Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director of Capital and Planning Division

Size: px
Start display at page:

Download "Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director of Capital and Planning Division"

Transcription

1 Date: August 17, 2017 To Through From Subject: Recreation and Park Commission Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director of Capital and Planning Division Toks Ajike, Project Manager, Capital Division Garfield Center: Pool & Renovation Concept Plan Agenda Item Wording: Discussion and possible action to approve a concept plan for improvements to Garfield Center - Pool and Clubhouse Renovation. Approval of this proposed action by the Commission is the Approval Action as defined by S.F. Administrative Code Chapter 31. Strategic Plan Strategy 1: Inspire Space: Objective: 1.2.: Strengthen the quality of existing parks and facilities. Complete 2012 bond projects. Strategy 2: Inspire Play: Promote active living, well-being and community for San Francisco s diverse and growing population. Objective 2.2 Strengthen and promote the safety, health and well-being of San Francisco s youth and seniors. Background / Description: Garfield Square is located at Harrison Street and 26th Street. The park is approximately 169,331 square feet and has a pool building and adjacent small club house, small sport court, synthetic field for soccer, a playground, picnic area and landscaping. The site is rectangular in shape and is oriented along a north-south axis. The northern portion of the park along 25th Street contains a picnic area and athletic field. The Fieldhouse and the Pool Building are located in the central portion of the park, and are separated by a basketball court. The southern portion of the park along 26th Street is occupied by a playground on the west and a small lawn area on the east. The two buildings in the park, the Fieldhouse and Pool Building, are located near its

2 center, just north of the playground. Both buildings are oriented on a north-south axis. The Fieldhouse contains classrooms, offices, and public restrooms, while the Pool Building houses the pool, locker rooms, and administrative/staff offices. The Project is in the high needs, family dense, Mission District neighborhood which continues to see an increase total households. It is directly adjacent to Bernal Dwellings, a 160 unit mixed income complex. The current utilization for youth swimming at this facility is right under 30%. Our goal is to increase utilization from the age group. The proposed project consists of the renovation of the existing pool building and demolition of the existing fieldhouse at Garfield Square. A new lobby and 3,550-square-foot recreation center addition will be constructed as an extension of the renovated pool building to create a single integrated facility. The natatorium renovation includes a voluntary seismic upgrade. Site improvements include a new courtyard associated with the renovated pool and recreation center addition, a new sport court, modifications to the existing irrigation system, additional site lighting, and upgrades to accessible paths of travel. The new integrated Garfield Center is an expanded facility with leveraged funds to address all park users not just swimmers Improvement Plan and Outreach Process: The planning process and community engagement started in late spring 2015 and ended June We had a total of 3 community meetings and approximately 10 presentations to community focus groups and organizations; Community Meeting #1 = November 17, 2015 Community Meeting #2 = Jan 19, 2017 Community Meeting #3 = May 11, 2017 Outreach and Community Engagement Main goal for the outreach is to collect and gather community input from multiple channels Our process was community driven, iterative and involved stakeholder focus groups We partnered closely with neighborhood outreach organizations to ensure we had representation in the community Tools and strategy: o Commissioned a Voice Survey in the winter of over 180 respondents; o Banners were placed on the project site vicinity and surrounding areas to participate in a short survey; The Survey was in 2 parts; 1) agree & disagree questions, 2) open ended questions to garner input including asking what improvements could be made to make it a place you want to patronize/use. o Findings include Safety around the facility Updated locker-rooms more open or available hours

3 pool size, more light, indoor air quality & thermal comfort more light more efficient payment process o feedback/rpd Blog Road Show: o SFPD, Captain Perea and Griffin, Mission Police Station o Bernal Dwellings, o Latino Cultural District, Erik Arguello o Precita Eyes: Susan Cervantes o Mission Education Project, (after school program) o Tracy Brown; SFUSD after school program During the planning process, the community responded positively to the conceptual design schemes presented to them, but expressed a slight preference to a pool that was flexible in providing programing, a dedicated community room to have events, and upgrading the mechanical and plumbing systems to improve indoor air quality and thermal comfort. We also received feedback from various patrons regarding our proposal to introduce a bulkhead in the pool shell that divides the pool into 2 sections. The Pool is currently 33 yards. The current design calls for the 25 yard regulation length and a shallow end. This increases tremendously our ability to increase program hours for lap and recreation swimming by over 40%. There was opposition to changing the current pool length of 33 yards. But there were also parents and elderly patrons that loved the shallow end with a stepped entrance, similar to what we have at Hamilton Pool. Current issues and constraints Site Ambiguous and dangerous intersection of pedestrian and vehicles Elevation for accessibility Front Door Conflicts & almost invisible entrance Lighting and Safety Building & Pool No visual connection to the outdoors Integrated facility that houses the pool and clubhouse, Seismic Safety Building Skin Wall /Lighting & better pool lighting Limited and unbalanced natural light Exterior walk path for adult and seniors Pool Systems & Pool temperature Outdated locker room & confusing circulation More aquatic programming for kids, seniors and adults Acoustics

