BOARD ACTION AGENDA ITEM #VI PROJECT PRIORITIES

Size: px
Start display at page:

Download "BOARD ACTION AGENDA ITEM #VI PROJECT PRIORITIES"

Transcription

1 NOTES BOARD ACTION AGENDA ITEM #VI PROJECT PRIORITIES Presenter: Summary: Colleen McGue, Mike Maholtz, and Leigh Holt, MPO Staff Each year the MPO Board adopts an annual list of Priorities. Once adopted, the Priority Lists are submitted to FDOT for its direction and guidance in programming projects in the next tentative Five Year Work Program (Fiscal Years 2018/ /2023). MPO member jurisdictions submitted applications for prioritization that have been reviewed by the Technical Advisory Committee (TAC) Prioritization Subcommittee based upon criteria adopted by the MPO Committees and MPO Board in April The final adopted Priority List will become part of the Fiscal Year (FY) 2018/ /2023 Transportation Improvement Program (TIP) which is the major planning document for securing state and federal funding and will include projects programmed by the Florida Department of Transportation (FDOT) as a result of this project prioritization process Attachments: 1) 2017 Sarasota/Manatee MPO Priorities Summary 2) a LRTP Cost Feasible Priorities- Advance s b. Response to FDOT Request for Transportation Priorities FY 2022/2023 3) Draft 2017 Charlotte -Punta Gorda MPO Joint Regional TRIP/Trails Priorities 4) Draft 2017 Polk TPO Joint Regional TRIP/Trails Priorities Recommended Action: MPO Board Adoption of the 2017 Priorities MPO Meeting Agenda Item Prepared By: Leigh Holt AGENDA ITEM #VI-2

2 Number of s Color Code 2017 Sarasota/Manatee MPO Priorities Summary Attachment 1 14 Advancing projects from current work program with at least one phase funded. Additional funding required. 44 applications reviewed/revised/scored/ranked/complete. 12 applications reviewed/revised/scored/ranked. 4 s submitted directly to FDOT for consideration as part of the Advanced Traffic Management System (ATMS). 5 Advancing projects for major bridges. 79 TOTAL PROJECTS RANKED (s may be included in more than one category below) 2040 LONG RANGE TRANSPORTATION PLAN COST FEASIBLE PRIORITIES 6(+1) RRI 4 ATMS 32 CMS 10 MMEC 25 TA 2 SIS 33 HC 5 BR Regional Roadway Investments: The regional roadway system includes roads that facilitate accessibility to the region s economic anchors, such as the downtowns, the port, and other key economic activity centers. These are the highest priority regional projects identified as financially feasible in the 2040 Long Range Transportation Plan (LRTP). Advanced Traffic Management System: The 2040 LRTP cost feasible plan includes $20 million per county over the 20-year period between 2021 and 2040 for expansion of the system. These projects were submitted directly to FDOT for to ensure consistency with the new ATMS Concept of Operations plan which is nearing completion and the mandated by FDOT and compliance with Federal Highway Administration Rule 940. Congestion Management System: The congestion management process identifies significant congestion problems and near-term, lower cost strategies for multi modal mobility management and corridor or intersection congestion mitigation. The LRTP cost feasible plan sets aside $1 million annually in each county, to be shared among jurisdictions, for congestion management projects. Congestion constrained corridors receive priority for these funds. Multi Modal Emphasis Corridor: The MMEC provides a renewed focus on urban revitalization of the /Tamiami Trail scenic highway corridor from the Charlotte line to 17 th Street in Palmetto. The goal is to fund a package of mobility enhancement strategies that directly relate to local government redevelopment strategies that improve walking, bicycling, and transit accessibility. Transportation Alternatives: Non-motorized, transportation alternatives include on- and off-road pedestrian and bicycle facilities, infrastructure projects for improving non-driver access to public transportation and enhanced mobility, community activities and environmental mitigation, recreational trail projects, and safe routes to school. Approximately $600,000 is available annually for all jurisdictions. FDOT REQUEST FOR TRANSPORTATION PROJECT PRIORITIES FISCAL YEAR 2022/2023 Strategic Intermodal System: Florida s highest statewide priorities focus on regional, statewide, interstate, and international facilities to facilitate freight movement and economic development. I-75 is the region s interstate roadway. Port Manatee and the Sarasota-Bradenton International Airport are SIS facilities and roads leading into those facilities are considered SIS Connectors. Highway Capacity: Chapter , Florida Statutes require MPO/TPOs to develop and submit an annual list of priority projects based upon project selection criteria which considers the Strategic Intermodal System (SIS) its connectors, other regionally significant facilities, and the local LRTP. All projects on the state road system are listed as highway capacity projects. Infrastructure Condition: FDOT inspects all public highway bridges and Florida s inventory ranks among the best in the nation. In Manatee and Sarasota Counties, 95 % of all bridges are in good conditions and no bridges are in poor condition. There are currently five major bridges in the FDOT work program that need additional funding for the next phase of development that are ranked here. 32 CMS Congestion Management System: Same as above 25 TA Transportation Alternatives: Same as above 7 MUT Multi Use Trails: In addition to Transportation Alternatives, FDOT has funding available specifically for multi-use trails. 5 RT Regional Trails: Prioritized funding for regional trails designated by the Florida Department of al Protection (FDEP) Greenways and Trails Department. 10 TRIP 3 CIGP Transportation Regional Incentive Program: State funds provide incentives for local governments and the private sector to pay for projects benefiting regional travel and commerce. FDOT will pay up to 50 percent of the non-federal share of project costs for public transportation facility projects. The MPO has regional agreements with both Polk and Charlotte Counties in order to be considered for TRIP funding. Incentive Grant Program: Grants to counties to improve transportation facilities including transit located on the State Highway System (SHS) or to relieve congestion on the SHS, consistent with the local LRTP per Section , Florida Statutes.

