3.16 TRANSPORTATION AND TRAFFIC
|
|
- Kelley Gibbs
- 6 years ago
- Views:
Transcription
1 3.16 TRANSPORTATION AND TRAFFIC This section describes transportation and traffic conditions in the planning area and analyzes the changes that would occur as a result of implementation of the proposed General Plan. Information presented in the discussion and subsequent analysis was drawn from technical analyses performed by Fehr & Peers and provided in Appendix H of this EIR. This analysis is consistent with the SANDAG Congestion Management Procedures EXISTING ENVIRONMENTAL SETTING Existing Roadway System The City of San Marcos transportation system consists of highways, streets, pedestrian paths, transit routes, and bikeways. The existing roadway network of the San Marcos planning area is shown in Figure The San Marcos circulation network is connected to a larger regional system. State Route 78 (SR-78) bisects the planning area into north and south sections. SR-78 carries west- and east-bound travel lanes connecting to Interstate 5 (I-5) to west, to Interstate 15 (I-15) to the east, and provides access to destinations throughout southern California through these connections. Within the planning area, access to SR-78 is provided from S. Rancho Santa Fe Road, Las Posas /Via Vera Cruz, San Marcos Boulevard, Twin Oaks Valley Road, E. Barham Drive/Woodland Parkway, and Nordahl Road. Surface streets connect San Marcos to the cities of Vista, Carlsbad, Escondido and unincorporated areas of the county. Roadway Classification Standards The planning area was developed with established traffic patterns. Some of the communities currently undergoing development do not yet have fully established traffic patterns. The planning area roadway system includes a range of facilities serving both regional and local connectivity. The current street classification in the planning area roadway system includes a state freeway; prime arterials, major arterials, rural arterials, secondary arterials; industrials, collector streets; local access streets; and private streets. Two major functions of a roadway are to serve through-traffic and to provide access to adjacent property, and roadways prioritize these two functions differently. Arterials, which mostly consist of the bigger roadways, generally prioritize the movement of traffic over access to individual adjacent properties. Local streets, which mostly consist of smaller roadways, prioritize access to private properties over through-traffic. Roadways are also intended to provide bicycle and pedestrian access and circulation, and are the backbone of the bicycle and pedestrian network. Figure illustrates the major routes and street typologies of the San Marcos roadway system, and displays the functional classification for each of these roadways. The entire current roadway system is categorized below. San Marcos General Plan EIR November 2011
2 Figure City of San Marcos Existing Roadway Network
3 Regional System Freeways are intended to serve inter-regional travel, carry traffic efficiently from one end of the city to the other, and/or provide connections from one city to other cities and counties. Freeways are accesscontrolled with two or more lanes in each direction. The one major freeway that provides direct access to and from the City is State Route 78 (SR-78). Interstate 15 (I-15) and Interstate 5 (I-5) provide indirect access to and from the City, by way of SR-78. SR-78 has three lanes, in general, in each direction in the vicinity of San Marcos, and it provides direct access to and from the City via on- and off-ramps located at Rancho Santa Fe Road, Via Vera Cruz/Las Posas Road, San Marcos Boulevard, Twin Oaks Valley Road, Barham Drive/Woodland Parkway and Nordahl Road. SR-78 generally runs in the east-west direction through the City. Traveling westbound, SR-78 originates at the I-15 interchange in the City of Escondido; westbound, it terminates at the I-5 interchange in the City of Oceanside. In addition, I-15 and I-5 provide indirect access to and from the City by way of interchanges with State Route 78 (SR-78). Both I-15 and I-5 generally run in the north-south direction, and provide a means of inter-regional travel, as the freeways travel to the north into Riverside and Orange County, respectively. Both I-15 and I-5 have four lanes, in general, in each direction where they intersect with SR-78. These freeways serve as the foundation of San Marcos regional transportation network. Arterials Arterials are designed to move large volumes of traffic and provide a high level of mobility between major residential, employment, and activity centers. They are also intended to move traffic between freeways and local/collector roads. They are intended not just for motor vehicle circulation but also for transit, bicycle and pedestrian circulation. The San Marcos General Plan provides general guidance for the form and function of arterial roadways and divides arterial roadways into four different sub-categories: prime, major, secondary and rural. The prime, major, secondary and rural arterials, together with the freeways, form a network carrying relatively long-distance, high-speed traffic; a secondary arterial provides service for trips of moderate length at somewhat slower speeds than major arterials. Additionally, major arterial roadways provides for at least four travel lanes, a raised or painted median, and bike lanes, whereas a minor arterial roadway provides two travel lanes and bike lanes. Parking is prohibited on arterials. The existing major arterials are discussed below and identified in Figure Twin Oaks Valley Road/San Elijo Road is a north-south arterial that has two to eight lanes throughout the planning area. Twin Oaks Valley Road extends from unincorporated San Diego County through the City of San Marcos, and transitions to San Elijo Road in the San Elijo Hills community. Within the City of San Marcos, it fluctuates between a two-lane facility (to the north) and an eight-lane facility (near SR- 78). Twin Oaks Valley Road is classified in the General Plan as a six-lane prime arterial from Border Road to Village Drive, and as a four-lane major arterial south of Village Drive. San Marcos General Plan EIR November 2011
4 Rancho Santa Fe Road is a north-south arterial that has four to six lanes throughout the planning area. Rancho Santa Fe Road extends from Mission Road to the Carlsbad city limits. The San Diego Association of Governments (SANDAG) Congestion Management Plan (CMP) classifies Rancho Santa Fe Road as a Regionally Significant Arterial (RSA). Las Posas Road is a north-south arterial that has four to six lanes throughout the planning area. Las Posas Road extends from the City of San Marcos s northern boundary and terminates a few hundred feet south of San Marcos Boulevard. Mission Road is an east-west arterial that has four to six lanes throughout the Planning area. Mission Road extends east from Rancho Santa Fe Road across the City of San Marcos into Escondido. West of Rancho Santa Fe Road, Mission Road becomes South Santa Fe Avenue. San Marcos Boulevard is an east-west arterial that has four to six lanes throughout the City. San Marcos Boulevard extends east from Business Park Drive at the City s western boundary to Mission Road in the eastern portion of the City. San Marcos Boulevard is designated as a six-lane prime arterial in the City of San Marcos. The SANDAG CMP classifies San Marcos Boulevard as an RSA. Barham Drive generally runs in an east-west direction and has two to five lanes throughout the City. Barham Road extends east from Twin Oaks Valley Road and terminates at Mission Road in the City of Escondido. Nordahl Road generally travels in a north-south direction and has two to four lanes throughout the planning area. Woodland Parkway is a north-south arterial that has two to four lanes throughout the planning area. Woodland Parkway extends south from Borden Road at the San Marcos-Escondido city boundary and terminates at Barham Drive. Discovery Street generally runs in an east-west direction with two-lanes. Discovery Street extends from San Marcos Boulevard to Craven Road/Bent Avenue. Collectors Collectors are intended to collect traffic from local roadways and carry it to roadways higher in the street classification hierarchy. These roadways serve as intermediaries between arterials and local roads, and provide direct access to parcels in both residential and non-residential areas. These roadways typically have one lane of traffic in each direction and can carry a maximum of up to 15,000 vehicles daily. San Marcos General Plan EIR November 2011
