Meath County Council. Meath County Council Boat Slipways. Technical Engineering Report. Job No. : Date: Jan 2018

Size: px
Start display at page:

Download "Meath County Council. Meath County Council Boat Slipways. Technical Engineering Report. Job No. : Date: Jan 2018"

Transcription

1 Job No. : Date: Jan 2018 Meath County Council Meath County Council Boat Slipways Technical Engineering Report 2B Richview Office Park Clonskeagh Dublin 14

2

3 CONTENTS Page No. 1 INTRODUCTION General Justification for Works Description of proposed works Trim Castle (MH_BS_003) Bective (MH_BS_004) Navan Old Bridge (MH_BS_005) Navan Centre (MH_BS_006) Navan Weir (MH_BS_007) Stackallen (MH_BS_008) Navan Blackwater (MH_BS_009) WATER LEVELS OPW Records CFRAMS Mapping Comparison of Predicted Flood LEVELS HYDROLOGICAL ASSESSMENT HEALTH AND SAFETY Slip Resistance Working in the River Design Risk Assessment APPENDIX A - DESIGN RISK ASSESSMENT Malone O Regan

4 1 INTRODUCTION 1.1 GENERAL Malone O Regan have been engaged by Meath County Council to prepare a planning submission for the construction of 7 no. Boat Slipways on the River Boyne and the River Blackwater in County Meath. This report describes the proposed Slipway structure and access arrangements for each site. The report also considers health and safety risks and identifies how the proposed designs have mitigated any such risks. This report should be read in conjunction with reports titled Natura Impact Statement, Ecological Appraisal and Preliminary Construction Environmental Management Plan which have been produced by Malone O Regan and are provided under separate cover. It is the intention that this report and the reports mentioned above, along with the relevant drawings will accompany the planning application. 1.2 JUSTIFICATION FOR WORKS The construction of the Slipways are considered an essential requirement to expedite response times in dealing with emergencies and also to improve the health and safety conditions for all personnel launching boats onto the river. The Slipways will be used by the following statutory and voluntary service providers: Civil Defence Meath River Rescue; An Garda Síochána; Irish Coastguard; and, Meath County Council Fire & Rescue services. The Emergency services have been consulted and have confirmed that the identified sites for the Boat Slipways are most suitable and necessary for their operations on the rivers Boyne and Blackwater in the Navan / Trim general area. 1.3 DESCRIPTION OF PROPOSED WORKS Trim Castle (MH_BS_003) Site Setup and Access The proposed Slipway site is located off the Castle Street road in Trim. As part of the construction of the Slipway the will be required to secure the site by providing temporary heras fencing from the entrance at Castle Street to the Slipway location on the bank of the River Boyne. Site specific details for the anticipated construction works site set-up are provided on Malone O Regan drawing 16009/171 The existing stoned access to the Sewage Pumping Station and river Boyne at the site location will be used by construction traffic during the works. In its current condition the Malone O Regan 1

5 track is liable to be damaged by the wheels of construction plant. It is likely that the contractor will need to form a temporary haul road using imported hardcore material. Figure 2-1: Trim Castle Site Location Slipway Construction The proposed Slipway will be constructed in the same location as the existing access way to the river Boyne. Details of the proposed Slipway are indicated on Malone O Regan drawing 16009/100. Site specific details are provided on Malone O Regan drawings 16009/182 and 16009/192. It is envisaged that construction of the Slipway will take 4-6 weeks and will comprise the following steps. A small cofferdam will be created at the toe of the Slipway. The cofferdam will consist of a barrier formed using a number of woven polypropylene tonne bags. The bags will be filled with coarse grain sand which will be well compacted and the bags will sit closely together to minimise gaps. An impermeable, heavy-duty polythene liner will be placed on the retained water side of the barrier to prevent seepage of silt through the barrier into the river. Water will be pumped out of the cofferdam and will pass through a temporary mobile settlement tank before being returned to the river. The settlement tank will contain a number of inclined lamella plates to allow any suspended particles to be removed by gravity. The existing bank will be excavated to achieve the required formation level for the boat ramp. Stone riprap material will be installed at the toe of the ramp. A precast concrete beam will be lifted into position at the toe of the ramp. The use of precast concrete will avoid the requirement for pouring concrete within the river Malone O Regan 2

6 extents. It will therefore minimise the amount of work which needs to be carriedout at the river edge and will reduce the risk of cement and other contaminants from entering the watercourse. 400mm of compacted hardcore will be installed above the existing bank, behind the riprap. A geotextile layer will be installed above the hardcore which will prevent migration of fine particles as a result of the river action. The articulated concrete mattress sections used to form the Slipway deck will be delivered to site and lifted into position using an excavator. The top of the mattress will be temporarily secured by installing a number of galvanised steel tubes driven into the existing bank. The precast mattresses will be manufactured with a number of looped stainless steel cables along their bottom edge. These cables will tie into similar cables which project from the precast toe-beam. An in-situ concrete anchor beam and slab will be installed at the head of the Dycel mattress units, securing them in place. The existing loose stone surfacing to the access road will be replaced with a reinforced grass surface and Grasscrete hardstanding as indicated on drawing 16009/182. An anchor / belay ring will be cast into the slab to make it easier to lift boats in and out of the water. Additional mooring rings will be placed on either side of the Slipway to allow waiting boats to be tied-up without blocking the Slipway. It can be seen on drawing 16009/192 that there is a significant difference between the highest and lowest water levels which are anticipated in the river (refer also to Section 2). The level of the Slipway toe has been set at the 99% river level i.e. the toe of the Slipway will be submerged for 99% of the time and will only be exposed during extreme dry weather events Landscaping and Surfacing The existing ground will be re-graded to tie in with the proposed new Slipway. It is proposed to construct the access road using reinforced grass i.e. a plastic cellular grid, capable of supporting vehicular traffic, will be laid above the existing ground. This product will blend in with the surrounding grassed areas and minimise the visual impact of the access road. At the head of the Slipway and within the proposed vehicle turning area, where significant wheel turning movements are anticipated it is proposed to construct a Grasscrete slab. Grasscrete is a cast in-situ cellular reinforced concrete system with voids created by plastic void formers that will be infilled with grass Drainage The Grasscrete and reinforced grass surfaces proposed for this site are permeable and do not have an impact on the site drainage. The proposed Slipway arrangement includes a small area of impermeable concrete hardstanding at the top of the ramped section. This area of hardstanding has an area of 14m 2. The sloped section of the Slipway will be surfaced using a number of precast Dycel mattress units. These precast units are formed with a regular pattern of voids Malone O Regan 3

7 within the slab which will allow for percolation of rainwater. The area of hardstanding at the top of the Slipway will drain towards these mattress units and it is likely that this runoff will percolate through the holes in the mattress units and that there will be no significant surface water runoff to the river. Therefore, there is no requirement for any drainage systems to be installed as part of the Slipway construction. Malone O Regan 4

