1 THE STRATEGY: PROPOSED PROJECTS TO BE DELIVERED alking The following walking and public rights of way projects will improve the attractiveness of walking both within March itself and out into the countryside. These schemes will help to address the following strategy objectives: IMPROVE PEOPLE S ABILITY TO GET ABOUT AND LIVE INDEPENDENT & HEALTHY LIVES IMPROVE ACCESS TO KEY SERVICES AND DESTINATIONS ITHIN MARCH BY A VARIETY OF METHODS OF TRAVEL IMPROVE THE SAFETY OF THE TRANSPORT NETORK, PARTICULARLY FOR THE MOST VULNERABLE USERS IMPROVE THE ENVIRONMENT & PUBLIC REALM ITHIN MARCH AND HELP TO ADDRESS THE CHALLENGES OF CLIMATE CHANGE March Market Town Transport Strategy

2 Map showing location of projects to improve alking & Public Rights of ay March Market Town Transport Strategy

3 ID Specific Location Detail of Project Cost Elwyn Rd, between Elwyn Court and herry Path Estover Rd, between Elm Rd and entrance to playing fields Norwood Rd Bridge Nightall Drive to Marwick Rd Station Rd, in vicinity of County Rd S side of City Rd, to the N of the entrance to police station 'Old Railway Path' across Stow Fen Paths along river to the east of March Shepperson s Bridge Burrowmoor Loop Nene North Bank Gap Gault Bank Eastern side of A141 Bridge over railway B1101, between Lambs Hill Drove & Honeymead Rd Town Centre Creek Road level crossing Introduce shared use foot and cycle path on western side of Elwyn Rd between Elwyn Court and herry Path (as a continuation of existing Elwyn Rd shared use path) (this could also include a cantilevered path over the river bank to improve the walkway along river.) Lack of any footpath in this location discourages walking & cycling. Project will encourage walking & cycling to GP surgery & town centre 0 (cost in cycle scheme C4c) Introduce footpath on northern side of Estover Rd 30,000 Complete missing link in footpath on north side of Norwood Rd bridge (consider speed reduction and safety measures as part of the scheme) OR Introduce traffic signals to restrict traffic movements over bridge to 1-way at a time, reallocating road-space to pedestrian & cycle use (consider speed reduction and safety measures as part of the scheme) Footpath connecting Nightall Drive to Marwick Rd. Project will enable wheelchair users to access Marwick Centre without having to go on a main road Introduce formal pedestrian crossing of Station Rd The ratio of pedestrians to vehicles does not yet meet the criteria to warrant a pelican crossing, but at such a time as it does this project could be delivered Introduce footpath across well-trodden triangular piece of grass in near police station Resurface with planings so route can be used all year round Drainage and vegetation control work Dedicate route as bridleway Engineering work to improve paths under railway bridge and past the works Legal work to resolve anomalies Improve existing deteriorating bridge to allow for future potential pedestrian / cycle links Project to work with landowners to try to connect the dead end section of footpath 15 on the south side of the river where horses were originally boated across the river to a circuit with options to Gaul Road and / or Burrowmoor Road Project to work with landowners to try to connect the dead end section of footpath 15 on the north side of the river where horses were originally boated across the river to the path that continues west along the river Surface improvements to add to the value of this byway for off-road recreation Introduce solar-powered stud lights on A141 bridge. This scheme could be delivered as a stand-alone project or as part of cycle project C5b. Cycle project C2 Route improvements between Neale-ade Community College and imblington will also deliver benefits for pedestrians and runners through widening the footway, creating a safer crossing of the A141 and introducing solar-powered stud lights on the shared use path Definitive Map project to research the status of unrecorded routes (such as cut-through alleyways) and make Orders to record those that should be so, in order to reduce number of disputes Introduce footway on approach to Creek Road level crossing on either side of the level crossing 0 (cost in cycle scheme C5d) 100,000 60,000 3,000 75,000 25,000 35,000 25,000 25,000 40,000 2,000 0 (cost in Scheme C2bcd) 20,000 Strategy-wide Promote walking routes around March on FDC/partner websites TBC TBC March Market Town Transport Strategy

4 Cycling The following cycling projects will improve the attractiveness of cycling both within March itself and out into the countryside. By creating a comprehensive network of quality cycle routes it is hoped that a significant increase in the numbers of people cycling can be achieved. The strategy will aim to ensure cycle improvements are in full compliance with LTN 2/08 standards. These schemes will help to address the following strategy objectives: IMPROVE PEOPLE S ABILITY TO GET ABOUT AND LIVE INDEPENDENT & HEALTHY LIVES IMPROVE ACCESS TO KEY SERVICES AND DESTINATIONS ITHIN MARCH BY A VARIETY OF METHODS OF TRAVEL IMPROVE THE SAFETY OF THE TRANSPORT NETORK, PARTICULARLY FOR THE MOST VULNERABLE USERS IMPROVE HO THE FUTURE GROTH AND SHAPE OF MARCH IS MANAGED IMPROVE THE ENVIRONMENT & PUBLIC REALM ITHIN MARCH AND HELP TO ADDRESS THE CHALLENGES OF CLIMATE CHANGE March Market Town Transport Strategy