5 Neighborhood Streets Neighborhood streets are intended to serve adjacent properties and should enhance community livability. These roadways provide direct access to properties and connect to collectors and secondary arterials. They carry limited through-traffic. Speed limits on local roadways normally do not exceed 25 miles per hour. These roadways typically carry less than 1,000 vehicles per day, and through-traffic is discouraged. Private Streets Many developments within the City are connected to the neighborhood street system by means of private streets. Although the maintenance of these facilities is not the responsibility of the City, the design of all private streets is reviewed by the City Engineer, in conformance to San Marcos s Roadway Design Standards. PERFORMANCE CRITERIA LEVEL OF SERVICE STANDARDS The performance criteria used in San Marcos are based on two primary measures. The first is capacity, which establishes the vehicle carrying ability of a roadway and the second is volume. The volume measure is either a traffic count (in the case of existing volumes) or a forecast for a future point in time. The ratio between the volume and the capacity give a volume/capacity (V/C) ration and based on that V/C ratio, a corresponding level of service is determined. A level of service scale is used to evaluate roadway performance based on V/C ratios. The level of service (LOS) levels range from A to F, with LOS A representing free flow conditions and LOS F representing severe traffic congestion. Generally, level of service descriptions are described below in terms of driver experience: LOS A represents free flow travel for vehicles. Individual users are virtually unaffected by others in the traffic stream. LOS B represents stable flow, but the presence of other users in the traffic stream begins to be noticeable. LOS C represents a range in which the influence of traffic density on operations becomes noticeable. The ability to maneuver within the traffic stream and to select an operating speed is now clearly affected by the presence of other vehicles. LOS D borders on unstable flow. Speeds and ability to maneuver are severely restricted because of traffic congestion. LOS E represents unstable operating conditions at or near the capacity level where maneuverability is severely limited. LOS E represents at capacity operations. LOS F is used to define forced or a breakdown traffic flow where unsignalized and signalized intersections exceed 50 and 80 seconds of delay, respectively. San Marcos General Plan EIR November 2011
6 Various level of service standards have been established to evaluate observed traffic conditions, future development plans, and street network modifications. At the regional planning level, SANDAG specifies LOS E as the operating standard for CMP intersections in San Diego County. At the local level, evaluation of volumes, capacities, and levels of service on the planning area street system is based on peak hour intersection data, since intersections are the primary limiting factor affecting traffic flow on surface streets. Table provides descriptions of traffic flow characteristics associated with each level of service. The proposed General Plan establishes vehicular LOS D as an acceptable level of operations based on street typology for the freeway, industrial streets, Mission Road, Rancho Santa Fe Road, and Twin Oaks Valley Road; a vehicular LOS E is acceptable for San Marcos Boulevard (between Discovery and Grand), Collector Streets, Neighborhood Streets, and Main Street (within the University District); a Flexible LOS allowing LOS below those identified above, is allowed in the core of San Marcos and where it is considered environmentally, politically, or socially infeasible to provide acceptable service levels. For vehicles, the Mobility Element identifies flexible LOS standards will be needed on, Rancho Santa Fe Road, and Twin Oaks Valley Road. Figure presents existing planning area roadway segments ADT and LOS. Table Signalized and Unsignalized Intersection Level of Service Criteria Level of Service A B C D E F Description Operations with very low delay occurring with favorable progression and/or short cycle length. Operations with low delay occurring with good progression and/or short cycle lengths. Operations with average delays resulting from fair progression and/or longer cycle lengths. Individual cycle failures begin to appear. Operations with longer delays due to a combination of unfavorable progression, long cycle lengths, or high V/C ratios. Many vehicles stop and individual cycle failures are noticeable. Operations with high delay values indicating poor progression, long cycle lengths, and high V/C ratios. Individual cycle failures are frequent occurrences. This is considered to be the limit of acceptable delay. Operation with delays unacceptable to most drivers occurring due to over saturation, poor progression, or very long cycle lengths. Signalized Average Control Delay per Vehicle (Seconds) Unsignalized Average Control Per Vehicle (Seconds) < 10.0 < 10.0 > 10.0 to 20.0 > 10.0 to 15.0 > 20.0 to 35.0 > 15.0 to 25.0 > 35.0 to 55.0 > 25.0 to 35.0 > 55.0 to 80.0 > 35.0 to 50.0 > 80.0 San Marcos General Plan EIR November 2011
7 BUENA CREEK RD ,, N:\Projects\OC_Projects\OC \Fig2_ExRoadwaySegmentADTandLOS.mxd 1 6, ,, MELROSE DR RANCHO SANTA FE RD SAN ELIJO RD ELFIN FOREST EAST LAKE RIDGE DR 3 2,, , , SECURITY PL 2 8, S PACIFIC ST LINDA VISTA DR 3 0, GRAND AV LA MIRADA DR VIRGINIA PL DESCANSO AV 1 2,, OLEANDER AV SMILAX RD S SANTA FE AV BUENA CREEK RD ,, , LAS POSAS RD QUESTHAVEN RD DISCOVERY ST S BENT AV VIA VERA CRUZ 33 99,, LOS VALLECITOS BL 3 0, , MISSION RD N LAS POSAS RD SAN ELIJO RD 1 9, S TWIN OAKS VALLEY RD CRAVEN RD BARHAM DR ,, ,, W SAN MARCOS BL KNOLL RD 1 5, RICHMAR AV BORDEN RD 2 5, WOODWARD ST 2 4, N TWIN OAKS VALLEY RD 11 11,, }þ78 2 1, MULBERRY DR E LA CIENEGA RD OLIVE ST CORONADO HILLS DR LA MOREE RD E MISSION RD ROSE RANCH RD RICHLAND RD RANCHEROS DR 1 4,, WOODLAND PY BORDEN RD CENTER DR BENNETT AV KNOB HILL RD ROCK SPRINGS RD 9,, NORDAHL RD MISSION RD MONTIEL RD 15 FIGURE 1 EXISTING ROADWAY SEGMENT ADT AND LEVEL OF SERVICE (LOS) Figure City of San Marcos NOT TO SCALE N Existing Roadway Segment ADT and LOS Sphere of Influence # Average Daily Traffic C D F # A - B Level of Service LEGEND
8 This page intentionally left blank. San Marcos General Plan EIR November 2011
9 EXISTING TRAFFIC CONDITIONS The existing average daily traffic (ADT) volumes on the circulation system are illustrated in Figure The level of service was calculated for key roadway segments in San Marcos regional roadway system to evaluate existing traffic conditions. Daily capacity thresholds are in accordance with the SANTEC/ITE guidelines, and are shown in Table This table establishes the daily roadway capacities by street typology. Table summarizes existing daily roadway volumes and LOS. The San Marcos Boulevard, east of Rancho Santa Fe Road, roadway segments were identified as operating at LOS F based on existing geometrics and daily volume capacities. It should be noted that, although the volume to capacity assessment for San Marcos Boulevard indicates that it is operating at an unacceptable level, the City has recently implemented adaptive signal synchronization along the San Marcos Boulevard corridor. As such, the facility operates much more efficiently with higher capacity than the capacity assessment indicates. Table Daily Roadway Segment Capacity Typical Lane Vehicular Level of Service Street Typology Configuration LOS A LOS B LOS C LOS D LOS E Arterial 8 lanes 29,200 40,800 58,300 64,200 70,000 Arterial 6 lanes 25,000 35,000 50,000 55,000 60,000 Arterial with Class II or Class III Bike Lanes 4 lanes 15,000 21,000 30,000 35,000 40,000 Arterial with Enhanced Bike Facilities 4 lanes 15,000 21,000 30,000 35,000 40,000 Multi-Way Boulevard 4 lanes for through trips, two lanes for local 16,800 25,200 31,500 37,800 42,000 serving trips 1 Industrial Collector 4 lanes 10,000 14,000 20,000 25,000 30,000 Collector& Main Street 2 lanes plus TWLTL 5,000 7,000 10,000 13,000 15,000 Collector & Main Street 2 lanes 2 2,500 3,500 5,000 6,500 8,000 Freeway Mixed-Flow Lane ,760 1,980 2,200 Freeway HOV Lanes ,440 1,620 1,800 Note: These are general capacities for planning purposes. Specific operational characteristics, such as signal coordination, can enhance operations significantly. 1 LOS thresholds were calculated based on V/C ratios of the daily threshold volumes for the corresponding roadway classification. Multi-way boulevard capacity assumes a similar capacity as a 4-lane arterial plus an additional 1,000 ADT capacity per lane for the local service roadway. 2 With fronting commercial or residential property 3 Per lane capacities presented. Source: SANTEC/ITE Guidelines for Traffic Impact Studies in the San Diego Region, San Marcos General Plan EIR November 2011