3 2040 LONG RANGE TRANSPORTATION PLAN (LRTP) COST FEASIBLE PRIORITIES - ADVANCING PROJECTS These projects have a least one phase already budgeted or underway in the Florida Department of Transportation (FDOT) five-year work program. The Federal Highway Administration (FHWA) and FDOT require advancement of currently funded projects before new projects can be added to the work program so these projects are the TOP PRIORITY FOR MPO AND FDOT FUNDING. s are usually funded on a twoyear cycle. For example, a project that is nearing completion of the DESIGN phase provides a more accurate estimate of the funds needed for the CONSTRUCTION phase. Advancing 1 Manatee 2 Manatee 3 Sarasota 4 Sarasota 5 Sarasota 6 Manatee 7 Manatee 8 Sarasota 9 Palmetto 10 Manatee 11 Sarasota 12 Bradenton 13 Manatee / 15th St East/ 301 Blvd (Center) 15th St East/ 301 Blvd (North) Ringling TRIP: 15th St East/ 301 Blvd (South) 10th Ave SR 70 Intersection Southern Parkway Ellenton-Gillette Road 14 Manatee Willow-Ellenton Trail Magellan Dr. to 49th Ave E 49 th Ave E to Roundabouts at Main St and Ringling Roundabout at Pine Place Roundabout at Fruitville Road Edwards Drive to Pearl Avenue From Tallevast Rd to Magellan Roundabout at University Pkwy Riverside Dr. to 17th St At 30th St. East Roundabouts at Myrtle St and Martin Luther King Jr Way 43rd Street West to 26th Street West 17th Street East to Mendoza Road Lincoln Park to US 301 (Parrish) 1 Score Bike Path Sidewalks Multi Use Trail LRTP/MPO Funds Regional Roadway Regional Roadway Multi Modal Emphasis Corridor Congestion Management Multi Modal Emphasis Corridor Multi Modal Emphasis Corridor Multi Modal Emphasis Corridor Multi Modal Emphasis Corridor Multi Modal Emphasis Corridor Congestion Management Multi Modal Emphasis Corridor Transportation Alternatives Transportation Alternatives Transportation Alternatives FDOT Funds Regionally Significant Regionally Significant State Highway System Congested Corridor State Highway System State Highway System Regionally Significant State Highway System Alternate State Highway System SIS/Regionally Significant Regionally Significant Transportation Alternatives Transportation Alternatives Trans Alt Multi Use Trails Regional Trails

4 2040 LONG RANGE TRANSPORTATION PLAN (LRTP) COST FEASIBLE PRIORITIES Regional Roadway Investments The regional roadway system includes roads that facilitate accessibility to the region s economic anchors, such as the downtowns, the port, and other key economic activity centers. These are the highest priority regional projects identified as financially feasible in the 2040 Long Range Transportation Plan (LRTP). Advancing Regional Roadway 1 Manatee 2 Manatee 3 Manatee 4 Sarasota 5 Sarasota 6 Sarasota / 15th St East/ 301 Blvd (Center) 15th St East/ 301 Blvd (North) 15th St East/ 301 Blvd (South) TRIP: River Road ( 1) River Road ( 2) River Road ( 3) 7 North Port Price Boulevard *Limit change requires LRTP amendment Magellan Drive to 49th Ave E 49 th Ave E to From Tallevast Rd to Magellan to north of West Villages Pkwy West Villages Pkwy to Center Road Center Road to I-75 Sumter to North Port High School/ Heron Creek * Right of Way Right of Way Right of Way Right of Way Right of Way Score

5 2040 LONG RANGE TRANSPORTATION PLAN (LRTP) COST FEASIBLE PRIORITIES Advanced Traffic Management System (ATMS) Regional Roadway Investments The 2040 LRTP cost feasible plan includes $20 million per county over the 20-year period between 2021 and 2040 for expansion of the two-county regional system. These projects were submitted directly to FDOT to ensure consistency with the new Sarasota/Manatee ATMS Concept of Operations plan which is nearing completion. ATMS projects must also comply with Florida s Statewide Systems Engineering Management Plan to receive state transportation funds and with Federal Highway Administration Rule 940 to receive federal funds. Local Requesting Manatee / RTMC Networking Infrastructure Replace router, hub switches, and firewall at TMC ATMS Manatee Traffic Signal Infrastructure Replace controllers and edge switches system-wide ATMS Sarasota Variable Signage Message boards at critical intersections to improve traffic flow ATMS Sarasota ATMS Network Expansion on McIntosh Road Wilkinson Road to Fruitville Road ATMS 3

6 2040 LONG RANGE TRANSPORTATION PLAN (LRTP) COST FEASIBLE PRIORITIES Multi Modal Emphasis Corridor (MMEC) The MMEC provides a renewed focus on urban revitalization of the /Tamiami Trail scenic highway corridor from the Charlotte line to 17 th Street in Palmetto. The goal, as described in the LRTP, is to fund a package of mobility enhancement strategies that directly relate to local government redevelopment strategies that improve walking, bicycling, and transit accessibility. MMEC / Score Advancing 1 Sarasota 2 Sarasota TRIP: 3 Manatee 4 Sarasota 5 Palmetto 10th Ave ( alternate) 6 Sarasota 7 Manatee Roundabouts at Main St and Ringling Roundabout at Fruitville Road Edwards Drive to Pearl Avenue Roundabout at University Pkwy Riverside Dr. to 17th St Roundabouts at Myrtle St and Martin Luther King Jr Way Edwards Drive to 26th Ave West Bicycle Wayfinding/Signage Right of Way / Right of Way / Right of Way / Right of Way / Manatee At Bayshore Gardens Parkway Manatee Bus (14th St W) 39th Ave West to 26th Ave West Pedestrian Crossings Manatee At Bayshore Gardens Parkway

7 2040 LONG RANGE TRANSPORTATION PLAN (LRTP) COST FEASIBLE PRIORITIES Congestion Management System (CMS) The congestion management process identifies significant congestion problems and near-term, lower cost strategies for multi modal mobility management and corridor or intersection congestion mitigation. The LRTP cost feasible plan sets aside $1 million annually in each county, to be shared among jurisdictions, for congestion management projects. Congestion constrained corridors are to receive priority for these funds. FDOT has additional funds available for congestion management. Advancing MMEC / 1 Manatee 15th St East/ 301 Magellan Dr. to Right of Way Blvd (Center) 49th Ave E Manatee 15th St East/ th Ave E to Right of Way Blvd (North) Sarasota Roundabouts at Main St Right of Way / and Ringling Sarasota Ringling Roundabout at Right of Way / Pine Place Sarasota TRIP: Roundabout at Right of Way / Fruitville Road Manatee 15th St East/ 301 From Tallevast Rd to Right of Way Blvd (South) Magellan Sarasota Roundabout at University Pkwy Palmetto 10th Ave Riverside Dr. to Right of Way / 17th St Manatee SR 70 Intersection At 30th St. East Right of Way Sarasota Roundabouts at Myrtle St and Right of Way / Martin Luther King Jr Way Holmes Beach TRIP: SR 789 (Gulf Southern City to Drive) Marina Drive Intersection Manatee At Bayshore Gardens Parkway Manatee 53rd Ave West At 26th Steet West 14 Manatee SR 684 (Cortez Rd) At 26th Street West Score