5 Map showing locations of proposed cycling projects within March March Market Town Transport Strategy

6 ID Specific Location Detail of Project Cost C1 Cycle route improvements to/from Railway Station 29,000 C1a Southbound route from railway station to town centre B1101 Station Rd, Remove centre line from carriageway between Station Introduce on-road southbound advisory (i.e. dashed white line) cycle lane Approach and Introduce double yellow lines across whole section on east side of road Creek Rd Signing introduced to advertise this as a route to the town centre 15,000 C1b C1c C1d Broad Street to Railway Station Marylebone Rd bridge to/from railway station Between igstone's bridge and Station Northbound route from town centre to railway station 1)Signed route created via Broad St, Robingoodfellow's Lane, National Cycle Network Route path to station 2)solar powered stud lights to be installed on the route Route between Marylebone Rd bridge and railway station Signed route created via Marylebone Rd, Henson Rd, Maple Grove, Hawthorne Grove, Acacia Grove, Robingoodfellows Lane, NCN Route path to station Introduce warning signs at junction of Marylebone Rd with Dartford Rd to make drivers aware that cyclists crossing here Routes between railway station and igstone's bridge Consolidate signing for route from bridge to station via aterside Gardens, Foxglove ay and illow Herb Close Sign southbound route from Station Rd to igstone's Bridge via St John's Rd 1,000 5,000 1,000 Sign route to rail station from town centre along Nene Parade B1101 Elm Road Route between station and northeast March / new development C1e between Estover Remove centre line from carriageway Rd and Station Introduce on-road advisor cycle lanes 7,000 Approach Introduce double yellow lines C2 Cycle route improvements between Neale-ade Community College and imblington 670,000 C2a Reduce speed limit from 40mph to 30mph B1101 Remove centre line from carriageway imblington Road Introduce on-road advisory cycle lanes between Job's Introduce double yellow lines Lane and Lambs Consider introducing an unsegregated dual use path along this section Hill Drove 10,000 C2b C2c C2d C2e B1101 imblington Road between Lambs Hill Drove and A141/imblington Rd roundabout A141 / B1101 roundabout to 40mph signs on B1101 March Road B1101 March Road, between 40mph signs (just south of A141 roundabout) and Honeymead Rd B1101 March Road / Doddington Rd, between Honeymead Rd and B1093 Old Station ay Upgrade existing footpath to shared use cycle-path on the eastern side of imblington Rd Introduce solar-powered stud lights Replace existing splitter island with longer and wider version to facilitate safe crossing of the southeast arm of the A141 Upgrade existing footpath to shared use cycle-path on eastern side of road, as far as 40mph signs Upgrade existing footpath to shared use cycle-path on eastern side of B1101 Introduce solar-powered stud lights Upgrade existing footpath to shared use cycle-path on eastern side of B ,000 60, , ,000 March Market Town Transport Strategy

7 C3 C3a C3b C3c C3d C3e C3f C3g C4 C4a C4b C4c Cycle route improvements between southwest March / new development and town centre Routes between Hatchwood Park / S March and town centre Signed routes created from Hatchwood Park to town centre via Between S Cherryholt Ave, Ellingham Ave, Gaul Rd recreation ground, The Chase & March and town est End Park (for south of river) / est End (for north of river) centre Consider additional route for cyclists along Oxbow Crescent straight onto the park with a path rather than sharing with traffic on Gaul Road. Gaul Rd recreation ground between Ellingham Avenue cut-through and NE corner of field est End Park, between The Chase and The Brewin Chase est End Park, riverside path between footbridge and Acre Road Development located N. of Knight's End Rd and S. of Gaul Rd Link between proposed Hatchwood Park development and The Avenue (S. of Coronation Close, Public Right of ay 156/12) est of March in the vicinity of aveney Drive and indsor Drive Create formal shared use cycleway along route of existing informal path across playing field consider solar powered stud lights as part of schemes est End Park south Create new shared use cycle-path along southern perimeter of est End Park consider solar powered stud lights as part of schemes est End Park Riverside Path consider solar powered stud lights as part of schemes iden existing footpath and convert to shared use OR 179, ,000 1,000 70,000 70, ,000 Convert existing footpath to shared use 3,000 Links between S March new development and existing cycle / road network Developer Multiple accesses for cylists and pedestrians from new development to to provide cycle routes and roads leading to town / Neale-ade Link from Hatchwood Park to The Avenue Upgrade existing soft surface to tarmac Introduce streetlighting OR Upgrade existing soft surface to tarmac Introduce solar-powered stud lights along section Pedestrian /cycling bridge across the river. Several options regarding location to be considered as part of outline and detailed design in order to develop the most appropriate solution. Cycle route improvements between Neale-ade Community College and town centre / igstone's bridge B1101 between Cycle route improvements along The Avenue / The Causeway / High St Neale-ade & corridor town centre Review and refresh existing cycle routes in South March Chapel St Neale-ade to igstone's bridge & town centre Chapel St Introduce street lighting OR Introduce solar-powered stud lights Elwyn Rd corridor Consolidate signing along existing route and consider the introduction of a pedestrian/cycle crossing to the west at the junction of St Peters Road/ Upwell Road / Elwyn Road / Eastwood Avenue (assessment to consider precise location and nature of the crossing) Developer to provide TBC 71,000-91,000 15,000 25,000 plus ongoing revenue commitment 5,000 TBC at design stage March Market Town Transport Strategy