4 Project Goals Program and create destination aquatic facility that appeals to a variety of Pool users, from casual lap swimmers to families, elderly interested in recreational swimming with emphasis on teenage and young adult age group. Integrate the new addition with existing the building architecturally and programmatically, potentially using it to improve the entry sequence Design the mechanical/dehumidification system to function reliably and efficiently within the specific challenges presented by the fact that the building is a public pool in order improve indoor air quality and thermal comfort. Creating a welcoming and architecturally sensitive main entry that solves the existing building code deficiencies and promotes the universal accessibility. Where necessary, design a seismic restraint system that fits within the existing building fabric while providing a level of life safety that is appropriate for its use. These themes informed the design goals for the Garfield Pool & Clubhouse Renovation funded by the 2012 Clean and Safe Neighborhood Parks Bond (2012 Bond). Major Features of the Pool Renovation Concept Design: The Garfield Center Pool and Clubhouse Renovation Project which is funded with over $11 million in funds through 2012 Bond Program includes the following key elements: A flexible community room for events. Introduction of floatable Bulkhead to allow for dual programming and increased programming hours by over 40 percent. The benefit to us is to be able to use separate dedicated pool space with a gradual step down pool area for youth swim lessons and rec swimming. Multi-program spaces are considered best practice in pool design. Currently un-accompanied toddlers under 4 feet cannot use the pool, without an adult, the shallow area allows young toddlers A defined entry that is visually pleasing and accessible. New Mechanical/Plumbing systems to improve indoor air quality and thermal comfort. A new site plan that clearly delineates pedestrian/vehicular traffic for safety. An accessible ramp and stair to identify the entrance and landscaping. The legacy murals of the exterior south and east walls are being preserved

5 The proposed design for the clubhouse represents a contemporary interpretation of the mid Century modern style of the Pool Building The new lobby and proposed courtyard allows for the project to recapture a sparingly used space for a multitude of programs, live Dance, Yoga and even splash Pad Bulkhead Pool Options Studies During the course of the project, we studied different options and configurations for the pool length including materials suggested by interested parties and pool patrons. One option is a pool divider or in lane bulkhead device that hangs from floating lane lines to provide a demarcation of a lane ending. These hanging devices can be used for casual lap swimming or for practice without flip turns, but they will not support a swim meet or flip turn swimming. The other option presented is a movable bulkhead from a Scandinavian company. this bulkhead hinges at the floor and is inflated to pivot 90 degrees as a vertical bulkhead. This bulkhead does not meet California Health Code. To store the bulkhead in the non-inflated, position the pool must be notched to allow the floor to be flat. This notch does not meet code allowable floor slopes. If the floor is not notched, then the bulkhead will create a protrusion, which again is a violation of California Health Code. Most bulkheads due to their resilience and configuration are over 7,000 pounds in weight and require large equipment to move. It cannot be moved by site staff. The installation of the gradual step stairs is essential to youth swim lessons and recreational swim. In addition, the minimum width of a body water is 15 feet, this means that that we cannot move the bulkhead any closer to the shallow end of the pool than configured. Budget: Sources: 2012 Clean & Safe Bond & Eastern Neighborhood Funds & Interagency Plan Implementation Committee (IPIC) 2012 Clean & Safe Bond $11M IPIC $5,538,000 Total: $16.5 Million Uses: Estimated Construction Budget: $12.M Construction Contingency $1M Estimated Soft Cost Budget: 3.3M

