Location: MUD Density. Province: Field: Location: Well: Company: Newfoundland Undefined UTM (NAD 27) Storm #1 Vulcan Minerals Inc.

Size: px
Start display at page:

Download "Location: MUD Density. Province: Field: Location: Well: Company: Newfoundland Undefined UTM (NAD 27) Storm #1 Vulcan Minerals Inc."

Transcription

1 RMF Measured Temperature RMC Measured Temperature Source RMF RMC RM MRT RMF MRT Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By Karla Smith 9 Dartmouth Andrea Doyle. degc -Aug- -Aug- : : Mud tank.8 ohm.m Fluid Loss PH Source Of Sample RM Measured Temperature 8 degc MUD Density Viscosity. mm Fresh mud kg/m s Logging Date Run Number Depth Driller Schlumberger Depth Bottom Log Interval Top Log Interval Casing Driller Size Depth Casing Schlumberger Bit Size Type Fluid In Hole -Aug- 88. m m m m.8 mm m m Province: Field: Location: Well: Company: API Serial No. Drilling Measured From: Rig Floor Newfoundland Undefined UTM (NAD ) Storm # Vulcan Minerals Inc. LOCATION Log Measured From: Rig Floor Permanent Datum: Ground Level UTM (NAD ) Northing: 89; Easting: 9 Platform Express Density-Neutron Log Well: Field: Province: Storm # Undefined Newfoundland Location: Company: Vulcan Minerals Inc. St Elev Elev.9 No

2 ephenville.: K.B. G.L. D.F. 9.9 m 9 m 9.9 m.: 9 m m above Perm. Datum rthing 89 Easting 9 RMF Measured Temperature RMC Measured Temperature Source RMF RMC RM MRT RMF MRT Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By MUD Fluid Loss PH Source Of Sample RM Measured Temperature Density Viscosity Logging Date Run Number Depth Driller Schlumberger Depth Bottom Log Interval Top Log Interval Casing Driller Size Depth Casing Schlumberger Bit Size Type Fluid In Hole Run Run Run Run DEPTH SUMMARY LISTING Depth Measuring Device Type: IDW-B Serial Number: 9 Calibration Date: 9-Apr- Calibrator Serial Number: Calibration Cable Type: -9P-LXS Wheel Correction : - Wheel Correction : - Depth System Equipment Tension Device Type: CMTD-B/A Serial Number: 9 Calibration Date: 9-Aug- Calibrator Serial Number: 89 Calibration Gain:.9 Calibration Offset:. Date Created: -AUG- :: Logging Cable Type: -9P-LXS Serial Number: Length:. M Conveyance Method: Wireline Rig Type: LAND

3 Log Sequence: Rig Up Length At Surface: Rig Up Length At Bottom: Rig Up Length Correction: Stretch Correction: Tool Zero Check At Surface: First Log In the Well. M. M. M. M -. M Depth Control Parameters Depth Control Remarks. Primary depth control was a calibrated IDW DISCLAIMER THE USE OF AND RELIANCE UPON THIS RECORDED-DATA BY THE HEREIN NAMED COMPANY (AND ANY OF ITS AFFILIATES, PARTNERS, REPRESENTATIVES, AGENTS, CONSULTANTS AND EMPLOYEES) IS SUBJECT TO THE TERMS AND CONDITIONS AGREED UPON BETWEEN SCHLUMBERGER AND THE COMPANY, INCLUDING: (a) RESTRICTIONS ON USE OF THE RECORDED-DATA; (b) DISCLAIMERS AND WAIVERS OF WARRANTIES AND REPRESENTATIONS REGARDING COMPANY'S USE OF AND RELIANCE UPON THE RECORDED-DATA; AND (c) CUSTOMER'S FULL AND SOLE RESPONSIBILITY FOR ANY INFERENCE DRAWN OR DECISION MADE IN CONNECTION WITH THE USE OF THIS RECORDED-DATA. OTHER SERVICES OTHER SERVICES OS: HRLA OS: OS: DSI OS: OS: OS: OS: OS: OS: OS: REMARKS: RUN NUMBER REMARKS: RUN NUMBER Data acquired prior to fishing job for logging tools. Bottom of tool was at 8m when stuck. Tool was determined to be stuck at the tool by using LEH-QT head tension ( lbs while stuck). Toolstring run as per tool sketch. Logs run on a sandstone matrix (MDEN= kg/m^, DTM=8 us/ft). Dartmouth District: 9-8- Crew: Steve Beaton, Harry Creemer RUN RUN SERVICE ORDER #: 9 SERVICE ORDER #: PROGRAM VERSION: C- PROGRAM VERSION: FLUID LEVEL: m FLUID LEVEL: LOGGED INTERVAL START STOP LOGGED INTERVAL START STOP GSR-U/Y NCT-B CNB-AB NCS-VB EQUIPMENT DESCRIPTION RUN RUN SURFACE EQUIPMENT WITM (DTS)-A DOWNHOLE EQUIPMENT

4 LEH-QT LEH-QT 9 AH-8 DTC-H ECH-KC HILTH-FTB HGNSD-H 888 HMCA-H HGNH 89 NLS-KL NSR-F HACCZ-H HCNT-H HGR HRCC-H 88 HRMS-H 88 HRGD-H 88 GLS-VJ CTEM HGNS HTEM HMCA TelStatus ToolStatu Gamma-Ray Neutron F Neutron N HGNS sens HRCC cart MCFL HILT cali HRDD-LS HRDD-SS HRDD-BS AH-.8 AH-. HRLT-B HRUH-B 8 HRUC-B 8 HRLS-B 89 HRLH-B 8 HRLC-B 8 AH- 8 High Res. 9.. DSST-B SPAC-B 89 ECH-SD SMDR-BD 8 SSIJ-BA 88 SMDX-AA 8.8 BNS-CCS PWF DF HTEN HMAS HV Accelerom Tension TOOL ZERO.. MAXIMUM STRING DIAMETER MM MEASUREMENTS RELATIVE TO TOOL ZERO ALL LENGTHS IN METERS.

5 MAIN PASS : MAXIS Field Log Company: Vulcan Minerals Inc. Well: Storm # Input DLIS Files DEFAULT MERGE_DSI_HRLA_TLD_ FN: PRODUCER -Aug- : 9. M 8. M Output DLIS Files DEFAULT DSI_HRLA_TLD_MCFL_PUP FN:9 PRODUCER -Aug- 8: 9. M 9. M OP System Version: C- MCM DSST-B C- HRLT-B C- HILTH-FTB SRPC-88-HILT DTC-H C- Time Mark Every S PIP SUMMARY Tension (TENS) (LBF) HILT Caliper (HCAL) (MM) Gamma Ray (GR) (GAPI) Bit Size (BS) (MM) Std. Res. Formation Density (RHOZ) 9 (K/M) 9 Std. Res. Formation Pe (PEFZ) Density Correction (HDRA) (----) - (K/M) Alpha Processed Neutron Porosity (NPOR). (V/V) -.

