South Marston Village Strategy Presentation

Size: px
Start display at page:

Download "South Marston Village Strategy Presentation"

Transcription

1 South Marston Village Strategy Presentation Village Strategy Working Party 16 th March

2 Main Presentation Agenda Purpose Vision & Objectives Context PEST, SWOT Key areas housing, roads, infrastructure Options Summary Questions Next Steps 2

3 Introduction Why this has come about? Swindon/Crown Timber Survey Public meeting Working party 73% (233/318) households responded 90% were happy to rely on Parish Council to pursue a planned approach to development 3

4 Purpose To create and protect a long term Village Community within South Marston To plan the infrastructure for an active and sustainable village community in the context of the development requirements of Swindon To distil the views of 677 villagers into a single plan that will provide a basis for us to engage with the planners and developers 96% of the 73% of village households who responded to last year s survey said it was important South Marston should remain as a separate community. 4

5 Goal and Objective To establish strong majority agreement around the size, shape and structure for the Village over the next 30 years including: Housing Roads Support Services Community facilities 5

6 An ideal recognising It is a wish list Not a fait accomplit Suppositions, ifs & buts Wide spread & experienced input Something around which our Parish Council can then engage with the Borough / Developers etc. 6

7 Hilltops Our Own Unique Perspective Perception How we perceive the world perspectives Values, Position, Tenant / Home Owner / Land owner 7

8 View it from each other s perspective 8

9 Context An extra 35,000 houses to be built around Swindon by 2026 of which: A total of c.12,000 houses to be built South of A420 & to the North of the Village as part of the Eastern Development Area (Source: Regional Spatial Strategy) 9

10 Regional Spatial Strategy 10

11 Impact upon Traffic Sewage Trade Aesthetics Community spirit Youth Development Senior Citizens Local facilities 11

12 Strengths Village Rural Settlement Boundary (The Red Line) Defined Rural Buffer Community involvement Core elements to protect (Church, School, Village Hall, Green) 12

13 Weaknesses Diminishing Community Integration Current size cannot sustain certain key facilities that the village could do with Poorly planned add on developments 13

14 Opportunities Integrated design Tidy up Brown Field Sites Cash for new Village Facilities Become of a size to sustain other facilities without losing identity 14

15 Threats Someone will always be affected by change NIMBY Failure to compromise Inertia, apathy Reduced community involvement / integration Noise & traffic pollution Swindon engulfs the village 15

16 Evolution - Not Revolution 10% % South of A420 development 10% 10% 10% 10% 10% 10% Where We Want to Be 10% South Marston doubles its size 10% Where Now 16

17 Key Areas - options Housing Roads Infrastructure Other 17

18 Housing Fairly wide - spread agreement to the following developments: Crown Timber 69 homes inc 18 flats 75% of survey responses supported development of Crown Timber Site 18

19 N Crown Trading Estate Development c 69 houses 19

20 Public Meeting Attendee Feedback Crown Timber 83/85 = 97.6% said they were comfortable with the development of Crown Timber for housing No one said no, with 1 no view and 1 conditional on quantity 20

21 Housing Fairly wide - spread agreement to the following developments: Crown Timber 69 homes inc 18 flats Thornhill Industrial Park (with area of Green along frontage & around the bend) 180 mixed grade and Purpose housing with affordable stock being majored on 61% of survey responses supported development of Thornhill Industrial Park 21

22 N Crown Trading Estate Development c 69 houses Thornhill Ind Estate Devt c. 180 houses 22

23 Public Meeting Attendee Feedback Thornhill Industrial Estate 76/85 = 89.4% said they were comfortable with the development of Thornhill for housing 7 said No and 2 others said Yes conditional on quantity Total in favour with or without conditions 91.8% 23

24 Housing Fairly wide - spread agreement to the following developments: Crown Timber 69 homes inc 18 flats Thornhill Industrial Park (with area of Green along frontage & around the bend) 180 mixed grade housing with affordable stock being majored on With some openness to understand more about: Manor Farm & the land at the foot of Nightingale Hotel 60 houses If a redeployment of land behind Bell Gardens was secured for recreational purposes it may enhance the vision of the village and open up other opportunities for community facilities 24

25 N Crown Trading Estate Development c 60 houses Dev t Relief Road (2 way) Manor Farm development, less clear as to boundaries Thornhill Ind Estate Devt c. 120 houses 25

26 Public Meeting Attendee Feedback Manor Farm Housing Development 54 / 85 = 63.5% in favour 25 / 85 = 29.4% not in favour 1 / 85 on conditional of quantity 5 / 85 = unsure Overall 64.7% in general favour and up to 70.6% in favour or needing more information as to the detail 26

27 Roads What to do about safety at Pound Corner? What to do about safety at Thornhill Bend & Highworth Road bends? Widely agreed as a significant problem which will become a very major one in the future if we don t act. 94% said something needed to be done around traffic and traffic control 27

28 Road Options Leave as it is Leave as it is but use technology & speed controls By pass Traffic control around Pound Corner, close Pound Corner Block Highworth Road One way system with relief road Combination 28