8 (CMS continued) 15 Manatee 16 Manatee 17 Bradenton Beach 18 Manatee CIGP: 60th Avenue East TRIP: 53rd Ave West (SR 70) TRIP: SR789 (Gulf Drive) TRIP: SR 684 (Cortez Road) 19 Sarasota Honore Avenue US 301 to Outlet Mall entrance At 14th Street West Longboat Pass Bridge to 27th Street North At 34th Street West University Pkwy to 17th Street Capacity 20 Manatee US 301 At 15th Street East 21 Manatee US 301 At 30th Avenue East 22 Bradenton 3rd Avenue East A parcel of land bound to the south by SR 64 (Manatee Ave.), to the west by 10th St. E., to the east by 12th St. E. and to the north by the Manatee River 23 Bradenton 17th Avenue West At 9th Street West 24 Bradenton 9th Street West At 13th Avenue West 25 Manatee US 301 At Tallevast Road Manatee 57th Avenue West At 26th Street West North Port Price Boulevard Sumter to North Port High School/ Heron Creek Capacity Sarasota 29 Sarasota TRIP: I-75 Overpass TRIP: Cattlemen Road Lakewood Ranch Blvd to North Cattlemen Road At Richardson Road Capacity

9 2040 LONG RANGE TRANSPORTATION PLAN (LRTP) COST FEASIBLE PRIORITIES Transportation Alternatives (TA) Non-motorized, transportation alternatives include on- and off-road pedestrian and bicycle facilities, infrastructure projects for improving non-driver access to public transportation and enhanced mobility, community activities and environmental mitigation, recreational trail projects, and safe routes to school. Approximately $600,000 is available annually in each county. Advancing TA / 1 Palmetto 10th Ave 2 Bradenton Southern Parkway 3 Manatee 4 Manatee Ellenton-Gillette Road Willow-Ellenton Trail 5 Manatee 9th St West 6 Holmes Beach TRIP: SR 789 (Gulf Drive) 7 Manatee US Manatee 33 rd Ave West 9 Manatee 34th Ave West 10 Sarasota Desoto Road Tuttle Avenue 47th Street 11 Manatee 18th St West 12 Manatee US Bradenton Beach TRIP: SR789 (Gulf Drive) Riverside Drive to 17th St 43rd Street West to 26th Street West 17th Street East to Mendoza Road US 301 (Ellenton) to US 301 (Parrish) SR 684 (Cortez Rd) to 301 Blvd Southern City to Marina Drive Intersection 51st Ave East to 60th Ave East Bus (14th St W) to east end of 33rd Ave West Bus (14th St W) to 9th St West North Lockwood Ridge Rd to North Washington Blvd. University Pkwy to Myrtle Street North Lockwood Ridge Rd to N Shade Ave SR 684 (Cortez Rd) to 38th Ave West 41st Ave East to 51st Ave East Longboat Pass Bridge to 27th Street North Bike Path Sidewalks Multi Use Trail Sidewalk Sidewalk Sidewalks Sidewalk/Pedestrian Bridge Right of Way / Score Sidewalks Sidewalk Sidewalks

10 (TA continued) 14 Bradenton 3rd Avenue East 15 Sarasota Legacy Trail Northern Extension 16 Sarasota Jacaranda Blvd 17 Sarasota Tuttle Avenue 18 Manatee Florida Blvd 19 Manatee Morgan Johnson Road 20 Sarasota Proctor Road 21 North Port Biscayne Drive 22 North Port Ponce de Leon 23 Manatee University Parkway A parcel of land bound to the south by SR 64 (Manatee Ave.), to the west by 10th St. E., to the east by 12th St. E. and to the north by the Manatee River Northern limits of existing Legacy Trail to Payne Park South of Border Road to Commercial Ct/Executive Drive Myrtle Street to University Pkwy 26th Street West to 34th Street West 13th Ave East to south of So SR 64 McIntosh Road to Honore Ave Glenallen to Ponce de Leon Biscayne to Tropicaire Lakewood Ranch Blvd to Lorraine Rd Multi Use Trail al Study Sidewalks Bike Lanes Sidewalk Sidewalk Sidewalks Bike Lanes Bike Lanes Multi Use Trail 24 Sarasota School Avenue To Datura Street Multi Use Trail Sarasota Osprey Park Trailhead Osprey Park to the Legacy Trail Multi Use Trail

11 RESPONSE TO FDOT REQUEST FOR TRANSPORTATION PROJECT PRIORITIES FISCAL YEAR 2022/2023 Strategic Intermodal System (SIS) Florida s highest statewide priorities focus on regional, statewide, interstate, and international facilities to facilitate freight movement and economic development. I-75 is the region s interstate roadway. Port Manatee and the Sarasota-Bradenton International Airport are SIS facilities and roads leading into those facilities are considered SIS Connectors. SIS 1 Port Manatee 2 Sarasota / SIS: Piney Point Road I-75 at Toledo Blade 200 feet east of Reeder Road to CS railroad (0.43 mile) Port Manatee SIS Connector I-75 at Toledo Blade Blvd Park and Ride Score RESPONSE TO FDOT REQUEST FOR TRANSPORTATION PROJECT PRIORITIES FISCAL YEAR 2022/2023 (CIGP) The Incentive Grant Program (CIGP) was created for the purpose of providing grants to counties, to improve a transportation facility including transit which is located on the State Highway System (SHS) or which relieves traffic congestion on the SHS, per Section , Florida Statutes. Each eligible project must be consistent with the Florida Transportation Plan, Metropolitan Planning Organization Plan, and any appropriate local government comprehensive plan. HC 1 Manatee 2 Manatee 3 Manatee / CIGP: 60th Avenue East CIGP: SR 684 (Cortez Road) CIGP: US 301 US 301 to Outlet Mall entrance At 75th St West At SR 62/Erie Road Capacity Score

12 MUT RESPONSE TO FDOT REQUEST FOR TRANSPORTATION PROJECT PRIORITIES FISCAL YEAR 2022/2023 Multi Use Trails (MUT) In addition to Transportation Alternatives, FDOT has funding available specifically for multi-use trails. Advancing 1 Manatee 2 Holmes Beach 3 Bradenton Beach / Willow-Ellenton Trail TRIP: SR 789 (Gulf Drive) TRIP: SR789 (Gulf Drive) US 301 (Ellenton) to US 301 (Parrish) Southern City to Marina Drive Intersection Longboat Pass Bridge to 27th Street North Multi Use Trail Development Score Sarasota Multi Use Trail Legacy Trail Northern Northern limits of existing al Study Extension Legacy Trail to Payne Park & Manatee Lakewood Ranch Blvd to Multi Use Trail University Parkway Lorraine Rd Sarasota School Avenue To Datura Street Multi Use Trail Sarasota Osprey Park Trailhead Osprey Park to the Legacy Trail Multi Use Trail Development & Regional Trails (RT) Trails designated by the Florida Department of al Protection (FDEP) Greenways and Trails Dept. are also eligible for regional trail funding. RT / Score US 301 (Ellenton) to US 301 Advancing 1 Manatee Willow-Ellenton Trail Multi Use Trail (Parrish) TRIP: SR 789 Southern City to Marina 2 Holmes Beach (Gulf Drive) Drive Intersection. TRIP: SR789 Longboat Pass Bridge to 27th 3 Bradenton Beach (Gulf Drive) Street North Legacy Trail Northern limits of existing Multi Use Trail 4 Sarasota Development Northern Extension Legacy Trail to Payne Park al Study & 2

