EasyWay. Additional Lanes Programme 10 Projects in The Netherlands. Evaluation Expert Group (EW EEG) Document EEG/11/7.

Size: px
Start display at page:

Download "EasyWay. Additional Lanes Programme 10 Projects in The Netherlands. Evaluation Expert Group (EW EEG) Document EEG/11/7."

Transcription

1 EasyWay Evaluation Expert Group (EW EEG) Document EEG/11/7 Additional Lanes Programme 10 Projects in The Netherlands Final Version Issue: 1 st edition Version: 1.0 Date: December 20 th, 2011 Issued by: Rijkswaterstaat (NL) Authors: Feiko van der Veen, DHV Henk Taale, Rijkswaterstaat

2 PREFACE Rijkswaterstaat (RWS) manages The Netherlands main highway network and main waterway network. RWS is responsible not only for the technical condition of the infrastructure but also for its user-friendliness. There are a lot of roadways in The Netherlands with congestion. Rijkswaterstaat launched the Additional Lanes Programme in 2008 in order to tackle thirty persistent bottlenecks on the main highway network. In short, the programme was called in Dutch Spoedaanpak, literally Speeding Up Approach, because the programme was mend to speed up the works on the extra lanes. For the programme it was agreed that 10 projects would be completed by May 2011 and the rest of the projects should have been started. Preliminary work on the Additional Lanes Programme in 2009 paid off the following year in the form of 6 completed projects, 16 start-ups, and 30 successful tendering procedures. The Additional Lanes Programme is characterized by widening roads and by using existing road capacity more efficiently. This is done by adding new lanes and by using tje hard shoulders as extra lanes during peak hours. The objectives were to improve traffic throughput and to make travel time more reliable. To accomplish these goals earlier, it was decided to speed up the (initial) design and construction period. With adjustments of processes (like more steps running in parallel) it became possible to realise projects earlier. March 2011 the first 10 road sections with additional lanes were completed. These 10 projects in the Additional Lanes Programme were evaluated in the spring of In May 2011 another 6 projects were completed and the results of these projects will be reported separately. This evaluation report presents the effects of the first 10 projects in terms of: acceleration of the construction time; established reduction of congestion; calculated economic savings. The document gives a description of set-up and objectives of each of the first 10 projects, and discusses the effects found. Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

3 TABLE OF CONTENTS REPORT TEMPLATE Key Evaluation Results Impact on Traffic Flow Impact on Safety Impact on Environment Other Key Results Description of the Problem Sites Issues Addressed Description of the ITS Project Service Area Key Words Objectives Systems and Technologies Applied Costs Status of the Project Evaluation Planned Timing and Type of Evaluation Objectives for the Evaluation Research Questions Study Area for the Evaluation... 12

4 4.5. Expected Impacts Used Methods The Impact of the Project - Results Technical Performance Results Project 1: A2 Leenderheide Valkenswaard Project 2: A9 Holendrecht - Diemen Project 3: A58 Batadorp - Oirschot Project 4: A12 Woerden - Gouda Project 5: A12 Woerden - Oudenrijn Project 6: A27 Everdingen - Lunetten Project 7: A2 Holendrecht - Maarssen Project 8: A9 Velsen - Raasdorp Project 9: A9 Badhoevedorp - Raasdorp Project 10: A28 Zwolle - Meppel Reliability of Results Research Questions Answered Overall Assessment Safety and Environment Efficiency European Dimension: Transferability of the Results Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

5 REPORT TEMPLATE Project Name: Additional Lanes Programme 10 Projects in The Netherlands Project Code: CEN16/CEN33 Area Code: CS214 EasyWay Region: CENTRICO Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

6 1. Key Evaluation Results This section presents a brief summary of the key results related to the EasyWay objectives and any other key results. The detailed results can be found in the next chapters. The effects of the Additional Lanes Programme (in Dutch Spoedaanpak ) were evaluated through 10 projects in different parts of The Netherlands. In these projects three different types of lanes were created in order to improve traffic flow: Permanent extra lanes: permanent available for motorized traffic; Hard shoulder running lanes: extra lanes on roadways, using the shoulder lanes, that are temporary available for motorized traffic; Dynamic left lanes: extra left lanes on the roadway created by narrowing the existing lanes. The Additional Lanes Programme was launched to accelerate the decision-making processes in order to be able to build new lanes earlier. In this way, vehicle hours lost due to congestion could be cut down and economic savings achieved Impact on Traffic Flow The impact of the first ten projects evaluated is impressive: The total acceleration time counted up to 2,220 work days. Without the Additional Lanes Programme, congestion would still exist at the majority of these ten bottlenecks. Thanks to the extra lanes, an average reduction of vehicle hours lost could be achieved of 65% on these stretches of roadway. The direct total reduction of vehicle hours was almost 3.5 million, thanks to the acceleration. The reduction in the coming years is calculated to be 4 million hours annually. Direct economic savings were M 51.1, the annual savings expected to be M The total capital investments will be recovered in four to five years time. The reduction of congestion on these stretches of roadway is larger than the EasyWay objective, which is 25% by Impact on Safety Not evaluated Impact on Environment Not evaluated Other Key Results Not evaluated. Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

7 2. Description of the Problem 2.1. Sites The locations of the first ten evaluated projects of the Additional Lanes Programme are visualized in figure 2.1. The characteristics of these ten locations are found in table 2.1 Figure 2.1: Locations of the evaluated projects Road section Type of lane # Lanes Opening date 1 A2 Leenderheide-Valkenswaard Permanent 1 24 October A9 Holendrecht-Diemen Hard shoulder running 2 15 November A58 Batadorp-Oirschot Permanent 1 23 November A12 Woerden-Gouda Dynamic left lane 1 9 December A12 Woerden-Oudenrijn Permanent 1 1 November A27 Everdingen-Lunetten Hard shoulder running 1 9 February A2 Holendrecht-Maarssen Permanent 2 21 July / 6 September A9 Velsen-Raasdorp Hard shoulder running 2 1 March A9 Badhoevedorp-Raasdorp Hard shoulder running 1 1 March A28 Zwolle-Meppel Permanent 1 12 December 2010 Table 2.1: Characteristics of the evaluated projects Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

8 The difference between the types of lane is as follows: A permanent lane is an extra lane on a roadway that is permanent available for motorized traffic; A hard shoulder running lane is an extra lane on a roadway that is temporary available for motorized traffic. The shoulder lane is used to create this type of lane. In The Netherlands the hard shoulder running lane is open only during the peak hours when the amount of traffic exceeds 3,000 vehicles per hour (on a two lane roadway), usually between 6.00 and and between and Note: this threshold is going to be limited to 2,700 vehicles per hour. A dynamic left lane is a special kind of rush-hour lane, e.g. an extra left lane on the roadway created by narrowing the existing lanes. The shoulder lane is still available at a highway with dynamic left lane Issues Addressed There are a lot of roadways in The Netherlands with congestion. Since January 1 st, 2009 the Act Acceleration Decision-making Road Projects is active (in Dutch: Wet Versnelling Besluitvorming Wegprojecten ), also known as Spoedaanpak, literally Speeding up Approach. Thanks to this Act, the decision-making process regarding adjustment and widening of roads can be accelerated. Under commission of the Minister of Infrastructure and Environment, Rijkswaterstaat urges the tackling of 30 persisting bottlenecks in the highway road network in order to improve traffic flow and make travel time more reliable. The first ten projects of this Additional Lanes Programme were completed and evaluated by May The issues addressed were: acceleration of decision-making processes for the construction of extra lanes (by more process steps running in parallel); reduction of congestion at bottlenecks; economic savings as a result of improved traffic flows in an earlier stage than originally planned. In the next chapter, the policy objectives and used systems and technologies are described. Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