8 C4d Elwyn Rd, between Elwyn Court and herry Path Introduce shared use cyclepath on western side of road between Elywn Court and herry Path (as a continuation of existing Elywn Rd shared use path) 50,000 March Market Town Transport Strategy

9 C5 C5a C5b C5c C5d C5e Cycle route improvements between Hostmoor Avenue retail park / industrial estate and rest of the town B1099 isbech Reduce speed limit from 40mph to 30mph Rd between Peas Remove centre line from carriageway Hill roundabout Introduce on-road advisory cycle lanes and Marylybone Sign route, including routes feeding into this e.g from Marylebone Bridge Rd A141, on east side between Peas Hill roundabout and Hostmoor Ave and south side of Hostmoor Ave as far as petrol station Norwood Rd between isbech Rd and cut through to Hostmoor Avenue, then onto Hostmoor Ave Norwood Rd between junction with B1101 Elm Rd and cut through to Hostmoor Ave Russell Avenue Upgrade existing path on E. side of A141 and S. side of Hostmoor Ave to shared use cycleway Introduce solar-powered stud lights on A141 bridge (nb this could be delivered as stand-alone pedestrian project, see Project 13) Sign route Discuss with Tescos the possibility of creating an entrance for cycle/ pedestrians in the northwest corner of their site Route along Norwood Rd corridor Remove centre line from carriageway of Norwood Rd Introduce on-road advisory cycle lanes Introduce double yellow lines Introduce signing along route, including from roads feeding into Norwood Rd such as Robingoodfellow's Rd, Maple Grove and on Hostmoor Ave Complete missing link in footpath on north side of Norwood Rd bridge, and create to shared use, and consider speed reduction and safety measures as part of the scheme OR Introduce traffic signals to restrict traffic movements over bridge to 1-way at a time, reallocating road-space to pedestrian & cycle use, and consider speed reduction measures as part of the scheme. Cycle and footbridge north from the bend in Russell Avenue to encourage more people to walk and cycle to Hostmoor. Benefits of the scheme to be assessed under TC5 mitigation study. 258, ,000 15, ,000 13, ,000 80,000 C6 Cycle route improvements to/from development located to the south of Barker's Lane 0 Links between new development Multiple accesses for cylists and pedestrians from new development to cycle routes and roads leading to Neale-ade, imblington and the town C6a and imblington centre Rd, Barkers Lane, Monte Long Close Introduce signing and Calvalry Drive C6b C7 C7a C7b Barkers Lane, between nw and ne corners of new development Upgrade Barkers Lane unpaved track (Path 156/24) to high quality tarmaced cycleway. Introduce solar powered stud lights Cycle route improvements to/from development located to the north of Estover Rd and east of Elm Rd Between N. of Estover Rd Multiple accesses for cylists and pedestrians from new development to development and cycle routes and roads Elm Rd, Estover Rd, Station Rd, Introduce signing Creek Rd, Nene Parade To the east of March in the vicinity of Swallow ay and aterside Gardens Pedestrian/cycling bridge to the east of March in the vicinity of Swallow ay and aterside Gardens. Several options regarding location to be considered as part of outline and detailed design in order to develop the most appropriate solution. Benefits of the scheme to be assessed under TC5 mitigation study. TBC Developer to provide Developer to provide 0 Developer to provide TBC March Market Town Transport Strategy

10 C8 Cycle route improvements to the National Cycle Network Route 63 C8a C8b Route to north, within and west of March NCN Route 63 between hitemoor Prison and Twenty Foot Road Refresh and renew signing for route in and around March, CCC will also provide support where appropriate to Sustrans as they seek to obtain cycle rights beyond the marina. CCC support Sustrans plans to re-route the NCN via the town centre as this will help to boost tourism. hitemoor Prison to Twenty Foot Road Resurface with planings Drainage and vegetation control 97, ,000 2,000 40,000 OR Introduce hard tarmaced surface 120,000 C8c Twenty Foot Road to Long Drove NCN Route 63 Resurface with planings between Twenty Drainage and vegetation control Foot Rd and Long As well as being part of the NCN, it provides an off-road link to Rings End Drove and Guyhirn 55,000 C9 Cycle route improvements in the Town Centre 30,000 C9 Town Centre - High St, City Rd, George St, Market Place, Broad St, Introduce 20mph zone Gray's Lane, Introduce gateway features at entrances to zone Station Rd, 30,000 Dartford Rd, Darthill Rd, Robin Goodfellows Lane C10 Schemes to promote & encourage the take-up of cycling 24,000 C10a hole of the strategy area Introduction of additional cycle parking at key locations in the town. 10,000 C10b Applicable for anyone living, working or Creation of a March Cycle Forum 2,000 studying in March C10c C10d C10e C11 C11 Available throughout the March Area To cover cycle routes in and around March Central location / railway station North and South of the river Town Centre Area Bikeability cycle training 2,000 Cycle map and brochure 5,000 Event to promote cycling within March, including help and advice on cycle maintenance Strategic Cycle Infrastructure: Cycle/Pedestrian bridges (s) over the river and/or railway line Options for a cycle/pedestrian bridge will be explored. Several options for the location will be examined to work out the most appropriate solution, these locations could include: From Nene Parade to Elwyn Road (nr Kashmir Balti House restaurant) From Grays Lane to south of river. 5, , , ,000 2,500,00 0 March Market Town Transport Strategy

