1 Bradford s Landing Preliminary Plan Abandonment AB753 & AB754 1

2 Overview Staff recommends Approval of Preliminary Plan with revised conditions and Adoption of the Resolution. 244 lots for 222 TH and 22 SF including 15% MPDUs Staff recommends granting the abandonment AB753 and AB754 for portions of Bradford Road, Norbeck Avenue and Coolidge Avenue. 2

3 Overview 1) Site Location 2) Process & Proposal 3) Required Findings 4) Community Concerns 5) Recommendation and revised conditions 3

4 1) Site Location ICC Greenbriar at Norbeck Crossing East Norbeck Local Park N Leisure World 4

5 1) Site Location & Zoning East Norbeck Local Park N Leisure World 5

6 1) Site Description gross acres N Greenbriar at Norbeck Crossing ICC 6

7 Overview 1) Site Location 2) Process & Proposal 3) Required Findings 4) Community Concerns 5) Recommendation and revised conditions 7

8 2) Process & Proposal a) Concept Plan (optional, completed Spring 2016) b) Preliminary Plan (required, current stage) Road Abandonments c) Site Plan (required, forthcoming) 8

9 2a) Concept Plan 5 layouts Main Concerns Road network Open space network Building orientation Unit type distribution Visitor parking 9

10 2a) Concept Plan 5 layouts Main Concerns Road network Open space network Building orientation Unit type distribution Visitor parking 10

11 2a) Concept Plan 5 layouts Main Concerns Road network Open space network Building orientation Unit type distribution Visitor parking 11

12 2a) Concept Plan 5 layouts Main Concerns Road network Open space network Building orientation Unit type distribution Visitor parking 12

13 2b) Preliminary Plan Proposal 244 DU 22 detached (9%) 222 TH (91%) 244 DU 207 market rate 37 MPDUs (15%) 143 TDRs Protecting 935 acres of farmland 13

14 2b) Proposal Road network Open space network Building orientation Unit type distribution Pedestrian/Bicycle circulation 14

15 2b) Preliminary Plan Proposal Pedestrian access to East Norbeck Local Park 15

16 2b) Preliminary Plan Proposal Sidewalk extension along Norbeck Rd 16

17 2b) Abandonment Proposal 17

18 Overview 1) Site Location 2) Process & Proposal 3) Required Findings 4) Community Concerns 5) Recommendation and revised conditions 18

19 3) Required Findings a) Master Plan b) Adequate Public Facilities (APF) c) Forest Conservation Law d) Storm Water Management e) Location & orientation of the lots 19

20 3a) Olney Master Plan Golden Bear Area (p.34) R-200/TDR-7 Internal connection for pedestrians and cyclists to East Norbeck Local Park Appropriate open space and play areas Affordable housing Controlled access onto MD 28 Dual bikeway for MD 28 Source: 2005 Olney Master Plan 20

21 3b) Adequate Public Facilities (APF) Roads/Transit Existing Conditions o The existing Norbeck Rd ROW is between wide. o Applicant will dedicate sufficient right-of-way to achieve the required 75 from the centerline along their property frontage and providing a 10 shared use path along the frontage. o Road improvements are not being required because of the ongoing Norbeck Road/Spencerville Road (MD 198) Corridor Study. 21

22 3b) Adequate Public Facilities (APF) Roads/Transit LATR & TPAR Analysis o 134 new AM peak-hour trips and 166 new PM peak-hour trips > Subject to LATR o No intersections exceed CLV standard > LATR test is satisfied o TPAR Olney Policy Area is adequate under roadway but transit is inadequate > TPAR mitigation fee of 25% of the Transportation Impact Tax CLV Calculations Studied Intersection Traffic Condition Existing Background Total AM PM AM PM AM PM Norbeck Road & Coolidge Avenue 1,306 1,230 1,306 1,234 1,372 1,322 Norbeck Road & Norbeck Boulevard 1,311 1,272 1,313 1,276 1,379 1,364 Norbeck Road & Bradford Road Norbeck Road & Public Street A ,332 1,178 Norbeck Road & Wintergate Drive 1,233 1,204 1,239 1,218 1,244 1,238 CLV standard of 1,475 for intersections 22