13 5 Sarasota Osprey Park Trailhead Osprey Park to the Legacy Trail Multi Use Trail Development & RESPONSE TO FDOT REQUEST FOR TRANSPORTATION PROJECT PRIORITIES FISCAL YEAR 2022/2023 Highway Capacity (HC) Advancing HC 1 Manatee 2 Manatee 3 Manatee / (Desoto Bridge) SR 64 (Manatee Ave/Anna Maria Bridge) SR 684 (Cortez Rd/Cortez Bridge) TRIP: SR 789 (Gulf Drive) SR 64 (Manatee Ave.) to Haben Blvd /Replacement Bridge Score SR 789 to Perico Bay /Replacement Bridge Right of Way / rd St. W. to SR 789 (Gulf Dr) /Replacement Bridge Sarasota Roundabouts at Right of Way / Main St and Ringling Sarasota Roundabout at Right of Way / TRIP: Fruitville Road Manatee Edwards Drive to Pearl Avenue Sarasota SR 789 (Ringling/ Bird Key to /Replacement Bridge Coon Key Bridge) Sarasota Harbor West Sarasota Roundabout at University Pkwy Manatee SR 789 (Gulf Drive) North Shore to /Replacement Bridge Coquina Beach Manatee SR 70 Intersection At 30th St. East Right of Way Sarasota Roundabouts at Myrtle St and Martin Luther Right of Way / King Jr Way Holmes Beach 13 Manatee Southern City to Marina Drive Intersection Edwards Drive to 26th Ave West Bicycle Wayfinding/Signage

14 (HC continued) 14 Manatee 51st Ave East to Sidewalk US th Ave East Manatee At Bayshore Gardens Parkway Manatee Bus 39th Ave West to Pedestrian Crossings (14th St W) 26th Ave West Manatee SR 684 (Cortez Rd) At 26th Street West Manatee At Bayshore Gardens Parkway Manatee TRIP: 53rd Avenue At 14th Street West West (SR 70) Manatee 41st Ave East to Sidewalks US st Ave East Bradenton Beach TRIP: SR 789 Longboat Pass Bridge to (Gulf Drive) 27th Street North Manatee TRIP: SR 684 (Cortez Road) At 34th Street West Manatee CIGP: SR 684 (Cortez Road) At 75th St West Beach 24 Sarasota Road/Siesta Key Avenida Del Mare to (SR 789A) Midnight Pass Road 25 Manatee US 301 At 15th Street East Manatee US 301 At 30th Avenue East Longboat Key SR 789 (Gulf of Mexico Drive) Between 450 block and 1000 block of Gulf of Mexico Drive Turn Lanes Manatee US 301 At 63rd Ave East 29 Bradenton SR 64 Martinique Drive Planning Study (Manatee Ave) (Harbour Isles) Manatee US 301 At Tallevast Road Manatee CIGP: US 301 At SR 62/Erie Road Manatee SR 70 At Lorraine Road Sarasota I-75 at Toledo Blade I-75 at Toledo Blade Blvd Park and Ride

15 MAP 21 - Safety HC 1 Manatee / (Desoto Bridge) SR 64 (Manatee Ave.) to Haben Blvd /Replacement Bridge Score High Crash Non- Motorized Advancing 2 Sarasota 3 Manatee 4 Manatee 5 Holmes Beach 6 Manatee 7 Manatee 8 Manatee 9 Manatee 10 Manatee 11 Manatee 12 Manatee 13 Manatee Ringling SR 70 Intersection 9th St West TRIP: SR 789 (Gulf Drive) US 301 Bus (14th St W) 53rd Ave West SR 684 (Cortez Rd) CIGP: 60th Avenue East Roundabout at Pine Place At 30th St. East SR 684 (Cortez Rd) to 301 Blvd Southern City to Marina Drive Intersection Edwards Drive to 26th Ave West 51st Ave East to 60th Ave East At Bayshore Gardens Parkway 39th Ave West to 26th Ave West At 26th St West At 26th Street West At Bayshore Gardens Parkway US 301 to Outlet Mall entrance Sidewalk Bicycle Wayfinding/Signage Sidewalk Pedestrian Crossings Capacity Right of Way /

16 (Safety Continued) 14 Manatee 15 Manatee 16 Manatee 33 rd Ave West 34th Ave West TRIP: 53rd Avenue West (SR 70) 17 Sarasota Desoto Road Tuttle Avenue 47th Street 18 Manatee 19 Manatee 18th St West TRIP: SR 684 (Cortez Road) Bus (14th St W) to east end of 33rd Ave West Bus (14th St W) to 9th St West At 14th Street West North Lockwood Ridge Rd to North Washington Blvd. University Pkwy to Myrtle Street North Lockwood Ridge Rd to N Shade Ave SR 684 (Cortez Rd) to 38th Ave West At 34th Street West Sidewalks Sidewalk/Pedestrian Bridge Sidewalks Sidewalk MAP-21 - Infrastructure Condition (IC) Advancing IC 1 Manatee 2 Manatee 3 Manatee 4 Sarasota 5 Manatee / (Desoto Bridge) SR 64 (Manatee Ave/ Anna Maria Bridge) SR 684 (Cortez Rd/ Cortez Bridge) SR 789 (Ringling Blvd/ Coon Key Bridge) SR 789 (Gulf of Mexico Drive) SR 64 (Manatee Ave.) to Haben Blvd /Replacement Bridge Development & SR 789 to Perico Bay /Replacement Bridge Right of Way / Score rd St. W. to SR 789 (Gulf Dr) /Replacement Bridge Bird Key to Sarasota Harbor West North Shore to Coquina Beach /Replacement Bridge /Replacement Bridge