6 Total: $16.5 M Next Steps: Complete Civic Design Review Process July/August 2017 Develop and Complete Public Art Enrichment Component Spring and Summer 2017 Complete Detailed Design December 2017 Construction Start Planned June 2018 Supported By: Mission Education Projects Community Meeting Attendees Bernal Dwellings SFPD Precita Eyes Latino Cultural District Opposed By: Some individual lap swimmer s due to the proposed length of the pool. The project team was also presented with a petition from Pool patrons who were opposed to changing the pool length. Recommendation: RESOLVED, that this Commission approve a concept plan for improvements to Garfield Center - Pool and Clubhouse Renovation. Approval of this proposed action by the Commission is the Approval Action as defined by S.F. Administrative Code Chapter 31. Attachments: Attachment 1 Existing Site Plan Attachment 2 - Proposed Site Plan Attachment 3 Proposed Floor Plan Attachment 4 Axonometric Site View Attachments 5, 6, 7, & 8 Elevations & Courtyard Views

CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW. Petitioner defines the project area limits and gathers petition signatures.

CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW. Petitioner defines the project area limits and gathers petition signatures. CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW Step 1: Petition Petitioner defines the project area limits and gathers petition signatures. 50% of addresses within the project area must sign

More information

VALPARAISO HIGH SCHOOL NEW NATATORIUM Valparaiso Community Schools

VALPARAISO HIGH SCHOOL NEW NATATORIUM Valparaiso Community Schools VALPARAISO HIGH SCHOOL NEW NATATORIUM DESIGN UPDATE PREPARED BY: GIBRALTAR DESIGN SUBMITTED TO: OF TRUSTEES School Board Meeting CONTENT 1 2 3 4 5 6 7 Introduction Summary Programming Pool Considerations

More information

Public Meeting #1 Minutes Job No March 06, 2018

Public Meeting #1 Minutes Job No March 06, 2018 Gig Harbor Sports Complex Bruce Dees & Associates Public Meeting #1 Minutes Job No. 173-02-01 March 06, 2018 PURPOSE The purpose of this meeting was to receive public input on the preliminary program for

More information

Cordova Community Pool Replacement Cordova Recreation and Park District Community Workshop #2 October 23, 2018

Cordova Community Pool Replacement Cordova Recreation and Park District Community Workshop #2 October 23, 2018 Cordova Community Pool Replacement Cordova Recreation and Park District Community Workshop #2 October 23, 2018 Fall 2017 Jan. 2018 Feb. 2018 May 2018 May 2018 Aug. 2018 Oct. 2018 Oct. 2018 LPA hired by

More information

FALL 2014 WORKSHOPS TAKEAWAYS

FALL 2014 WORKSHOPS TAKEAWAYS SFMTA WORKSHOP FEEDBACK The SFMTA and partner agencies are continuing to utilize feedback from the Fall 2014 workshops to inform priorities and next steps for the Embarcadero Enhancement Project. Throughout

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project. TRAVEL PLAN Central European University Campus Redevelopment Project Page 1 Table of Contents Introduction... 3 Background... 7 Building Users... 7 Transportation in Community Consultation... 7 Summary

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1 BD00 RESOLUTION NO. - RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE [NTIP PLANNING] FINAL REPORT WHEREAS, The Vision Zero Ramp Intersection Study Phase was recommended by Commissioner

More information

Main Building and raft building viewed from the south side of the Oklahoma River. The white water Main Building anchors the development.

Main Building and raft building viewed from the south side of the Oklahoma River. The white water Main Building anchors the development. Client: OKCMAPS Office Completion: April 2016 Scope: Main Building: 16,326 SF Raft Storage Building: 2,041 SF Kayak Storage Building: 1,348 SF Rotary Point Pavilion: 1,387 SF Cost: $45.2 M Awards: RIVERSPORT

More information

BAINBRIDGE ISLAND AQUATICS FEASIBILITY STUDY 01/17/2019

BAINBRIDGE ISLAND AQUATICS FEASIBILITY STUDY 01/17/2019 BAINBRIDGE ISLAND AQUATICS FEASIBILITY STUDY Outline Public Outreach Jurisdiction Requirements Site Analysis Site Design Plans Pricing Operational Study Slide 2 of 47 Outline PUBLIC OUTREACH Primary Users

More information

FACILITIES PUBLIC FEEDBACK

FACILITIES PUBLIC FEEDBACK FACILITIES PUBLIC FEEDBACK tennis outdoor basketball court camper/rv hook-ups beach area along lake croquet lawn interpretive trails putting green horseshoe pits wellness stations sand volleyball courts

More information

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods N D. Focus Area II Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods Transit Road Focus Area II is located in the Hamlet

