1 Feasibility of a Bus Priority Lane for Galle Road Amal S. Kumarage Professor Dept. of Civil Engineering University of Moratuwa G.L. Dimantha De Silva Research Assistant University of Calgary Canada IESL Annual Sessions 21 st October 2003
2 What is a Bus Lane? A bus lane is a lane on a highway dedicated for the exclusive use of buses. Bus lanes have been gaining popularity elsewhere in the world. Bus priority lanes are so termed as they are intended to provide priority travel for buses vis-à-vis other traffic. This is part of the strategy which is intended to attract more passengers to buses, so that taking cars off the road would ultimately lead to better speeds for all road users.
3 When are Bus Lanes used? Where demand for buses is high (generally at least 45 buses per hour). Where the condition of traffic flow on the road as measured by the Level of Service under traffic flow theory is category C or worse. Where required for strategic public transport development When there are special access requirements ( such as bus terminals, etc.).
4 Benefits of a Bus Lane Reduction in traffic congestion, fuel use and exhaust emissions; Increased people moving efficiency of the road network; Better use of existing road infrastructure; Reduced total travel time; Increased public transport patronage.
5 Study Methodology Selection of Study Area Theoretical Determination Scenario I: Existing condition, where all lanes have mixed traffic Scenario II: With a bus lane for all buses Scenario III: With a a bus lane carrying slow buses only. Field Observations Analysis of Results Comparison with Theoretical Results Conclusions
6 Selection of Study Area Galle Road between Moratuwa Cross Junction & Kollupitiya Junction Three different geometric designs identified as Sections 1, 2 and 3. CROSS JUNCTION MALIBAN JUNC. WELLAWATTA BRIDGE KOLLUPITIYA SECTION 1 6 lane divided SECTION lane undivided SECTION 3 4 lane divided With 2 parking lanes
7 SF = V EPCU Theoretical Considerations LOS (v/c ratio) SF = V EPCU V C Speed = SF [ 2000 N FE FHV FP FW FS] Q = U ln(49.504) ln 2.71 lnu
8 SPEED-FLOW RELATIONSHIP FOR GALLE ROAD SPEED (km/h) FLOW (V e h/hr/lane)
9 Theoretical Speed Computation SPEED ( km/h ) LOCATION CONDITION PEAK HOUR OFF PEAK HOUR CARS BUSES CARS BUSES GOLUMADAMA CURRENT WITH BUS LANE ( ALL BUSES) WITH BUS LANE ( 60 % BUSES) SPEED ( km/h ) LOCATION CONDITION PEAK HOUR OFF PEAK HOUR CARS BUSES CARS BUSES MUNT LAVINIA CURRENT WITH BUS LANE ( ALL BUSES) WITH BUS LANE ( 60 % BUSES) 18.21* *
10 Theoretical Computations (Contd ) SPEED ( km/h ) LOCATION CONDITION PEAK HOUR OFF PEAK HOUR CARS BUSES CARS BUSES BAMBAL ALAPITIYA CURRENT WITH BUS LANE ( ALL BUSES) WITH BUS LANE ( 60 % BUSES)
11 Field Observation Project Committee University of Moratuwa RDA Traffic Police NTC WP Passenger Transport Authority
12 SIGN BOARDS
13 Field Observation Implementation DAY ONE DAY TWO NO BUS LANE SURVEY DONE Program BUS LANE IMPLEMENTED IN SECTION 1 NO SURVEY DAY THREE & DAY FOUR BUS LANE IMPLEMENTED IN SECTION 1 SURVEY DONE
14 Analysis of Field Observations GOLUMADAMA AVERAGE SPEED (km/h) AVERAGE FLOW (veh/h) CARS BUSES BUS LANE NOT IN OPERATION (DAY 1) BUS LANE IN OPERATION (DAY 3) BUS LANE IN OPERATION (DAY 4)
15 Comparison of Speeds Before & After (Section 1) Speed (km/hr) Scenario Theoretical Observed Without Bus Lane Observed With Bus Lane Cars Buses Cars Buses Cars Buses Current With Bus Lane (All Buses) With Bus Lane (60% of Buses)
16 CONCLUSION CAPACITY REDUCTION FACTOR FOR SRI LANKAN ROADS (FS) GOLUMADAMA CAPACITY REDUCTION FACTOR FOR SL ROADS (Fs) NORMAL OPERATION CAR LANE BUS LANE 0.416
17 Reasons for Reduction of Capacity The Movement of Cyclists and slow moving vehicles on the Bus Lane The Movement of Pedestrians and Parking of Vehicles on the Bus Lane Insufficient Length of Bus Bays Passengers Waiting within Bus Bays Gullies and & Accumulation of Sand on Bus Lane
18
19
20
21
22
23
24
25
26 For a Successful Bus Lane There should be at least 3 lanes in each direction OR 5 lanes with reversible centre lane. Bus Lane should be marked to a minimum width of 3.5 metres. Bus halts and Bays should be large enough not to form bus queues and also to prevent passengers from coming to the carriageway. Bicycles should be banned or a separate cycle lane should be provided. Slow moving vehicles should be accommodated in the middle lane.