11 Summary map showing location of key cycling and walking schemes March Market Town Transport Strategy

12 Safety The following safety schemes would help to address the following strategy objectives: IMPROVE PEOPLE S ABILITY TO GET ABOUT AND LIVE INDEPENDENT & HEALTHY LIVES IMPROVE THE SAFETY OF THE TRANSPORT NETORK, PARTICULARLY FOR THE MOST VULNERABLE USERS Map showing location of projects to address safety issues March Market Town Transport Strategy

13 ID S1 S2 S3 S4 S5 Specific Location B1099 Upwell Rd, in vicinity of junction with Cavalry Drive Burrowmoor Rd, outside Primary School Gaul Rd junction with A141 A141, from roundabout with isbech Rd extending north for over 1 mile past properties in estry Junctions of: * A141/ Hostmoor Ave * A141 / Cobblestones Access Rd * A141 / isbech Rd Detail of Project Introduce further, more effective speed reduction measures (not speed bumps) Make drivers more aware of the presence of primary school children by installing improved more effective school warning signs Introduce a roundabout. Gaul Rd development is required to deliver a scheme that brings safety benefits at this junction as a condition of planning consent. Reduction in speed limit from 50mph to 40mph. NB this scheme is due to be delivered in March 2013 and has been partfunded by Cambridgeshire County Council & March Town Council. If local concern regarding the safety of these junctions remains after Project S4 is implemented: Carry out feasibility study looking at the most appropriate mitigation measures for the area. Any suggested scheme(s) arising from this study such as; reducing the height of the Peas Hill roundabout to improve visibility and improve safety, would then form part of this strategy. [This project would need to be mindful of Project TC5 which is concerned with identifying options for mitigating impact of future traffic including in this area.] Cost 50,000 15,000 To be provided by developer(s) 5,000 Up to 15,000 for feasibility study to identify preferred options S6 E. side of A141 Bridge Project 13 to introduce solar-powered stud lights on A141 bridge will provide safety benefits to pedestrians travelling across the bridge. See 13 S7 S8 S9 S10 S11 B1101, between Lambs Hill Drove & Honeymead Rd Area surrounding Railway Station Area between Burrowmoor Rd to the south & Station Rd / Creek Rd / Sainsbury s access to the northeast and Dartford Rd / Lidl access to the northwest. Twenty Foot Road junction with A141 isbech Road between the Peas Hill Roundabout roundabout and Norwood Rd. Cycle project C2 Route improvements between Neale-ade Community College and imblington will also deliver safety benefits through provision of a widened off-road cycleway, creating a safer crossing of the A141 and introducing solar-powered stud lights on the shared use path Produce and implement a car park management strategy for the station and areas surrounding the railway station. This scheme (PT4) would address existing safety issues relating to vehicles blocking back onto the Elm Rd level crossing. Project TC1 Town Centre improvements would seek to address identified safety issues. Speed restrictions on Twenty Foot Road junction with A141. Scheme could include moving parapet to improve visibility and safety for pedestrians. Reduce the speed limit on this road from 40mph to 30mph. This scheme also forms part of C5a but could be delivered as a separate standalone scheme. See C2 See PT4 See TC1 Est. 800k TBC March Market Town Transport Strategy

14 Public Transport The following projects will help to address the following strategy objectives: IMPROVE PEOPLE S ABILITY TO GET ABOUT AND LIVE INDEPENDENT & HEALTHY LIVES IMPROVE ACCESS TO KEY SERVICES AND DESTINATIONS ITHIN MARCH BY A VARIETY OF METHODS OF TRAVEL IMPROVE CONNECTIONS BETEEN MARCH AND KEY SETTLEMENTS & SERVICES IN THE IDER REGION IMPROVE THE SAFETY OF THE TRANSPORT NETORK, PARTICULARLY FOR THE MOST VULNERABLE USERS IMPROVE HO THE FUTURE GROTH AND SHAPE OF MARCH IS MANAGED IMPROVE THE ENVIRONMENT & PUBLIC REALM ITHIN MARCH AND HELP TO ADDRESS THE CHALLENGES OF CLIMATE CHANGE March Market Town Transport Strategy

15 March Market Town Transport Strategy

TIP Scheme List Huntingdonshire

TIP Scheme List Huntingdonshire Scheme List 2018 - Huntingdonshire C = cycling, W = walking, P = public transport, T = traffic and highway, S = safety 265 T A1096 junction capacity enhancements Highway Capacity Improvements LTTS around

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents

More information

Improving Thetford Cycling Provision. In and Around Thetford

Improving Thetford Cycling Provision. In and Around Thetford Improving Cycling Provision In and Around Thetford Presentation to Thetford Town Council July 2015 About Me Lecturer in Mathematics at the University of East Anglia Keen recreational cyclist Volunteer

More information

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &

More information

TIP Scheme List East Cambridgeshire

TIP Scheme List East Cambridgeshire C = cycling, W = walking, P = public transport, T = traffic and highway, S = safety 454 P Soham Railway Station Rail Improvement LTTS + 455 P Ely area rail infrastructure improvements Rail Improvement