More information

CITY OF MERRIAM PARKS AND RECREATION FACILITIES MASTER PLAN

CITY OF MERRIAM PARKS AND RECREATION FACILITIES MASTER PLAN CITY OF MERRIAM PARKS AND RECREATION FACILITIES MASTER PLAN Process Site analysis and facility assessments Programs and services assessments Financial analysis Levels of service standards Where are We

More information

Speed Limits Study and Proposal. Public Input Session: 8/14/13

Speed Limits Study and Proposal. Public Input Session: 8/14/13 Speed Limits Study and Proposal Public Input Session: 8/14/13 Why is Decatur a unique place for this project? First Community Transportation Plan in the nation with a Health Impact Assessment. Strong sense

More information

TOWN OF PAYSON TRAFFIC CALMING MANUAL

TOWN OF PAYSON TRAFFIC CALMING MANUAL TOWN OF PAYSON TRAFFIC CALMING MANUAL APPROVED BY THE PAYSON TOWN COUNCIL SEPTEMBER 6, 2007 TOWN OF PAYSON TRAFFIC CALMING POLICY 1.0 Introduction Traffic Calming involves retrofitting physical devices

More information

Aquatic Facility Feasibility Study Falmouth, MA. Presented By: James Preisig: Falmouth Aquatics Kevin Post: Counsilman-Hunsaker

Aquatic Facility Feasibility Study Falmouth, MA. Presented By: James Preisig: Falmouth Aquatics Kevin Post: Counsilman-Hunsaker Aquatic Facility Feasibility Study Falmouth, MA Presented By: James Preisig: Falmouth Aquatics Kevin Post: Counsilman-Hunsaker Agenda 1. Introduction to Falmouth Aquatics 2. Counsilman-Hunsaker Process

More information

Proposed Amendment to the City-Wide Trails Plan

Proposed Amendment to the City-Wide Trails Plan Proposed Amendment to the City-Wide Trails Plan Planning and Zoning Commission June 23, 2015 Comprehensive Plan 2010 Sustainable Community Recommendations 2 Goal: Walking and Cycling are Encouraged throughout

More information

CHAPTER 7.0 IMPLEMENTATION

CHAPTER 7.0 IMPLEMENTATION CHAPTER 7.0 IMPLEMENTATION Achieving the vision of the Better Streets Plan will rely on the ability to effectively fund, build and maintain improvements, and to sustain improvements over time. CHAPTER

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 12 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various bicycle improvements and traffic modifications

More information

Big Sky Recreation Center Big Sky Event Center

Big Sky Recreation Center Big Sky Event Center Big Sky Recreation Center Big Sky Event Center Feasibility Study Update The Isaac Sports Group And USAquatics March 13, 2014 AQUATICS Family Aquatic Center 84 to 86 degrees Zero Depth entry Maximum Depth

More information

Pennsylvania Avenue (CR 484) Design Alternatives Study

Pennsylvania Avenue (CR 484) Design Alternatives Study MEMORANDUM Pennsylvania Avenue (CR 484) Design Alternatives Study Prepared for: APRIL 2016 Prepared By TABLE OF CONTENTS Project Background... 2 Previous Concept... 2 Existing Conditions... 4 New Alternatives...

More information

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST THE VILLAGE AT PEDESTRIAN CIRCULATION MAIN STREETS NORTH/SOUTH MAIN STREETS EAST/WEST SLIP STREET CREEK SIDE LANE PEDESTRIAN CIRCULATION DESCRIPTION: Circulation through the downtown of is organized by

More information

Congupna Community Plan Steering Committee (CCPSC) Greater Shepparton City Council (GSCC) CCPSC GSCC VicRoads CCPSC GSCC. CCPSC GSCC VicRoads

Congupna Community Plan Steering Committee (CCPSC) Greater Shepparton City Council (GSCC) CCPSC GSCC VicRoads CCPSC GSCC. CCPSC GSCC VicRoads CONGUPNA Action Plan Goal Actions Partnerships Timeframes / 1. Advocate for services - natural gas, sewerage Identify a range of advocacy measures to lobby with relevant government departments and utility

More information

ORRVILLE YMCA. Natatorium Project

ORRVILLE YMCA. Natatorium Project ORRVILLE YMCA Natatorium Project OUR MISSION To put Christian principles into practice through programs that build healthy spirit, mind and body for all. OUR PROMISE No one will be turned away from the

