0.17 Miles West of Josey lane Danieldale Road IH 35E Houston School Road

Size: px
Start display at page:

Download "0.17 Miles West of Josey lane Danieldale Road IH 35E Houston School Road"

Transcription

1 NRSA1-DAL- 8 TxDOT Dallas Improvement Whitlock Road IH 35E Old Denton Road Reconstruct 4 lane undivided to 4 lane divided with left turns $3,802,480 Minor Arterial NRSA1-DAL- 11 TxDOT Dallas New roadway Conflans Road SH 161 Valley View lane Construct 0 to 4 lane divided facility with new sidewalks and shared use path $30,952,202 Major Collector NRSA1-DAL- 16 TxDOT Dallas Addition of lanes Mckinney Street (Old FM 426) 1.4 Miles west of SL Miles East of SL 288 Widen 2 lane roadway to 4 lane divided urban $18,267,303 Minor Arterial NRSA1-DAL- 17 TxDOT Dallas Addition of lanes FM Miles west of SL Miles East of SL 288 Widen from 2 lane roadway to 4 lane divided urban; addition of lanes $682,697 Minor Arterial NRSA1-DAL- 31 TxDOT Dallas Addition of lanes FM 544 FM 2281 (Denton Drive) 0.17 Miles West of Josey lane Reconstruct and widen 2 lane rural highway to 6 lane divided urban facility $43,439,321 Minor Arterial NRSA1-DAL- 32 TxDOT Dallas Improvement Danieldale Road IH 35E Houston School Road Recon. 2 ln undiv to 2 ln undiv urban from IH 35E NB fr rd to Longhorn Trl & Recon. 2 ln undiv to 3 ln undiv with contin. cntr turn ln w/transition lns, signals, & add combo lns for lt & rt turn lns from Longhorn Trl to Houston School Rd $6,194,242 Minor Arterial NRSA1-DAL- 33 TxDOT Dallas Addition of lanes Pleasant Run Road Lancaster-Hutchins Millers Ferry Road Widen 2 lane to 4 lane divided urban roadway $15,423,000 Minor Arterial NRSA1-DAL- 37 TxDOT Dallas Addition of lanes, Reconstruction FM 3097 FM 740 East of Tubbs Road Reconstruct and widen 2 lane undivided to 4 lane divided $14,049,455 Major Collector NRSA1-DAL- 39 TxDOT Dallas Addition of lanes Medical District Drive IH 35E Harry Hines Blvd Reconstruct and widen from 4 lane to 6 lane divided $26,617,109 Major Collector Source: North Central Texas Council of Governments Page 1

2 NRSA1-DAL- 51 TxDOT Dallas Addition of lanes FM 455 Wildwood Trail SH 121 Widen facility to 4 lane urban divided (ultimate 6 lane divided) $82,910,295 Minor Arterial NRSA1-DAL- 67 TxDOT Dallas New roadway Corporate Drive FM 544 Josey lane Construct 4 lane divided roadway (segment 6) $20,898,278 Minor Arterial NRSA1-DAL- 71 TxDOT Dallas New roadway FM 2514 FM 1378 East of Lavon Parkway Realign highway from FM 1378 southeast to near Lavon Parkway, construct 4 lane divided highway (ultimate 6 lanes) $9,251,843 Major Collector NRSA1-DAL- 72 TxDOT Dallas Addition of lanes, Improvements, Bike/Pedestrian FM 2514 FM 2551 West of FM 1378 Widen 2 lane rural to 4 lane (ultimate 6 lane) urban roadway including new pedestrian improvements and left/right turn lanes $26,454,250 Major Collector NRSA1-DAL- 82 TxDOT Dallas New roadway Pleasant Valley Road Richfield Drive at Creek Meadow Lane Miles Road Construct a 4 lane divided roadway and bridge $26,845,032 Minor Arterial NRSA1-DAL- 86 TxDOT Dallas Addition of lanes Gerault/ Morriss FM 2499 FM 407 Widen and reconstruct 4 to 6 lane divided urban arterial from FM 2499 to FM 3040 and Reconstruct 4 to 4 lane divided urban from FM 3040 to FM 407 with traffic signal and drainage improvements West of FM 2499/Gerault Road intersection $32,047,204 Minor Arterial NRSA1-DAL- 89 TxDOT Dallas Addition of lanes Mayhill Road IH 35E US 380 Expand 2 lane rural road to a 4 lane divided urban arterial (ultimate 6 lane), extension of FM 2499 $95,603,459 Minor Arterial NRSA1-DAL- 95 TxDOT Dallas Improvement IH 20 At Bonnie View Road Improve approach, widen bridge to add turn lanes and replace traffic signal system $3,376,725 Minor Arterial NRSA1-DAL- 104 TxDOT Dallas Interchange SP 557 At Las Lomas Parkway (CR 305) Construct Phase 1 (4 lanes) of ultimate 8 lane bridge plus connections to Las Lomas Parkway $2,961,583 Freeway/ Expressway Source: North Central Texas Council of Governments Page 2

3 NRSA1-DAL- 105 TxDOT Dallas Addition of lanes SP 557 At Las Lomas Parkway (CR 305) Construct Phase 2 (Final 4 lanes) of ultimate 8 lane bridge plus connections to Las Lomas Parkway $6,021,704 Freeway/ Expressway NRSA1-DAL- 107 TxDOT Dallas Addition of lanes Wildlife Parkway SH 161 Belt Line Road Construct 0/2 lane rural to 2/4 lane divided including bridge over Trinity River $35,121,000 Major Collector NRSA1-DAL- 108 TxDOT Dallas Improvement, Addition of lanes FM 2478 US 380 FM 1461 Widen 2 lane rural highway to 4 lane divided; Realign intersection at FM 1461 (6 lane ultimate) $54,868,369 Minor Arterial NRSA1-DAL- 109 TxDOT Dallas Improvement, Reconstruction, Addition of lanes FM 2478 FM 1461 North of FM 1461 Widen 2 lane rural highway to 4 lane divided (6 lane ultimate) Realign intersection of FM 1461 $5,173,412 Minor Arterial NRSA1-DAL- 110 TxDOT Dallas Addition of lanes FM 2551 FM 2514 FM 2170 Reconstruct and widen 2 lane rural to 6 lane urban divided $65,817,835 Minor Arterial NRSA1-DAL- 111 TxDOT Dallas New roadway FM 3486 FM 986 SH 34 Reconstruct 2 lane County Road to 2 lane FM highway $6,311,958 Not on (State Funded) NRSA1-DAL- 118 TxDOT Dallas Addition of lanes FM 156 SH th Street Widen 2 to 4 lane divided urban cross section $45,201,856 Minor Arterial NRSA1-DAL- 119 TxDOT Dallas Addition of lanes FM 2786 SH 5 East of Angel Parkway in Allen Widen 2 to 4 lane divided (6 lane ultimate) with Improvements at SH 5 $11,160,911 Minor Arterial NRSA1-DAL- 120 TxDOT Dallas Addition of lanes FM 2786 East of Angel Parkway FM 1378 Reconstruct 2 lane roadway to a 4 lane (ultimate 6) divided roadway $10,575,825 Minor Arterial Source: North Central Texas Council of Governments Page 3