More information

= <10k <250k = <500k = 500k+ Major schemes

= <10k <250k = <500k = 500k+ Major schemes Cost Scheme Reference Schemes Scheme Type Relevant document / Source Timescale =

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 5 South and East Chelmsford July - August 27 Chelmsford City Growth Package Contents Introduction 5 Army and Navy Roundabout Improvements:

More information

Cycle Network Background Paper

Cycle Network Background Paper Cycle Network Background Paper The council is hoping to achieve a comprehensive cycle network including radial routes into town, routes across town N-S and E-W including safer junctions. The aim overall

More information

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING NOVEMBER 216 MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING Cambridgeshire County Council Type of document (version)

More information

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION Title: Prepared by: A9 Dualling Project: Dalraddy to Slochd Murray Ferguson, Director of Planning and Rural Development and Gavin Miles, Head of Planning

More information

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas GLEN EIRA CITY COUNCIL MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas 1 WHAT HAVE WE HEARD? WHAT NOW? Stage one Tell us what you love about your shopping strip November

More information

CUERDEN TRANSPORT PROPOSALS

CUERDEN TRANSPORT PROPOSALS 1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS. CHURCH ROAD Public consultation document YOUR TELL US VIEWS www.enjoywalthamforest.co.uk CHURCH ROAD Introduction Waltham Forest Council was one of three boroughs to be awarded 27million of funding from

More information

Yorkhill & Kelvingrove Community Council Cycling Village Proposal. Yorkhill Kelvingrove Cycling Village (1.3)

Yorkhill & Kelvingrove Community Council Cycling Village Proposal. Yorkhill Kelvingrove Cycling Village (1.3) Yorkhill Kelvingrove Cycling Village (1.3) 1) Introduction In recent years our community has been transformed. We have seen additional student and residential accommodation constructed. The redevelopment

More information

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING BBAG BRIEFING NOTE EMAIL: BERMUDABRIDGEAGP@BTINTERNET.COM WWW.FACEBOOK.COM/GROUPS/BERMUDABRIDGEAG TWITTER @BERMUDABRIDGEAG CYCLING BBAG BRIEFING NOTE

More information

Appendix 1 Greenway Standards

Appendix 1 Greenway Standards Appendix 1 Greenway Standards Nigel Brigham & Associates A report for 1 What is a Greenway? The Brief for this Review suggested that Greenway routes should have: An all weather, hard surface (generally

More information

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train

More information

MAGNA PARK Lutterworth. DHL SUPPLY CHAIN: Design and Access Statement. June

MAGNA PARK Lutterworth. DHL SUPPLY CHAIN: Design and Access Statement. June DHL SUPPLY CHAIN: Design and Access Statement June 2015 CONTENTS SECTION - The Access Proposals 9.1. Site Access 140 9.2. Mere Lane 140 9.3. A5 140 9.4. Footpaths, cycle ways and bridleways 142 SECTION

More information

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000 National Cycle Network Funding Scheme 2012/2012 Application Form Section 1:Project Outline Name and Address of Local Authority Contact person/proposed project manager Waterford City Council Paul Cleary,

More information

A27 Worthing and Lancing: facilities for walking, cycling, and horse riding [nonmotorised

A27 Worthing and Lancing: facilities for walking, cycling, and horse riding [nonmotorised A27 Worthing and Lancing: facilities for walking, cycling, and horse riding [nonmotorised users (NMUs)] Introduction This note describes our understanding of the needs of Non-Motorised Users (NMUs) as

More information

Roads and public rights of way

Roads and public rights of way Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:

More information

PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP

PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP SUMMARY OF FINDINGS AND PRIORITIES PARKING There was a high level of response to this topic which included many aspirations to provide car parking near to

More information

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

sessions. The opinions of local people will help decide which of these two options is taken forward to be built. A4018 FAQs Why are no bus lanes proposed north of Crow Lane? Inbound and outbound bus lanes were considered north of the Crow Lane junction, but they took away capacity from other traffic on the approach

More information

The Wincheap Society

The Wincheap Society The Wincheap Society s on sections of: Thanington 4th Arm Slip Road, Walking, Cycling & Horse-Riding Assessment & Review Report, by Peter Brett Associates, October 2017, on behalf of Pentland Properties

More information

Strategy for Walking & Cycling Action Plan

Strategy for Walking & Cycling Action Plan Strategy for Walking & Cycling Action Plan To achieve higher levels of walking and cycling activity, the destinations which people access have to be available within suitable distances and designed to

More information

Cycle Superhighway 4 from Tower Bridge to Greenwich

Cycle Superhighway 4 from Tower Bridge to Greenwich Cycle Superhighway 4 from Tower Bridge to Greenwich About Sustrans Sustrans is the charity making it easier for people to walk and cycle. We are engineers and educators, experts and advocates. We connect

More information

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017 Nottingham Junctions Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017 Introduction The is the key east-west link across the East Midlands. The route is subject

More information

The Legal Record of Rights of Way

The Legal Record of Rights of Way Cranborne Chase and West Wiltshire Downs Area of Outstanding Natural Beauty The Legal Record of Rights of Way www.ccwwdaonb.org.uk Who records and manages Rights of Way (RoW)? County Councils have the