6 FR GR FR HCAL FR RHOZ FR PEFZ FR NPOR FR HDRA Bit Size (BS) (MM) Gamma Ray (GR) (GAPI) HILT Caliper (HCAL) (MM) Alpha Processed Neutron Porosity (NPOR). (V/V) -. Std. Res. Formation Pe (PEFZ) Density Correction (HDRA) (----) - (K/M) Std. Res. Formation Density (RHOZ) 9 (K/M) 9 Tension (TENS) (LBF) Time Mark Every S PIP SUMMARY Parameters DLIS Name Description DSST-B: Dipole Shear Imager - B BHS Borehole Status OPEN GCSE Generalized Caliper Selection HCAL GDEV Average Angular Deviation of Borehole from Normal DEG GGRD Geothermal Gradient. DF/F MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE SHT Surface Hole Temperature 8 DEGF HRLT-B: High Resolution Laterolog Array - B BHS Borehole Status OPEN GCSE Generalized Caliper Selection HCAL GDEV Average Angular Deviation of Borehole from Normal DEG GGRD Geothermal Gradient. DF/F MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE SHT Surface Hole Temperature 8 DEGF HILTH-FTB: High resolution Integrated Logging Tool-DTS BHFL Borehole Fluid Type WATER BHFL_TLD HILT Nuclear Mud Base WATER BHS Borehole Status OPEN BSCO Borehole Salinity Correction Option NO CCCO Casing & Cement Thickness Correction Option NO DHC Density Hole Correction BS FSAL Formation Salinity - PPM FSCO Formation Salinity Correction Option NO GCSE Generalized Caliper Selection HCAL GDEV Average Angular Deviation of Borehole from Normal DEG GGRD Geothermal Gradient. DF/F HSCO Hole Size Correction Option YES MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE MCCO Mud Cake Correction Option NO MCOR Mud Correction NATU MWCO Mud Weight Correction Option NO NAAC HRDD APS Activation Correction OFF NMT HILT Nuclear Mud Type NOBARITE NPRM HRDD Processing Mode StdRes NSAR HRDD Depth Sampling Rate IN PTCO Pressure/Temperature Correction Option NO SDAT Standoff Data Source SOCN SHT Surface Hole Temperature 8 DEGF SOCN Standoff Distance. IN SOCO Standoff Correction Option NO System and Miscellaneous

7 BS BSAL Bit Size Borehole Salinity. -. MM PPM CSIZ Current Casing Size.8 MM CWEI Casing Weight. KG/M DFD Drilling Fluid Density. K/M DO Depth Offset for Playback. M MST Mud Sample Temperature 8. DEGC PP Playback Processing RECOMPUTE RMFS Resistivity of Mud Filtrate Sample -. OHMM TDL Total Depth - Logger. M Format: SANDSTONE_ Vertical Scale: : Graphics File Created: -Aug- 8: OP System Version: C- MCM DSST-B C- HRLT-B C- HILTH-FTB SRPC-88-HILT DTC-H C- Input DLIS Files DEFAULT MERGE_DSI_HRLA_TLD_ FN: PRODUCER -Aug- : 9. M 8. M Output DLIS Files DEFAULT DSI_HRLA_TLD_MCFL_PUP FN:9 PRODUCER -Aug- 8: MAIN PASS : MAXIS Field Log Company: Vulcan Minerals Inc. Well: Storm # Input DLIS Files DEFAULT MERGE_DSI_HRLA_TLD_ FN: PRODUCER -Aug- : 9. M 8. M Output DLIS Files DEFAULT DSI_HRLA_TLD_MCFL_PUP FN:9 PRODUCER -Aug- 8: 9. M 9. M OP System Version: C- MCM DSST-B C- HRLT-B C- HILTH-FTB SRPC-88-HILT DTC-H C- Time Mark Every S PIP SUMMARY Tension (TENS) (LBF) HILT Caliper (HCAL) (MM) Gamma Ray (GR) (GAPI) Bit Size (BS) (MM) Std. Res. Formation Density (RHOZ) 9 (K/M) 9 Std. Res. Formation Pe (PEFZ) Density Correction (HDRA) (----) - (K/M) Alpha Processed Neutron Porosity (NPOR). (V/V) -.

8 FR GR FR HCAL FR PEFZ FR RHOZ FR NPOR FR HDRA Bit Size (BS) (MM) Gamma Ray (GR) (GAPI) HILT Caliper (HCAL) (MM) Alpha Processed Neutron Porosity (NPOR). (V/V) -. Std. Res. Formation Pe (PEFZ) Density Correction (HDRA) (----) - (K/M) Std. Res. Formation Density (RHOZ) 9 (K/M) 9 Tension (TENS) (LBF)

9 Time Mark Every S PIP SUMMARY Parameters DLIS Name Description DSST-B: Dipole Shear Imager - B BHS Borehole Status OPEN GCSE Generalized Caliper Selection HCAL GDEV Average Angular Deviation of Borehole from Normal DEG GGRD Geothermal Gradient. DF/F MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE SHT Surface Hole Temperature 8 DEGF HRLT-B: High Resolution Laterolog Array - B BHS Borehole Status OPEN GCSE Generalized Caliper Selection HCAL GDEV Average Angular Deviation of Borehole from Normal DEG GGRD Geothermal Gradient. DF/F MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE SHT Surface Hole Temperature 8 DEGF HILTH-FTB: High resolution Integrated Logging Tool-DTS BHFL Borehole Fluid Type WATER BHFL_TLD HILT Nuclear Mud Base WATER BHS Borehole Status OPEN BSCO Borehole Salinity Correction Option NO CCCO Casing & Cement Thickness Correction Option NO DHC Density Hole Correction BS FSAL Formation Salinity - PPM FSCO Formation Salinity Correction Option NO GCSE Generalized Caliper Selection HCAL GDEV Average Angular Deviation of Borehole from Normal DEG GGRD Geothermal Gradient. DF/F HSCO Hole Size Correction Option YES MATR Rock Matrix for Neutron Porosity Corrections SANDSTONE MCCO Mud Cake Correction Option NO MCOR Mud Correction NATU MWCO Mud Weight Correction Option NO NAAC HRDD APS Activation Correction OFF NMT HILT Nuclear Mud Type NOBARITE NPRM HRDD Processing Mode StdRes NSAR HRDD Depth Sampling Rate IN PTCO Pressure/Temperature Correction Option NO SDAT Standoff Data Source SOCN SHT Surface Hole Temperature 8 DEGF SOCN Standoff Distance. IN SOCO Standoff Correction Option NO System and Miscellaneous BS Bit Size. MM BSAL Borehole Salinity -. PPM CSIZ Current Casing Size.8 MM CWEI Casing Weight. KG/M DFD Drilling Fluid Density. K/M DO Depth Offset for Playback. M MST Mud Sample Temperature 8. DEGC PP Playback Processing RECOMPUTE RMFS Resistivity of Mud Filtrate Sample -. OHMM TDL Total Depth - Logger. M Format: SANDSTONE POROSITY Vertical Scale: : Graphics File Created: -Aug- 8: OP System Version: C- MCM DSST-B C- HRLT-B C- HILTH-FTB SRPC-88-HILT DTC-H C- Input DLIS Files DEFAULT MERGE_DSI_HRLA_TLD_ FN: PRODUCER -Aug- : 9. M 8. M Output DLIS Files DEFAULT DSI_HRLA_TLD_MCFL_PUP FN:9 PRODUCER -Aug- 8:

10 CALIBRATIONS - HRLT V : -Aug- : HRLT A-A Voltage Plus - N/A 8 N/A N/A UV HRLT A-A Voltage Plus - N/A N/A N/A UV HRLT A-A Voltage Plus - N/A 8 N/A N/A UV HRLT A-A Voltage Plus - N/A N/A N/A UV HRLT A-A Voltage Plus - N/A 9 N/A N/A UV MAXIS Field Log Calibration and Check Summary Measurement Nominal After Change Limit Units - HRLT M : -Aug- : HRLT M-M Voltage Plus - N/A -. N/A N/A 9.8 UV HRLT M-M Voltage Plus - N/A -. N/A N/A 9.8 UV HRLT M-M Voltage Plus - N/A -9. N/A N/A 9.8 UV HRLT M-M Voltage Plus - N/A -.8 N/A N/A 9.8 UV HRLT M-M Voltage Plus - N/A -. N/A N/A 9.8 UV HRLT M-M Voltage Plus - N/A -.9 N/A N/A 9.8 UV HRLT M-M Voltage Plus - N/A. N/A N/A 9.8 UV HRLT M-M Voltage Plus - N/A N/A N/A 9.8 UV - HRLT M : -Aug- : HRLT M-M Voltage Plus - N/A N/A N/A. UV HRLT M-M Voltage Plus - N/A 9 N/A N/A. UV HRLT M-M Voltage Plus - N/A N/A N/A. UV HRLT M-M Voltage Plus - N/A N/A N/A. UV HRLT M-M Voltage Plus - N/A N/A N/A. UV HRLT M-M Voltage Plus - N/A 8 N/A N/A. UV HRLT M-M Voltage Plus - N/A -99 N/A N/A. UV HRLT M-M Voltage Plus - N/A N/A N/A. UV - HRLT M : -Aug- : HRLT M-M Voltage Plus - N/A N/A N/A. UV HRLT M-M Voltage Plus - N/A N/A N/A. UV HRLT M-M Voltage Plus - N/A N/A N/A. UV HRLT M-M Voltage Plus - N/A 8 N/A N/A. UV HRLT M-M Voltage Plus - N/A N/A N/A. UV HRLT M-M Voltage Plus - N/A N/A N/A. UV HRLT M-M Voltage Plus - N/A -9 N/A N/A. UV HRLT M-M Voltage Plus - N/A N/A N/A. UV - HRLT V : -Aug- : HRLT A-A Voltage Plus - N/A 9 N/A N/A UV HRLT A-A Voltage Plus - N/A N/A N/A UV HRLT A-A Voltage Plus - N/A 88 N/A N/A UV HRLT A-A Voltage Plus - N/A 8 N/A N/A UV HRLT A-A Voltage Plus - N/A 9 N/A N/A UV HRLT A-A Voltage Plus - N/A 9 N/A N/A UV HRLT A-A Voltage Plus - N/A -98 N/A N/A UV HRLT A-A Voltage Plus - N/A N/A N/A UV - HRLT V : -Aug- : HRLT A-A Voltage Plus - N/A 8 N/A N/A UV HRLT A-A Voltage Plus - N/A N/A N/A UV HRLT A-A Voltage Plus - N/A 8 N/A N/A UV HRLT A-A Voltage Plus - N/A 88 N/A N/A UV HRLT A-A Voltage Plus - N/A 9 N/A N/A UV HRLT A-A Voltage Plus - N/A 9 N/A N/A UV HRLT A-A Voltage Plus - N/A -989 N/A N/A UV HRLT A-A Voltage Plus - N/A N/A N/A UV

11 HRLT A A Voltage Plus N/A 9 N/A N/A UV HRLT A-A Voltage Plus - N/A 9 N/A N/A UV HRLT A-A Voltage Plus - N/A -9 N/A N/A UV HRLT A-A Voltage Plus - N/A N/A N/A UV - HRLT VTP : -Aug- : HRLT Torpedo-M Voltage - N/A - N/A N/A UV HRLT Torpedo-M Voltage - N/A - N/A N/A UV HRLT Torpedo-M Voltage - N/A -89 N/A N/A UV HRLT Torpedo-M Voltage - N/A - N/A N/A UV HRLT Torpedo-M Voltage - N/A -9 N/A N/A UV HRLT Torpedo-M Voltage - N/A -98 N/A N/A UV HRLT Torpedo-M Voltage - N/A 9 N/A N/A UV HRLT Torpedo-M Voltage - N/A - N/A N/A UV - HRLT VBD : -Aug- : HRLT Bridle#9-M Voltage - N/A - N/A N/A UV HRLT Bridle#9-M Voltage - N/A - N/A N/A UV HRLT Bridle#9-M Voltage - N/A -89 N/A N/A UV HRLT Bridle#9-M Voltage - N/A - N/A N/A UV HRLT Bridle#9-M Voltage - N/A -9 N/A N/A UV HRLT Bridle#9-M Voltage - N/A -98 N/A N/A UV HRLT Bridle#9-M Voltage - N/A N/A N/A UV HRLT Bridle#9-M Voltage - N/A - N/A N/A UV - HRLT ISO : -Aug- : HRLT Source Current Plus - N/A 8. N/A N/A 8. UA HRLT Source Current Plus - N/A N/A N/A 8. UA HRLT Source Current Plus - N/A N/A N/A 8. UA HRLT Source Current Plus - N/A N/A N/A 8. UA HRLT Source Current Plus - N/A N/A N/A 8. UA HRLT Source Current Plus - N/A N/A N/A 8. UA HRLT Source Current Plus - N/A N/A N/A 8. UA HRLT Source Current Plus - N/A N/A N/A 8. UA - HRLT MV : -Aug- : HRLT Vertical Voltage Pl - N/A -9. N/A N/A 9.8 UV HRLT Vertical Voltage Pl - N/A -8. N/A N/A 9.8 UV HRLT Vertical Voltage Pl - N/A -.8 N/A N/A 9.8 UV HRLT Vertical Voltage Pl - N/A -9.8 N/A N/A 9.8 UV HRLT Vertical Voltage Pl - N/A -. N/A N/A 9.8 UV HRLT Vertical Voltage Pl - N/A -.8 N/A N/A 9.8 UV HRLT Vertical Voltage Pl - N/A 8.8 N/A N/A 9.8 UV HRLT Vertical Voltage Pl - N/A N/A N/A 9.8 UV High resolution Integrated Logging Tool-DTS Wellsite Calibration - Stab Measurement Summary : -Aug- :8 BS Window Ratio. N/A.8 N/A N/A N/A BS Window Sum 8 N/A N/A N/A N/A CPS SS Window Ratio.8 N/A.8 N/A N/A N/A SS Window Sum 9 N/A N/A N/A N/A CPS LS Window Ratio. N/A.99 N/A N/A N/A LS Window Sum N/A N/A N/A N/A CPS High resolution Integrated Logging Tool-DTS Wellsite Calibration - Photo-multiplier High Voltages Calibrations : -Aug- :8 BS PM High Voltage (Command) N/A N/A N/A N/A V SS PM High Voltage (Command) N/A N/A N/A N/A V LS PM High Voltage (Command) 9 N/A N/A N/A N/A V High resolution Integrated Logging Tool-DTS Wellsite Calibration - Crystal Quality Resolutions Calibration : -Aug- :8 BS Crystal Resolution.8 N/A.8 N/A N/A N/A % SS Crystal Resolution 8.8 N/A 8.8 N/A N/A N/A % LS Crystal Resolution 8.9 N/A 8.8 N/A N/A N/A % High resolution Integrated Logging Tool-DTS Wellsite Calibration - MCFL Calibration : -Aug- : Raw B Resistivity 8 N/A 89 N/A N/A N/A OHMM Raw B Resistivity 8 N/A N/A N/A N/A OHMM Raw B Resistivity 8 N/A 88 N/A N/A N/A OHMM High resolution Integrated Logging Tool-DTS Wellsite Calibration - HILT Caliper Calibration : -Aug- : HILT Caliper Zero Measurement. N/A 8.8 N/A N/A N/A MM HILT Caliper Plus Measurement.8 N/A 9. N/A N/A N/A MM High resolution Integrated Logging Tool-DTS Wellsite Calibration - Detector Calibration