9 3. Description of the ITS Project 3.1. Service Area The EasyWay Service areas are: Traveller Information Services, Traffic Management Services, Freight and Logistics Services, ICT Infrastructure. In the Additional Lanes Programme, the main focus was on the use of the hard shoulder as extra lane. This is considered as an example of traffic management services. In order to evaluate the effects of these services, traffic monitoring was used to collect traffic data Key Words The following key words (highlighted) describe the nature of the Additional Lanes Programme and the applications used. The focus is on use of extra lanes and in some of the projects the use of the hard shoulder. Traveller Information Services Pre-trip Traveller Information On-trip Traveller Information Variable Message Signs Highway Advisory Radio Traffic Management Services Freight and Logistics Services ICT Infrastructure Variable Speed Limits Freight Management Data Management and Exchange Speed Control using ANPR Use of Hard Shoulder Automatic Incident Detection Vehicle Safety Systems Parking Areas Hazardous Goods Monitoring and Tracking Traffic Management Plans DATEX II Traffic Monitoring Driver Behaviour Use of CCTV Transport Security Control Centres Comprehension and Compliance Ramp Metering Traffic Management using Rerouting Enforcement Table 3.1: Services involved in the Additional Lanes Programme (marked in yellow and bold) Except at the permanent extra lanes, the hard shoulder lane and the dynamic left lane are opened for motorized vehicles when extra capacity is needed to keep the traffic flowing. Traffic is monitored using the Motorway Traffic Management system. Operators at the control centres open and close the extra lanes after observing CCTV camera images. After opening of an extra lane, speed limits usually are changed (reduced) Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

10 by use of matrix signs above each lane and additional rotational signs at the side of the roadway. Nowadays, the closure of the extra lanes on the hard shoulder normally takes place (almost) automatically Objectives The overall objectives of the Additional Lanes Programme are: to improve traffic throughput at traffic bottlenecks; and to make travel time more reliable, both by speeding up the (initial) design and construction period. The objectives of the ten separate projects depended on the position of the stretch in the road network. In most cases however, the objective was to create more capacity in order to avoid congestion on the specific roadway stretch and avoid blocking back to interchanges upstream as a consequence. The objectives per project were: Project Type of lane Objective 1 A2 Leenderheide-Valkenswaard Permanent Buffer to avoid blocking back on A67 2 A9 Holendrecht-Diemen (2 lanes) Hard shoulder running 3 A58 Batadorp-Oirschot Permanent 4 A12 Woerden-Gouda Dynamic left lane Improve throughput between Holendrecht and Diemen Buffer to avoid blocking back on Ring Road Eindhoven Improve throughput A12 5 A12 Woerden-Oudenrijn Permanent Improve traffic throughput and traffic safety 6 A27 Everdingen-Lunetten Hard shoulder running Buffer to avoid blocking back on the A2 from the A27 (morning peak) 7 A2 Holendrecht-Maarssen (2 lanes) Permanent Improve traffic throughput 8 A9 Velsen-Raasdorp (2 lanes) 9 A9 Badhoevedorp-Raasdorp Hard shoulder running Hard shoulder running Resolve A9 bottlenecks Velsen (morning) and Rottepolderplein (evening peak) Resolve bottleneck A9 (northbound) 10 A28 Zwolle-Meppel Permanent Improve traffic throughput 3.4. Systems and Technologies Applied The following systems and technologies were applied in the first ten projects: The Dutch Motorway Traffic Management system to monitor traffic and to impose measurements; CCTV to observe traffic; Variable message signs to impose reduces speed limits; Rotational signs to inform road users of changes in road surface lay-out. Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

11 3.5. Costs The project costs in rough figures below have been given by the project organisation. These costs are the capital investment costs including installation works. Project Type of lane Total length Capital [km] investment costs 1 A2 Leenderheide-Valkenswaard Permanent ,500,000 2 A9 Holendrecht-Diemen (2 lanes) Hard shoulder running ,300,000 3 A58 Batadorp-Oirschot Permanent ,100,000 4 A12 Woerden-Gouda Dynamic left lane ,000,000 5 A12 Woerden-Oudenrijn Permanent ,300,000 6 A27 Everdingen-Lunetten Hard shoulder running ,200,000 7 A2 Holendrecht-Maarssen (2 lanes) Permanent ,100,000 8 A9 Velsen-Raasdorp (2 lanes) Hard shoulder running ,400,000 9 A9 Badhoevedorp-Raasdorp Hard shoulder running A28 Zwolle-Meppel Permanent ,000,000 Table 3.2: Costs overview in (euros) for the first ten projects total 303,900, Status of the Project In May 2011, all ten projects were completed and evaluated. At the time of writing (December 2011), the installed systems and measures are still operational and work properly. Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

12 4. Evaluation Planned 4.1. Timing and Type of Evaluation The evaluation of the ten projects was carried out ex-post in April and May 2011, after completion of the projects (implementation of extra lanes and configuration of the control measures). The evaluation included traffic related effects, based on traffic data, using a before and after survey. No simulation was applied Objectives for the Evaluation The objective of the evaluation was to determine the effects of the 10 projects in terms of: travel times / traffic flow, change in vehicle hours lost and economic savings due to an acceleration of the construction process Research Questions The main question of the evaluation was: "What are the traffic effects of the extra lanes in the road network?" More in detail, the research questions posed were as follows: 1. Are the project realised earlier than planned? 2. How much earlier were the projects completed? 3. Do the adjustments, with one or more extra lanes and the necessary control systems, work well? 4. What are the benefits of the adjustments? The research questions derived from this last question were as follows: a. What are, per road stretch, the gains in travel time, from the moment that the extra capacity has been realised? b. What are, also per road stretch, the socio-economic benefits, based on the reduction in vehicle hours lost on the concerned road stretches (monitoring sections), over the period that the projects are realised earlier? c. What are the changes in traffic distance (vehicle kilometres driven)? 4.4. Study Area for the Evaluation The study areas for the evaluation are shown on the map of The Netherlands in figure 2.1 and more detailed in chapter 5 per project Expected Impacts No specific expected impacts were formulated beforehand. Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

13 4.6. Used Methods In order to investigate what the benefits were by accelerating the construction of the extra lanes, the following steps were carried out in the analysis phase of the evaluation: Collection of basic traffic data; First analysis; Putting the first analysis to the test against the used methodology and interpretation; Carrying out remaining analysis; Report, improvements and revision. First for each extra lane a stretch was defined where the initial congestion was present. Sometimes an extra lane improves the throughput on an alternative route (see figure 5.2 for an example). This alternative stretch was defined as well. The next step was to collect traffic data of the period before and after the opening of the lane(s). In order to carry out a reliable and comparable calculation regarding the reduction in congestion and the resulting economic savings, the unrepresentative days with identified special events that gave strong peaks or pits in congestion (like accidents, bad weather conditions and road works on one hand and holidays on the other hand) were filtered out. Vehicle hours lost were calculated for the remaining days. In the analysis, distinction was made between the extended morning peak ( ), the extended evening peak ( ) and the rest of the day. Travel time profits were converted per stretch into monetary values using value of time calculations. Passenger and freight traffic were calculated separately. The economic savings were calculated by multiplying the savings in vehicle hours lost with values of time. Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

14 5. The Impact of the Project - Results 5.1. Technical Performance No remarks Results Below, the results of the evaluation are described per project of the Additional Lanes Programme. First the situation is described and shown. Then basic data of the project are given and the results of the analysis on the indicators traffic distance (vehicle kilometres driven), traffic delay (vehicle hours delay) and travel time (in minutes) PROJECT 1: A2 LEENDERHEIDE VALKENSWAARD Situation The A67/A2 is an important international corridor towards Belgium (north-south) and Germany (westeast), and thus for the accessibility and economic development of the city of Eindhoven. Since the opening of the Eindhoven Ring Road, the traffic flow south of the Leenderheide interchange was problematic with blocking back on the A67 as a consequence. Rijkswaterstaat imcreased the road capacity on the A2 and the throughput on the A67 by building a new lane between interchange Leenderheide and exit Valkenswaard. Figure 5.1: A2 Leenderheide Valkenswaard (new lane in blue, monitoring section in red) Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

15 Basic data Table 5.1 shows the characteristics of the extra lane build on the A2. Details of project 1: A2 Leenderheide - Valkenswaard Type of lane Length Reference speed Permanent (from 1x2 to 1x3 lanes) 5.8 km 120 km/h Actual opening date 24 October 2010 Initial opening date 31 March 2012 Table 5.1: Characteristics of the project A2 Leenderheide Valkenswaard Analysis Data collection was based on a before survey in June-July 2010 and September-October 2010 and an after survey in November 2010 until March Table 5.2 shows the results of the indicator calculations. The extended morning peak is from 6.00 till 10.00, the extended evening peak from till hrs. Period Before After Difference Travel time (min) Travel Travel AM peak % -24.0% -0.2 PM peak % -33.8% -1.1 Other % -51.0% -0.2 Total % -36.9% -0,5 Table 5.2: Results analysis for the project A2 Leenderheide Valkenswaard Economic savings Through the Additional Lanes Programme, this extra lane was opened 330 work days in advance. The economic savings, based on the reduction of vehicle hours lost and this number of work days were calculated to be M 1.20 (in total 61,200 hours). Table 5.3 shows the savings per period of the day. Economic savings (in ) Morning peak 14,852 Evening peak 864,723 Rest of the day 320,008 Total 1,199,583 Table 5.3: Economic savings project A2 Leenderheide Valkenswaard Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

