problem with causing one problem by solving another. I m concerned when the solution to get to these regulatory numbers affects other areas. Ms. Valiela: The studying was done re sewering and found that on the southern part of the peninsula it was more important to do this. There will have to be further sewering in Town. Ms. Gladfelter: There is an issue with sewering because of sea level rise. I do appreciate all the work you have done. Mr. Patton: Are you removing the groin or the jetty? It s confusing in what you have told us and the way it is written in the proposal. Mr. Ramsey: That s a labeling issue. Mr. Patton: What about the structure that is there now? Mr. Ramsey: We will shorten the groin and rebuild the jetty to its permitted length so it traps sand 9

10 better than it does now. Mr. Patton: What is the reason for extending the western jetty? Mr. Ramsey: It will hold the sand better and help the erosion problem. Mr. Patton: In addressing the scouring, is the orientation of the channel relative? Mr. Ramsey: We try to have inlets lined up. Mr. Patton: The boat traffic is very minimal on the pond now. Will the bridge survive 86 years at its current height? Increasing the width is an improvement. Mr. Ramsey: We expect it will. Nitrogen is always increasing to the north. Mr. Patton: But the shellfishing is good in the north and we want to preserve that. It is surprising to me that there is one page on monitoring in this huge presentation. Can t it be built into this project? Ms. Janney: The town has a pond watch program with monitoring plans. Mr. Patton: There should be a monitoring component that is a little more fleshed out. Mr. Bird: I concur with Betsy that we re pushing a problem down the road. The issue of nitrogen the solution is not polluting the ocean. We are already using it as a dump now. The project has merit and certainly is a short term solution. What we really need to do is look at ways we can address nitrogen loading at the source and not let it go somewhere else. Did I understand correctly that by widening this inlet the entire length of the inlet from the ocean to Bournes Pond would need dredging on a continual basis? Mr. Ramsey: 90 feet is needed to keep sand moving. We are looking at this as not any real change to existing practice but we will have currents sufficient to keep it clear. Mr. Bird: Would it help if the bridge height is raised as far as dredging goes? Mr. Ramsey: Yes. Mr. Bird: Clearly there is a potential for larger boats if you raise the height of the bridge. You can build something that will detract from that. You need to think outside the box. Ms. McKay: Since you re getting the baseline data, you can also look at the DMF letter and see what the monitoring proposal will be. Then we ll all be on the same page re that. Did I see a design for a cofferdam? Ms. Janney: Yes, but it may not be the actual design. Ms. McKay: I ll have to write that into the OOC. Tom Duncan (Waterways Committee) Nitrogen is very negative but when it gets into Vineyard Sound it will not pollute. Jay Decoteau (abutters on south side) presented a letter and photos to the Board. He read the letter highlighting the concerns of his family and showing how erosion has occurred in the area when inlets are changed. I may have questions for the presenters tonight and I would like you to have the answers after I receive that information. Ms. Gladfelter: If the hearing were closed tonight we couldn t take any further information. Ms. McKay: The hearing will be continued. If you me your questions we will send them to the Water Quality Management Committee, GHD and Applied Coastal. How long will it take for the data information and the monitoring plan to be fleshed out? Does continuing the hearing to May 17 th work for you? Ms. Valiela: No, it s too soon. Ms. McKay: How about June 7 th? Ms. Valiela: Yes. Ms. Gladfelter: At the request of the applicant I move to continue the hearing until June 7, Ms. Schumacher (to the Decoteaus) Can you attend a hearing on that day? Mr. Decoteau: Yes. 10

11 CONTINUED REQUESTS FOR A HEARING UNDER A NOTICE OF INTENT Beccles Road Nominee Trust (c/o Dana Doe), 19 Beccles Road & Sippewissett Road (Map C), Falmouth, MA For permission to install approximately 100 linear feet of steel sheeting along the base of the existing mortared stone revetment which includes construction access, vegetation restoration and the associated clearing, excavating, grading and landscaping. Ms. McKay: We do not have a quorum but with the agreement of the applicant we can reset it. The applicant is agreeable. Ms. Gladfelter: Move to reset the quorum. Quorum: Jamie, Betsy, Courtney, Mary, Steve Ms. McKay (to Mr. McGrath) Would you please go through a brief history of the project? Michael McGrath (Holmes & McGrath) presented photos. The project is to address a riprap at the rear of the land at Beccles Road. Resource areas include Buzzards Bay, coastal beach, coastal bank, Velocity zone, an existing mortared riprap. The first photo I showed you is the existing riprap. Because of the white color at the base and above it you can see that it s more weathered. In previous submissions I gave you the dimensions of what was apparent there. The next photo was taken on October 6 th and you can see two buoys underneath the toe stones. The wall is in eminent danger of failing. There are a series of rebars that were driven to be sure we are clear of the stones when we are driving the sheeting and won t hit the stones. The piping shows that material will wash out behind the wall and the next series of photos show a riprap collapse. On the 4 th page you can see an enormous void behind the riprap. We couldn t see behind it before. Ms. Gladfelter: Likely there are voids. Mr. McGrath: There are voids. The next series of photos show that apparently the beach in front of the house was greater. Aerial photos show a drop in the elevation of the beach. 1 Wigwam has a short jetty and an armored frontage for a couple hundred feet. You gave them approval to raise the riprap a foot. A sand ramp was constructed and after it was discontinued they shaped it into a dune and now it is completely gone. Erosion has gone beyond the inland edge of the riprap. The riprap could collapse at any time. The stone will be installed seaward of the proposed sheeting (Phase 1). In phase 2 we will rebuild the riprap with dry laid stone. We have tried to obtain permission from the Association to get access but don t have it yet. Mean high water on this end of the Cape is about one foot higher in my estimation. I observed the temperature of Buzzards Bay and last year it was warmer than ever. These two things have accelerated erosion along Buzzards Bay. The groin is full of sand so the damage is a combination of what I mentioned above. The groin that is owned by the people who own the beach has trapped sand. To say that we have to nourish that beach is unfair to my client. I don t know how you can condition that we put sand on someone else s land. Ms. McKay: When was the house rebuilt? Mr. McGrath: 5 years ago. Ms. McKay: Was the landscaping done at the same time? I know there was a lot of work done by Solien. Dana Doe (applicant) We tried to rebuild the house on the existing foundation. Ms. McKay: When was the landscaping done? Mr. Doe: At the same time in The house was vacant for about a year. Ms. McKay: How was the wall then? Mr. Doe: The wall was fine, but there was erosion at the toe. We tried to mend the wall by putting concrete in some of the holes, but were told no to do that. A winter storm came and the sand was all gone. 11