23 3b) Adequate Public Facilities (APF) Rockville School Cluster Subject to a school facilities payment at the middle school level according to the FY 2017 Annual School Test Water & Sewer Category Change (16-OLN-03A and 16-OLN-04A) Approved by the County Executive All dwellings serviced by public water and sewer Other Public Facilities All facilities adequate and within the standards of the Subdivision Staging Policy 23

24 3c) Lot Adequacy R-200/TDR-7 zone Optional Method MPDU density bonus Waiver of the Allowed Building Type Mix Waiver of Resubdivision Criteria Section 50-29(b)(2) Modified Right-of-Way Truncation Building Type Z.O. Required Proposed Detached Min 15% 9% (22 du) Townhouses N/A 91% (222 du) Multi-family Max 35% N/A 24

25 3d) Preliminary Forest Conservation Plan 28.3 acres of net tract Existing 3.85 acres of forest 3.33 acres to be removed 0.52 acres to be saved Total 7.39 acres afforestation/ reforestation requirement Not possible to meet the minimum requirements of forest retention on the Subject Property per Section 22A-12(f) of the Forest Conservation Law acres of afforestation on-site 2.70 acres off-site to an approved forest mitigation bank Variance Trees (24) specimen trees = 923 inches plant 77, 3 caliper trees Reforestation Area Forest cleared 25

26 3e) Storm Water Management (SWM) Concept Approved Micro-bioretention, bio-swales, drywells and at-grade planter boxes SWM pond to manage up to the 100-year storm event as required by DPS 26

27 Overview 1) Site Location 2) Process & Proposal 3) Required Findings 4) Community Concerns 5) Recommendation and revised conditions 27

28 Community Concerns Applicant Community Meeting Pre-submission meeting Preliminary Plan 6/28/16 Staff presented at Follow-up Community Meeting Hampshire Village Community Room 11/9/16 Over 50 in attendance Staff met with Leisure World representatives 11/9/16 Correspondence Prior to Posting Staff Report 5 letters of concern Correspondence After Posting Staff Report 3 additional letters of concern 1 letter in opposition 28

29 Community Concerns Traffic and congestion on MD 28 Left turns Resident s Video Lack of service roads Control access onto Norbeck Road Potential trespassing of private property Inefficient access to the Local Park Unsafe pedestrian access & circulation on MD 28 No sidewalks No crosswalks Density transition along Norbeck Rd 29

30 Community Concerns Current SHA s projects 1) Providing Double Left Turn Lanes for northbound Georgia Avenue to westbound Norbeck Road (SHA Contract No. MO ) Design phase with an advertisement date of January 31, 2017 and a notice to proceed on May 15,

31 Community Concerns Current SHA s projects 2) Norbeck Road/Spencerville Road (MD 198) Corridor Study Project planning now with only Planning funding through FY 2017 SHA Project MO

32 Community Concerns Current SHA s projects 3) Interchange at Georgia Avenue/Norbeck Road (SHA Project MO ) The project is currently in preliminary engineering phase. No CIP funding has been allocated for the next two phases right-of-way and construction funding. 32

33 Community Concerns Current SHA s projects 4) Concept Study for a sidewalk connecting Georgia Ave to Bailey s Lane along the south side of Norbeck Road. Not funded. 4a) Sidewalk and crosswalk improvements connecting Grace House Assisted Living and East Norbeck Local Park. Funded but an implementation schedule has not been determined yet. 4a) 33