10 Roadway Santa Fe Avenue Rancho Santa Fe Road Table Daily Roadway Volumes and Levels of Service Segment Classification Lanes LOS D Capacity ADT LOS West of Smilax Road 1 Collector 2 13,000 Future -- West of Rancho Santa Fe Road Major 4 35,000 13,980 A between Mission Road and Capalina Road Major 4 35,000 12,540 A between Grand Avenue and Linda Vista Drive Major 4 35,000 30,890 D between Grandon Avenue and Security Place Major 4 35,000 28,960 C South of San Marcos Boulevard Major 4 35,000 32,140 D between Melrose Drive and San Elijo Road Prime 6 55,000 26,640 B San Elijo Road East of Rancho Santa Fe Road Major 4 35,000 16,180 B North of Borden Road 1 Major 2 13,000 Future -- Las Posas Road North of Descanso Avenue Prime 6 55,000 30,310 B North of Linda Vista Drive Major 4 35,000 8,450 A North of Windy Way 2 Rural 4 35,000 24,950 C North of Richmar Avenue Major 4 35,000 25,490 C Twin Valley Oaks Road Woodland Parkway between San Marcos Boulevard and SR-78 WB Ramp Prime 6 55,000 36,120 C North of Barham Drive Prime 8 64,200 29,810 B South of South Village Drive Major 5 40,000 14,220 A South of El Norte Parkway Major 4 35,000 9,300 A North of Mission Road Major 4 35,000 14,330 A Borden Road East of Vineyard Road 2 Collector 2 13,000 Future -- East of Las Posas Road Major 4 35,000 17,400 B West of Aberdeen Avenue Major 4 35,000 19,170 B Mission Road between Knoll Road and Fitzpatrick Road Major 4 35,000 15,730 B East of Mulberry Drive Prime 6 55,000 21,370 A West of Rancho Santa Fe Road Major 5 40,000 29,470 C San Marcos Boulevard Rancho Santa Fe Road to Bent Avenue between Bent Avenue and Grand Avenue Major 4 35,000 44,640 F Prime 6 55,000 39,520 C Discovery Street West of Twin Valley Oaks Road 2 Collector 2 13,000 Future -- West of La Moree Road Major 5 40,000 11,440 A Barham Drive East of Twin Valley Oaks Road 2 Major 5 40,000 Future -- 1 Roadway segment would be analyzed in future scenario as a two lane roadway within a right of way consistent with the County of San Diego s General Plan. 2 The Level of Service of the roadway segment is analyzed using the criteria of Major Arterial (4 lanes). San Marcos General Plan EIR November 2011
11 The incorporated City of San Marcos has 31 major intersections including 11 freeway ramps that have been evaluated based on input received from City Staff. Figure a and b shows locations and existing traffic volumes at each study intersection. Figure provides the roadway geometry for each of these intersections along with traffic control and the speed limit on each approach. Of the 31 major intersections within the City, 28 intersections are signalized, one is Side-Street-Stop-Controlled (SSSC) and two are All-Way-Stop-Controlled (AWSC). In conformance with the SANTEC/ITE traffic study guidelines, existing AM and PM peak hour operating conditions for the signalized and unsignalized intersections were evaluated using the 2000 Highway Capacity Manual (Transportation Research Board, 2000) methodology. The Traffix software package was used to evaluate the study intersections using the HCM methodology. Table provides the study intersections and level-of-service during the AM and PM peak hours. In general, all the 31 study intersections operate at LOS D or better during both of the peak periods. Parking Parking availability is important for the overall quality of life in San Marcos and the vitality of taxgenerating commercial, retail, entertainment and service uses. A lack of parking frustrates residents, businesses, and visitors, while too much parking wastes valuable land and impedes the area s economic, aesthetic, and environmental objectives. Greater management of parking spaces in the planning area can help achieve mobility, environmental, and community development goals. As portions of the planning area develop or redevelop, additional parking may be necessary to accommodate greater intensity of development. Current parking standards of the Zoning Ordinance, as compared to similar jurisdictions and updated parking codes, provide marginally less parking for commercial uses and marginally more parking for public and service uses. Utilization and availability of parking within the planning area are adequate for standard daily use. Alternative Transportation Public transportation and alternative modes of travel are an important component of a comprehensive circulation system. Public and alternative modes of transportation offer an alternative to the use of automobiles and help reduce air pollution and road congestion. To promote the increased usage of these modes of transportation, adequate facilities are required. Public Bus Service Public bus service in San Marcos is operated by North County Transit District (NCTD). Figure indicates the location of NCTD BREEZE bus routes serving the planning area. Bus routes provide access within San Marcos and provide connective access to other Cities including Vista, Carlsbad, Encinitas and Escondido. These routes link housing, jobs, higher education campuses, retail and recreation areas in the planning area and the greater North County area. NCTD currently operates six fixed Breeze bus service San Marcos General Plan EIR November 2011
12 Intersection Table Existing Intersection Level of Service Signal Control AM Peak Hour PM Peak Hour Delay LOS Delay LOS 1. Smilax Road/Poinsettia Avenue AWSC 11.0 B 11.5 B 2. Smilax Road/Mimosa Avenue SSSC 12.6 B 12.8 B 3. Rancho Santa Fe Road/Santa Fe Avenue/ Mission Road Signalized 22.9 C 25.3 C 4. Rancho Santa Fe Road/SR-78 Westbound Ramps Signalized 29.7 C 26.7 C 5. Rancho Santa Fe Road.SR-78 Eastbound Ramps Signalized 21.3 C 20.8 C 6. Rancho Santa Fe Road/Linda Vista Drive Signalized 17.1 B 18.5 B 7. Rancho Santa Fe Road/San Marcos Boulevard Signalized 30.6 C 39.7 D 8. Rancho Santa Fe Road/Melrose Drive Signalized 31.8 C 28.7 C 9. Rancho Santa Fe Road/San Elijo Road Signalized 24.7 C 37.0 D 10. Las Posas Road/Mission Road Signalized 34.1 C 41.8 D 11. Las Posas Road/SR-78 Westbound Ramps Signalized 27.9 C 34.2 C 12. Las Posas Road/Grand Avenue Signalized 24.3 C 31.6 C 13. SR-78 Eastbound Ramps/Via Vera Cruz/ Grand Avenue Signalized 34.8 C 37.5 D 14. Las Posas Road/San Marcos Boulevard Signalized 20.2 C 32.0 C 15. Grand Avenue/San Marcos Boulevard Signalized 12.6 B 32.7 C 16. SR-78 Eastbound Ramps/San Marcos Boulevard Signalized 14.9 B 22.7 C 17. Knoll Road/Mission Road Signalized 19.3 B 23.1 C 18. SR-78 Westbound Ramps/Knoll Road/ San Marcos Boulevard Signalized 34.9 C 34.0 C 19. Buena Creek Road/Twin Oaks Valley Road Signalized 18.7 B 22.3 C 20. Borden Road/Twin Oaks Valley Road Signalized 45.6 D 21.8 C 21. Twin Oaks Valley Road/San Marcos Boulevard Signalized 36.2 D 42.1 D 22. San Marcos Boulevard/Mission Road Signalized 29.2 C 28.8 C 23. Twin Oaks Valley Road/SR-78 Westbound Ramps Signalized 17.6 B 15.2 B 24. Twin Oaks Valley Road/SR-78 Eastbound Ramps Signalized 39.1 D 27.3 C 25. Twin Oaks Valley Road/Barham Drive Signalized 27.3 C 27.9 C 26. Twin Oaks Valley Road/Craven Drive Signalized 29.7 C 34.3 C 27. SR-78 Eastbound Off-Ramp/Barham Drive Signalized 22.2 C 16.4 B 28. SR-78 Westbound Ramps/Rancheros Drive AWSC 15.8 C 17.3 C 29. Woodland Parkway/Mission Road Signalized 33.1 C 32.6 C 30. Nordahl Road/SR-78 Westbound Ramps Signalized 24.8 C 26.4 C 31. Nordahl Road/SR-78 Eastbound Ramps Signalized 24.9 C 26.8 C Source: Fehr & Peers 2011 routes that provide access from, to and within the planning area; routes are identified and summarized on Table Routes 304, 305, 347 and 445 all serve or stop at the Palomar Community College Transit Station providing increased transit accessibility by connecting to the SPRINTER Rail line and Coaster/Amtrak lines via Poinsettia Station in Carlsbad. San Marcos General Plan EIR November 2011