4 NRSA1-DAL- 124 TxDOT Dallas Addition of lanes, New roadway , IH 35E/Dickerson Parkway Sandy Lake Road/Whitlock lane PGBT (SH 190) Lane ramp and 4 to 6 frontage road Construction along IH 35E and a new 6 lane overpass at Dickerson Parkway (part of phased implementation of the IH 35E corridor) $101,673,681 Minor Arterial NRSA1-DAL- 126 TxDOT Dallas Addition of lanes FM 552 SH 205 SH 66 Widen from 2 lane rural to 4 lane urban section $60,527,989 Major Collector NRSA1-DAL- 127 TxDOT Dallas Addition of lanes FM 549 SH 205 SH 276 Widen from 2 lane rural to 4 lane urban $28,194,287 Major Collector NRSA1-DAL- 129 TxDOT Dallas Addition of lanes FM 3549 IH 30 North of SH 66 Widen from 2 lane rural to 4 lane urban divided section $16,108,298 Minor Arterial NRSA1-DAL- 130 TxDOT Dallas Bike/Pedestrian Old town Transit Oriented Development Bounded By 100 N. Charles Street; 200 N. Charles Street 100 West to 500 E. Blocks of Main Street and The 100 N. to 500 S. Blocks of Mill Street Pedestrian amenities; Landscaping; Improvements; Bike Connection; traffic signalization; and Street Improvements on Main St and Mill St to reduce from 2 lanes to 1 lane In each direction to accomm. Pedestrian Impr. $3,750,000 Minor Arterial NRSA1-DAL- 131 TxDOT Dallas Bike/Pedestrian Thomasson Square Bounded By Karla Drive on the north, Moon Drive and; Whitson Way on the south Forrest Drive on the east and the city drainage channel on the west Ped amen., Bike Ln/Trl, Lndscp, Int. Improv. incl Lt Trn Lns, Rt Trn Lns, Improv. to Int. Geom. and/or Lndscp on Gus Thomasson, & Traf. Sgnlztion & Str. Improv. incl 6 to 4 Lns on Gus Thomasson Rd B/W Karla Dr (N. Bndry) & Moon Dr & Whitson Way (S. Bndry) $3,749,421 Minor Arterial NRSA1-DAL- 133 TxDOT Dallas Addition of lanes FM 455 West of FM 2450 East of Marion Road Reconstruct and widen 2 lane rural to 4 lane urban divided $66,770,314 Minor Arterial NRSA1-DAL- 139 TxDOT Dallas Addition of lanes West Lucas Road FM 2551 FM 1378 Widen from 2 lanes to 3 lane section; Add westbound to northbound right turn lane $1,500,000 Minor Arterial NRSA1-DAL- 140 TxDOT Dallas Addition of lanes FM 3038 Virginia Parkway West of Joplin Drive US 75 Widen 4 to 6 lane divided including a bridge over Wilson Creek $16,092,551 Major Collector Source: North Central Texas Council of Governments Page 4

5 NRSA1-DAL- 144 TxDOT Dallas New roadway Frontier Parkway (CR 5) SH 289 (Preston Road) DNT Construct new 2 to 4 lane divided urban arterial with grade separation over BNRR, 2- way service road north of grade separation, and quiet zones $24,586,700 Minor Arterial NRSA1-DAL- 150 TxDOT Dallas Addition of lanes FM 148 South of US 80 SP 557 Widen existing highway from 2 lane rural to 4 lane divided $15,400,000 Major Collector NRSA1-DAL- 152 TxDOT Dallas Addition of lanes Dallas Parkway SH 121 Lebanon Road Widen northbound and southbound Dallas Parkway from 2 lanes in each direction to 3 lanes in each direction $7,068,000 Major Collector NRSA1-DAL- 153 TxDOT Dallas Addition of lanes Dallas Parkway Lebanon Road Eldorado Parkway Widen northbound and southbound Dallas Parkway from 2 lanes in each direction to 3 lanes in each direction $4,550,000 Major Collector NRSA1-DAL- 154 TxDOT Dallas Addition of lanes FM 2514 North of Drain Drive Brown Street Widen facility from 2 lane to 4/6 lane urban divided $38,799,763 Major Collector NRSA1-DAL- 155 TxDOT Dallas Addition of lanes FM 2514 East of Lavon Parkway North of Drain Drive Widen Facility from 2 lane to 4 lane urban divided (ultimate 6 lane divided) $21,271,466 Major Collector NRSA1-DAL- 156 TxDOT Dallas Addition of lanes FM 2514 West of FM 1378 FM 1378 Reconstruct 2 lane rural to 4 lane urban (ultimate 6 lane urban divided) $2,322,460 Major Collector NRSA1-DAL- 162 TxDOT Dallas Addition of lanes Hickory Creek Road FM 2181 Proposed FM 2499 Construct and widen from 2 lane undivided to 4 lane undivided urban roadway $3,000,000 Major Collector NRSA1-DAL- 163 TxDOT Dallas New roadway Kirkpatrick Lane (Phase III) FM 1171 Bellaire Blvd Construct 0 to 4 lane roadway $11,529,000 Major Collector Source: North Central Texas Council of Governments Page 5

6 NRSA1-DAL- 165 TxDOT Dallas Addition of lanes Hickox Road Toler Road Merritt Road Widen from 2 lanes to 4 lanes (Phase 2) $3,000,000 Minor Arterial NRSA1-DAL- 166 TxDOT Dallas Addition of lanes Lawson Road Milam Road Clay-Mathis Road Widen from 2 lanes to 4 lanes $13,335,000 Minor Arterial NRSA1-DAL- 167 TxDOT Dallas Addition of lanes Lebanon Road Coit Road Independence Parkway Widen from 2 lanes to 4 lanes $5,800,000 Major Collector NRSA1-DAL- 168 TxDOT Dallas Addition of lanes Main Street FM 423 DNT Widen from 4 lanes to 6 lanes $1,200,000 Minor Arterial NRSA1-DAL- 169 TxDOT Dallas Addition of lanes FM 548 North of US 80 S of SH 205 (Rockwall C/L) Widen and reconstruct 2 lane rural to 4 lane urban divided (6 lane ultimate) $109,599,843 Major Collector NRSA1-DAL- 171 TxDOT Dallas Addition of lanes Chaha Road Rowlett Road Kirby Road Widen from 2 lanes to 3 lanes $5,016,500 Major Collector NRSA1-DAL- 173 TxDOT Dallas Addition of lanes N/A Ridgeview Drive Alma US 75 Widen from 2 lanes to 4 lanes $18,979,785 Major Collector NRSA1-DAL- 175 TxDOT Dallas New roadway FM 148 South of FM 3039 US 175 Construct 0 to 2 rural lane undivided $8,000,000 Minor Arterial NRSA1-DAL- 177 TxDOT Dallas New roadway Denton Creek Blvd At Graham Branch Build new location 0 to 4 lane bridge $8,967,000 Minor Arterial Source: North Central Texas Council of Governments Page 6

7 NRSA1-DAL- 178 TxDOT Dallas Interchange Denton Creek Blvd At IH 35W Interchange $5,000,000 Minor Arterial NRSA1-DAL- 179 TxDOT Dallas Improvement Skillern Road Flower Mound Road River Hill Drive Reconstruct 2 to 2 lanes $905,000 Minor Arterial NRSA1-DAL- 182 TxDOT Dallas New roadway Valley Ridge Blvd Mill Street College Street Construct 0 to 4 lane divided urban arterial $17,770,000 Major Collector NRSA1-DAL- 184 TxDOT Dallas New roadway Wheatland Road Dallas/Lancaster City Limit University Hills along The Dallas/Lancaster City Limits Construct 0 to 4 lane divided roadway and bicycle/pedestrian facilities $4,809,552 Major Collector NRSA1-DAL- 185 TxDOT Dallas Addition of lanes Hickory Creek Road FM 2181 River Pass Widen from 2 lanes to 4 lanes (ultimate 6 lanes) $3,500,000 Major Collector NRSA1-DAL- 187 TxDOT Dallas Bridge, Improvement, Bike/Pedestrian SH 114/ Texas Plaza bridge SL 12 SS 482 Construct 0 to 4 lane signature bridge with bicycle lane, sidewalks, Improvements, and ramp modifications $54,413,449 Minor Arterial NRSA1-DAL- 188 TxDOT Dallas 633 Improvement/ Reconstruct , Dolphin Road Spring Ave North of Haskell Ave/Military Parkway Reconstruct existing roadway from 4 lane undivided to 4 lane divided with intersection improvements at Haskell $4,694,450 Minor Arterial NRSA1-DAL- 189 TxDOT Dallas Reconstruction FM 407 Gulf Ave West of Sage Drive Realign existing 2 to 2 lane roadway $600,000 Minor Arterial NRSA1-DAL- 190 TxDOT Dallas Reconstruction, Addition of lanes FM 548 S of SH 205 (Kaufman County Line) SH 205 Widen and reconstruct 2 lane rural to 4 lane divided urban roadway (ultimate 6) $13,126,932 Minor Arterial Source: North Central Texas Council of Governments Page 7