34 Community Concerns Current SHA s projects 4) Concept Study for a sidewalk connecting Georgia Ave to Bailey s Lane along the south side of Norbeck Road. Not funded. 4a) Sidewalk and crosswalk improvements connecting Grace House Assisted Living and East Norbeck Local Park. Funded but an implementation schedule has not been determined yet. 4a) 34

35 Community Concerns Pedestrian access & circulation on MD 28 35

36 2b) Preliminary Plan Proposal Sidewalk extension along Norbeck Rd 36

37 Community Concerns Pedestrian access to East Norbeck Local Park 37

38 Overview 1) Site Location 2) Process & Proposal 3) Required Findings 4) Community Concerns 5) Recommendation and revised conditions 38

39 Recommendation and revised conditions Staff recommends Approval of Preliminary Plan and associated preliminary forest conservation plan with revised conditions and Adoption of the Resolution. Staff recommends approval of the abandonment AB753 and AB754 and transmittal to the Montgomery County Executive. 39

40 Recommendation and revised conditions 14) The Applicant must provide Private Road A and alleys, as shown on Sheet 3a of the Certified Preliminary Plan, subject to the following conditions: Private Road A and alleys must be shown on separate parcels that are subject to an approved restrictive covenant ( Covenant ), to be recorded in the Montgomery County Land Records with the Liber and Folio referenced on the record plat. a. Private Road A and alleys include any sidewalks, bikeways, storm drainage facilities, street trees, street lights, private utility systems and other necessary improvements as required by either the Preliminary Plan or the subsequent Site Plan within the delineated private road area (collectively, the Private Roads ), all of which must be included in a long-term maintenance plan along with the Private Road. b. The Covenant must be approved by the M-NCPPC Office of General Counsel and must include at a minimum: i. That Applicant is fully responsible for the design, construction, operation maintenance and repair of the Private Roads, including other necessary improvements as shown within the delineated area in accordance with the criteria set forth in the Preliminary Plan and any subsequent Site Plan; ii. Utilities located within the Private Roads area must be in an easement approved by the applicable utility provider, or be provided as private connections; iii. That the Private Roads must remain open for pedestrians and both motorized and non-motorized vehicles at all times as part of the iv. project common area, except for temporary closures as permitted by MCDPS and approved by the Montgomery County Fire Marshall; That Applicant must properly maintain all of the improvements within the Private Roads area in good condition and repair in accordance with applicable laws and regulations at all times. At a minimum, Applicant is obligated to remove snow and ice, and provide routine and extraordinary repairs, maintenance and replacement to keep the Private Roads open and in good repair for safe use; and v. That any subsequent amendment is subject to approval by the M-NCPPC Office of General Counsel. c. Private Road A must be designed and constructed according to the Montgomery County Road Code Standard MC per the modified typical section specified by the subsequent Site Plan. Private alleys must be designed and constructed according to the Montgomery County Road Code Standard MC per the modified typical section specified by the subsequent Site Plan. d. Prior to recordation of the plat, the Applicant must deliver to the Planning Department, with a copy to MCDPS, certification by a professional engineer licensed in the State of Maryland that the Private Road A has been designed in accordance with the paving detail and cross-section specifications as shown on the Preliminary Plan, and further certifying that the road has been designed in accordance with sound engineering principles for safe use including horizontal and vertical alignments for the intended target speed, adequate typical section(s) for vehicles/pedestrians/bicyclists, ADA compliance, drainage facilities, sight distances, points of access, and parking ( Certified Design ). e. The Private Roads must meet all necessary requirements for emergency access, egress and apparatus as determined by the Montgomery County Fire Marshal. 40

41 Thank you Q&A 41

Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park

Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park Traffic Impact Analysis Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park Silver Spring, MD Lot 17: Site Plan No. 821413 Lot 18: Site Plan No. 821414 Filing Number: 13-TS-1198527A Prepared

More information

RCCG Jesus House. Preliminary Plan # TRAFFIC STUDY. Prepared for: RCCG Jesus House Montgomery County, Maryland

