1 Overview of 4 th Bridge Working Group Meeting For the Route 27/244 Interchange Modification Project (VDOT Project No V01, UPC 13528) Held June 12, 2006 At the Carver Center, Arlington The fourth meeting of the Washington Boulevard/Columbia Pike Bridge Working Group was held on June 12, 2006 from 7:00 P.M. to 9:00 P.M. at the Carver Center in Arlington. The following representatives were in attendance: Arlington View Civic Association Mr. George Figliozzi gfigliozzi@nhpco.org Mr. Wilbert Briggs, Sr. wbriggsr@aol.com Mr. Tom Barlow tobarlow@aol.com Ms. Marie Gee Ms. Karen Butler beadswithbooks@verizon.com Mr. Lewis Gee lgee04@verizon.net Mr. Richard E. Smith Mr. Earl W. Barber Ms. Theresa Ray & Mr. Roger Ray Rtray3@verizon.net Kate Rettenmaier krettenm@yahoo.com Mr. Josh Rhoads josh.rhoads@gmail.com Columbia Heights Civic Association Mr. Ed Miltenberger miltenberger@afsa.org Penrose Neighborhood Association Mr. Tom Greenfield Tomg01y@yahoo.com West Hampton Mews Condominium Association Ms. Betty Hartman Parking889@cs.com VDOT Bud Siegel bud.siegel@vdot.virginia.gov Carol Bondurant carol.bondurant@vdot.virginia.gov Arlington County Bill Roberts wroberts@arlingtonva.us Dennis Leach dleach@arlingtonva.us Wasim Raja wraja@arlingtonva.us Patricia Bush pbush@arlingtonva.us VHB Robert Brander rbrander@vhb.com Warren Hughes whughes@vhb.com 1
2 TY Lin International Kevin Ducharme Adel Kotb After brief introductions of all the participants, Bud Siegel turned the meeting over to Warren Hughes (VHB). He gave a brief synopsis of the Traffic Operations Study the objectives, background, and methodology of the report. There was an immediate complaint from the citizens regarding what is described in the report as the base alternative. It shows S. Queen St. cut off from Columbia Pike, and it is their understanding that the concept approved in 2003 showed S. Queen St. having access to Columbia Pike. VHB mentioned that they just received the crash data for the project area. There were 126 crashes within the interchange area, with 50 occuring at the S. Queen St. junction. A citizen asked how many accidents were at S. Quinn Street, and VHB replied that they did not have the exact numbers in front of them, but that they believe there were 38 accidents. VHB began by giving a brief overview of each of the alternatives analyzed during the Tier I analysis, as well as noting which alternatives were being recommended for further study (Tier II analysis). Alternative A1 (realign Ramp F to stop bar) and A2 (allow NB through movement from S. Quinn St under Alternative A1) were recommended for further study. o There was a citizen question regarding the grades of the ramps since the bridge will be raised. TYLIN responded that the grades will be raised to tie into the bridge, but the profiles will tie into the existing ground at Columbia Pike and there will be no impact to the townhouses at Penrose o There was some citizen concern regarding the length of crosswalk between Ramp F and G because there is no provision for an island now that NB S. Quinn St traffic will continue to Ramp F. Alternative B (remove the time of day description on Ramp G left-only/shared thruright to be allowed at all times) was removed from consideration due to the queue spillback onto Washington Blvd. o There was a citizen comment that there currently is driver confusion at Ramp G. Recently added pavement markings denoting turning movements conflict with the time of day sign restrictions. The pavement markings show the left only/shared thru-right, and the time of day restriction sign shows left only/thru movement in the PM. Arlington County responded that they would look into this matter to clarify. o There was a citizen comment that the traffic should be slowed down through the area. o A citizen commented that EB Columbia Pike traffic accelerates to get onto Ramp E, which leads to accidents at the S. Quinn St. intersection. It is also difficult to cross Columbia Pike due to EB drivers frequently running red lights, and at the 2
3 Rolfe St intersection there is no stoplight. It was also noted that the citizens wish for the signals to be synchronized. Alternative C1 (adding a pedestrian signal at Ramp E near S. Queen St.) was removed from consideration because the existing number of pedestrian crossings were not large enough to warrant the pedestrian signal. In addition, the location of the signal would be in the middle of the on-ramp which violates driver expectancy and could affect safety and efficiency. o The question was raised as to why S. Queen St. was closed off in this alternative. VHB responded that S. Queen St. should have been shown similar to Alternative B (remain open with access to Ramp E) o The question was raised regarding the high speed of vehicles between S. Quinn St. and S. Queen St. VHB replied that the pedestrian signal would be synchronized