Establishment of Traffic Signal Policies and Procedures for Adoption on Saskatchewan s Highway Network

Size: px
Start display at page:

Download "Establishment of Traffic Signal Policies and Procedures for Adoption on Saskatchewan s Highway Network"

Transcription

1 Establishment of Traffic Signal Policies and Procedures for Adoption on Saskatchewan s Highway Network Paul H. A. Steel, M. Eng., P.Eng., Tetra Tech Canada Jeffrey Holland, P.Eng., Saskatchewan Ministry of Highways and Infrastructure Paper prepared for presentation at the Improving Road Safety in Rural Areas Session of the 2017 Conference of the Transportation Association of Canada St. Johns, Newfoundland and Labrador 1

2 ABSTRACT The Saskatchewan Ministry of Highways and Infrastructure (the Ministry) completed a study in 2015 to expand their compliment of safety countermeasures along medium to high volume corridors and intersections. The report recommended to only consider the implementation of traffic signals where certain operational and safety conditions were met. The Ministry has not traditionally used signals at isolated, high speed rural intersection as a safety countermeasure because of the risk that collision severity will increase, in addition to compromising the intended mobility of these free-flowing major highway systems. Within this context, the Ministry retained Tetra Tech to assist in the development of policies and procedures for signal adoption. The policies will guide the Ministry to determine whether traffic conditions are/are not favourable to support signal implementation at locations under review. Policy statements were developed from current industry practices and from other jurisdictions guidelines and policy documents. A total of 13 statements were recommended to address: conditions where traffic signals could be considered, conditions where they may not be appropriate and other policy decision items. The current procedures adopted by the Ministry date back to 1989, and followed closely to the Transportation Association of Canada (TAC) guidelines of that time. As part of this latest initiative, Tetra Tech reviewed the current TAC procedures as well as other industry practices to confirm the approach that should be adopted that represents the Saskatchewan context. The recommendation for the Ministry was to adopt a hybrid of approaches used in North America jurisdictions that address the following: Achieving a minimum traffic volume for various time periods (eight-hour, four-hour and peak-hour volumes); Meeting a specific collision experience threshold that demonstrates under certain conditions, installing signals can benefit an intersection by reducing collisions of a high severity and type sufficiently to offset the increase in similar/lower severity collisions; Coordinated signal system to address adequate progression of vehicles along the main corridor; and Demonstrated improvement in the level of service and delay. This paper will present a summary of current industry practices, to discuss the establishment of policies and preferred warrants for adoption by the Ministry, as well as to provide the findings of a calibration check that applied the recommended policy statements and warrant procedures on four candidate intersections. 2

3 INTRODUCTION The Saskatchewan Ministry of Highways and Infrastructure completed a study in February 2015 titled Safety Countermeasures for Saskatchewan Highways for the purpose of expanding their compliment of safety countermeasures along medium to high volume corridors, and intersections. As part of this study, a review of current industry practices was completed to confirm the effect that installing traffic signals could have on the safety performance of an intersection. With respect to considering the installation of traffic signals to address safety issues, the report recommended that the Ministry only consider such, when the following operational and safety conditions apply: The Canadian Traffic Signal Matrix Warrant Procedure (TAC, 2007) is met; The National Cooperative Highway Research Program (NCHRP) collision experience warrant is met; Traffic analysis confirms a significant reduction in delay for traffic on the minor road; and Other countermeasures including roundabouts have been deemed inappropriate for the context. According to this 2015 study, traffic signals are not currently used at isolated, high speed rural intersections. There are some corridors within urban communities that are or have been under the Ministry s jurisdiction, most noticeably on the TransCanada Highway (Victoria Avenue) in Regina and Highway 7 in Kindersley, which were installed and operated by the municipality. In addition, this report states that Saskatchewan has no rural traffic signals or roundabouts and the Ministry has not traditionally used traffic signals as a safety countermeasure because of the risk that collision severity will increase, in addition to compromising the economic benefit of free-flowing major highway systems. Allway stop control is occasionally used at rural provincial highway junctions, but never where one of the highways is a four-lane divided facility. This study also discussed the existing conditions experienced in the province regarding suburban (or satellite) communities that surround Saskatchewan s largest cities (most noticeably Regina and Saskatoon), where development, traffic and population growth have led to increased pressures placed on the highway system. In areas with such pressures, the Ministry has received requests to consider traffic signal installation to better manage gaps in the traffic stream for minor road approaches. Up until recently, the Ministry was reluctant to install traffic signals at isolated, high speed rural intersections due to many safety concerns with respect to an over-representation of certain types of higher severity collisions, specifically right angle and rear ends. With the recommendation for the Ministry to consider traffic signals under certain operational and safety conditions, the Ministry commissioned a review of other jurisdictional practices and current industry standards specific to the use of traffic signals on their high speed rural highway network that would update current policies and practices within the province. CURRENT POLICIES AND STANDARDS The current policy administered on provincial highways was developed in 1989 and is included under Section 2500 of the Ministry s Design Manual 2. The policy defines the warranting conditions that must be met to consider installing traffic signals on the highway network within the jurisdiction of the Ministry. The warrants follow the procedures contained in the Manual of Uniform Traffic Control Devices for Canada (MUTCDC) with some localization to better suit Saskatchewan conditions. At the time the policy was developed, all data interpretation and warrant evaluation was completed by department district staff with approvals being obtained through the former Design and Traffic Safety Branch. Joint reviews of signal requirements were completed with municipal staff for highway routes through urban centres. The review 3

4 and approval process required that a completed warrant evaluation worksheet for each intersection under review be submitted that followed the procedures outlined in the MUTCDC methodology (prior to it being revised in 2007 with the introduction of the TAC Traffic Signal Warrant Spreadsheet). The sample worksheet is provided as Figure 1. Figure 1: Evaluation Work Sheet 4