16 PROJECT 2: A9 HOLENDRECHT - DIEMEN Situation At the A9 south of Amsterdam, an extra lane was built in both directions. These lanes improve the accessibility of the business locations along the A9 and of the Amsterdam region. This stretch with two extra lanes has an alternative route. That is why traffic this alternative route was taken in account as well in the evaluation. Figure 5.2: Map of project 2: A9 Holendrecht- Diemen (new lanes in blue, monitoring sections in red, alternative routes in green) Basic data Table 5.4 shows the characteristics of the extra lane(s) involved. Details of project project 2: A9 Holendrecht-Diemen Type of lane(s) Length Reference speed Hard shoulder running (from 2x2 to 2x3 lanes) 2.8 km (northern lane), 3,25 (southern lane) 100 km/h Actual opening date 15 November 2010 Initial opening date 31 December 2010 Table 5.4: Characteristics of the project A9 Holendrecht-Diemen Analysis Data collection was based on a before survey in December 2009 until June 2010 and September-October 2010 and an after survey in December 2010 until March Table 5.5 and 5.6 show the results of the indicator calculations for the lanes in each direction. The extended morning peak is from 6.00 till hrs, the extended evening peak from till hrs. Period Before After Difference Travel time (min) Travel Travel AM peak % -1.4% 0.0 PM peak % -40.9% -6.2 Other % -49.0% -0.2 Total % -40.4% -2.9 Table 5.5: Results analysis for the project A9 Holendrecht-Diemen (southern lane) Note: the vehicle hours lost figures are including the alternative route Amstel-Diemen! Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

17 Period Before After Difference Travel time (min) Travel Travel AM peak % 7.1% +0.2 PM peak % -47.2% -1.3 Other % -31.3% 0.0 Total % -26.0% -0.2 Table 5.6: Results analysis for the project A9 Diemen-Holendrecht (northern lane) Note: the vehicle hours lost figures are including the alternative route Diemen-Amstel! Economic savings Through the Additional Lanes Programme, these extra lanes were opened only 30 work days in advance. However, the economic savings, based on the reduction of vehicle hours lost and the number of saved work days were M 0.82 (in total 53,500 hours) for the southern lane (Holendrecht-Diemen) and M 0.25 (in total 16,000 hours) for the northern lane (Diemen-Holendrecht). Table 5.7 shows the savings per period of the day for both lanes. Economic savings (in ) Southern lane Economic savings (in ) Northern lane Morning peak 1,070 Morning peak - 22,839 Evening peak 688,463 Evening peak 215,877 Rest of the day 130,720 Rest of the day 54,956 Total 820,253 Total 247,994 Table 5.7: Economic savings project A9 Holendrecht-Diemen (including the alternative routes!) PROJECT 3: A58 BATADORP - OIRSCHOT Situation At the A58 near Eindhoven, an extra (third) lane is built between interchange Batadorp and exit Oirschot. This lane was necessary to avoid blocking back of traffic on the A2 in northern direction, and thus to improve the accessibility of the business locations of the Eindhoven region. Figure 5.3: Map of project 3: A58 Batadorp-Oirschot (new lane in blue, monitoring section in red, alternative route in green) Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

18 Basic data Table 5.8 shows the characteristics of the extra lane(s) involved. Details of project project 3: A58 Batadorp-Oirschot Type of lane(s) Length Reference speed Permanent: (from 1x2 to 1x3 lanes) 6.0 km 120 km/h Actual opening date 23 November 2010 Initial opening date 31 March 2012 Table 5.8: Characteristics of the project A58 Batadorp-Oirschot Analysis Data collection was based on a before survey in June-July 2010 and September-November 2010 and an after survey in December 2010 until March Table 5.9 shows the results of the indicator calculations. The extended morning peak is from 6.00 till hrs., the extended evening peak from till hrs. Period Before After Difference Travel time (min) Travel Travel AM peak % -9.7% -0.4 PM peak % -14.9% -0.4 Other % -72.% -0.3 Total ,5-1.0% -21.2% -0.3 Table 5.9: Results analysis for the project A58 Batadorp-Oirschot Note: the vehicle hours lost figures are including the alternative route Eindhoven-Noord - Batadorp Economic savings Through the Additional Lanes Programme, this additional lane was opened 309 work days earlier. The economic savings, based on the reduction of vehicle hours lost and the number of saved work days were M 0.96 (in total 53,200 hours). Table 5.10 shows the savings per period of the day. Economic savings (in ) Morning peak 67,704 Evening peak 490,183 Rest of the day 402,993 total 960,880 Table 5.10: Economic savings project A58 Batadorp-Oirschot (including alternative route) Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

19 PROJECT 4: A12 WOERDEN - GOUDA Situation Traffic on the A12 between Utrecht and Gouda was congested on a regular basis due to insufficient capacity. People living in the neighbourhood suffered from rat running, resulting in air and noise pollution. Figure 5.4: Map of project 4: A12 Woerden-Gouda (new lane in blue, monitoring section in red) Rijkswaterstaat is busy with a complete make over of the A12 in the coming years, from The Hague till the German border. Within the Additional Lanes Programme, 8 projects are going to be completed along the A12. In this project an additional dynamic left lane was built between Woerden and Gouda which links up with the existing dynamic left lane from Gouda to The Hague. Basic data Table 5.11 shows the characteristics of this dynamic left lane. Details of project 4: A12 Woerden-Gouda Type of lane Length Reference speed Dynamic left lane: (from 1x3 to 1x4 lanes) 17.0 km Actual opening date 9 December km/h when extra lane is open (default 120 km/h) Initial opening date 31 March 2012 Table 5.11: Characteristics of the project A12 Woerden-Gouda Analysis Data collection was based on a before survey in January-June 2010 and September-November 2010 and an after survey in January until March Table 5.12 shows the results of the indicator calculations. The extended morning peak is from 6.00 till 10.00, the extended evening peak from till Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

20 Period Before After Difference Travel time (min) Travel Travel AM peak % -91.4% -3.8 PM peak % -86.3% Other % -84.0% -0.6 Total ,2% -86.9% -4.1 Table 5.12: Results analysis for the project A12 Woerden-Gouda Economic savings Through the Additional Lanes Programme, this extra lane was opened 297 work days earlier. The economic savings, based on the reduction of vehicle hours lost and this number of work days were calculated as M (in total 1,263,700 hours). Table 5.13 shows the savings per period of the day. Economic savings (in ) Morning peak 3,546,859 Evening peak 16,261,223 Rest of the day 1,725,521 Total 21,533,603 Table 5.13: Economic savings project A12 Woerden-Gouda PROJECT 5: A12 WOERDEN - OUDENRIJN Situation This stretch of roadway was widened from three to four lanes to improve traffic throughput and traffic safety (the latter was not evaluated). The lane was created using existing asphalt. Figure 5.5: Map of project 5: A12 Woerden-Oudenrijn (new lane in blue, monitoring section in red) Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

21 Basic data Table 5.14 shows the characteristics of the extra lane involved. Details of project 5: A12 Woerden-Oudenrijn Type of lane Length Reference speed Permanent (from 1x3 to 1x4 lanes) 10.0 km Actual opening date 1 November km/h (at the end transition to 100 km/h) Initial opening date 30 June 2011 Table 5.14: Characteristics of the project A12 Woerden-Oudenrijn Analysis Data collection was based on a before survey in January-June 2010 and September-October 2010 and an after survey in November 2010 until March Table 5.15 shows the results of the indicator calculations. The extended morning peak is from 6.00 till 10.00, the extended evening peak from till Before After Difference Period Travel time Travel Travel (min) AM peak % PM peak % Other % Total % Table 5.15: Results analysis for the project A12 Woerden-Oudenrijn Economic savings Through the Additional Lanes Programme, this extra lane was opened 164 work days in advance. The economic savings, based on the reduction of vehicle hours lost and this number of work days were calculated as almost M 3.59 (in total 213,600 hours). Table 5.16 shows the savings per period of the day. Economic savings (in ) Morning peak 1,949,428 Evening peak 1,180,500 Rest of the day 457,874 total 3,587,801 Table 5.16: Economic savings project A12 Woerden-Oudenrijn Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