13 Figure a City of San Marcos Existing Peak Hour Traffic Volumes
14 This page intentionally left blank. San Marcos General Plan EIR November 2011
15 Figure b City of San Marcos Existing Peak Hour Traffic Volumes (Cont.)
16 This page intentionally left blank. San Marcos General Plan EIR November 2011
17 Figure City of San Marcos Intersection Geometry
18 Table NCTD Bus Routes Serving San Marcos (2011) Route Description Communities Served 304/ San Marcos to Encinitas via Rancho Santa Fe Road Escondido to Vista Transit Center via Mission Road 332 South Vista and Vista Business Park California State University San Marcos Shuttle Escondido to Palomar Community College via California State University San Marcos Access to Encinitas from Business/Industrial, Lake San Marcos, Questhaven/La Costa along Rancho Santa Fe Road Access through San Marcos to Escondido and Vista from Business/Industrial District, College Area, Richmar, and Richland neighborhoods Access to Vista from Business/Industrial District at Poinsettia/La Mirada CSUSM on-campus only Access from Palomar Community College through San Marcos to Escondido from College, Business/Industrial District, Barham/Discovery Community, and Richland Neighborhood 358/359 El Norte Parkway into Escondido Minimal access from Richland to Escondido Carlsbad Poinsettia Coaster 445 Connection Source: From Palomar Community College Transit Station through San Marcos and Carlsbad to the Poinsettia Station. Passenger Rail Service There are two major rails lines serving the planning area. Figure indicates the location of passenger rail service in San Marcos. One of the major rail lines provides direct service to San Marcos. This line is referred to as The SPRINTER, and is considered a light-rail passenger service that operates from approximately 4 am-9 pm Monday through Friday with service every 30 minutes in both directions. Service runs every 30 minutes for westbound trips between 9:33 am and 5:33 pm and for eastbound trips between 10:33 am and 6:33 pm, with hourly service before and after these times, in the mornings and evenings on Saturdays, Sundays and Holidays. Transit Stations serving the SPRINTER are located at the Buena Creek, Palomar Community College, San Marcos Civic Center, California State University San Marcos, and Nordahl Road areas within the vicinity of San Marcos. The SPRINTER provides services from the Oceanside Transit Center to the Escondido Transit Center. In between the transit centers, it also provides service to the City of Vista. Free parking lots are available at all Transit Stations, except for the California State University San Marcos and the San Marcos Civic Center Transit Stations. The SPRINTER offers easy connections to Breeze network. The other major rail line that provides indirect service to San Marcos is the Coaster. The Coaster is considered a commuter rail passenger service that operates from approximately 5 am to 8 pm Monday through Friday. Service during the AM peak period is provided with approximate headways of 27 to 37 minutes traveling southbound, from Oceanside. Service during the PM peak period is provided with approximate headways of 30 to 45 minutes traveling northbound, from Downtown San Diego. The Coaster provides indirect service to San Marcos, via the SPRINTER and the Breeze. In order to travel between San Marcos and Downtown San Diego, riders must transfer to the Coaster at the Oceanside San Marcos General Plan EIR November 2011
19 Figure City of San Marcos NCTD and Transit Routes
20 Transit Center. In between San Marcos and Downtown San Diego, the Coaster provides service to Old Town San Diego, Sorrento Valley, Solana Beach, Encinitas, Carlsbad Poinsettia, and Carlsbad Village. Parking is available free of charge at all stations, except for the Downtown San Diego at Santa Fe Depot station, where metered parking is available. The Coaster rail line west of I-5 provides indirect service to San Marcos. Residents can access the Coaster by public transit through two connection routes. From Palomar Community College Transit Station, riders can access the Coaster via NCTD Breeze route 445 connecting to the Poinsettia Station. The SPRINTER from any of the four San Marcos stations will connect to the Coaster via the Oceanside Transit Center. The Coaster rail line connects San Marcos to the greater San Diego region and shares tracks with AmTrak, allowing access to California and the Pacific Northwest. Bikeways San Marcos updated the San Marcos Bicycle Master Plan in 2001 identifying existing and planned bikeway facilities. Existing bikeways serve all San Marcos communities and limited areas of the SOI. There are several Class I Bikeway facilities in the planning area. Several of the facilities are of considerable length, such as those facilities along Melrose Drive, San Elijo Road, Twin Oaks Valley Road, La Cienega Road, and north of the intersection of Rancho Santa Fe Road and South Santa Fe Avenue/Mission Road. It should be noted that, although many of the Class I facilities are paved, some are comprised of compacted decomposed granite (DG).In addition, the Inland Rail Trail from the East City Limits to Pacific Street is also designated as a Class I Bikeway. There are several Class II Bikeway facilities, as well. Most of the facilities run along the major arterials within the City, such as Rancho Santa Fe Road, San Marcos Boulevard, Twin Oaks Valley Road, Mission Road, and Barham Drive. There are only short segments of Grand Avenue, Richland Road, Knob Hill Road etc. that are classified as a Class III facility. Figure provides an overview of existing bicycle facilities in San Marcos. Pedestrian and Trail Facilities Pedestrian paths are primarily developed as part of the roadway and trail systems of a city and reflect the interconnected nature of circulation and transportation systems as a whole. Currently sidewalks are provided along most of the major routes within the City. However, there are some gaps especially in the older areas and in the Business/Industrial District and Barham/Discovery Community and Richland neighborhoods predating In addition, in order to provide safe routes to school for San Marcos students and residents, the City recently completed improvements to Rock Springs Road and Richland Road. The project involved construction of curb, gutter, sidewalks, medians, a roundabout, road improvements and associated work along Rock Springs Road from Richland Road to Woodland Parkway. The project also includes sidewalk along the west side of Richland Road from Elizabeth Street to Mission Hills High School. The project was completed in Spring/Summer in The planning area has an integrated trail system that aims to provide recreational access and alternative circulation for non-motorized users through an interlinked city-wide system of trails connecting San Marcos General Plan EIR November 2011
21 Figure City of San Marcos Existing and Proposed Bicycle Routes and Facilities
22 neighborhoods to local and amusing parks, schools, Palomar Community College and CSUSM. The system is also designed to connect with the wider regional trails system as planned by adjacent cities, such as Carlsbad, Vista, Escondido, and Encinitas, and the County of San Diego. Figure provides an overview of existing and future trail facilities within the City. According to the City of San Marcos Master Trails Plan (adopted in 1991), two types of trail corridors have been designated: an Urban Trail corridor, and a Multi-Use Trail corridor. The Urban Trails provide recreation and alternative means of circulation for bicyclists and pedestrians located primarily in the more intensively developed valley areas of the City. The Multi-use Trails provide recreational access to the less intensively developed areas of the City for bicyclists, pedestrians, and equestrians. The trails are located throughout the City, totaling approximately 102 miles of trails according to the Master Trails Plan. Of the 102 miles of trail proposed in the Master Trails Plan, approximately 21 miles would be designated Urban Trails, while the remaining 81 miles would be designated as Multiuse Trails. The system currently has 58 miles of constructed trails. Even though bikeway master plans specifically address bicycle facilities on paved road-ways, a community s trails are relevant, even if they are unpaved and are not intended to meet Caltrans bikeway standards. This is especially true wherever connections can be made that enhance intra-community connectivity by linking the two systems. Therefore, these two non-motorized systems can be regarded as complementary extensions of each other. Truck Routes and Freight Currently, there are 9 truck routes in the planning area, which are listed below: Mission Road from Rancho Santa Fe Road to the eastern City limits South Santa Fe Avenue; from Rancho Santa Fe Road to the western City limits Grand Avenue; from Rancho Santa Fe Road to Las Posas Road (in the future, the truck route will extend along the Grand Avenue southerly extension to the future Discovery Street extension) Linda Vista Drive, from Rancho Santa Fe Road to Las Posas Road Barham Drive, from the future Discovery Street extension at Twin Oaks Valley Road to the eastern City Limit Rancho Santa Fe Road, from the southern City Limit to Mission Road Las Posas Road, from Linda Vista Drive to Mission Road Twin Oaks Valley Road, from Barham Drive to San Marcos Boulevard Woodland Parkway; from Mission Road to Barham Road Truck routes are subject to public hearings and consideration by the Traffic Safety Commission and City Council prior to their adoption. Figure identified existing truck routes. San Marcos General Plan EIR November 2011
23 Figure City of San Marcos Existing and Proposed Trails