RCCG Jesus House. Preliminary Plan # TRAFFIC STUDY. Prepared for: RCCG Jesus House Montgomery County, Maryland TRAFFIC STUDY Prepared for: Montgomery County, Maryland Prepared by: SSSTS Consulting (410) 718-8660(410) 718-8660 Table of Contents SECTION 1 - INTRODUCTION... 1 SECTION 2 - EXISTING CONDITIONS... 4 Public

More information

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004 Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3

More information

CLARKSBURG PREMIUM OUTLETS AT CABIN BRANCH LOCAL AREA TRANSPORTATION REVIEW EXEMPTION STATEMENT

CLARKSBURG PREMIUM OUTLETS AT CABIN BRANCH LOCAL AREA TRANSPORTATION REVIEW EXEMPTION STATEMENT CLARKSBURG PREMIUM OUTLETS AT CABIN BRANCH LOCAL AREA TRANSPORTATION REVIEW EXEMPTION STATEMENT May 12, 2014 CLARKSBURG PREMIUM OUTLETS AT CABIN BRANCH TRANSPORTATION REVIEW EXEMPTION STATEMENT MONTGOMERY

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas

More information

Access requests to County streets and roadways are processed through one of the following methods:

Access requests to County streets and roadways are processed through one of the following methods: 13.1 GENERAL APPLICATION PROCESS Access requests to County streets and roadways are processed through one of the following methods: A. Planned Developments may set general locations for access points.

More information

Town of Siler City - Unified Development Ordinance ARTICLE XIV - Streets and Sidewalks

Town of Siler City - Unified Development Ordinance ARTICLE XIV - Streets and Sidewalks ARTICLE XIV - Streets and Sidewalks 193 Street Classification (a) In all new subdivisions, streets that are dedicated to public use shall be classified as provided in 193(b) (1) The classification shall

More information

Issue Commentary Staff Response

Issue Commentary Staff Response MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 9 Date: 11-1-18 Local Area Transportation Review (LATR) Pedestrian Adequacy Test Technical

More information

Zlatko Krstulich, P.Eng. City of O9awa

Zlatko Krstulich, P.Eng. City of O9awa Zlatko Krstulich, P.Eng. City of O9awa 1. Introduction to the Ontario Traffic Manual Series 2. What is OTM Book 18: Bicycle Facilities? 3. Study / Committee Team Members 4. Brief overview of the content

More information

COUNTY OF SONOMA PERMIT AND RESOURCE MANAGEMENT DEPARTMENT 2550 Ventura Avenue, Santa Rosa, CA (707) FAX (707)

COUNTY OF SONOMA PERMIT AND RESOURCE MANAGEMENT DEPARTMENT 2550 Ventura Avenue, Santa Rosa, CA (707) FAX (707) COUNTY OF SONOMA PERMIT AND RESOURCE MANAGEMENT DEPARTMENT 2550 Ventura Avenue, Santa Rosa, CA 95403 (707) 565-1900 FAX (707) 565-1103 DATE: February 17, 2012 TO: Board of Supervisors FROM: Blake Hillegas,

More information

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. 4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey: Old Strathcona s neighbourhood renewal process is now at the draft concept design phase. Over the last several months, the city has been gathering local knowledge and resident input that has been used

More information

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building. CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Preliminary Transportation Analysis

Preliminary Transportation Analysis Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to

More information

BPP / SUB

BPP / SUB Development Services Department Project/File: Lead Agency: Site address: Millwell Place Subdivision/ BPP15-0031/ SUB15-0064 This is a preliminary plat application to allow for the development of 68 building

More information

RZC Appendix 8A Marymoor Subarea Street Requirements

RZC Appendix 8A Marymoor Subarea Street Requirements RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

Community Transportation Plan

Community Transportation Plan Community Transportation Plan Appendix A: Traffic Calming CITY OF DECATUR COMMUNITY TRANSPORTATION PLAN Appendix A: City of Decatur City-wide Residential Traffic Calming Program Process & Procedures The