with the S. Quinn St signal to alleviate this issue. Alternative C2 (adding a new signal at Columbia Pike and S. Queen St., realigning Ramp E away from S. Queen St., and provide access from S. Queen St. to EB Columbia Pike and to Ramp E) and C3 (adding a new signal at Columbia Pike and S. Queen St., realigning Ramp E away from S. Queen St., and provide all movements to/from EB and WB Columbia Pike) were also removed from consideration. In the case of Alternative C2, a signal is not warranted per the MUTCD. In the case of Alternative C3, there would be signficant delays for EB and WB Columbia Pike during the peak hour, and in addition Ramp B would back up onto Washington Blvd. o The question was raised if a single lane on Ramp E would work. VHB responded that it could not accommodate the AM peak hour volumes (up to 2 ½ hour period), but it could accommodate the traffic in the remainder of the day Alternative D (adding a left turn bay from WB Columbia Pike to S. Quinn St) was recommended for further study. It was noted that a substandard taper/storage length would be required to provide adequate left turn storage from EB Columbia Pike to Ramp B. o The question was raised as to why this dedicated left turn is even necessary, since the sense is that most traffic turns left at Rolfe St. They feel this will unnecessarily bring more traffic into the neighborhood Alternative E1 (realigning Ramp D to a new signal at S. Orme St.) and Alternative E2 (Alt. E1 + permit left turns from Ramp D) were both recommended for further study. VHB noted that the intersection would be slightly skewed due to the Arlington County Rehab Center building located at the corner of Ramp D and EB Columbia Pike. o There was the citizen comment regarding South Gate Road being closed in the future due to the Army/Navy Annex. Arlington County mentioned that the population east of S. Orme St. will decrease due to the two Army/Navy buildings being closed. o The question was raised if Ramp C is to be closed, and VHB replied that it would be closed. 3
4 o The question was raised as to why there were 2 lanes on Ramp B. VHB responded that 1 lane was for the right turns onto WB Columbia Pike and the other was for the left turns onto EB Columbia Pike o VHB added that the right turn volumes from Ramp D to EB Columbia Pike were low Alternative F1 (single lane on Ramp E with a through/through-right on EB Columbia Pike) and Alternative F2 (removal of time of day restriction from Rolfe St to Ramp E) were both removed from consideration. In the case of Alternate F1, VHB mentioned that there will be significant queueing during the AM peak that would back up all the way to Courthouse Rd. There are also safety issues with potential queue jumpers. In the case of Alternative F2, in the AM peak the network would operate similar to Alternative F1 since only the right lane will be feeding Ramp E. o The question was raised as to why the traffic analysis is based on the peak hour. Arlington County responded that this is to strike a balance by taking into consideration pedestrians, bicyclists, drivers, and transit. Traffic studies and improvements are designed for the worst case scenario in terms of traffic volumes, such that the network will not experience break down conditions, where no one is able to move through the roadway system during the peak periods and thereby extending the time that extreme traffic congestion prevails. o The question was raised if it would be possible to close Ramp E. VHB responded that this would not work. Alternative G (eliminate Ramp D) was removed from consideration. This would mean all vehicles bound for Columbia Pike from NB Washington Boulevard and NB I-395 would use Ramp B, which would increase delays on NB Washington Blvd, and increase weaving from NB I-395/Arlington Ridge Rd ramp to Ramp B. VHB then summarized all the alternatives and which ones were carried forward to Tier II analysis. The following issues were raised by the citizens: Regarding Alternate B (remove the time of day restriction on Ramp G left-only/shared thru-right to be allowed at all times), the question was raised why two lefts are needed in the first place. VHB responded that during the PM peak hour there would be spillback onto Washington Blvd in the future given the projected traffic volumes. Arlington County mentioned that they would prefer the single left turn if feasible. Regarding Alternate C1 (adding a pedestrian signal at Ramp E near S. Queen St.), a citizen commented that currently it is dangerous to cross Ramp E. Arlington County responded that the goal is to provide safe passage for pedestrians on both sides of Columbia Pike. A citizen commented that S. Queen St. being totally blocked off or with only access to Ramp E via right in/right out is unacceptable Regarding Alternate C3 (adding a new signal at Columbia Pike and S. Queen St./Ramp E, to provide all movements to/from EB and WB Columbia Pike), the question was raised why it cannot be considered for Tier II analysis, as it is the only acceptable option for the citizens. Arlington County responded that Alternate C3 was removed from consideration on a technical basis, but the County has not eliminated it altogether. 4