More information

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015). COUNCIL MEETING Meeting Date: March 10, 2015 Agenda Item #: 13.1 Wye Road Functional Planning Study (January 2015) Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January

More information

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES INNER LOOP EAST TRANSFORMATION PROJECT AIA Rochester Annual Meeting November 13, 2013 Bret Garwood, NBD Erik Frisch, DES Why? We are building a city that encourages walking, biking and enjoying the outdoor

More information

A Comparison for Ames, Iowa

A Comparison for Ames, Iowa A Comparison for Ames, Iowa Overview Comparative analysis not concept planning Costs based on defined pool types and sizes Costs indexed to 2017 Pool examples shown Pool Types Considered Option 1 --- competition

More information

Technical Working Group November 15, 2017

Technical Working Group November 15, 2017 Technical Working Group November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

McLaren Park. Disc Golf Meeting. April 20, 2010

McLaren Park. Disc Golf Meeting. April 20, 2010 McLaren Park Disc Golf Meeting April 20, 2010 Welcome! Introductions Ground Rules Review Questions and Topics to Cover Background Presentation by the San Francisco Disc Golf Club Questions and Answers

More information

Manatee County Parks & Natural Resources. John H. Marble Community Pool Revitalization & Marketing Plan Summer 2014

Manatee County Parks & Natural Resources. John H. Marble Community Pool Revitalization & Marketing Plan Summer 2014 Manatee County Parks & Natural Resources John H. Marble Community Pool Revitalization & Marketing Plan Summer 2014 Submitted March 2014 Manatee County Parks & Natural Resources John H. Marble Community

More information

Outdoor Pool Public Forum University of New Hampshire. July 1, 2014

Outdoor Pool Public Forum University of New Hampshire. July 1, 2014 Outdoor Pool Public Forum July 1, 2014 Agenda 7:00 Introductions Project History Project Goals Existing Pool Design Evolution of New Pool Current Design 7:30 Small Group Discussion 8:30 Share Each Group

More information

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights

More information

The Public Safety Complex Southampton MA. a critical time

The Public Safety Complex Southampton MA. a critical time The Public Safety Complex Southampton MA a critical time April 7, 2015 1863: Southampton constructs a new school house 1927: Southampton discontinues use of facility as a school December 1946: Southampton

More information

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 OVERALL LAND USE CONCEPT Overall Broadway Valdez District: 95.5 acres (35.1 acres right-of ways + 60.4 acres developable land) Plan Subareas:

More information

San Francisco Planning Department IPIC Report 2016

San Francisco Planning Department IPIC Report 2016 San Francisco Planning Department IPIC Report 2016 and Expenditure Plan FY 2017 2018 San Francisco Planning Commission January 7, 2016 IMPLEMENTING OUR COMMUNITY PLANS The Plan Implementation Team manages

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

Napa County Fairgrounds Opportunity Analysis. RCH Group A. Plescia & Co. Fair & Exposition Planning Consultants. September 8, 2016.

Napa County Fairgrounds Opportunity Analysis. RCH Group A. Plescia & Co. Fair & Exposition Planning Consultants. September 8, 2016. Napa County Fairgrounds Opportunity Analysis September 8, 2016 Prepared by: RCH Group A. Plescia & Co. Fair & Exposition Planning Consultants Our Goal / Objective Goal Our primary objective is to evaluate

More information

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan Application of a Complete Street initiative and how it might function operationally 8 8 Southbend to Prima Vista October 30, 2017 Presentation Agenda 2 Perspective and History Traffic projections, Levels

More information

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24

More information

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND COUNCIL POLICY NAME: COUNCIL ADVISORY COMMITTEES - TERMS OF REFERENCE ISSUED: APRIL 3, 2006 AMENDED: NOVEMBER 27, 2006 NOVEMBER 23, 2009 JANUARY 11, 2010 DECEMBER 17, 2012 POLICY COUNCIL REFERENCE: 06/119

More information

Lakeside Green Street Project Improvement. Public Works Committee February 27, 2018

Lakeside Green Street Project Improvement. Public Works Committee February 27, 2018 Lakeside Green Street Improvement Public Works Committee February 27, 2018 Construction of Lakeside Green Streets is currently underway Photo: Sergio Ruiz Photo: Sergio Ruiz 100% Do people biking on the

More information

EXCELLENCE University of Wisconsin - Madison Athletic Facility Master Plan August 29th, 2007