12 : -Aug- : Gamma Ray Background. N/A. N/A N/A N/A GAPI Gamma Ray (Jig - Bkg). N/A. N/A N/A. GAPI Gamma Ray (Calibrated). N/A. N/A N/A. GAPI High resolution Integrated Logging Tool-DTS Wellsite Calibration - Zero Measurement : 8-Jun- :9 : -Aug- : CNTC Background N/A N/A. CPS CFTC Background...99 N/A N/A.8 CPS High resolution Integrated Logging Tool-DTS Wellsite Calibration - Ratio Measurement : 8-Jun- :9 Thermal Near Corr. (Tank) N/A N/A N/A N/A CPS Thermal Far Corr. (Tank) 9 9 N/A N/A N/A N/A CPS CNTC/CFTC (Tank).9. N/A N/A N/A N/A High resolution Integrated Logging Tool-DTS Wellsite Calibration - Accelerometer Calibration : -Aug- : Z-Axis Acceleration 9.8 N/A 9.8 N/A N/A N/A M/S High resolution Integrated Logging Tool-DTS Calibration - Inversion results : -Aug- : Rho Aluminum K/M Rho Magnesium K/M Pe Aluminum Pe Magnesium High resolution Integrated Logging Tool-DTS Calibration - Deviation Summary : -Aug- : BS Average Deviation % BS Max Deviation % SS Average Deviation % SS Max Deviation % LS Average Deviation % LS Max Deviation % The GLS-VJ source activity is acceptable. The HGNS Neutron Calibration was done with the following parameters : NCT-B Water Temperature 8. DEGC. Thermal Housing Size 8. MM. NSR-F serial number High Resolution Laterolog Array - B / Equipment Identification Primary Equipment: HRLT Sonde HRLS - B 89 Auxiliary Equipment: HRLT lower Housing HRLH - B 8 HRLT Lower Cartridge HRLC - B 8 HRLT upper Housing HRUH - B 8 HRLT Upper Cartridge HRUC - B 8 HRLT M HRLT M-M Voltage Plus UV Nominal

13 -8. : -Aug- : HRLT M HRLT M-M Voltage Plus UV Nominal : -Aug- : HRLT M HRLT M-M Voltage Plus UV Nominal : -Aug- : HRLT V HRLT A-A Voltage Plus UV Nominal : -Aug- : HRLT V HRLT A-A Voltage Plus UV Nominal 8

14 : -Aug- : HRLT V HRLT A-A Voltage Plus UV Nominal : -Aug- : HRLT VTP HRLT Torpedo-M Voltage Plus UV Nominal : -Aug- : HRLT VBD HRLT Bridle#9-M Voltage Plus UV Nominal

15 : -Aug- : HRLT ISO HRLT Source Current Plus UA Nominal : -Aug- : HRLT MV HRLT Vertical Voltage Plus UV Nominal : -Aug- : High resolution Integrated Logging Tool-DTS / Equipment Identification Primary Equipment: HILT high-resolution Mechanical Sonde HRMS - H 88 HILT Rxo Gamma-ray Device HRGD - H 88 HILT Micro Cylindrically Focused Log Dev MCFL - H GR Logging Source GLS - VJ HILT High Res. Control Cartridge HRCC - H 88 HILT Gamma-Ray Neutron Sonde-DTS HGNS - H 888 HILT Gamma-Ray Device HGR - HILT Neutron Detector with Alpha Source HCNT - H Auxiliary Equipment: Neutron Calibration Tank Gamma Source Radioactive NCT - B GSR - U/Y BS Window Ratio High resolution Integrated Logging Tool-DTS Wellsite Calibration Stab Measurement Summary SS Window Ratio LS Window Ratio BS Window Sum CPS SS Window Sum CPS LS Window Sum CPS

16 : -Aug- :8 High resolution Integrated Logging Tool-DTS Wellsite Calibration Photo-multiplier High Voltages Calibrations BS PM High Voltage (Command) V SS PM High Voltage (Command) V LS PM High Voltage (Command) V : -Aug- :8 High resolution Integrated Logging Tool-DTS Wellsite Calibration Crystal Quality Resolutions Calibration BS Crystal Resolution % SS Crystal Resolution % LS Crystal Resolution % : -Aug- :8 High resolution Integrated Logging Tool-DTS Wellsite Calibration MCFL Calibration Raw B Resistivity OHMM Raw B Resistivity OHMM Raw B Resistivity OHMM : -Aug- : High resolution Integrated Logging Tool-DTS Wellsite Calibration HILT Caliper Calibration HILT Caliper Zero Measurement MM HILT Caliper Plus Measurement MM : -Aug- : High resolution Integrated Logging Tool-DTS Wellsite Calibration Detector Calibration Gamma Ray Background GAPI Gamma Ray (Jig - Bkg) GAPI Gamma Ray (Calibrated) GAPI : -Aug- : High resolution Integrated Logging Tool-DTS Wellsite Calibration Zero Measurement CNTC Background CPS CFTC Background CPS : 8-Jun- :9 : -Aug- :.. High resolution Integrated Logging Tool-DTS Wellsite Calibration Ratio Measurement Thermal Near Corr. (Tank) CPS Thermal Far Corr. (Tank) CPS CNTC/CFTC (Tank) : 8-Jun- :9 High resolution Integrated Logging Tool-DTS Wellsite Calibration Accelerometer Calibration Z-Axis Acceleration M/S 9.8

17 : -Aug- :. High resolution Integrated Logging Tool-DTS Calibration Inversion results Rho Aluminum K/M Rho Magnesium K/M Pe Aluminum Pe Magnesium : -Aug- : High resolution Integrated Logging Tool-DTS Calibration Deviation Summary BS Average Deviation % SS Average Deviation % LS Average Deviation % BS Max Deviation % SS Max Deviation % LS Max Deviation % : -Aug- : High resolution Integrated Logging Tool-DTS Calibration Zero Measurement CNTC Background CPS CFTC Background CPS : 8-Jun- :9 High resolution Integrated Logging Tool-DTS Calibration Tank Measurement Thermal Near Corr. (Tank) CPS Thermal Far Corr. (Tank) CPS CNTC/CFTC (Tank) : 8-Jun- :9 Company: Well: Field: Province: Location: Vulcan Minerals Inc. Storm # Undefined Newfoundland Stephenville Platform Express Density-Neutron Log

County: Field: Location: Well: Company: Drilling Measured From: API Serial No. KELLY BUSHING KELLY BUSHING. District: Grant.

County: Field: Location: Well: Company: Drilling Measured From: API Serial No. KELLY BUSHING KELLY BUSHING. District: Grant. RMF @ Measured Temperature RMC @ Measured Temperature Source RMF RMC RM @ MRT RMF @ MRT Maximum Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed

More information

Lamont Doherty. Expedition 335 Site U1256D. Superfast Spreading Crust IV. Pacific Ocean. Company: Well: Field: Hostile Litho Density

Lamont Doherty. Expedition 335 Site U1256D. Superfast Spreading Crust IV. Pacific Ocean. Company: Well: Field: Hostile Litho Density Run 1 Run 2 Run Company: Lamont Doherty Well: Field: Rig: Expedition 335 Site U1256D Superfast Spreading Crust IV Joides Resolution Ocean: Hostile Litho Density Pacific Ocean Joides Resolution Superfast

More information

Lamont Doherty. Expedition 330 Site U1376A. Louisville Seamounts. Company: Well: Field: Phasor Induction. Natural Gamma Ray.

Lamont Doherty. Expedition 330 Site U1376A. Louisville Seamounts. Company: Well: Field: Phasor Induction. Natural Gamma Ray. Run 1 Run 2 Run Company: Lamont Doherty Well: Field: Rig: Expedition 33 Site U1376A Louisville Seamounts JOIDES Resolution Ocean: Phasor Induction Pacific JOIDES Resolution Louisville Seamounts Latitude:

More information

Lamont Doherty. Expedition 330 Site U1374A. Louisville Seamounts. Company: Well: Field: Phasor. Induction Natural Gamma Ray.