5 A citizen commented that there should be no changes on Columbia Pike safety of the pedestrians should be the only concern, and now the potential of closing S. Queen St. off to Columbia Pike will make things that much worse. A citizen commented that S. Queen St. is the safest way out of the neighborhood. There are frequent accidents on S. Quinn St and there is no signal at Rolfe St. Bill Roberts stated that the next Bridge Working Group Meeting will focus on bridge aesthetics. Dennis Leach briefly summarized the meeting by saying the the improvements to S. Quinn St/ Ramp F & G, Ramp A/B, and S. Orme St./Ramp D have generally been accepted. The only outstanding issue involves S. Queen St. The meeting was adjourned at 9:00 PM. 5
Intersection Control Evaluation Report Project: Alternative: Location: Evaluator:
Report Project: Alternative: Location: Evaluator: Franklin/Interstate-15 Interchange City of Lake Elsinore, 33 40'13.08"N 117 18'34.30"W Jeffrey Hsu 1 Introduction Policy Directive 13-02 calls for the
More informationColumbia Pike Implementation Team (CPIT) Meeting
Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal
More informationHarrah s Station Square Casino
Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December
More informationHighway 111 Corridor Study
Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More informationINNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate
INNOVATIVE INTERSECTION SOLUTIONS Jay Bockisch, PE, PTOE Senior Associate INNOVATIVE INTERSECTION SOLUTIONS Innovative intersection overview Case studies Continuous flow intersection Modern roundabouts
More informationTraffic Impact Analysis Chatham County Grocery Chatham County, NC
Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...
More informationALLEY 24 TRAFFIC STUDY
ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland
More informationM-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016
M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has
More informationPARDON OUR DUST. Arlington Boulevard (Route 50), 10 th Street and Courthouse Road Interchange (ARRA) Project No. (FO) , C501, B612, B611
PARDON OUR DUST Arlington Boulevard (Route 50), 10 th Street and Courthouse Road Interchange (ARRA) Project No. (FO) 0050-000-728, C501, B612, B611 WELCOME Larry Tomlinson, P.E., L.S. Area Construction
More informationQueensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011
: Summary of Recommendations Presentation to Manhattan Community Board 8 May 4, 2011 1 Overview Study Goal: Identify cost-effective ways to improve bus speed and reliability for local and express buses
More informationProject Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015
Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative
More informationAverage Delay/Vehicle (sec/veh) Signalized. Unsignalized Intersection
Attachment: Traffic Analysis Results Traffic simulation modeling analysis was completed for Santa Cruz Ave from Alameda De Las Pulgas to Junipero Serra Blvd. Analysis was performed for existing conditions
More informationSouthside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division
Southside Road Prepared for: City of St. John s Police & Traffic Committee Prepared by: City of St. John s Traffic Division January 2007 Southside Road - Traffic Report Page 1 of 9 BACKGROUND: th At the
More informationLeague City Parkway at Brittany Lakes/Fennigan Intersection Evaluation/ Traffic Study. Second Public Meeting February 6, 2018
League City Parkway at Brittany Lakes/Fennigan Intersection Evaluation/ Traffic Study Second Public Meeting February 6, 2018 City Project Information League City Parkway and Brittany Lakes Dr./ Fennigan
More informationDDI s Can Move More Than Cars! 2016 Western ITE Conference Albuquerque, NM July 12, 2016 Alex Ariniello, P.E. Public Works Director, Town of Superior
DDI s Can Move More Than Cars! 2016 Western ITE Conference Albuquerque, NM July 12, 2016 Alex Ariniello, P.E. Public Works Director, Town of Superior Overview How did we get to the DDI concept? What s
More informationRoute 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council
Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: 0007-253-109 UPC 106573 Presentation to Town Council June 26, 2017 Council Decisions East Market Street / Battlefield
More informationMETHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)
Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic
More informationA number of inferences have been drawn from the observations, each of which is discussed below.