8 1.3.2 Bective (MH_BS_004) Site Description The site is bounded by the River Boyne on its southern and eastern boundaries, and by the L4010 and a narrow access road on the northern and western boundaries respectively. Beyond the river and road boundaries surrounding the site, the proposed site is surrounded by predominantly agricultural lands Site Setup and Access Access to the river is off a narrow access road which in turn lies off the L4010 public road. The junction of the L4010 public road with the access road may be difficult for large vehicles or vehicles with a trailer to negotiate. There is a large area of gravel surfacing in the vicinity of the proposed Slipway site which provides adequate turning space for vehicles. There is debris from a dead tree sitting on the gravel surfaced area that will need to be removed from the site. As part of the construction of the Slipway the will be required to secure the site by providing temporary heras fencing or wooden hoarding alongside the existing access road. Site specific details for the anticipated construction works site set-up are provided on Malone O Regan drawing 16009/172. Figure 2-6: Bective Site Location Slipway Construction Details of the proposed Slipway at this location are indicated on Malone O Regan drawing 16009/100. Site specific details are provided on Malone O Regan drawings 16009/183 and 16009/193. Malone O Regan 5

9 The construction details will be similar to those outlined in Section with the following exceptions: It is not proposed to use Grasscrete and reinforced grass surfacing at this site Landscaping and Surfacing The sides of the Slipway will tie in with the existing river bank. The existing ground will be re-graded to tie in with the proposed new Slipway. It is proposed to retain the existing stone surfacing between the access point off the L4010 and the head of the proposed Slipway Drainage As described in Section there is no requirement for any drainage systems to be installed as part of the Slipway construction since the majority of proposed surfacing materials are permeable. Malone O Regan 6

10 1.3.3 Navan Old Bridge (MH_BS_005) Site Description The site is bounded by the River Boyne on its eastern boundary and by the R147 and a bridge on its western and southern boundaries respectively. The northern boundary of the site comprises of a green area between the R147 and the River Boyne. The proposed site is located on the outskirts of Navan town, with Navan town located to the north of the site and agricultural lands located to the south of the site Site Setup and Access The proposed Slipway site is located off the R147 road in Navan. As part of the construction of the Slipway the will be required to secure the site by providing temporary heras fencing or wooden hoarding at the entrance to the site off the R174. There is an existing stoned access between the R147 and the proposed Slipway location which provides a vehicle turning area for access to the Slipway. Site specific details for the anticipated construction works site set-up are provided on Malone O Regan drawing 16009/173. Figure 2-5: Navan Old Bridge Site Location Slipway Construction Details of the proposed Slipway at this location are indicated on Malone O Regan drawing 16009/100. Site specific details are provided on Malone O Regan drawings 16009/184 and 16009/194. The construction details will be similar to those outlined in Section with the following exceptions: Malone O Regan 7

11 It is not proposed to use Grasscrete and reinforced grass surfacing at this site Landscaping and Surfacing The sides of the Slipway will tie in with the existing river bank. The existing ground will be re-graded to tie in with the proposed new Slipway. It is proposed to retain the existing stoned area between the access point off the R147 and the head of the proposed Slipway Drainage As described in Section there is no requirement for any drainage systems to be installed as part of the Slipway construction since the majority of proposed surfacing materials are permeable. Malone O Regan 8

12 1.3.4 Navan Centre (MH_BS_006) Site Description The site is located in the centre of Navan town and is bounded by the River Boyne on its northern boundary and by a Navan Town Council car park on its southern boundary. The site is bounded by the Boyne Ramparts Heritage Walk lands on its eastern and western boundaries Site Setup and Access The proposed Slipway site is located in close proximity to a public carpark in the centre of Navan town and will be accessed from the carpark via a narrow bridge and existing pathway which is surfaced with loose gravel material. The sharp crest on the bridge means that it will be difficult to drive larger trailers over the bridge. Indeed, there is evidence that the top of the bridge has been damaged by passing vehicles or their trailers. MOR consulted with the Civil Defence who advised that this bridge will afford sufficient access to the proposed Slipway. The proposed Slipway location is quite confined and there is significantly less space for vehicle turning than is the case at the other Slipway locations. The proposed Slipway is also located immediately adjacent to a public footpath. It is therefore likely that the footpath will need to be closed to public access for a period during the construction works. The closure of the footpath will need to be agreed with the Local Authority prior to commencement of the works. Site specific details for the anticipated construction works site set-up are provided on Malone O Regan drawing 16009/174. Figure 2-7: Navan Centre Site Location Malone O Regan 9

13 Slipway Construction Details of the proposed Slipway at this location are indicated on Malone O Regan drawing 16009/100. Site specific details are provided on Malone O Regan drawings 16009/185 and 16009/195. The construction details will be similar to those outlined in Section with the following exceptions: It is not proposed to use Grasscrete and reinforced grass surfacing at this site. The construction of the Slipway at this location is extremely restricted due to the existing levels at the head of the proposed Slipway and the lack of available space to regrade the surface levels. As a result this Slipway will have a slope of approximately 17 degrees which is steeper than that the slope of 7-12 degrees which would normally be considered ideal (Ref. Guidance on Trail-Sail Association website, Landscaping and Surfacing The sides of the Slipway will tie in with the existing river bank. The existing ground will be re-graded to tie in with the proposed new Slipway. The existing gravel surfacing will be extended on the southern side of the public footpath in order to provide a turning area for vehicles using the Slipway. It is proposed to include additional linemarking in the carpark to prevent unauthorised vehicles parking in front of the bridge and obstructing access to the Slipway. It is also proposed to replace the existing bollards at the bridge, two of which are currently missing Drainage As described in Section there is no requirement for any drainage systems to be installed as part of the Slipway construction since the majority of proposed surfacing materials are permeable. Malone O Regan 10

14 1.3.5 Navan Weir (MH_BS_007) Site Description The proposed site is located on the outskirts of Navan town and is bounded by the River Boyne on its northern and western boundary. The site is bounded by the Boyne Ramparts Heritage Walk lands on its eastern and southern boundaries. Beyond the river and Boyne Ramparts Heritage Walk lands surrounding the site, the proposed site is surrounded by a mixture of residential and agricultural lands Site Setup and Access Access to the proposed Slipway location is by an existing 140m long narrow gravel road off the Boyne Road, which in turn runs into a 230m run of gravel canal towpath leading to the proposed site. There is no existing Slipway or vehicle turning area at this location. The existing access route is via an old masonry bridge across a canal. In order to access the Slipway vehicles will need to turn sharply to the left and southwestwards after crossing the bridge and turn 360 degrees before proceeding in a northeasterly direction along the existing towpath to the proposed Slipway site It is envisaged that construction of the new Slipway will require the towpath to be occasionally closed to public access. Access for construction traffic will need to managed locally and will need to be agreed with the Local Authority. Site specific details for the anticipated construction works site set-up are provided on Malone O Regan drawing 16009/175. Figure 2-4: Navan Weir Site Location Malone O Regan 11

15 Slipway Construction Details of the proposed Slipway at this location are indicated on Malone O Regan drawing 16009/100. Site specific details are provided on Malone O Regan drawings 16009/186 and 16009/196. The construction details will be similar to those outlined in Section with the following exceptions: The existing river bank at this location slopes steeply down to the river. Formation of the proposed Slipway will require cutting in to the existing bank and locally lowering the levels. In order to minimise disruption to the existing bank, gabion baskets have been indicated along both sides of the proposed Slipway. These gabions will allow a step to be formed between the level of the Slipway at the river edge and the adjacent ground level. It is not proposed to use Grasscrete and reinforced grass surfacing at this site Landscaping and Surfacing The sides of the Slipway will be formed using stone-filled gabion baskets which will retain the existing bank. The existing ground around the Slipway and the access route to the Slipway will be re-graded to tie in with the proposed new Slipway. It is proposed to retain the existing gravel pathway access route from the public road to the Slipway and to provide a new vehicle turning area by laying additional hardcore at the head of the Slipway Drainage As described in Section there is no requirement for any drainage systems to be installed as part of the Slipway construction since the majority of proposed surfacing materials are permeable. Malone O Regan 12

