SUBJECT: TOP OF THE WORLD PEDESTRIAN PATHWAY ALIGNMENT SELECTION AND DESIGN CONTRACT AMENDMENT
|
|
- Jean Phillips
- 5 years ago
- Views:
Transcription
1 City of Laguna Beach AGENDA BILL No. 1 6 Meeting Date: 8/19/14 SUBJECT: TOP OF THE WORLD PEDESTRIAN PATHWAY ALIGNMENT SELECTION AND DESIGN CONTRACT AMENDMENT I. SUMMARY OF THE MATTER Pedestrians and cyclists currently use existing unimproved trails that traverse County, City, and private properties as access to and from Aliso and Wood Canyons Wilderness Park and the Fire Road. On May 6, 2014, the City Council considered several options for the location of an improved trail between Top of the World Drive and the Fire Road. At that time, staff was directed to pursue a trail generally in the alignment of the existing informal pathway or an alternative alignment to extend the trail further through the open space at reduced grades. That alternative alignment has an additional estimated cost of $200,000, which an adjacent property owner initially stated at the City Council meeting might be covered by him and another adjacent property owner. Final arrangements for such a contribution could not be reached. Therefore, staff is recommending the selection of an alignment generally along the existing pathway alignment as further described in this report. Staff is also recommending a design contract amendment for additional design work and CEQA document preparation as described further in this report. (Continued) RECOMMENDATION: It is recommended that the City Council: 1. Direct the City Manager to pursue Alternative 6, as shown on Attachment 2, for a Top of The World Pedestrian Pathway; 2. Direct the City Manager to submit a resolution to the City Council for acceptance of a portion of Top of the World Drive and Alta Laguna Blvd. for public access to the pathway; and 3. Approve a contract amendment with the design engineer, Stantec, for additional design and environmental services in the amount of $62,000. Appropriations Requested: (None) Submitted by:., Steve May, Director of Parte -Works Fund: Attachments: (1) Concepts 1-5 Coordinated with: WM ;9-4.L1V7 Wade Brown, roject Director (2) Alignment 6, (3) Stair/Ramp Detail Approved: Jolin Pietig, City Mana
2 "Top of the World Pedestrian Pathway Alignment Selection and Design Contract Amendment" August 19, 2014 Page 2 of 3 II. PEDESTRIAN PATHWAY ANALYSIS Three alternative alignments were presented to the City Council in May. These alternatives are shown as Alignments 1, 2, and 3 on Attachment 1. Since that time, three additional alignment alternatives have been developed and are shown as Alignments 4 and 5 on Attachment 1 and as Alignment 6 on Attachment 2. Alignment 6 is the recommended alignment for reasons described below. Alternative 4 was explored to reduce grades and Alternative 5 was developed to move the trail farther away from the developed properties contingent on receiving a contribution from the property owners to cover the additional costs for that alignment. Finally, Alignment 6 was developed to follow the existing alignment and to minimize impacts to the County Park and open space. The pathway in Alignment 6 follows the general alignment of the existing informal trail. By utilizing a stair and ramp combination in the steeper sections as shown on Attachment 3, the trail will provide improved access for pedestrians, cyclists, and pedestrians with strollers. The stair and ramp section will provide a smooth surface to ride a bicycle, or to walk the stairs while pushing a bike alongside on the ramp. This trail alignment will not have any new impacts to the County Park, since the trail will follow the existing informal pathway through the Park. Alignment 6 is fully supported by the OC Parks staff, and would likely require minimal permitting through the County. Finally, Alignment 6 is the least expensive alternative. Therefore, Alignment 6 is now the recommended trail alignment for the project. III. RIGHT-OF-WAY, SIDEWALK, AND PARKING In order to design a trail, easements and other rights must be acquired. To reach the Park and Fire Road, people travel along a private portion of Alta Laguna Boulevard, from Treetop Lane to Top of The World Drive, along the private street Top of The World Drive, and across private property. To ensure that the public is traversing the area by means of legal access, it is recommended that the City accept the private portion of Alta Laguna Boulevard and a portion of Top of the World Drive and install additional paving, parking spaces, and sidewalk to the trail. In addition to providing legal access, these improvements will provide public benefits associated with the pedestrian trail. These street improvements are also a valuable trade for the new easement across the private property that is required for the trail. It is recommended that the City Council direct staff to prepare documents for the acceptance of portions of the private streets mentioned above. IV. DESIGN CONTRACT In February 2013, the City Council awarded a contract to Stantec for the design of a pedestrian pathway that would run through the proposed new easement, through City property, and through County Park land. Additional work has been completed for the preparation of the six conceptual alignments and CEQA documents for a trail through the Park. The proposed project now requires additional work to prepare engineering for the street improvements, a water quality management plan, a legal description for the right-of-way acceptance, and the revisions to CEQA documents to address the recommended Alignment 6. Stantec has prepared a proposal for the work in the amount of $62,000. It is recommended that the City Council approve a contract amendment with Stantec for that amount, for a total contract amount of $153,000.