12 Ms. McKay: Why not just rebuild the wall all at once. Why in phases? Mr. McGrath: We were trying to get it done before summer. Ms. McKay: Why can t you just rebuild it? Mr. McGrath: That s an option. Ms. McKay: I don t see the necessity to do it in phases. Would you have to re-design it? Mr. McGrath: No just change it to a bigger toe. Ms. McKay: Why wait until the 11 th hour to repair it when it s failing? I would prefer it done all at once. Can you do it without going on to Association property? If you put bigger toe stones in there, how will you excavate and then get them in? Mr. McGrath: We can install riprap from the top, but it s not a good idea. I m not sure I can reach that far. Ms. McKay: Construction access would be through the mitigation planting? Would the Association allow that? It would be a lot less destructive to the area. I would prefer it done in one phase. Mr. Bird: When you did the construction the first time most of the activity centered around the house and you did just a cursory landscaping? Mr. Doe: I did a lot of landscaping when we built the house. All the plants are new plants. Mr. Bird: You and the people doing the landscaping noticed no problem with the wall. Mr. Doe: No we didn t. Mr. Bird: The flowable fill are you going to inject it behind the wall? Ms. Gladfelter: They are not going to fill in the voids. Mr. McGrath: We will drive the sheeting and there will be a gap. I need something to connect the wall to. The fill is only temporary. Mr. Bird: One of my concerns is that because of the dynamic conditions where the toe stones are going to go, it s vulnerable because of erosion. The sinking of the beach will continue and you will put toe stones in and 3 years from now with storms, etc. - will this be effective? Mr. McGrath: You can t say it will not happen and some beaches have disappeared but if they are installed right it should be fine. Mr. Bird: There are all kinds of approaches to projects. I appreciate Mr. Doe s attempt to keep it that way. I just want to be assured that with all this effort the conditions can be satisfied. Mr. Doe: The seawall itself is in great shape; it s the bottom that s a problem. Since we started the process I m more worried about it than ever. I m trying to fix it so the house stays up on the hill. Mr. Bird: I understand what s going on because I live in the area. Ms. Gladfelter: When were the pictures taken that you gave to us and where were they taken? Ms. McKay: You need them labeled. Mr. McGrath: I will label them and bring you another copy. Ms. Gladfelter: For the record it needs to be on the sheet. Sand moves in and out in different places. I understand your concern. If you were doing this project and were allowed to armor it, is this the wall you would put in? Mr. McGrath: I have space constraints. Ms. Gladfelter: If you re going to build a wall, don t you want to build the best design possible for that site? Mr. McGrath: I just waited 3 years for a Chapter 91 license and I d have to wait 3 years to get this done because of the slow to answer of the DEP. Ms. Gladfelter: You wouldn t normally do this with sheeting. Mr. McGrath: Sheeting is important to keeping the wall there. The house is too close. I have a certain amount of space. Ms. Gladfelter: I think you have enough space for a different slope. Mr. McGrath: This is a very high wall. Ms. Gladfelter: If a hurricane hits it could hit anywhere. I m concerned for Mr. Doe and the money you will spend that you get the best protection for the house. 12

13 Mr. Mathews: Is the same design as the one on Penzance? Mr. McGrath: Yes. Mr. Patton: No questions or comments. Ms. Gladfelter: Your constraint is because of the slow permitting by DEP? Mr. McGrath: And access. We d have to provide beach nourishment forever. Mr. Bird: The truth of the matter is nobody knows for sure because everything is site specific. You re dealing with site realities and you can t make a silk purse out of a sow s ear. I wish that everyone involved would work together with this, but that s not our problem. If you feel that this will work and it won t fall into the ocean in the near future, who am I to say that some other approach is better? Mr. McGrath: We are also guided by your regulations. Ms. McKay: If you did phase 1 when would phase 2 happen? Mr. McGrath: I don t know. Mr. Doe: Is my word good enough that I would do it soon? Ms. McKay: No disrespect to you, but no one s word is good enough. We have been burned too often. Mr. Doe: If we re able to get steel sheeting in soon. Ms. McKay: I just want to know about the reconstruction of the wall. Mr. Doe: In the winter. Ms. McKay: Okay. Ms. Gladfelter: Move to close the hearing and take it under advisement. Leslie Fields (Woods Hole Group) Installing a vertical sheet filled wall doesn t meet your performance standards. It will have an adverse effect on the beach. I disagree about the imminent threat to the wall. It s possible that the sand will come back in. There is no need to construct phase 1. We would urge that they go right to phase 2 and rebuild the revetment. That will not encroach on the Association beach. I urge the applicants to consider a more gradual slope and add beach nourishment. DEP agrees that you should do it in one step. DEP also says there should be some kind of beach nourishment. There should also be a monitoring component. Mr. Bird: In your proposed alternative how do you handle the transition? Ms. Fields: I don t know. They should talk to the property owners next door and ask them. The sharp angle at the end of the structure is causing more scouring. Mr. Bird: You re proposing a rather complex alternative. Ms. Fields: I m proposing a design that would not affect the beach. Mr. McGrath: I submitted the design to DEP and they had no problem with the sheeting. John Ramsey (Applied Coastal) I think there is an issue with the WPA and steel sheet piling. Phase 1 is very problematic. It should be done once. I also agree that they need beach nourishment. Over time the beach will lower. Ms. Fields submitted a prepared letter to the Board and to Mr. McGrath. Janice Hartline (President of the Association) I believe that we would be more amenable if they went right to phase 2. We never insisted on yearly beach nourishment. I wanted to clarify that. Steve (neighbor) In order to allow access we needed to have a specific plan and we never received one. We re looking for a good solution and we are willing to work with everyone to get it accomplished. Mr. McGrath: I did submit a plan to the Association showing existing vegetation and restoration on either side of the path to the them. Ms. Gladfelter: We need a copy of that. Mr. McGrath: There s been no permission granted. Why would I give you that? Mr. Mathews: Because they are saying there hadn t been any ask for permission. 13