EXCELLENCE University of Wisconsin - Madison Athletic Facility Master Plan August 29th, 2007 EXCELLENCE University of Wisconsin - Madison Athletic Facility Master Plan August 29th, 2007 Purpose: Creating a road map and time line for expanding our facilities Flagship Facilities Goal: To create

More information

CITY COUNCIL AGENDA REPORT

CITY COUNCIL AGENDA REPORT CITY COUNCIL AGENDA REPORT Subject: GROSVENOR POOL REPORT Recommendation(s) 1. That the Grosvenor Outdoor Pool Report Part 2, 2015, provided as Attachment 1 to the Grosvenor Pool Report agenda report dated

More information

Introduction.

Introduction. 2307-1.0. Introduction. Delaware s Safe Routes to School (SRTS) Program was established September 10, 2002 when Governor Ruth Ann Minner signed Senate Bill 353 of the 141st General Assembly of Delaware

More information

Tampa: Davis Islands Recreation Area

Tampa: Davis Islands Recreation Area 1) PROCESS a) Provide As-Built Documentation i) Elements Design Team completed measured as-built drawings as well as extensive photo documentation of the building. ii) Elements Design Team met and held

More information

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities I MOVE that the Council: AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities 1. INSTRUCT the Department of City Planning to amend the proposed Mobility Plan to include the following;

More information

Aquatic Concepts. July 23, 2018

Aquatic Concepts. July 23, 2018 Aquatic Concepts July 23, 2018 DESIGN DIRECTION Lazy River Zero Depth Entry Water slides at least one for 48 + and one for little kids Spray features Indoor lap lanes Outdoor lap lanes that can accommodate

More information

Plainfield Gateway. Plainfield Context

Plainfield Gateway. Plainfield Context Plainfield Gateway The western arm of The Campus, much like the Thomas Street Placita eastern arm, must connect residents and workers from the western side of the neighborhood to The Campus and the activity

More information

Have your say. Aquatic AND Leisure Facility. Aquatic AND Leisure Facility ON THE NEW. Information Booklet

Have your say. Aquatic AND Leisure Facility. Aquatic AND Leisure Facility ON THE NEW. Information Booklet Have your say Aquatic AND Leisure Facility ON THE NEW Aquatic AND Leisure Facility Information Booklet It s time to upgrade our aquatic and leisure facilities to meet your needs now, and into the future.

More information

Community Task Force November 15, 2017

Community Task Force November 15, 2017 Community Task Force November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return Summary: Local return is an important revenue source for cities to maintain their local transportation infrastructure. Most cities use their local return to operate small bus systems and repave streets,

More information

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan

Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan AGENDA 1 Introductions & Project Scope 2 Public Outreach Recap 3 Living Streets Design Manual 4 Aviation Boulevard

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting

Replace century-old sewer & water pipes Pedestrian-scale sidewalk lighting PROJECT OVERVIEW The Masonic Avenue Streetscape Project is an effort to improve safety for everyone travelling on Masonic Avenue between Geary Boulevard and Fell Street. This project will bring a variety

More information

WANAKA SWIMMING FACILITIES STATEMENT OF PROPOSAL

WANAKA SWIMMING FACILITIES STATEMENT OF PROPOSAL WANAKA SWIMMING FACILITIES STATEMENT OF PROPOSAL 17 October 2014 Contents Executive Summary Background National Guidelines The Status Quo Issue One Timing Issue Two Location Issue Three Size Issue Four

More information

TRENDS SEPTEMBER

TRENDS SEPTEMBER 2 Chapter 2 TRENDS In order to keep pace with the demands of a growing population, the City of Chanhassen needs to consider how the dynamic nature of technologies, trends, cultures, and activities will

More information

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685

Community Development and Recreation Committee. General Manager, Parks, Forestry and Recreation. P:\2015\Cluster A\PFR\CD AFS#22685 CD10.2 STAFF REPORT ACTION REQUIRED City of Toronto Outdoor Tennis Operations Date: February 19, 2016 To: From: Wards: Reference Number: Community Development and Recreation Committee General Manager,

More information

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution Finksburg Planning and Citizens Council March 22, 2018 Overview Progress Citizen Outreach Vision Chapter 3 - Existing Conditions Chapter 4

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Application of a Complete Street

Application of a Complete Street Application of a Complete Street Southbend to Prima Vista Update May 14, 2018 Meeting Agenda Perspective and History Public input received Typical sections being considered Presentation of the 2-lane master