3 "Top of the World Pedestrian Pathway Alignment Selection and Design Contract Amendment" August 19, 2014 Page 3 of 3 V. BUDGET The remaining project budget, after the award of a design contract amendment described in Section IV, will be $320,000. It is too early in the design process to accurately estimate the project construction costs, especially since the conceptual plans for the street improvements have not been started. It is possible that additional funds will be needed to complete construction. VI. SCHEDULE To meet the grant deadlines for design completion by February 2015, the project must move forward without delay. There is no possibility of extending the grant deadlines. If Alignment 6 is approved by the City Council, then the anticipated schedule for the project would be as follows: Complete preliminary design Complete CUP and CEQA process 90% final design County and Coastal Conservancy reviews Complete final design Start construction Complete construction 9/11/14 11/12/14 12/15/14 1/05/15 1/20/15 5/01/15 7/31/15
4 GRAPKOSCALE LEGEND SOWN. Mar ram warier worm morr r LAGUNA PATHWA:y_(:214442) TOP OF THE MELD ALIGNMENTS ANALYSIS CONCEPTS 1-5 PROW in Concept Alignments 1-5 Ji ALIGNMENTS 1-5 ALIGNMENTS 1, 2, 5, pt am to Imam, r or, er. sricl 10,1/6 mons 1.10 MX SUM IISS. "MOUS WEISZ INK ROM C le MK P.M :40. INSIS NON SOZ 1/11 PM NO Off In ON NE mamas ALIGNMENT4 E PATHWAY SECTION 4' PATHWAY SECTION SECTION AA AT BEDE= SECTION C-C ALIGNMENTS 1-5 ALIGNMENT 1 ALIGNMENT 3 ALIGNMENT 4 ALIGNMENT 5 CU I arm ram sam r WOOS UOISSS. ROM < MOZ 5' PATHWAY SECTION SECTION IF* PATHWAY SECTION SECTION 043 SW PATHWAY SECTION IP PATHWAY SECT/ON B' PATHWAY SECTION SECTION B-0 SECTION D-0 SECTION ES Stantec WIDOZILOGT E.S.SINE,(0 =WWI CITY OF LAGUNA BEACH 005 FONZENUI SEACHC8 CONTACT: WADE 0170W CD
5 CD OEM= ROM P910 title' r Sat HI. ore! EWING GUMS OR POMO VMS. UR MAWS MOW MEM SIAMH ICS STOW PROVEC11011 =MO NO 90% COIPACTIM SUNNI" 1\.) tr PATHWAY SECTION SECTION A-A It_Far_ggww. PEWS. ROME V.OPE >152. Mr01 < ION MVO AT COMM. SUMS RD= PAT1 MOM TO IMMT411 rat Mt REMO.,--VIONE EROSION POOIECTOVI '-W PATHWAY SECTION SECTION Eta Alignment 6 (10 Stantec 31111EC1NOL0GY OPIVERME CA stanie.carn LAGUNA PATHWAY TOP OF THE WORLD CONCEPT EXHIBIT AND ALTERNATIVE SS ANALYSIS PROJECT sow of 1
6 Ramp Plan View Stair and Ramp Combination Trail Stairs Handrail (this side only) PA EMT C N UNK FENCE 10' EXIST EASEMENT VARIES VI-5 11 MINUTE OR PERVIOUS P244G WHERE SLOPE >104 PERVIOUS MATERIAL WHERE SLOPES < 10X CONCRETE STAIRS RAILING AT CONCRETE STAIRS REDUCE PATH WIDTH 10 MAINTAJN =1. who 2' MAX lit RETAINING STONE EROSION PROTECTION WHERE SHOWN 5'43' PATHWAY SECTION SECTION B-B E luawq 0e1W
BICYCLE/PEDESTRIAN ADVISORY COMMITTEE AGENDA Tuesday, October 11, :30 PM Conference Room A
BICYCLE/PEDESTRIAN ADVISORY COMMITTEE AGENDA Tuesday, October 11, 2016-5:30 PM Conference Room A The meeting location is accessible to persons with disabilities. A request for an interpreter for the hearing
More informationConstruction Specifications Manual
Isle of Wight County Pedestrian and Bicycle Master Plan Construction Specifications Manual Adopted August 20, 2009 Introduction The Isle of Wight County Pedestrian and Bicycle Facilities Master Plan was
More informationMontgomery County Life Sciences Center. LOOP TRAIL GSSC Implementation Advisory Committee Meeting #2 March 26, 2015
Montgomery County Life Sciences Center LOOP TRAIL GSSC Implementation Advisory Committee Meeting #2 March 26, 2015 Trail Alternatives GENERAL ASSUMPTIONS Where separated bicycle and pedestrian facilities