14 Ms. Gladfelter: (to Association members) We can t force you to do that, only urge you to do that. Ms. McKay: If the Board were to approve this project you will get a special condition: an inventory and number of the plants that are coming out. Next time provide it in the beginning. Mr. Mathews: Is there opposition to doing this as one project? How long will the phases take? Mr. McGrath: If we do phase 1 it will only take a couple of weeks. Ms. McKay: How about phase 2? Mr. McGrath: That will take longer. Ms. Schumacher: Do you have to do something before phase 2? Mr. McGrath: When I see the damage, yes. Brian Wall (Attorney representing the applicant) I rose to address the access question. I think the Commission is being manipulated. They know the applicant needs a permit. This is a dynamic environment and the jetties interrupt that. The argument that beach nourishment is needed because of this reconstruction is not true. Mr. Doe met with the Association many times and asked for access and the answer was if you nourish the beach. The Association is foisting on Mr. Doe the responsibility to nourish their beach. Mr. Doe: We had meetings and phone calls with Association members and they have been great. As for the beach nourishment I am happy to pay my fair share, but to be the sole person to nourish the beach is ridiculous. I m happy to share the cost. Ms. Gladfelter: I don t believe the Association has a beach nourishment OOC. Ms. McKay: No they don t. Ms. Gladfelter: That s something we d have to consider also. Don Duncan (neighbor) There has never been voiced a condition of beach nourishment. Our concern was to avoid further scouring of the beach. Brad Butman: In response to beach nourishment. It would be better for Mr. Doe. Nourishment will protect the toe stones. I urge you to consider that. It seems logical that it will protect your wall. I haven t heard from the engineer that there is a big void. I think it could be done in one shot in the fall. Mr. Bird: It should be done in one shot. The OOC needed is a separate issue. Ms. Schumacher called for the vote. John Zizza, 82 Waterside Drive, North Falmouth, MA For permission to relocate six (6) large boulders within an area of stones to open up three channels between 20-ft and 40-ft wide through the boulder field for small craft navigation into Megansett Harbor. The hearing is continued until May 24, Shirley Rothwell, 28 Drift Road, West Falmouth, MA For permission to install a new Title 5 sewage disposal system within naturally vegetated resource area and buffer, to construct a new 6-ft x 12-ft deck, expand existing deck, install an underground electric line and the associated clearing, excavating, grading and landscaping. The hearing is continued until May 24, The Deborah Jeanne Clarke Trust 2016 (c/o Deborah Clarke), 80L Little Island Road, West Falmouth, MA For permission to raze the existing dwelling and construct a new 5-bedroom singlefamily house with attached garage, deck with stairs, porch, install walkways, Title 5 sewage disposals system, utilities, dry wells, driveway, to remove trees and invasive plants, revegetate, install mitigation plantings and the associated clearing, excavating, grading and landscaping. Ms. McKay: No comment at this time. Tom Bunker (BSS Design) presented abutter s cards. The property fronts on Falmouth Harbor. Resource areas include salt marsh, rocky shore, riprap, ground slopes up to elevation 32, VE at elevation 18 half way up the bank, 25-ft Falmouth V zone to the top of the bank, 100-ft A zone from 14

15 the salt marsh, 50-ft A zone to coastal bank and 100-ft B zone to coastal bank. The proposal is to tear down the existing house and put up a new house in basically the same place. 719-sq.ft of mitigation is required. There is an increase of impervious surface in the A zone of 143-sq.ft and 145-sq.ft in the B zone. The new septic system will be built further back and out of your jurisdiction. A number of cedar trees will be taken down. The path going down the property will be kept in the same location. Theresa Sprague (Blueflax Design) I met with Jen at the site when I discovered some problems on the property. In the OOC in 94 a condition stated that the area had to be maintained at 4-ft high. It was labeled in the land management plan presented to the Board. There was a weird grassy area that the OOC allowed. We will vegetate areas in the lawn. The vegetation is not all indigenous. The oak trees have been cut to a 4-ft height. There are invasive species on the top of the bank along with eastern red cedar and bayberry. There is also Japanese knotweed. The goals are to improve the existing wildlife habitat, enhance the resource area, eliminate the continued disturbance within the buffer strip, and provide the required mitigation. 8 trees will be removed within the buffer zone and we will plant 12 trees in their place. We will be maintaining the path. Ms. McKay: Will you remove all the cedars that have been topped? Ms. Sprague: No. Ms. McKay: How about the oaks? Ms. Sprague: Yes. They are not even worth keeping. Ms. McKay: But you re not planting any oaks? Ms. Sprague: We re proposing eastern red cedars and bayberry. Along the northern property line there will be vibernum. Ms. McKay: They know they can t maintain that to 4-ft. Ms. Sprague: Yes. Mr. Patton: No questions or comments. Mr. Mathews: No questions or comments. Ms. Gladfelter: The oak shrubs or stump sprout - you will cut them, not pull them? Ms. Sprague: Yes. Mr. Bird: No questions or comments. Ms. Schumacher: You always do a great job with your report. Mr. Bird: Move to close the hearing and take it under advisement. REQUESTS TO EXTEND THE EXISTING ORDER OF CONDITIONS Lisa Huffman, 7 Swing Lane, Falmouth, MA (DEP # ) Requests a one year extension. Ms. McKay: The applicant has requested a one year extension. Staff recommends it. Ms. Gladfelter: At the request of the applicant I move to grant a one year extension. VOTE ORDER OF CONDITIONS 55 & 57 Gunning Point Ave (Figueredo) 04/26/17 Quorum: Ms. McKay: We do not have a quorum. We will need to postpone this until next week. 15