Lamont Doherty. Expedition 330 Site U1374A. Louisville Seamounts. Company: Well: Field: Phasor. Induction Natural Gamma Ray. Run 1 Run 2 Run Company: Lamont Doherty Well: Field: Rig: Expedition 33 Site U1374A Louisville Seamounts JOIDES Resolution Ocean: Phasor Pacific JOIDES Resolution Louisville Seamounts Latitude: S 28* 35.75

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 102948 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

HRLA High-Resolution Laterolog Array Tool. Improving the accuracy of Rt

HRLA High-Resolution Laterolog Array Tool. Improving the accuracy of Rt HRLA High-Resolution Laterolog Array Tool Improving the accuracy of Rt Applications Resistivity determination in conductive mud systems Thin-bed evaluation Invasion characterization for permeability indication

More information

Depth - Driller COMPANY VAL ENERGY INC. BROWN-ROLFE 3-26 FIELD COUNTY GROUND LEVEL. , 11.0 ft above perm. Datum. Elev.: K.B ft

Depth - Driller COMPANY VAL ENERGY INC. BROWN-ROLFE 3-26 FIELD COUNTY GROUND LEVEL. , 11.0 ft above perm. Datum. Elev.: K.B ft Witnessed By Recorded By Equipment Location Max. Rec. Temperature Time on Bottom Time Since Circulation Rm BHT Source Rmf Rmc Rmc Meas. Temperature Rmf Meas. Temperature Rm Meas. Temperature Source of

More information

FORMATION TESTER MOBILITY. Lachlan Finlayson, Chief Petrophysicist Petrofac Engineering & Production Services Engineering Services Consultancy

FORMATION TESTER MOBILITY. Lachlan Finlayson, Chief Petrophysicist Petrofac Engineering & Production Services Engineering Services Consultancy FORMATION TESTER MOBILITY Lachlan Finlayson, Chief Petrophysicist Petrofac Engineering & Production Services Engineering Services Consultancy 1 Introduction Petrofac Formation Testers Pretest Procedure

More information

New power in production logging

New power in production logging New power in production logging Locating the zones where fluids enter the wellbore in a producing or injecting well is an important aspect of production logging. It is relatively straightforward to establish

More information

Cased-Hole Logging Environment

Cased-Hole Logging Environment Cased-Hole Logging Environment 2 Planning a Production Logging Job Planning is an important part of a production logging job. Frequently these jobs can only be done in safety during daylight. Thus, the

More information

4 RESERVOIR ENGINEERING

4 RESERVOIR ENGINEERING 4 RESERVOIR ENGINEERING This chapter summarizes the reservoir engineering data and analysis used in the development of the Depletion Plan for the White Rose Field. The data were derived from seismic and

More information

OIL/GAS WELL COMPLETION REPORT. Well Name and Number Surveyed elevation (feet): KB GL

OIL/GAS WELL COMPLETION REPORT. Well Name and Number Surveyed elevation (feet): KB GL 1800 Washingn Blvd. Baltimore Maryland 21230 OIL/GAS WELL COMPLETION REPORT Permit No. Name of Operar Address Well Name and Number Surveyed elevation (feet): KB GL Well Location Field (If wildcat, so state)

More information

BLACK HILLS PLATEAU PRODUCTION COMPANY

BLACK HILLS PLATEAU PRODUCTION COMPANY BLACK HILLS PLATEAU PRODUCTION COMPANY DRILLING PROGRAM Homer Deep Unit 9 11CH SHL: 300 FNL, 200 FWL, NWNW Sect. 9 T8S R98W BHL: 1350 FSL, 2100 FEL NWSE Sect. 15 T8S R98W Garfield & Mesa Counties, Colorado

More information

Flow Scanner. Production logging in multiphase horizontal wells

Flow Scanner. Production logging in multiphase horizontal wells Flow Scanner Production logging in multiphase horizontal wells Applications Multiphase flow profiling in nonvertical wells Identification of fluid and gas entries in multiphase well or liquid in gas wells

More information

Situated 250km from Muscat in

Situated 250km from Muscat in CYAN MAGENTA YELLOW BLACK GRAVITY GAINS A novel method of determining gas saturation has proved successful in Oman s Natih Field where conventional methods were giving anomalous results in difficult conditions.

More information

Basic Well Log Interpretation

Basic Well Log Interpretation PDHonline Course K132 (3 PDH) Basic Well Log Interpretation Instructor: Joshua Cook, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

Well Integrity Log Interpretation (Magnetic Thickness Detector and 56-Arm Multi-Finger Caliper)

Well Integrity Log Interpretation (Magnetic Thickness Detector and 56-Arm Multi-Finger Caliper) Well Integrity Log Interpretation (Magnetic Thickness Detector and 56-Arm Multi-Finger Caliper) Company: Well: Field: Province: Alberta Country: Canada License: UWI: Logging Date: 21-Mar-2015 Report Date:

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

Overview. 2 Module 13: Advanced Data Processing

Overview. 2 Module 13: Advanced Data Processing 2 Module 13: Advanced Data Processing Overview This section of the course covers advanced data processing when profiling. We will discuss the removal of the fairly gross effects of ship heave and talk

More information

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement Rotary Steerable System for high-performance drilling and accurate wellbore placement The PowerDrive X6 RSS maintains control under the most difficult conditions, bringing the benefits of rotary steerable

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Date: Tracking No.: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Submitted

More information

D DAVID PUBLISHING. Gas Ratio Analysis in Hovsan Oil Field. 1. Introduction 1. Samir Hashimov

D DAVID PUBLISHING. Gas Ratio Analysis in Hovsan Oil Field. 1. Introduction 1. Samir Hashimov Journal of Geological Resource and Engineering 1 (2015) 42-48 doi:10.17265/2328-2193/2015.01.006 D DAVID PUBLISHING Samir Hashimov Department of Lithology, Mineralogy and Petrography, The Azerbaijan State

More information

GeoNeurale. Testing, Testing 1,2,3. GeoNeurale. by Gene Ballay PART 1. Lichtenbergstrasse Munich Garching

GeoNeurale. Testing, Testing 1,2,3. GeoNeurale. by Gene Ballay PART 1. Lichtenbergstrasse Munich Garching GeoNeurale Testing, Testing 1,2,3 by Gene Ballay PART 1 GeoNeurale Lichtenbergstrasse 8 85748 Munich Garching www.geoneurale.com Fluid Pressures and Capillary Pressure Fluid pressure gradients, and the

More information

Comparative temperature measurements in an experimental borehole heat exchanger. Vincent Badoux 1, Rita Kobler 2

Comparative temperature measurements in an experimental borehole heat exchanger. Vincent Badoux 1, Rita Kobler 2 European Geothermal Congress 2016 Strasbourg, France, 19-24 Sept 2016 Comparative temperature measurements in an experimental borehole heat exchanger Vincent Badoux 1, Rita Kobler 2 1 GEOTEST AG, Bernstrasse

More information

Depth - Driller COMPANY HILL TRUST 7-20 FIELD COUNTY. , 14.0 ft above perm. Datum. Elev.: K.B ft ft. Fold here

Depth - Driller COMPANY HILL TRUST 7-20 FIELD COUNTY. , 14.0 ft above perm. Datum. Elev.: K.B ft ft. Fold here Witnessed By Recorded By Equipment Location Max. Rec. Temperature Time on Bottom Time Since Circulation Rm @ BHT Source Rmf Rmc Rmc @ Meas. Temperature Rmf @ Meas. Temperature Rm @ Meas. Temperature Source

More information

COPYRIGHT. Reservoir Fluid Fundamentals. Reservoir Brine Basic Workflow Exercise Review. Brine Density at Standard Conditions

COPYRIGHT. Reservoir Fluid Fundamentals. Reservoir Brine Basic Workflow Exercise Review. Brine Density at Standard Conditions Reservoir Fluid Fundamentals Reservoir Brine Basic Workflow Exercise Review Brine Density at Standard Conditions B C D E F Salinity 120,000 [ppm] 120000 [ppm] 4 Pressure of Interest 2,250 [psia] 15484.8

More information

1. Air is blown through a pipe AB at a rate of 15 litre per minute. The cross-sectional area of broad

1. Air is blown through a pipe AB at a rate of 15 litre per minute. The cross-sectional area of broad Keshaw Classes IIT/JEE Medical Classes 5-A 11028 / 9, WEA, Sat Nagar, Karol Bagh New Delhi-110005 Mob:9910915514,9953150192 Ph:011-45660510 E-mail : keshawclasses@gmail.com Web:www.keshawclasses.com Solids