16 1.3.6 Stackallen (MH_BS_008) Site Description The proposed site is located approximately 6km to the north-east of Navan town centre. The site is bounded by the River Boyne on its northern and western boundaries and by an unnamed public road on its southern boundary. The site is bounded by a derelict building and a small cluster of residential houses on its eastern boundary. Beyond the river and road boundaries surrounding the site, the proposed site is surrounded by predominantly agricultural lands Site Setup and Access This site is located off Local Road L in the Stackallen area. There is an existing stoned path to the River Boyne at this location. As part of the construction of the proposed Slipway the will be required to secure the site from the entrance off the public road to the Slipway location on the bank of the River Boyne. The existing stoned access path can be utilised by the for construction traffic. The will need to widen the existing stoned access route at the junction with the public road. Site specific details for the anticipated construction works site set-up are provided on Malone O Regan drawing 16009/170. Figure 2-2: Stackallen Site Location Slipway Construction Details of the proposed Slipway at this location are indicated on Malone O Regan drawing 16009/100. Site specific details are provided on Malone O Regan drawings 16009/180 and 16009/190. Malone O Regan 13

17 The construction details will be similar to those outlined in Section with the following exceptions: It is not proposed to use Grasscrete and reinforced grass surfacing at this site Landscaping and Surfacing The sides of the Slipway will tie in with the existing river bank. The existing ground will be re-graded to tie in with the proposed new Slipway. It is proposed to retain the existing stoned access route from the public road to the proposed Slipway and to provide a vehicle turning area by laying additional hardcore at the head of the Slipway. It is proposed to install a timber edging to contain the hardcore surfacing at this site Drainage As described in Section there is no requirement for any drainage systems to be installed as part of the Slipway construction since the majority of proposed surfacing materials are permeable. Malone O Regan 14

18 1.3.7 Navan Blackwater (MH_BS_009) Site Description The proposed site is located in the centre of Navan town. The site is bounded to the south and the east by the River Blackwater, while to the north and west it is bounded by the Blackwater Park. Beyond the river and parkland boundaries surrounding the site, the proposed site is surrounded by a mixture of residential and commercial lands Site Setup and Access The proposed Slipway location is accessed through Blackwater Park. There is an existing tarmacadam pathway that loops around the Blackwater Park. The proposed access route to the Slipway is through this park. A new access route to the proposed Slipway will need to be constructed off the existing tarmacadam pathway. As access to this Slipway is through a public park, an agreement would need to be reached with the Local Authority to temporarily close off a section of the footpath within Blackwater Park to allow construction traffic to access the site. The extent of the site to be secured by the for the duration of the works would also need to be agreed with the Local Authority. Site specific details for the anticipated construction works site set-up are provided on Malone O Regan drawing 16009/176. Figure 2-3: Navan Blackwater Site Location Slipway Construction Details of the proposed Slipway at this location are indicated on Malone O Regan drawing 16009/100. Site specific details are provided on Malone O Regan drawings 16009/187 and 16009/197. Malone O Regan 15

19 The construction details will be similar to those outlined in Section with the following exceptions: It is not proposed to use Grasscrete and reinforced grass surfacing at this site Landscaping and Surfacing The sides of the Slipway will tie in with the existing river bank. The existing ground will be re-graded to tie in with the proposed new Slipway. It is proposed to construct an access route to the proposed Slipway using gravel surfacing. Additional gravel will also be laid in order to provide a turning area which will be set-back approximately 8m from the head of the Slipway. In order to prevent these new gravel areas from spreading under the weight of vehicular traffic, wooden sleepers will be installed around the perimeter of the gravel Drainage As described in Section there is no requirement for any drainage systems to be installed as part of the Slipway construction since the majority of proposed surfacing materials are permeable. Malone O Regan 16

20 2 WATER LEVELS Water levels were recorded at each of the 7 No. proposed Slipway sites by Absolute Precision surveyors as part of the topographical survey conducted for each site. Predicted water levels for a range of storm events were predicted based on the following sources of information: 1. OPW records 2. CFRAMS mapping 2.1 OPW RECORDS The mean recorded river level for the nearest gauging station to the proposed Slipway location on the day that the topographical survey was conducted was sourced from the Office of Public Works. Long-term statistical data from the Office of Public Works was also sourced for the nearest gauging station to the proposed Slipway location. The data sourced included the 1%, 5%, 95% and 99% duration percentiles for the recorded river levels based upon data derived for the period 1975 to The duration percentile river level is the river level that is equalled or exceeded for the given percentage of time. For example, the 1% river level percentile is the river level that is equalled or exceeded 1% of the time. The 1%, 5%, 95% and 99% duration percentile river levels were estimated for each of the 7 No. proposed sites based upon the following data: - Recorded water level on the day the topographical survey was conducted; - Mean river water level at the nearest gauging station to the proposed site sourced from the OPW; - Long-term statistical duration percentile river levels sourced from the OPW. The difference between the recorded river water level on the day the topographical survey was conducted and the mean river water level for the same day at the nearest weather station was calculated. This level difference was used to estimate the site specific 1%, 5%, 95% and 99% duration percentile river levels for each of the 7 No. proposed sites. 2.2 CFRAMS MAPPING In order to verify the river water levels which were calculated using the OPW data, Malone O Regan consulted the CFRAMS mapping. CFRAMS mapping gives predicted flood levels during 0.1%, 1% and 10% flood events on sections of the River Boyne and River Blackwater. 2.3 COMPARISON OF PREDICTED FLOOD LEVELS CFRAMS mapping was not available for the sites at Stackallen and Bective. For the remaining sites a comparison was made of the 1% flood level predicted using the OPW data and the CFRAMS maps. This comparison is shown in Table 2.1 below: Malone O Regan 17

21 Location Predicted 1% River Level OPW Data Predicted 1% River Level CFRAMS Mapping Difference (m) Navan Old Bridge m m 0.17 Navan Blackwater m m 0.10 Navan Centre m m 2.24 Navan Weir m m 1.69 Trim Castle m m 1.56 Table 2.1 Comparison of Predicted Flood Levels It can be seen that the flood levels calculated using the 2 different methods compare well for the Navan Old Bridge and Navan Blackwater sites. The corresponding Slipway section drawings for these sites have been prepared to show river levels calculated using the OPW data. At Navan Centre and Navan Weir, the 1% river levels calculated based on the CFRAMS mapping are substantially higher than the levels based on OPW data. It is noted that there is a Weir located between each of these sites and the nearest OPE gauging station. It is likely that the presence of this Weir has introduced a degree of inaccuracy into the levels predicted using the OPW data. The corresponding Slipway section drawings for these sites have therefore been prepared to show river levels calculated using the CFRAMS data. It is not clear why there is such a discrepancy in the two sets of levels at Trim Castle. Given the close proximity of the OPW gauging station to the site, similarities between the results could have been expected. The Slipway section for this site has been prepared to indicate river levels calculated using the OPW data. The 1% flood level as predicted from the CFRAMS mapping is also shown. It is important to note that the maximum flood levels are only provided for information and they have no bearing on the design of the Slipways. The level of the Slipway toe was set using the predicted low water level (the toe is positioned so that it will be submerged for 99% of the time). The top of the Slipway has been designed to tie into the surrounding ground level. No attempt has been made to build-up the top of the Slipway level to match the maximum predicted flood levels. Such measures would not improve the usability of the Slipway as the approach roads would still be submerged. Therefore the disparity in predicted 1% river levels using the OPW records and the CFRAMS mapping is not a cause for concern. Malone O Regan 18