29 Leave as is Positives Convenience of access to Highworth, local villages and their facilities Emergency services maintain direct access Passing trade not affected and may increase (economic benefit) No cost Incoming services florists/take-aways Bus routes Concerns Escalating traffic from new development within the village Escalating traffic from development south of A420 using it as a thoroughfare to Highworth Escalating traffic from the North through to Sainsburys No solution / escalation of problems at the bends, Pound Corner or speeding traffic down Old Vicarage Lane 29

30 Leave as is & use technology & speed controls Average speed monitors with plate recognition & flashing signs Include 20 mph limits Increase number of pinch points not bumps (Old Vicarage Lane, Thornhill Road) 30

31 Leave as is with technology / speed controls Positives Same benefits as before Greater chance of slowing traffic through all points of the village Possible reduction in incentive to be a rat run Negatives Traffic volumes will still rise - will it be that much of a disincentive relative to traffic build up elsewhere? Associated noise from bumps and pinch points ONLY OF USE IF POLICE WOULD PROSECUTE & CURRENT EXPERIENCE SUGGESTS UNLIKELY 31

32 By-pass 32

33 By-pass with current Highworth Road closed. Not illustrative of the exact points of join & closure N 33

34 By-pass Positives Reduced traffic through bends, heart of village and Pound Corner Removes all through traffic from Keypoint end of Village Reduce traffic down Old Vicarage Lane Concerns Cost (c. 1.82m to 2.15m excluding pavements etc.) Honda & farmer approval required as partly on their land Route through Farmland and thus could lead to further development of land West of Greenfields Becomes an even more attractive high speed route to Highworth. Due to industrial buildings would have to link back up in the middle of the bends, partly defeating the object and creating a new junction / bottleneck. Unless possibility of cut through Honda land and sharing 34 of cost as some mutual benefit of access maybe derived

35 Honda complete by-pass Positives Reduced traffic through bends, heart of village and Pound Corner Removes all through traffic from Keypoint end of Village Reduce traffic down Old Vicarage Lane Discourage traffic from any new development South of A420 Concerns Cost (c. 1.82m to 2.15m excluding pavements etc.) MAYBE REDUCED Honda approval required as partly on their land Route through Farmland and thus could lead to further development of land West of Greenfields Reduced risk if route more directly away from Village Becomes an even more attractive high speed route to Highworth but not necessarily running along the back of the village Due to industrial buildings would have to link back up in the middle of the bends, partly defeating the object and creating a new junction / bottle-kneck. not applicable 35

36 Close Pound Corner, Relief Road & Lights either side of Pound Corner 36

37 N Close Pound Corner Lights Relief Road 37

38 Traffic lights either side of Pound Corner & close Pound Corner (plus relief road) Positives Relatively low cost Leaves Highworth Road open Improves safety enabling pavements installed Reduce traffic around the school Concerns Need a relief road (but potential down the side of Nightingale Hotel to Manor Farm, through to Thornhill road) Council s view of traffic lights in villages (urbanisation) Traffic from new Development South of A420 may reroute from Old Vic Lane through centre of village Thornhill Road (however lights would be a disincentive) Back log of traffic through village & increases pollution Positioning of lights close to houses & entrances for local residents 38

39 Road Options Leave as it is Leave as it is but use technology & speed controls By pass Traffic control around Pound Corner, close Pound Corner with relief road Block Highworth Road One way system with relief road Combination 46% supported the idea of road closure 39

40 Block Highworth Road (with Cycle Path / Access) Positives Cheap to do Reversible Borough Council say possible but with reservations Dramatically reduces through traffic Improved safety at bends & Pound Corner Reduced traffic speeding down Old Vicarage Lane Reclaims centre of the Village for Pedestrians & Cyclists Environment / health / community 40

41 Concerns Block Highworth Road (with Cycle Path / Access) Impact on local businesses (inside & outside) Inconvenience for Villagers needing access to Highworth and beyond (Schools, Medical, Post Office, Supermarine etc.) Create increased traffic on routes outside of the Village Cut off connection with other rural areas and open us up to being considered part of Swindon Emergency services impacted upon Bus / school bus routes Increase potential bottleneck at Gable Cross / Carpenters Arms exits (offset by no Blunsdon / Highworth / Sevenhampton etc. traffic cutting through) 41

42 Block road additional time & distance.. Outward would be To Supermarine To Highworth Mkt. Place Return would be From Supermarine From Highworth Mkt. Place Ave return trip Highworth Currently Would be Increase of Miles 1.2 to to to to % Minutes 2 ½ to 9 7 to 12 ½ 2 ½ to 7 ¼ 7 to ½ 68% Cycle Paths Nearby parking & walk to S- Marine 3 x return trip per week for 40 25p per mile = c 160 p.a.