More information

IDL01. Battery Powered Precision Digital Gauge for Leak Testing. Stainless Steel Sensor. class 0.05

IDL01. Battery Powered Precision Digital Gauge for Leak Testing. Stainless Steel Sensor. class 0.05 IDL0 Battery Powered Precision Digital Gauge for Leak Testing Stainless Steel Sensor class 0.05 Nominal pressure from 0 00 mbar up to 0... 00 bar Special characteristics modular sensor concept data logger

More information

Deploying the TCM-1 Tilt Current Meter in an Inverted (Hanging) Orientation By: Nick Lowell, Founder & President

Deploying the TCM-1 Tilt Current Meter in an Inverted (Hanging) Orientation By: Nick Lowell, Founder & President Lowell Instruments Application Note #TCMA Deploying the TCM-1 Tilt Current Meter in an Inverted (Hanging) Orientation By: Nick Lowell, Founder & President 1 Introduction The TCM-1 Tilt Current Meter (TCM)

More information

Depth - Driller COMPANY MCCOY PETROLEUM CORP SCHMIDT C 4-29 FIELD COUNTY GROUND LEVEL. , 13.0 ft above perm. Datum. Elev.: K.B ft

Depth - Driller COMPANY MCCOY PETROLEUM CORP SCHMIDT C 4-29 FIELD COUNTY GROUND LEVEL. , 13.0 ft above perm. Datum. Elev.: K.B ft Witnessed By Recorded By Equipment Location Max. Rec. Temperature Time on Bottom Time Since Circulation Rm @ BHT Source Rmf Rmc Rmc @ Meas. Temperature Rmf @ Meas. Temperature Rm @ Meas. Temperature Source

More information

WL16 WATER LEVEL LOGGERS Submersible pressure transducer and USB datalogger combination

WL16 WATER LEVEL LOGGERS Submersible pressure transducer and USB datalogger combination WL16 WATER LEVEL LOGGERS Submersible pressure transducer and USB datalogger combination Warning: Non-vented water level loggers may have readings with errors of up to 250mm due to barometric pressure changes.

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

Reservoir Fluid Fundamentals COPYRIGHT. Dry Gas Fluid Basic Workflow Exercise Review

Reservoir Fluid Fundamentals COPYRIGHT. Dry Gas Fluid Basic Workflow Exercise Review Pseudo-Critical Properties Reservoir Fluid Fundamentals Dry Gas Fluid Basic Workflow Exercise Review B C D E F 3 Separator Gas Specific Gravity 0.6300 [1/air] 0.6300 [1/air] 4 Separator Pressure 100.0

More information

APPENDIX A1 - Drilling and completion work programme

APPENDIX A1 - Drilling and completion work programme APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme

More information

Final Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800

Final Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800 Final Well Report Revision: Version 0 Operating Company: Vulcan Minerals Inc. (Investcan Energy Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800 Field: Flat Bay Location: Western Newfoundland,

More information

Total Ionization Dose (TID) Test Results of the RH1028MW Ultralow Noise Precision High Speed Operational Low Dose Rate (LDR)

Total Ionization Dose (TID) Test Results of the RH1028MW Ultralow Noise Precision High Speed Operational Low Dose Rate (LDR) Total Ionization Dose (TID) Test Results of the RH1028MW Ultralow Noise Precision High Speed Operational Amplifiers @ Low Dose Rate (LDR) LDR = 10 mrads(si)/s 20 February 2015 Duc Nguyen, Sana Rezgui Acknowledgements

More information

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer Inflatable Packer Single & Double Single & Double Packer Dimension Wireline Packer Water Testing Packer (WTP) Packer Packer Working Pressure & Depth Chart Packer Water Hand Pump Packer Air Driven Pump

More information

RMAG, Snowbird, UT, October 6-9, Michael Holmes, Antony M. Holmes, and Dominic I. Holmes, Digital Formation, Inc.

RMAG, Snowbird, UT, October 6-9, Michael Holmes, Antony M. Holmes, and Dominic I. Holmes, Digital Formation, Inc. RMAG, Snowbird, UT, October 6-9, 2007 A METHOD TO QUANTIFY GAS SATURATION IN GAS/WATER SYSTEMS, USING DENSITY AND NEUTRON LOGS INTERPRETATION OF RESERVOIR PROPERTIES WHEN COMPARED WITH GAS SATURATIONS

More information

DM01. Please visit our website: Battery Powered Precision Digital Gauge. Stainless Steel Sensor. class 0.05

DM01. Please visit our website:  Battery Powered Precision Digital Gauge. Stainless Steel Sensor. class 0.05 DM0 Battery Powered Stainless Steel Sensor class 0.05 Nominal pressure from 0 00 mbar up to 0... 00 bar Special characteristics modular sensor concept data logger graphic display stainless steel housing

More information

Depth - Driller COMPANY VAL ENERGY INC. BLEVINS #1-35 FIELD COUNTY GROUND LEVEL. , 11.0 ft above perm. Datum. Elev.: K.B ft

Depth - Driller COMPANY VAL ENERGY INC. BLEVINS #1-35 FIELD COUNTY GROUND LEVEL. , 11.0 ft above perm. Datum. Elev.: K.B ft Witnessed By Recorded By Equipment Location Max. Rec. Temperature Time on Bottom Time Since Circulation Rm @ BHT Source Rmf Rmc Rmc @ Meas. Temperature Rmf @ Meas. Temperature Rm @ Meas. Temperature Source

More information

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0 Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0 1. Introduction. 2. Data Input. Header. Bit Information. Mud Information. Casing Program. P.D.M./Turbine. Drill String Design.

More information

Operating instructions Safety Rope Emergency Stop Switches ZB0052 / ZB0053 ZB0072 / ZB0073

Operating instructions Safety Rope Emergency Stop Switches ZB0052 / ZB0053 ZB0072 / ZB0073 Operating instructions Safety Rope Emergency Stop Switches UK ZB0052 / ZB0053 ZB0072 / ZB0073 7390878 / 02 03 / 2011 Contents 1 Safety instructions...3 2 Installation / set-up...4 2.1 Applications...4

More information

HUMOR 20. High Accuracy Humidity Calibrator. Water T, p1 HUMOR 20 V1.0

HUMOR 20. High Accuracy Humidity Calibrator. Water T, p1 HUMOR 20 V1.0 High Accuracy Humidity Calibrator The role of humidity calibrations that are accurate, reproducible, and documentable is becoming more and more important. ISO quality guidelines and regulations according

More information

WILD WELL CONTROL WARNING SIGNS OF KICKS

WILD WELL CONTROL WARNING SIGNS OF KICKS WARNING SIGNS OF KICKS Warning Signs of Kicks Learning Objectives You will learn the warning signs that indicate the well may be kicking: Warning signs of kicks False kick indicators You will also learn

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 10/13/2015

More information

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for 2-7/8 Triple Port PBL 1-10-201 2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at Rig site, the

More information

HUMOR 20 HUMOR 20. High-precision Humidity Calibrator. Water T, p1

HUMOR 20 HUMOR 20. High-precision Humidity Calibrator. Water T, p1 High-precision Humidity Calibrator The role of humidity calibrations that are accurate, reproducible, and documentable is becoming more and more important. ISO quality guidelines and regulations according

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 16947 Status: Submitted RAILROAD COMMISSION OF TEAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

Rig Math. Page 1.