22 3 HYDROLOGICAL ASSESSMENT Consideration has been given to how the proposed Slipways will affect the flow of water in the adjoining rivers. In particular, an assessment has been undertaken to determine the effect that construction of the Slipways will have on the channel conveyance capacity of the river. The Slipways have been designed to maintain to existing profile of the riverbank as far as is possible. The topographical surveys commissioned for each site were extended into the river at each location allowing for the accurate measurement of the existing bank profile at the proposed Slipway locations. This survey information has also been used to calculate the cross-sectional area of the river below the water line when considering the 1% river level. It is therefore possible to assess the loss of cross-sectional area as a result of the Slipway construction. The loss of cross-sectional area as a result of the proposed Slipway construction at each site is presented in Table 3.1 below. Location Estimated % Loss of Channel Cross- Section Based on 1% River Level Navan Old Bridge 4.8% Navan Blackwater 1.1% Navan Centre No loss of Cross-Section Navan Weir No loss of Cross-Section Trim Castle No loss of Cross-Section Stackallen 2.8% Bective No loss of Cross-Section Table 3.1 Loss in Cross-Sectional Area as a Result of Slipway Construction It can be seen that for 4 of the 7 sites, the proposed Slipway will not result in any loss of channel cross-sectional area. Of the remaining sites, the loss of cross-section area is marginal (in all cases less than 5%). It is considered that the proposed Slipways will not adversely impact on the flow in the river. It is also noted that the proposed Slipways are only 4.8m wide. The width of the Slipways has been kept as small as possible in order to reduce the impact on the river bank. Also the use of a profiled concrete mattress as opposed to a smooth concrete finish will ensure that the texture of the Slipway surface better replicates the natural riverbank, further minimising the impact on river flows. Malone O Regan 19

23 4 HEALTH AND SAFETY It is proposed to construct the new Slipways using both pre-cast and cast in-situ concrete elements. The toe of the Slipways will be constructed using a precast concrete beam and the ramped section of the Slipways will be constructed using a number of Dycel 150 articulated concrete mattresses. There are a number of Health and Safety benefits associated with the use of these precast concrete elements Slip Resistance The articulated concrete mattress units are formed with a series of voids which will offer improved slip-resistance over a typical cast in-situ concrete slab. The voids will be filled with gravel and the mattress underlain with a geotextile to prevent grass / weed growth. Malone O Regan discussed the proposed use of precast mattresses with Michael Fitzsimons of the Civil Defence. Mr Fitzsimons advised that precast mattresses had been used previously on the River Shannon and noted that from his discussions with several boat users the precast mattresses were viewed to have a greater slip resistance than an in-situ alternative. The upper section of the Slipway will be constructed using an in-situ concrete slab. The concrete will have a brushed finished to offer enhanced slip resistance Working in the River The use of precast concrete minimises the amount of work which needs to be completed in and adjacent to the river. The precast concrete toe beam and the articulated concrete mattress units can be lifted into place using an excavator thereby reducing the amount of works which need to be carried-out within the river compared to using in-situ concrete. In order to minimise the extent of works taking place within the river, it is proposed to restrict the works such that they will take place during the summer months when the river levels are expected to be at the lowest Design Risk Assessment A Design Risk Assessment is included in Appendix A. Malone O Regan 20

24 APPENDIX A - DESIGN RISK ASSESSMENT Malone O Regan

25 16009 Meath County Council Slipways Design Risk Assessment 1.0 Introduction In the following design risk assessments the risks are assessed on the basis of likelihood and severity in order to generate a risk rating as follows. Likelihood 0 No Risk 1 Highly Unlikely 2 Remote 3 Possible 4 Probable 5 Highly likely Severity 1 Negligible 2 Minor Injury 3 Major Injury 4 Severe Injury 5 Fatalities Risk Rating 1-4 Low Risk - Communicate 2.0 Persons Exposed 5-14 Medium Risk - Reduce - Communicate High Risk - Eliminate from design and / or construction - Reduce - Communicate : End-User: Maintenance: Public: Includes employees of the contractor and any sub-contractor engaged by the client for the construction or maintenance of the project Includes the client, their employees and the facilities operator Includes persons undertaking maintenance activities during the operation of the facility Includes any member of the public or visitor who could be exposed to hazards during the construction use or maintenance of the facility 3.0 Malone O Regan s Role in the Project Civil Structural Engineer Project Manager PSDP Building Services Engineer

26 Design Risk Assessment Sheet Project: Meath County Council Slipways Analysed By: D. Weir Job No. : Date: Item No. Identified Hazards No Control Measures Associated Risks Population Exposed Control Measures Applied Risk Control Measures Person Responsible for Action Residual Risk Likelihood of Occurence Consequence of Occurence Risk Rating Risk Rating 1 Gradient of Boat Ramp Trips and slips by users of the boat ramps. Trips and slips by members of public. End-User Control Measures Implemented Dycel mattress proposed in place of Designer 9 Maintenance brushed concrete finish. During Public discussions with the Civil Defence it was agreed that this would offer improved slip resistance. Wherever possible the gradient of the slipway has been designed so as not to exceed 12 degrees. Warning signage to be installed. Further Control Measures Required Local Authority to ensure appropriate inspection and maintenance programme is implemented. End User responsible for using appropriate life jackets Designer Designer Local Authority End User MALONE O REGAN Consulting Engineers

27 Design Risk Assessment Sheet Project: Meath County Council Slipways Analysed By: D. Weir Job No. : Date: Item No. Identified Hazards No Control Measures Associated Risks Population Exposed Control Measures Applied Risk Control Measures Person Responsible for Action Residual Risk Likelihood of Occurence Consequence of Occurence Risk Rating Risk Rating 2 Slips at toe of boat ramp Trips, slips and falls by users of the boat ramps. Trips, slips and falls by members of public. Risk of drowning End-User Control Measures Implemented Toe to be surrounded in large stone Designer 10 Maintenance riprap material to prevent erosion Public around toe. Warning signage to be installed. Life rings to be installed Designer Designer Further Control Measures Required Local Authority to ensure appropriate inspection and maintenance programme is implemented. In particular the LA should monitor for possible erosion of the stone at the toe of the ramp and place additional stone if required. End User responsible for using appropriate life jackets Local Authority End User MALONE O REGAN Consulting Engineers

28 Design Risk Assessment Sheet Project: Meath County Council Slipways Analysed By: D. Weir Job No. : Date: Item No. Identified Hazards No Control Measures Associated Risks Population Exposed Control Measures Applied Risk Control Measures Person Responsible for Action Residual Risk Likelihood of Occurence Consequence of Occurence Risk Rating Risk Rating 3 Boat Operations Persons being struck by boat Persons injured while boarding or disembarking boats. End-User Control Measures Implemented Mooring bollards specified. Designer 10 Maintenance Public Belay rings structure. included in slipway Designer Risk of drowning New slipway provides stable surface to help facilitate boarding / disembarking boats. Life rings to be installed Designer Designer Further Control Measures Required Local Authority to ensure appropriate inspection and maintenance programme is implemented. End User responsible for using appropriate life jackets Local Authority End User MALONE O REGAN Consulting Engineers