16 190 Edgewater Drive East (Rosato) 04/26/17 Quorum: Steve, Betsy, Mary, Courtney Ms. McKay: This is the dock replacement in the A zone. I will cite the DMF letter. Ms. Gladfelter: This is pretty straight forward. They made the pilings a little bigger. Ms. Gladfelter: Move to adopt the Order of Conditions as discussed. Ms. Schumacher: Second. 78 Squibnocket Drive (Spalaris) 04/26/17 Quorum: Steve, Betsy, Mary, Courtney Ms. McKay: This is to finish the driveway. There will be the same conditions as the settlement had. Ms. Gladfelter: Move to adopt the Order of Conditions as discussed. 30 Little Harbor Road (USCG) 04/26/17 Quorum: Steve, Betsy, Mary, Courtney Ms. McKay: The questions of our Engineering Department were sent to the USCG and were addressed by them to their satisfaction. Standard Conditions will be applied. Ms. Gladfelter: Move to adopt the Order of Conditions as discussed. 256 Alder Lane (Battles) 04/26/17 Quorum: Steve, Betsy, Mary, Courtney Ms. McKay: This is the removal of the creosote wall and putting in a different one. Mr. Bird: Putting in a modular stone wall. Ms. Gladfelter: They are also removing a strip of concrete. Ms. McKay: They will add a Tupelo, re-grade and replant with native species. Mr. Patton: We asked for construction sequencing and methodology. Ms. McKay: Staff will help the engineer with choosing the plants. Ms. Gladfelter: Make sure the construction sequencing is in the record. Ms. Schumacher: Do they have Association permission? Ms. McKay: It s in the file. Mr. Bird: Move to adopt the Order of Conditions as discussed. Mr. Patton: Second. Megansett Harbor (Miller) 04/26/17 Quorum: Steve, Betsy, Mary, Courtney Ms. McKay: This is the oyster growing project in Megansett harbor. There will be the standard aquaculture requirements. Ms. Schumacher: Was it shifted for eelgrass? Ms. McKay: Yes and the shift was reflected in the application. Mr. Bird: Move to adopt the Order of Conditions as discussed. 16

17 Mr. Bird: Move to adjourn. The meeting adjourned at 10:59 p.m. Respectfully submitted, Susan Cronin, Recording Secretary 17

The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, DECEMBER 12, 2018 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m.

The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, DECEMBER 12, 2018 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m. The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, DECEMBER 12, 2018 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m. Present: Absent: Jamie Mathews, Vice-Chair Betsy Gladfelter Maurie

More information

The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, FEBRUARY 1, 2017 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m.

The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, FEBRUARY 1, 2017 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m. The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, FEBRUARY 1, 2017 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m. Present: Absent: Russ Robbins, Chair Mary Schumacher, Vice-Chair

More information

The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, MARCH 29, 2017 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m.

The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, MARCH 29, 2017 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m. The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, MARCH 29, 2017 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m. Present: Mary Schumacher, Vice-Chair (arrived at 7:35) Jamie Mathews

More information

RI Regulatory Setbacks & Buffers: Coastal Management Issues

RI Regulatory Setbacks & Buffers: Coastal Management Issues RI Regulatory Setbacks & Buffers: Coastal Management Issues New England Onsite Wastewater Training Program @ URI OWT 155 - November 29, 2012 James Boyd - Coastal Policy Analyst Photo: October 30, 2012

More information

Building Coastal Resiliency at Plymouth Long Beach

Building Coastal Resiliency at Plymouth Long Beach Building Coastal Resiliency at Plymouth Long Beach Department of Marine and Environmental Affairs March 30, 2017 Introducing Green Infrastructure for Coastal Resiliency Plymouth Long Beach & Warren s Cove

More information

The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, MAY 2, 2018 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m.

The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, MAY 2, 2018 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m. The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, MAY 2, 2018 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m. Present: Absent: Mary Schumacher, Chair Jamie Mathews, Vice-Chair Betsy

More information

GONE! Coastal Erosion Happens During Storms! Why Worry About Coastal Setbacks? Goals for Today

GONE! Coastal Erosion Happens During Storms! Why Worry About Coastal Setbacks? Goals for Today RI Regulatory Setbacks & Buffers: Coastal Zone Management Issues New England Onsite Wastewater Training Program @ URI OWT 155 November 21, 2013 Goals for Today Understand the impacts of storms, coastal

More information

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score)

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score) Soft Shore Protection/Structure Removal Blueprint for San Juan County Forage Fish Beaches Appendix 2: Recommendations for sites scoring below the top ten, sorted by island (east to west) Blakely Island,

More information

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION Dave Basco Old Dominion University, Norfolk, Virginia, USA National Park Service Photo STRUCTURAL (changes to natural, physical system) hardening (seawalls,

More information

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION AND FUNCTIONAL DESIGN OF COASTAL STRUCTURES

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION AND FUNCTIONAL DESIGN OF COASTAL STRUCTURES The University of the West Indies Organization of American States PROFESSIONAL DEVELOPMENT PROGRAMME: COASTAL INFRASTRUCTURE DESIGN, CONSTRUCTION AND MAINTENANCE A COURSE IN COASTAL DEFENSE SYSTEMS I CHAPTER

More information

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] October 25, 2016 Iris Hill Town Administrator Town of Edisto Beach 2414 Murray St Edisto Beach SC 29438 RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] Dear Iris, Hurricane

More information

ATLANTIC COUNTY 2006 to 2008

ATLANTIC COUNTY 2006 to 2008 ATLANTIC COUNTY 2006 to 2008 The Atlantic County oceanfront shoreline consists of three barrier islands where the northern one, Little Beach Island and a third of the second, Brigantine Island, are undeveloped

More information

VIMS CCRM Coastal Management Decision Tools. Decision Tree for Undefended Shorelines and Those with Failed Structures

VIMS CCRM Coastal Management Decision Tools. Decision Tree for Undefended Shorelines and Those with Failed Structures VIMS CCRM Coastal Management Decision Tools Decision Tree for Undefended Shorelines and Those with Failed Structures Center for Coastal Resources Management Virginia Institute of Marine Science Gloucester

More information

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018 ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY Contract #2 Construction Scope April 18th-19th 2018 New York District PLAN COMPONENTS Length of Beachfill 35,000

More information

Figure 106. Locations of the 28 NJBPN profile stations in Ocean County, NJ.

Figure 106. Locations of the 28 NJBPN profile stations in Ocean County, NJ. 130 Figure 106. Locations of the 28 NJBPN profile stations in Ocean County, NJ. 131 2016-2017 Beach Fills in Ocean County: The federal/state/local storm damage reduction project (beachfill) between Manasquan

More information

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring

Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring Delaware Chapter Surfrider Foundation - Indian River Inlet Monitoring In 2012, the Delaware Surfrider Foundation Chapter formed the Surf Quality and Access Committee to focus on issues such as surf spot

More information

NORTHAMPTON COUNTY WETLANDS BOARD Minutes May 15, 2013

NORTHAMPTON COUNTY WETLANDS BOARD Minutes May 15, 2013 NORTHAMPTON COUNTY WETLANDS BOARD Minutes May 15, 2013 This was the regular meeting of the Northampton County Wetlands Board held on Wednesday, May 15, 2013 in the Board Chambers located at 16404 Courthouse

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

Figure 1. Schematic illustration of the major environments on Mustang Island.