More information

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES 6.0. TARGETS PREFACE The University of St Andrews has

More information

Appendix 11 Barton Greenway Review

Appendix 11 Barton Greenway Review Appendix 11 Barton Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Bulwell Cycling Consultation

Bulwell Cycling Consultation Bulwell Cycling Consultation Image 1 Bulwell Bogs (Sutton, 2015) As part of a final year research project, I am seeking feedback on proposals for cycling improvements in Bulwell. This consultation is not

More information

a CYCLING ACTION PROGRESS MEETING

a CYCLING ACTION PROGRESS MEETING a CYCLING ACTION PROGRESS MEETING 9 TH APRIL 2013 Present: Apologies: Chris Vinestock (CCS Transportation, Head of Service) Cllr Nick Davies (CCS Cycle Forum Designate) Ben George (CCS Transport Strategy)

More information

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor Comments on the Hailsham to Eastbourne Sustainable Transport Corridor Version 1.1 25/01/2015 Paul Humphreys 1 Table of Contents Version Control... 2 Summary... 2 Rationale provided by ESCC... 3 The ESCC

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

Speed Limit Policy Isle of Wight Council

Speed Limit Policy Isle of Wight Council APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits

More information

Navan Cycle Network (Athlumney to Trim Road Cycle and Pedestrian Scheme) Part 8 Report

Navan Cycle Network (Athlumney to Trim Road Cycle and Pedestrian Scheme) Part 8 Report (Athlumney to Trim Road Cycle and Pedestrian Scheme) Part 8 Report September 2018 Quality information Prepared by Checked by Approved by Matt Richardson Engineer Brian McMahon Principal Engineer Dimitris

More information

Design Workshops Summary of all Feedback January 2017

Design Workshops Summary of all Feedback January 2017 Histon Road Corridor Design Workshops Summary of all Feedback January 2017 CITY DEAL AND GROWTH Commitment to Growth: Government, County, City and District Emerging Local Plans: 33,000 new homes 45,000

More information

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London Chapter 4 Route Window C3 Hyde Park and Park Lane shafts Transport for London HYDE PARK AND PARK LANE SHAFTS 4 Route Window C3 Hyde Park and Park Lane shafts Introduction 4.1 In this route window, which

More information

Nottingham Cycle City Frequently Asked Questions

Nottingham Cycle City Frequently Asked Questions Nottingham Cycle City Frequently Asked Questions About the scheme How much money is to be spent on cycling? And where is the money from? We have 6.1 million in Growth Fund which we will be investing directly

More information

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian

More information

Warfield Neighbourhood Plan: 4.4 Infrastructure

Warfield Neighbourhood Plan: 4.4 Infrastructure Warfield Neighbourhood Plan: 4.4 Infrastructure Previously decided Policy headings: Policy WNP16 Transport Impact of Development Policy WNP17 Transport Proposals Policy WNP18 New School Buildings Policy

More information

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -

More information

Issues at T junctions:

Issues at T junctions: TheSlade_PublicConsulationPlans_March2017.pdf These comments relate to junction designs in this phase of the project on The Slade. Comments begin with the northernmost junction: Girdlestone Rd and continue

More information

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013 Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along

More information

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

High 2010 Medium 2010/11. PCT NHS Darlington Primary Care Trust HPC DBC DBC. High HPC. Med to High

High 2010 Medium 2010/11. PCT NHS Darlington Primary Care Trust HPC DBC DBC. High HPC. Med to High Hurworth Parish Plan 2010 Actions In this action plan cost ranges are: Low up to 499 Med - 500 to 4,999 High 5,000+ Very - Over 20,000 Hurworth Parish Council Darlington Borough Council MSG Middleton St

More information

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas: Context and Problems Corridor length 12.3 km; Population within 800m 59,922; Jobs within 800m 59,100; Unemployment 11%; Average Index of Multiple Deprivation 46; Households with no car 45%; Proportion

More information

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2 Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:

More information

Space for Cycling. A guide for decision makers

Space for Cycling. A guide for decision makers Space for Cycling A guide for decision makers Why create Space for Cycling? Imagine your area with considerably less traffic. Imagine safe streets and neighbourhoods, clean air, young and old alike able

More information

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1 TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL Page 1 Table of Contents 1.0 Introduction... 3 2.0 Project Overview... 3 3.0 Project Proposals... 4 3.1 Enfield Road / Durham Road Junction... 3 5 3.2 Summerfield

More information

CAMBRIDGE SOUTH EAST. Transport Study. Consultation extended to 9 April. Formerly known as A1307, Three Campuses to Cambridge.