29 Design Risk Assessment Sheet Project: Meath County Council Slipways Analysed By: D. Weir Job No. : Date: Item No. Identified Hazards No Control Measures Associated Risks Population Exposed Control Measures Applied Risk Control Measures Person Responsible for Action Residual Risk Likelihood of Occurence Consequence of Occurence Risk Rating Risk Rating 4 Working in proximity to river Works contractor staff falling into river Risk of drowning. End-User Control Measures Implemented The design has sought to make use of Designer 10 Maintenance precast concrete elements over insitu Public concrete to minimise working time. Further Control Measures Required Works contractor to ensure all staff are given appropriate PPE including life jackets. to install temporary life rings MALONE O REGAN Consulting Engineers

30 Design Risk Assessment Sheet Project: Meath County Council Slipways Analysed By: D. Weir Job No. : Date: Item No. Identified Hazards No Control Measures Associated Risks Population Exposed Control Measures Applied Risk Control Measures Person Responsible for Action Residual Risk Likelihood of Occurence Consequence of Occurence Risk Rating Risk Rating 5 Working in proximity to river (pollution) Risk of contamination of open water course by petrol spills, site debris, wet concrete etc. End-User Maintenance Public Control Measures Implemented The design has sought to make use of precast concrete elements over insitu concrete to minimise working time and to reduce risk of concrete spills into river. Designer 1 Gabion baskets specified at a number of locations to minimise the extent of disruptive works to the riverbank. Further Control Measures Required to provide construction method statement to show works are in accordance with best practice guides including: Control of Water Pollution from Construction Sites Guide to Good Practice (Ciria Guide SP156) Control of Water Pollution from Construction Sites Guidance for Consultants and s (Ciria Guide C532) Designer MALONE O REGAN Consulting Engineers

31 Design Risk Assessment Sheet Project: Meath County Council Slipways Analysed By: D. Weir Job No. : Date: Item No. Identified Hazards No Control Measures Associated Risks Population Exposed Control Measures Applied Risk Control Measures Person Responsible for Action Residual Risk Likelihood of Occurence Consequence of Occurence Risk Rating Risk Rating 6 Vehicle Operations when slipway in use. End User struck by moving vehicle Member of public struck by moving vehicle End-User Control Measures Implemented The design for each slipway includes Designer 10 Maintenance adequate turning areas for a vehicle Public towing a trailer. Swept path analysis completed for all sites. Designer Further Control Measures Required Appropriate warning signage, safety cordons to be adopted by end user when slipways are in use. Vehicles to be guided when reversing. MALONE O REGAN Consulting Engineers

32 Design Risk Assessment Sheet Project: Meath County Council Slipways Analysed By: D. Weir Job No. : Date: Item No. Identified Hazards No Control Measures Associated Risks Population Exposed Control Measures Applied Risk Control Measures Person Responsible for Action Residual Risk Likelihood of Occurence Consequence of Occurence Risk Rating Risk Rating 7 Vehicle operations during construction staff struck by moving vehicle Member of public struck by moving vehicle End-User Control Measures Implemented The design has sought to make use of Designer 10 Maintenance precast concrete elements over insitu Public concrete to minimise working time. Further Control Measures Required to provide traffic management plan for each site. Pedestrian routes and construction traffic routes shall be clearly separated and controlled. to erect adequate warning signage and site hoarding to protect members of public from works. Appropriately trained banksmen to be utilised when moving plant. All staff to wear appropriate PPE including hi-vis clothing. to ensure site is adequately lit at all times and to provide additional lighting if required. MALONE O REGAN Consulting Engineers

33 Design Risk Assessment Sheet Project: Meath County Council Slipways Analysed By: D. Weir Job No. : Date: Item No. Identified Hazards No Control Measures Associated Risks Population Exposed Control Measures Applied Risk Control Measures Person Responsible for Action Residual Risk Likelihood of Occurence Consequence of Occurence Risk Rating Risk Rating 8 Erection of precast concrete elements Working at height Objects falling Lifting, manual handling End-User Further Control Measures Required Lifting on precast units should be 5 Maintenance completed under the supervision of Public trained and qualified banksmen only. Erect appropriate warning signs. MALONE O REGAN Consulting Engineers

72 Crossrail Amendment of Provisions

72 Crossrail Amendment of Provisions 72 Crossrail Amendment of Provisions Manhattan Shaft Worksite 5.4.36 This new worksite is adjacent to the Tumbling Bay worksite and will occupy an area of land between the Manhattan Building and the Great

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure 18 Maintaining the pedestrian network Maintaining the pedestrian network Maintenance in the short and long term Planning for pedestrians during maintenance works 18.1 Introduction Both pedestrian-related

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

Review of Guidelines for Cycleway Safety Fencing

Review of Guidelines for Cycleway Safety Fencing Review of Guidelines for Cycleway 1.0 PURPOSE 1.1 This document is meant to provide a review of available reference documents for determining appropriate fencing requirements for cycleway paths and shared

More information

Components of a Barrage

Components of a Barrage Components of a Barrage Definition The only difference between a weir and a barrage is of gates, that is the flow in barrage is regulated by gates and that in weirs, by its crest height. Barrages are costlier

More information

NEASHAM PARISH COUNCIL Risk Assessment relating to Neasham Village Green (approved by Council on 6 November 2017)

NEASHAM PARISH COUNCIL Risk Assessment relating to Neasham Village Green (approved by Council on 6 November 2017) SEVERITY Risk matrix Definitions LIKELIHOOD 1 2 3 4 5 1 1 2 3 4 5 2 2 4 6 8 10 3 3 6 9 12 15 4 4 8 12 16 20 5 5 10 15 20 25 Site description: Neasham Village Green is an open area of grassland in the middle

More information

Geotechnics, Face and Stockpile Operations

Geotechnics, Face and Stockpile Operations Quarries National Joint Advisory Committee (QNJAC) Geotechnics, Face and Stockpile Operations Information Sheet 4 October 2012 Duties of the Operator This information sheet has been developed by the Quarries

More information

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide RIIWMG203D Drain and Dewater Civil Construction Site Table of Contents 1.1 Introduction... 3 1.1.1 Drainage and Dewatering... 3 1.2 Site Policies and Procedures... 5 1.3 Work Instructions... 6 1.3.1 Reading

More information

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000 National Cycle Network Funding Scheme 2012/2012 Application Form Section 1:Project Outline Name and Address of Local Authority Contact person/proposed project manager Waterford City Council Paul Cleary,

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

C.A.R.S. Project Design Report.

C.A.R.S. Project Design Report. C.A.R.S. Project Design Report. PRODUCED BY: Browne, A. Kennedy, M. Dolan, N. Selman, C. STUDENT NO: DATE DUE: COURSE: LECTURER: C09365788-C09686908-D11125480-C08868352 20-April-2012 Dt004/3 Civil Engineering

More information

Appendix 12 Parking on footways and verges

Appendix 12 Parking on footways and verges Appendix 12 Parking on footways and verges Legal position Parking on footways and verges whether wholly or partly is banned throughout London, unless signs are placed to allow parking. The ban requires

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE Rugby Football Union 1 INTRODUCTION The last 15 years has seen major innovations in the development of artificial turf surfaces for sport. Most significant for

More information

GENERIC ENVIRONMENT RISK ASSESSMENT

GENERIC ENVIRONMENT RISK ASSESSMENT No. P01: Out of Classroom Page 1 of 12 Appendix 3: Generic Environment Assessment APPENDIX 3: GENERIC ENVIRONMENT RISK ASSESSMENT This appendix contains the Assessment for Generic Environment Assessment.