22 PROJECT 6: A27 EVERDINGEN - LUNETTEN Situation The Utrecht region is the traffic centre of The Netherlands. The A27 between the interchanges Everdingen and Lunetten and the A2 between interchanges Oudenrijn and Everdingen connect the south with the centre region and with the north of The Netherlands. Congestion on this triangle have consequences for traffic in all directions. The A27 is widened to avoid blocking back on the A2. Figure 5.6: Map of project 6: A27 Everdingen- Lunetten (new lane in blue, monitoring section in red) Basic data Table 5.17 shows the characteristics of the extra lane involved. Details of project 6: A27 Everdingen-Lunetten Type of lane Length Hard shoulder running (from 1x2 to 1x3 lanes) 10.0 km Reference speed 100 km/h Actual opening date 9 February 2011 Initial opening date 31 March 2012 Table 5.17: Characteristics of the project A12 Woerden-Oudenrijn Analysis Data collection was based on a before survey in February-December 2010 and January 2011 and an after survey in February-March Table 5.18 shows the results of the indicator calculations. The extended morning peak is from 6.00 till 10.00, the extended evening peak from till Period Before After Difference Travel time (min) Travel Travel AM peak % -66.0% PM peak % -27.9% -1.6 Other % -80.1% -0.6 Total % -60.3% -4.1 Table 5.18: Results analysis for the project A12 Woerden-Oudenrijn Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

23 Economic savings Through the Additional Lanes Programme, this extra lane was opened 258 work days earlier. The economic savings, based on the reduction of vehicle hours lost and this number of work days were calculated as M 8.96 (in total 458,400 hours). Table 5.19 shows the savings per period of the day. Economic savings (in ) Morning peak 6,467,028 Evening peak 825,971 Rest of the day 1,662,770 total 8,955,770 Table 5.19: Economic savings project A12 Woerden-Oudenrijn PROJECT 7: A2 HOLENDRECHT - MAARSSEN Situation In the mid-90 s, it was decided to widen the A2 between Amsterdam and Utrecht to 2x4 lanes. However, traffic volumes grew faster than expected. In 2006 it was decided to widen even more to 2x5 lanes in both directions. Figure 5.7: Map of project 7: A2 Holendrecht- Maarssen (new lanes in blue, monitoring sections in red) Basic data Table 5.20 shows the characteristics of the extra lane(s) involved. Details of project project 7: A2 Holendrecht-Maarssen Type of lane(s) Permanent (from 2x3 to 2x5 lanes instead of 2x4) Length Reference speed Actual opening date 16.0 km (in both directions) 120 km/h 6 September 2010 (Western lane) 21 July 2010 (Eastern lane) Initial opening date 31 December 2010 Table 5.20: Characteristics of the project A2 Holendrecht-Maarssen Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

24 Analysis Data collection was based on a before survey in September 2009 until February 2010 and an after survey in September 2010 until February Table 5.21 and 5.22 show the results of the indicator calculations for the lanes in each direction. The extended morning peak is from 6.00 till hrs, the extended evening peak from till hrs. Period Before After Difference Travel time (min) Travel Travel AM peak % -46.6% -4.6 PM peak % -6.9% -1.4 Other % -73.1% -1.1 Total % -32.3% -1.8 Table 5.21: Results analysis for the project A2 Holendrecht-Maarssen (western lane) Period Before After Difference Travel time (min) Travel Travel AM peak % -98.9% PM peak % -93.4% -1.6 Other % -98.3% -1.0 Total % -98.5% -4.2 Table 5.22: Results analysis for the project A2 Maarssen-Holendrecht (eastern lane) Economic savings Through the Additional Lanes Programme, these extra lanes were opened 80 work days and more (eastern lane) in advance. The economic savings, based on the reduction of vehicle hours lost and the number of saved work days were M 1.69 (in total 103,100 hours) for the western lane (Holendrecht-Maarssen) and M 3.63 (in total 219,600 hours) for the eastern lane (Maarssen-Holendrecht). Table 5.23 shows the savings per period of the day for both lanes. Economic savings (in ) Western lane Economic savings (in ) Eastern lane Morning peak 923,096 Morning peak 3,003,784 Evening peak 167,012 Evening peak 252,900 Rest of the day 599,887 Rest of the day 378,200 Total 1,689,995 total 3,634,883 Table 5.23: Economic savings project A2 Holendrecht-Maarssen Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

25 PROJECT 8: A9 VELSEN - RAASDORP Situation Direct reason to construct these 2 hard shoulder running lanes was the daily congestion on the A9 in this region around Haarlem, Amsterdam and Schiphol Airport. Through these extra lanes, the traffic problems at the interchanges Velsen (morning peak) and Rottepolderplein (evening peak) should be resolved. Figure 5.8 Map of project 8: A9 Velsen- Raasdorp (new lanes in blue, monitoring sections in red) Basic data Table 5.24 shows the characteristics of the extra lane(s) involved. Details of project project 8: A9 Velsen-Raasdorp Type of lane(s) Length Reference speed Actual opening date 1 March 2011 Hard shoulder running (from 2x2 to 2x3 lanes) 8.1 km (in both directions) 120 km/h in quiet periods, 100 km/h during rush hours Initial opening date 31 December 2011 Table 5.24: Characteristics of the project A9 Velsen-Raasdorp Analysis Data collection was based on a before survey in January-June 2010 and an after survey from March 2011 till mid April Table 5.25 and 5.26 show the results of the indicator calculations for the lanes in each direction. The morning peak is from 6.00 till hrs, the evening peak from till hrs. Period Before After Difference Travel time (min) Travel Travel AM peak % -19.6% -7.1 PM peak % -23.2% -0.1 Other % -32.2% -0.1 Total % -20.5% -1.6 Table 5.25: Results analysis for the project project A9 Velsen-Raasdorp (western lane) Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

26 Period Before After Difference Travel time (min) Travel Travel AM peak % -29.0% -0.2 PM peak % -96.3% Other % -56.6% -0.3 Total % -91.9% -2.8 Table 5.26: Results analysis for the project project A9 Raasdorp-Velsen (eastern lane) Economic savings Through the Additional Lanes Programme, these extra lanes were opened 179 work days earlier. The economic savings, based on the reduction of vehicle hours lost and the number of saved work days were more than M 1.52 (in total 95,300 hours) for the western lane (Velsen-Raasdorp) and more than M 4.65 (in total 293,900 hours) for the eastern lane (Raasdorp-Velsen). Table 5.27 shows the savings per period of the day for both lanes. Economic savings (in ) Western lane Economic savings (in ) Eastern lane Morning peak 1,355,537 Morning peak 30,786 Evening peak 13,214 Evening peak 4, Rest of the day 155,136 Rest of the day 219,498 total 1,523,887 Total 4,652,104 Table 5.27: Economic savings project project A9 Velsen-Raasdorp PROJECT 9: A9 BADHOEVEDORP - RAASDORP Situation In combination with the extra lanes of project 8 (Velsen-Raasdorp), this hard shoulder running lane was intended to resolve the daily congestion on this vital part of the A9. Figure 5.9: Map of project 9: A9 Badhoevedorp-Raasdorp (new lane in blue, monitoring section in red) Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