27 For a Successful Bus Lane No Parking should be strictly enforced. Express buses should be allowed to operate in the centre lane except when making pick ups or drop offs near selected stops. Water Gullies should be outside the Bus Lane. Road edges should be regularly cleaned of accumulated debris including sand.
28 THANK YOU
DERIVATION OF A SIGNAL TIMING SCHEME FOR AN EXTERNALLY SIGNALIZED ROUNDABOUT
DERIVATION OF A SIGNAL TIMING SCHEME FOR AN EXTERNALLY SIGNALIZED ROUNDABOUT Paper Presented at the Annual Sessions of the Institute of Engineers, Sri Lanka Dr. Amal S. Kumarage, Senior Lecturer Dr. J.M.S.J.
More informationlast week, Road Safety Secretariat & Road Safety Fund to commence in June 2004)
Proposal for a Land Transport Action Plan 2004/05 Traffic & Road Safety Management Joint Programs with Police 24 May 2004 Action Plan (as approved by HE President on April 30 th Buses (NTC, SLCTB) Railways(deferred)
More informationFEASIBLE SOLUTIONS FOR REDUCING TRAFFIC FROM MEERAMAKKAM MOSQUE JUNCTION TO THOPAWANA TEMPLE AREA IN KANDY
FEASIBLE SOLUTIONS FOR REDUCING TRAFFIC FROM MEERAMAKKAM MOSQUE JUNCTION TO THOPAWANA TEMPLE AREA IN KANDY A.M.Z. Zimar 1*, P. Sanjeevan 2 1 South Eastern University of Srilanka, Srilanka 2 Central Engineering
More informationBELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development
BELFAST RAPID TRANSIT Ciarán de Búrca Director, Transport Projects Division Department for Regional Development Objectives of Belfast Rapid Transit To provide a modern, safe, efficient and high quality
More informationConversation of at Grade Signalized Intersection in to Grade Separated Intersection
IJIRST International Journal for Innovative Research in Science & Technology Volume 2 Issue 05 October 2015 ISSN (online): 2349-6010 Conversation of at Grade Signalized Intersection in to Grade Separated
More information2. Context. Existing framework. The context. The challenge. Transport Strategy
Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington
More information2.0 LANE WIDTHS GUIDELINE
2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated
More informationAnalysis of Signalized Intersections
Analysis of Signalized Intersections What is Intersection analysis Inverse application of the signal timing design In signal timing design, green times are estimated to provide necessary capacity In intersection
More informationOverhead Pedestrian Crossings Economic Evaluation through Vehicle Operating Cost and Travel Time Savings
OUSL Journal (2014) Vol 7, (pp77-94) Overhead Pedestrian Crossings Economic Evaluation through Vehicle Operating Cost and Travel Time Savings K. M. G. N. S. Kumara, V. K. M. Pinnagoda and K. S. Weerasekera
More informationLaunch of Book ANALYSIS OF ROAD ACCIDENTS IN SRI LANKA
Launch of Book ANALYSIS OF ROAD ACCIDENTS IN SRI LANKA Analysis for 2001 & 2002 Prof. Amal S. Kumarage, University of Moratuwa Mr. S.M. Wickremasinghe, DIG, Sri Lanka Police Ms. M.D.R.P. Jayaratne, University
More informationOperational Comparison of Transit Signal Priority Strategies
Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,
More informationCity of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A
A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table
More informationChapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation
Chapter 37 Capacity and LOS Analysis of a Signalized I/S 37.1 Overview The Highway Capacity Manual defines the capacity as the maximum howdy rate at which persons or vehicle can be reasonably expected
More informationMethodology for analysing capacity and level of service for signalized intersections (HCM 2000)
Methodology for analysing capacity and level of service for signalized intersections (HCM 2000) Ivana Nedevska 1, Slobodan Ognjenović 2,* and Elena Gusakova 3 1 GEING Krebs und Kiefer-Skopje, Macedonia
More informationDr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS
Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Overview Highway Functions and Classifications Highway Design Components Design Control
More informationThe Consultation has now ended.