24 The freight line that runs through San Marcos is parallel to SR-78. The freight rail line is operated by Burlington Northern Santa Fe (BNSF). The rail right-of-way is used by both freight and commuter (SPRINTER) rail services. BNSF is one of the largest railway companies in the United States with more than 390 different railroad lines. Aviation Facilities The two nearby airports McClellan-Palomar Airport located 2.5 miles west of the planning area boundary, and San Diego International Airport (SDIA)/Lindbergh Field located approximately 35 miles south of the City, offer air service to the City. McClellan-Palomar Airport is a gateway to and from San Diego s North County, which is a general aviation airport used primarily for business and recreational purposes. Lindbergh Field is the region s primary commercial airport. One heli-pad owned and utilized by the San Diego County Sherriff s Department existing within the planning area REGULATORY SETTING The following provides a general description of the applicable regulatory requirements for the planning area, including federal, state, regional, and local guidelines. Federal Regulations Department of Transportation Act of 1966 Section 4(f) of the Department of Transportation Act of 1966 specifies that a transportation project requiring the use of publicly owned parks, recreation areas, historic sites (including those owned privately), wildlife and waterfowl refuges, and many other types of resources can be approved only if there is no feasible and prudent alternate to using that land and if the project is planned to minimize harm to the property. General procedures are as follows: A specific finding is required. Section 4(f) lands may be used for Federal Aid highways only if: 1. There is no prudent and feasible alternative to using that land; and 2. The program or project includes all possible planning to minimize harm to the park, recreation area, wildlife and waterfowl refuge, or historic site resulting from the use. Each project proposal must include a Section 4(f) avoidance alternative (Caltrans 2011). Surface Transportation Assistance Act (STAA) In 1982, the federal government passed the Surface Transportation Assistance Act (STAA). This act requires states to allow larger trucks on the National Network, which is compared of the Interstate San Marcos General Plan EIR November 2011
25 Figure City of San Marcos Existing and Future Truck Routes
26 This page intentionally left blank. San Marcos General Plan EIR November 2011
27 System plus the non-interstate Federal-Aid Primary System. Larger trucks includes (1) doubles with 28.5 foot trailers, (2) singles with 48-foot semi-trailers and unlimited kingpin-to-rear axle (KPRA) distance, (3) unlimited length for both vehicle combinations, and (4) widths up to 102 inches. SR-78 in the planning area is defined as STAA routes. State Regulations California Department of Transportation (Caltrans) Caltrans is the primary state agency responsible for transportation issues. One of its duties is the construction and maintenance of the state highway system. Caltrans has established standards for roadway traffic flow and has developed procedures to determine if intersections require improvements. For projects that may physically affect facilities under its administration, Caltrans requires encroachment permits before any construction work may be undertaken. For projects that would not physically affect facilities, but may influence traffic flow and levels of services at such facilities, Caltrans may recommend measures to mitigate the traffic impacts of such projects. California Transportation Commission (CTC) The CTC consists of nine members appointed by the Governor. CTC is responsible for the programming and allocating of funds for the construction of highway, passenger rail, and transit improvements throughout the state. CTC is responsible for adopting the State Transportation Improvement Program and the State Highway Operation and Protection Program. Assembly Bill (AB) 32 With AB 32, the Global Warming Solutions Act of 2006, the State of California committed itself to reducing greenhouse gas (GHG) emissions to 1990 levels by The California Air Resources Board (CARB) is coordinating the response to comply with AB 32. In 2007, CARB adopted a list of early action programs that could be put in place by January 1, In 2008, CARB defined its 1990 baseline level of emissions, and by 2011 it will complete its major rule making for reducing GHG emissions. Rules on emissions, as well as market-based mechanisms like the proposed cap and trade program, will take effect January 1, On December 11, 2008, CARB adopted its Proposed Scoping Plan for AB 32. This scoping plan included the approval of Senate Bill (SB) 375 as the means for achieving regional transportation-related GHG targets. SB 375 provides guidance on how curbing emissions from cars and light trucks can help the state comply with AB 32. SB 375 SB 375 has four key components. First, SB 375 requires regional GHG emissions targets. CARB s Regional Targets Advisory Committee will guide the adoption of targets to be met by 2020 and 2035 for San Marcos General Plan EIR November 2011
28 each Metropolitan Planning Organization (MPO) in the state. For Cal Poly Pomona, the MPO is the SCAG (see below). These targets, which MPOs may propose themselves, will be updated every 8 years in conjunction with the revision schedule for housing and transportation elements. Second, MPOs will be required to create a Sustainable Communities Strategy (SCS) that provides a plan for meeting regional targets. The SCS and the Regional Transportation Plan (RTP) must be consistent with each other, including action items and financing decisions. If the SCS does not meet the regional target, the MPO must produce an Alternative Planning Strategy that details an alternative plan to meet the target. Third, SB 375 requires that regional housing elements and transportation plans (also prepared by SCAG as the MPO for Los Angeles) be synchronized on 8-year schedules. In addition, Regional Housing Needs Assessment allocation numbers must conform to the SCS. If local jurisdictions are required to rezone land as a result of changes in the housing element, rezoning must take place within three years. Finally, MPOs must use transportation and air emissions modeling techniques consistent with guidelines prepared by the CTC. Regional Transportation Planning Agencies (such as SANDAG) are encouraged, but not required, to use t ravel demand models consistent with the CTC guidelines. The SANDAG region will be the first region in the State that will adopt a Sustainable Communities Strategies (SCS) and Regional Transportation Plan (RTP) update under SB 375. AB 1358 California Complete Streets Act of 2008 Supporting some of the previously referenced regulations/requirements, the California Complete Streets Act of 2008 (AB 1358) requires circulation elements as of January 1, 2011, to accommodate the transportation system from a multi-modal perspective, including public transit, walking and biking, which have traditionally been marginalized in comparison to autos in contemporary American urban planning. Local Plans and Policies SANDAG Regional Transportation Plan SANDAG is the regional transportation planning agency in San Diego County. As such, they are responsible for planning and funding transportation projects throughout the region. SANDAG has completed its 2050 RTP. The RTP was adopted on October 28, The following projects have been identified in the study area to improve mobility: Extension of LRT to Escondido Express LRT along the transit corridor High frequency local bus routes within the City Streetcar/shuttle route in the core of San Marcos Managed highway lanes on SR-78 San Marcos General Plan EIR November 2011
29 Congestion Management Program (CMP) The 2008 Congestion Management Program (CMP) for San Diego County was developed to meet the requirements of Section of the California Government Code. The CMP requires that, when an environmental impact report is prepared for a project, traffic and transit impact analyses be conducted for select regional facilities based on the quantity of project traffic expected to use these facilities. Currently the planning area has three designated CMP facilities: SR-78, San Marcos Boulevard, and Rancho Santa Fe Road. The City of San Marcos Bikeway Master Plan The 2005 Bikeway Master Plan is an update to the city s original master plan adopted in Goals of the master plan were to obtain State Bicycle Transportation Account (BTA) grant funds and improve bicycle facilities throughout the city for safer routes to school, connections to adjacent cities and incorporate an environmental inventory analysis. One of the goals of the master plan was to connect the City s trails to bicycle facilities to complete a safe and enjoyable trail and bikeway system (City of San Marcos 2005). City of San Marcos Municipal Code Section 9.04 of the City of San Marcos Municipal Code includes the general provisions and regulations for parks, trails and recreation facilities THRESHOLDS FOR DETERMINING SIGNIFICANCE The impact of the proposed project related to transportation and traffic would be considered significant if it would exceed the following thresholds of significance, in accordance with Appendix G of the CEQA Guidelines: Conflict with an a applicable plan, ordinance, or policy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of transportation including mass transit and nonmotorized travel and relevant components of the circulation system, including but not limited to intersection, streets, highways and freeways, pedestrian and bicycle paths, and mass transit; Conflict with an applicable congestion management program, including, but not limited to level of service standards and travel demand measures, or other standards established by the county congestion management agency for designated roads or highways; Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks; Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment); Result in inadequate emergency access; or San Marcos General Plan EIR November 2011