27 Basic data Table 5.28 shows the characteristics of the extra lane involved. Details of project 9: A9 Badhoevedorp-Raasdorp Type of lane Length Reference speed Actual opening date 1 March 2011 Hard shoulder running (from 1x2 to 1x3 lanes) 3.0 km 100 km/h (80 km/h during rush-hours) Initial opening date 31 December 2011 Table 5.28: Characteristics of the project A9 Badhoevedorp-Raasdorp Analysis Data collection was based on a before survey in January-June 2010 and an after survey in March till mid April Table 5.29 shows the results of the indicator calculations. The extended morning peak is from 6.00 till hrs, the extended evening peak from till hrs. Period Before After Difference Travel time (min) Travel Travel AM peak % -29.0% -0.2 PM peak % -96.3% Other % -56.6% -0.3 Total % -91.9% -2.8 Table 5.29: Results analysis for the project A9 Badhoevedorp-Raasdorp Note: the figures in the table above are identical to the analysed data in table 5.26 as the motoring sections of these projects are the same. For the calculations of the economic savings, the total effect was distributed over the section Badhoevedorp-Raasdorp (this project 9) and the next section Raasdorp-Velsen (project 8) in the proportion of 1/3 (one-third) to project 9 and 2/3 (two-third) to project 8. Economic savings Through the Additional Lanes Programme, this extra lane was opened 179 work days earlier. The economic savings, based on the reduction of vehicle hours lost and this number of work days were calculated as M 2.33 (in total 147,000 hours). Table 5.30 shows the savings per period of the day. Economic savings (in ) Morning peak 15,393 Evening peak 2,200,910 Rest of the day 109,749 Total 2,326,052 Table 5.30: Economic savings project A9 Badhoevedorp-Raasdorp Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

28 PROJECT 10: A28 ZWOLLE - MEPPEL Situation The A28 is the most important highway for the north of The Netherlands. Because of the regular congestion between interchanges Hattemerbroek and Lankhorst, Rijkswaterstaat widened this part of the A28 in both directions. The evaluation took place for the permanent extra lane at the eastern side. : Figure 5.10: Map of project 10: A28 Zwolle-Meppel (new lane in blue, monitoring section in red) Basic data Table 5.31 shows the characteristics of the extra lane involved. Details of project 10: A28 Zwolle-Meppel Type of lane Length Reference speed Permanent (from 1x2 to 1x3 lanes) 15.4 km 120 km/h Actual opening date 12 December 2010 Initial opening date 30 September 2012 Table 5.31: Characteristics of the project A28 Zwolle-Meppel Analysis Data collection was based on a before survey in January-April 2010 and September 2010 and an after survey in January until March Table 5.32 shows the results of the indicator calculations. The extended morning peak is from 6.00 till hrs, the extended evening peak from till hrs. Period Before After Difference Travel time (min) Travel Travel AM peak % -5.4% -1.0 PM peak % -84.2% -4.9 Other % -64.3% -0.7 Total % -72.9% -2.1 Table 5.32: Results analysis for the project A28 Zwolle-Meppel Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

29 Economic savings Through the Additional Lanes Programme, this extra lane was opened 390 work days in advance. The economic savings, based on the reduction of vehicle hours lost and this number of work days were calculated as M 8.71 (in total 479,700 hours). Table 5.33 shows the savings per period of the day. Economic savings (in ) Morning peak 65,785 Evening peak 7,407,349 Rest of the day 1,234,745 Total 8,707,879 Table 5.33: Economic savings project A28 Zwolle-Meppel 5.3. Reliability of Results See section Research Questions Answered See section Overall Assessment A comprehensive programme of projects with extra lanes was carried out in The Netherlands. Below the main finding of the evaluation are summarised in terms of contribution to the European objectives SAFETY AND ENVIRONMENT Not evaluated EFFICIENCY ALL LANES In table 5.34 the overall results of the evaluation are summarised. Acceleration time [# work days] Average reduction of vehicle hours lost Total reduction of vehicle hours lost [hours] Economic savings [ ] A2: Leenderheide-Valkenswaard % 61,200 1,200,000 A9: Holendrecht-Diemen % 53, A9: Diemen-Holendrecht % 16, ,000 A58 Batadorp-Oirschot % 53, ,000 A12 Woerden-Gouda % 1,263,700 21,530,000 A12 Woerden-Oudenrijn % 213,600 3,590,000 A27 Everdingen-Lunetten % 458,400 8,960,000 A2: Holendrecht-Maarssen % 103,100 1,690,000 A2: Maarssen-Holendrecht % 219,600 3,630,000 A9: Velsen-Raasdorp % 95,300 1,520,000 Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

30 Acceleration time [# work days] Average reduction of vehicle hours lost Total reduction of vehicle hours lost [hours] Economic savings [ ] A9: Raasdorp-Velsen % 293,900 4,650,000 A9: Badhoevedorp-Raasdorp % 147,000 2,330,000 A28 Zwolle-Meppel % 479,900 8,710,000 Total 65 % 3,459,000 59,800,000 Table 5.34: Overall results for all ten projects For the ten projects the capital investment costs were M (see chapter 3.5) The direct economic savings were M 59.8, due to the acceleration of the building process through these ten projects of the Additional Lanes Programme. Not considered in the evaluation was the annual reduction of vehicle hours lost due to the extra lanes. Based on the figures in table and the assumption of 220 work days per year, the annual savings could be calculated as follows: Total annual reduction of vehicle hours lost: 3,997,000 hours Total annual economic savings: 67,364,000 Based on these annual economic savings and investment costs of M 303.9, the conclusion is that the return on investment period is 4.5 years. The reduction of congestion on these 10 stretches of roadway is more than the Easyway objective, which is 25% by EFFICIENCY HARD-SHOULDER RUNNING In table 5.35 the overall result for using the hard-shoulder as extra lane is given. As can be seen from the table the use of the hard-shoulder is very efficient. The performance is on average 1.7% higher and the delay is decreased with 58%. Before After Difference Before After Difference A9 Holendrecht-Diemen ,3% ,4% A9 Diemen-Holendrech ,5% ,0% A12 Woerden-Gouda ,2% ,9% A27 Everdingen-Lunetten ,5% ,3% A9 Velsen-Raasdorp ,6% ,5% A9 Raasdorp-Velsen ,6% ,2% A9 Badhoevedorp-Raasdorp ,6% ,2% Total ,7% ,0% Table 5.35: Overall results for the projects with hard-shoulder running Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

31 6. European Dimension: Transferability of the Results The following conclusions can be made regarding the applicability of the results of the Additional Lanes Programme to other similar implementations in The Netherlands and other countries: Acceleration of building extra lanes pays off. Several additional lanes are in the pipeline or are already opened in The Netherlands by the time of writing this report (December 2011).: Although the characteristics of roadways in other European countries differ from those used in The Netherlands, acceleration of the building processes will always be beneficial: congestion is reduced at traffic bottlenecks in an earlier stage and the road users will be more satisfied, because of durable (positive) effects. Additional Lanes Programme 10 projects in The Netherlands December 20 th, 2011

EasyWay. Urban Travel Times on VMSs around Eindhoven. Evaluation Expert Group Document. Version 0.9. Issue: 1 st edition. Date: August 27 th, 2013

EasyWay. Urban Travel Times on VMSs around Eindhoven. Evaluation Expert Group Document. Version 0.9. Issue: 1 st edition. Date: August 27 th, 2013 EasyWay Evaluation Expert Group Document Urban Travel Times on VMSs around Eindhoven Version 0.9 Issue: 1 st edition Date: August 27 th, 2013 Issued by: Rijkswaterstaat (NL) Authors: Feiko van der Veen,

More information

EasyWay. Traffic Management Scenarios on the A15 Motorway (Rotterdam) Evaluation Expert Group Document. Final Version. Issue: 2 nd edition

EasyWay. Traffic Management Scenarios on the A15 Motorway (Rotterdam) Evaluation Expert Group Document. Final Version. Issue: 2 nd edition EasyWay Evaluation Expert Group Document Traffic Management Scenarios on the A15 Motorway (Rotterdam) Final Version Issue: 2 nd edition Date: August 27 th, 2013 Issued by: Rijkswaterstaat (NL) Authors:

More information

Automatisch rijden, het gedrag van bestuurders en verkeersstromen

Automatisch rijden, het gedrag van bestuurders en verkeersstromen Automatisch rijden, het gedrag van bestuurders en verkeersstromen Bart van Arem EVU Symposium, 9 september 2016, Postillion Hotel Amersfoort Veluwemeer Rivium Buses (Rotterdam) 2013: DAVI on the road 2016:

More information

The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass).