More information

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building. CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED

More information

ABOUT THIS OPEN HOUSE

ABOUT THIS OPEN HOUSE ABOUT THIS OPEN HOUSE Welcome, and thanks for joining us today for the Folsom-Howard Near-Term Project! The purpose of today s open house is to: Understand how the near-term project ties into the larger

More information

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM

PEDALING FORWARD. A Glance at the SFMTA s Bike Program for SFMTA.COM PEDALING FORWARD A Glance at the SFMTA s Bike Program for 2017-2021 SFMTA.COM INTRODUCTION About This Booklet More people from all walks of life see their bicycle as a more convenient way to get where

More information

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_ AGENDA ITEM SUMMARY AGENCY: City Council MEETING DATE: June 25, 2012 DEPARTMENT: Community Dev PREPARED BY: T Spade DEPT. DIR. APPROVAL: MJ CITY MGR. APPROVAL: LR PRESENTED BY: T Spade TITLE: RECEIVE REPORT

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Better Market Street Project Update. Urban Forestry Council September 17, 2014 Better Market Street Project Update Urban Forestry Council September 17, 2014 Project Area Limits Better Market Street Schedule Market Street City s busiest transit corridor Over 85 buses per hour 14 surface

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

CITY MANUALS AND STANDARDS REVIEW

CITY MANUALS AND STANDARDS REVIEW GEORGETOWN SIDEWALK MASTER PLAN CITY MANUALS AND STANDARDS REVIEW RESOURCES AND STANDARDS As part of the Master Plan process, a review and evaluation of current City documents and policies relevant to

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: November 20, 2017 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 12/5/17 Board Meeting: San Francisco Freeway Corridor Management Study

More information

Honey Lake Valley Recreation Authority Pool Community Workshop Presentation

Honey Lake Valley Recreation Authority Pool Community Workshop Presentation PREVIOUS WORK UNDERTAKEN BY HLVRA Phase I 19 sites were explored and scored for viability Phase II 3 finalists emerged 800 South Street Site Credence School Site* Mesa Street Site March 2014 Aquatic Design

More information

McCarren Park Pool PlaNYC Survey Results

McCarren Park Pool PlaNYC Survey Results McCarren Park Pool PlaNYC Survey Results Capital Project Thanks to Mayor Bloomberg s PlaNYC, the New York City Department of Parks & Recreation (DPR) is developing plans for a major investment in McCarren

More information

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns. Welcome! Thank you for participating in today s Valencia Bikeway Improvements workshop. Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns. Initial

More information

City of Davenport CitiBus Public Transportation Study. April 2015

City of Davenport CitiBus Public Transportation Study. April 2015 City of Davenport CitiBus Public Transportation Study April 2015 Overview Project Background Key Findings CitiBus Service Allocation Policy Discussion 2 Project Background 3 About CitiBus Operates 17 routes

More information

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2 Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2: Policies and Actions The Bicycle Master Plan provides a road map for making bicycling in Bellingham a viable transportation

More information

San Jose Transportation Policy

San Jose Transportation Policy San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland

More information

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee 2100 Clarendon Boulevard, Suite 700, Arlington, VA 22201 TEL 703-228-3525 FAX 703-228-3543 www.arlingtonva.us

More information

Point Defiance Park. Master Plan

Point Defiance Park. Master Plan Point Defiance Park Master Plan Public Participation 1/29, 2/26, 3/26 & 4/23 Owen Beach Ferry Zoo Fort Nisqually Mildred Street Pearl Street Triangle Hare & Hare Master Plan - 1911 2008 Concept Plan Comments

More information

FINAL REPORT DECEMBER 2011

FINAL REPORT DECEMBER 2011 FINAL REPORT DECEMBER 2011 AKNOWLEDGEMENTS SFMTA Staff Erin Miller, Project Manager Timothy Papandreou Jerry Robbins Pamela Stone Mike Sallaberry Chris Dimeling Emily Drennen Suzanne Chen-Harding San

More information

Paoli Road Improvement Feasibility Study

Paoli Road Improvement Feasibility Study Paoli Road Improvement Feasibility Study & Public Participation Project March 24, 2015 Prepared for: Tredyffrin Township Prepared by: McMahon Associates, Inc. with Town Planning Partnership, LLC Glackin