30 Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities, or otherwise decrease the performance or safety of such facilities ANALYSIS OF ENVIRONMENTAL IMPACTS Impact analysis in this section used the San Marcos Traffic Demand Model. For purposes of this impact analysis that follows, CMP-designated facilities are addressed. For non-cmp designated facilities, the following criteria are applied: The addition of project traffic causes the LOS for any travel mode to degrade at a study facility from an acceptable level to an unacceptable level based on the criteria outlined in Table : The project increases the delay at a study intersection currently operating at an unacceptably level by 2 or more seconds; or The project causes the volume-to-capacity ratio to increase at study roadway segments currently operating at an unacceptable level by 0.02 or more. Table LOS Parameters Mode Preference Street Typology Street Transit Bicycle Pedestrian Vehicular Multi-Way Boulevard LOS D LOS D LOS C LOS E Arterial with Class II or Class III bike facility and sidewalks LOS E LOS E LOS E LOS D Arterial with Enhanced Bike/ Ped Facilities LOS D LOS D LOS C LOS D Freeway LOS E N/A N/A LOS D Collector LOS E LOS D LOS C LOS E Class I Bike/Ped Path N/A LOS D LOS C N/A Neighborhood Street LOS E LOS D LOS C LOS E Industrial Streets LOS E LOS E LOS E LOS D Main Street Concept LOS D LOS D LOS C LOS E Notes: N/A = Mode not permissible. In general, the study area for this assessment is from San Elijo Road to the south, the City Limit to the north, Smilax Road to the west, and E. Mission Road to the east. Please note that the General Plan provides for extensive bicycle, pedestrian, and transit amenities throughout the City. It is assumed that the City will design the bicycle, pedestrian, and transit facilities sufficiently to achieve the level of service parameters identified above, Additionally, as identified in the implementation component of the Mobility Element, the City should further define operating levels for San Marcos General Plan EIR November 2011
31 alternative mode facilities. As such, this assessment focuses on the vehicle operating level of service, with the assumption that implementation of the mobility element will ultimately provide acceptable levels of service for the other travel modes. Additionally, area freeway segments were addressed consistent with the requirements set forth in the Congestion Management Program (CMP). It should be noted that an existing plus project impact assessment for a General Plan (which has a development life of 20 years or more) is an unrealistic assessment. However, based on recent CEQA litigation (specifically the Sunnyvale West Neighborhood Association vs. City of Sunnyvale City Council), the court ruled that the project must be evaluated against the CEQA baseline condition. As such, this scenario has been included, albeit unrealistic, to develop impacts and mitigation measures assuming full development of the proposed project as if it were constructed today. Please note that this assessment includes planned capacity traffic volumes resulting from implementation from the proposed General Plan travel demand forecast runs, but assumes the existing roadway segment lane configurations and intersection geometrics. Conflict with an Applicable Plan Establishing Measures of Effectiveness for the Circulation System Performance Peak Hour Intersection Level of Service Implementation of the proposed General Plan would result in general intensification of the planning area. Development at equal or more intense levels is permitted by the proposed General Plan, especially in mixed use and non-residential areas along primary circulation corridors of the Business/Industrial District, Richmar, Richland and Barham/Discovery Community neighborhoods. According to the proposed General Plan criteria, the following vehicular LOS criteria are applied based on street typology to identify acceptable operations: LOS D for the freeway, industrial streets, Mission Road, Rancho Santa Fe Road, and Twin Oaks Valley Road LOS E for San Marcos Boulevard (between Discovery and Grand), Collector Streets, Neighborhood Streets, and Main Street (within the University District) Flexible LOS, allowing LOS below those identified above, is allowed in the core of San Marcos and where it is considered environmentally, politically, or socially infeasible to provide acceptable service levels. For vehicles, the Mobility Element identifies flexible LOS standards will be needed on, Rancho Santa Fe Road, Las Posas Road, and Twin Oaks Valley Road. Development or intensification activities is expected to result in increases to the resident population, number of employees, and number of visitors to the planning area, resulting in increases in traffic San Marcos General Plan EIR November 2011
32 volumes. Table presents a comparison of existing and future LOS and delay at study intersections in the planning area. Figure illustrates intersection LOS resulting from planned development capacity of the proposed General Plan; shaded boxes indicate significant impacts. For eight of these intersections, service LOS would be reduced and delay time would increase; these changes that would result from implementation of the proposed General Plan would be a significant impact. Implementation of the project would result in the following intersections operating below the service levels identified in Table : Rancho Santa Fe Road/San Marcos Boulevard PM Peak Hour The City is implementing flexible LOS standards at this intersection to reduce impacts for pedestrians and bicycles near the high school. Therefore, although it is congested during the PM peak hour, the project impact is considered less-than-significant. Rancho Santa Fe Road/Melrose Drive AM Peak Hour The impact is considered significant and is therefore subject to mitigation. Rancho Santa Fe Road/San Elijo Road PM Peak Hour The impact is considered significant and is therefore subject to mitigation. Las Posas Road/SR-78 Westbound Ramps PM Peak Hour The City is implementing flexible LOS standards at this intersection to reduce impacts for pedestrians and bicycles through the corridor and minimize impacts to the urban environment. Therefore, although it is congested during the PM peak hour, the project impact is considered less-than-significant. Buena Creek Road/Twin Oaks Valley Road AM and PM Peak Hours The impact is considered significant and mitigation is required. Borden Road/Twin Oaks Valley Road AM and PM Peak Hours The impact is considered significant and mitigation is required. Twin Oaks Valley Road/San Marcos Boulevard AM and PM Peak Hours The City is implementing flexible LOS standards at this intersection to reduce impacts for pedestrians and bicycles through the corridor and minimize impacts to the urban environment. Therefore, although it is congested during the AM and PM peak hours, the project impact is considered less than significant. Twin Oaks Valley Road/SR-78 Eastbound Ramps AM and PM Peak Hours The City is implementing flexible LOS standards at this intersection to reduce impacts for pedestrians and bicycles through the corridor and minimize impacts to the urban environment. Therefore, although it is congested during the AM and PM peak hours, the project impact is considered less than significant. San Marcos General Plan EIR November 2011
33 Figure (Cont.) City of San Marcos Cumulative Project Intersection LOS
34 Table Proposed General Plan Intersection Level of service Intersection 1. Smilax Road/ Poinsettia Avenue 2. Smilax Road/ Mimosa Avenue 3. Rancho Santa Fe Road/Santa Fe Avenue/Mission Road 4. Rancho Santa Fe Road/SR-78 Westbound Ramps 5. Rancho Santa Fe Road/SR-78 Eastbound Ramps 6. Rancho Santa Fe Road/Linda Vista Drive 7. Rancho Santa Fe Road/San Marcos Boulevard 8. Rancho Santa Fe Road/Melrose Drive 9. Rancho Santa Fe Road/San Elijo Road 10. Las Posas Road/Mission Road 11. Las Posas Road/SR- 78 Westbound Ramps 12. Las Posas Road/Grand Avenue 13. SR-78 Eastbound Ramps/Via Vera Cruz/Grand Avenue 14. Las Posas Road/ San Marcos Boulevard 15. Grand Avenue/ San Marcos Boulevard 16. SR-78 Eastbound Ramps/San Marcos Boulevard 17. Knoll Road/ Mission Road 18. SR-78 Westbound Ramps/Knoll Road/ San Marcos Boulevard 19. Buena Creek Road/Twin Oaks Valley Road Signal Control Planned Capacity of Proposed General Plan AM Peak Hour PM Peak Hour Existing Conditions AM Peak Hour PM Peak Hour Delay LOS Delay LOS Delay LOS Delay LOS Change In Delay AM Peak Hour PM Peak Hour SSSC 15.6 C 15.8 C 17.0 C 20.7 C SSSC 20.7 C 21.9 C 18.2 C >120 F 2.5 N/A S 20.5 C 21.9 C 22.9 C 24.3 C S 25.9 C 24.6 C 26.8 C 24.4 C S 20.0 C 20.7 C 20.4 C 21.4 C S 17.5 B 20.9 C 21.8 C 27.4 C S 32.6 C 79.0 E 31.3 C 56.3 E S 70.4 E 37.5 D 33.7 C 30.3 C S 51.9 D >120 F 23.2 C 22.1 C 28.7 N/A S 29.6 C 40.7 D 31.0 C 42.2 D S 51.9 D F 96.7 F F S 23.8 C 30.8 C 25.0 C 35.6 D S 46.5 D 50.8 D 49.3 D 42.0 D S 19.2 B 33.3 C 26.4 C 96.0 F S 12.4 B 28.3 C 14.5 B 31.9 C S 20.8 C 22.7 C 17.1 B 23.0 C S 24.3 C 36.9 D 24.3 C 33.7 C S 36.6 D 37.2 D 41.7 D 26.1 D S 90.7 F F 81.4 F 95.6 F San Marcos General Plan EIR November 2011
35 Intersection Table Proposed General Plan Intersection Level of service Signal Control Planned Capacity of Proposed General Plan AM Peak Hour PM Peak Hour Existing Conditions AM Peak Hour PM Peak Hour Delay LOS Delay LOS Delay LOS Delay LOS Change In Delay AM Peak Hour 20. Borden Road/Twin Oaks Valley Road S >120 F >120 F >120 F 80.5 F N/A N/A 21. Twin Oaks Valley Road/San Marcos S >120 F 99.8 F 41.0 D 34.7 C N/A 65.1 Boulevard 22. San Marcos Boulevard/Mission S 42.4 D 40.0 D 24.5 C 26.7 C Road 23. Twin Oaks Valley Road/SR-78 S 18.5 B 18.7 B 18.1 B 16.3 B Westbound Ramps 24. Twin Oaks Valley Road/SR-78 Eastbound S F 58.6 E 63.0 E 37.5 D Ramps 25. Twin Oaks Valley Road/Barham Drive S 30.1 C 33.0 C C 34.9 C Twin Oaks Valley Road/Craven Drive S 31.6 C 40.8 D 37.1 D 43.2 D SR-78 Eastbound Off-Ramp/Barham S 29.1 C 23.5 C 38.2 D 41.3 D Drive 28. SR-78 Westbound Ramps/Rancheros AWSC 26.5 D 25.8 D 18.7 C 20.1 C Drive 29. Woodland Parkway/Mission Road S 38.7 D 42.1 D 32.3 C 37.0 D Nordahl Road/SR- 78 Westbound Ramps S 23.9 C 24.9 C 23.3 C 27.3 C Nordahl Road/SR- 78 Eastbound Ramps S 25.0 C 27.1 C 24.9 C 26.8 C Note: BOLD identifies significant impact Italics indicates locations where flexible levels of service are being applied. PM Peak Hour The Mobility Element of the proposed General Plan includes policies to enhance traffic circulation, two future truck routes to add to current routes, and reduce vehicle trips. These policies require new development to prepare and implement Transportation Demand Management (TDM) programs to minimize vehicle trip generation and promote alternative modes of travel, improve connectivity within the City by closing gaps in the circulation network, implementing Complete Streets, utilize technology and intelligent transportation systems to stabilize street system flow and efficiency as an alternative to roadway widening, and establish an intra-city shuttle system that connects the central development nodes of the City. The proposed General Plan also proposes improvements to the circulation network of the planning area including but not limited to, two interchange improvements, three intersection improvements including Rancho Santa Fe Rd./W San Marcos Blvd. and Linda Vista Dr./S Bent Ave., San Marcos General Plan EIR November 2011