Figure 1. Schematic illustration of the major environments on Mustang Island. STOP #1: PACKERY CHANNEL BEACH TO BAY We will start this field guide near the north jetty of Packery Channel and hike across the island to Corpus Christi Bay (fig. 1). The island emerges from the Gulf

More information

CONSERVATION COMMISSION Meeting Minutes THURSDAY May 10, :00 p.m. Stoughton Police Department 26 Rose Street, Stoughton, MA 02072

CONSERVATION COMMISSION Meeting Minutes THURSDAY May 10, :00 p.m. Stoughton Police Department 26 Rose Street, Stoughton, MA 02072 CONSERVATION COMMISSION Meeting Minutes THURSDAY May 10, 2018 6:00 p.m. Stoughton Police Department 26 Rose Street, Stoughton, MA 02072 The May 10, 2018 meeting of the Conservation Commission was called

More information

Impact of Hurricane Matthew on the Atlantic Coast of Florida

Impact of Hurricane Matthew on the Atlantic Coast of Florida Impact of Hurricane Matthew on the Atlantic Coast of Florida A coastal engineer was driving across country and his jeep broke down in front of a monastery. It was late in the day and the monks invited

More information

Fact Sheet Ordinance Regulating Erosion Threatened Structures

Fact Sheet Ordinance Regulating Erosion Threatened Structures Fact Sheet Ordinance Regulating Erosion Threatened Structures Town of Duck, North Carolina August 15, 2011 What is being considered? The Town of Duck Council is considering an ordinance to limit the encroachment

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

Shoreline Studies Program, Department of Physical Sciences, VIMS

Shoreline Studies Program, Department of Physical Sciences, VIMS Living Shoreline Training Class 2017 1 Demonstration sites discussed in this talk. 2 A shoreline management plan for the entire creek made conceptual shoreline management recommendations along every stretch

More information

then extrapolated to larger area just based on the length of bank [that actually falls in this category].

then extrapolated to larger area just based on the length of bank [that actually falls in this category]. Ken Rood: Good morning, all. You'll probably be glad to know I'm the last speaker of the day. I'm never sure if that's a good thing or not. But [lucky me]. And I'm going to talk today -- the title of the

More information

MINUTES OF THE ST. MARY S COUNTY BOARD OF APPEALS MEETING ROOM 14 * GOVERNMENTAL CENTER * LEONARDTOWN, MARYLAND Thursday, October 9, 2003

MINUTES OF THE ST. MARY S COUNTY BOARD OF APPEALS MEETING ROOM 14 * GOVERNMENTAL CENTER * LEONARDTOWN, MARYLAND Thursday, October 9, 2003 MINUTES OF THE ST. MARY S COUNTY BOARD OF APPEALS MEETING ROOM 14 * GOVERNMENTAL CENTER * LEONARDTOWN, MARYLAND Thursday, October 9, 2003 Marie Underwood, Chairperson George Allan Hayden, Sr., Vice Chair

More information

Information for File # SEW

Information for File # SEW Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street

More information

Estuarine Shoreline Stabilization

Estuarine Shoreline Stabilization Estuarine Shoreline Stabilization Property Owner s Guide to Determining the Most Appropriate Stabilization Method Estuarine shorelines are dynamic features that experience continued erosion. Land is lost

More information

Broad Beach Sand & Dune Habitat Restoration Project. Revetment Owners Meeting July 12, 2017

Broad Beach Sand & Dune Habitat Restoration Project. Revetment Owners Meeting July 12, 2017 Broad Beach Sand & Dune Habitat Restoration Project Revetment Owners Meeting July 12, 2017 Status of Project Entitlement Coastal Commission CDP approved 10/15 (consolidated with City of Malibu), PTI conditions

More information

HARBOR INFRASTRUCTURE INVENTORIES Fairport Harbor, OH

HARBOR INFRASTRUCTURE INVENTORIES Fairport Harbor, OH HARBOR INFRASTRUCTURE INVENTORIES Fairport Harbor, OH Harbor Location: Fairport Harbor is located at the mouth of the Grand River on the southern shore of Lake Erie in the city of Fairport, OH, approximately

More information

4/20/17. #31 - Coastal Erosion. Coastal Erosion - Overview

4/20/17. #31 - Coastal Erosion. Coastal Erosion - Overview Writing Assignment Due Monday by 11:59 pm #31 - Coastal Erosion Beach front property! Great View! Buy now at a great price! See main class web pages for detailed instructions Essays will be submitted in

More information

Part 9 Specific Land Uses - Foreshore & Waterway Development

Part 9 Specific Land Uses - Foreshore & Waterway Development 7 FORESHORE AND WATERWAY DEVELOPMENT This section applies to the following development uses proposed within the foreshore area (defined by LM LEP 2014), and contains Council s specific requirements for

More information

The Dynamic Coast. Right Place Resources. A presentation about the interaction between the dynamic coast and people

The Dynamic Coast. Right Place Resources. A presentation about the interaction between the dynamic coast and people The Dynamic Coast Houses threatened by coastal erosion in California Right Place Resources A presentation about the interaction between the dynamic coast and people For the rest of the presentations in

More information

Final Waterways Assets and Resources Survey Master Plan for Dredging and Beach Nourishment

Final Waterways Assets and Resources Survey Master Plan for Dredging and Beach Nourishment Final Waterways Assets and Resources Survey Master Plan for Dredging and Beach Nourishment For, Massachusetts Prepared For: Dennis Town Hall P.O. Box 2060 485 Main Street Dennis, MA 02660 Prepared By:

More information

ZBA 11/27/18 - Page 1

ZBA 11/27/18 - Page 1 ZBA 11/27/18 - Page 1 CHILI ZONING BOARD OF APPEALS November 27, 2018 A meeting of the Chili Zoning Board was held on November 27, 2018 at the Chili Town Hall, 3333 Chili Avenue, Rochester, New York 14624

More information

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155

Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155 154 Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155 ATLANTIC COUNTY SPRING 2009 to FALL 2010 The Atlantic County coastline consists of three barrier islands. Between Little