More information

Focus on Enforcement. 7/21/2017 Presentation to SFMTA Policy & Governance Committee. Joe Lapka Corina Monzón

Focus on Enforcement. 7/21/2017 Presentation to SFMTA Policy & Governance Committee. Joe Lapka Corina Monzón Focus on Enforcement Insights from research and analysis in support of San Francisco s Vision Zero plan to eliminate traffic deaths Joe Lapka Corina Monzón 7/21/2017 Presentation to SFMTA Policy & Governance

More information

Rochester Area Bike Sharing Program Study

Rochester Area Bike Sharing Program Study roc bike share Rochester Area Bike Sharing Program Study Executive Summary ~ January 2015 JANUARY 2015 8484 Georgia Avenue, Suite 800 Silver Spring, MD 20910 3495 Winton Pl., Bldg E, Suite 110 Rochester,

More information

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House Bus Rapid Transit ALTERNATIVES ANALYSIS Open House June 23, 2015 Open House Meeting Agenda Agenda Introductions What is BRT? Project Goals Study Tasks Next steps Discussion PVTA Bus Rapid Transit Study

More information

Pocatello Regional Transit Master Transit Plan Draft Recommendations

Pocatello Regional Transit Master Transit Plan Draft Recommendations Pocatello Regional Transit Master Transit Plan Draft Recommendations Presentation Outline 1. 2. 3. 4. What is the Master Transit Plan? An overview of the study Where Are We Today? Key take-aways from existing

More information

MTP BICYCLE ELEMENT UPDATE. November 2017

MTP BICYCLE ELEMENT UPDATE. November 2017 MTP BICYCLE ELEMENT UPDATE November 2017 TIME FOR AN UPDATE Bicycle Element adopted in July 2008 Almost 10 years old Many planned facilities have been implemented 10 years more experience in planning,

More information

Mitchell Drive Indoor Basketball Facility

Mitchell Drive Indoor Basketball Facility attachment 2 PROJECT DESCRIPTION (Updated 1-19-15) Mitchell Drive Indoor Basketball Facility The subject site is located just east of North Wiget Lane, along Mitchell Drive. The subject Indoor Basketball

More information

Summary of Proposal to Upgrade Swimming Facilities for the Wanaka Ward

Summary of Proposal to Upgrade Swimming Facilities for the Wanaka Ward Attachment B Summary of Proposal to Upgrade Swimming Facilities for the Wanaka Ward Introduction The Queenstown Lakes District Council is proposing to build an eight lane lap pool and a learners pool costing

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO.: 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various traffic and parking modifications on Bay Street

More information

VILLAGE OF NILES TRAFFIC CALMING POLICY

VILLAGE OF NILES TRAFFIC CALMING POLICY INTRODUCTION There is increasing interest across the country in developing new strategies to reduce the speed and amount of traffic in residential neighborhoods. Measurement of speeds, traffic volumes,

More information

SARASOTA COUNTY GOVERNMENT Parks and Recreation

SARASOTA COUNTY GOVERNMENT Parks and Recreation SARASOTA COUNTY GOVERNMENT Parks and Recreation TO: Sarasota County Commission THROUGH: Randall H. Reid, County Administrator FROM: Carolyn Brown, Director, Parks and Recreation DATE: September 17, 2013

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY The Active Transportation Plan is a guide to accomplish the Town s vision for developing a network of sidewalks, on-road bicycle facilities, and trails that allow for safe and convenient

More information

System Performance Innovation FACT Sheet Hawk Pedestrian Beacon

System Performance Innovation FACT Sheet Hawk Pedestrian Beacon Hawk Pedestrian Beacon Description of the Challenge or Opportunity Hawk Pedestrian Beacon Understanding the motivation. Describe the pre-existing product/process that is the subject of the innovation:

More information

Assemblymember Phil Steck and Mayor Gary McCarthy Announce Upgrades to Schenectady Central Park

Assemblymember Phil Steck and Mayor Gary McCarthy Announce Upgrades to Schenectady Central Park Gary R. McCarthy Mayor OFFICE OF THE MAYOR CITY OF SCHENECTADY NEW YORK City Hall, 105 Jay Street, Rm 111 Schenectady, N.Y. 12305-1938 Office: (518) 382-5000 Cell: (518) 424-0483 Fax: (518) 382-5272 gmccarthy@schenectadyny.gov

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 12 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving the traffic modifications associated with the Dolores Street

More information