The Consultation has now ended. We have received Cabinet Member approval to undertake implementation of the Baker Street Two Way scheme. You are not viewing the most recent documentation. Please visit
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More informationCanada s Capital Region Delegation to the Velo-City Global 2010 Conference
Canada s Capital Region Delegation to the Velo-City Global 2010 Conference Report of Findings from Visits, Meetings & Presentations In Amsterdam-Den Haag, Utrecht, Berlin & Copenhagen The Itinerary Copenhagen
More informationUNIT V 1. What are the traffic management measures? [N/D-13] 2. What is Transportation System Management (TSM)? [N/D-14]
UNIT V 1. What are the traffic management measures? [N/D-13] Some of the well-known traffic management measures are: a) Restrictions on turning movements b) One - way streets c) Tidal - flow operations
More informationMobility measures in Vitoria-Gasteiz
CIVITAS Study Tour in Vitoria-Gasteiz, Spain 19 & 20 June 2014 Palacio Zulueta Public Space and Nature Environment Service, Paseo de la Senda 2, Vitoria-Gastez Giving back the public space to the people
More information4. Guided Bus Explained
4. Guided Bus Explained Contents 1 INTRODUCTION... 2 Structure of this report... 2 2 KERB GUIDED BUS... 3 Overview... 3 Kerb guidance... 3 Figures Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5
More information1. Introduction. 2. Survey Method. Volume 6 Issue 5, May Licensed Under Creative Commons Attribution CC BY
A Study on Performance of an Urban Arterial Corridor Guggilla Raju 1, Rontala Ashwini 2 1 Assistant Professor, Department of Civil Engineering, GCET 2 Assistant Professor, Department of Civil Engineering,
More informationSouthside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division
Southside Road Prepared for: City of St. John s Police & Traffic Committee Prepared by: City of St. John s Traffic Division January 2007 Southside Road - Traffic Report Page 1 of 9 BACKGROUND: th At the
More informationBus Lanes and Pre-signals with Transit Signal Priority: Domains of Application
Bus Lanes and Pre-signals with Transit Signal Priority: Domains of Application MASITE Meeting October 5, 2015 S. Ilgin Guler, Ph.D. Assistant Professor Civil and Environmental Engineering Pennsylvania
More informationUrban Street Design and Development
Urban Street Design and Development Ashok Bhattacharjee, Advisor, Clean Air and Sustainable Mobility, Centre for Science and Environment CSE Workshop on Safe Access and Parking - Lytton Hotel, Kolkata
More informationLYNNWOOD ROAD ARTERIAL STUDY The effect of intersection spacing on arterial operation
LYNNWOOD ROAD ARTERIAL STUDY The effect of intersection spacing on arterial operation A J Joubert*, S L Burnett**, and T Ueckermann* *PWV Consortium, PO Box 1109, Sunninghill 2157 **Gautrans, Gauteng Department
More informationScope of the Transit Priority Project
Transit Planning Committee #1 March 19, 2015 Scope of the Transit Priority Project Review of the 2010 plan Analysis of Transit Priority Measures Preliminary plans for rapid transit Recommendations for
More informationAPPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY
APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose
More informationDUNBOW ROAD FUNCTIONAL PLANNING
DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report
More informationNo-car lanes in Tyneside results from modelling and stakeholder analysis
No-car lanes in Tyneside results from modelling and stakeholder analysis Dr Corinne Mulley, Newcastle University Dr Jessica Anderson, JMP Consulting Vilnius, September 2007 Belfast Brighton Glasgow Leeds
More informationBASIC FREEWAY CAPACITY STUDIES Definitions
Definitions A freeway is a divided highway facility having two or more lanes in each direction for the exclusive use of traffic with full control of access and egress. Freeway is the only facility that
More informationMOBILITY CHALLENGES IN HILL CITIES
MOBILITY CHALLENGES IN HILL CITIES Lalmuansanga Ralte, MCS Pvt Secretary to Minister & Under Secretary Urban Development & Poverty Alleviation Department Govt. of Mizoram DEMOGRAPHIC OVERVIEW INDIA MIZORAM
More informationDRAFT. Memo. Range of the Alternatives Considered in the EIS
Memo Date: Friday, December 09, 2016 Project: To: From: Subject: State Route 30 EIS UDOT Vince Izzo This memorandum summarizes the draft State Route (S.R.) 30 Level 1 screening results. A more detailed
More informationDecongestion Strategies for Delhi Roads
PWD, Delhi 1 Presented By: Sh.Manoj Kumar(CPM); Sh.Ravi Kant (S.E); Sh.A.K.Agrawal (S.E) Public Works Department - GNCTD Agendas Main Challenges in Delhi Population, Land, Multiplicity of Authorities,
More informationApplication of SUTI in Colombo (Western Region)
Application of SUTI in Colombo (Western Region) Dr Dimantha De Silva Senior Lecturer, University of Moratuwa Capacity Building Workshop on Sustainable Urban Transport Index (SUTI) 30 th & 31 st October
More informationECONOMY PEOPLE ENVIRONMENT
Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements
More informationCabinet Member for Highways & Streetscene. Highway Infrastructure Manager
LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS
More informationImprovement of pedestrian safety and traffic flow regulation at the railway junction, Kandy
J.Natn.Sci.Foundation Sri Lanka 2013 41 (3): 259-270 DOI: http://dx.doi.org/10.4038/jnsfsr.v41i3.6060 RESEARCH ARTICLE Improvement of pedestrian safety and traffic flow regulation at the railway junction,
More informationaasidra for Roundabouts INTRODUCTION
aasidra for Roundabouts INTRODUCTION Rahmi Akçelik Director, Akcelik & Associates Pty Ltd Adjunct Professor, Monash University Mark Besley Director, Akcelik & Associates Pty Ltd TRB Roundabout Conference
More informationClassification Criteria
SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed
More information2.2 TRANSIT VISION 2040 FROM VISION TO ACTION. Emphasize transit priority solutions STRATEGIC DIRECTION
TRANSIT VISION 2040 FROM VISION TO ACTION TRANSIT VISION 2040 defines a future in which public transit maximizes its contribution to quality of life with benefits that support a vibrant and equitable society,
More informationMaynooth Cycling Submission on North South Corridor
Maynooth Cycling Submission on North South Corridor Maynooth Cycling welcomes the intention to improve facilities and quality of service for pedestrians and cyclists in Maynooth. In particular, we strongly
More informationRoadways. Roadways III.