8 NRSA1-DAL- 191 TxDOT Dallas Addition of lanes Wintergreen Road Jefferson Street West of Carpenter Road Reconstruct and widen 2 lane undivided rural to 4 lane divided urban $18,885,938 Minor Arterial NRSA1-DAL- 192 TxDOT Dallas Reconstruction, Addition of lanes Jefferson Street from Wintergreen Road to Pleasant Run Road Jefferson Street and Pleasant Run Road Lancaster-Hutchins Road Widen and reconstruct 2 lane undivided rural to 4 lane divided urban $11,295,657 Major Collector NRSA1-DAL- 193 TxDOT Dallas Addition of lanes FM 1387 Midlothian Parkway FM 664 Reconstruct and widen from 2 lane undivided rural to 4 lane urban divided (ultimate 6 lane) $54,840,610 Major Collector NRSA1-DAL- 195 TxDOT Dallas New roadway FM 1171 IH 35W West of FM 156 Construct new 0 to 6 lane divided arterial $59,192,338 Major Collector NRSA1-DAL- 196 TxDOT Dallas Bike/Pedestrian Denton Drive South of Walnut Hill lane North of Royal lane Reconstruct Denton Dr from 2 ln undivided rural into 3 ln urban transit oriented roadway with center turn ln, bike ln, sidewalks, and sidewalk connection to Harry Hines Blvd along both Walnut Hill Ln and Royal Ln connecting Dart LRT Station $10,253,616 Major Collector NRSA1-DAL- 197 TxDOT Dallas Improvement Waketon Road FM 2499 Chinn Chapel Road Realignment of roadway (2 to 2 lanes) $5,876,000 Major Collector NRSA1-DAL- 200 TxDOT Dallas New roadway New Collin County N/S Road #1 SH 121/FM 455 FM 545/FM 1827 New 4 lane road (PA) $8,587,037 Not on NRSA1-DAL- 201 TxDOT Dallas Realignment FM 1827/New Collin County N/S Road #1 FM 545/FM 1827 FM 1827/CR 470 Realign 4 lane road (PA) $12,318,304 Not on NRSA1-DAL- 202 TxDOT Dallas New roadway New Collin County N/S Road #1 FM 1827/CR 470 CR 463 (North) New 4 lane road (PA) $4,897,286 Not on Source: North Central Texas Council of Governments Page 8

9 NRSA1-DAL- 203 TxDOT Dallas Realignment New Collin County N/S Road #1 CR 463 (North) US 380 Realign 4 lane road (PA) $8,981,690 Not on NRSA1-DAL- 204 TxDOT Dallas New roadway New Collin County N/S Road #1 US 380 FM 546/CR 447 New 4 lane road (PA) $8,730,034 Not on NRSA1-DAL- 205 TxDOT Dallas Realignment New Collin County N/S Road #1 FM 546/CR 447 FM 982/CR 444 Realign 4 lane road (MA) $8,839,204 Not on NRSA1-DAL- 206 TxDOT Dallas Realignment FM 982/Collin County FM 982/CR 444 FM 3286 Realign 4 lane road (MA) $1,396,662 Minor Arterial N/S Road #1 NRSA1-DAL- 207 TxDOT Dallas WIdening FM 3286 Lucas Road/Collin County N/S Road #1 FM 982 FM 1378 Widen 2 to 4 lanes (MA) $30,486,697 Major Collector NRSA1-DAL- 210 TxDOT Dallas WIdening McMillien Dr/Collin County E/W Road #2 McCreary Rd Country Club Rd Widen 2 to 6 lanes (MA) $5,571,272 Major Collector NRSA1-DAL- 211 TxDOT Dallas WIdening Park Blvd/Collin County E/W Road #2 Country Club Rd SH 78/Kreymer Ln Widen 2 to 6 lanes (MA) $13,266,495 Not on NRSA1-DAL- 212 TxDOT Dallas Widening Kreymer Ln/Collin Collin County E/W Road County E/W Road #2 SH 78/Kreymer Ln #3/Troy Rd Widen 2 to 4 lanes (MA) $3,934,743 Not on NRSA1-DAL- 213 TxDOT Dallas New roadway Hensley Ln/New Collin County E/W Road #3 McCreary Rd Woodbridge Pkwy New 4 lane road (MA) $3,620,045 Not on Source: North Central Texas Council of Governments Page 9

10 NRSA1-DAL- 214 TxDOT Dallas Widening Hensley Ln/New Collin County E/W Road #3 Woodbridge Pkwy Sanden Blvd Widen 2 to 4 lanes (MA) $2,794,349 Not on NRSA1-DAL- 215 TxDOT Dallas Realignment Alanis Dr/New Collin Realign 4 lane road (MA) w/ SH 78 grade County E/W Road #3 Sanden Blvd Ballard St separation $7,199,601 Not on NRSA1-DAL- 217 TxDOT Dallas New roadway New Collin County E/W Road #3 FM 544 (Vinson Rd) SH 205 New 4 lane road (MA) $41,314,032 Minor Arterial NRSA1-DAL- 218 TxDOT Dallas Widening Campbell Road/Collin County E/W Road #4 PGBT Murphy Rd Widen 2/4 to 6 lanes (PA) $5,017,220 Minor Arterial NRSA1-DAL- 219 TxDOT Dallas Widening Blackburn Rd/Collin County E/W Road #4 Murphy Rd Dewitt Rd Widen 2 to 4 lanes (MA) $2,822,539 Major Collector NRSA1-DAL- 221 TxDOT Dallas WIdening Sachse Rd/Collin County E/W Road #4 SH 78/Sachse Rd Sachse Rd/Elm Grove Rd Widen 2 to 4 lanes (MA) $7,185,250 Major Collector NRSA1-DAL- 222 TxDOT Dallas Widening Elm Grove Rd/Collin County E/W Road #4 Sachse Rd/Elm Grove Rd Vinson Rd Widen 2 to 4 lanes (MA) $5,758,348 Major Collector NRSA1-DAL- 223 TxDOT Dallas Widening FM 544 (Vinson Rd)/Collin County N/S Road #5 Alanis Dr/Collin County E/W Road #3 Elm Grove Rd Widen 2 to 4 lanes (MA) $7,812,594 Not on NRSA1-DAL- 224 TxDOT Dallas New roadway FM 544 (Vinson Rd)/Collin County N/S Road #5 Elm Grove Rd Merritt Rd/Hickox Rd New 4 lane road (MA) w/ diamond PGBT $17,470,833 Major Collector Source: North Central Texas Council of Governments Page 10