Rig Math. Page 1. Page 1 The Calculator and Main Keyboard Display Numerical 10-key pad used for entering numerical values Trigonometric Functions These keys will be used where wellbore angle is an issue These are the keys

More information

DM01. Battery Powered Precision Digital Gauge. Stainless Steel Sensor. class 0.05

DM01. Battery Powered Precision Digital Gauge. Stainless Steel Sensor. class 0.05 Battery Powered Stainless Steel Sensor class 0.05 Nominal pressure from 0 00 mbar up to 0... 00 bar Special characteristics modular sensor concept data logger graphic display stainless steel housing Ø

More information

Buckland Wind Resource Report

Buckland Wind Resource Report Buckland Wind Resource Report By: Douglas Vaught, P.E., V3 Energy LLC, Eagle River, Alaska Date: September 17, 2010 Buckland met tower; D. Vaught photo Contents Summary... 2 Test Site Location... 2 Photographs...

More information

COMPARISON OF CONTEMPORANEOUS WAVE MEASUREMENTS WITH A SAAB WAVERADAR REX AND A DATAWELL DIRECTIONAL WAVERIDER BUOY

COMPARISON OF CONTEMPORANEOUS WAVE MEASUREMENTS WITH A SAAB WAVERADAR REX AND A DATAWELL DIRECTIONAL WAVERIDER BUOY COMPARISON OF CONTEMPORANEOUS WAVE MEASUREMENTS WITH A SAAB WAVERADAR REX AND A DATAWELL DIRECTIONAL WAVERIDER BUOY Scott Noreika, Mark Beardsley, Lulu Lodder, Sarah Brown and David Duncalf rpsmetocean.com

More information

Moyno ERT Power Sections. Operational Guidelines

Moyno ERT Power Sections. Operational Guidelines Moyno ERT Power Sections Operational Guidelines Moyno ERT Power Section Operational Guidelines Index 1. Introduction... 3 2. ERT Performance Graph Interpretation... 3 3. Elastomer Compression (Fit) Recommendations...

More information

Reducing Nonproductive Time

Reducing Nonproductive Time Reducing Nonproductive Time Pipe Recovery Services Solving challenges. Pipe Recovery Services Pipe Recovery Services Halliburton offers a wide range of free point indicators, severing tools and experienced

More information

OC508 Programmable mv Calibrator

OC508 Programmable mv Calibrator OC508_GBM_201609 OC508 Programmable mv Calibrator Owner s Manual Orbit Controls AG Zürcherstrasse 137 CH8952 Schlieren - ZH orbitcontrols.ch OC508 Programmable mv Calibrator Selection of DIN Thermocouples

More information

Section Freepoint Service 26.1 FREEPOINT CONTROL PANEL

Section Freepoint Service 26.1 FREEPOINT CONTROL PANEL Section 26 26 Freepoint Service The Warrior system supports Freepoint tools that do not require motorized deployment. This includes Applied Electronics Bowspring and Magnetic tools and Homco tools. Other

More information

COPYRIGHT. Production Logging Fundamentals. By the end of this lesson, you will be able to:

COPYRIGHT. Production Logging Fundamentals. By the end of this lesson, you will be able to: Production Logging Fundamentals Learning Objectives Production Logging Fundamentals By the end of this lesson, you will be able to: Demonstrate the principles and operation of the logging tools associated

More information

Along-string pressure, temperature measurements hold revolutionary promise for downhole management

Along-string pressure, temperature measurements hold revolutionary promise for downhole management Along-string pressure, temperature measurements hold revolutionary promise for downhole management IT S WIDELY KNOWN that the majority of stuck pipe incidents occur while pulling out of hole. If we can

More information

COPYRIGHT. Production Logging Flowmeter Survey Solution Guide

COPYRIGHT. Production Logging Flowmeter Survey Solution Guide Production Logging Flowmeter Survey Solution Guide Applying Slippage & Liquid Holdup equations, solve for Q oil and Q water at 6130 ft and 6216 ft @ 6130 ft, the % ratio of flow is about 100 %, or 9190

More information

ETd 04. Battery Powered Precision Digital Gauge. Stainless Steel Sensor. Type: ETd 04. class 0.05

ETd 04. Battery Powered Precision Digital Gauge. Stainless Steel Sensor.  Type: ETd 04. class 0.05 Battery Powered Stainless Steel Sensor class 0.05 Nominal pressure from 0 100 mbar up to 0... 400 bar Special characteristics modular sensor concept data logger graphic display stainless steel housing

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 15871 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

and its weight (in newtons) when located on a planet with an acceleration of gravity equal to 4.0 ft/s 2.

and its weight (in newtons) when located on a planet with an acceleration of gravity equal to 4.0 ft/s 2. 1.26. A certain object weighs 300 N at the earth's surface. Determine the mass of the object (in kilograms) and its weight (in newtons) when located on a planet with an acceleration of gravity equal to

More information

DFX II Series. Digital Force Gauge

DFX II Series. Digital Force Gauge DFX II Series Digital Force Gauge Functions and Features Simple Operation User friendly four button operation for; Peak, Units, Zero and Info. PEAK- change from Normal to Peak mode UNITS- select desired

More information

Expert Hydrostatic Level Transmitters

Expert Hydrostatic Level Transmitters Expert Hydrostatic s General Features MJK Expert hydrostatic level transmitters are designed for level measurement by submerging the transmitter in open channels, drains and tanks. Expert hydrostatic level

More information

Analysis of 24-Hour Pump Test in Well NC-EWDP-3S, Near Yucca Mountain, Nevada

Analysis of 24-Hour Pump Test in Well NC-EWDP-3S, Near Yucca Mountain, Nevada Analysis of 24-Hour Pump Test in Well NC-EWDP-3S, Near Yucca Mountain, Nevada Prepared for: Nye County Department of Natural Resources and Federal Facilities, Nuclear Waste Repository Project Office, Grant

More information

For a similar sensor with o-ring mounting, refer to the 85BSD digital output pressure sensor.

For a similar sensor with o-ring mounting, refer to the 85BSD digital output pressure sensor. Weldable or threaded process fittings Pressure/temperature read-out Digital output ASIC calibrated Absolute, gage Cable/connector option Low power option DESCRIPTION The 85BSD is a small profile, media

More information

Troxler Electronic Laboratories, Inc.

Troxler Electronic Laboratories, Inc. TROXLER MODELS 3400 4640 BASIC GAUGE OPERATIONS Troxler Electronic Laboratories, Inc. 3008 Cornwallis Road P.O. Box 12057 Research Triangle Park, NC 27709 Phone: 1.877.TROXLER Outside the U.S.A.: +1.919.549.8661

More information

86BSD Backside Digital Output

86BSD Backside Digital Output Stainless steel with O-ring seal Pressure/temperature read-out Backside digital output ASIC calibrated Absolute, gage Cable/connector option Low power option DESCRIPTION The 86BSD is a small profile, media

More information

PC-PUMP Points to Consider

PC-PUMP Points to Consider PC-PUMP Points to Consider March 2007 This document contains a list of details regarding the use of C-FER s PC-PUMP software that all users should be aware of. These are based on questions asked and problems

More information

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Advanced Applications of Wireline Cased-Hole Formation Testers Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Agenda Introduction to Cased Hole Formation tester Tool specifications Applications

More information

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity : Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.

More information

River Bridge - Test Shaft-1 Clarke County, MS, 4/2/2012

River Bridge - Test Shaft-1 Clarke County, MS, 4/2/2012 Page 1 of 9 The enclosed report contains the data and analysis summary for the SoniCaliper shaft caliper, performed at River Bridge (Test Shaft-1), Clarke County, MS on Monday, April 02, 2012 by Dave Jakstis.