The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass). Welcome The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass). The M1 is a vital part of the strategic road network, connecting

More information

Evaluation summary of Pilot trial with Hard Shoulder Running on the Hillerød Motorway

Evaluation summary of Pilot trial with Hard Shoulder Running on the Hillerød Motorway Date 30 August 2016 Contact Claus Lund Andersen Mail clla@vd.dk Phone +45 7244 3333 Document 14/15723-56 Page 1/5 Evaluation summary of Pilot trial with Hard Shoulder Running on the Hillerød Motorway Summary

More information

Congestion Management Report

Congestion Management Report Congestion Management Report F.E. EVERETT TURNPIKE (NORTH), MERRIMACK Segment Length: 7.0 miles Daily Traffic Volumes: 60,000-69,000 Analysis Period: May 2015 Number of Traffic Signals: 0 Number of travel

More information

TRIM Queue, Vejle N Denmark. Evaluation report

TRIM Queue, Vejle N Denmark. Evaluation report EUROPEAN COMMISSION DIRECTORATE GENERAL ENERGY AND TRANSPORT TRIM Queue, Vejle N Denmark Evaluation report November 2009 Version 1.0 TRIM_Queue_EasyWay_Evaluation_Report_DK Updated: November 09 Document

More information

Traffic Engineering Research Centre Department of Civil and Environmental Engineering, NTNU

Traffic Engineering Research Centre Department of Civil and Environmental Engineering, NTNU Managed motorways Seminar Traffic Management and Control June 8 th 2017, Thon Hotel Bristol, Oslo Arvid Aakre Traffic Engineering Research Centre Department of Civil and Environmental Engineering, NTNU

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Mobility and Congestion

Mobility and Congestion Technical Memorandum Mobility and Congestion Prepared for: Prepared by: September 25, 2013 1 Table of Contents 1. Introduction... 1 2. Congestion Forecasting Process... 1 2.1 Mobility and Congestion Terms...

More information

Managed Motorways Experience from the UK

Managed Motorways Experience from the UK Managed Motorways Experience from the UK Author David Kamnitzer (dkamnitzer@ibigroup.com) Director, IBI Group Project Manager of IBI Group s technical advisor commission for the Highways Agency s Managed

More information

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018 Northern Virginia Express Lanes Design Challenges and Solutions IBTTA Maintenance and Roadway Operations Workshop June 25, 2018 Virginia Express Lanes Overview 60 miles of managed lanes (4 projects) Long

More information

Reducing randomness: the advent of self driving cars

Reducing randomness: the advent of self driving cars Reducing randomness: the advent of self driving cars Prof Dr Ir Bart van Arem TU Delft, Faculty of Civil Engineering and Geosciences Department Transport & Planning 1 Your speaker 1982-1986 MSc, Qeueing

More information

Siła-Nowicka, K. (2018) Analysis of Actual Versus Permitted Driving Speed: a Case Study from Glasgow, Scotland. In: 26th Annual GIScience Research UK Conference (GISRUK 2018), Leicester, UK, 17-20 Apr

More information

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018 Florida Department of Transportation District Six Project FM #432687-1-52-01 Public Information Meeting Tuesday, July 24, 2018 South Florida Express Lanes Network The I-75/SR 826 Palmetto Express Lanes

More information

A simulation study of using active traffic management strategies on congested freeways

A simulation study of using active traffic management strategies on congested freeways Journal of Modern Transportation Volume 20, Number 3, September 2012, Page 178-184 Journal homepage: jmt.swjtu.edu.cn DOI: 10.1007/BF03325796 A simulation study of using active traffic management strategies

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Highway 17 Transportation Improvement Study

Highway 17 Transportation Improvement Study Final Report Highway 17 Transportation Improvement Study prepared for Santa Cruz County Regional Transportation Commission (SCCRTC) prepared by Planning and Engineering, Inc. 1155 North First Street, Suite

More information

MnPASS System Today and the Future

MnPASS System Today and the Future MnPASS System Today and the Future April 2010 By Nick Thompson Minnesota Department of Transportation Topics Minnesota s Current and Future MnPASS High Occupancy Toll Systems Overview of the MnPASS System

More information

I-25 South Gap Project Monument to Castle Rock

I-25 South Gap Project Monument to Castle Rock I-25 South Gap Project Monument to Castle Rock Project Overview Castle Rock Town Council April 3, 2018 by Chuck Attardo I-25 South: Monument to C-470 An Important Corridor to Colorado Links the state s

More information

Part-time Shoulder Use Guide

Part-time Shoulder Use Guide 1 Part-time Shoulder Use Guide FHWA Guide AASHTO SCOTE, Savannah GA June 2016 DOTs Face Increasing Challenges 2 Performance Based Practical Design 3 PBPD is a decision making approach that helps agencies

More information

Focus Measure Evaluation Results

Focus Measure Evaluation Results Focus Measure Evaluation Results UTR 4.3 Rewarding mobilists for avoiding rush hour Patricia Stumpel-Vos (City of Utrecht) February 2013 Executive Summary Since 2007 extensive infrastructural adaptations

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project

Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project Preliminary Review of the T-REX Southeast Corridor Highway and Light Rail Transit Project DRCOG Congestion Mitigation Program White Paper 07-1 (February 16, 2007) On time and under budget! Festivities

More information

Report to Cabinet. 18 May 2016

Report to Cabinet. 18 May 2016 Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment

More information

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 Aiming for Zero Road Worker Safety Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 1. Road Worker Safety Strategy. RWS Strategic Target No. 1: achieve a substantial

More information

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division Southside Road Prepared for: City of St. John s Police & Traffic Committee Prepared by: City of St. John s Traffic Division January 2007 Southside Road - Traffic Report Page 1 of 9 BACKGROUND: th At the

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

How to achieve fluid traffic

How to achieve fluid traffic Kanton Basel-Stadt How to achieve fluid traffic Objectives, instruments and limits of traffic management Alain Groff, Office for Mobility, Canton of Basel-Stadt Overview Some figures about Basel Tools

More information

Part-time Shoulder Use Guide

Part-time Shoulder Use Guide 1 Part-time Shoulder Use Guide FHWA Guide AASHTO SCOD, Baltimore, MD June 2016 DOTs Face Increasing Challenges 2 Performance Based Practical Design 3 PBPD is a decision making approach that helps agencies

More information

Efficient Use of Highway Capacity Summary Report to Congress

Efficient Use of Highway Capacity Summary Report to Congress Efficient Use of Highway Capacity Summary Report to Congress November 2010 Foreword This report was developed to summarize the implementation of safety shoulders as travel lanes as a method to increase

More information

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting 72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME Public Information Meeting Project Goals About the Project The goal of this project is to address congestion along 72 Avenue and adjacent streets

More information

Konstantin Glukhenkiy Economic Affairs Officer

Konstantin Glukhenkiy Economic Affairs Officer Konstantin Glukhenkiy Economic Affairs Officer Rapid growth of urban areas Very rapid increase in motorisation Substantial increases in traffic congestion Relative decline of public transport usage and

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

Washington DC Section of ITE Project Briefing

Washington DC Section of ITE Project Briefing Washington DC Section of ITE Project Briefing November 5, 2015 Renée Hamilton, VDOT, Deputy District Administrator I-66 Outside the Beltway Improvement Area Project Location Virginia 2 Purpose and Need

More information

The I-85 Express Lanes Project NASCIO Recognition Award Nomination

The I-85 Express Lanes Project NASCIO Recognition Award Nomination The I-85 Express Lanes Project 2012 NASCIO Recognition Award Nomination Submitting Agency: State Road and Tollway Authority Nomination Category: Information Communications Technology Contact: Malika Reed

More information

Welcome. Smart motorway M1 junctions 13 to 16 public information exhibition. Highways England Creative [XXXXX_XXXX_XXX]

Welcome. Smart motorway M1 junctions 13 to 16 public information exhibition. Highways England Creative [XXXXX_XXXX_XXX] Welcome Smart motorway junctions 13 to 16 public information exhibition Smart motorways Smart motorways are a technology driven approach to the use of our motorways, increasing capacity and relieving congestion

More information

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

Appendix B: Forecasting and Traffic Operations Analysis Framework Document Existing Conditions Report - Appendix Appendix B: Forecasting and Traffic Operations Analysis Framework Document This document defines the methodology and assumptions that will be used in the traffic forecasting

More information

ENCOURAGING TAXI DRIVERS TO BEHAVE: GRAFTON BRIDGE TAXI AND BUS LANE TRIAL

ENCOURAGING TAXI DRIVERS TO BEHAVE: GRAFTON BRIDGE TAXI AND BUS LANE TRIAL Encouraging Taxi Drivers to Behave Douglas-Jones, Segedin Page 1 ENCOURAGING TAXI DRIVERS TO BEHAVE: GRAFTON BRIDGE TAXI AND BUS LANE TRIAL Presenter: Rob Douglas-Jones, MEng, Traffic Operations Manager

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

EFFECTS AND ACCEPTANCE OF ENFORCEMENT. SUMMARY.