11 NRSA1-DAL- 225 TxDOT Dallas Widening Hickox Rd/Collin County N/S Road #5 Merritt Rd/Hickox Rd Castle Dr Widen 2 to 4 lanes (MA) $2,252,085 Not on NRSA1-DAL- 226 TxDOT Dallas New roadway Hickox Rd/Collin County N/S Road #5 Castle Dr Centerville Rd New 4 lane road (MA) $4,535,436 Major Collector NRSA1-DAL- 227 TxDOT Dallas Widening Castle Dr/Collin County N/S Road #5 Centerville Rd Country Club Rd Widen 2 to 4 lanes (MA) $3,022,428 Not on NRSA1-DAL- 229 TxDOT Dallas New roadway Collin County E/W Road #7 SH 5 (Greenville Ave)/Chaparral Rd Chase Oaks Blvd (W of US 75) New 4 lane road (C) w/ grade separation over US 75 mainlanes & frontage roads $6,599,933 Major Collector NRSA1-DAL- 230 TxDOT Dallas Widening FM 6/Collin County E/W Road #8 SH 78 SH 66 Widen 2 to 4 lanes (MA) $27,985,519 Major Collector NRSA1-DAL- 231 TxDOT Dallas New roadway FM 6/Collin County E/W Road #8 SH 66 FM 35 (S of SH 66) New 4 lane road (MA) $3,620,045 Major Collector NRSA1-DAL- 232 TxDOT Dallas WIdening FM 35/Collin County E/W Road #8 FM 35 (S of SH 66) IH 30 Widen 2 to 4 lanes (MA) $7,926,890 Major Collector NRSA1-DAL- 233 TxDOT Dallas Widening FM 2755/Collin County E/W Road #9 SH 78 FM 2755/Watkins Rd Widen 2 to 4 lanes (PA) $11,571,025 Major Collector NRSA1-DAL- 234 TxDOT Dallas Widening Watkins Rd/Collin County E/W Road #9 FM 2755/Watkins Rd FM 1777/CR 590 Widen 2 to 4 lanes (PA) $8,411,237 Not on Source: North Central Texas Council of Governments Page 11

12 NRSA1-DAL- 235 TxDOT Dallas New roadway FM 2642/Collin County E/W Road #9 FM 1777/CR 590 SH 66/FM 2642 New 4 lane road (PA) $6,884,391 Major Collector NRSA1-DAL- 236 TxDOT Dallas Widening FM 2642/Collin County E/W Road #9 SH 66/FM 2642 FM 35/FM 2642 Widen 2 to 4 lanes (PA) $6,930,322 Minor Arterial NRSA1-DAL- 237 TxDOT Dallas WIdening FM 35/Collin County E/W Road #9 FM 35/FM 2642 SH 276 Widen 2 to 4 lanes (PA) $15,711,295 Not on NRSA1-DAL- 238 TxDOT Dallas Widening CR 482/Collin County E/W Road #10 SH 78 CR 483 (East) Widen 2 to 4 lanes (MA) $3,136,724 Not on NRSA1-DAL- 239 TxDOT Dallas New roadway Collin County E/W Road #10 CR 483 (East) FM 2755 (West) New 4 lane road (MA) $5,855,730 Major Collector NRSA1-DAL- 240 TxDOT Dallas Widening FM 2755/Collin County E/W Road #10 FM 2755 (West) Erby Campbell Rd/Collin County N/S Road #13 Widen 2 to 4 lanes (MA) $12,290,113 Not on NRSA1-DAL- 241 TxDOT Dallas New roadway Collin County E/W Road #10 Erby Campbell Rd/Collin County N/S Road #13 SH 66 New 4 lane road (MA) $7,909,464 Not on NRSA1-DAL- 242 TxDOT Dallas New roadway FM 3549/Collin FM 552/FM 3549 County N/S Road #11 FM 2755 (West) New 4 lane road (MA) $7,771,019 Major Collector NRSA1-DAL- 243 TxDOT Dallas Widening FM 2755/Collin FM 2755 (West) County N/S Road #11 FM 2755/Watkins Rd Widen 2 to 4 lanes (MA) $4,562,970 Not on Source: North Central Texas Council of Governments Page 12

13 NRSA1-DAL- 244 TxDOT Dallas New roadway FM 3549/Collin FM 2755/Watkins Rd County N/S Road #11 FM 6 New 4 lane road (MA) $9,030,894 Major Collector NRSA1-DAL- 245 TxDOT Dallas Widening FM 1138/Collin FM FM 1138/Outer Loop County N/S Road # (S of Nevada/NETEX) Widen 2 to 4 lanes (MA) $6,386,718 Not on NRSA1-DAL- 246 TxDOT Dallas New roadway Collin County N/S Road #12 FM 1138 (S of Nevada/NETEX) FM 6/FM 1138 New 4 lane road (MA) $3,868,113 Major Collector NRSA1-DAL- 247 TxDOT Dallas Widening FM 1138/Collin FM 6/FM 1138 County N/S Road #12 FM 1778/CR 643 Widen 2 to 4 lanes (MA) $7,527,111 Minor Collector NRSA1-DAL- 248 TxDOT Dallas WIdening Collin County N/S Road #12 FM 1778/CR 643 CR 609 (North) Widen 2 to 4 lanes (MA) $11,975,416 Not on NRSA1-DAL- 249 TxDOT Dallas New roadway Collin County N/S Road #12 CR 609 (North) Main St/Josephine Rd New 4 lane road (MA) $5,827,540 Minor Collector NRSA1-DAL- 250 TxDOT Dallas Widening Main St/Collin Main St/Josephine Rd County N/S Road #12 US 380/Main St Widen 2 to 4 lanes (MA) $1,281,854 Not on NRSA1-DAL- 251 TxDOT Dallas Realignment Erby Campbell/Collin Collin County E/W Road County N/S Road #13 #10 SH 66 Realign 2 to 4 lanes (C) $5,673,779 Minor Collector NRSA1-DAL- 253 TxDOT Dallas Widening FM 1778/Collin County E/W Road #14 SH 78 CR 695 Widen 2 to 4 lanes (MA) $19,018,180 Not on Source: North Central Texas Council of Governments Page 13

14 NRSA1-DAL- 254 TxDOT Dallas Realignment FM 1778/Collin County E/W Road #14 CR 695 FM 6/FM 1777 Realign 2 to 4 lanes (MA) $4,258,153 Not on NRSA1-DAL- 255 TxDOT Dallas Realignment FM 1777/Collin FM 6/FM 1777 County N/S Road #14 SH 66 Widen 2 to 4 lanes (MA) $17,250,442 Not on NRSA1-DAL- 256 TxDOT Dallas New roadway FM 1777/Collin SH 66 County N/S Road #14 FM 35/FM 2453 New 4 lane road (MA) w/ IH 30 interchange $7,292,370 Not on NRSA1-DAL- 259 TxDOT Dallas WIdening Rock Ridge Rd FM 1378 (Country Club Rd) Exchange Pkwy Widen 2 to 4 lanes (C) $1,853,342 Not on NRSA1-DAL- 260 TxDOT Dallas WIdening Rock Ridge Rd Exchange Pkwy FM 2170 (Estates Pkwy) Widen 2 to 4 lanes (C) $2,936,834 Not on NRSA1-DAL- 261 TxDOT Dallas New roadway McCreary Rd Lucas Rd/Lewis Ln FM 2514 (Parker Rd)/McCReary Rd New 4 lane road (C) $7,913,051 Minor Collector NRSA1-DAL- 263 TxDOT Dallas Widening Lucas Rd FM 2551 (angel Pkwy) FM 1378 (Country Club Rd) Widen 2 to 4 lanes (MA) $7,185,250 Not on NRSA1-DAL- 264 TxDOT Dallas New roadway Outer Loop/FM 548 Connector IH 30 FM 548 New 4 lane divided $9,100,000 Major Collector NRSA1-DAL- 265 TxDOT Dallas Widening FM 548 Outer Loop/FM 548 Connector SH 276 Widen 2 to 4 lane divided $8,400,000 Major Collector Source: North Central Texas Council of Governments Page 14