5 The warrant procedure effectively assigned priority points based on several factors: The relative effect from which the installation of a traffic signal is expected to have on the existing safety performance of the intersection (i.e., its ability to improve the traffic safety and reduce certain types of collisions). The net effect that signals would have on the availability of crossing gaps at the intersection and downstream, the progression of vehicles as influenced by signals, the expected delay and the number of stops introduced by signals. The application of expansion factors that capture a subjective judgment on the probable increase in traffic volume at the subject intersection due to the introduction of signals (perceived improvement to the network attracts more vehicle trips than it otherwise would have). The average vehicular and pedestrian volumes recorded during the peak period counts. The increased safety, capacity and mobility due to a reduction in the number of conflict points for one-way streets compared to two-way operations, where applicable. The probable randomness of vehicles arriving at the subject intersection where upstream signals are as close as 450m, the effects of out-of-phase vehicular volumes reducing otherwise available crossing gaps between platoons for one-way streets, and the degree of difficulty experienced by vehicles and pedestrians caused by gap interruptions. The localization of the national standards to better suit Saskatchewan s conditions appears to be reflected in average vehicular volumes with the TAC procedure considering the average volume divided by 1,000 to assist in determining priority points for Parts II and III (refer to Figure 1), whereas this is reduced to 400 in Design Manual 2. An overall score is developed by summing the priority points received by each of the factors noted above. The policy and procedures outlined in Design Manual 2 are silent on the number of priority points required to confirm that the warrant for traffic signals is met. Therefore, it is assumed that the Ministry relied on the conditions stated in the MUTCDC methodology to determine when the warrant was met or not (i.e., equal to or exceeding 100 priority points). OTHER NORTH AMERICAN JURISDICTIONAL PRACTICES Establishing traffic control consistency and expectations enhances safety on a transportation network. Therefore reaching out to other jurisdictions to understand their practices and procedures is an important step in the overall development of policies and warrants. Other North American jurisdictions viewed as having comparable road environments as well as being neighbouring provinces and states were polled as part of updating and revising Saskatchewan s practices. From the review of current policy documents and warrant procedures applied in Saskatchewan and other jurisdictions, and through supplemental information gathered as part of a jurisdictional scan, a summary of parameters or elements applied to traffic signal warrants is presented in Figure 2. These parameters dictate the warranting conditions that suggest traffic signal installation may benefit the operation and/or safety of road users. They form the basis of the criteria, parameters or elements that have been included in the development or adoption of the warrant procedures and policies for consideration by the Ministry. 5

6 Criteria Parameters SK BC AB MB ON TAC FHWA Minimum Traffic Volume Delay Safety Analysis Traffic Operation Intersection and Roadway Configuration Minimum Eight Hour Vehicle Volume X X Minimum Six Hour Vehicle Volume X X X Minimum Four Hour Vehicle Volume X X Peak Hour Volume X X X Combination Warrant X X Projected Volumes X X Population X Delay to Cross Traffic X X X X Peak Hour Delay X X X X Analytical Safety Analysis and Prediction X X X X Collision Experience X Pedestrian Volume X School Crossing X X X Interruption of Continuous Traffic X X X Progressive Movement X X Platoon Adjustment Factor X X X X Intersection Spacing X X Intersection Near a Grade Crossing X X X X System Warrant X X X Posted Speed Intersection Configuration X X X Lane Configuration X Traffic Composition X X X Figure 2: Summary of Jurisdictions Traffic Signal Parameters Observations regarding the application of warrant procedures for traffic signal installation include: Most of the authorities use minimum traffic volume criteria with variations between their application and thresholds considered. Calculation of vehicle delays are based solely on traffic volumes; delay at a subject intersection would perhaps be better quantified through traffic analysis to understand the magnitude of delay encountered and the possible improvements that signals may offer given specific site context data and information. As a starting point, the revisions to the crash experience warrant proposed in the NCHRP 204 report should be adopted (refer to the next Section of this paper). For additional safety analysis, the InSAT tool developed as part of the crash experience warrant (NCHRP 204) can be used to quantify the expected safety benefits of considering intersection improvements including traffic signal installation as well as other measures in an urban, suburban, or rural areas. A similar application has been developed and documented in the Ontario Traffic Manual (OTM book 12) for safety analysis of intersection improvement options. Three of the four Canadian jurisdictions reviewed (excluding Alberta) have developed policies specific to the implementation of traffic signals, with Alberta defaulting to the current TAC standards in lieu of any formal policy statements. Only British Columbia and Alberta have formally developed policies regarding the use of roundabouts, with both adopting a roundabout first policy. It is understood that jurisdictions in the United States apply the procedures outlined in the Federal Highways Administration s (FHWA) MUTCD for determining traffic signal warrants, with various jurisdictions implementing alternative traffic control measures where possible instead of signals. 6 TAC Guidelines TAC Guidelines

7 Each of the procedures currently in use today include parameters from each of the main warranting criteria with exception of delay (in terms of seconds/vehicle). Both British Columbia and Ontario have adapted their warranting procedures to include a component that specifically addresses delay, whether from a strict application of the magnitude of traffic volumes (Ontario) or expressed in terms of delay per vehicle-hours combined with traffic volume thresholds (British Columbia). The previous TAC procedure prior to the 2007 update, which is still considered by the Ministry in their latest design guide, accounted for delay as a component of the net effect that signals would have on the availability of crossing gaps at the intersection and downstream, the progression of vehicles, the expected delay and the number of stops introduced. As noted in the Ministry s review of safety countermeasures, delay should be considered as part of determining the need for a traffic signal at a subject intersection and not necessarily just to confirm the warrant. The remaining four criteria are all captured in varying ways by the procedures, and as such, require different parameters as part of warranting traffic signals. The intent of this review summary is not to imply that all parameters have to be addressed in one way or another when determining the appropriate procedures for adoption by the Ministry, but rather to identify any gaps amongst the varying procedures, such as delay, that should be considered as part of establishing policies and warranting procedures for use by the Ministry to improve upon current practices. In fact, as part of determining which parameters should be adopted, it may be possible that some of these parameters such as school crossing are not included at this time since there are very few occurrences of schools being located in areas where the Ministry is the road authority. However, the Ministry can reference TAC s current guidelines such as the Pedestrian Crossing Control Guide (published in 2012) if asked to address such an issue. NCHRP Web-Only Document 204 The National Cooperative Highway Research Program web-only report 204, Crash Experience Warrant for Traffic Signals was published in This report found that there is a threshold value of observed crashes beyond which signal installation is likely to improve safety. However, the threshold value was found to vary by area type, the number of intersection legs and the number of lanes on each intersection approach. The current methodology adopted by the FHWA includes a warrant that captures collision experience with the warrant met when five or more reported collisions of types susceptible to correction by traffic signals have occurred within a 12 month period (similar to BC s current warrant). The current warrant practice adopted in Ontario includes a similar procedure; however, the Ministry of Transportation Ontario (MTO) has also developed a more robust methodology that seeks to quantify expected safety benefits should a traffic signal be installed. The research completed by the NCHRP seeks, in a similar vain to MTO, to establish a more robust warrant requirement that addresses an apparent contradiction within the engineering community: many jurisdictions now state in their best practices that alternate options to traffic signal installation be considered prior to implementing signals with others reducing the warrant threshold (priority point scoring), which increases the likelihood of signals being warranted. NCHRP s research recommends that the proposed collision experience warrant be adopted in the next edition of the MUTCD and revise the approach to consider installing signals should a one year collision history or a three year collision history demonstrate that signals will in fact improve, not deteriorate, the safety performance of the subject intersection. The following points present a summary of the intersection safety analysis tool (InSAT) developed as part of this research to establish a methodology to address traffic signal crashes and expected safety performance: 7