More informationMethuen Rail Trail City of Methuen Public Information Meeting Methuen City Hall
Methuen Rail Trail City of Methuen Public Information Meeting Methuen City Hall September 22, 2016 Agenda 1 Welcome and Introductions 2 Methuen Rail Trail Update 3 What is a Rail Trail? 4 Conceptual Design
More information4. Mobility and Transportation Element. Page Bikes and Pedestrians
Below are the specific General Plan text changes proposed for A-16-015 and the proposed changes to Figure MT-2 Paths and Trails. In general changes consist of removing references to the Bicycle, Pedestrian
More informationWHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.
CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED
More informationLawrence Loop SWOT Analysis
Alignment: A1 (Map Color: Red) Description: This alignment connects to the Sandra Shaw Trail on the north side of the pond and heads north through undeveloped property and then west to Michigan Street
More informationBikeway Elements. Study Area A: Needwood Road and Vicinity (Figures 3 and 4)
B R I G G S C H A N E Y R O A D I N T E R C H A N G E The ROD includes a partial interchange at Briggs Chaney Road, which is not included in the Fairland Master Plan. This interchange includes ramps to
More informationADA on Construction. Guidance for Section C Plan Preparers
ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize
More informationAccommodating Pedestrians in the Work Zone
Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,
More informationBuilding Great Neighbourhoods BELLEVUE AND VIRGINIA PARK
Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting
More informationSaskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening
Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project
More information01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS
01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS Existing Bus Stop Existing US101 On-ramp Existing POC Old Redwood Highway Rich Street City ROW Environmental Study Limit Industrial Way NO DESIGNATED
More informationBOLAND DRIVE PATH PROJECT. Martin Le Jack Reilly Paul Rodriguez Allison Rotella Maria Wilson
BOLAND DRIVE PATH PROJECT Martin Le Jack Reilly Paul Rodriguez Allison Rotella Maria Wilson INTRODUCTION TO PROJECT The purpose: to construct a multi-purpose path, which will connect two existing bike
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationAGENDA ITEM SUMMARY March 5, 2019 City Council
Agenda Item 20 AGENDA ITEM SUMMARY March 5, 2019 City Council STAFF Amanda Mansfield, Transportation Planner Paul Sizemore, FC Moves Senior Manager Chris Van Hall, Legal SUBJECT Items Relating to Regulating
More informationSR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016
SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility
More informationProject Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationMid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)
Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Sponsor St Peters Project No. RB19-000022 Project Type Other TOTAL FUNDING Total County Sponsor Federal $1,177,251.00 $238,179.00 $59,546.00 $879,526.00
More informationHospital Link Project Project Update November 2017
Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationPavement Rehabilitation & Buffered Bike Lane
Pembina Highway from Grant Avenue to Osborne Street Pavement Rehabilitation & Buffered Bike Lane Welcome April 21, 2016 Please complete and submit a comment sheet prior to leaving or complete it online
More informationAdopt Resolution to declare the intent of the City Council to vacate Worthington Street to allow for the widening of Laurel Street.