36 increase a portion of Rancho Santa Fe Rd. to 6 lanes, two SR-78 overpasses, several pedestrian bridges and two SPRINTER grade separations. See Figure Intensification of the planning area associated with the proposed General Plan would result in a significant impact to peak hour intersection level of service at the program level; mitigation is required. Daily and Peak Hour Roadway Segment Volumes Impacts of increased traffic volume resulting from the proposed General Plan are compared to existing daily and peak hour traffic volumes in Table and Figure The Mobility Element of the proposed General Plan includes policies to safely and efficiently accommodate traffic generated by development, require new development to prepare and implement Transportation Demand Management (TDM) programs to minimize vehicle trip generation and promote alternative modes of travel, continue to consult with Caltrans on transportation planning, operations, and funding to develop the City s circulation system as it relates to State Route 78, strive to ensure that streets within San Marcos shall be complete streets where feasible, increase access, safety and connectivity of multimodal circulation networks to reduce vehicle trips, establish an intra-city shuttle system that connects the central development nodes of the City, and maximizing the service areas covered by the complete transit system. These policies are designed to improve the system as a whole, provide greater options for non-vehicle trips and generally reduce traffic congestion. The Land Use and Community Design Element includes land use planning methods and policies that mingle compatible uses in mixed use configurations, promote development near existing transit facilities and expand trails to provide an increased level of alternative transportation service. Implementation of the proposed land use plan, Figure 2.0-3, would result in an increased level of traffic on some local roadways. Based on the roadway segment assessment, see Table , reduced LOS would occur along the following segments with implementation of the General Plan. However, the proposed Mobility Element includes a policy to implement flexible Level of Service Standards in certain locations within the urban core. All of the following roadway segments are within the urban core. Application of the flexible LOS standard as applied to these segments would avoid significant impacts to these locations. The General Plan would have a less than significant impact on roadway segment operations. Rancho Santa Fe Road between Grand and Linda Vista - The City is implementing flexible LOS standards at this location to reduce impacts for pedestrians and bicycles in the core of San Marcos. Therefore, this impact is considered less than significant. Rancho Santa Fe Road between Grandon Avenue and Security Place - The City is implementing flexible LOS standards at this location to reduce impacts for pedestrians and bicycles in the core of San Marcos. Therefore, this impact is considered less than significant. San Marcos General Plan EIR November 2011
37 Figure City of San Marcos Proposed Mobility Improvements
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More information3.9 - Transportation and Traffic
Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.
More informationNorth County Metro. Community Summaries, Maps and Matrices
North County Metro Interstate 15 Mountain Meadow Road / Mirar De Valle Road Deer Springs Road Overview Sponsor Group Preferences The North County Metro sub-region includes two represented communities:
More information5.3 TRAFFIC, CIRCULATION AND PARKING
5.3 TRAFFIC, CIRCULATION AND PARKING This section is based upon the Downtown Lancaster Specific Plan Traffic Impact Analysis (April 2, 2008) and the Downtown Lancaster Specific Plan Parking Analysis (May
More informationTRAFFIC IMPACT ANALYSIS
TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014
More information4.11 TRANSPORTATION 4.11 TRANSPORTATION Environmental Setting Intersection, Roadway, and Freeway Evaluation Methodology
4.11 TRANSPORTATION This section describes the road transportation system in the vicinity of the proposed Project and the potential impacts to this system from the proposed Project. The analysis in this
More informationSOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM
SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM Prepared by the City of Solana Beach January 2005 Introduction In June of 1993, the Solana Beach City Council adopted a Bikeway Master Plan as directed
More informationMagnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.
Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6
More informationD.13 Transportation and Traffic
This section addresses transportation and traffic issues and impacts related to the Proposed Project. Section D.13.1 provides a description of the affected environment for the Proposed Project. Applicable
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationTABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...
TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...
More informationSolana Beach Comprehensive Active Transportation Strategy (CATS)
Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element
More informationDavid DiPierro, John Amberson. Steering Committee Meeting #4 Overview
IBI GROUP 18401 Von Karman Avenue Suite 110 Irvine CA 92612 USA tel 949 833 5588 fax 949 833 5511 ibigroup.com Memorandum To/Attention Steering Committee Members Date February 17, 2016 From IBI Group Project
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More informationUniversity Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007
Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-
More informationCity of Homewood Transportation Plan
City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION
More informationCirculation in Elk Grove includes: Motor vehicles, including cars and trucks
Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including
More informationRoadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004
Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3
More informationTABLE TRAFFIC ANALYSIS SCENARIOS
4.11 TRANSPORTATION The potential traffic impacts of the proposed project are evaluated in the Buena Park Beach/Orangethorpe Mixed Use Project Traffic Analysis (Traffic Analysis) by Austin-Foust Associates
More informationGeneral Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701
General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 Meeting Agenda 1. Purpose of Scoping Meeting 2. Project Overview 3.
More informationCity of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A
A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table
More informationMEMORANDUM. To: 1.0 PURPOSE
MEMORANDUM To: Scott Holland, Elements Architecture From: Brian Grover, Dudek Date: July 16, 2014 1.0 PURPOSE In response to the November 4, 2013 request (RE: Incomplete Application Southern California
More informationLyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study
Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report Appendix I Traffic Impact Study Street 0 80-1947 500.4501 RITA ld Court 0 91355-1096 400.7401 LA n Avenue 0 590-3745 300-9301
More informationWaterford Lakes Small Area Study
Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS
More informationSECTION 1 - TRAFFIC PLANNING
SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationInterchanges with Interstate 10 (I-10), I-15, and State Route 210 (SR-210) provide regional highway access to the planning area.
5.13 TRANSPORTATION This section describes the transportation network and traffic conditions within the planning area and evaluates potential transportation impacts due to implementation of the General
More informationChapter 6 Transportation Plan
Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised
More informationTRASBURG RANSPORTATION
TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION
More informationExhibit 1 PLANNING COMMISSION AGENDA ITEM
Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:
More informationTRAFFIC STUDY GUIDELINES Clarksville Street Department
TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two
More informationAbrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677
Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,
More information5.16 TRAFFIC AND CIRCULATION
5.16 TRAFFIC AND CIRCULATION This section is based upon the Tierra Robles Traffic Impact Study (May 2015) and Supplemental Traffic Impact Analysis (August 2017) prepared by Omni-Means Engineering Solutions,
More informationPlanning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service
Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Changes from Committee Review Draft 2017 Multimodal Transportation
More informationClassification Criteria
SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed
More informationMCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx
MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Madera County Transportation Commission Regional Transportation Plan / Sustainable Communities Strategy Multi-Modal Project
More informationDUNBOW ROAD FUNCTIONAL PLANNING
DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report
More information3.0 PROJECT DESCRIPTION
The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.
More informationMOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.
CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure
More informationFigure 1: East West Connector Alignment Alternatives Concept Drawing
Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road
More informationList of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...
List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing
More informationTRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION
TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212
More informationCONNECTING PEOPLE TO PLACES
CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the
More informationNOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS
Tahoe Transportation District 128 Market Street, Suite 3F Stateline, NV 89449 Phone: (775) 589-5500 www.tahoetransportation.org Federal Highway Administration 650 Capitol Mall, Suite 4-100 Sacramento,
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More information3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM
3.16 TRANSPORTATION, CIRCULATION, AND PARKING This section assesses the potential for implementation of the Orchard Park Redevelopment component of the 2018 LRDP to result in impacts related to transportation,
More informationTraffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas
ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest
More informationCorpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:
Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency
More informationChapter 4 Traffic Analysis
Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection
More informationCarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California
CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California TUSTIN 17782 17th Street Suite 200 Tustin, CA 92780-1947 714.665.4500 Fax: 714.665.4501 LOS ANGELES 145 S. Spring Street Suite 120
More informationSan Jose Transportation Policy
San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland
More informationREVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY
ITEM Town of Atherton TRANSPORTATION COMMITTEE STAFF REPORT TO: FROM: MEMBERS OF THE COMMITTEE ROBERT OVADIA, PUBLIC WORKS DIRECTOR DATE: FEBRUARY 12, 2019 SUBJECT: REVIEW OF LOCAL TRAFFIC FLOW / LONG
More information4.11 Transportation and Traffic
4.11.1 Introduction This section evaluates whether implementation of the Russian River Estuary Management Project (Estuary Management Project) would result in potential adverse impacts related to transportation
More informationSETTINGS AND OPPORTUNITIES MOBILITY & ACCESS
7 mobility & access how do people use el camino what is it like to drive on el camino/to park along el camino what is the pedestrian experience like what is the role of transit along the corridor what
More informationI-105 Corridor Sustainability Study (CSS)
I-105 Corridor Sustainability Study (CSS) Metro Streets and Freeways Subcommittee March 21, 2019 Gary Hamrick Cambridge Systematics, Inc. I-105 CSS Project History & Background Funded by Caltrans Sustainable
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas
More informationDefining Purpose and Need
Advanced Design Flexibility Pilot Workshop Session 4 Jack Broz, PE, HR Green May 5-6, 2010 Defining Purpose and Need In your agency s project development process, when do design engineers typically get
More informationChapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails
Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationAppendix 3 Roadway and Bike/Ped Design Standards
Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.
More informationCITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies
CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number
More informationBridges and Arizona Crossings
Circulation and Transportation 5-11 Discovery Street/Barham Drive. Discovery Street is planned 5.4.3 Specific Plan Circulation Improvements to be extended eastward from its terminus at Craven Road Circulation
More informationWELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.
City of Carlsbad Pedestrian Master Plan: WELCOME WELCOME Please Sign In Provide Input at Flip Charts Review Boards Presentation of Draft Plan Thank you for joining us at the Second Public Workshop for
More informationWhere We Live and Work Today
San Diego Forward: The 2019-2050 Regional Plan Network Concepts Transportation Committee Item 4 October 19, 2018 Where We Live and Work Today 2018 2 2019 Regional Plan Transportation Committee Item 4 October
More information4.10 TRAFFIC AND CIRCULATION
4.10 TRAFFIC AND CIRCULATION The following section is based on a traffic and circulation study prepared by Fehr & Peers, Inc. (November 2003; refer to Appendix F for technical calculations). The effects
More information4.12 TRANSPORTATION Executive Summary. Setting
4.12 TRANSPORTATION 4.12.1 Executive Summary This section is based on the Multimodal Transportation Impact Study (TIS; 2016) prepared by Omni-Means, Ltd. to evaluate projected transportation impact conditions
More informationTRANSPORTATION TRAINING TOPICS. April 6, 2010
TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA
More informationGOAL 2A: ESTABLISH AND MAINTAIN A SAFE, CONVENIENT, AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM TO MOVE PEOPLE AND GOODS THROUGHOUT THE CITY.
2. TRANSPORTATION ELEMENT The purpose of this element is to assist in establishing an adequate transportation system within the City and to plan for future motorized and non-motorized traffic circulation
More informationMoving Towards Complete Streets MMLOS Applications
Moving Towards Complete Streets MMLOS Applications Transportation Education Series May 18 th, 2012 It s not just for cars! Presentation Overview The Complete Streets Movement What is Multi-Modal Level
More information2.0 Ballpark District
2.0 Ballpark District 2.1 Introduction The Ballpark District is located in the south central portion of the City of Lake Elsinore, just north of the City limit line in this area. The Ballpark District
More information5.16 TRANSPORTATION AND TRAFFIC
5.16 This section of the draft environmental impact report (DEIR) evaluates the potential for implementation of the proposed Project to result in transportation and traffic impacts in the City of Long
More informationTRANSPORTATION & MOBILITY
TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines
More informationEXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives
Contents EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW... 1-1 1.1 Study Scope... 1-1 1.2 Study Area... 1-1 1.3 Study Objectives... 1-3 2 EXISTING CONDITIONS... 2-1 2.1 Existing Freeway Conditions... 2-4 2.1.1
More informationComplete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA
Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,
More informationLos Coyotes Country Club Development Plan Traffic Impact Analysis
Los Coyotes Country Club Development Plan Traffic Impact Analysis Prepared For: Phil Martin Associates 2073007450 Los Coyotes Country Club Development Plan Traffic Impact Analysis June 19, 2014 Prepared
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationMission Street Medical Office Development
reet Medical Office Development Traffic Impact Analysis Prepared for: Palo Alto Medical Foundation February 23, 2012 Hexagon Office: 7888 Wren Avenue, Suite B121 Gilroy, CA 95020 Hexagon Job Number: 11RD11
More information2045 Long Range Transportation Plan. Summary of Draft
2045 Long Range Transportation Plan Summary of Draft Fredericksburg Area Metropolitan Planning Organization The George Washington Region includes the City of Fredericksburg and the counties of Caroline,
More informationHENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.
HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc
More informationo n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.
N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation
More informationRecommended Roadway Plan Section 2 - Land Development and Roadway Access
Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines
More informationHighway 111 Corridor Study
Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,
More informationMultimodal Through Corridors and Placemaking Corridors
68 Multimodal Through Corridors and Placemaking Corridors Corridors have different functions in a region. Some corridors are used to get smoothly and rapidly through a region or to get quickly to major
More informationHighway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
More informationProject Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015
Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More informationSixth Line Development - Transit Facilities Plan
Memorandum Date: November 13, 2012 To: From: c.c. Subject: Rob Freeman (Freeman Planning) Kevin Phillips Sixth Line Development - Transit Facilities Plan 33016631 This memo was prepared to review the transit
More informationTABLE OF CONTENTS. Executive Summary
Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting
More informationsummary of issues and opportunities
1 summary of issues and opportunities EXECUTIVE SUMMARY CHAPTER 2: HISTORY - 3: LAND USE This first chapter is an overview of lessons learned from analysis of the existing conditions on El Camino as well
More informationThis document may be reprinted or extracted without permission, provided credit to the City of Pasadena Department of Transportation
TRANSPORTATION IMPACT ANALYSIS CURRENT PRACTICE & GUIDELINES Prepared by: Transportation Complete Streets Division Department of Transportation 20150925 This document may be reprinted or extracted without
More informationThis chapter describes the proposed circulation system and transportation alternatives associated with
5.0 Circulation 5.1 OVERVIEW This chapter describes the proposed circulation system and transportation alternatives associated with West Landing, and summarize the information contained in the Existing
More information1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT
1.0 INTRODUCTION This chapter provides an overview of the purpose, authorization and focus of this Recirculated Draft Environmental Impact Report (EIR), an identification of the Lead Agency, an outline
More informationCirculation and Parking
CHAPTER 6 Circulation and Parking A. Introduction This chapter describes the circulation recommendations for the Downtown Hemet Specific Plan, which includes recommendations for improving the roadway network,
More informationTransportation Master Plan Advisory Task Force
Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved
More informationMoving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.
City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018
More informationSubject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis
MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade
More informationARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY
ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,
More informationJONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY
JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State
More informationEXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY
EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY The Caledon Transportation Needs Study has been undertaken as a joint project by the Town of Caledon and the Region of Peel to determine the existing
More information