43 One way & footpath round Pound Corner 43

44 One way & footpath round pound corner 44

45 Two way North of Pound Corner, but must turn Pound Corner coming south One way from Pound Corner up to School Entrance N Two way up to Pound Corner Two way down Old Vicarage Lane from Carpenters until School entrance. Possible one way system on single lane road back into centre of village 45

46 One way system in heart of village Positives Enables a pavement / footpath around Pound Corner Reduces volume of traffic through village one way Concerns A pavement would restrict turning circle for larger vehicles Inconvenience of long journey vs crow flies distance Increases traffic other ways Old Vicarage Lane & back up the centre of the Village 46

47 Road summary By-pass option least likely to be achievable & affordable, could create very high volumes of traffic and other bottle necks. Unless Honda give us a more viable option Lights in village unpopular tail backs, pollution, irritant Closure of Highworth road, easiest to do, most effective and lowest cost but at a certain inconvenience to a reasonable proportion of those within & outside the Village. Only solutions to Pound Corner involve closure or one way system enabling a pavement round one bend Speed calming measures ignored by many whilst unenforceable 47

48 A Road Proposal (see map next slide) IF HONDA BY-PASS OPTION NOT POSSIBLE IF POLICE NOT HAPPY TO ENFORCE TRAFFIC CALMING MEASURES Stage 1 close Highworth Road and see benefits & downsides (Buys time) Then trial one way round Pound Corner if and when relief roads are created Then look at footpath round Pound Corner 48

49 Close Highworth Road further Supermarine turn, with parking bay One way along Vicarage Lane from Pound Corner up School Entrance N Two way North of Pound Corner, but must turn Pound Corner coming south Two way up to Pound Corner Two way down Old Vicarage Lane from Carpenters until School. Two way to this point One way system on single lane road back into centre of village 49

50 Additional road requirements Traffic lights at Gable Cross Roundabout at Carpenters Arms turning onto A420 50

51 Public Meeting Attendee Feedback Q. I would support the closure of the Highworth Road if no viable by-pass option? 33 / 77 said yes = 42.9% 44 / 77 said no = 57.1% (2 non resident) 8 did not respond This is little to no difference from overall village survey last year 51

52 Other Sewage & drainage Pavements / cycle paths Parking Infrastructure 52

53 Public Meeting Attendee Feedback There was unanimous agreement that the Village had traffic problems and there was a concern about the growth in these problems. In certain parts it was a speeding problem, others a volume based issue and others a congestion based problem. Further alternatives proposed for the Parish Council to look into were: One way out of the Village on Highworth Rd going North with sectioned off cycle / footpath for safety & healthy option. Halving the problem, not exacerbating the Gable Cross & Carpenters Arms roundabouts and return trip via alternative route shorter and quicker than other way round Introduce a barrier system on Highworth Road for Villagers & Emergency Services only Re-approaching Police re attitude to enforce speeding fines on traffic tracking / camera systems if brought in 53

54 Sewage & drainage Increasing stress on existing infra-structure Water logging in many areas, e.g. behind Bell Gardens, Manor Cottages & many other areas. Need to review whole drainage system of Village Pumping station is overloaded total review of sewage system required now and definitely with any further development Possibility of creation of lakes and tree planting to absorb moisture to the South and East of the Village Need for an effective surface water drainage strategy 54

55 Footpaths / Cycle Paths Currently inadequate through the village, 90% of responses said they use existing footpaths and bridleways 55

56 Footpath N Gap opposite car park Pound Corner Ash Gardens to Hodinotts Corner Church Ground to Manor Cottages Other 56

57 Public Meeting Attendee Feedback Footpaths / cycle paths One proposed amendment which carried fairly strong favour was not to have a one way traffic route back through the middle of the village from Manor Farm through Bell Gardens, but that this should be part of a cycle / footpath system. 57

58 Parking Inadequate parking for current & future school / village recreational / church demand No parking close to present village hall whilst area in front of it could be made available, it has its uses especially for Tots n Toddlers & children s parties If Village Hall not required for child based activities, a few spaces could be created to serve whatever future function it might have If land behind Bell Gardens was adopted by the Village extending the current car park could be considered 56% of responses said there was a need for more off road parking 58

59 Infrastructure School size Community shop / Post Office Sports Changing Rooms Youth Club, Tots & Toddler Group, Friendly Club etc Village Hall Meeting Rooms Church Sports Hall Village use & school Recreational space (sports field) Hotel & pubs Allotments 80% responses said there should be better facilities for households 59

60 School Potential expansion of pupils from village (reduces availability to outside pupils - may reduce traffic & parking challenges) Lack of space for school gymnasium (therefore link to a Community Centre facility would be useful) School safe for foreseeable future but need to be aware: Local Gov t education strategy Health in school requirements 60

61 Community Shop / Post Office Questionable as to whether existing Village size could sustain, but a Village twice the size may do If other options are available to support the current requirements of the Village Hall, this would be an excellent location This could promote local produce / services / farmers market It could create first job opportunities for young villagers 90% saw a need for a Village shop 61

62 Recreational Facilities Recent changing room/ pavilion project on hold Recreational area currently adequate (although subject to conflicts of use), but would be reduced if any sizeable build on the land and car park extension created Acquisition of land behind Bell Gardens Protect land between The Nightingale Hotel and A420 by considering more Green Infrastructure, Forest, Lake etc. 80% saw recreational and play area as adequate for current needs 62