17 DRAFT May 31, TRANSPORTATION REGIONAL INCENTIVE PROGRAM (TRIP) PROJECT PRIORITY LIST CHARLOTTE COUNTY-PUNTA GORDA MPO - SARASOTA/MANATEE MPO Priority TRIP Funds 1 River Road from U.S. 41 to north of West Villages Parkway Sarasota $5,000,000 2 Burnt Store Road ( II) from Tern Bay Terminus to Notre Charlotte $2,000,000 Dame Blvd 3 (14 th St SR 70 (53 rd Ave W) add separate Manatee $303,574 westbound right turn lane 4 I-75 Overpass from Lakewood Ranch Blvd to N. Cattlemen Road construct a four lane overpass connecting Lakewood Ranch Blvd to North Cattlemen Rd. Attachment 3 Sarasota $20,600,000 5 Piper Road North from Henry Street to US 17; four lanes divided in unimproved corridor; ROW/ Charlotte 6 SR 684 (Cortez 34th St W extend eastbound right turn lane Manatee 7 Fruitville: replace existing traffic signal with a modern City of roundabout. The project will include pedestrian and transit Sarasota s, lighting and landscaping. Carmalita Street Extension making Carmalita St two City of way through the NB and SB lanes. Add traffic signals at Punta both intersections; extend multi-use trail from Linear Park Gorda along SB to Carmalita St. and along Carmalita St to Taylor St. ROW/ 9 SR 789 Complete Street (Anna Maria Island City of Multi-Use Trail) Complete Streets s from southern Holmes Holmes Beach limits to Marina Drive intersection Beach 10 Cattlemen Richardson roundabout at intersection Sarasota 11 SR 789 Complete Street (Anna Maria Island City of Multi-Use Trail) Complete Streets s from Longboat Bradenton Pass Bridge to 27 th Street North Beach 12 Iona Road construct new road from Fruitville Rd to Palmer Blvd Sarasota 13 Moccasin Wallow Road from to Gateway Blvd widen from Manatee 2-4 lanes and reconstruct with multi-modal enhancements $2,000,000 $303,574 $5,500,000 $850,000 $7,089,017 $5,370,000 $5,960,734 $26,700,000 $32,557,016

18 Priority Draft May 31, JOINT REGIONAL TRAILS PROJECT PRIORITY LIST CHARLOTTE COUNTY-PUNTA GORDA MPO - SARASOTA/MANATEE MPO RTAP funds 1 Legacy Trail Northern Extension al survey for new 7.5-mile addition to existing rails-to-trails corridor connecting Venice and Sarasota downtowns. Sarasota $425,000 2 Sidewalks (Morningside Drive to Sarasota ), 8 foot sidewalk, PE/). Next segment: a. East side (Conway Blvd to Midway Blvd.), 8 foot sidewalk, estimated cost $1.88 Million 3 Willow-Ellenton Greenway Multi-Use Trail from US 301 (Ellenton) to US 301 (Parrish) and construction of enhanced trail system for pedestrians and bicycles adjacent to the railroad tracks from Ellenton-Gillette Rd to Erie Rd. Charlotte $1,880,000 Manatee $2,700,000 4 Legacy Trail, Osprey Junction Trailhead (Legacy Trail at East end of Bay Street) and construct a 10 ft. wide multi-use trail connecting Legacy Trail to Osprey Park, including parking, restrooms and additional amenities. Sarasota $2,000,000 5 Multi-Use Recreational Trail (MURT) Bridges and Construct bicycle/pedestrian bridge over Alligator Creek along MURT. City of Punta Gorda $1,600,000 6 Anna Maria Island Multi Use Trail SUN Trail extension from Longboat Key to Manatee Avenue parallel to SR 789/Gulf Drive including downtown cycle tracks Cities of Bradenton Beach and Holmes Beach $12,900,000 The Charlotte -Punta Gorda MPO and Sarasota/Manatee MPO interlocal agreement for joint regional transportation planning and coordination, asks that FDOT attempt to award funding on an equitable basis among the three counties (Charlotte, Manatee and Sarasota) when funding new TRIP projects.

19 Priorit y DRAFT June 8, JOINT REGIONAL TRAILS PROJECT PRIORITY LIST POLK TPO - SARASOTA/MANATEE MPO RTAP funds 1 Legacy Trail Northern Extension al survey for new 7.5-mile addition to existing rails-to-trails corridor connecting Venice and Sarasota downtowns. 2 Tenoroc Trail I PD&E Study for a 2.2 mi. segment between Lake Parker and SR 33. The proposed trail provides direct access to 2 regional parks and over 1,600 acres of state-owned conservation/recreation land. A component of Florida s SUNTrail Network, future phases will link Lakeland s Lake-to-Lake Connector to the Van Fleet State Trail and Florida s Coast-to-Coast Trail. 3 Willow-Ellenton Greenway Multi-Use Trail from Lincoln Park (Palmetto) to US 301 (Parrish) and construction of enhanced trail system for pedestrians and bicycles adjacent to the railroad tracks from Lincoln Park to Erie Rd. 4 Haines City Rail-Trail II First phase between Downtown and Grace Ave. was opened in early II extends trail to the Ridge Scenic Highway (state designated scenic highway) and Lake Eva Recreational Complex. City is seeking and funding. 5 Anna Maria Island Multi Use Trail SUN Trail extension from Longboat Key to Manatee Avenue parallel to SR 789/Gulf Drive including downtown cycle tracks 6 Tenoroc Trail II PD&E Study for a 12 mi. segment between I and the Polk Parkway/Braddock Rd Interchange and the multi-use trail being constructed by the Turnpike. A component of Florida s SUNTrail Network, the trail will link Lakeland s Lake-to-Lake Connector to the Van Fleet State Trail and Florida s Coast-to-Coast Trail. 7 Legacy Trail Osprey Park Trailhead (Osprey Park to Legacy Trail) and construct a 10 ft. wide multi-use trail connecting Legacy Trail to Osprey Park, including parking, restrooms, and additional amenities. Attachment 4 Sarasota City of Lakeland Manatee City of Haines City Cities of Bradenton Beach and Holmes Beach Polk Sarasota $425,000 $500,000 $2,700,000 $130,000 (PE) $1,424,000 (CST) $12,900,000 $2,000,000 $2,000,000

20 DRAFT May 26, TRANSPORTATION REGIONAL INCENTIVE PROGRAM (TRIP) PROJECT PRIORITY LIST POLK TPO - SARASOTA/MANATEE MPO Priority TRIP Funds 1 River Road from U.S. 41 to north of West Villages Parkway Sarasota $5,000,000 2 (14 th St SR 70 (53 rd Ave W) add separate Manatee $303,574 westbound right turn lane 3 I-75 Overpass from Lakewood Ranch Blvd to N. Cattlemen Road construct a four lane overpass connecting Lakewood Ranch Blvd to North Cattlemen Rd. Sarasota $20,600,000 4 SR 684 (Cortez 34th St W extend eastbound right turn lane Manatee 5 Fruitville: replace existing traffic signal with a modern City of roundabout. The project will include pedestrian and transit Sarasota s, lighting and landscaping. 6 SR 789 Complete Street (Anna Maria Island City of Multi-Use Trail) Complete Streets s from southern Holmes Holmes Beach limits to Marina Drive intersection Beach 7 Cattlemen Richardson roundabout at intersection Sarasota 8 SR 789 Complete Street (Anna Maria Island City of Multi-Use Trail) Complete Streets s from Longboat Bradenton Pass Bridge to 27 th Street North Beach 9 Iona Road construct new road from Fruitville Rd to Palmer Blvd Sarasota 10 Moccasin Wallow Road from to Gateway Blvd widen from Manatee 2-4 lanes and reconstruct with multi-modal enhancements $303,574 $5,500,000 $7,089,017 $5,370,000 $5,960,734 $26,700,000 $32,557,016 The Polk TPO did not bring any applications forward for TRIP funding in the 2017 Prioritization Cycle.