More information

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle Key Messages Short duration static works must not exceed 60 mins, including setting up and dismantling traffic management. A vehicle or vehicles should be used whenever possible to protect the workforce.

More information

Appendix 4C - Sample SWMS Trenching

Appendix 4C - Sample SWMS Trenching Appendix 4C - Sample SWMS Trenching SAFE WORK METHOD STATEMENT SWMS Reference : Insert document number : Version A Date : Workplace / Project : Company Address: Work Activity / Job / Task or Process :

More information

Ormiston Academies Trust. Ormiston Horizon Academy. Working at Height Policy October 2016

Ormiston Academies Trust. Ormiston Horizon Academy. Working at Height Policy October 2016 Ormiston Academies Trust Ormiston Horizon Academy Working at Height Policy Project/job number: Author: Sharlene Smith/Handsam Date: 25/10/16 Contributors: Sharlene Smith Version number: 1.1 Reviewed by:

More information

FAQ s Walsh Road / Ferguson Road Pilot Scheme

FAQ s Walsh Road / Ferguson Road Pilot Scheme FAQ s Walsh Road / Ferguson Road Pilot Scheme What is happening? Traffic calming measures are being installed as a pilot. Temporary Bollards will be installed to the east of 1 Ferguson Road and a Temporary

More information

LEVEL CROSSING SIGHTING DISTANCES

LEVEL CROSSING SIGHTING DISTANCES Ref No: HGR-A0458 Issue No: 01 Issue Date: September 2012 HERITAGE RAILWAY ASSOCIATION GUIDANCE NOTE LEVEL CROSSING SIGHTING DISTANCES for Footpath and Vehicular User-Worked Crossings Purpose This document

More information

Risk Assessment Form

Risk Assessment Form Assessment Form This reviewed assessment supersedes the original assessment dated October 2003 and is reviewed on an annual basis Business Area: Ingleton Waterfalls Walk Area/Task: Pathway around the waterfalls

More information

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection TOPIC: COMMON PROBLEMS FOR SMALL DAMS WITH CONCRETE CHANNEL SPILLWAYS The State Dam Safety Program has inspection requirements for state regulated dams. A dam, like any man-made structure, will change

More information

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's

More information

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard.

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard. 2.15 Temporary Safety Barriers and/or Warning Signs Purpose This instruction sets out the minimum requirements for the installation and erection of temporary safety barriers and/or warning signs to: Protect

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

Part 9 Specific Land Uses - Foreshore & Waterway Development

Part 9 Specific Land Uses - Foreshore & Waterway Development 7 FORESHORE AND WATERWAY DEVELOPMENT This section applies to the following development uses proposed within the foreshore area (defined by LM LEP 2014), and contains Council s specific requirements for

More information

Parking. Parking 11/27/2012. On street parking. Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way.

Parking. Parking 11/27/2012. On street parking. Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way. Parking On street parking Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way. At-grade parking lot Parking garages SITE Parking 90 degree (20 x 9 stalls)

More information

Monitoring excavation in the highway

Monitoring excavation in the highway This unit covers the requirements that you must meet when monitoring excavation work in the highway. You must ensure that you act in accordance with all current specifications and procedures and that you

More information

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers Working at Height 1. PURPOSE 1.1 To ensure that any work at height is carried out in accordance with the legal requirements and associated guidance. This includes the use of scaffolds, towers, ladders,

More information

Temporary Vehicle Restraint System Policy

Temporary Vehicle Restraint System Policy Temporary Vehicle Restraint System Policy Prepared By; J Wilkinson H&S Manager, Civils Prepared for: Installation of TVRS on all triio highways projects including JV s. Page 1 of 8 Contents 1.0 Introduction

More information

Bogo Operations Pollution Incident Response Management Plan

Bogo Operations Pollution Incident Response Management Plan Bogo Operations Pollution Incident Response Management Plan Rhyolite Hard Rock Aggregate Quarry 134 Paynes Road BOOKHAM NSW 2582 PO Box 426 COWRA NSW 2794 p: 02 6227 7260 p: 02 6345 4253 e: info@bogoquarry.com.au

More information

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS Project: (insert Client) Replacement/ Repair of high level light units/ high

More information

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS Why does the City have a Safe Walks Program? The Safe Walks program was initiated in 2006 at the request of City Council in order to address the increasing

More information

This report provides an overview of all the feedback received, key themes which emerged and the actions Grenadier will take in response.

This report provides an overview of all the feedback received, key themes which emerged and the actions Grenadier will take in response. Executive Summary During October 2017, Grenadier held three well attended public consultation events at Ocean in Exmouth. In addition, a bespoke consultation website was created to allow for online feedback,

More information

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual LoneStar Fiberglass Pools Do-It-Yourself Installation Manual Chris 1/3/2008 Do-It-Yourself The installation of a LoneStar Fiberglass pool is a much simpler task than most people think. What is important

More information

HAZARD MANAGEMENT PROCEDURE

HAZARD MANAGEMENT PROCEDURE TABLE OF CONTENTS 1. OBJECTIVE... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4. RESPONSIBILITIES... 2 5. HAZARD IDENTIFICATION... 3 5.1 HAZARD AND RISK IDENTIFICATION TOOLS AND METHODS... 3 5.1.1 Take 5 Risk

More information

Temporary load-bearing support for structural alterations or repairs

Temporary load-bearing support for structural alterations or repairs CRITICAL NOTE This document only becomes a Safe Work Method Statement where the High Risk Construction Work section of this document is completed Company: ABN: Contact Person: Ph: Project/Site: Principal

More information

Agenda Item # Page # RECOMMENDATION

Agenda Item # Page # RECOMMENDATION TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON FEBRUARY 2, 2016 JOHN BRAAM, P. ENG. MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER FIELD MARSHAL WOLSELEY

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

M9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study

M9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study A90 Tealing Moving Cursor Programme Junction Study This is an unpublished report prepared for the Transport Scotland, Trunk Road and Bus Operations Division (TRBO) and must not be referred to in any publication

More information

Risk Control at United Fire Group

Risk Control at United Fire Group In the United States, falls are the leading cause of fatalities on a construction site. Employers and employees need to do the following: Where protection is required, select fall protection systems appropriate

More information

Lecture 10 : Sewer Appurtenances

Lecture 10 : Sewer Appurtenances 1 P age Module 8 : Sewer Appurtenances Lecture 10 : Sewer Appurtenances 2 P age The structures, which are constructed at suitable intervals along the sewerage system to help its efficient operation and

More information

PRO Lifting Operations

PRO Lifting Operations MS&L Procedure PRO-4.5-0001-1-06 Lifting Operations Document Owner: Bill Kruesi HSSE Manager - Asset Mgmt. Owen Quake ANZ Engineering Authority Approved By: Bill Kruesi HSSE Manager - Asset Mgmt. Control

More information

QLDC Council 29 October Report for Agenda Item: 3

QLDC Council 29 October Report for Agenda Item: 3 QLDC Council 29 October 2015 Department: Infrastructure Beach Street Pedestrianisation Purpose Report for Agenda Item: 3 1 The purpose of this report is to obtain Council approval to consult over options

More information

The Corporation of the City of Sarnia. School Crossing Guard Warrant Policy

The Corporation of the City of Sarnia. School Crossing Guard Warrant Policy The Corporation of the City of Sarnia School Crossing Guard Warrant Policy Table of Contents Overview And Description... 2 Role of the School Crossing Guard... 2 Definition of a Designated School Crossing...