Technical Memo To: Steve Gramm, Study Advisory Team From: Rick Laughlin Project: I-190/Silver St. CC: Date: 4/4/2011 Job No: RE: Special event observation HDR conducted an observation of special event
More informationTraffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas
ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest
More informationTruck Climbing Lane Traffic Justification Report
ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:
More informationLOOP 360 IMPROVEMENT STUDY
LOOP 360 IMPROVEMENT STUDY Overview and Preliminary Analysis August 2015 1 STUDY PROCESS 2 Study Background Loop 360 serves a wide range of users, including residents, businesses, bicyclists, and commuters
More informationRM 620 FEASIBILITY STUDY
RM 620 FEASIBILITY STUDY Sections 5 & 6 December 7, 2015 STUDY PROCESS Study Purpose and Goals The RM 620 Feasibility Study was launched by the Texas Department of Transportation (TxDOT) to analyze transportation
More informationCommunity Advisory Committee
Community Advisory Committee Meeting #1 November 19, 2014 Presentation Team Matt Fulda, Greater Bridgeport Regional Council Chris Granatini, P.E., Tighe & Bond Craig Yannes, P.E., PE PTOE, Tighe & Bond
More informationArlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016
Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing May 2016 Overview 10-Year Transit Development Plan Premium Transit Network Columbia Pike service concept Premium amenities
More informationTraffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC
Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.
More informationAccess Management Regulations and Standards
Access Management Regulations and Standards January 2014 Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while preserving
More informationDate: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study
To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth
More informationCity of Davis East Covell Corridor Plan
Community Open House #2 January 22, 2014 6:00 8:00 p.m. Veterans Memorial Center, Club Room City of Davis Introduction The (ECCP) is a taking a comprehensive look at the existing transportation systems
More informationAPPENDIX D. May 22, 2002 Open House Summary and Materials
APPENDIX D May 22, 2002 Open House Summary and Materials TH 36 Partnership Study Open House May 22, 2002 Summary of Survey Responses 1. If no new crossing of the St. Croix River is built (e.g. the existing
More informationShockoe Bottom Preliminary Traffic and Parking Analysis
Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA
More informationOwnership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park
Traffic Impact Analysis Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park Silver Spring, MD Lot 17: Site Plan No. 821413 Lot 18: Site Plan No. 821414 Filing Number: 13-TS-1198527A Prepared
More informationAppendix B: Forecasting and Traffic Operations Analysis Framework Document
Existing Conditions Report - Appendix Appendix B: Forecasting and Traffic Operations Analysis Framework Document This document defines the methodology and assumptions that will be used in the traffic forecasting
More informationQueensgate Drive Corridor Traffic Study
January 2015 Prepared for: City of Richland Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington 99336 Table of Contents Introduction and Background... 1 Existing
More information9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.