15 NRSA1-DAL- 266 TxDOT Dallas Widening FM 548 SH 276 SH 205 Widen 2 to 4 lane divided $27,000,000 Major Collector NRSA1-DAL- 300 TxDOT Dallas Widening FM 1461 West of County Road 166 CR 123 Widen and reconstruct 2 lane rural to 4 lane urban (ultimate 6 lanes) $15,834,370 Major Collector NRSA1-DAL- 301 TxDOT Dallas Widening FM 1461 SH 289 West of County Road 166 Widen and reconstruct 2 lane rural to 4 lane urban (ultimate 6 lanes) $93,670,180 Minor Arterial NRSA1-DAL- 302 TxDOT Dallas Widening FM 1515/Airport Road Bonnie Brae Masch Branch Road Widen 2 lane rural section to 6 lane divided urban $34,751,182 Minor/Major Collector NRSA1-DAL- 304 TxDOT Dallas Reconstruct College Street Mill Street Railroad Street Reconstruct from 2 to 2 lanes, add bicycle lanes, widen/expand sidewalks, and add onstreet parking $3,750,000 Major Collector NRSA1-DAL- 305 TxDOT Dallas Reconstruct South Shady Shores Road West Shady Shores Road Swisher Road Reconstruct Road from 2 to 2 lanes to elevate out of flood plain with drainage improvements $19,110,000 Major Collector NRSA1-DAL- 306 TxDOT Dallas Reconstruct and Widen FM 455 SH 5 East of Wildwood Trail Reconstruct and widen 2 to 4 lane urban divided (ultimate 6 lanes) $26,596,569 Minor Arterial NRSA1-DAL- 307 TxDOT Dallas Widening East Bear Creek Road Hampton Road IH 35E Reconstruct and widen from 2 lanes rural undivided to 4 lanes urban divided with bicycle/pedestrian accomodations and intersection improvements $25,600,000 Minor Arterial NRSA1-DAL- 308 TxDOT Dallas Addition of Lanes VA Fishtrap Rd (FM 1385 to Teel), Gee Rd (US 380 to Fishtrap) Teel Parkway (US 380 to Fishtrap) Widen and Reconstruct rural roadways as twolane urban roadways, including a three-lane bridge over Doe Branch $17,267,615 Major Collector Source: North Central Texas Council of Governments Page 15

16 NRSA1-FTW Addition of lanes, Reconstruction FM 156 US 81/287 Watauga Road (McElroy) Reconstruct and widen 2 lane to 4 lane divided $61,509,400 Major Collector NRSA1-FTW Addition of lanes FM 3391 IH 35W East of CR 602 Widen from 2 lanes to 6 lanes from IH 35W to Hurst Avenue and 2 lanes to 4 lanes from Hurst Avenue to CR 602 $35,273,646 Minor Arterial NRSA1-FTW New roadway Chapel Creek Blvd At IH 30 Construct new 6 lane bridge with 4 thru lanes, 2 left turn lanes, a separate U-turn bridge to include right-turn lanes, approaches, pedestrian improvements, signalization, lighting, and retaining wall improvements $12,685,953 Major Collector NRSA1-FTW New roadway Alsbury Hulen Street CR 1020 (approximately 0.2 Miles) Construction of a 4 lane extension of Alsbury Boulevard $4,945,889 Minor Arterial NRSA1-FTW New roadway White Settlement Road At Bypass Channel Construct 4 lane bridge at new location of proposed bypass channel for trinity river near CBD of Fort $48,923,288 Major Collector NRSA1-FTW Rehabilitation FM 730 Approx. 3 Miles north of SH 114 SH 114 Widen and Reconst. from 2 lane to 2 lane urban For SHoulders and Safety, add turn lanes $15,845,000 Major Collector NRSA1-FTW Addition of lanes FM 1884 SH 171 South of B.B. Fielder Road Widen from 2 lane to 4 lane with raised median $12,103,299 Major Collector NRSA1-FTW Bike/Pedestrian Snider Street Extension Project On Main Street, Snider Street, and Northeast Parkway bounded by Main St to the south, Northeast Pkwy on the north, Davis Blvd on the east & Smithfield Rd on the west Pedestrian amenities; landscaping; traffic signalization; street construction includes extending Snider Street north to connect to Northeast Parkway (2 lanes), and Northeast Parkway west to connect to Snider Street (2 lanes) $2,927,324 Not on (RTR Funded) NRSA1-FTW Bike/Pedestrian Joshua Station T.O.D. Bounded By Hwy 174 on Infrastructure Project the East Cleburne Rail Corridor on the West Pedestrian amenities; landscaping; street construction includes extending Plum Street (4 lanes) $829,019 N/A - Railwayhighway grade crossing Source: North Central Texas Council of Governments Page 16

17 NRSA1-FTW Safety Peach Street area Peach Street Live Oak Connector Construct the Live Oak Connector; Close Peach Street and East 1St Street at up crossing; and install fences to restrict pedestrian access across the RR tracks $3,200,254 Major Collector NRSA1-FTW Bridge, grade separation, Improvement, Reconstruction Bailey-Boswell At BUS 287P Improvement - Construct 0 to 2 lane overpass/bridge over UPRR, BNSFRR, & BUS 287P $12,390,990 Major Collector NRSA1-FTW Bike/Pedestrian Meandering Road SH 183 to Gillham Road LTJG Barnett Road from Gillham Road to Military Parkway Realign and add traffic signal at Roberts Cut off, Construct roundabout at LTJG Barnett, Reconstruct Meandering Road from 4 to 3 lanes, and add sidewalks and bicycle lanes $17,334,010 Minor Arterial NRSA1-FTW Reconstruct Main Street (FM 1187 BUS) Crowley Road (FM 731) Beverly Street Reconstruct from 3 to 2 lanes, add bicycle lanes, new sidewalks, add on-street parking, construct 2 roundabouts $11,677,376 Minor Arterial NRSA1-FTW Bike/Pedestrian Hurst Bellaire Sd Project Bounded By Pipeline On Pecan Street On The The North; Brown Trail On South; Bellaire On The The West East Pedestrian amenities; Landscaping; Improvements; Signalization; Street Construction Realigning 4 lane Brown Trail Ave $973,368 Major Collector/ Principal NRSA1-FTW Reconstruction, grade separation, US 81/US 287 Ramp Improvements At FM 3479/Harmon Road/North Tarrant Parkway Construct North Tarrant Parkway over US 287 with turnaround on eastside; construct Harmon Rd over US 287; reconstruct existing SB entrance ramp to US 287 w/auxiliary lane $8,068,892 Major Collector/ Principal NRSA1-FTW Reconstruction, grade separation, Improvement FM 1810 East of Public Road 1122 Int. of US 81/287 at FM 1810 Realignment of FM 1810 and grade separation and retaining walls at realigned intersection at US 81/287 & BU 81D $25,009,417 Major Collector NRSA1-FTW Reconstruct Holiday lane IH 820 Lewis Drive Reconstruct 4 to 4 lane roadway $1,700,000 Major Collector NRSA1-FTW Addition of lanes, Bridge, Rail Transit, Reconstruction FM 157 Main Street 8th Street 7th Street Realign roadway 2 lane rural to 2 lane urban with sidewalks and turn lanes $4,353,344 Major Collector Source: North Central Texas Council of Governments Page 17