EFFECTS AND ACCEPTANCE OF ENFORCEMENT. SUMMARY. EFFECTS AND ACCEPTANCE OF ENFORCEMENT. Jan Malenstein, National Police Agency, Traffic and Transport Division. PO box 100, 3970 AC Driebergen, The Netherlands. Phone: +31 343 533565, fax: +31 343 531355,

More information

Welcome. Smart motorway M6 junctions 13 to 15 public information exhibition. Highways England Creative BHM18_0060_RHK

Welcome. Smart motorway M6 junctions 13 to 15 public information exhibition. Highways England Creative BHM18_0060_RHK Welcome Smart motorway M6 junctions 13 to 15 public information exhibition Smart motorways Smart motorways are a technology driven approach to the use of our motorways, increasing capacity and relieving

More information

South King County High-Capacity Transit Corridor Study

South King County High-Capacity Transit Corridor Study HIGH-CAPACITY TRANSIT CORRIDOR STUDY South King County Corridor South King County High-Capacity Transit Corridor Study Corridor Report August 2014 South King County High Capacity Transit Corridor Report

More information

Know your smart motorways M60/M62, Greater Manchester

Know your smart motorways M60/M62, Greater Manchester Know your smart motorways M/M62, Greater Manchester Manchester smart motorways: M junction 8 to M62 junction 20 The M and M62 are vital parts of the strategic road network in England. They provide an important

More information

EUROPEAN ROAD ASSESSMENT PROGRAMME EuroRAP I (2003) TECHNICAL REPORT

EUROPEAN ROAD ASSESSMENT PROGRAMME EuroRAP I (2003) TECHNICAL REPORT EUROPEAN ROAD ASSESSMENT PROGRAMME EuroRAP I (2003) TECHNICAL REPORT by David Lynam, Ton Hummel, Judith Barker (TRL) and Stephen D Lawson (The AA Motoring Trust) May 2004 CONTENTS EUROPEAN ROAD ASSESSMENT

More information

Congestion Management Report

Congestion Management Report Congestion Management Report DANIEL WEBSTER HIGHWAY, MERRIMACK Segment Length: 9.9 miles Daily Traffic Volumes: 13,000-21,000 Analysis Period: July August 2015 Number of Traffic Signals: 14 Number of travel

More information

Copenhagen Cycling Map. Red Lines Cycling facilities

Copenhagen Cycling Map. Red Lines Cycling facilities Copenhagen Cycling Map Red Lines Cycling facilities Copenhagen Cycling Facilities Design Approaches Transportation without Pollution Copenhagen s Strategy Where Cycling is one of the top key activities

More information

Traditional Public Transport Priority. Priority/Traffic Management? What is Integrated Public Transport Priority/Traffic management? Why? How?

Traditional Public Transport Priority. Priority/Traffic Management? What is Integrated Public Transport Priority/Traffic management? Why? How? Integrated Public Transport Priority & Traffic Management Sam Zimmerman What is Integrated Public Transport Priority/Traffic management? Why? How? Integrated Public Transport Priority/Traffic Management?

More information

Welcome! San Jose Avenue Open House August 25, 2015

Welcome! San Jose Avenue Open House August 25, 2015 Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

RIGHT-OF-WAY INTERSECTIONS

RIGHT-OF-WAY INTERSECTIONS Infrastructure Give Cycling a Push INFRASTRUCTURE/ INTERSECTSIONS AND CROSSINGS RIGHT-OF-WAY INTERSECTIONS Overview Right-of-way mixed traffic is the simplest, most agreeable approach for cyclists on quiet

More information

DYNAMIC LANES FOR AUCKLAND

DYNAMIC LANES FOR AUCKLAND Dynamic Lanes for Auckland MENEZES M. and INMAN R. Page 1 DYNAMIC LANES FOR AUCKLAND Authors: INMAN, Robert BA (Hons) Previously Auckland Transport Senior Traffic Engineer Now Aurecon Robert.Inman@aurecongroup.com

More information

Toll Rate Public Hearing

Toll Rate Public Hearing Toll Rate Public Hearing I-77 Express Toll Rate Hearing September 13, 2018 AGENDA AND HOUSEKEEPING Speaker Signup Bathrooms/Exits Facebook Live Introductions Thanks and Recognition 6:30-6:35 6:35-6:55

More information

Bus Queue Jump (Lane) Utilization: A case study in Calgary, AB Canada Muhammad Asim P.Eng, M.Sc. The City of Calgary

Bus Queue Jump (Lane) Utilization: A case study in Calgary, AB Canada Muhammad Asim P.Eng, M.Sc. The City of Calgary Bus Queue Jump (Lane) Utilization: A case study in Calgary, AB Canada Muhammad Asim P.Eng, M.Sc. The City of Calgary 1 Presentation Outline Introduction to Calgary Transit Background of the Project (why

More information

Highways England Creative M Welcome. Smart motorway M6 junctions 16 to 19 public information exhibition

Highways England Creative M Welcome. Smart motorway M6 junctions 16 to 19 public information exhibition Welcome Smart motorway junctions 16 to 19 public information exhibition Smart motorway junctions 16 to 19 Making the motorway better The is also part of the Highways England strategic road network connecting

More information

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 2011 Edition - Revision 2 Page 275 Section 2G.01 Scope CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 01 Preferential lanes are lanes designated for special traffic uses such as high-occupancy vehicles

More information

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009 Integrated Regional Traffic Management Michael Aherne Technical Director POLIS Conference 2009 M50 finish Public Transport and Pedestrians College Green The Spatial Perspective What Could has

More information

I-35W Solutions Alliance Project Update July 13, 2017

I-35W Solutions Alliance Project Update July 13, 2017 Title I-35W Solutions Alliance Project Update July 13, 2017 Evaluating the potential for Bus Rapid Transit and MnPASS Express Lanes in the southwest Metro, Investigating options for improved bus service

More information

Traffic Control Inspection Checklist Segment:

Traffic Control Inspection Checklist Segment: Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager

More information

York Scarborough Bridge Economic Appraisal Update Technical Note

York Scarborough Bridge Economic Appraisal Update Technical Note York Scarborough Bridge Economic Appraisal Update Technical Note Specification No. 1 Client name West Yorkshire Combined Authority Client reference M088 Discipline Transportation Project name CCAG2 Economics

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT

February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT February 2018 HIGHWAY 316 IMPROVEMENTS PROJECT Agenda 1 2 3 4 5 A Message from the City Project Area Traffic Conditions Pedestrian/Bicycle Comfort & Safety Next Steps Q&A City of Hastings Supports a study

More information

Congestion Management in Singapore. Assoc Prof Anthony TH CHIN Department of Economics National University of Singapore

Congestion Management in Singapore. Assoc Prof Anthony TH CHIN Department of Economics National University of Singapore Congestion Management in Singapore Assoc Prof Anthony TH CHIN Department of Economics National University of Singapore anthonychin@nus.edu.sg Introduction 2 Introduction and What is Traffic Congestion?

More information

US 69 RELIEF ROUTE STUDY

US 69 RELIEF ROUTE STUDY US 69 RELIEF ROUTE STUDY Jacksonville, Texas PUBLIC MEETING #2 May 29 th, 2018 Welcome to the public meeting for the US 69 Relief Route Study in Jacksonville. This is the second public meeting for this

More information

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development State Transportation Commission 2015 Twelve Year Program Development Regional results of the survey and public feedback from August thru November 2013 Shenango Valley MPO Version 01-2014 Mobility Concerns

More information

Governor s Transportation Vision Panel

Governor s Transportation Vision Panel Office of Governor Kate Brown Governor s Transportation Vision Panel JLA Public Involvement Project Overview The is a yearlong effort to develop a series of recommendations for the Governor that address

More information

CONGESTED LOS ANGELES

CONGESTED LOS ANGELES CONGESTED LOS ANGELES Prepared For: Mayor Antonio Villaraigosa and City Council City of Los Angeles Prepared By: Jacki Murdock Transportation Analyst LADOT December 11 th, 2011 Outline What causes congestion?