More information

NATIONAL GROUND GRADING - CATEGORY H

NATIONAL GROUND GRADING - CATEGORY H Page 1 NATIONAL GROUND GRADING - CATEGORY H (appropriate to entry to NLS Step 6) NB When considering any developments of the ground to comply with the requirements of this grade, clubs are recommended

More information

Bulwell Cycling Consultation

Bulwell Cycling Consultation Bulwell Cycling Consultation Image 1 Bulwell Bogs (Sutton, 2015) As part of a final year research project, I am seeking feedback on proposals for cycling improvements in Bulwell. This consultation is not

More information

Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 23 Temporary Fencing and other means of enclosure (Enabling

Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 23 Temporary Fencing and other means of enclosure (Enabling Galloper Wind Farm Project Response to Development Consent Order Part 3 Requirement 23 Temporary Fencing and other means of enclosure (Enabling Stage) June 2013 Document Reference GWF R24 070613 Galloper

More information

Safety Training Program Waterfed Pole Safety

Safety Training Program Waterfed Pole Safety Safety Training Program Waterfed Pole Safety Through the OSHA and IWCA Alliance, IWCA developed This presentation for informational purposes only. It does not Necessarily reflect the official views of

More information

14 NOISE AND VIBRATION

14 NOISE AND VIBRATION 14 NOISE AND VIBRATION 14.1 EXISTING ENVIRONMENT 14.1.1 The noise environment within Poole Harbour is generally characterised by low to medium noise levels depending on location. For example, certain areas

More information

Safe Work Method Statement

Safe Work Method Statement TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Working at eight SWMS No. 16 Authorized and email Signed by the (Managing

More information

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2 Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:

More information

TOWN OF PAYSON TRAFFIC CALMING MANUAL

TOWN OF PAYSON TRAFFIC CALMING MANUAL TOWN OF PAYSON TRAFFIC CALMING MANUAL APPROVED BY THE PAYSON TOWN COUNCIL SEPTEMBER 6, 2007 TOWN OF PAYSON TRAFFIC CALMING POLICY 1.0 Introduction Traffic Calming involves retrofitting physical devices

More information

Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome

Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome 1.0 Draft 07.03.2016 David Maine 1 st Draft for consultation/review 1.1 Approved 10.01.2017 David Maine

More information

CONTRACTOR SAFETY INDUCTION HANDBOOK

CONTRACTOR SAFETY INDUCTION HANDBOOK CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number

More information

GUIDANCE NOTICE. Unpowered Barges. Definition. General. Risk assessment. Application. Safety Management. Compliance

GUIDANCE NOTICE. Unpowered Barges. Definition. General. Risk assessment. Application. Safety Management. Compliance GUIDANCE NOTICE Unpowered Barges Definition Unpowered Barge - a vessel that is not propelled by mechanical means and is navigated by a powered vessel that moves it by pushing or towing. General This notice

More information

Hierarchy of Control. Regard must be had to. Identify all the steps / processes. (a) the severity of the hazard or risk in question;

Hierarchy of Control. Regard must be had to. Identify all the steps / processes. (a) the severity of the hazard or risk in question; AUSTRALIAN POWER BOAT ASSOCIATION OFFSHORE COUNCIL INC. OFFSHORE SUPERBOAT CHAMPIONSHIPS HERVEY BAY, 29 30 November 2014 RISK ASSESSMENT FORM General Guidelines Risk Assessment Process Test of Practicability

More information

Design Measures taken, or being taken to eliminate or reduce the hazard

Design Measures taken, or being taken to eliminate or reduce the hazard Part B: CDM 2007 MMFD Procedures Hazard Elimination and Management Schedule Project Title: Managed Motorways All Lanes Running (MM-ALR) Job No.: 1039092 Design Discipline: IAN161/12 Prepared By: Emma Clutterbuck

More information

Buggy Policy Document Date: 10 November 2017

Buggy Policy Document Date: 10 November 2017 Buggy Policy Document Date: 10 November 2017 Cavendish Golf Club recognises that it has a duty of care to the staff, members and guest users of the golf course. The topography and nature of the course

More information

0 CITY OF SANTA ANA 0

0 CITY OF SANTA ANA 0 : A traffic control plan (Plan) is required whenever work is to be performed within the public right-of-way and is deemed necessary by the City of Santa Ana's (City) Traffic Engineer. Work cannot start

More information

Staff Contractors. Public. Staff Contractors

Staff Contractors. Public. Staff Contractors 1. Vehicle movements In conjunction with the vehicle driver, venue management and the client, our staff should ensure the safe parking of vehicles for loading and unloading purposes. Depending upon circumstances

More information

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Adopted January 6, 2014 Town of Mooresville Development Services Department TOWN OF MOORESVILLE NEIGHBORHOOD TRAFFIC

More information

Appendix D Stage 1 Road Safety Audit

Appendix D Stage 1 Road Safety Audit N2 Monaghan Town to Emyvale Road Improvements Part 8 Application Description of Proposed Development Appendi D N2 Monaghan Town to Emyvale, County Monaghan Proposed Pavement and Minor Improvement Scheme

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Notice of Intent to Close Inactive CCR Surface Impoundments

Notice of Intent to Close Inactive CCR Surface Impoundments Notice of Intent to Close Inactive CCR Surface Impoundments Virginia Electric and Power Company Possum Point Power Station Coal Combustion Residual Surface Impoundments A, B, C, D, and E Dumfries, Virginia

More information

Part B Design Guidance / Principles _

Part B Design Guidance / Principles _ Part B Design Guidance / Principles www. landlab.co.nz Queenstown Town Centre Public Realm Design Guidelines Version 7 14 June 2018 Page 006 B1 Design Guidance & Best Practice The Queenstown Town Centre

More information

CLUB RISK ASSESSMENT TEMPLATE

CLUB RISK ASSESSMENT TEMPLATE CLUB / VENUE (Guidance for clubs to adapt for their own use) 1. ALL AREAS Slips, trips and falls injury from slips trips and falls from uneven or damaged surfaces, holes etc. External ground surfaces,

More information

Non-required Fences Update

Non-required Fences Update Non-required Fences Update Quality of Life & Environment Committee January 11, 2016 Presented by the Department of Sustainable Development and Construction Purpose Follow up on the May 26, 2015, August

More information

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN). Purpose To provide guidance in controlling the risks associated with confined spaces including identifying confined spaces, working in a confined space and issuing confined space entry permits. Scope This

More information

Waikanae River Environmental Strategy. 12. Arapawaiti/Otaihanga Reach

Waikanae River Environmental Strategy. 12. Arapawaiti/Otaihanga Reach 74 Waikanae River Environmental Strategy 12. Arapawaiti/Otaihanga Reach Figure 12: Arapawaiti/Otaihanga Reach 75 PART C: Protecting and Improving the River Corridor / Arapawaiti/Otaihanga Reach Waikanae