9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major
More informationEvaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation
Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad
More informationComplete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA
Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,
More informationORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS
ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS STAFF REPORT OF: January 6, 2019 SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INVESTIGATOR: O Neill Drive at Roanoke Drive; Ladera Ranch; TB 922-E6 Clever
More informationNorth Buckhead Civic Association. Recommendations For Wieuca Road
North Buckhead Civic Association Recommendations For Wieuca Road October 7, 2009 Blank Page Page 2 of 16 Table of Contents 1. BACKGROUND 4 2. TRAFFIC SIGNALS AND ALL WAY STOPS 5 3. SPEED LIMITS AND SPEED
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationBlair/Williamson Intersection Expressed Needs
Blair/Williamson Intersection Expressed Needs NORTH Blair Street is a barrier for pedestrians and bicycles Relocate Capitol City Trail crossing from Blair Street and John Nolen Drive intersection to Williamson
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION SHA CTP Project No. MO891A21, US 29, Fairland Road to Musgrove Road Interchange Improvement, Design Review
More informationChapter 5 5. INTERSECTIONS 5.1. INTRODUCTION
Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION Intersections are the physical component of the roadways where two highways intersect. They are the most complex element of roadways, since it requires more
More informationTRAFFIC SIGNAL WARRANT STUDY
TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION
More informationReference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis
To James Hinkamp and Tony Coe, City of Lafayette Date January 19, 2017 Copies Reference number 243381/VP From Michael Iswalt and Vanessa Peers File reference 4-05 Subject Lafayette Downtown Congestion
More informationWELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018
WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More informationDonahue Drive Corridor Traffic Operational Evaluation
Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background
More informationMINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY
MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study
More informationComments EXECUTIVE SUMMARY
Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal
More informationMEMORANDUM. Charlotte Fleetwood, Transportation Planner
MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering
More informationAccess Management Regulations and Standards
Access Management Regulations and Standards Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while simultaneously preserving
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of June 15, 2013 DATE: June 4, 2013 SUBJECT: Request to authorize Advertisement of a Public Hearing to consider an Amendment to Chapter 14.2
More information8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN
8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report
More informationDate: April 7, 2015 To: Chris Hartzell, PE Dakota County, MN From: Jacob Bongard, PE Bolton & Menk, Inc. Subject: Traffic Considerations Memorandum
M E M O R A N D U M Date: April 7, 2015 To: Chris Hartzell, PE Dakota County, MN From: Jacob Bongard, PE Bolton & Menk, Inc. Subject: Traffic Considerations Memorandum I. Introduction The objective of
More informationArlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014
Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks Thomas Jefferson Working Group Meeting #6 November 10, 2014 2 3 INTRODUCTION 4 Goal of our work: Identify and assess multi-modal
More informationMilitary Road Safety Improvements
Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and
More informationEXISTING (2006) CONDITIONS
Section 2 EXISTING (2006) CONDITIONS This section provides a description of the existing transportation system in the study area and a comprehensive analysis of existing traffic operations and crash history.
More information7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION
7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.1 INTRODUCTION & METHODOLOGY FEASIBILITY REPORT Congestion hot spot problem locations have been assessed using the
More informationPEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES
PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility
More informationNixon, Green, and Dhu Varren Roads. Intersection Improvement Study
Nixon, Green, and Dhu Varren Roads Intersection Improvement Study Background Public Discussion October 2013 Over 100 people participated Summary available at project website Intersection Study Started
More informationWISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017
WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING March 28, 2017 STUDY AREA N MEETING AGENDA Introductions Study Background Alternatives Studied Recommended Alternative Discussion STUDY BACKGROUND
More information1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY
1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343
More informationAppendix A: Crosswalk Policy
Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Introduction This citywide Crosswalk Policy is aimed at improving pedestrian safety and enhancing pedestrian mobility by providing a framework
More informationFinancial Project ID No(s).: and ETDM No(s).: and 14181
Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach
More informationFigure 1: East West Connector Alignment Alternatives Concept Drawing
Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationOffset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico
Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico INSTITUTE OF TRANSPORTATION ENGINEERS 2016 WESTERN DISTRICT MEETING JULY 11, 2016 7/11/2016 1 Project Vicinity Map 7/11/2016