More information

Stevens Creek Corridor

Stevens Creek Corridor O F F I C E O F T H E D I R E C T O R O F P U B L I C W O R K S Stevens Creek Corridor Creek Restoration Project Volume Three Project Update: Creek Photos, Before & After BY GAIL SEEDS - PROJECT MANAGER,

More information

For more information or permission to reprint slides, please contact Donna Milligan at 1

For more information or permission to reprint slides, please contact Donna Milligan at 1 For more information or permission to reprint slides, please contact Donna Milligan at milligan@vims.edu 1 For more information or permission to reprint slides, please contact Donna Milligan at milligan@vims.edu

More information

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY Aerial photograph taken April 21, 2018 showing the view up the beach

More information

City of Burnaby Environmental Review Committee (ERC) Guide for Applicants

City of Burnaby Environmental Review Committee (ERC) Guide for Applicants City of Burnaby Environmental Review Committee (ERC) Guide for Applicants 2017-2018 This Guide summarizes the ERC process for project review including applications for a relaxation (variance) to the development

More information

County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017

County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017 County of Santa Barbara Permit Option Analysis Goleta Beach JULY 13, 2017 Introduction 2 Goleta Beach Park welcomes 1.5 million visitors annually Amenities include: Picnic Areas and Group Areas w/bbqs

More information

Building Great Neighbourhoods STRATHEARN

Building Great Neighbourhoods STRATHEARN Building Great Neighbourhoods STRATHEARN Public Involvement Community League Meeting #1: October 5, 2015 Public Meeting #2: March 15, 2016 Public Meeting #3: January 17, 2017 Building Great Neighbourhoods

More information

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS January 23, 2018 543 Harbor Boulevard, Suite 204 Destin, Florida 32541 850.654.1555

More information

MARLWOOD GOLF & COUNTRY CLUB WASAGA BEACH, ONTARIO

MARLWOOD GOLF & COUNTRY CLUB WASAGA BEACH, ONTARIO MARLWOOD GOLF & COUNTRY CLUB WASAGA BEACH, ONTARIO Prepared for: Marlwood Golf & Country Club 445 Golf Course Road Wasaga Beach, Ontario L0L 2P0 Prepared by: MBTW Golf Design 255 Wicksteed Avenue Unit

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

23- Year Sand Volume Changes at Site 132, 15th Street, Brigantine

23- Year Sand Volume Changes at Site 132, 15th Street, Brigantine 149 Figure75. Location map for the 9 NJBPN profile sites in Atlantic County, NJ ATLANTIC COUNTY SPRING 2008 to FALL 2009 150 The Atlantic County oceanfront shoreline consists of three barrier islands.

More information

4/20/17. #32 - Coastal Erosion Case Histories - Lake Michigan

4/20/17. #32 - Coastal Erosion Case Histories - Lake Michigan Writing Assignment Due Monday by 11:59 pm #32 - Coastal Erosion Case Histories - Lake Michigan See main class web pages for detailed instructions Submit papers Illinois Compass No copying: Compass will

More information

HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan

HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan Harbor Location: Marquette Harbor is located in Marquette Bay on the south shore of Lake Superior, 160 miles west of Sault Ste. Marie, MI and

More information

Community Advisory Committee (CAC) Workshop #6

Community Advisory Committee (CAC) Workshop #6 Community Advisory Committee (CAC) Workshop #6 MEETING SUMMARY HELD Tuesday, September 9, 2014 6:30 8:30 PM Nokomis Community Center 2401 E. Minnehaha Pkwy Minneapolis, MN 55417 Meeting Purpose: Discuss

More information

UPPER BEACH REPLENISHMENT PROJECT RELATED

UPPER BEACH REPLENISHMENT PROJECT RELATED ASSESSMENT OF SAND VOLUME LOSS at the TOWNSHIP of UPPER BEACH REPLENISHMENT PROJECT RELATED to the LANDFALL OF HURRICANE SANDY - PURSUANT TO NJ-DR 4086 This assessment is in response to Hurricane Sandy

More information

DUNE STABILIZATION AND BEACH EROSION

DUNE STABILIZATION AND BEACH EROSION DUNE STABILIZATION AND BEACH EROSION CAPE HATTERAS NATIONAL SEASHORE NORTH CAROLINA ROBERT DOLAN PAUL GODFREY U. S. DEPARTMENT OF INTERIOR NATIONAL PARK SERVICE OFFICE OF NATURAL SCIENCE WASHINGTON, D.

More information

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN DESIGN DETAILS 135 AREA CHARACTER East Grand Forks a city of 7,501 people is located across the

More information

Issues facing this region include the status of the Sluice Creek tide gates, various tidal wetlands, and locations of public access:

Issues facing this region include the status of the Sluice Creek tide gates, various tidal wetlands, and locations of public access: 5.6 Guilford Point to Madison Town Line Existing Resources This region extends from Guilford Point to the Madison town line. Named places include Grass Island and the East River. Residential, commercial,

More information

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update June 2016 US Army Corps of Engineers Project Purpose Three specific damage mechanisms of coastal

More information

Ninilchik Harbor Page 2 of 11

Ninilchik Harbor Page 2 of 11 Ninilchik Harbor Ninilchik Harbor Page 2 of 11 Condition of Improvements 31 December 2017 Ninilchik Harbor, Alaska (CWIS No. 012640, 087345) Authorization Rivers and Harbors Act, 3 July 1958 (P.L. 85-500

More information

SPO Regional Challenge Grant Creation of a Sea Level Adaption Working Group for Biddeford, Saco, OOB and Scarborough J.T. Lockman, AICP, Planning

SPO Regional Challenge Grant Creation of a Sea Level Adaption Working Group for Biddeford, Saco, OOB and Scarborough J.T. Lockman, AICP, Planning SPO Regional Challenge Grant Creation of a Sea Level Adaption Working Group for Biddeford, Saco, OOB and Scarborough J.T. Lockman, AICP, Planning Director Southern Maine Regional Planning Commission jlockman@smrpc.org

More information

LAB: WHERE S THE BEACH

LAB: WHERE S THE BEACH Name: LAB: WHERE S THE BEACH Introduction When you build a sandcastle on the beach, you don't expect it to last forever. You spread out your towel to sunbathe, but you know you can't stay in the same spot