8 InSAT can be used to predict the potential crash numbers for an intersection even if the crash data is not available. If the crash data is available, then the tool will be able to compare the crash data before and after the intersection is signalized. InSAT was specifically developed to support the evaluation of a change in traffic control (e.g., conversion from stop to signal control) at a subject intersection. However, it can also be used to evaluate the safety effect of alternative geometric design elements and traffic control features. InSAT is intended to be used to evaluate intersection safety. The intersection can be located in an urban, suburban, or rural area. The default coefficients for the predictive models used in InSAT are taken from the Highway Safety Manual. They limit InSAT to specific combinations of intersection legs and major road lanes, and for intersections where the roads serve two-way traffic. InSAT can be used to evaluate the safety effect of installing or removing a traffic control signal. InSAT can accommodate a crash period that is one to five years in duration (consecutive years for which observed crash data are available). The Empirical Bayes (EB) Method is used as the basis for combining the model prediction and the observed crash data. Through the establishment of this tool, the expected intersection performance can be quantified prior to making any proposed changes. The output of the work completed to develop this analysis tool are published as tables that define the threshold values of observed crashes beyond which signal installation is likely to improve safety. Beyond these outputs for traffic signal thresholds, this tool can be used for other applications where a quantified safety benefit can be expected. For ease of adoption, the focus is on the application of the published tables that define an expectation of when traffic signal installation can be beneficial to improving intersection safety. Table 1 indicates the conditions considered in the establishment of the revised collision experience warrant as derived from the InSAT tool. These conditions provide an indication of the locations that may be suitable candidates for the installation of signals, and not just in meeting collision history requirements. Table 1: Candidate Elements for the Proposed Crash Experience Warrant Element Control Types Area Type Time Period for Crash History Crash Severity Categories Crash Type Categories Conditions Two-way Stop Control Converted to Signal Control Urban and Rural 1 Year, 3 Years All Severities, Fatal and Injury All Types, Angle Intersection Legs 3, 4 Major Road AADT Range: Based on Volumes in FHWA MUTCD Warrants 1 and 7 Minor Road AADT Range: Based on Volumes in FHWA MUTCD Warrants 1 and 7 From this list of candidate elements, four crash warrant tables were produced that indicated favourable situations where traffic signals might be considered for the collision history observed. However, only two 8

9 of these tables were recommended for adoption in the next edition of the MUTCD procedures. Those that addressed all collision types were not carried forward. In establishing the recommended warrant procedures, it was determined that the crash severity category focus on fatal and injury collisions rather than including property-damage only (PDO) collisions as well. The reason cited was with respect to these types of collisions not being reliably or consistently reported in some jurisdictions [i.e., variations in the threshold limit (dollar value) by jurisdictions that classify when a collision is a PDO and when it is not]. Angle collisions were proposed instead of considering all types since they are the most predominant crash type that satisfies current warrant procedures that focus on types susceptible to correction by traffic signals. The intent to focus on angle collisions only is to avoid situations where the warrant may be met by other types of collisions at subject intersections that are uninfluenced by the presence of a signal. Two crash history time periods were considered: One year: suitable for a quick response that allows jurisdictions to respond in a timely manner if only a short crash history exists rather than waiting for more evidence to suggest a need exists and a recent degradation in intersection safety is evident. Three year: to provide thresholds that will have a more subtle effect on safety that is only detectable using a longer period of evaluation. To satisfy the one year and three year histories, the following tables document the NCHRP s recommended thresholds. Table 2: One Year Collision History Warrant for Rural Areas Area Type Urban Rural Number of Lanes on Each Approach Total Angle Collisions and Pedestrian Collisions Total Fatal and Injury Angle Collisions and Pedestrian Collisions Major Minor Four Legs Three Legs Four Legs Three Legs

10 Table 3: Three Year Collision History Warrant for Rural Areas Area Type Urban Rural Number of Lanes on Each Approach Total Angle Collisions and Pedestrian Collisions Total Fatal and Injury Angle Collisions and Pedestrian Collisions Major Minor Four Legs Three Legs Four Legs Three Legs When applying Table 2 and Table 3, rural refers to those intersections where the major road speed exceeds 40 mph (64 km/h) or intersections located in an isolated community with a population less than 10,000. Angle collisions include those that occur at an angle and involve one or more vehicles on the major road and one or more vehicles on the minor road. By applying the warrant requirements specified above, those locations where the collision experience does not meet the proposed warrants could see the safety performance deteriorate with the installation of traffic signals, whereas those meeting these requirements are expected to see an improvement. ESTABLISHMENT OF TRAFFIC SIGNAL POLICIES The establishment of policies is intended to guide the Ministry and their vendors in determining whether the traffic conditions may or may not be favourable for traffic signals. The policy suggestions below have been developed from current industry practices and from the review of other jurisdictions guidelines and policy documents. They address conditions where traffic signals could be considered, conditions where they may not be appropriate and other policy decision items related to traffic signals. The need to consider traffic signals or another form of traffic control or improvement is largely based on one or a combination of factors, most commonly: Requests from municipalities, members of the public or political pressures; Perceived safety or operational issues that lead to a perceived reduction in the level of service (LOS) or comfort level of travellers, or increased risks being taken to enter or exit the main traffic stream; Intensified development or changes to the proposed/existing land use are being considered or implemented; or Changes to the road network are expected to alter traffic patterns and flows. These factors are an indication that traffic signals may be required to maintain or improve the roadway operation. They should be reviewed in relation to the following policy statements where traffic signals are deemed to be an appropriate option for consideration. 10

11 POLICY STATEMENTS: CONDITIONS WHERE TRAFFIC SIGNALS MAY BE FAVOURABLE Traffic signals are generally considered to be an appropriate traffic control device (and possible safety enhancement) in: Urban areas (within urban municipal limits). Urban fringe areas, which can typically be identified by: Transitional area from a rural cross-section to an urban cross-section; Presence of reduced speeds (80 km/h or less); and Presence of barrier curb and gutter. Where a future interchange is identified on the provincial network, traffic signals (or an alternate form of traffic control or intersection improvements) may be considered as part of the interchange staging to defer such capital expenditures within urban and urban fringe areas. Areas in close proximity to urban centres that demonstrate either the following conditions are evident either through a review of available data and/or observations made in the field: Noticeable delays to the minor road traffic waiting to enter the major road. Known collision history, trends, severity, frequency, etc. One or more of the warranting conditions must be met to consider the need for traffic signals further, which includes satisfying: Minimum traffic volumes, collision history, operational conditions (i.e., acceptable delay). Collision experience demonstrates that signals are expected to improve the overall safety performance of the intersection: Through application of the Crash Experience Warrant from NCHRP 204. Other safety and/or operational measures did not provide satisfactory improvements to the safety and/or operational performance of the intersection: A noticeable reduction in the collision frequency, trends and/or severity. The intersection LOS is not improved to meet the Ministry s acceptable levels (LOS C or greater for rural highway corridors). Other traffic control/intersection treatments are considered inappropriate for the site context (i.e., four-way stop control, roundabout, additional lanes, etc.). Concerns are expressed by municipal partners, members of the public or industry stakeholders that suggest the Ministry consider a review of the intersection for the purpose of determining appropriate improvements that may address those concerns. An engineering study suggests that traffic signals be considered further where sufficient analysis has yet to be completed to determine the suitability of traffic signals. 11