18 NRSA1-FTW Addition of lanes, Bridge, Rail Transit, Reconstruction FM 157 US 67 8th Street Realign roadway 2 lane rural to 2 lane urban with sidewalks and turn lanes $9,928,344 Minor Arterial NRSA1-FTW Reconstruct Glade Road NB SH 360 Frtg West Airfield Drive Reconstruct from 2 to 2 lanes (add center turn lane and shoulders) $5,942,036 Minor Arterial NRSA1-FTW Improvement On Lakeshore Drive At US 180/IH 20 Improvements at Lakeshore Drive, US 180, and IH 20 frontage roads, construct turnaround bridge, and widen existing Lakeshore Drive bridge to accommodate turn lanes $9,632,465 Major Collector NRSA1-FTW New Roadway; Reconstruct Avondale-Haslet Intermodal Parkway West of Haslet County Line Road Construct new 0 to 4 lane and reconstruct existing 2 lane to 4 lane divided urban roadway $26,479,000 Major Collector NRSA1-FTW- 72 Minor Arterial/ Major Addition of lanes FM 1886 SH 199 Parker County Line Widen 2 lane rural to 6 lane urban divided $95,065,116 Collector NRSA1-FTW Addition of lanes FM 1886 FM 3325 Tarrant County Line Widen 2 lane rural to 4 lane urban divided (Ultimate 6 lanes) $71,323,836 Major Collector NRSA1-FTW New Roadway BU 81-D CR Realigned FM 1810 North of CR 2090 Realignment of BU 81-D at realigned intersection of US 81/287 & FM 1810/BU 81-D $940,000 Major Collector NRSA1-PAR- 4 TxDOT Paris New roadway SS 1570 SH 66 US 380 Construct 2 lanes (4 lane ultimate) divided highway on new location $11,904,439 Major Collector NRSA1-PAR- 6 TxDOT Paris Widening FM 2642 FM 35 SH 66 Widen 2 lane to 4 lane divided urban with sidewalks $23,728,088 Major Collector Source: North Central Texas Council of Governments Page 18

19 NRSA1-PAR- 7 TxDOT Paris Widening FM 1570 IH 30 SH 66 Construct 2 lane to 4 lane divided with shoulders (HMAC Pavement and RR crossing) North Project $23,507,081 Major Collector Source: North Central Texas Council of Governments Page 19

20 TIP Code Project Type CSJ Facility From To Description Project Cost , , NRSA , Reconstruction US 81/287 SH 114 Wise/Tarrant County Line Convert frontage roads to 4/6 One-Way Operation $139,896,000 NRSA Rehabilitation US 287 On US 81/US 287 From FM 3479 (Harmon Road) South of North Tarrant Parkway Crossover Reconstruct Northbound Frontage Road And Exit Ramp South of FM 3479 $3,320,649 NRSA Rehabilitation US 287 On US 81/US 287 From FM 3479 (Harmon Road) Southbound Entrance Ramp Construct Turnaround from NB to SB at North Tarrant Parkway; Reconstruct existing southbound frontage road from FM 3479 to US 287 $3,313,133 NRSA Rehabilitation US 287 On US 81/US 287 From North Entrance/Exit Ramp North Reconstruct NB frontage road from FM 3479 to Ramp and FM 3479 (Harmon Road) southbound frontage road from ramp to FM 3479 $3,313,131 NRSA Rehabilitation US 81/287 North of FM 3479 North of IH 35W interchange Construct auxiliary lane from northbound entrance from FM 3479 and IH 35W to North Tarrant Parkway; auxiliary lane for southbound exit to FM 3479 and entrance from North Tarrant $3,352,548 NRSA Rehabilitation US 81/287 Tarrant/Wise County Line IH 35W Convert frontage roads from 4 disc. frtg roads to 4/6 con. frtg roads one-way operation $47,783,614 NRSA New Roadway US 287 Heritage Pkwy Johnson County Line Construct 0 to 4 lane frontage roads $1,657,177 NRSA New Roadway US 287 Tarrant County Line BU 287 Construct 0 to 4 lane frontage roads $6,405,530 NRSA New frontage roads SH 114 FM 1938 Dove Road Construct 0 to 2 lane EB frontage road from FM 1938 to Solana/Kirkwood and construct 0 to 2 lane WB and 0 to 2 lane EB frontage roads from Solana/Kirkwood to Dove $37,301,365 NRSA New Roadway SH 114 Freeport Parkway Esters Blvd Construct WB 0 to 2 lane Frontage Road and Ramp Modifications $4,350,854 NRSA New Roadway IH 635 Royal lane West of Belt Line Rd Construct 0 to 2 lane WB Frontage Road and Ramp Modifications $33,554,913 Source: North Central Texas Council of Governments Page 20

21 TIP Code Project Type CSJ Facility From To Description Project Cost NRSA New Roadway IH 635 South of Gross Rd US 80 Construct Northbound Frontage Road to Provide Access to Galloway Avenue, And Ramp Improvements at Gross Rd $10,924,920 NRSA New Roadway IH 30 SH 161 NW 7th Street Construct 0 to 4 lane frontage roads $31,640,353 NRSA New Roadway IH 30 NW 7th Street Belt Line Road Construct 0 to 2/3 lane WB Frontage Road And Ramp Modifications $21,977,250 NRSA New Roadway IH 30 Belt Line Rd Macarthur Blvd Construct 3 lane frontage roads on each side (EB And WB) $32,731,618 NRSA Addition of lanes, New Roadway, Bridge, Interchange, IH 30 Bass Pro Drive Dalrock Rd Ramp Modifications Construct 0 to 6 lane frontage roads, Bayside Bridge, and Ramp Modifications; Reconstruct Dalrock Interchange $154,693,497 NRSA New Roadway IH 30 Dalrock East of Horizon Construct 0/4 to 4/6 lane frontage roads; Reconstruct Horizon Rd interchange and ramp modifications $89,803,427 NRSA Interchange SP 557 At Las Lomas Parkway (CR 305) Construct Phase 1 (4 lanes) of ultimate 8 lane bridge plus connections to Las Lomas Parkway Freeway/ Expressway NRSA Addition of lanes SP 557 At Las Lomas Parkway (CR 305) Construct Phase 2 (Final 4 lanes) of ultimate 8 lane bridge plus connections to Las Lomas Parkway Freeway/ Expressway NRSA Interchange IH 30 Dalrock Rd (Rockwall C/L) East of Dalrock Rd Transition for Dalrock Interchange including reconstruction of existing 4 to 4 land frontage roads and ramps $10,426,949 NRSA Interchange IH 30 At FM 3549 Reconstruct interchange at FM 3549 including 2/3 lane frontage rds and ramps construction $111,933,568 NRSA New Roadway, Reconstruction IH 20 On IH 20 frontage roads From Centerpoint Road Lakeshore Drive Construct new eastbound 2/3 lane frontage road and Reconstruct Existing 2 lane Portion of Eastbound Frontage Road to 2/3 lane Frontage Road West of Lakeshore Drive (Phase 1B of 3) $14,379,742 Source: North Central Texas Council of Governments Page 21

22 TIP Code Project Type CSJ Facility From To Description Project Cost NRSA Addition of lanes, Bridge, Reconstruction IH 20 Bankhead Highway Centerpoint Road Reconstruct 2 lane bridge to 1 lane u-turn bridge, Construct 0 to 4 lane bridge at Centerpoint Rd, Construct 0 to 4/6 lane frontage roads on IH 20 and ramps $27,615,937 NRSA Addition of lanes IH 20 West of Bankhead Highway East of Bankhead Highway Reconstruct and widen 2 lane bridge to 4 lane bridge at Bankhead over IH 20, ramp modifications and 2 lane frontage roads in each direction with an auxiliary lane between ramps west of Bankhead, construct new u-turn bridge east of Bankhead $250,000 NRSA , New Roadway IH 20 Sh 161/Lakeridge Parkway East of Carrier Parkway Construct 0 to 6 lane frontage roads and ramp modifications $44,389,365 NRSA New Roadway IH 20 West of Haymarket Rd West of US 175 Construct 2 lane EB and WB frontage roads and new ramps $8,744,273 NRSA New Roadway, Bike/Pedestrian IH 20 West of Carrier Parkway FM 1382 (Belt Line Road) Construct 0 to 6 lane frontage roads, ramp modifications, and sidewalks $35,543,589 NRSA New Roadway IH 20 North Main Street Camp Wisdom Road Construct 0 to 4 lane frontage roads $8,054,299 NRSA , New Roadway IH 20 West of Cockrell Hill Rd Hampton Rd Construct 0 to 4 lane frontage roads $31,897,216 NRSA New Roadway IH 20 Lawson Road Kaufman County Line Add 0 to 4 lanes continuous frontage roads $77,263,210 NRSA New Roadway SP 557 FM 148 IH 20 New location 2 lane frontage road eastbound only $4,266,024 NRSA New Roadway US 175 FM 148 CR 4106 in Crandall Construct new 2 lane frontage roads; Convert existing frontage road from 2 lane 2-way to 2 lane 1-way frontage road & ramp modifications $19,922,969 NRSA New Roadway IH 35W Eagle Parkway SH 114 Construct 2 lane southbound frontage roads with ramp modifications (Phase 1) $35,080,152 Source: North Central Texas Council of Governments Page 22