63 Friendly Club, Youth Club, Tots n Toddlers Important initiatives to develop and strengthen a sense of Community Village Hall too small to support current numbers and future potential demand Possible use of Church if pews were replaced with chairs. Existing facility not used to full potential. Church members open to suggestions. 58% expressed a need for a Community Centre 63

64 Village Hall Important to retain the building Its usage may alter over the years, but the exterior of the building should remain If all its current uses could be moved to the Church or a new multi-functional centre the Village Hall could be used (with Parking) as: A Post Office / Village Store Local Enterprise initiatives A couple of maisonettes sell off or let 64

65 Hotels & pubs Current number fine & expansion positive Village utilisation of the Hotel for meetings, youth club etc. would be good, but couldn t rely upon so felt need to create own facilities Wouldn t want to develop facilities that are in direct conflict i.e. Fully Licensed Bar / Squash / Gym etc. (Complement not conflict) 65

66 Sports Hall / Recreational Centre 79% said there needed to be improved recreational facilities 81% felt better facilities should be available for year olds General feel is to keep this for recreation, rather than over complicate it for more formal functions such as receptions / events Building requirements changing facilities, PE Hall (High Ceiling) 5-a-side size Stage? separate room / storage / access Social area with a self service coffee / soft drinks area (self licence bar capability) 66

67 Village Hall current uses move to New Centre, Church or Hotel Parish Meetings Tots n Toddlers Youth Club Friendly Club Children s Parties Village Charitable / Fund raising events Village Meetings 67

68 Public Meeting Attendee Feedback Q. I support the Recreational Centre idea as suggested? 73 / 85 answered yes = 85.9% 1 / 85 answered no = 1.3% 11 failed to answer Of those who answered 98.6% were in favour However 77% answered Yes to Is this conditional on additional land being available e.g. behind Bell Gardens? 68

69 Majority views seem to favour: Approval to Brown field site housing (possibly Manor Farm if can secure land behind Bell Gardens) Large Recreational facility accommodating a high ceiling hall, changing rooms, social room (self catering bar & vending) for use by school and community Trial closure of Highworth Road (reversible) If / once relief road put in beside the Nightingale Hotel implement one way system & pavement at Pound Corner Extend current car park area if Bell Garden land adopted Protect Village Hall, but be open to alternative viable uses Develop green infrastructure to support drainage and define and protect Parish boundaries (there was a reasonable minority for each) 69

70 Putting it all together 70

71 Close Highworth Road N Extra Parking New recreational facility Lakes to aid drainage New Housing e.g. Tree Planting Allotments 71

72 Public Meeting Attendee Feedback On a scale of 1 to 10 how important do you feel it is to keep the existing Green Field sites green? Not important / should develop 5/84 = 6% Low density housing positively favoured 16/84 = 19% Prefer no housing but at worst accept low density 14/84 = 16.7% Very important no development 18 / 84 = 21.4% Critical no development 31 / 84 = 36.9% 1 didn t respond 75% of those who responded said they were not in favour of Green Field Site development.. 72

73 Next Steps Feedback sheets complete and hand in Results Review & refine presentation Report to Borough Respond to Borough & Local Landowners / Developers as and when approached Keep you informed addresses? Thankyou 73

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

DATE: June 22, General Release SUBMITTED BY: LAND DEVELOPMENT SERVICES. RE: City Centre Survey Results

DATE: June 22, General Release SUBMITTED BY: LAND DEVELOPMENT SERVICES. RE: City Centre Survey Results DATE: June 22, 2018 TO: General Release SUBMITTED BY: LAND DEVELOPMENT SERVICES RE: City Centre Survey Results The following is a summary of preliminary findings for the Community Identity and Vision survey.

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk

More information

Infrastructure Focus Group Report

Infrastructure Focus Group Report Infrastructure Focus Group Report Version history: 1. V1 circulated to Focus Group participants for comment on 5 July 2. V2 with minor amendments and the addition of appendix 1 circulated to Neighbourhood

More information

ENFIELD TOWN THE REVISED DESIGN

ENFIELD TOWN THE REVISED DESIGN TOWN THE REVISED DESIGN We re turning Enfield into a borough that encourages walking and cycling, a place that s easy for all of us to get around however we choose to travel. A greener place, with safer

More information

1.0 Introduction. Long standing options identified in the 2006 South Marston Village Report.

1.0 Introduction. Long standing options identified in the 2006 South Marston Village Report. 1.0 Introduction 1.1 Part One of this study has assessed options to mitigate the impacts of existing issues on the road network in and around South Marston Village. Issues have been identified from site

More information

Summary and Analysis of feedback from the August Bank Holiday Fete 25 August 2014

Summary and Analysis of feedback from the August Bank Holiday Fete 25 August 2014 Summary and Analysis of feedback from the August Bank Holiday Fete 25 August 2014 Housing and Design Record of Comments from fete School Age Group : No Comments 18 30 Age Group : No Comments 30 60 Age

More information

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND COUNCIL POLICY NAME: COUNCIL ADVISORY COMMITTEES - TERMS OF REFERENCE ISSUED: APRIL 3, 2006 AMENDED: NOVEMBER 27, 2006 NOVEMBER 23, 2009 JANUARY 11, 2010 DECEMBER 17, 2012 POLICY COUNCIL REFERENCE: 06/119