More information

WIND DATA REPORT. Paxton, MA

WIND DATA REPORT. Paxton, MA WIND DATA REPORT Paxton, MA July 1, 2011 September 30, 2011 Prepared for Massachusetts Clean Energy Center 55 Summer Street, 9th Floor Boston, MA 02110 by Eric Morgan James F. Manwell Anthony F. Ellis

More information

Wave Load Pattern Definition

Wave Load Pattern Definition COMPUTERS AND STRUCTURES, INC., AUGUST 2010 AUTOMATIC WAVE LOADS TECHNICAL NOTE DEFINING WAVE LOADS This section describes how to define automatic wave loads. The automatic wave load is a special type

More information

Technical Report. 5th Round Robin Test for Multi-Capillary Ventilation Calibration Standards (2016/2017)

Technical Report. 5th Round Robin Test for Multi-Capillary Ventilation Calibration Standards (2016/2017) Physical Test Methods Sub-Group Technical Report 5th Round Robin Test for Multi-Capillary Ventilation Calibration Standards (2016/2017) June 2018 Author: James Vincent Cerulean, Milton Keynes, United Kingdom

More information

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also) RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for -3/4 PBL -3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes -1/4 & -1/2 also) OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at

More information

Stuart River Preliminary HDD Feasibility Assessment Report

Stuart River Preliminary HDD Feasibility Assessment Report Stuart River Preliminary HDD Feasibility Assessment Report 08C7138-PL-RPT-0006, Rev. 3 08-Jun-2010 Enbridge Northern Gateway Project WorleyParsons Canada Services Ltd. Calgary Division 400, 10201 Southport

More information

FIG: 27.1 Tool String

FIG: 27.1 Tool String Bring up Radioactive Tracer service. Click Acquisition Box - Edit - Tool String Edit the tool string as necessary to reflect the tool string being run. This is important to insure proper offsets, filters,

More information

BIT User Manual. 1. About this manual. 2. Know your BIT 1.1. WARNING System Components

BIT User Manual. 1. About this manual. 2. Know your BIT 1.1. WARNING System Components BIT User Manual About this manual WARNING Know your BIT System Components Operation Methods Maintenance, charging 3.3.1. Cleaning General handling Software Setup Calibrating the BIT Inclinometer calibration

More information

OxyScan Graphic. Operating Instructions. UMS Micro-oxygen sensor 501. Microprocessor instrument

OxyScan Graphic. Operating Instructions. UMS Micro-oxygen sensor 501. Microprocessor instrument OxyScan Graphic Operating Instructions UMS Micro-oxygen sensor 501 Microprocessor instrument Introduction Thank you for choosing the UMS Micro Oxygen Sensor 501 - a highly advanced product! Please read

More information

Qualification of Fastrak & First Gen Product to Railway applications Shock and Vibration Standard EN 61373

Qualification of Fastrak & First Gen Product to Railway applications Shock and Vibration Standard EN 61373 Qualification of Fastrak & First Gen Product to Railway applications Shock and Vibration Standard EN 61373 (Governing Standard BS EN 5155 Railway Applications Electronic equipment used on rolling stock)

More information

PNN Annual Conference 2006

PNN Annual Conference 2006 PNN Annual Conference 26 Zoran Markovic, Hotwell, Klingenbach, Austria Miichail Adrian Nicolae, Toreador, Romania Introduction The main component of natural gas is Methane (CH4) the lightest hydrocarbon

More information

WIND DATA REPORT. Bourne Water District

WIND DATA REPORT. Bourne Water District WIND DATA REPORT Bourne Water District July to September 2010 Prepared for Massachusetts Clean Energy Center 55 Summer Street, 9th Floor Boston, MA 02110 by Dylan Chase James F. Manwell Utama Abdulwahid

More information

HydroPull. Extended-Reach Tool. Applications

HydroPull. Extended-Reach Tool. Applications Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well

More information

Module 9. Advanced Data Processing

Module 9. Advanced Data Processing Module 9 Advanced Data Processing 2 Module 9: Advanced Data processing Overview Advanced Data Processing or Why Doesn t My Data Look Like the Examples in Class? Sensor alignment, matching measurements

More information

CHDT Cased Hole Dynamics Tester. Pressure testing and sampling in cased wells

CHDT Cased Hole Dynamics Tester. Pressure testing and sampling in cased wells CHDT Cased Hole Dynamics Tester testing and sampling in cased wells Applications Evaluation of old wells for bypassed hydrocarbons Development of critical economic data for well evaluation Reduced-risk

More information

Abandonment Program for Paramount Fort Liard F 36

Abandonment Program for Paramount Fort Liard F 36 Abandonment Program for Paramount Fort Liard F 36 Well Name: Paramount et al Liard F 36 Area: 60 0 10 N, 123 0 15 W Location: Latitude: 60 0 05 27 Longitude: 123 0 22 00 UWI: 300F366010123150 WID: 1841

More information

Rimage Everest 600 Thermal Retransfer Printer

Rimage Everest 600 Thermal Retransfer Printer Rimage Everest 600 Thermal Retransfer Printer Superior Print Technology: Superior Results CONTENTS I. Overview II. Printer Comparison III. Print Modes IV. Advantages of Thermal Retransfer Printing V. Printer

More information

ASDX Series Silicon Pressure Sensors

ASDX Series Silicon Pressure Sensors ASDX Series Silicon Pressure Sensors DESCRIPTION The ASDX Series is a Silicon Pressure Sensor offering a ratiometric analog interface for reading pressure over the specified full scale pressure span and

More information

Hydro-Mech Bridge Plug

Hydro-Mech Bridge Plug Manual No: 0620000303 Revision: F Approved By: Quality Engineer Date: 2014-9-9 Hydro-Mech Bridge Plug DESCRIPTION: Map Hydro-Mech Bridge Plug is hydraulically actuated and mechanically set. Compact, with

More information

Digital Pressure and Temperature Sensor

Digital Pressure and Temperature Sensor Digital Pressure and Temperature Sensor Introduction Stevens Smart PT is an advanced digital pressure and temperature sensor ideal for water level measurements as well as many other types of pressure and

More information

Formation Pressure Testers, Back to Basics. Mike Millar

Formation Pressure Testers, Back to Basics. Mike Millar Formation Pressure Testers, Back to Basics. A review of the acquisition, quality control and use of formation pressures. Mike Millar LPS Seminar - Everything Formation Testing Thursday 14th December 2017

More information

P9000 DESCRIPTION. For parts requiring RoHS compliance, please contact factory. P February /6

P9000 DESCRIPTION. For parts requiring RoHS compliance, please contact factory. P February /6 P9000 High accuracy through digital compensation High thermal stability Rugged stainless steel construction Ideal for test stands High burst pressure limit DESCRIPTION The P9000 Series is a range of advanced,

More information

PHYS 101 Previous Exam Problems

PHYS 101 Previous Exam Problems PHYS 101 Previous Exam Problems CHAPTER 14 Fluids Fluids at rest pressure vs. depth Pascal s principle Archimedes s principle Buoynat forces Fluids in motion: Continuity & Bernoulli equations 1. How deep

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE Instructions Use the example well data from this document or the powerpoint notes handout to complete the following graphs.

More information

STIPumpCard. User Manual

STIPumpCard. User Manual STIPumpCard User Manual Contents 1. Introduction...1 1.1. What is STIPumpCard?... 1 1.2. Main User Interface... 2 2. Input Parameters...4 2.1. Project... 4 2.2. Simulation Settings GroupBox... 4 2.3. Pump

More information

Rubber Lining, Conveyors & Ceramics

Rubber Lining, Conveyors & Ceramics Wenco Fabric Belts Wenco has always focused on meeting the needs of the bulk material handling industry by supplying various high quality types of conveyor belts to the industry. he carcass consists of

More information

Density and Archimedes Principle 11-cor

Density and Archimedes Principle 11-cor Density and Archimedes Principle 11-cor Objectives: To understand the concept of density and its relationship to various materials. To understand and use Archimedes Principle. Equipment: Dial calipers,

More information

Data Collection and Processing: Elwha Estuary Survey, February 2013

Data Collection and Processing: Elwha Estuary Survey, February 2013 Data Collection and Processing: Elwha Estuary Survey, February 2013 Ian Miller, WA Sea Grant Olympic Peninsula Field Office, 1502 E. Lauridsen Blvd #82, Port Angeles, WA 98362 immiller@u.washington.edu

More information