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

Overview Open Space and Recreation

Overview Open Space and Recreation Overview Open Space and Recreation Open Space Plan (2004) Environmental Priority Areas Town Character Priority Areas Recreational Facilities maintained by the Town RSU 21 Recreational Facilities in Kennebunk

More information

OECS Regional Engineering Workshop September 29 October 3, 2014

OECS Regional Engineering Workshop September 29 October 3, 2014 B E A C H E S. M A R I N A S. D E S I G N. C O N S T R U C T I O N. OECS Regional Engineering Workshop September 29 October 3, 2014 Coastal Erosion and Sea Defense: Introduction to Coastal/Marine Structures

More information

FINDING OF NO SIGNIFICANT IMPACT

FINDING OF NO SIGNIFICANT IMPACT DEPARTMENT OF THE ARMY CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A HAGOOD AVENUE CHARLESTON, SOUTH CAROLINA 29403-5107 FINDING OF NO SIGNIFICANT IMPACT EDISTO BEACH COASTAL STORM DAMAGE REDUCTION GENERAL

More information

PRESS RELEASE. Sandy Beach after the Christmas Trough

PRESS RELEASE. Sandy Beach after the Christmas Trough PRESS RELEASE Sandy Beach after the Christmas Trough On 24 December 2013, a severe weather trough caused the Vieux Fort River to swell and, around 7pm, break its banks in the La Tourney area. The river

More information

Impacts of breakwaters and training walls

Impacts of breakwaters and training walls Across the eastern seaboard of Australia, breakwaters and training walls have instigated fundamental perturbations to coastal and estuary processes. This has induced long-term changes to foreshore alignments,

More information

I would like to welcome Parish President VJ St. Pierre, Councilwoman Carolyn Schexnaydre and Councilman Terry Authement who are here.

I would like to welcome Parish President VJ St. Pierre, Councilwoman Carolyn Schexnaydre and Councilman Terry Authement who are here. IER 1, 2 and 3 Public Meeting Thursday, December 6, 2007 Location Time Attendees Format Handouts Facilitator Ramada New Orleans Airport 110 James Drive East St. Rose, LA 70087 6:00 p.m. Open House 7:00

More information

NORTHAMPTON COUNTY WETLANDS BOARD Minutes December 15, 2010

NORTHAMPTON COUNTY WETLANDS BOARD Minutes December 15, 2010 NORTHAMPTON COUNTY WETLANDS BOARD Minutes December 15, 2010 This was the regular meeting of the Northampton County Wetlands Board held on Wednesday, December 15, 2010, in the former Northampton Middle

More information

Protecting our Beaches

Protecting our Beaches Protecting our Beaches South Amelia Island Shore Stabilization Project Nassau County, FL Mr. Drew Wallace President South Amelia Island Shore Stabilization Association (SAISSA) Mr. Bill Moore, AICP Project

More information

Shellfish Division Annual Shellfish Resource Management Regulations

Shellfish Division Annual Shellfish Resource Management Regulations Shellfish Division 2017-2018 Annual Shellfish Resource Management Regulations September 10, 2018 1 TOWN OF FALMOUTH OYSTER REGULATIONS 2018-2019 SEASON Family/Recreational: Between October 1, 2018 and

More information

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012 NOME HARBOR 1-32 NOME HARBOR, ALASKA (CWIS NOS. 72742, 87755, 12270, & 10422) Condition of Improvement 30 September 2012 AUTHORIZATION: (1) Rivers and Harbors Act, 8 August 1917 (House Doc. 1932, 64th

More information

Controlling Coastal erosion

Controlling Coastal erosion Controlling Coastal erosion Coastal Erosion Rates in the U.S. Coastal Erosion and Stabilization Economic pressures demanding the stabilization of beaches and coastlines are immense Coastal Erosion and

More information

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT Department of the Army New England District, Corps of Engineers 696 Virginia Road

More information

Long Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program

Long Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program 2017 National Conference on Beach Preservation Technology February 8-10, 2017; Stuart, Florida Long Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program Thomas

More information

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3

The District Municipality of Muskoka 70 Pine Street Bracebridge ON P1L 1N3 Public Information Centre Summary Report Muskoka Road 15 (Santa s Village Road) Transportation Improvements from the Beaver Creek Bridge to the Entrance of Santa s Village The District Municipality of

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

Navarre Beach & Dune Restoration Project Status Report to be regularly updated June 17, 2016 Report

Navarre Beach & Dune Restoration Project Status Report to be regularly updated June 17, 2016 Report Navarre Beach & Dune Restoration Project Status Report to be regularly updated June 17, 2016 Report Work Completed (June 11 to June 17) Weeks Marine Inc. (Contractor): o continued filling Segment 4 including

More information

Figure 38. Locations of the 28 NJBPN profile stations in Ocean County, NJ.

Figure 38. Locations of the 28 NJBPN profile stations in Ocean County, NJ. 55 Figure 38. Locations of the 28 NJBPN profile stations in Ocean County, NJ. 56 Individual Site Descriptions: Northern Ocean County recovered its beaches approaching pre-hurricane Sandy elevation or width,

More information

Warm-up # 7 A day 5/17 - B day 5/18 UPDATE YOUR TABLE OF CONTENTS

Warm-up # 7 A day 5/17 - B day 5/18 UPDATE YOUR TABLE OF CONTENTS Warm-up # 7 A day 5/17 - B day 5/18 UPDATE YOUR TABLE OF CONTENTS Question: List all examples of surface water on Earth. Answer: Rivers and streams, lakes and reservoirs, (ponds) wetlands, estuaries and

More information

Coastal management has lagged behind the growth in population leading to problems with pollution

Coastal management has lagged behind the growth in population leading to problems with pollution Fifty percent of the population of the industrialized world lives within 100 km of a coast. Coastal management has lagged behind the growth in population leading to problems with pollution and natural

More information

US Beach Nourishment Experience:

US Beach Nourishment Experience: Beach Nourishment: Introduction of new sand to the beach by truck or dredge Large beach >1 million cubic yards (100,000 dump truck loads) Funding is a combination of federal, state, local & private Also

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

New Jersey Coastal Zone Overview. The New Jersey Beach Profile Network (NJBPN) 3 Dimensional Assessments. Quantifying Shoreline Migration