More information

Rural Economy and Connectivity Committee. Restricted Roads (20mph Speed Limit) (Scotland) Bill: Key Themes Arising from the Online Survey

Rural Economy and Connectivity Committee. Restricted Roads (20mph Speed Limit) (Scotland) Bill: Key Themes Arising from the Online Survey Rural Economy and Connectivity Committee Restricted Roads (20mph Speed Limit) (Scotland) Bill: Key Themes Arising from the Online Survey Introduction On Friday 9 November 2018, the Rural Economy and Connectivity

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

Annex 5: Justification Schedule

Annex 5: Justification Schedule SOUTH MARSTON VILLAGE NEIGHBOURHOOD PLAN 2026 Annex 5: Justification Schedule (to be read alongside the submission draft of the Plan) There are three types of evidence offered in support of each Neighbourhood

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

Warfield Neighbourhood Plan: 4.4 Infrastructure

Warfield Neighbourhood Plan: 4.4 Infrastructure Warfield Neighbourhood Plan: 4.4 Infrastructure Previously decided Policy headings: Policy WNP16 Transport Impact of Development Policy WNP17 Transport Proposals Policy WNP18 New School Buildings Policy

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey: Old Strathcona s neighbourhood renewal process is now at the draft concept design phase. Over the last several months, the city has been gathering local knowledge and resident input that has been used

More information

September HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL

September HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL September 2017 HAWKHURST PARISH COUNCIL Page 1 of 13 SPORTS STRATEGY FINAL Table of Contents EXECUTIVE SUMMARY 3 1. INTRODUCTION 4 2. LOCAL CONTEXT 5 3. OBJECTIVES 7 4. PRIORITIES 8 5. FUNDING OPTIONS

More information

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

Travel Planning WC & NWCD Cycling Group. Thursday 2 nd July Amanda Holden

Travel Planning WC & NWCD Cycling Group. Thursday 2 nd July Amanda Holden Travel Planning WC & NWCD Cycling Group Thursday 2 nd July Amanda Holden 1 Today s workshop What is Travel Planning? University Travel Plan NWCD Travel Plan Targets Cycling Initiatives Other Travel Plan

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group Guide to the Cycle Enfield Public Consultation on Enfield Town Produced by the Save Our Enfield Town Campaign Group What s in this guide? Introduction Page 3 What Enfield Council says about Option 1 Page

More information

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of

More information

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013 Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along

More information

PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP

PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP SUMMARY OF FINDINGS AND PRIORITIES PARKING There was a high level of response to this topic which included many aspirations to provide car parking near to

More information

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS

More information

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas GLEN EIRA CITY COUNCIL MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas 1 WHAT HAVE WE HEARD? WHAT NOW? Stage one Tell us what you love about your shopping strip November

More information

Green Streets and Urban Greenways

Green Streets and Urban Greenways 127 11 Green Streets and Urban Greenways 11. Green Streets and Urban Greenways 128 11 Green Streets and Urban Greenways Once the traffic-free section of a route has come to an end, then comes the remaining

More information

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

CITY OF SAINT JOHN TRAFFIC CALMING POLICY CITY OF SAINT JOHN TRAFFIC CALMING POLICY VERSION: 1.0 April 10, 2012 Pedestrians, Cyclists and Motorists Sharing Street Spaces CONTENTS INTRODUCTION... 3 POLICY GOAL... 3 POLICY OBJECTIVES... 3 GUIDING

More information

FUTUREDMS 2018 CONSULTATION REPORT

FUTUREDMS 2018 CONSULTATION REPORT FUTUREDMS 2018 CONSULTATION REPORT Rev 1 17/08/2018 Sharing ideas of how to make amazing spaces and facilities better through the passion of talented people working together This document presents the

More information

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith

More information

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction

More information

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland Walking and Cycling Action Plan Summary A Catalyst for Change The Regional Transport Strategy for the west of Scotland 2007-2021 Strathclyde Partnership for Transport Contents Purpose...2 Issues, Constraints

More information

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive Byron Avenue Traffic Calming Design Sherbourne Road to Island Park Drive Public Meeting Thursday June 16, 2016 Our Lady of Fatima Parish 153 Woodroffe Avenue 6 9pm 1 Project Summary Area Projects Background

More information

MARKHOUSE ROAD IMPROVEMENTS

MARKHOUSE ROAD IMPROVEMENTS MARKHOUSE ROAD IMPROVEMENTS www.enjoywalthamforest.co.uk Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of 27million from Transport for London, we re delivering the

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents

More information

Your views are important. Please fill in a form before you leave. Or alternatively

Your views are important. Please fill in a form before you leave. Or alternatively Drum Property Group is delighted to welcome you to this exhibition which sets out our initial proposals for a mixed-use development at Stead s Place, Edinburgh. We are keen to hear the views of local people

More information

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign E4 Cycle Route Exeter University to Redhayes Bridge - Recommendations from Exeter Cycling Campaign 1.0 Introduction Exeter Cycling Campaign has prepared this report to provide recommendations for Devon

More information

Martlesham Heath: January 23 rd 2014

Martlesham Heath: January 23 rd 2014 Public meetings - Roads & Transport responses Three public meeting were held in which members of the public were invited to give their views. This document contains the comments received. For each meeting

More information

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use Footpath design A guide to creating footpaths that are safe, comfortable, and easy to use November 2013 Contents Introduction / 1 Zoning system / 2 Width / 4 Height / 5 Surface / 5 Footpath elements /

More information

Bristol City Council has produced a draft Bristol Transport Strategy document.