Introduction 97 Roadway Design Principles 98 Safe Speeds 99 Optimizing of Street Space 00 Minimum Lane Widths in the City of Boston 02 Design Features that Reduce Operating Speeds 05 Travel Lanes Transit
More informationANALYSIS OF THE TRENDS IN ACCIDENT RATES IN SRI LANKA
ANALYSIS OF THE TRENDS IN ACCIDENT RATES IN SRI LANKA Amal S. Kumarage 1, Cammilus R. Abeygoonawardena 2 and Ravindra Wijesundera 3 ABSTRACT INTRODUCTION In Sri Lanka, both the vehicle population as well
More informationEvaluation of bus lanes in central urban areas through the use of modelling techniques
Evaluation of bus lanes in central urban areas through the use of modelling techniques S. Basbas Dept. of Transportation and Hydraulics Engineering, Faculty of Rural and Surveying Engineering, School of
More informationIntegrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009
Integrated Regional Traffic Management Michael Aherne Technical Director POLIS Conference 2009 M50 finish Public Transport and Pedestrians College Green The Spatial Perspective What Could has
More informationWelcome. If you have any questions or comments on the project, please contact:
Welcome This drop-in public open house is intended to provide information about the Bay Street bike lanes project. This project proposes a dedicated cycling facility along Bay Street between Aberdeen Avenue
More informationVolume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning
Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning Hao Xu (Corresponding Author) Research Associate Department of Civil & Environmental Engineering Texas
More informationBalancing Operation & Safety for Motorized and Non-Motorized Traffic
Balancing Operation & Safety for Motorized and Non-Motorized Traffic Brian Willham, PE, PTOE Iowa Director - MOVITE June 30, 2014 Learning Objectives: When & Why should we measure the performance of complete
More informationWelcome to the McKenzie Interchange Project Open House!
Welcome to the McKenzie Interchange Project Open House! Purpose of Open House To provide you with information regarding the project and for you to have the opportunity to share your input on design concepts.
More informationAUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS
AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS BACKGROUND: This study is a collaboration between Urban Circus (Visualisation) and Ethos Urban (Urban Design) Ideas were workshopped
More informationB9 Junctions - Right of way
DRIVING IN JUNCTIONS 1 / 14 Order of the traffic situations are very simple. Do all training in e-autokoulu and theory test training in ajokaista.com. Driving in junctions Driving order Equal Yield sign
More informationCITY OF SASKATOON COUNCIL POLICY
ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,
More informationSimulation Analysis of Intersection Treatments for Cycle Tracks
Abstract Simulation Analysis of Intersection Treatments for Cycle Tracks The increased use of cycle tracks also known as protected bike lanes has led to investigations of how to accommodate them at intersections.
More informationDefining Purpose and Need
Advanced Design Flexibility Pilot Workshop Session 4 Jack Broz, PE, HR Green May 5-6, 2010 Defining Purpose and Need In your agency s project development process, when do design engineers typically get
More informationMilton Road Project Update. Paul van de Bulk 30 January 2018
Milton Road Project Update Paul van de Bulk 30 January 2018 Milton Road Project Objectives Comprehensive priority for buses in both directions wherever practicable; Safer and more convenient routes for
More informationIntegrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012
Integrated Corridor Approach to Urban Transport O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012 What is the Integrated Corridor Approach for Urban Transport Public? Why
More informationNew Strategic Road Safety Plan Risk assessment as alternative for (lack of) accident data?