12 Through traffic analysis, confirm that a significant reduction in delay for traffic on the minor road can be achieved for existing and future conditions (as agreed upon with the Ministry): Isolated intersections: As demonstrated by an improvement from unacceptable to acceptable intersection operational performance, or A reduction in delays in the design hour in the order of 50% or higher. Signalized corridors: Progression of the main road can be achieved while improving the delay experienced by minor road traffic. Where the signalization of an intersection adjacent to an existing or proposed signalized intersection(s) is expected to improve the progression of traffic along the major road (i.e., through coordination). POLICY STATEMENT: CONDITION TO BE MET PRIOR TO CONSIDERING TRAFFIC SIGNALS Prior to signals being installed, the hierarchy of improvements currently adopted by the Ministry must have been implemented at the subject location. Typically these are implemented from lower cost to higher capital cost investments as illustrated below: Signage/ Markings Advanced Warning Geometry (Lanes/Ramps) Traffic Control POLICY STATEMENTS: CONDITIONS WHERE TRAFFIC SIGNALS MAY NOT BE APPROPRIATE Traffic signals should be avoided in rural high speed environments (i.e., posted speed limits exceeding 90 km/h). Traffic signals should not be installed if their introduction will seriously disrupt progressive traffic flow on the main road to an unacceptable level (as determined by traffic analysis). Traffic signals should not be considered on: Freeways (or future/planned freeways); Divided highways identified as future freeways; and National highway core routes where the posted speed is 90 km/h or greater (unless compatible with a staged plan). POLICY STATEMENTS: OTHER TRAFFIC SIGNAL CONSIDERATIONS Where traffic signals are deemed to be warranted, the posted speed of the roadway should be 90 km/h or less. The installation of Advanced Warning Flashers at a signalized intersection should follow the guidelines contained in TAC s MUTCDC. 12

13 Where existing traffic signals are installed, a review of the warrant procedure can be applied to determine whether traffic signals are still an acceptable solution to address safety and/or operational concerns that may have arisen since installation or continue to remain unsolved after implementation. This may be applicable if there is a change to traffic patterns. Where traffic signals are no longer justified and a decision is made to remove such, removal should be accomplished following the procedures outlined in the FHWA s MUTCD: Determine the appropriate traffic control to be used after signal removal. Reconcile any sight distance restrictions, as required. Inform the public and stakeholders of the removal decision with supporting justification. Install the appropriate traffic control to replace signals and flash/cover the signal heads for a minimum of 90 days. At the discretion of the Ministry, it may be desirable to conduct an engineering (removal) study confirming the need to remove a signal, and then remove the signal. Table 4 presents a summary of the policy statements that both favour the installation of signals as well as those that suggest signals may not be appropriate for the location under review. These guidelines are meant to assist the practitioner with the application of each policy statement and to determine overall compliance of the location in support of or against considering signals further. After review of the policy statements for a specific location, engineering judgment may be required as some of the policy statements may support signal implementation while other policy statements do not support the implementation. The actual warrant procedures should be followed to determine if there is support from the policy statements to proceed further with a review of signalization. Table 4: Policy Application Review Policy Statement Response Comments / Rationale (application of policy statement) Urban area/urban fringe area. Is the intersection under review located within an urban environment? Future interchange location. Is the intersection under review identified as a future interchange location? In close proximity to an urban centre with noticeable delays/ known collision history trends. One or more warranting conditions met. Collision experience demonstrates signals may improve the overall safety. Does this intersection demonstrate such conditions that might benefit from signal installation (excessive delay / specific collision trends that signals might help improve)? Are one or more of the warranting conditions met through application of the warrant procedures or as determined by other means (i.e. other engineering studies such as a safety assessment, detailed capacity analysis etc.)? Is there an expected improvement in the safety performance of the intersection from signal installation as determined through application of the Crash Experience Warrant? Compliance One or more (preferably more) of these statements should be favourable towards a review of signals for the subject intersection, i.e., answered YES. 13

14 Table 4: Policy Application Review Policy Statement Other safety/operational measures did not provide satisfactory improvements. Other traffic controls considered inappropriate for the site context. Response Comments / Rationale (application of policy statement) Have other safety and or operational measures been implemented to address known problems that have not adequately addressed such problems? Are other traffic control options (i.e. four-way stop, roundabouts etc.) considered to be inappropriate for the subject location? Engineering study findings. Have there been any engineering studies performed to address the concerns at the subject location that recommend the installation of traffic signals? The need to consider such a study may have arisen from concerns expressed by municipal partners, members of the public or industry stakeholders. Desirable signal progression achievable. Hierarchy of intersection improvements adequately tried and tested. Located in a rural high speed environment. Possibility to disrupt progressive traffic flow. Freeway/divided highway/national highway core route. Is the installation of a signal upstream or downstream of another signal expected to improve the operation through a signalized corridor? Has the Ministry s toolbox or hierarchy of possible improvement options been tried and tested at the subject intersection? If not, these should be considered prior to proceeding any further with signal implementation. Is the intersection under review located within a rural environment? Will the introduction of signals seriously disrupt progressive traffic flow on the main road to an unacceptable level? Is the intersection under review located on an existing or future freeway, or on a core route with high posted speed limits? (Note: signals may be acceptable if part of a staged plan). Compliance Should be answered YES prior to reviewing signals further. All responses should be favourable towards a review of signals for the subject intersection, i.e., all should indicate NO. The initial nine statements presented in Table 4 largely describe situations that may be favourable for considering a traffic signal at a subject intersection. As a minimum, at least one of these statements should have a response of YES; however, the preference would be to have several YES responses indicating compounding issues at the subject intersection, which has been the focus of an engineering study. Such studies should review a comprehensive array of improvement options and determine traffic signals to be a suitable improvement over other alternatives and conclude that other countermeasures have been implemented but without the desired outcomes to address known concerns. If such options have yet to be explored, the hierarchy of improvement options available to the Ministry should be adequately tried and tested prior to proceeding any further with signal implementation. There are certain situations where traffic signal installation is deemed to be unfavourable due to the intended function of the roadway(s) for the subject intersection as well as the expectation of drivers to encounter traffic signals in areas where they are not commonly deployed. To address these situations, 14

15 the last three policy statements should each receive a NO response prior to considering signal implementation. However, if low cost corridor improvements are part of a staged implementation plan required to defer large capital funding until it is available, the practitioner may want to consider traffic signals in those situations described in the three last policy statements, as long as signalization is not the ultimate improvement for corridors with these attributes and will improve the safety of the intersection. In summary, to consider traffic signals further: At least one of the initial nine statements have a response of YES; The hierarchy of improvement options available to the Ministry have been adequately tried and tested; and None of the last three statements receive a YES response (all should be NO) with except if a signal is part of a staged implementation. WARRANT CONDITIONS FOR SASKATCHEWAN The five main criteria or groupings of parameters listed in Figure 2 include minimum traffic volume, delay, safety, traffic operation and intersection/roadway configuration. Naturally these criteria overlap and should not be viewed as discrete areas (i.e., delay is often considered to be component of traffic operation and could have been grouped together). In lieu of having their own guidelines or standards for certain situations, the Ministry typically defaults to the national standards published by TAC or equivalent organizations. The latest traffic signal warrant procedure published by TAC was in Since then, at least two Canadian provinces have opted to align their traffic signal warrant procedures more closely to the current FHWA methodology than to the TAC procedure and perhaps other jurisdictions may also have followed in a similar manner or be considering such. As the warrant procedures adopted by the FHWA and others address a wider array of possible situations where traffic signals may improve the conditions for traffic progression, conflicts, operations and other intersection related concerns, and as they reflect more recent industry practices (especially when considering the safety implications associated with traffic signals), it is suggested that the Ministry adopt a similar set of procedures to those of the FHWA, BC and Ontario, with some revisions that address the current Saskatchewan context. The procedures presented to the Ministry for adoption are defined in Table 5. 15