23 TIP Code Project Type CSJ Facility From To Description Project Cost NRSA Bike/Pedestrian, New Roadway IH 35E Manana Drive Royal lane Construct new 0 to 2 lane frontage roads northbound from Manana Dr to Royal lane and southbound from Walnut Hill Lane to Manana Dr and pedestrian improvements along Walnut Hill Lane $21,882,803 NRSA New Roadway, Bottleneck Removal IH 35E Lombardy lane Spur 482 (Storey Rd) Construct 0 to 2 SB frontage road and ramp modifications $11,689,762 NRSA Improvement IH 35E At Bear Creek Road Construct Improvements including reconstructing existing 4 to 4 lane frontage roads with the addition of a Texas U-turn and sidewalks $9,172,876 NRSA Reconstruction, Ramp Modifications IH 45 At SL 9 Reconstruct existing 2 to 2 lane southbound frontage road and ramp modifications $3,330,000 NRSA , Improvement US 81 North of CR 2195 North of US 380 Construct mainlane grade separation at relocated FM 1810 and US 81D with addition of ramps and 0 to 2 lane frontage roads $19,437,723 Source: North Central Texas Council of Governments Page 23

Transportation Improvement Program. Appendix H. Non-regionally Significant Arterials in Mobility 2045

Transportation Improvement Program. Appendix H. Non-regionally Significant Arterials in Mobility 2045 2019-2022 Transportation Improvement Program Appendix H Non-regionally Significant Arterials in Mobility 2045 North Central Texas Council of Governments DFW Metropolitan Planning Organization Revised June

More information

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028 Collin 54005 2351 01 017 FM 2478 FM 1461 to US 380 Collin 54005.1 2351 02 014 FM 2478 Collin 55038 2679 03 015 FM 2514 FM 1461 to North of FM 1461 East of Lavon Parkway to North of Drain Drive Widen two

More information

Transportation Improvement Program. Appendix H. Non-regionally Significant Arterials in Mobility Update

Transportation Improvement Program. Appendix H. Non-regionally Significant Arterials in Mobility Update 2015-2018 Transportation Improvement Program Appendix H Non-regionally Significant Arterials in Mobility 2035 2014 Update North Central Texas Council of Governments DFW Metropolitan Planning Organization

More information

GENERAL DESCRIPTION. Page 1 of 5

GENERAL DESCRIPTION. Page 1 of 5 38. SH 114/SH 121 Corridor The DFW Connector : FT1345, FT 1347, FT1424, FR1424, FT1425, FR1425, FT1440, FT1500, FR1500, FT1505, FR1505, FT1507, FR1507, FT1510, FR1510, FT1715, FR1715, FT2720, FR2720, HM8190

More information

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7. TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN Analysis of Future Conditions.. 7.2 Thoroughfare Plan.. 7.3 Proposed Cross-Sections.. 7.4 Arterials Minor Arterials Collectors Local Streets Thoroughfare Plan Map

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Regional Transportation Committee (RTC) 10-Year Project Milestone Policy. Transportation and Trinity River Project Committee October 26, 2015

Regional Transportation Committee (RTC) 10-Year Project Milestone Policy. Transportation and Trinity River Project Committee October 26, 2015 Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015 Purpose of Briefing Brief the Transportation and Trinity River

More information

BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM)

BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM) NOTICE OF PUBLIC MEETING INTERSTATE HIGHWAY 30 (Rockwall) FROM: BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM) 2642 CSJs: 0009-11-238; 0009-12-215; 0009-12-908 Dallas County and Rockwall County, Texas

More information

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING February 13, 2012 This regional transportation plan will: 1. Review existing plans for the cities and counties,

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities. Table of Contents 3.1. Interim vs. Ultimate Configuration for the Remaining Segments of NTE... 1 3.2. Characteristics of Project Segments... 3 3.2.1. All Segments... 5 3.2.2. Segment 2E... 8 3.2.3. Segment

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

NCTCOG DALLAS-FORT WORTH-ARLINGTON CATEGORY 7 RECAP FY 2013

NCTCOG DALLAS-FORT WORTH-ARLINGTON CATEGORY 7 RECAP FY 2013 NCTCOG DALLAS-FORT WORTH-ARLINGTON CATEGORY 7 RECAP FY 2013 Total Uncommitted Funds FY 2013 A + B = C C + D = E E - F = G A B C D E F G Balance Carryover from FY 12 FY (includes all adjustments) Total

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

Safety. Rural. District. Strategic Projects $4,150, to Maple Streett $6,117,000. west of Conway BNSF railroad. Georgia Street $549,080

Safety. Rural. District. Strategic Projects $4,150, to Maple Streett $6,117,000. west of Conway BNSF railroad. Georgia Street $549,080 Selected for $2 Billion Allocation Safety SLRTP Rural priority IH 35 Corridor Border and Port Trade 100 most congested Ports to Plains Corridor IH 69 Corridor Rural System Preservation Other High Corridors

More information

PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME.

PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME. 1 PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME. - SANDRA GREEN, CITY SECRETARY FARMERSVILLE CITY COUNCIL MEETING February

More information

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009. Value from &! M East HOU M East HOU M East HOU &! M East HOU &! M East HOU IH 45 0271-14-217 0271-14-218 0271-14-213 0271-14-228 0500-03-462 0500-03-550 0500-03-565 Reconstruct US /IH 610 IC. Construct

More information

North Central Texas Council of Governments

North Central Texas Council of Governments North Central Texas Council of Governments TO: Peggy Thurin, P.E. DATE: September 25, 2018 Texas Department of Transportation FROM: Jenny Narvaez Program Manager SUBJECT: Transmittal of the Draft Congestion

More information

TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATIONS FEBRUARY 2009 REVISIONS

TRANSPORTATION IMPROVEMENT PROGRAM MODIFICATIONS FEBRUARY 2009 REVISIONS MOD TIP CODE 2008-274 12175.08, 12416.08, 12417.08, 12418.08, 12419.08, 12420.08, 12421.08, 12422.08 DENTON COUNTY TRANSPORTATION AUTHORITY (DCTA) - FY08 PROGRAM OF S - TRANSIT SECTION 5307 - URBANIZED

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

Proposed Project I 35 from Denton to Cooke County Line

Proposed Project I 35 from Denton to Cooke County Line Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Mobility 2045 Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects Number Alamo Area Commute Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County AACOG Solutions Program Alamo Area Commute Solutions Pgm - FY 2017 $100,000 5101.0 0915-12-547 7/2018 Bexar Alamo

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

A: PLANNED P ROJECTS PROJECTS

A: PLANNED P ROJECTS PROJECTS Appendix A: PLANNED PROJECTS Programming Study Sound Barrier along south side of for approx. 2100 feet. Construction Complete $850,000 5 8613.00 Y Y Y Sound Barrier along south side of for 500' west of