New Strategic Road Safety Plan 2016-2021 Risk assessment as alternative for (lack of) accident data? Eric de Kievit senior advisor Traffic & Transport Research e.de.kievit@amsterdam.nl 18 November 2016
More informationNATIONAL HOSPITAL OF SRI LANKA TRAFFIC ANALYSIS OF DEVELOPMENT MASTER-PLAN
NATIONAL HOSPITAL OF SRI LANKA TRAFFIC ANALYSIS OF DEVELOPMENT MASTER-PLAN 11 March 2014 Amal S. Kumarage Dept of Transport & Logistics Management, University of Moratuwa Persons Arriving at NHSL per day
More informationMilton Road Bus Stop and Crossings Workshop WSP. 19th September 2017
Bus Stop and Crossings Workshop WSP 19th September 2017 Workshop Aims Task 1: Identify preferences for bus stop designs relative to: (a) Ranking preference between 4 possible bus stop designs on the narrower
More informationPublic Works and Infrastructure Committee. General Manager, Transportation Services
STAFF REPORT ACTION REQUIRED Extending the Bay Street Bicycle Lanes Date: May 16, 2013 To: From: Public Works and Infrastructure Committee General Manager, Transportation Services Wards: Toronto Centre
More informationMill Hill Broadway Capacity Improvement
1 16 MARCH 2016 Mill Hill Broadway Capacity Improvement Presentation to Barnet Members and Mill Hill Residents Association 2 Background A1 is one of 23 Transport for London Road Network (TLRN) Strategic
More informationMILTON ROAD LLF PROJECT UPDATE
Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable
More informationProposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017
WELCOME Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 Purpose of the Open House The purpose of this Open House is to gain public input on the bicycle lanes proposed
More information20mph in Edinburgh. Phil Noble
20mph in Edinburgh Phil Noble Structure of Presentation Where have we come from? South Edinburgh Pilot results Citywide 20 - strategy, consultation, implementation IMAGE? 2 20mph zones and pilot area (2012)
More informationTraffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs.
Traffic signs Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs. Although The Highway Code shows many of the signs commonly in use,
More informationE4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign
E4 Cycle Route Exeter University to Redhayes Bridge - Recommendations from Exeter Cycling Campaign 1.0 Introduction Exeter Cycling Campaign has prepared this report to provide recommendations for Devon
More informationNorth West Non-Technical Summary of the Transport Assessment September 2011
North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North
More informationTraffic Signals. Part I
Traffic Signals Part I Part I The Islamic University of Gaza Civil Engineering Department Traffic Engineering (Optional Course) ECIV 5332 Instructor: Dr. Yahya Sarraj Associate Prof. in Transportation
More informationINDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.
INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting
More informationStanley Street/Shotover Street, Queenstown. Traffic Modelling Report
Stanley Street/Shotover Street, Queenstown Traffic Modelling Report Stanley Street/Shotover Street, Queenstown Traffic Modelling Report Prepared By Chris Morahan Transportation Engineer/Traffic Modeller
More informationHarbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report
Consultant Services for Updating Intersections Operations to Accommodate Bi-Directional Cycle Tracks Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) January 30, 2014 Consultant
More informationReport to Cabinet. 18 May 2016
Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment
More informationImproving the Bus Network through Traffic Signalling. Henry Axon Transport for London
Improving the Bus Network through Traffic Signalling Henry Axon Transport for London Improving the Bus Network through Traffic Signalling Introduction Transport for London (TfL) operates the most frequent
More informationChapter 5. Complete Streets and Walkable Communities.
Chapter 5. Complete Streets and Walkable Communities. 5.1 Description of Complete Streets. Cities throughout the world, and specifically the United States, are coming to embrace a new transportation and
More informationDeveloping a Safer Cycling Strategy for the ACT ACRS Conference August 2012
Developing a Safer Cycling Strategy for the ACT ACRS Conference 2012 Peter Strang Canberra Manager Sarah Court Transport Consultant 10 August 2012 Presentation Outline Background Data Analysis (Stage 1)
More informationProposed Trial of Lane Reduction on Highway 19A (McMillan Corfield) City of Parksville Town Hall Meeting
Proposed Trial of Lane Reduction on Highway 19A (McMillan Corfield) City of Parksville Town Hall Meeting October 21 st, 2013 On August 7, 2013, Council directed staff to forward the following topic to
More informationHighway 111 Corridor Study
Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,
More informationAUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS
AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS STURT ST BALLARAT WATERGARDENS TAYLORS LAKES SIMPSON ST YARRAVILLE CHAPEL ST SOUTH YARRA RINGWOOD STATION MONASH FREEWAY SA NSW VIC
More informationIntersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session
Intersection Improvement: 1 Welcome WHY IS AN INTERSECTION IMPROVEMENT NEEDED? 2 Traffic volumes for Sturgeon Road, Silver Avenue and Murray Park Road exceed the capacity of the existing 4-way stop controlled
More informationCycling Facilities on Woodbine Avenue and Corley Avenue
PW15.10 REPORT FOR ACTION Cycling Facilities on and Corley Date: September 13, 2016 To: Public Works and Infrastructure Committee From: Acting General Manager, Transportation Services Wards: Ward 31 -
More informationA127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017
A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place
More informationThe Present Traffic Situation and a review of the UniflowSystem
The Present Traffic Situation and a review of the UniflowSystem Amal S. Kumarage Department of Transport & Logistics Management University of Moratuwa Presentation to the Institute of Engineers Sri Lanka
More informationMultimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland
Multimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland A Path to Successful Implementation James Allday Bunch - Sabra, Wang & Associates, Inc. ITS
More informationOTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:
OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012
More informationAmendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008
Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 The following amendments to the wording of the maintenance strategy apply following the revised maintenance
More information20mph. We want to make Edinburgh a better and safer place to live, work and play.