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 12 Date: 12-10-15 Symmetry at Cloverleaf LLC, Provisional Adequate Public Facilities, PAPF

More information

Bellevue Downtown Association Downtown Bike Series

Bellevue Downtown Association Downtown Bike Series Bellevue Downtown Association Downtown Bike Series Meeting 2 Franz Loewenherz Andreas Piller Kyle Potuzak Chris Long October 26, 2017 Today s Agenda: 1) Meeting Purpose 2) 9/28 Meeting Recap 3) Candidate

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION SHA CTP Project No. MO891A21, US 29, Fairland Road to Musgrove Road Interchange Improvement, Design Review

More information

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

11/28/2016 VIA

11/28/2016 VIA 11/28/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, Ca 95811 RE: Natomas Corporate Center Commercial Building

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016 1 City of Atlanta-MARTA Sales Tax Referendum Draft Project List Atlanta City Council Work Session May 19, 2016 2 SB 369 - MARTA Sales tax for up to 0.50% is allowed in the City of Atlanta for MARTA Purpose

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections Roadway Cross-Sections Medford s roadway cross-section standards apply to new and reconstructed roads. The crosssections take into consideration roadway function and operational characteristics, including

More information

Committed to Service

Committed to Service Development Services Department Committed to Service January 19, 2016 TO: FROM: SUBJECT: ACHD Board of Commissioners Mindy Wallace, AICP Planner III Kirsten Subdivision/BPP15-0023 Executive Summary: The

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL 4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL The Transportation Services Committee recommends the adoption of

More information

Street Paving and Sidewalk Policy

Street Paving and Sidewalk Policy City Commission Policy 600 Street Paving and Sidewalk Policy DEPARTMENT: Public Works DATE ADOPTED: June 7, 1995 DATE OF LAST REVISION: December 10, 2014 Policy No. 600.01 AUTHORITY: PASS City of Tallahassee-Leon

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT

MONTGOMERY COUNTY PLANNING DEPARTMENT MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION Tilden Middle School/Rock Terrace School, Mandatory Referral, MR2017014 MCPB Item No. Date: 11-09-17 Amy

More information

PARKMERCED. San Francisco Municipal Transportation Agency Board Meeting September 7, 2010

PARKMERCED. San Francisco Municipal Transportation Agency Board Meeting September 7, 2010 PARKMERCED San Francisco Municipal Transportation Agency Board Meeting September 7, 2010 Project Team OEWD: Overview Project Sponsor: Parkmerced Highlights SFMTA: Transportation Highlights, Process and

More information

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand 6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION Bicycle and pedestrian travel along and in the vicinity of the corridor is part of the vision of Somerset and Hunterdon counties and the integrated

More information

Development Services Department

Development Services Department Development Services Department Project/File: Lead Agency: Site address: Harris Ranch Specific Area Plan Text Amendments/ZOA14-00001 The applicant is requesting approval of a text amendment application

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Adopting Conceptual Proposal for Streetscape Improvements to Broadway,

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Mercer County Planning Division AECOM Transportation (formerly DMJM Harris) January 29, 2009 Agenda Project Status

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017

CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway. Open House - February 2017 CITY OF MINNEAPOLIS 26 th St E/W & 28 th St E/W Protected Bikeway Open House - February 2017 2/27/2017 1 Purpose of Meeting Inform: Provide an overview of the project Opportunity to gather feedback/input/observations

More information

CITY OF ROSEVILLE DESIGN STANDARDS

CITY OF ROSEVILLE DESIGN STANDARDS CITY OF ROSEVILLE DESIGN STANDARDS Section 1 Purpose and Definitions 1-1 Purpose PD 1 1-2 Design Practice PD 1 1-3 Definitions PD 1 Section 2 General Requirements 2-1 Plans by an Appropriate Engineer GR