16 Table 5: Preferred Warrant Conditions for the Ministry Warrant No. Metric FHWA ON BC Comment Proposed Metric for Adoption 1 Eight Hour Vehicular Volume FHWA and BC warrant 2 Four Hour Vehicular Volume thresholds are identical, ON thresholds are close to 3 Peak Hour Vehicular Volume X FHWA/BC 4 Pedestrian Volume X X 5 School Crossing X X X 6 Coordinated Signal System X BC standard is close to FHWA 7 Crash Experience ON and BC thresholds are close to FHWA 8 Roadway Network X BC threshold is close to FHWA 9 Intersection Near a Grade Crossing X X X - Safety Analysis X - Operational Analysis Note: The warrant numbers reference the FHWA procedures since Ontario (ON) and BC have adopted different numbering based on their adoption of individual warrant conditions The following warranting parameters, conditions or justifications are under review for adoption by the Ministry that determine when a subject intersection may be a suitable location for traffic signal installation provided the policy statements presented previously are favourable. These are not listed in any particular order of preference, but rather follow closely to the order presented in other jurisdictional procedures for ease of cross-referencing, and to list similar parameters together. 1. Minimum Traffic Volumes: Eight hour minimum traffic volumes. Combination of conditions used to analyze the eight hour minimum traffic volumes. Four hour minimum traffic volumes. Peak hour minimum traffic volumes 2. Collision Experience 3. Coordinated Signal System 4. Capacity Analysis (LOS and Delay) The intent of applying the warranting factors is to determine which factors govern the need for signals or not. Signals are considered to be warranted when each of the following conditions are met, i.e., all have to be met to satisfy the need to consider traffic signals: One of the four minimum traffic volume warrants are met. The collision experience can be demonstrated either from a review of historical crashes or the predicted safety benefits are met. 16

17 Where applicable, the coordinated signal system demonstrates acceptable performance for traffic progression along the corridor. A satisfactory reduction of delays in the design hour, particularly for minor road traffic, as confirmed through capacity analysis. Meeting these conditions also assumes that the policy statements have been applied and demonstrate the need for signals including the trial of other safety countermeasures or intersection treatments/ improvements. The metrics provided in the volume warrants and collision experience, provide practitioners with a guide as to the magnitude of the traffic volumes and reported collisions required to meet these components. The other conditions will likely have to be determined through some form of engineering review or larger study to determine their applicability. CALIBRATION CHECK A calibration check of the recommended policy statements and warrant procedures was performed on four candidate intersections identified by Ministry regional staff. The purpose of the check was to apply the statements and procedures, and then determine whether any refinement of either were required to address conditions specific to Saskatchewan. It also served to provide examples and to inform the Ministry as to how these statements and warrants are to be applied going forward. A representative sample of candidate sites was chosen to capture various settings and travel patterns that could be used to demonstrate whether those locations would meet the policy statements and their ability to then meet/ or not meet the warranting conditions. The four locations chosen and the rationale for their selection is noted as follows: Highway 1 (TransCanada Highway) and 9 th Avenue NW at Moose Jaw Rationale: located on the urban fringe of Moose Jaw (first intersection providing access into the city from the west). Highway 46 and the Pilot Butte Access (Grid 624), east of Regina Rationale: on a highway with significant commuter traffic between the City of Regina and satellite communities including Pilot Butte. Highway 22 and the Mosaic K3 Mine Access, east of Esterhazy Rationale: the intersection has very distinct peak hour periods due to mine shift changes from the K3 site as well as at least one other adjacent mine site. Highway 6 and Highway 16 north junction, near Dafoe Rationale: isolated intersection in a very rural location, but on a major trucking route between Saskatoon and Yorkton. From a review of the traffic signal policy statements, two locations from the four demonstrated conditions considered to be favourable for further review when seeking to address operational and/or safety enhancements though implementation of traffic signals. These two locations include the intersection of Highway 1 and 9 th Avenue in Moose Jaw, and the intersection of Highway 46 and Grid 624 at Pilot Butte. The other two locations are in high speed rural areas with no evidence of safety or operational concerns that would benefit from the implementation of traffic signals. 17

18 Of the two locations shortlisted from the policy statement review, one demonstrated a need to review traffic signals or an alternate form of control further, but only after other measures are tried and tested, or ruled out for inappropriateness. The intersection of Highway 46 and Grid 624 meets two of the warranting conditions; however, it does not meet the crash experience warrant suggesting that the installation of traffic signals would likely reduce the safety performance from current levels, most likely through an over-representation of rear end collisions. With these considerations in mind, it is suggested that alternate forms of traffic control and safety enhancement be reviewed for their appropriateness and effectiveness prior to pursuing traffic signals further. CONCLUDING REMARKS As demonstrated through the recent research completed and documented in the NCHRP Report 204, traffic signal installation can be used as a safety countermeasure to enhance intersection performance, when an over-representation of collisions are observed that can be corrected by traffic signals, i.e. higher severity and angle collisions. The policy statements and warrants developed for the Ministry place an emphasis on the importance of only pursuing the implementation of traffic signals when there is either a perceived or demonstrated safety performance issue in combination with other metrics and analysis. The establishment of the policy statements and warranting conditions are based on current and leading industry practices that can easily be applied by the Ministry and their vendors to convey to nonengineering persons of the minimum thresholds and conditions that must exist prior to installing signals on the provincial network. Over the years, the Ministry has received ongoing pressure from external stakeholders as well as the public to consider a wider deployment of signals but has shown reluctance due to the inherent safety performance concerns that can be realized after implementation. The work completed by the Ministry now provides the guidance and direction needed to both pursue signals to their satisfaction as well as to provide supporting rationale both for and against their deployment. As the statements and warranting conditions are adopted throughout the Ministry, it is anticipated that refinements will be made to ensure these continue to meet Ministry and other stakeholder needs. 18