TO: FROM: SUBJECT: Kent Studebaker, Mayor Members of the City Council Erica Rooney, PE, City Engineer Engineering Department Resolution 15 05 Declaring the City s intent to Vacate Worthington Street, Dedicate
More informationChapter 3 DESIGN SPECIFICATIONS
Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically
More informationBicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)
Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed
More informationRC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found
RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found on Sheet 1. RC-67M note Construct curb ramps with a minimum
More informationSomerville Community Path Feasibility Study
Somerville Community Path Feasibility Study Prepared for: City of Somerville, Massachusetts Strategic Planning and Community Development July 14, 2006 Prepared by: VOLLMER Table of Contents Section 1.0
More informationPoor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns
Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement
More informationDesign of Stanley Park S-Curve
ADMINISTRATIVE REPORT Date: May 4, 2001 TO: FROM: Author/Local: F. Klotzbach/7118 RTS NO. 01644 CC File No. Standing Committee on Transportation and Traffic General Manager of Engineering Services, in
More informationFifth & Kirkham Traffic-Calming Project. 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018
Fifth & Kirkham Traffic-Calming Project 5 th Avenue and Kirkham Street Presented at the UCSF Quarterly Parnassus Community Meeting May 3, 2018 1 Agenda Welcome and introductions Project history, goals,
More informationOff-Road Facilities Part 1: Shared Use Path Design
Off-Road Facilities Part 1: Shared Use Path Design Presentation by: Eric Mongelli, P.E. Tom Huber October 9, 2012 FOLLOW THE CONVERSATION ON TWITTER Toole Design Group is live tweeting this webinar @tooledesign
More informationRebuilding Highway 7 Town Centre Boulevard to Sciberras Road
Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road Project Status Update Presentation to City of Markham Development Services Committee October 22, 2013 Presentation Outline Background Status
More informationAction Recommendation: Budget Impact:
City of Fayetteville Staff Review Form Submitted By 2018 0473 Legistar File ID 9/18/2018 City Council Meeting Date Agenda Item Only N/A for Non Agenda Item Matt Mihalevich 8/28/2018 DEVELOPMENT SERVICES
More informationGeorge Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access
George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access The replacement of the George Washington Bridge suspender ropes is part of the
More informationMunicipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018
Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge
More informationKnox Street Complete Streets Project
Knox Street Complete Streets Project Meeting Purpose Get community feedback on two conceptual street design options Meeting Agenda Presentation (20 minutes) Project background and schedule Summary of preferences
More informationPublic Open House #2. THE CITY OF NORTH VANCOUVER CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th STREET) JULY 2013
CHESTERFIELD AVENUE CYCLING IMPROVEMENTS (4th - 13th Street) Public Open House #2 1 Chesterfield Avenue provides an important north/south connection between Lonsdale Quay and West 23rd Street Purpose of
More informationPUBLIC SERVICE DEPARTMENT
PUBLIC SERVICE DEPARTMENT Engineering Division 732 City Hall 124 West Michigan Avenue Lansing, Michigan 48933 (517) 483-4455 FAX: (517) 483-6082 http://publicservice.cityoflansingmi.com March 30, 2011
More informationCity of Madison: 2017 Capital Budget Capital Improvement Plan
Capital Improvement Plan Project Summary Bikeways Program 779,000 751,000 630,000 670,000 703,000 703,000 Cannonball Path 210,000 - - 730,000 - - Cap City Trail 1,140,000-360,000 - - 910,000 Ice Age Junction
More informationMAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report
Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction
More informationBackground Planning Committee STAFF REPORT March 7, 2018 Page 2 of 2 On June 21, 2017, the Authority approved the programming of second cycle One Bay
Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Approval of Resolution 18-11-G Appropriating Measure J TLC
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: August 25, 2016 TO: FROM: ACTION TRANSMITTAL No. 2016-47 Technical Advisory Committee TAC Funding and Programming Committee
More informationGerald Desmond Bridge Replacement: The Severance of a Major Bicycling and Ped Route
GDB Bike Ped Access R3.0 Slide # 1 Gerald Desmond Bridge Replacement: The Severance of a Major Bicycling and Ped Route Dan Gutierrez CABO D7 Director GDB Bike Ped Access R3.0 Slide # 2 Overview Literally!
More informationADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT
ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but
More informationBuilding Great Neighbourhoods QUEEN ALEXANDRA
Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.
More informationPROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia
PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1
More informationDesign Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope
Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian
More informationVicinity Map. Proposed Roosevelt Street Sidewalk Project OVERLAND ROAD TO CASSIA STREET W ROSE HILL ST W ALBION ST S OWYHEE ST W CASSIA ST
Vicinity Map W ROSE HILL ST Cassia Park W CAMAS ST LEGEND W ALBION ST S ROOSEVELT ST W CASSIA ST Sacred Heart W KOOTENAI ST Monroe Elementary S OWYHEE ST South Junior High S SHOSHONE ST Project area Bus
More informationOrange Center Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete
More informationHospital Link Project Project Update September 2017
Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationSC 41/Joe Rouse Intersection Improvements
SC 41/Joe Rouse Intersection Improvements Scope: Add dual left-turn lanes from Joe Rouse Road onto southbound SC 41 to reduce re-occurring peak hour congestion, particularly the AM peak. Construction Cost
More informationMISSISSIPPI EAST BANK TRAIL
MINNEAPOLIS PARK AND RECREATION BOARD MISSISSIPPI EAST BANK TRAIL PUBLIC MEETING #3 10.28.2014 What We ve Heard: Feedback from Public Meeting #2 Items that are very important to the community: Trail lighting
More informationFOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)
FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas
More informationAppendix H RESPONSES TO PUBLIC COMMENTS
Appendix H TO PUBLIC COMMENTS A-1 This comment letter confirms receipt and distribution of the draft IS/ MND and documents project compliance with State Clearinghouse review requirements for the draft
More informationTRANSPORTATION COMMISSION Agenda Staff Report
TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED
More informationCity of Scotts Valley CITY COUNCIL STAFF REPORT
DATE: April 19, 2017 City of Scotts Valley CITY COUNCIL STAFF REPORT AGENDA ITEM 2 DATE: 4-19-2017 TO: FROM: APPROVED: SUBJECT: Honorable Mayor and City Council Scott Hamby, Public Works Director Jenny
More informationACTION TRANSMITTAL No
ransportation Advisory Board of the Metropolitan Council of the win Cities A: February 22, 2018 O: FROM: ACIO RASMIAL o. 2018-22 echnical Advisory Committee AC Funding and Programming Committee PRPAR BY:
More informationParks, Open Space, Trails and Recreation Master Plan
5.3 DEFINITIONS AND VOCABULARY In order to fully understand the range of trails that have been developed, and should be developed, throughout the community, a vocabulary needs to be established for the
More informationVDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations
VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66
More informationADA Operations Contact Info
Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us
More informationPattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards
Replacement Project Community Connections Phase 2 Consultation Appendix 3: Open House Display Boards November 2016 Welcome! Welcome to the Replacement Project Public Open House We Want to Hear from You
More informationCITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL
ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE
More informationAgenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationFrome Street Bicycle Route
The Adelaide City Council invites engagement from the community about Frome Street Bicycle Route Project Summary Adelaide City Council is seeking feedback on design options to construct bicycle facilities
More informationCity of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton
More informationSOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM
SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM Prepared by the City of Solana Beach January 2005 Introduction In June of 1993, the Solana Beach City Council adopted a Bikeway Master Plan as directed
More informationLee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses
Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007
More informationTable 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line
Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3
More information12/13/2018 VIA
12/13/2018 VIA EMAIL Daniel Abbes, Assistant Planner City of Sacramento community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: Bruceville Apartments (P18-073) Dear Mr.