Bristol City Council has produced a draft Bristol Transport Strategy document. Bristol Transport Strategy Summary Document Introduction Bristol City Council has produced a draft Bristol Transport Strategy document. The Strategy fills a gap in transport policy for Bristol. We have

More information

M6 Junction 10 Public Consultation

M6 Junction 10 Public Consultation M6 Junction 10 Public Consultation December 2015 Introduction Walsall Council and Highways England are developing plans to provide a long term improvement to M6 junction 10. We are holding this non-statutory

More information

CUERDEN TRANSPORT PROPOSALS

CUERDEN TRANSPORT PROPOSALS 1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This

More information

Improving Thetford Cycling Provision. In and Around Thetford

Improving Thetford Cycling Provision. In and Around Thetford Improving Cycling Provision In and Around Thetford Presentation to Thetford Town Council July 2015 About Me Lecturer in Mathematics at the University of East Anglia Keen recreational cyclist Volunteer

More information

Welcome! Public Open House on UBC s Transportation Plan

Welcome! Public Open House on UBC s Transportation Plan 1 Welcome! Public Open House on UBC s Transportation Plan Public open house hours: to When it comes to on-campus transportation, what do you think is working well and what are some opportunities for improvement?

More information

Design Workshops Summary of all Feedback January 2017

Design Workshops Summary of all Feedback January 2017 Histon Road Corridor Design Workshops Summary of all Feedback January 2017 CITY DEAL AND GROWTH Commitment to Growth: Government, County, City and District Emerging Local Plans: 33,000 new homes 45,000

More information

Frome Street Bicycle Route

Frome Street Bicycle Route The Adelaide City Council invites engagement from the community about Frome Street Bicycle Route Project Summary Adelaide City Council is seeking feedback on design options to construct bicycle facilities

More information

Easton Safer Streets - Final Project Report BRISTOL

Easton Safer Streets - Final Project Report BRISTOL - Final Project Report BRISTOL A Sustrans Community Street Design Project in partnership with Bristol City Council February 07 About Sustrans Sustrans makes smarter travel choices possible, desirable and

More information

FONTMELL MAGNA. Village Traffic Management Scheme (TMS) Presented to and adopted by Fontmell Magna PC September 2014

FONTMELL MAGNA. Village Traffic Management Scheme (TMS) Presented to and adopted by Fontmell Magna PC September 2014 FONTMELL MAGNA Village Traffic Management Scheme (TMS) Presented to and adopted by Fontmell Magna PC September 2014 Why do we need a Village Traffic Management Scheme? 1. Because of the impact the A350

More information

DRAFT for a State Policy for Healthy Spaces and Places

DRAFT for a State Policy for Healthy Spaces and Places DRAFT for a State Policy for Healthy Spaces and Places 1 DRAFT State Policy for Healthy spaces and Places 1. Purpose To encourage the use and development of land that builds healthy communities through

More information

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2 Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2: Policies and Actions The Bicycle Master Plan provides a road map for making bicycling in Bellingham a viable transportation

More information

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS. CHURCH ROAD Public consultation document YOUR TELL US VIEWS www.enjoywalthamforest.co.uk CHURCH ROAD Introduction Waltham Forest Council was one of three boroughs to be awarded 27million of funding from

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

CHAPTER 3: Vision Statement and Goals

CHAPTER 3: Vision Statement and Goals Davidson Walks & Rolls: Active Transportation Master Plan CHAPTER 3 Contents: Overview Vision Statement Measurable Goals Public Outreach CHAPTER 3: Vision Statement and Goals Overview The vision statement

More information

Eastern PA Trail Summit October 1, 2018

Eastern PA Trail Summit October 1, 2018 Eastern PA Trail Summit October 1, 2018 WHO WE ARE + WHY + WE RE * HERE * * * * * * Session Goals: Discuss how to coordinate planning and design in small, urbanized towns Consider how to develop alternative

More information

20mph Speed Limit Trial Warrington Borough Council. Mark Tune Traffic Management & Road Safety Manager

20mph Speed Limit Trial Warrington Borough Council. Mark Tune Traffic Management & Road Safety Manager 20mph Speed Limit Trial Warrington Borough Council Mark Tune Traffic Management & Road Safety Manager Benefits of reduced speed Reduced number and severity of accidents More cycle friendly environment

More information

The boards contain our dra Vision & Objec ves for Danbury.