More information

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER 2013 14:19 Thursday, June 13, 2013 1 ABILENE DISTRICT FUNC AUTHORIZED TOTAL EST OVER- TAYLOR 0034-01-124 US 83 C 34-1-124 5 3.2 P14BM $2,112,500 $3,721,952

More information

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for

More information

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m. FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m. Introductions Agency Partners H-GAC Missouri City TxDOT Introductions Consulting Team In Association

More information

Town of Flower Mound Master Transportation Plan Update

Town of Flower Mound Master Transportation Plan Update Town of Flower Mound Master Transportation Plan Update Town Council January 5, 2009 Agenda Project Schedule Why we re here Recommended Changes to MTP; plus: Transportation Commission Recommendations (11/11/08)

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

State Route 160 (Blue Diamond Highway)

State Route 160 (Blue Diamond Highway) State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

Ave C to Ave J Repair and installation of sidewalks along eastern side of Main St

Ave C to Ave J Repair and installation of sidewalks along eastern side of Main St 2040 Metropolitan Transportation Plan Project Listing Short Range Funded (2014-2023) Projects with Allocated as of June 2017 and Listed in the Transportation Improvement Program (TIP) CATEGORY 7 PROJECTS

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9. CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure

More information

INTERSTATE 540 IMPROVEMENT STUDY

INTERSTATE 540 IMPROVEMENT STUDY INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY APRIL, 2006 INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY April, 2006 Prepared by Parsons Transportation Group

More information

Proposed Action, Purpose and Need Technical Memorandum

Proposed Action, Purpose and Need Technical Memorandum Proposed Action, Purpose and Need Technical Memorandum MoPac (State Loop 1) Intersections, Austin District From North of Slaughter Lane to South of La Crosse Avenue CSJ: 3136-01-015 Travis County, Texas

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program Project Number Alamo Area Commute Solutions Pgm - 5301.0 0915-00-195 AAMPO Alamo Area Commute Solutions Pgm - 5302.0 0915-00-196 AAMPO Alamo Area Commute Solutions

More information

3.0 Future Conditions

3.0 Future Conditions 3.0 Future Conditions In order to be able to recommend appropriate improvements to the transportation system of the Town, it is important to first understand the nature and volume of traffic that is expected

More information

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road.

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road. CAMPO Plan Priority Project List: Regionally Funded Projects (Projects may be funded by Federal, State or Local funding) AS AMENDED: 1/10/2011, 3/11/2011, 10/10/2011, 4/9/2012, and 10/8/2012 I. Roadway

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

Circulation and Mobility

Circulation and Mobility SECTION 4 Circulation and Mobility OVERVIEW The first phase of the circulation analysis is to address specific concerns regarding the circulation system in the vicinity of the Gateway Specific Plan area

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

Quiet Zones: Silencing Train Horns at Railroad Crossings

Quiet Zones: Silencing Train Horns at Railroad Crossings Quiet Zones: Silencing Train Horns at Railroad Crossings Council Transportation and Environment Committee Prepared by Public Works and Transportation Transportation Programs - Planning January 12, 2009

More information

I-40 Maumelle New Interchange and new 2-lane facility 48 $10.4 $29.8 Highest. Full ITS Implementation 55 $63.3 $144.5 Highest

I-40 Maumelle New Interchange and new 2-lane facility 48 $10.4 $29.8 Highest. Full ITS Implementation 55 $63.3 $144.5 Highest PROJECT PRIORITIES: FREEWAYS 92 Freeway System ITS 60 $2.3 $2.3 Highest 94 Freeway System ITS 60 $7.9 $10.2 Highest 65 North Cabot Interchange - Hwy 38 State Hwy 367 and State Hwy 38 US Hwy 67 / 167 New

More information

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

Southwestern RPO Prioritization Local Input Points for Division Needs Funding H172327 US 19 Business paved shoulders; include bicycle lanes and sidewalks. Location: extends 0.9 miles from Junaluska Road in Andrews to US 19/74. $ 6,100,000 9.20 H090251-AC R-3622AC NC 294 (southern

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,

More information

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 MAJOR WIDENING TO 4 LANES FROM 1.0 MI E OF DENIS JONES RD TO BETHEL CHURCH RD. B0060 1.10 BALLARD US 60 3.700 INCLUDES KEVIL BYPASS.

More information

"Mobility 2040" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Mobility 2040 Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects Number Alamo Area Commute Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County AACOG Solutions Program Alamo Area Commute Solutions Pgm - FY 2017 $100,000 5101.0 0915-12-547 7/2018 Alamo Area

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

DRAFT INVESTMENT CORRIDORS

DRAFT INVESTMENT CORRIDORS DRAFT INVESTMENT CORRIDORS Mode Studied ID CORRIDOR / ROADWAY FROM TO EXISTING CMTA ROUTES CORRIDOR TYPE PRIORITY STREET COMMUTER ELECTRIC EXPRESS LIGHT METRO RAPID RIGHT-OF-WAY PRESERVATION SHUTTLE STREETCAR

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

4.0 Recommended Transportation Plan

4.0 Recommended Transportation Plan 4.0 Recommended Transportation Plan The Town wants to provide a multi modal transportation system for its residents in order to provide them with options when making trips. The automobile has always been

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

4.0 Recommended Transportation Plan

4.0 Recommended Transportation Plan 4.0 Recommended Transportation Plan The Town wants to provide a multi modal transportation system for its residents in order to provide them with options when making trips. The automobile has always been

More information

Existing LBJ Traffic Conditions and Motorist Travel Characteristics

Existing LBJ Traffic Conditions and Motorist Travel Characteristics JOSEY LN WEBBS CHAPEL RD MARSH LN TOLLWAY Existing LBJ Traffic Conditions and Motorist Travel Characteristics This Chapter summarizes data collected pertaining to existing traffic counts and travel characteristics

More information

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION The City of Starke is currently a bottleneck for traffic traveling along U.S. 301 in Bradford County. Local urban traffic combined with increasing

More information

Route 79/Davol Street Corridor Study

Route 79/Davol Street Corridor Study Route 79/Davol Street Corridor Study Fall River, MA Public Information Meeting #2 November 21, 2013 Fall River Heritage State Park Fall River, MA Agenda Welcome and Introductions Overview of Study Process

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015 FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

Mobility Greater Johnson County Transportation Coalition. May 23, 2018

Mobility Greater Johnson County Transportation Coalition. May 23, 2018 Mobility 2045 Greater Johnson County Transportation Coalition May 23, 2018 Agenda Regional Perspective Mobility Planning Overview Mobility 2045 Draft Recommendations Financial Planning Overview Schedule

More information

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, 2 0 1 3 B R A Z O S C E N T E R Project Overview Study Goals and Objectives» Improve traffic flow» Reduce delay»

More information

Chapter 6 Transportation Plan

Chapter 6 Transportation Plan Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised

More information

REPORT TO FRESNO COUNCIL OF GOVERNMENTS STEVE BRANDT, QUAD KNOPF ASSISTANT PROJECT MANAGER THROUGH: LAUREN DAWSON, FRESNO COG PROJECT MANAGER

REPORT TO FRESNO COUNCIL OF GOVERNMENTS STEVE BRANDT, QUAD KNOPF ASSISTANT PROJECT MANAGER THROUGH: LAUREN DAWSON, FRESNO COG PROJECT MANAGER REPORT TO FRESNO COUNCIL OF GOVERNMENTS DATE: APRIL 2012 TO: FROM: FRESNO COG POLICY BOARD STEVE BRANDT, QUAD KNOPF ASSISTANT PROJECT MANAGER THROUGH: LAUREN DAWSON, FRESNO COG PROJECT MANAGER SUBJECT:

More information

Preliminary Engineering Study

Preliminary Engineering Study Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary

More information

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Trans-Canada Highway 1 RW Bruhn Bridge Replacement Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the

More information