19 REFERENCES Tetra Tech Canada Inc. October Traffic Signal Warrants: Summary of Jurisdictional Review and Document Review; Establishment of Policies and Procedures. Saskatchewan Ministry of Highways and Infrastructure Section 2500, Design Manual 2. Transportation Association of Canada Traffic Signal Warrant Spreadsheet. Transportation Association of Canada Manual of Uniform Traffic Control Devices for Canada. Part B Traffic Control Signals, Division 2, Installation Guidelines for Traffic control Signals. British Columbia Ministry of Transportation and Infrastructure. Electrical Engineering Centre. April Section 400 Signal Design. Ministry of Transportation Ontario. March Traffic Signals, Book 12, Ontario Traffic Manual. Federal Highways Administration. Manual of Uniform Traffic Control Devices for Streets and Highways Edition. Part 4 Highway Traffic Signals. National Cooperative Highway Research Program. Transportation Research Board of the National Academies. June Web-Only Document 204: Crash Experience Warrant for Traffic Signals. 19

CITY OF SASKATOON COUNCIL POLICY

CITY OF SASKATOON COUNCIL POLICY ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,

More information

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS Geometric Design Guide for Canadian Roads 1.3.4 CHARACTERISTICS OF CLASSIFICATIONS The principal characteristics of each of the six groups of road classifications are described by the following figure

More information

Access Location, Spacing, Turn Lanes, and Medians

Access Location, Spacing, Turn Lanes, and Medians Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

TRAFFIC SIGNAL WARRANT SUMMARY

TRAFFIC SIGNAL WARRANT SUMMARY Level 1. Is the critical speed of major street traffic > 7 km/h (4 mph)? Yes No 2. Is the intersection in a built-up area of isolated community of

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES

Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES 5.1 PURPOSE (1) The purpose of the Traffic Safety Studies chapter is to provide guidance on the data collection requirements for conducting a

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

CITY OF SAINT JOHN TRAFFIC CALMING POLICY CITY OF SAINT JOHN TRAFFIC CALMING POLICY VERSION: 1.0 April 10, 2012 Pedestrians, Cyclists and Motorists Sharing Street Spaces CONTENTS INTRODUCTION... 3 POLICY GOAL... 3 POLICY OBJECTIVES... 3 GUIDING

More information

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future

Alberta Highway 881. Corridor Management Plan. Session Forum 1 - Highways. Tri-Party Transportation Conference Moving Alberta Into the Future Tri-Party Transportation Conference Moving Alberta Into the Future Alberta Highway 881 Corridor Management Plan Lac La Biche to Anzac Session Forum 1 - Highways March 2017 INTRODUCTION + 241 km long, 2

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

Traffic Signal Warrant Analysis Report

Traffic Signal Warrant Analysis Report Traffic Signal Warrant Analysis Report US26: Springwater At-Grade Intersection key# 15773 US26 at SE 267 th Avenue (M.P. 16.24) and US26 at SE Stone Road (M.P. 16.77) Prepared by Katherine Carlos, E.I.

More information

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02 1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT

More information

POLICY: TRAFFIC CALMING

POLICY: TRAFFIC CALMING 2006 MAY REFERENCE: COUNCIL APPROVED BY COUNCIL MAY 23, 2006 CITY OPERATIONS - NO. 608 POLICY: TRAFFIC CALMING A. All requests for traffic calming within the City shall be considered in accordance with

More information

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL CITY OF WEST KELOWNA COUNCIL POLICY MANUAL Page 1 of 7 DEPARTMENT: Engineering Services SUBJECT: Traffic Calming Policy (Revised June 6, 2017) Policy Statement: The provision of traffic calming measures

More information

CROSSING GUARD PLACEMENT CONSIDERATIONS AND GAP ASSESSMENT

CROSSING GUARD PLACEMENT CONSIDERATIONS AND GAP ASSESSMENT CROSSING GUARD PLACEMENT CONSIDERATIONS AND GAP ASSESSMENT Many factors contribute to the need for a Crossing Guard. General federal guidance, provided by the FHWA MUTCD, states that adult crossing guards

More information

TRAFFIC SIGNALS OR ROUNDABOUT AT THIS UNUSUAL INTERSECTION?

TRAFFIC SIGNALS OR ROUNDABOUT AT THIS UNUSUAL INTERSECTION? TRAFFIC SIGNALS OR ROUNDABOUT AT THIS UNUSUAL INTERSECTION? Presenting Author Phil Weber, P.Eng. GHD Inc. (The Home of Ourston Engineering) 11 Allstate Parkway, Suite 310 Markham, ON L3R 9T8 Phone (905)

More information

Pedestrian Crosswalk Audit

Pedestrian Crosswalk Audit 1200, Scotia Place, Tower 1 10060 Jasper Avenue Edmonton, Alberta T5J 3R8 edmonton.ca/auditor Pedestrian Crosswalk Audit June 19, 2017 The conducted this project in accordance with the International Standards

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Document 2 - City of Ottawa Pedestrian Crossover (PXO) Program

Document 2 - City of Ottawa Pedestrian Crossover (PXO) Program 40 Document 2 - City of Ottawa Pedestrian Crossover (PXO) Program OVERVIEW The City of Ottawa Pedestrian Crossover (PXO) Program provides the basis for PXO implementation in Ottawa. The program s processes

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Roundabouts in Edmonton - A Comparison to the State-of-the-Art

Roundabouts in Edmonton - A Comparison to the State-of-the-Art Roundabouts in Edmonton - A Comparison to the State-of-the-Art Authors: Carl Clayton, P.Eng. P.E. PTOE Stantec Consulting Ltd. Chuan Kua, P.Eng. City of Edmonton, Transportation and Streets Brice Stephenson,

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

Effects of Traffic Signal Retiming on Safety. Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc.

Effects of Traffic Signal Retiming on Safety. Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc. Effects of Traffic Signal Retiming on Safety Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc. Introduction It has long been recognized that traffic signal timing can have an impact

More information

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014 Page: 1 of 8 1 POLICY 1.01 The City shall follow all of the specifications in the Manual of Uniform Traffic Control Devices for Canada, prepared by the National Committee of Uniform Traffic Control, and

More information

Collision Estimation and Cost Calculation

Collision Estimation and Cost Calculation Collision Estimation and Cost Calculation Table of Contents Introduction... 3 Rates Based Method... 4 20-Year Collision Cost Procedure... 4 Safety Performance Function Method... 7 Important notes when

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

Operational Ranking of Intersections: A Novel Prioritization Methodology

Operational Ranking of Intersections: A Novel Prioritization Methodology Operational Ranking of Intersections: A Novel Prioritization Methodology Reza Omrani, Ph.D. Transportation Engineer CIMA+ 3027 Harvester Road, Suite 400 Burlington, ON L7N 3G7 Reza.Omrani@cima.ca Pedram

More information

Zlatko Krstulich, P.Eng. City of O9awa

Zlatko Krstulich, P.Eng. City of O9awa Zlatko Krstulich, P.Eng. City of O9awa 1. Introduction to the Ontario Traffic Manual Series 2. What is OTM Book 18: Bicycle Facilities? 3. Study / Committee Team Members 4. Brief overview of the content

More information

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY 4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after

More information

Abstract. Background. protected/permissive operation. Source: Google Streetview, Fairview/Orchard intersection

Abstract. Background. protected/permissive operation. Source: Google Streetview, Fairview/Orchard intersection ITE 2015 Western District Annual Meeting Ada County Highway District s Flashing Yellow Arrow Initiative Primary Author: Tim Curns, PE Ada County Highway District Traffic Engineer Author: Andrew Cibor,

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Synthesis of Safety For Traffic Operations. Leanna Belluz Transport Canada. Gerry Forbes, M.Eng., P.Eng., P.T.O.E. Intus Road Safety Engineering Inc.