The boards contain our dra Vision & Objec ves for Danbury. Welcome Thank you for visi ng today The boards contain our dra Vision & Objec ves for Danbury. We are also displaying a map of Danbury showing the sites that have been put forward to build the 100 new

More information

ADOPTED BISHOPS LYDEARD & COTHELSTONE PARISH COUNCIL

ADOPTED BISHOPS LYDEARD & COTHELSTONE PARISH COUNCIL ADOPTED BISHOPS LYDEARD & COTHELSTONE PARISH COUNCIL Clerk to the Council: Mrs M Rousseau, West View, West Bagborough, TA4 3EG Phone: 01823 432 658 Email: clerk@bishopslydeard.org http://www.bishopslydeard.org.uk/

More information

Broad Street Bicycle Boulevard City Council Study Session Summary

Broad Street Bicycle Boulevard City Council Study Session Summary Broad Street Bicycle Boulevard City Council Study Session Summary Overview: On August 15 th, 2017, a City Council Study Session was held to invite community input and request City Council guidance on a

More information

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines I. Purpose: The City of Elizabeth City is committed to ensure the overall safety and livability of residential neighborhoods. One

More information

Infrastructure Policies

Infrastructure Policies Infrastructure Policies 1. Primary Healthcare Health facilities in Ashtead comprise, Ashtead Private Hospital, two GP surgeries at Gilbert House and St Stephens, two Dental practices, the Arch and Tudor

More information

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Kelowna On the Move. Pedestrian and Bicycle Master Plan Kelowna On the Move Pedestrian and Bicycle Master Plan Executive Summary April 2016 Purpose of the Plan The Pedestrian and Bicycle Master Plan identifies infrastructure, planning, and policy requirements

More information

High Street, Pulloxhill Consider Representations to Proposed Waiting Restrictions

High Street, Pulloxhill Consider Representations to Proposed Waiting Restrictions Meeting: Delegated Decisions by the Executive Member for Community Services on Traffic Regulation Orders Date: 4 February 2016 Subject: High Street, Pulloxhill Consider Representations to Proposed Waiting

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods N D. Focus Area II Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods Transit Road Focus Area II is located in the Hamlet

More information

Active Travel Strategy Dumfries and Galloway

Active Travel Strategy Dumfries and Galloway Active Travel Strategy Dumfries and Galloway Our Active Travel Strategy The agreed Interventions for Dumfries and Galloway Council s Local Transport Strategy includes an action to Develop an Active Travel

More information

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION Title: Prepared by: A9 Dualling Project: Dalraddy to Slochd Murray Ferguson, Director of Planning and Rural Development and Gavin Miles, Head of Planning

More information

FAQ s Walsh Road / Ferguson Road Pilot Scheme

FAQ s Walsh Road / Ferguson Road Pilot Scheme FAQ s Walsh Road / Ferguson Road Pilot Scheme What is happening? Traffic calming measures are being installed as a pilot. Temporary Bollards will be installed to the east of 1 Ferguson Road and a Temporary

More information

Road Safety in Radyr and Morganstown: the Community Council's response to Cardiff Council's draft scheme layout for highway improvements

Road Safety in Radyr and Morganstown: the Community Council's response to Cardiff Council's draft scheme layout for highway improvements Road Safety in Radyr and Morganstown: the Community Council's response to Cardiff Council's draft scheme layout for highway improvements Introduction Radyr and Morganstown Community Council has been invited

More information

Bike share success factors

Bike share success factors Bike share success factors A guide to the types of locations where bike share can flourish January 2016 Bike share success factors A guide to the types of locations where bike share can flourish and how

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE Have your say on proposals for a new public transport link and Park & Ride facility

More information

WANBOROUGH PARISH COUNCIL

WANBOROUGH PARISH COUNCIL 1 WANBOROUGH PARISH COUNCIL Minutes of the meeting of Wanborough Parish Council held on 18 th December 2017 in Wanborough Village Hall, High Street, Wanborough at 19.30. PRESENT: Mr C Offer (Chairman),

More information

WALK Friendly Communities: Creating Vibrant, Inclusive Places for People

WALK Friendly Communities: Creating Vibrant, Inclusive Places for People WALK Friendly Communities: Creating Vibrant, Inclusive Places for People Walkers are the indicator species for vibrant communities ~ Dr. Rodney Tolley, Director, Walk21 Imagine yourself walking safely

More information

Franklin Parking Analysis

Franklin Parking Analysis Franklin Parking Analysis Report Prepared for: The Town of Franklin, North Carolina Report prepared by: 525 N. Main Street Waynesville, NC 28786 Town of Franklin Parking Study J.M. Teague Engineering 1

More information

Bramshaw traffic calming proposal

Bramshaw traffic calming proposal - 1 - Bramshaw traffic calming proposal Initial options appraisal report July 2017 - 2-1. Project background Hampshire Country Council has commissioned Test Valley Borough Council to carry out an option

More information

EXECUTIVE SUMMARY. Vision

EXECUTIVE SUMMARY. Vision Vision Walking and bicycling in Salt Lake City will be safe, convenient, comfortable, and viable transportation options that connect people to places, foster recreational and economic development opportunities,