CAMBRIDGE SOUTH EAST. Transport Study. Consultation extended to 9 April. Formerly known as A1307, Three Campuses to Cambridge. CAMBRIDGE SOUTH EAST Transport Study Formerly known as, Three es to Have your say on new public transport links new and improved walking and cycling routes road safety improvements What are we consulting

More information

Introduction. Prince Street Cycling Ambition Fund Public Realm Project

Introduction. Prince Street Cycling Ambition Fund Public Realm Project Introduction The (CAF) project will create a high quality, 8-80 s cycle route up the west side of Prince Street from Cumberland Road, over Prince Street bridge to the Centre. This is part of the City Centre

More information

Guildford Borough (Draft)

Guildford Borough (Draft) ITEM Annex Page 7 Guildford Borough (Draft) Forward Programme Part A This is a work in progress and its completion is subject to the adoption of the Local Plan and Infrastructure Delivery Schedule November

More information

Cycle Routes. Traffic Advisory Leaflet 3/95 March Introduction. Implementation. Project aims. Design

Cycle Routes. Traffic Advisory Leaflet 3/95 March Introduction. Implementation. Project aims. Design Traffic Advisory Leaflet 3/95 March 1995 Cycle Routes Introduction The leaflet summarises the findings of the Cycle Routes Programme. This research was undertaken for the Department of Transport by the

More information

WHANGAREI IMPROVEMENTS

WHANGAREI IMPROVEMENTS WHANGAREI IMPROVEMENTS PROJECT OVERVIEW The NZ Transport Agency (NZTA) is working with Whangarei District Council (WDC) to improve the state highway through Whangarei. In addition to the recently completed

More information

Local Highway Panels Members Guide. 9 Public Rights of Way

Local Highway Panels Members Guide. 9 Public Rights of Way Local Highway Panels Members Guide 9 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction There are 3927km of (PROW) in Essex, and it is one of the most extensive networks in the country.

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Blyth Estuary Green Travel Project

Blyth Estuary Green Travel Project Blyth Estuary Green Travel Project Green Infrastructure Case Study Creating the UK s first Active Travel Town The Connect 2 Blyth Estuary Green Travel Project shows how green infrastructure can enable

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

HISTON ROAD Have your say on better public transport, cycling and walking journeys

HISTON ROAD Have your say on better public transport, cycling and walking journeys HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation

More information

Devonport City Cycling Network Strategy

Devonport City Cycling Network Strategy Devonport City Cycling Network Strategy 2010-2013 Devonport City Cycling Network Strategy Introduction In February 2010 a draft master plan for cycleways was presented to the community. The feedback received

More information

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route Dún Laoghaire Rathdown County Council Luas to Dart via UCD Cycle and Pedestrian Route October 2012 Luas to Dart via UCD Cycle and Pedestrian Route DOCUMENT CONTROL SHEET Client: Project Title: Document

More information

Chapter 7 - Rural Roads

Chapter 7 - Rural Roads Chapter 7 - Rural Roads Rural Roads On a significant length of the National Cycle Network cyclists will share rural roads with other traffic. The objective is to incorporate into the National Cycle Network

More information

A guide to how local communities can change local speed limits

A guide to how local communities can change local speed limits A guide to how local communities can change local speed limits The Council s approach to speed management Speeding continues to be one of the key road safety concerns being raised by local communities.

More information

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria, 1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology

More information

NCN 78 Benderloch to Ledaig Summary

NCN 78 Benderloch to Ledaig Summary NCN 78 Benderloch to Ledaig Summary Traffic-free Route Options Appraisal Summary Report Final Draft August 2016 About Sustrans Sustrans Scotland makes smarter travel choices possible, desirable and inevitable.

More information

MARKHOUSE ROAD IMPROVEMENTS

MARKHOUSE ROAD IMPROVEMENTS MARKHOUSE ROAD IMPROVEMENTS www.enjoywalthamforest.co.uk Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of 27million from Transport for London, we re delivering the

More information

Perne Rd / Radegund Rd Roundabout Cambridge

Perne Rd / Radegund Rd Roundabout Cambridge Perne Rd / Radegund Rd Roundabout Cambridge The conversion of an conventional urban roundabout to continental geometry A little bit of history The first traffic roundabout was built in Sollershott, Letchworth

More information

Scheme Category. Traffic Management. Traffic Management. Implementation LBAS ,000. Traffic Management. Traffic Management. Traffic Management

Scheme Category. Traffic Management. Traffic Management. Implementation LBAS ,000. Traffic Management. Traffic Management. Traffic Management 90,000 Ref Location Description Requested by Scheme Category Scheme stage Cost Code Estimated cost Comments RA London Road, Wickford close to no 63 2 Twinstead, Wickford 3 4 5 6 7 B48 Westmayne / Ford

More information

CYCLING TIME TRIALS The national governing body for CYCLING time trials

CYCLING TIME TRIALS The national governing body for CYCLING time trials CYCLING TIME TRIALS The national governing body for CYCLING time trials www.ctt.org.uk SOUTH DISTRICT COUNCIL COURSE DETAILS FOR START SHEETS & RISK ASSESSMENT INDEX Guidance Notes for Event Promoters

More information

Local Highway Panels Members Guide. 5 Crossing Facilities

Local Highway Panels Members Guide. 5 Crossing Facilities Local Highway Panels Members Guide 5 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction On the Network where there are sufficient crossing opportunities most individuals are able to cross

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

NW Bicester Masterplan. Access and Travel Strategy Appendix 2 Walking and Cycling Linkages

NW Bicester Masterplan. Access and Travel Strategy Appendix 2 Walking and Cycling Linkages NW Bicester Masterplan Access and Travel Strategy Hyder Consulting (UK) Limited 2212959 HCL House Fortran Road St Mellons Business Park St Mellons Cardiff CF3 0EY United Kingdom Tel: +44 (0)29 2092 6700