More informationHale iwa Improvement District Project
Hale iwa Improvement District Project Hale iwa, North Shore, O ahu October 10, 2017 Public Informational Meeting Environmental Impact Statement Preparation Notice Waialua Elementary School 67-020 Waialua
More informationStreet Paving and Sidewalk Policy
City Commission Policy 600 Street Paving and Sidewalk Policy DEPARTMENT: Public Works DATE ADOPTED: June 7, 1995 DATE OF LAST REVISION: December 10, 2014 Policy No. 600.01 AUTHORITY: PASS City of Tallahassee-Leon
More informationLeveraging Active Transportation & Recreation for Economic Development in Rural VT Vermont Bike Walk Summit
Leveraging Active Transportation & Recreation for Economic Development in Rural VT 2018 Vermont Bike Walk Summit 5.4.18 MRV Moves Active Transportation Plan Scope & Purpose Watershed-wide long-range
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationProposed Grant Funding
Proposed Grant Funding Congestion Management Air Quality Funding About the funding Funding may be competitive There are mandatory requirements Tied to o Congestion Management o Pedestrians o Bicycles o
More informationCompleting the Street: Denning Drive
Completing the Street: Denning Drive Public Workshop and Walking Audit Winter Park Civic Center May 12, 2016 Completing the Street What Makes This a Complete Street? Completing the Street Complete Streets
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationPreliminary Engineering Study
Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary
More informationSan Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form
FY of Allocation Action: 2006/07 Project Name: Implementing Agency: Laguna Honda Boulevard Bike Lane, Plaza to Dewey Boulevard Department of Parking and Traffic Category: Subcategory: EXPENDITURE PLAN
More informationBradford s Landing. Preliminary Plan Abandonment AB753 & AB754 MONTGOMERY COUNTY PLANNING DEPARTMENT
Bradford s Landing Preliminary Plan 120170060 Abandonment AB753 & AB754 1 Overview Staff recommends Approval of Preliminary Plan 120170060 with revised conditions and Adoption of the Resolution. 244 lots
More informationRegional Trails Corridor Assessment
Regional Trails Corridor Assessment Project Goals Complete the regional trails network in the River to Sea TPO Planning Area and advance the Florida Greenways and Trails System Plan by developing/finalizing
More informationRiNo Railroad Crossing Connectivity Analysis. Stakeholder Workshop June 29, 2017
RiNo Railroad Crossing Connectivity Analysis Stakeholder Workshop June 29, 2017 Ideas and Considerations Presented at Stakeholder Workshop Primary Focus: 38 th Street (between Walnut & Wynkoop) 1 Basic
More informationRZC Appendix 8A Marymoor Subarea Street Requirements
RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS
More information2. What role does Steamboat Mountain Resort seek to play in the development of the Plans?