More information

An Easier Commute. Learn how to use I-77 Express to save you time.

An Easier Commute. Learn how to use I-77 Express to save you time. An Easier Commute Learn how to use I-77 Express to save you time PUBLIC-PRIVATE PARTNERSHIP I-77 Express is the first-ever toll lane public-private partnership with NCDOT I-77 Mobility Partners is financing,

More information

This is not about Super Cycle Higways in the Netherlands - history, results and recommendations cycle highways -

This is not about Super Cycle Higways in the Netherlands - history, results and recommendations cycle highways - This is not about Super Cycle Higways in the Netherlands - history, results and recommendations cycle highways - Denmark, Trafikdage 22 August 2011 Ineke Spapé SOAB consultants Livability On behalf of

More information

Congestion Reducing Activities. Toby Carr GDOT Director of Planning April 10, 2014

Congestion Reducing Activities. Toby Carr GDOT Director of Planning April 10, 2014 Congestion Reducing Activities Toby Carr GDOT Director of Planning April 10, 2014 GDOT Performance Dashboard Congestion Congestion Relief Strategies 511 HEROS RTOP Highway Emergency Response Operators

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives Contents EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW... 1-1 1.1 Study Scope... 1-1 1.2 Study Area... 1-1 1.3 Study Objectives... 1-3 2 EXISTING CONDITIONS... 2-1 2.1 Existing Freeway Conditions... 2-4 2.1.1

More information

Maryland State Highway Mobility Report. Morteza Tadayon

Maryland State Highway Mobility Report. Morteza Tadayon Maryland State Highway Mobility Report Morteza Tadayon Background Mobility is a Key Performance Area (KPA) in the SHA Business Plan SHA adopts a performance based approach Monitors Highway System to identify

More information

IMPLEMENTATION PROCESS OF DIRECTIVE 2008/96/EC IN SLOVENIA

IMPLEMENTATION PROCESS OF DIRECTIVE 2008/96/EC IN SLOVENIA IMPLEMENTATION PROCESS OF DIRECTIVE 2008/96/EC IN SLOVENIA Zvonko Zavasnik, MSc IMPLEMENTATION PROCESS non-automatic process, transpose the substance, not literally, EU Directive Correlation table Correlation

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information

Capacity of transport infrastructure networks

Capacity of transport infrastructure networks Most infrastructure extension work is concentrated on roads. The total length of the motorway network has increased dramatically during the past two decades (about 3 % per year). Construction of the high-speed

More information

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference Canada s Capital Region Delegation to the Velo-City Global 2010 Conference Report of Findings from Visits, Meetings & Presentations In Amsterdam-Den Haag, Utrecht, Berlin & Copenhagen The Itinerary Copenhagen

More information

Wellington Public Transport Spine Study

Wellington Public Transport Spine Study Wellington Public Transport Spine Study Study purpose Feasibility study Options for a high quality, high frequency PT system Key action from Ngauranga to Airport Corridor Plan (2008) Long-term outlook

More information

Traffic safety developments in Poland

Traffic safety developments in Poland Traffic safety developments in Poland Siem Oppe D-2001-8 Traffic safety developments in Poland A research note D-2001-8 Siem Oppe Leidschendam, 2001 SWOV Institute for Road Safety Research, The Netherlands

More information

Highway 217 Corridor Study. Phase I Overview Report

Highway 217 Corridor Study. Phase I Overview Report Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems

More information

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report Preparedby: ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1

More information

Capital Beltway HOT Lanes - Frequently Asked Questions

Capital Beltway HOT Lanes - Frequently Asked Questions Capital Beltway HOT Lanes - Frequently Asked Questions December 20, 2007 1. What is the cost of the project? The fixed-price design-build cost is approximately $1.4 billion. 2. Why have the project costs

More information

Regional Bus Priority

Regional Bus Priority Regional Bus Priority Recommendation(s) That the Board: i) Notes the systematic review for bus priority measures on the proposed Frequent Transit Network (FTN). Executive summary The New Network public

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide)

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide) Phase 1 Consultation: Understanding the Need Feedback Form Thank you for participating in this phase of planning for the George Massey Tunnel Replacement. Your feedback is important to us. Input received

More information

9. Parking Supporting Statement

9. Parking Supporting Statement 9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.

More information

Impact of Signalized Intersection on Vehicle Queue Length At Uthm Main Entrance Mohd Zulhilmi Abdul Halim 1,b, Joewono Prasetijo 2,b

Impact of Signalized Intersection on Vehicle Queue Length At Uthm Main Entrance Mohd Zulhilmi Abdul Halim 1,b, Joewono Prasetijo 2,b Impact of Signalized Intersection on Vehicle Queue Length At Uthm Main Entrance Mohd Zulhilmi Abdul Halim 1,b, Joewono Prasetijo 2,b 1,2 Smart Driving Research Center, Faculty of Civil and Environmental

More information

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee SRF No. 7766 MEMORANDUM TO: FROM: Earl Haugen and UND Transportation and Traffic Coordination Committee Rick Lane, P.E. DATE: November 26, 2013 SUBJECT: UNIVERSITY AVE REVIEW Our review of the University

More information

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle SDOT SR0 Design Refinements RES August, 0 Version #D 0 CITY OF SEATTLE RESOLUTION..title A RESOLUTION relating to the State Route 0, Interstate to Medina Bridge Replacement and High Occupancy Vehicle Project;

More information

Assessing the Traffic and Energy Impacts of Connected and Automated Vehicles (CAVs)

Assessing the Traffic and Energy Impacts of Connected and Automated Vehicles (CAVs) Assessing the Traffic and Energy Impacts of Connected and Automated Vehicles (CAVs) Steven E. Shladover, Sc.D. (Retired from) California PATH Program University of California, Berkeley SIP-adus Workshop

More information

Freeway Performance Report 2015, 3 rd Quarter. Photo courtesy of

Freeway Performance Report 2015, 3 rd Quarter. Photo courtesy of Freeway Performance Report 2015, 3 rd Quarter Photo courtesy of NDOT Facebook page 1 Table of contents 1. Title page 2. Table of Contents 3. Objective 4. Corridor Map 5. Performance Details Performance

More information

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M. WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M. PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm

More information

Tackling congestion by making better use of England s motorways and trunk roads

Tackling congestion by making better use of England s motorways and trunk roads Tackling congestion by making better use of England s motorways and trunk roads LONDON: The Stationery Office 10.75 Ordered by the House of Commons to be printed on 24 November 2004 REPORT BY THE COMPTROLLER

More information

Municipality of Sofia Traffic Master Plan. Intelligent Transport Systems Strategy Andrew Walsh

Municipality of Sofia Traffic Master Plan. Intelligent Transport Systems Strategy Andrew Walsh Municipality of Sofia Traffic Master Plan Intelligent Transport Systems Strategy Andrew Walsh Introduction Presentation to describe an ITS Strategy for Sofia developed as part of the Sofia Traffic Master

More information

M1 Smart Motorways Junctions 32 to 35a

M1 Smart Motorways Junctions 32 to 35a M1 Smart Motorways Junctions 32 to 35a How Smart Motorways work Junctions 32 to 35a About Smart Motorways The M1 is a major strategic route connecting people, communities and businesses, carrying over

More information

Final Technical Report RAILYARD ALIGNMENT AND BENEFITS STUDY. Appendix F: Traffic Analysis, I 280

Final Technical Report RAILYARD ALIGNMENT AND BENEFITS STUDY. Appendix F: Traffic Analysis, I 280 Final Technical Report RAILYARD ALIGNMENT AND BENEFITS STUDY Appendix F: Traffic Analysis, I 280 MEMORANDUM Date: To: From: Subject: Susan Gygi, San Francisco Planning Department Dennis Lee and Eric Womeldorff

More information

Welcome to the McKenzie Interchange Project Open House!

Welcome to the McKenzie Interchange Project Open House! Welcome to the McKenzie Interchange Project Open House! Purpose of Open House To provide you with information regarding the project and for you to have the opportunity to share your input on design concepts.

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information