Synthesis of Safety For Traffic Operations. Leanna Belluz Transport Canada. Gerry Forbes, M.Eng., P.Eng., P.T.O.E. Intus Road Safety Engineering Inc. Synthesis of Safety For Traffic Operations Leanna Belluz Transport Canada Gerry Forbes, M.Eng., P.Eng., P.T.O.E. Intus Road Safety Engineering Inc. Paper prepared for presentation at the Traffic Operations

More information

Installation of Traffic Signals and Pedestrian Crossings

Installation of Traffic Signals and Pedestrian Crossings SER-009-021 Strathcona County Municipal Policy Handbook Installation of Traffic Signals and Pedestrian Crossings Date of Approval by Council: 04/16/91; 06/12/2007 Resolution No. 325/91; 526/2007 Lead Role:

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

UNCONTROLLED PEDESTRIAN CROSSING GUIDELINES

UNCONTROLLED PEDESTRIAN CROSSING GUIDELINES City and County of Denver UNCONTROLLED PEDESTRIAN CROSSING GUIDELINES Prepared for: Prepared by: Adopted September 2016 This page is intentionally left blank. Contents for Denver Uncontrolled Pedestrian

More information

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca OCTOBER 2014 Municipal Class Environmental Assessment COUNTY ROAD 22 HORSESHOE VALLEY ROAD Project A Truck Climbing Lanes Project B Intersection Improvements simcoe.ca CORPORATE COMMUNICATIONS DEPARTMENT

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

DESIGN BULLETIN #66/2010

DESIGN BULLETIN #66/2010 DESIGN BULLETIN #66/2010 Highway Geometric Design Guide Chapter B, Climbing Lane Warrants for Two Lane Undivided and Four Lane Divided Highways - Revised Summary This Design Bulletin is being issued as

More information

The Corporation of the City of Sarnia. School Crossing Guard Warrant Policy

The Corporation of the City of Sarnia. School Crossing Guard Warrant Policy The Corporation of the City of Sarnia School Crossing Guard Warrant Policy Table of Contents Overview And Description... 2 Role of the School Crossing Guard... 2 Definition of a Designated School Crossing...

More information

TECHNICAL MEMORANDUM VDOT Central Region On Call Task Order

TECHNICAL MEMORANDUM VDOT Central Region On Call Task Order Kittelson & Associates, Inc. T R A N S P O R T A T I O N E N G I N E E R I N G / P L A N N I N G 1850 Centennial Park Drive, Suite 130, 20191 P 703-885-8970 F 703-885-8971 TECHNICAL MEMORANDUM VDOT Central

More information

Roundabouts along Rural Arterials in South Africa

Roundabouts along Rural Arterials in South Africa Krogscheepers & Watters 0 0 Word count: 00 text + figures = 0 equivalent words including Title and Abstract. Roundabouts along Rural Arterials in South Africa Prepared for: rd Annual Meeting of Transportation

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

List of Display Boards

List of Display Boards List of Display Boards Welcome Introduction Municipal Class Environmental Assessment (EA) Process Need and Justification for an Interchange Alternatives for Evaluation Vertical and Horizontal Alignments

More information

A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways

A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways A Thesis Proposal By James A. Robertson Submitted to the Office of Graduate Studies Texas A&M University in partial fulfillment

More information

HCM Sixth Edition. Plus More. Rahim (Ray) Benekohal University of Illinois at Urban Champaign,

HCM Sixth Edition. Plus More. Rahim (Ray) Benekohal University of Illinois at Urban Champaign, HCM Sixth Edition What s New in the HCM Sixth Edition Plus More Rahim (Ray) Benekohal University of Illinois at Urban Champaign, 65 th Traffic Engineering and Safety Conference October 19 20, 2016 Institute

More information

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION The Transportation Services Committee recommends:

More information

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division Southside Road Prepared for: City of St. John s Police & Traffic Committee Prepared by: City of St. John s Traffic Division January 2007 Southside Road - Traffic Report Page 1 of 9 BACKGROUND: th At the

More information

Roundabout Feasibility Memorandum

Roundabout Feasibility Memorandum Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Access Management Regulations and Standards

Access Management Regulations and Standards Access Management Regulations and Standards January 2014 Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while preserving

More information

Roundabouts. By: Nezamuddin, Valparaiso University. February 19, 2015

Roundabouts. By: Nezamuddin, Valparaiso University. February 19, 2015 Roundabouts By: Nezamuddin, Valparaiso University February 19, 2015 Outline 1. Background on Roundabouts 2. Silhavy Rd. Corridor Improvement Project in Valparaiso, IN 3. 5-points Roundabout in Valparaiso,

More information

Edgemont Village Traffic and Parking Technical Report January 2014

Edgemont Village Traffic and Parking Technical Report January 2014 Edgemont Village Traffic and Parking Technical Report January 2014 In the fall of 2013, the District of North Vancouver engaged consultants to assess existing intersection and parking conditions in Edgemont

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

Chapter 3 Chapter 3 TRAFFIC SIGNAL WARRANT SUMMARY PURPOSE

Chapter 3 Chapter 3 TRAFFIC SIGNAL WARRANT SUMMARY PURPOSE Chapter 3 Chapter 3 Formatted: Heading 1, None, Space Before: 0 pt TRAFFIC SIGNAL WARRANT SUMMARY Formatted: Heading 2 1.263.13.1 PURPOSE (1) The Traffic Signal Warrant Summary Form (Form No. 750-020-01)

More information

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Recommended Roadway Plan Section 2 - Land Development and Roadway Access Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines

More information

5.0 Roadway System Plan

5.0 Roadway System Plan Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,

More information

Traffic Calming Policy

Traffic Calming Policy Article I. Purpose and Goal. The purpose of this policy is to establish criteria and procedures the City will use to evaluate requests for, and if appropriate, implement traffic calming measures. Neighborhood

More information

Appendix B Transportation Report

Appendix B Transportation Report Project File Report Appendix B Transportation Report Town of Whitby HMM Project No. 327878 Final Report October 2014 Revision and Version Tracking CP Rail Crossing at New Coronation Road Class EA Study

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

FHWA Safety Performance for Intersection Control Evaluation (SPICE) Tool

FHWA Safety Performance for Intersection Control Evaluation (SPICE) Tool FHWA Safety Performance for Intersection Control Evaluation (SPICE) Tool Virginia Section ITE Annual Meeting Virginia Beach June 217 Pete Jenior Kittelson & Associates, Inc. 1 Intersection Control Evaluation