More information

YELLOWHEAD TRAIL / 149 STREET INTERCHANGE

YELLOWHEAD TRAIL / 149 STREET INTERCHANGE YELLOWHEAD TRAIL / 149 STREET INTERCHANGE WELCOME Today we are introducing the concept planning project for a new gradeseparated interchange at Yellowhead Trail and 149 Street PURPOSE Provide information

More information

WHEREAS, the New Jersey Department of Transportation' s Complete Streets

WHEREAS, the New Jersey Department of Transportation' s Complete Streets WHEREAS, the State Department of Transportation adopted a Complete Streets Policy ( Policy No. 703), effective December 3, 2009, for all projects funded through the Department' s Capital Program and strongly

More information

5 Transit & Traffic. Overview

5 Transit & Traffic. Overview 5 Transit & Traffic Overview Montgomery Place s roadways and overall traffic circulation are unique in the city due to the narrow streets and avenues with boulevards; however, no sidewalks or curbs in

More information

2014 Mobility Assessment Report Functional Planning & Policy Montgomery County Planning Department

2014 Mobility Assessment Report Functional Planning & Policy Montgomery County Planning Department 2014 Mobility Assessment Report Functional Planning & Policy Montgomery County Planning Department Travel Trends National & Local Travel Trends Multi-Modal Monitoring Pedestrian Bikes Bus Rail Future Efforts

More information

ACHD Board of Commissioners Stacey Yarrington, Planner III Tandem Ridge/ EPP / PP-07-16/ RZ-12-16/ CPA-01-16/ A-07-16

ACHD Board of Commissioners Stacey Yarrington, Planner III Tandem Ridge/ EPP / PP-07-16/ RZ-12-16/ CPA-01-16/ A-07-16 Development Services Department DATE: December 14, 2016 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner III Tandem Ridge/ EPP16-0012/ PP-07-16/ Executive Summary: This is an annexation,

More information

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number: APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET I. GENERAL INFORMATION A. Project name: B. Subdivision/Site Development Plan/Grading Permit Name and Number: C. Project address: D. Project

More information

ORDINANCE NO AMENDMENT TO ORDINANCE NO NASSAU COUNTY, norida. WHEREAS, on the 28th day of January, 1991, the Board of County

ORDINANCE NO AMENDMENT TO ORDINANCE NO NASSAU COUNTY, norida. WHEREAS, on the 28th day of January, 1991, the Board of County ORDINANCE NO. 99-23 AMENDMENT TO ORDINANCE NO. 91-04 NASSAU COUNTY, norida WHEREAS, on the 28th day of January, 1991, the Board of County Commissioners, Nassau County, Florida (the "Board"), did adopt

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

Maywood Town Hall Meeting. May 4, 2016

Maywood Town Hall Meeting. May 4, 2016 Maywood Town Hall Meeting May 4, 2016 1 AGENDA Overall I-290 Study Background Maywood Advisory Working Group (AWG) findings to date Noise Wall Update Next Steps 2 Questions? Study team members also available

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

REMOVE BARRIERS TO, ENCOURAGE CREATION OF AND PROVIDE GUIDELINES FOR SAFE ROUTES (ALL DISTRICTS)

REMOVE BARRIERS TO, ENCOURAGE CREATION OF AND PROVIDE GUIDELINES FOR SAFE ROUTES (ALL DISTRICTS) Ordinance 2009-98 AN ORDINANCE OF THE BOARD OF SUPERVISORS OF PIMA COUNTY, ARIZONA; RELATING TO ZONING; AMENDING THE PIMA COUNTY ZONING CODE TITLE 18 BY AMENDING SECTION 18.03.020 (DEFINITIONS) TO ADD