More information

La Crescent Township Zoning Ordinance

La Crescent Township Zoning Ordinance La Crescent Township Zoning Ordinance Table of Contents SECTION 1 ~ PREAMBLE, TITLE, SHORT TITLE AND PURPOSE... 1 0101 Preamble... 1 0102 Title... 1 0103 Short Title... 1 0104 Purpose... 1 SECTION 2 ~

More information

Safe work method statements

Safe work method statements Information about Safe work method statements How to prepare and use a safe work method statement (SWMS) for high risk construction work (HRCW) and who needs to prepare one. October 2018 Key concepts Hazard

More information

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine. Health and Safety Procedure - Confined Spaces Section 1 - Background and Purpose (1) Confined spaces are, for the purposes of this procedure, defined as the following which is the definition under the

More information

4. Guided Bus Explained

4. Guided Bus Explained 4. Guided Bus Explained Contents 1 INTRODUCTION... 2 Structure of this report... 2 2 KERB GUIDED BUS... 3 Overview... 3 Kerb guidance... 3 Figures Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5

More information

Swim Spa Pre-delivery Guide

Swim Spa Pre-delivery Guide Swim Spa Pre-delivery Guide Hello! This document is designed to provide all the information you need to ensure the smooth delivery and installation of your spa or swim spa. Please read it carefully and

More information

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT SYDNEY TRAINS SAFETY MANAGEMENT SYSTEM OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT Purpose Scope Process flow This operating procedure supports SMS-07-SP-3067 Manage Safety Change and establishes the

More information

Heartwood Forest, in Sandridge, Hertfordshire, is a place where everyone can find space, peace, wildlife and miles of beautiful woodland to explore.

Heartwood Forest, in Sandridge, Hertfordshire, is a place where everyone can find space, peace, wildlife and miles of beautiful woodland to explore. Heartwood Forest Accessibility Statement September 2016 Purpose: This accessibility statement outlines the available facilities and access information for Heartwood Forest. Welcome We, the Woodland Trust,

More information

East Burke Transportation, Safety and Capacity Improvements

East Burke Transportation, Safety and Capacity Improvements East Burke Transportation, Safety and Capacity Improvements The purpose of this project is to increase mobility and improve safety for pedestrians, cyclists, and motor vehicles along VT Route 114 in the

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Intent??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Fall Protection is an integral part of our commitment to a safe work

More information

18 HOLE RISK ASSESSMENT COMPLETED BY: MARK HAINES POSITION HELD: COURSE MANAGER DATE:

18 HOLE RISK ASSESSMENT COMPLETED BY: MARK HAINES POSITION HELD: COURSE MANAGER DATE: 18 HOLE RISK ASSESSMENT COMPLETED BY: MARK HAINES POSITION HELD: COURSE MANAGER DATE: 03.02.2017 REVIEW DATE: 03.02.2019 Hole No. Risk Description Grade of Risk Recommendations 1st Course access path on

More information

3.1 TRAFFIC CALMING PROCESS SUMMARY

3.1 TRAFFIC CALMING PROCESS SUMMARY SECTION 3 3.0 TRAFFIC CALMING 3.1 TRAFFIC CALMING PROCESS SUMMARY Traffic calming is a means in which to reduce speeds and minimize vehicular traffic on local neighborhood streets. Citizen involvement

More information

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual Rhode Island

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual Rhode Island On-Site Leaching Chamber Specifications & Features Design & Installation Manual Rhode Island 1 This manual provides general design and installation information for use of ARC model plastic leaching chambers

More information

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed

More information

2.0 Management Systems and Documentation

2.0 Management Systems and Documentation SHE Rules BOW142.3 1.0 Introduction This document details the safety, health and environment rules that apply to anyone accessing Arqiva sites and describes the standards of performance expected. This

More information

4.7 Landscape Provisions.

4.7 Landscape Provisions. 4.7. A. Intent. Landscaping of required Yards and required Bufferyards is an essential element of the design of a site with respect to promoting the public health, safety, comfort, convenience and general

More information

TGSI Tactile Ground Surface Indicators

TGSI Tactile Ground Surface Indicators TGSI Tactile Ground Surface Indicators Introduction: This Design Note, No 11, provides guidelines and requirements for the use and installation of Tactile Ground Surface Indicators (TGSI s). References

More information

GRASS PITCHES FOR RUGBY

GRASS PITCHES FOR RUGBY GRASS PITCHES FOR RUGBY Introduction An essential part of the IRFU sports development programme and objectives is the provision of well constructed and maintained grass pitches either through improvement

More information

Highland Park Glengarry Court. Landscape design and Fencing rules

Highland Park Glengarry Court. Landscape design and Fencing rules Highland Park Glengarry Court Landscape design and Fencing rules Introduction Glengarry Court is to be developed as a comprehensive precinct with its own identity within Highland Park. This includes the

More information

Ulster Canal Greenway Phase 1 Stage 2 Road Safety Audit

Ulster Canal Greenway Phase 1 Stage 2 Road Safety Audit Monaghan County Council July 2013 Ulster Canal Greenway Phase 1 Stage 2 Road Safety Audit Prepared by:... Checked by:... Johanne Browne Brian McMahan Senior Consultant Senior Engineer Approved by:... Joe

More information

Annex L: Badger Survey Report

Annex L: Badger Survey Report Ashfield Land Management and Gazeley GLP Northampton s.à.r.l Annex L: Rail Central FEBRUARY 2018 1 RSK GENERAL NOTES Project No.: Title: Rail Central Client: Ashfield Land Management Limited and Gazeley

More information

10 SHERFORD Town Code

10 SHERFORD Town Code Key Fixes (Ref: Masterplan Book, section 4a. Land Use Budget and Key Fixes ) The Town Plan designs and allocates buildings, streets and spaces as accurately as possible in the understandable absence of

More information

Bulletin Swimming pool, hot tub and spa installations Rules , , , , , and

Bulletin Swimming pool, hot tub and spa installations Rules , , , , , and Bulletin 68-7-11 Swimming pool, hot tub and spa installations Rules 68-000, 68-056, 68-058, 68-064, 68-068, 68-302 and 68-404 Scope (1) Swimming pools - general (2) Grounding & bonding (a) Bonding for

More information

SINGLE LONG TERM MOORING AGAINST PRIVATE RESIDENTIAL LAND

SINGLE LONG TERM MOORING AGAINST PRIVATE RESIDENTIAL LAND SINGLE LONG TERM MOORING AGAINST PRIVATE RESIDENTIAL LAND The Canal & River Trust is the owner of the canal bed and permission is needed for the exclusive right to occupy water space as a home mooring.

More information

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police

More information

2017 Temporary traffic control guidelines for pedestrians. v.2

2017 Temporary traffic control guidelines for pedestrians. v.2 2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered

More information

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Synopsis This document sets out the design, construction and maintenance requirements for means of access onto, along

More information

FIRE HYDRANT TESTING METHOD STATEMENT.

FIRE HYDRANT TESTING METHOD STATEMENT. SUBJECT: TASK: FIRE HYDRANT INSPECTION & TESTING. 1. Location....1 2. The Scope of Works.... 1 3. Description of Task.... 1 4. Access & Egress to & from Work Area.... 2 5. Safety Hazard Identification....

More information