City of Steamboat Springs & Steamboat Springs Redevelopment Authority Request For Proposal Design Services Ski Area Arrival Experience Addendum #2 Issued: April 4, 2016 To: All Planholders of Record This
More informationPROJECT KEY TYPICAL SECTION 1 =60
6 WASHINGTON BLVD - BETWEEN NE 1ST ST AND NE 3RD ST Washington Boulevard is a low volume, low speed one-way road, signed for no street between NE 1st Street and NE 2nd Street, and closed to traffic between
More informationRoute 47 (North Main Street) Reconstruction
TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related
More informationAGENDA CITY OF HALF MOON BAY BICYCLE AND PEDESTRIAN ADVISORY COMMITTEE (BPAC) MEETING
AGENDA CITY OF HALF MOON BAY BICYCLE AND PEDESTRIAN ADVISORY COMMITTEE (BPAC) MEETING Thursday, January 18, 2018 6:30 pm Emergency Operations Center 537 Kelly Avenue, Half Moon Bay, CA 94019 This agenda
More informationWest Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road
West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,
More informationDATE: January 13, 2014 REPORT NO. CD TYPE OF REPORT: CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ]
DATE: January 13, 2014 REPORT NO. CD2014-011 TO: FROM: Chair and Members Committee of the Whole Community Services Gregory Dworak, General Manager Community Services 1.0 TYPE OF REPORT: CONSENT ITEM [
More informationStaff Report City of Manhattan Beach
Agenda Item #: Staff Report City of Manhattan Beach TO: Honorable Mayor Ward and Members of the City Council THROUGH: Geoff Dolan, City Manager FROM: Richard Gill, Director of Parks and Recreation Richard
More informationMontgomery County Life Sciences Center Loop Trail
Montgomery County Life Sciences Center Loop Trail Advisory Committee Meeting #1 February 10, 2015 Agenda 1. Project Background 2. Existing Conditions Analysis 3. Examples from Elsewhere 4. Discussion Project
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More informationScarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017
Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active
More informationFigure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements
INCORPORATE FEATURE PAVIN IN CROSSWALK AND INTERSECTION FIELDS Identifies high-priority pedestrian areas and create a station identity through colorful and interesting patterns ADD CURB EXTENSIONS Extending
More information1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT
1.0 INTRODUCTION This chapter provides an overview of the purpose, authorization and focus of this Recirculated Draft Environmental Impact Report (EIR), an identification of the Lead Agency, an outline
More informationCrosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans. Presentation to Sanibel City Council July 16, 2013
Crosswalk Policy Revisions & Pedestrian & Bicycle Connection Plans Presentation to Sanibel City Council July 16, 2013 Outline Crosswalk Policy Revisions Minimum Standards Goals and Objectives Pedestrian
More informationWarsaw, Missouri Van Buren Street Preliminary Engineering Report
Warsaw, Missouri Van Buren Street Preliminary Engineering Report Prepared for: The City of Warsaw 181 Harrison Street Warsaw, MO 65355 (660) 438-5522 Prepared by Charles LePage, P.E. CFS Engineers 119
More informationDuwamish Way-finding and CTR Report
V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail
More informationSouthbend to Prima Vista. October 30, Floresta Corridor Master Plan
Application of a Complete Street initiative and how it might function operationally 8 8 Southbend to Prima Vista October 30, 2017 Presentation Agenda 2 Perspective and History Traffic projections, Levels
More informationLyndale Drive Retaining Wall. Study. Public Meeting Registration: 6:00-6:30 Presentation and Discussion: 6:30-8:30 pm Tuesday, February 2 nd, 2016
Study Public Meeting Registration: 6:00-6:30 Presentation and Discussion: 6:30-8:30 pm Tuesday, February 2 nd, 2016 2 Welcome Thank you for attending tonight s public meeting for the Lyndale Drive Retaining
More information9.1 FUNCTIONAL HIGHWAY SYSTEMS IN URBANIZED AREAS Principal Arterial Interstate Principal Arterial Non-Interstate
Greater Bozeman Area Transportation Plan (2007 Update) Chapter 9: Recommended Major Street Network & Roadway Typical Sections 9.1 FUNCTIONAL HIGHWAY SYSTEMS IN URBANIZED AREAS The discussion in this Chapter
More information