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012 WEST CENTRAL FLORIDA MPO CHAIRS COORDINATING COMMITTEE REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012 TRANSPORTATION REGIONAL INCENTIVE PROGRAM (TRIP)

More information

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue 41 US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue EXECUTIVE SUMMARY DRAFT FEBRUARY 2019 Project Overview The US 41 Complete Streets Corridor Planning Study,

More information

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION. Tel: (941) AGENDA

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION. Tel: (941) AGENDA BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION Tel: (941) 883-3535 1. Call to Order & Roll Call AGENDA 3:00 p.m., Thursday, September

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Sarasota / Manatee Barrier Islands Traffic Study

Sarasota / Manatee Barrier Islands Traffic Study Sarasota / Manatee Barrier Islands Traffic Study PUBLIC INFORMATION WORKSHOP December 5, 2017 North Study Area o City of Anna Maria o Holmes Beach o Bradenton Beach o Coquina Beach o Longboat Key o Bradenton

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES Table 2: Non-Strategic Intermodal System (Non-SIS) Project Priorities FDOT Item- Phases

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE 1 Florida Department of Transportation District Four I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE Presentation Outline Overview of Planning and Programming I-95 Interchange

More information

CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION BICYCLE/PEDESTRIAN ADVISORY COMMITTEE (BPAC)

CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION BICYCLE/PEDESTRIAN ADVISORY COMMITTEE (BPAC) BPAC Minutes 03-16-2017 Page 1 CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION BICYCLE/PEDESTRIAN ADVISORY COMMITTEE (BPAC) MINUTES OF THE MEETING HELD ON MARCH 16, 2017 AT THE CULTURAL

More information

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE Red denotes new funding in FDOT WP since last year. SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) DRAFT 2016 TRANSPORTATION PROJECT PRIORITIES FY 2017-FY 2021 A(1). STRATEGIC INTERMODAL SYSTEM

More information

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP EXISTING PRIORITIES FUNDED FOR CONSTRUCTION Limits Description Status 1 415489 3 H1865 US HWY 301 FROM SR 674 TO BALM RD Widen 2 lanes to 6 lanes divided County / Construction Programmed 2016 2 405492

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017 SR 9/I-95 Interchange at PD&E Study Presentation

More information

Linking Transportation and Health in Nashville & Middle Tennessee

Linking Transportation and Health in Nashville & Middle Tennessee Linking Transportation and Health in Nashville & Middle Tennessee Fit Nation New Orleans CPPW Mentoring Grant Built Environment Program May 14, 2011 Local Transportation Planning Framework Federal U.S.

More information

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number

More information

Technical Advisory Committee (TAC)

Technical Advisory Committee (TAC) Technical Advisory Committee (TAC) January 17, 2018 CareerSource Heartland Sebring, FL 1) ROLL CALL 2) PUBLIC COMMENT 3) APPROVAL OF MINUTES* October 18, 2017 Meeting 4) SR 710 Extension in Okeechobee

More information

David Agacinski FDOT District One Bicycle & Pedestrian Coordinator Daniels Parkway Ft. Myers, Florida 33913

David Agacinski FDOT District One Bicycle & Pedestrian Coordinator Daniels Parkway Ft. Myers, Florida 33913 Meeting Notes Date: December 20, 2018 Project #: 20166 To: David Agacinski FDOT District One Bicycle & Pedestrian Coordinator 10041 Daniels Parkway Ft. Myers, Florida 33913 From: Project: Subject: Patty

More information

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017 1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO

More information

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL D: PROJECT PRIORITIZATION Prioritization of the improvements proposed in the Multimodal Improvement Plan is required in order to determine which projects should be funded first, where the transportation

More information

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015 COMPLETE STREETS A STEP FORWARD 2015 ITE District 10/FSITE Annual Meeting November 3, 2015 About Lakeland Incorporated: 1885 Population: 100,728 Area: Approx. 75 sq. mi Major Employers: Publix, Lakeland

More information

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects Printed 6/9/15 Project I-4 - widen to 1 lanes (Managed Use Lanes) Part of the I-4 Beyond the Ultimate project SR 47 - widen from 4 to 6 lanes (including ramps) Saxon Blvd - ramp and roadway improvements

More information

National Performance Management Measures. April 20, 2016 Webinar

National Performance Management Measures. April 20, 2016 Webinar Safety Performance Measures September 26, 2016 National Performance Management Measures April 20, 2016 Webinar Highway Safety Improvement Program Performance Measures 1 2 3 4 5 Number of fatalities Rate

More information

339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway

339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway 339 New Leicester Highway, Suite 140 Asheville. NC 28806 www.fbrmpo.org Long-Range Transportation Plan Transportation Improvement Program Highway Planning Bicycle and Pedestrian Planning Transit Planning

More information

CHARLOTTE COUNTY PUNTA GORDA MPO

CHARLOTTE COUNTY PUNTA GORDA MPO CHARLOTTE COUNTY PUNTA GORDA MPO 2035 Long Range Transportation Plan Summary Report (For Adoption by Charlotte County Punta Gorda MPO Board on December 13, 2010) Table of Contents Table of Contents Introduction

More information

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall

Complete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall Complete Streets Workshop Follow-up April 27, 2011 Rockledge City Hall Agenda Complete Streets draft briefing presentation and sample policy language Share your Complete Streets projects and post workshop

More information

Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN

Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN Prepared for Bay County Transportation Planning Organization and The Florida Department of Transportation, District Three Prepared

More information

City of Bartow Comprehensive Plan. Transportation Element

City of Bartow Comprehensive Plan. Transportation Element City of Bartow 2030 Comprehensive Plan Amended through January 7, 2013 TRANSPORTATION ELEMENT GOAL: IT SHALL BE A GOAL OF THE CITY OF BARTOW TO PROVIDE A SAFE AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM

More information

Performance Criteria for 2035 Long Range Transportation Plan

Performance Criteria for 2035 Long Range Transportation Plan Minimizing Impacts on Natural, Historic, Cultural or Archeological Resources 2035 LRTP Weighting Factor: 7% Objective 1.1: Use appropriate planning and design criteria to protect and enhance the built

More information

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015 FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL

More information

Prepared For: DIRECTION 2035 SHAPING OUR FUTURE SUMMARY REPORT JULY Prepared By: Staff to Bay County TPO