More information

Reflections on our learning: active travel, transport and inequalities

Reflections on our learning: active travel, transport and inequalities Reflections on our learning: active travel, transport and inequalities Jill Muirie Glasgow Centre for Population Health Active travel definition Active travel refers to walking, cycling or using some other

More information

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

sessions. The opinions of local people will help decide which of these two options is taken forward to be built. A4018 FAQs Why are no bus lanes proposed north of Crow Lane? Inbound and outbound bus lanes were considered north of the Crow Lane junction, but they took away capacity from other traffic on the approach

More information

HISTON ROAD Have your say on better public transport, cycling and walking journeys

HISTON ROAD Have your say on better public transport, cycling and walking journeys HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation

More information

Section 2 Strategic Alignment. Contents

Section 2 Strategic Alignment. Contents Section 2 Strategic Alignment Contents 2 Strategic Alignment... 2 2.1 General... 2 2.2 SmartGrowth Strategy and Implementation Plan... 2 2.3 Walking and Cycling Strategy... 3 2.4 Built Environment Strategy...

More information

Our journey a 20 year Transport Manifesto for the North East

Our journey a 20 year Transport Manifesto for the North East Our journey a 20 year Transport Manifesto for the North East Sustrans submission to North East Combined Authority (NECA). March 2016 Summary Sustrans is a leading UK charity enabling people to travel by

More information

Sherwood Drive Traffic Circle

Sherwood Drive Traffic Circle Strathcona County Sherwood Drive Traffic Circle Online Survey Results April 7, 215 I. Executive Summary The Sherwood Drive Traffic Circle Survey was administered in March 215. In total, 2,263 residents

More information

Offaly Local Authorities Traffic Calming Policy April 2016

Offaly Local Authorities Traffic Calming Policy April 2016 Offaly Local Authorities Traffic Calming Policy April 2016 Charlie McCarthy, Senior Engineer, Roads and Infrastructure, Offaly County Council, Aras An Chontae, Charleville Road, Tullamore, Co. Offaly.

More information

ON-STREET PARKING IN THE HIGHCLIFFE HIGH STREET. M Mawbey

ON-STREET PARKING IN THE HIGHCLIFFE HIGH STREET. M Mawbey ON-STREET PARKING IN THE HIGHCLIFFE HIGH STREET M Mawbey 1. INTRODUCTION 1.1 The rate of the flow of eastbound traffic into the High Street is controlled to a certain extent by a pedestrian crossing. Westbound

More information

Question 18 Other issues:

Question 18 Other issues: Question 18 Other issues: Are there any other local planning issues or anything else that you think the plan should tackle? We are unique in MK. Keep it that way. Morning and evening traffic so bad Plan

More information

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT One Size Doesn t Fit All S Corbett, C Chenery Page 1 ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT Authors/Presenters: Sam Corbett, Principal Transport

More information

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN Page 1 of 6 Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN Dear Mr Hassan 14th September 2015 Re: Development of Bus & Coach Station Site Following the submission

More information

Low traffic neighbourhoods

Low traffic neighbourhoods Low traffic neighbourhoods PHOTO: ELAINE KRAMER What, why, how? What low traffic neighbourhoods are, why you should be considering them in your borough and how to make sure they work well the five minute

More information

BYRES ROAD: PUBLIC REALM Public Consultation

BYRES ROAD: PUBLIC REALM Public Consultation Public Consultation Introduction As a vibrant commercial, shopping and residential location within the heart of the West End Byres Road is an important destination. Its proximity to the University of Glasgow

More information

City of Toronto Complete Streets Guidelines

City of Toronto Complete Streets Guidelines Round One This is a summary of the Complete Streets Guidelines Survey posted on June 18 th, 2015 and live until July 2 nd, 2015. The survey was designed to solicit feedback on the draft Complete Streets

More information

complete streets design and construction standards public primer City of Edmonton

complete streets design and construction standards public primer City of Edmonton complete streets design and construction standards public primer City of Edmonton introduction Complete Streets are streets for everyone: people who walk, wheel, bike, take transit, or drive. They are

More information

London Cycle Network Annual Report 2000

London Cycle Network Annual Report 2000 London Cycle Network Annual Report 2000 A cycle network for London by 2005 A cycle network for London by 2005 The London Cycle Network will: provide local links between residential neighbourhoods, railway

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

Draft Traffic Calming Policy Paper

Draft Traffic Calming Policy Paper Draft Traffic Calming Policy Paper What is Traffic Calming The term traffic calming is defined differently throughout the United States. The Institute of Transportation Engineers, an international educational

More information

Sevenways Roundabout, and the need for a Road Safety Scheme:

Sevenways Roundabout, and the need for a Road Safety Scheme: Sevenways Roundabout, and the need for a Road Safety Scheme: The way the current roundabout has evolved has obviously created an environment that is dangerous for all road users, motorists, cyclists and

More information

Local Government Road Safety Summit - 9 April 2018

Local Government Road Safety Summit - 9 April 2018 Local Government Road Safety Summit - 9 April 2018 Report on outcomes The Associate Minister of Transport, Hon Julie Anne Genter held the Local Government Road Safety Summit in Wellington on 9 April 2018.

More information