More information

Contents. Champaign-Urbana Mass Transit District Stop Placement Guidelines

Contents. Champaign-Urbana Mass Transit District Stop Placement Guidelines Contents Champaign-Urbana Mass Transit District Introduction... 1 Stop Spacing... 2 Rural... 2 Low Density Suburban... 2 General Urban... 2 Urban Core... 2 Operational Safety... 3 Stop Placement... 4 Nearside

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Automated Traffic Enforcement Technology Guidelines

Automated Traffic Enforcement Technology Guidelines Automated Traffic Enforcement Technology Guidelines Province of Alberta (September 2014) Revised Automated Traffic Enforcement Technology Guidelines Province of Alberta A. PREAMBLE Automated traffic enforcement

More information

2.2 TRANSIT VISION 2040 FROM VISION TO ACTION. Emphasize transit priority solutions STRATEGIC DIRECTION

2.2 TRANSIT VISION 2040 FROM VISION TO ACTION. Emphasize transit priority solutions STRATEGIC DIRECTION TRANSIT VISION 2040 FROM VISION TO ACTION TRANSIT VISION 2040 defines a future in which public transit maximizes its contribution to quality of life with benefits that support a vibrant and equitable society,

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

At each type of conflict location, the risk is affected by certain parameters:

At each type of conflict location, the risk is affected by certain parameters: TN001 April 2016 The separated cycleway options tool (SCOT) was developed to partially address some of the gaps identified in Stage 1 of the Cycling Network Guidance project relating to separated cycleways.

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

Pedestrian Signal Head Warrant Project

Pedestrian Signal Head Warrant Project Pedestrian Signal Head Warrant Project Authors: Alfred A Guebert, AAGuebert & Associates (Presenter) Irini Akhnoukh, City of Calgary Acknowledgement Daniel Beaulieu, Ville de Montréal (Co-Chair) Richard

More information

INTERSECTION SAFETY STUDY State Route 57 / Seville Road

INTERSECTION SAFETY STUDY State Route 57 / Seville Road INTERSECTION SAFETY STUDY State Route 57 / Seville Road City of Wadsworth, Medina County, Ohio Prepared For: City of Wadsworth Engineering Department 120 Maple Street Wadsworth, OH 44281 Prepared By: GPD

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

Design of Turn Lane Guidelines

Design of Turn Lane Guidelines Design of Turn Lane Guidelines CTS Transportation Research Conference May 24, 2012 Howard Preston, PE Minnesota Department of Transportation Research Services Office of Policy Analysis, Research & Innovation

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Performance-Based Approaches for Geometric Design of Roads. Douglas W. Harwood MRIGlobal 3 November 2014

Performance-Based Approaches for Geometric Design of Roads. Douglas W. Harwood MRIGlobal 3 November 2014 Performance-Based Approaches for Geometric Design of Roads Douglas W. Harwood MRIGlobal 3 November 2014 Traditional Approaches to Highway Geometric Design Based on established geometric design criteria

More information

Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks

Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks Adrian George Manager Network Improvements Anthony Fitts Manager Signal Design Melbourne s transport demands are growing 5m people

More information

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune

More information

Appendix A: Crosswalk Policy

Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Introduction This citywide Crosswalk Policy is aimed at improving pedestrian safety and enhancing pedestrian mobility by providing a framework

More information

Who is Toole Design Group?

Who is Toole Design Group? 2018 AASHTO Bike Guide Status Update NCHRP 15 60 Amalia Leighton Cody, PE, AICP & Kenneth Loen, PE Washington APWA October 4, 2018 Who is Toole Design Group? TDG is a full service engineering, planning

More information

Review of Considerations and Requirements for Automated Enforcement

Review of Considerations and Requirements for Automated Enforcement Review of Considerations and Requirements for Automated Enforcement Summary: The purpose of this report is to provide information related to expanding the use of automated enforcement in the City of Toronto,

More information

Intersection Safety Evaluation: InSAT Guidebook

Intersection Safety Evaluation: InSAT Guidebook Intersection Safety Evaluation: InSAT Guidebook Prepared for: National Cooperative Highway Research Program Transportation Research Board of The National Academies Project 07-18: Crash Experience Warrant

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

Updated Roundabout Analysis Methodology

Updated Roundabout Analysis Methodology Updated Roundabout Analysis Methodology In 1998, the Transportation Planning Analysis Unit (TPAU) working as part of the Roundabout Task Group selected the interim roundabout methodologies of the SIDRA

More information

102 Avenue Corridor Review

102 Avenue Corridor Review February 26, 2015 102 Avenue Corridor Review Transportation Association of Canada Road Safety Engineering Award Submission for the City of Edmonton Introduction Transportation Association of Canada Road

More information

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects Word Count: 4,305 Submission Date: August 1, 2015 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 1420 South

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report Preparedby: ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1

More information

draft Benefit Cost Analysis Agassiz Rosedale Highway 9/Yale Road East Intersection Improvement Apex Engineering Limited Prepared for:

draft Benefit Cost Analysis Agassiz Rosedale Highway 9/Yale Road East Intersection Improvement Apex Engineering Limited Prepared for: draft Benefit Cost Analysis Agassiz Rosedale Highway 9/Yale Road East Intersection Improvement Prepared for: BC Ministry of Transportation South Coast Region Prepared by: Apex Engineering 4299 West 14

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information

TRAFFIC SIGNAL WARRANTS

TRAFFIC SIGNAL WARRANTS TRAFFIC SIGNAL WARRANTS Guidelines for Conducting a Traffic Signal Warrant Analysis Report Number 3991-2 Project Number 7-3991 Sponsored by the Texas Department of Transportation Research Conducted by

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Recent U.S. Research on Safety Evaluation of Low-Cost Road Engineering Safety Countermeasures Lessons for Canada

Recent U.S. Research on Safety Evaluation of Low-Cost Road Engineering Safety Countermeasures Lessons for Canada Recent U.S. Research on Safety Evaluation of Low-Cost Road Engineering Safety Countermeasures Lessons for Canada Bhagwant Persaud Department of Civil Engineering, Ryerson University 350 Victoria Street,

More information

H8 Signs, Supports and Poles

H8 Signs, Supports and Poles Alberta Infrastructure and Transportation Roadside Design Guide November 2007 H8 Signs, Supports and Poles H8.1 Introduction This section identifies the appropriate roadside safety treatment for signs,

More information

Proposed Harmonized Warrants for Installation of 40 km/h Speed Limits and All-Way Stop Sign Control

Proposed Harmonized Warrants for Installation of 40 km/h Speed Limits and All-Way Stop Sign Control Proposed Harmonized s for Installation of 40 km/h Speed Limits and All-Way Stop Sign Control The Works Committee recommends the adoption of the following report (March 6, 2001) from the Commissioner of

More information

Proven Safety Countermeasures. FHWA Office of Safety January 12, :00 p.m. to 2:00 p.m. Eastern Time

Proven Safety Countermeasures. FHWA Office of Safety January 12, :00 p.m. to 2:00 p.m. Eastern Time Proven Safety Countermeasures FHWA Office of Safety January 12, 2012 1:00 p.m. to 2:00 p.m. Eastern Time Introduction and Background While States should still be considering the application of all of the

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information