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

FAQ s Walsh Road / Ferguson Road Pilot Scheme

FAQ s Walsh Road / Ferguson Road Pilot Scheme FAQ s Walsh Road / Ferguson Road Pilot Scheme What is happening? Traffic calming measures are being installed as a pilot. Temporary Bollards will be installed to the east of 1 Ferguson Road and a Temporary

More information

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network Need for a strategy 1. The government s aim is to double cycling levels nationally by 2025 [note 1]. This would bring significant health, environmental, economic and traffic benefits [note 2]. It is widely

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

Cycle Lanes Dixon Street (Worksop Road to Crayne Street)

Cycle Lanes Dixon Street (Worksop Road to Crayne Street) Cycle Lanes Dixon Street (Worksop Road to Crayne Street) Purpose of the Report To seek a decision to continue the on-road cycle lanes from Worksop Road to Crayne Street along Dixon Street in conjunction

More information

Truro cycle transport - mapping and suggestions By Transition Truro

Truro cycle transport - mapping and suggestions By Transition Truro Truro cycle transport - mapping and suggestions By Transition Truro Preface This document has been produced by Transition Truro in response to a consultation exercise being undertaken by Cormac Solutions

More information

SCHEME DESIGN AND ENGINEERING

SCHEME DESIGN AND ENGINEERING THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL

More information

Kings Road, Herne Bay: Proposed Crash Remedial Measure

Kings Road, Herne Bay: Proposed Crash Remedial Measure Kings Road, Herne Bay: Proposed Crash Remedial Measure To: Canterbury Joint Transportation Board 17 February 2015 By: Classification: Ward: Tim Read - Head of Transportation Unrestricted Herne Bay Summary:

More information

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk; Cork County Council 7 th December 2018 Dear Adrian O Neill (aoneill@jbbarry.ie) The Transport and Mobility Forum, Cork (TMF) is a representative group of organisations who have a common interest in sustainable

More information

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS

More information

The Consultation has now ended.

The Consultation has now ended. The Consultation has now ended. We have received Cabinet Member approval to undertake implementation of the Baker Street Two Way scheme. You are not viewing the most recent documentation. Please visit

More information

North West Non-Technical Summary of the Transport Assessment September 2011

North West Non-Technical Summary of the Transport Assessment September 2011 North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North

More information

Developing a Safer Cycling Strategy for the ACT ACRS Conference August 2012

Developing a Safer Cycling Strategy for the ACT ACRS Conference August 2012 Developing a Safer Cycling Strategy for the ACT ACRS Conference 2012 Peter Strang Canberra Manager Sarah Court Transport Consultant 10 August 2012 Presentation Outline Background Data Analysis (Stage 1)

More information

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge. Milton Road and Histon Road corridors bus priority infrastructure 1. Purpose The County Council would like to understand in more detail, the options to deliver the most effective corridor-based public

More information

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018. Your Ref: Derby City Council Air Quality - Preferred Option Nov 2018 Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN Date: 20 th November, 2018. 1. Introduction: 1.1. Derby Cycling

More information

Local Highway Panels Members Guide. 2 Speed and Traffic Management

Local Highway Panels Members Guide. 2 Speed and Traffic Management Local Highway Panels Members Guide 2 Speed and Traffic Management 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction Following the publication of the DfT guidance on setting local speed

More information

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road)

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Public Consultation Report on Submissions Client: Dun Laoghaire-Rathdown County Council Date: May 2018 Job Number: 15_116B Clifton Scannell Emerson

More information

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION) APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION) West Midlands Interchange Transport Assessment DCO Submission WEST MIDLANDS INTERCHANGE SUBJECT: Technical Note 22 Review of Vicarage Road Junction

More information

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07-1 Connectivity and Choice Transport connectivity and mode choice are critical to achieving productive, sustainable and socially just cities. Travel

More information

Your views are important. Please fill in a form before you leave. Or alternatively

Your views are important. Please fill in a form before you leave. Or alternatively Drum Property Group is delighted to welcome you to this exhibition which sets out our initial proposals for a mixed-use development at Stead s Place, Edinburgh. We are keen to hear the views of local people

More information

Sevenways Roundabout, and the need for a Road Safety Scheme:

Sevenways Roundabout, and the need for a Road Safety Scheme: Sevenways Roundabout, and the need for a Road Safety Scheme: The way the current roundabout has evolved has obviously created an environment that is dangerous for all road users, motorists, cyclists and

More information

Improving the A1 in Northumberland Public consultation. November December North of Ellingham

Improving the A1 in Northumberland Public consultation. November December North of Ellingham A1 Improving the A1 in Northumberland Public consultation November December 2016 North of Ellingham Improving the A1 in Northumberland In autumn 2014, the government announced the first Road Investment

More information

Response to Argent s Revised Outline Planning Application for Kings Cross Central

Response to Argent s Revised Outline Planning Application for Kings Cross Central Response to Argent s Revised Outline Planning Application for Kings Cross Central Camden Cycling Campaign November 2005 This submission to Camden s Planning Department is from Camden Cycling Campaign (CCC),

More information

6.1 Infrastructure and Safety

6.1 Infrastructure and Safety 6.0 PROPOSED ACTIONS Following is lists of projects identified to achieve the vision and objectives of the Strategy. Projects are listed under three categories - Infrastructure and Safety, Monitoring,