More informationTHE LANDMARK AT TALBOT PARK
TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the
More informationRiverside Drive Complete Streets Project 3 rd Community Meeting. March 26, 2015
Riverside Drive Complete Streets Project 3 rd Community Meeting March 26, 2015 Providing Feedback Sign-In with contact information for future updates Complete questionnaire provided tonight Complete comment
More informationTraffic Impact Study WestBranch Residential Development Davidson, NC March 2016
Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC
More informationHighway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
More informationPROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia
PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1
More informationWASHINGTON CITY TELEGRAPH ROAD & GREEN SPRINGS DRIVE INTERSECTION STUDY
WASHINGTON CITY TELEGRAPH ROAD & GREEN SPRINGS DRIVE INTERSECTION STUDY February 6, 2014 PREPARED BY: 11 North 300 West Washington, UT 84780 (435) 652-8450 phone (435) 652-8416 fax WASHINGTON CITY TELEGRAPH
More information/ Comment Sheet. . Comment Sheet ( ed in)
Summary of Content / Comment Sheet Response 1 A) Suggested the following streets be included in review for cut through restrictions: Holyrood Dr and Lawton St. B) In favor of red light camera at Balls
More informationMoPac South: Impact on Cesar Chavez Street and the Downtown Network
MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority
More informationMeade Street Bridge Design Alternative Study
Meade Street Bridge Design Alternative Study Preferred Alternative Presentation Stakeholder Meeting #3 June 23, 2011 Presented by: Dan Biggs, RLA Meeting Agenda Purpose: 1. Review Meeting #2 Feedback 2.
More informationPUBLIC HEARING QUESTIONS AND COMMENTS
Columbia Pike Multimodal Street Improvements Preliminary Engineering Phase PUBLIC HEARING QUESTIONS AND COMMENTS A public hearing for the Columbia Pike Multimodal Street Improvements project was held on
More informationDEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:
DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,
More informationEnvironmental Assessment Findings & Recommendations. Public Hearing November 13, 2014
Environmental Assessment Findings & Recommendations Public Hearing November 13, 2014 Welcome! Welcome and Introductions Project and Environmental Assessment Overview Public Comments Adjourn Purpose of
More information133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas
133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS Overland Park, Kansas September 1, 2017 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. LITERATURE REVIEW... 1 3. CONCEPT
More informationTRAFFIC IMPACT ANALYSIS
TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014
More information1 st and 2 nd Street Couplet FAQ s
1 st and 2 nd Street Couplet FAQ s Q. Will the proposed roundabout at Flume/2nd/1 st Streets affect access to businesses nearby?... 2 Q. What if the project isn t received well by the community after construction?...
More informationTraffic Signal Design
Traffic Signal Design Instructor: S. M. Mahdi Amiripour m.amiripour@gmail.com 2 Introduction Intersection is an area shared by two or more roads Designated for the vehicles to turn to different directions
More informationRoadways. Roadways III.
Introduction 97 Roadway Design Principles 98 Safe Speeds 99 Optimizing of Street Space 00 Minimum Lane Widths in the City of Boston 02 Design Features that Reduce Operating Speeds 05 Travel Lanes Transit
More informationToronto and East York Community Council. Director, Transportation Services, Toronto and East York District
No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity
More informationFeasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017
Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road October 3, 2017 Study Area (area within a ¼-mile radius of the study intersections) Route
More informationAbrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677
Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,
More information6060 North Central Expressway Mixed-Use Site Dallas, Texas
Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic
More informationAppendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station
Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,
More informationAppendix D: Concept Screening
Concept Description Concept #1 Route 288 Roadway Widening This concept consists of constructing a third lane on northbound and southbound Route 288 between Powhite Parkway and US 360. This improvement
More informationI-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer
I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up
More informationTRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION
TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212
More informationSR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.
SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017 SR 9/I-95 Interchange at PD&E Study Presentation
More informationRoute 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection
TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC
More informationDRAFT. Memo. Range of the Alternatives Considered in the EIS
Memo Date: Friday, December 09, 2016 Project: To: From: Subject: State Route 30 EIS UDOT Vince Izzo This memorandum summarizes the draft State Route (S.R.) 30 Level 1 screening results. A more detailed
More informationMineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st
Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24
More informationTroutbeck Farm Development
Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com
More informationBay to Bay Boulevard Complete Streets Project
Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information
More informationGrant Avenue Streetscape
REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,
More information