Prepared For: DIRECTION 2035 SHAPING OUR FUTURE SUMMARY REPORT JULY Prepared By: Staff to Bay County TPO Prepared For: DIRECTION 2035 SHAPING OUR FUTURE SUMMARY REPORT JULY 2012 Prepared By: Staff to Bay County TPO TPO Overview The Bay County Transportation Planning Organization (TPO) is a regional transportation

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

Needs Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN

Needs Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN Needs Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN Prepared for Bay County Transportation Planning Organization and The Florida Department of Transportation, District Three Prepared by West

More information

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads 1 Stakeholder Update May 21, 2018 2 Agenda Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads Proposed Evaluation Criteria Next Steps 1 Project/Schedule

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Palm Beach MPO Complete Streets Working Group

Palm Beach MPO Complete Streets Working Group Palm Beach MPO Complete Streets Working Group March 23, 2016 www.palmbeachmpo.org 2300 North Jog Road 4 th Floor West Palm Beach, FL 33411 561 684 4170 Agenda What are Complete Streets? Welcome Complete

More information

Bicycle and Pedestrian Plans and Improvements

Bicycle and Pedestrian Plans and Improvements Bicycle and Pedestrian Plans and Improvements Presented to the City Council By Randle Harwood, Planning and Development, and Richard Zavala, Parks and Community Services September 24, 2013 Purpose Review

More information

SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) FY 2018 TRANSPORTATION PROJECT PRIORITIES FY FY 2023 (ADOPTED JULY 13, 2017) A(1)

SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) FY 2018 TRANSPORTATION PROJECT PRIORITIES FY FY 2023 (ADOPTED JULY 13, 2017) A(1) A(1). STRATEGIC INTERMODAL SYSTEM (SIS) - HIGHWAY COMPONENT FISCAL YEAR, FDOT PROJECT NO SIS FUNDS 1 1 ELLIS ROAD WIDENING at I-95 ETEND/WIDEN ELLIS ROAD CONNECTION TO WICKHAM DESIGN/DRAINAGE ANALYSIS

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information

Orange County s Transportation Planning and Multimodal Corridor Plan

Orange County s Transportation Planning and Multimodal Corridor Plan Orange County Transportation Planning Division Orange County s Transportation Planning and Multimodal Corridor Plan Presentation to UCF LIFE November 11, 2014 Alissa Barber Torres, Ph.D., AICP, PLS Presentation

More information

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city

More information

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017 ` SR 976 BIRD ROAD/SW 40TH STREET FROM SR 821/HEFT TO SR 5/US-1 Miami-Dade County, Florida FPID No.: 434845-4-22-01 Planning Study Project Advisory Team Meeting May 24, 2017 1 Agenda Introductions Project

More information

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT: AGENDA REQUEST AGENDA HEADING: Unfinished Business BY Neighborhood and Development Services Originating Department COMMISSION MEETING DATE: November 1, 2010 Timothy Litchet Department Head AGENDA ITEM

More information

Regional Trails Corridor Assessment

Regional Trails Corridor Assessment Regional Trails Corridor Assessment Project Goals Complete the regional trails network in the River to Sea TPO Planning Area and advance the Florida Greenways and Trails System Plan by developing/finalizing

More information

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006 Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006 Public Hearing Regulations Chapter 23 of United States Code 128 Title 40 of the Code of Federal Regulations Parts 1500

More information

FM #: ETDM #: 11241

FM #: ETDM #: 11241 SR 826/Palmetto Expressway PD&E Study From SR 93/I 75 to the Golden Glades Interchange FM #: 418423 1 22 01 ETDM #: 11241 Agency/ Kick Off Meeting October 27, 2011 2 Location Map From SR 93/I 75 to Golden

More information

US 41 (Tamiami Trail) Corridor Study. Roadway Safety Audit

US 41 (Tamiami Trail) Corridor Study. Roadway Safety Audit US 41 (Tamiami Trail) Corridor Study Roadway Safety Audit US 41 RSA June 14/15, 2017 Agenda Project Overview Schedule RSA Process Overview RSA Responsibilities Historical Crash Review 2 PROJECT OVERVIEW

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY 7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)

More information

2. TRANSPORTATION ELEMENT.

2. TRANSPORTATION ELEMENT. 2. TRANSPORTATION ELEMENT. The purpose of this element is to assist in establishing an adequate transportation system within the City and to plan for future motorized and non-motorized traffic circulation

More information

MnPASS System Today and the Future

MnPASS System Today and the Future MnPASS System Today and the Future April 2010 By Nick Thompson Minnesota Department of Transportation Topics Minnesota s Current and Future MnPASS High Occupancy Toll Systems Overview of the MnPASS System

More information

US 1 Express Lanes Public Kick-Off Meeting

US 1 Express Lanes Public Kick-Off Meeting US 1 Express Lanes Project Development & Environment (PD&E) Study Public Kick-Off Meeting September 7 & 8, 2011 Miami Dade County, Florida 1 Presentation Agenda Introduction to MDX Background to PD&E studies

More information

STREET AND HIGHWAY PLAN

STREET AND HIGHWAY PLAN STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Attachment One Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Introduction Begun as part of the Moving Ahead for Progress in the

More information

2018 Safety Assessment Report

2018 Safety Assessment Report Measuring Performance 2018 Safety Assessment Report (This page is intentionally left blank) Measuring Performance 2018 Safety Assessment Report DRAFT 2 Table of Contents Performance Based Planning Overview...

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete.

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete. Thank you for this opportunity to discuss with you how we can work together to make our streets more complete. 1 2 3 Thank you for this opportunity to discuss with you how we can work together to make

More information

The Bike Buzz in Richland. November 2017 Carl Berkowitz

The Bike Buzz in Richland. November 2017 Carl Berkowitz The Bike Buzz in Richland November 2017 Carl Berkowitz Richland has been growing by leaps and bounds with lots of new homes and roads throughout the community. Recognizing all the growth in the Queensgate

More information

Mobility Plan Status Report 2012 Average Annual Daily Traffic

Mobility Plan Status Report 2012 Average Annual Daily Traffic Mobility Plan Status Report 2012 Average Annual Daily Traffic Gainesville Metropolitan Area Congestion Management Process January 22, 2014 Metropolitan Transportation Planning Organization for the Gainesville

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Goodlettsville Bicycle and Pedestrian Plan Executive Summary Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities

More information

The Florida Bicycle and Pedestrian Partnership Council

The Florida Bicycle and Pedestrian Partnership Council The Florida Bicycle and Pedestrian Partnership Council Input to the Update of the Florida Transportation Plan March 2015 This document presents input from the Florida Bicycle and Pedestrian Advisory Council

More information

LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018

LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018 LIST OF PRIORITY PROJECTS FY 2020-2024 TPA Committee Meetings & Board Review September 2018 MISSION To collaboratively plan, prioritize, and fund the transportation system. El Rio Trail Boca Raton, May