New Jersey Coastal Zone Overview. The New Jersey Beach Profile Network (NJBPN) 3 Dimensional Assessments. Quantifying Shoreline Migration New Jersey Coastal Zone Overview The New Jersey Beach Profile Network (NJBPN) Objectives Profile Locations Data Collection Analyzing NJBPN Data Examples 3 Dimensional Assessments Methodology Examples Quantifying

More information

Leaning Into Adaptation

Leaning Into Adaptation www.marinslr.org Leaning Into Adaptation GFNMS Ocean Summit, May 17, 2016 Jack Liebster, Planning Manager, Marin County Marin County C-SMART Sea Level Rise Adaptation Process Evaluate Science Info. Implement

More information

SIDEWALK GUIDELINES April 14, 2008

SIDEWALK GUIDELINES April 14, 2008 SIDEWALK GUIDELINES April 14, 2008 I. Introduction The issue of sidewalks represents a delicate balance that must be considered carefully. On the one hand, in certain circumstances, sidewalks are needed

More information

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)

MOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP) MOREHEAD CITY HARBOR, NC Dredged Material Management Plan (DMMP) Public Meeting/Info Session 15 January 2014 US Army Corps of Engineers Morehead City Harbor DMMP Presentation Topics Morehead City Harbor

More information

Figure 1. View of entrance to dock, accessible from Water Street, Woods Hole.

Figure 1. View of entrance to dock, accessible from Water Street, Woods Hole. Report on 2011 Surveys of Marine Invasive Species, Cape Cod Eel Pond, Woods Hole Location: Marine Biological Laboratory (MBL) dock Total # high-resolution photos: 29 Comments: This site would be suitable

More information

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD

ST. LOUIS SECTION PROJECT OF THE YEAR AWARD ST. LOUIS SECTION PROJECT OF THE YEAR AWARD Originality and Innovation The St. Louis Harbor Project is located in the Upper Mississippi River between the entrance to the Chain of Rocks Canal at River

More information

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA.

DRAFT. October 17, 2014 File No Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA. GZA GeoEnvironmental, Inc. Engineers and Scientists October 17, 2014 File No. 18.0171857.00 Mr. Brendhan Zubricki Town Administrator Essex Town Hall 30 Martin Street Essex, MA. 01929 DRAFT Re: Essex River

More information

2018 Beach Preservation Project Information

2018 Beach Preservation Project Information QUICK FACTS Beach Renourishment to begin late April 2018 o U.S. Army Corps of Engineers project o Project Area: 8 th St. E. to end of E. Ashley Ave. o Project Length: 2 miles o Cost: $10,900,000 o Funding:

More information

Shellfish Division Annual Shellfish Resource Management Regulations

Shellfish Division Annual Shellfish Resource Management Regulations Shellfish Division 2017-2018 Annual Shellfish Resource Management Regulations September 26, 2017 1 TOWN OF FALMOUTH OYSTER REGULATIONS 2017-2018 SEASON Family/Recreational: Between October 1, 2017 and

More information

TITLE: North Carolina s Changing Shorelines. KEYWORDS: erosion - shorelines - mapping - sustainability

TITLE: North Carolina s Changing Shorelines. KEYWORDS: erosion - shorelines - mapping - sustainability UNC Coastal Studies Institute Teacher Resources 1 TITLE: North Carolina s Changing Shorelines KEYWORDS: erosion - shorelines - mapping - sustainability Changing shorelines impact coastal infrastructure.

More information

COUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST

COUPLED MANAGEMENT STRATEGY LAKE CATHIE ESTUARY & COAST Lake Cathie Progress Association Inc. ABN 28 251 433 854 P.O. Box 247 Lake Cathie NSW 2445 PHONE/FAX: 02 6584 8211 EMAIL: r3packag@bigpond.com 20 th October 2009 Port Macquarie Hastings Council PO Box

More information

Design and Construction of Living

Design and Construction of Living Design and Construction of Living Shorelines A course for living shorelines professionals September 29, 2010 This course made possible by a grant from the Virginia Coastal Zone Management Program NOAA

More information

New Jersey Beach Profile Network Atlantic County Profile Site Locations

New Jersey Beach Profile Network Atlantic County Profile Site Locations 215 RICHARD STOCKTON COLLEGE OF NEW JERSEY New Jersey Beach Profile Network Atlantic County Profile Site Locations COASTAL RESEARCH CENTER Figure 128 There are nine NJBPN survey sites on the Atlantic County

More information

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active

More information

Nothing So Constant as Change

Nothing So Constant as Change Nothing So Constant as Change By Ron Schaper Dynamic Environments 1) Lake Levels 2) Beach Size 3) Cliff Erosion 4) Beach and Cliff Plant Communities 1) Lake Levels (Michigan/Huron) More than 20,000 years

More information

Welcome to Paddle for the Edge!

Welcome to Paddle for the Edge! Welcome to Paddle for the Edge! Thank you for volunteering to conduct a survey of the Barnegat Bay s shorelines. As a citizen scientist, you become part of a project to collect critical data about current

More information

Figure 262. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 279

Figure 262. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 279 278 Figure 262. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 279 ATLANTIC COUNTY SUMMARY The Atlantic County coastline consists of three barrier islands. The island of Little Beach

More information

The Sand Beaches of New Hampshire and Maine

The Sand Beaches of New Hampshire and Maine The Sand Beaches of New Hampshire and Maine Beach Preservation and Erosion Control Photographs provided by Joe Kelly and Steve Adams Cover photo: Reid State Park, ME Introduction The sand beaches of New

More information

Creation of Fish and Wildlife Habitat on the Closed Salmon Harbour Mine in Minto, NB

Creation of Fish and Wildlife Habitat on the Closed Salmon Harbour Mine in Minto, NB Creation of Fish and Wildlife Habitat on the Closed Salmon Harbour Mine in Minto, NB M. Coleman 1, R. Rutherford 2, RA Currie 3 1 NB Power 2 Thaumas Environmental Consultants Ltd 3 RA Currie Ltd. Location

More information

Restoration Project at Trout Run Nature Preserve

Restoration Project at Trout Run Nature Preserve Restoration Project at Trout Run Nature Preserve Report Prepared By Eli DePaulis, 12/30/17 Trout Run Nature Preserve is a 21.4-acre spring-fed wetland and upland ecosystem in Upper Allen Township, Cumberland

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information