More information

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero. RIDGELAND AVE OAK PARK AVE AUSTIN BLVD UP-RR BRC-RR ASHLAND AVE Study Area Map I-290 Phase I Study Area 294 UP RR Metra UP-W Illinois Prairie Path 38 Berkeley WOLF RD Hillside MANNHEIM RD Bellwood 290

More information

Route 47 (North Main Street) Reconstruction

Route 47 (North Main Street) Reconstruction TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related

More information

CITY MANUALS AND STANDARDS REVIEW

CITY MANUALS AND STANDARDS REVIEW GEORGETOWN SIDEWALK MASTER PLAN CITY MANUALS AND STANDARDS REVIEW RESOURCES AND STANDARDS As part of the Master Plan process, a review and evaluation of current City documents and policies relevant to

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer Abstract The Exposition Corridor transit project is a light rail project

More information

Villages of Pasadena Hills Financial Plan UPDATED Spring 2012 DRAFT

Villages of Pasadena Hills Financial Plan UPDATED Spring 2012 DRAFT 36 37 38 39 40 41 42 43 44 45 46 Appendix B (Unchanged from January 2009 Adoption) 47 Projects Approved Prior to VOPH Comprehensive Plan Amendment Ashley Groves Chapel Creek Chapel Hill Farmington Hills

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Welcome to the Open House

Welcome to the Open House Leslie Street Between 19 th Avenue and Stouffville Road Addendum to Class Environmental Assessment Study Welcome to the Open House Please sign in at the front desk. March 28, 2017 Richmond Green Sports

More information

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps Public information meeting #4 4 to 7 p.m., September 30, 2009 Hales Corners Welcome Thank you for attending this public information meeting for the WIS 100 Corridor Study. Your interest and comments are

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017 Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017 Purpose of Meeting Why are we here? Project Recap/Updates Project Limits/Segments Road Diet Concept Lessons Learned

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

ADA TRANSITION PLAN 2013

ADA TRANSITION PLAN 2013 ADA TRANSITION PLAN 2013 TABLE OF CONTENTS Contents Introduction 1 Purpose 2 Identified Obstacles to the Public Right of Way 3 Criteria for Determining Impediments at Village Facilities 4 Removing Barriers

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 12 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various bicycle improvements and traffic modifications

More information

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES December 2018 TABLE OF CONTENTS I. Executive Summary 3 II. When Is A Bicycle Pedestrian Transit Assessment (BPTA) Required? 4 III.

More information

NOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS

NOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS Tahoe Transportation District 128 Market Street, Suite 3F Stateline, NV 89449 Phone: (775) 589-5500 www.tahoetransportation.org Federal Highway Administration 650 Capitol Mall, Suite 4-100 Sacramento,

More information

Cincinnati Dayton Rd Widening

Cincinnati Dayton Rd Widening Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge

More information

Committed to Service

Committed to Service Development Services Department Committed to Service TO: FROM: Ada County Highway District Commissioners Mindy Wallace, AICP Planner III COMISSION HEARING: January 27, 2016 SUBJECT: Syringa Valley Specific

More information

December 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1

December 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1 December 15, 2017 City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1 Attention: Mr. Wally Dubyk, C.E.T. Project Manager, Infrastructure Approvals Dear

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

ADA Operations Contact Info

ADA Operations Contact Info Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us

More information

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY SECTION 7 INVEY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY The study corridor includes a total of 19 signalized intersections. Through consultation with Campbell County and the KYTC,

More information

Omaha s Complete Streets Policy

Omaha s Complete Streets Policy Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets

More information

FEASIBILITY STUDY MACARTHUR BOULEVARD

FEASIBILITY STUDY MACARTHUR BOULEVARD FEASIBILITY STUDY MACARTHUR BOULEVARD Wabash Avenue to South Grand Avenue Springfield, IL SANGAMON COUNTY TABLE OF CONTENTS 1.0 DESCRIPTION & PURPOSE AND NEED OF STUDY... 1 2.0 EXISTING CONDITIONS... 2

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY 4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information