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

2016 TELL THE TPO SURVEY

2016 TELL THE TPO SURVEY RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION 2016 TELL THE TPO SURVEY CAMPAIGN SUMMARY August 2016 Introduction The River to Sea Transportation Planning Organization (TPO) conducted its second Tell

More information

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016 1 City of Atlanta-MARTA Sales Tax Referendum Draft Project List Atlanta City Council Work Session May 19, 2016 2 SB 369 - MARTA Sales tax for up to 0.50% is allowed in the City of Atlanta for MARTA Purpose

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017 Downtown Naples Mobility and Connectivity Study Naples City Council Presentation January 2017 Agenda 1. Introduction 2. Scope Review 3. Project Schedule 4. Existing Conditions 5. Public Charrette 6. Mobility

More information

Safe Streets. City of Lake Forest Park. March 21, 2017

Safe Streets. City of Lake Forest Park. March 21, 2017 Safe Streets City of Lake Forest Park March 21, 2017 1 01 WELCOME 2 Agenda WELCOME WHAT IS THIS PROJECT? CONTEXT DRAFT CITYWIDE PROJECTS EXERCISE INTRODUCTION 3 02 WHAT IS THIS PROJECT? 4 WHAT IS THIS

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

Appendix B. Transportation Analysis. B.1 Summary. East Nassau Employment Center DSAP

Appendix B. Transportation Analysis. B.1 Summary. East Nassau Employment Center DSAP Appendix B Transportation Analysis B.1 Summary This report presents the transportation analysis completed for the East Nassau Community Planning Area (ENCPA). The ENCPA is defined as 24,000 acres in Nassau

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY Multi Modal Transit Access Plan KIPDA ID # 239 Project Type: STUDY Description: In conjunction with the results from Project Gobility and the Transit LOS Analysis, TARC seeks to examine the possibilities

More information

TxDOT Bicycle Tourism Trails Study Update. April 2017 BAC Meeting April 10, 2017

TxDOT Bicycle Tourism Trails Study Update. April 2017 BAC Meeting April 10, 2017 AGENDA ITEM 6 TxDOT Bicycle Tourism Trails Study Update April 2017 BAC Meeting April 10, 2017 Agenda Approval of interim products o Present study vision statement, goals, and study objectives o Present

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.

More information

2045 Long Range Transportation Plan. Summary of Draft

2045 Long Range Transportation Plan. Summary of Draft 2045 Long Range Transportation Plan Summary of Draft Fredericksburg Area Metropolitan Planning Organization The George Washington Region includes the City of Fredericksburg and the counties of Caroline,

More information

ELEMENT 11 TRANSPORTATION ELEMENT

ELEMENT 11 TRANSPORTATION ELEMENT ELEMENT 11 TRANSPORTATION ELEMENT TRANSIT, CIRCULATION, PARKING, PEDESTRIAN, & NON-VEHICULAR CIRCULATION Introduction The following narrative describes the concepts on which the transportation plan is

More information

FY FY 2023 Bay County TPO Project Priorities

FY FY 2023 Bay County TPO Project Priorities FY 2019 - FY 2023 Bay County TPO Project Priorities Prepared for Bay County Transportation Planning Organization; and The Florida Department of Transportation, District Three Prepared by West Florida Regional

More information

Final Sidewalk Feasibility Study

Final Sidewalk Feasibility Study Garfield Drive From Anastasia Drive to Elizabeth Place City of South Daytona July 23, 2009 Final Sidewalk Feasibility Study Prepared for: Prepared by: Final Sidewalk Feasibility Study Garfield Drive 2

More information

Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report

Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report MPO Board July 8, 2015 2 Crash Data Collection Motorcycle drove between stopped cars, ran a red light and collided with a

More information

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017 DES MOINES AREA MPO Presentation to Iowa Commercial Real Estate Association April 6, 2017 Presentation Outline MPO Overview Trends We re Watching Plans, Projects, Initiatives, Regional Transportation Priorities

More information

City of Fairfax, Virginia City Council Work Session

City of Fairfax, Virginia City Council Work Session City of Fairfax, Virginia City Council Work Session Agenda Item # City Council Meeting 12a 9/8/2015 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: FISCAL IMPACT: RECOMMENDATION: ALTERNATIVE COURSE OF ACTION: RESPONSIBLE

More information

Table of Contents EXECUTIVE SUMMARY...2

Table of Contents EXECUTIVE SUMMARY...2 Table of Contents EXECUTIVE SUMMARY...2 1. INTRODUCTION...3 1.1. BACKGROUND AND PLAN UPDATES...3 1.2. BENEFITS OF BICYCLING AND WALKING...3 1.3. VISION, MISSION, GOAL AND OBJECTIVES OF THE PLAN...5 2.

More information

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Federal and state agencies provide funding for local bikeway and trail projects. Descriptions follow for programs that

More information

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 McPhail Transportation Planning Services Ltd. AGENDA 6:00 7:00 pm Viewing Boards / Q & A with the Team 7:00 7:50

More information

ATTACHMENT "A" ULTIMATE IMPLEMENTATION DESCRIPTION

ATTACHMENT A ULTIMATE IMPLEMENTATION DESCRIPTION Red denotes new funding in FDOT WP since last year. ATTACHMENT "A" 2016 TRANSPORTATION PROJECT PRIORITIES FY 2017-FY 2021, ADOPTED JULY 9, A(1). STRATEGIC INTERMODAL SYSTEM (SIS) - HIGHWAY COMPONENT SIS

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

Road Diets FDOT Process

Road Diets FDOT Process Florida Department of TRANSPORTATION Road Diets FDOT Process Humberto Castillero, PE, PTOE Roadway Design Office Purpose of Guide Develop a statewide lane elimination review process Balance state & local

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street Welcome and Introduction Sign-in and comment sheets Restrooms and exits Meeting agenda and timeline Meeting goals / expectations Provide input to guide study recommendations Actively participate throughout

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

GOAL 2A: ESTABLISH AND MAINTAIN A SAFE, CONVENIENT, AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM TO MOVE PEOPLE AND GOODS THROUGHOUT THE CITY.

GOAL 2A: ESTABLISH AND MAINTAIN A SAFE, CONVENIENT, AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM TO MOVE PEOPLE AND GOODS THROUGHOUT THE CITY. 2. TRANSPORTATION ELEMENT The purpose of this element is to assist in establishing an adequate transportation system within the City and to plan for future motorized and non-motorized traffic circulation

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

BIKE PLAN CONTENTS GATEWAY

BIKE PLAN CONTENTS GATEWAY CONTENTS Acknowledgments...vii Great Rivers Greenway District Board of Directors... vii Great Rivers Greenway District Staff... vii Project Consultants... vii Committees... viii Citizens Advisory Committee

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information