20mph CREATING A BETTER SAFER EDINBURGH We want to make Edinburgh a better and safer place to live, work and play. That s why on 13 January 2015 Councillors approved a new speed limit network for Edinburgh
More informationMICROSIMULATION USING FOR CAPACITY ANALYSIS OF ROUNDABOUTS IN REAL CONDITIONS
Session 5. Transport and Logistics System Modelling Proceedings of the 11 th International Conference Reliability and Statistics in Transportation and Communication (RelStat 11), 19 22 October 2011, Riga,
More informationCycle Track Design Best Practices Cycle Track Sections
Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide
More informationMulti-criteria Evaluation of Traffic Signal Control Manfred Boltze and Wei Jiang 1
Multi-criteria Evaluation of Traffic Signal Control Manfred Boltze and Wei Jiang Transport Planning and Traffic Engineering, Technische Universität Darmstadt Future City 2017: Urban Sustainable Development
More informationENCOURAGING TAXI DRIVERS TO BEHAVE: GRAFTON BRIDGE TAXI AND BUS LANE TRIAL
Encouraging Taxi Drivers to Behave Douglas-Jones, Segedin Page 1 ENCOURAGING TAXI DRIVERS TO BEHAVE: GRAFTON BRIDGE TAXI AND BUS LANE TRIAL Presenter: Rob Douglas-Jones, MEng, Traffic Operations Manager
More informationPark & Ride Implications for TRICS Users. TRICS UGM, June 2009
Park & Ride Implications for TRICS Users Jonathan Whittaker TRICS UGM, June 2009 Park and Ride Research Note TRICS users in response to previous User Group questionnaires have highlighted Park and Ride
More informationWEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS
Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd
More informationGdynia s bicycle model
Gdynia s bicycle model Problems related to cycling network and demand modelling Michał Miszewski, city of Gdynia Development of tool for transport analysis - MST Statistical data (baseline and forecasts)
More informationAppendix FRANCE Lyon Croix-Rousse Tunnel
Appendix 2.9 - FRANCE Lyon Croix-Rousse Tunnel 1. SUMMARY A NEW MULTIMODAL TUNNEL The Croix-Rousse tunnel is located in Lyons (France). The City of Lyons has about 475.000 inhabitants with 1,31 million
More informationGD 0043/18 ACTIVE TRAVEL STRATEGY
GD 0043/18 ACTIVE TRAVEL STRATEGY 2018-2021 May 2018 Minister s Introduction There is strong evidence that regular physical activity reduces the risk of a range of health conditions. The best way to increase
More informationStrategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment
Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -
More informationINDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:
INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.
More informationA65 TRANSPORT ASSESSMENT. 13 th May 2005
A65 TRANSPORT ASSESSMENT 13 th May 2005 1 CONTENTS 1.0 Introduction 2.0 Overview 3.0 Detailed Assessment of the A65 Corridor 4.0 Future Proposals 5.0 Conclusions List of Figures Figure 1: AM Average Traffic
More informationImpact of Signalized Intersection on Vehicle Queue Length At Uthm Main Entrance Mohd Zulhilmi Abdul Halim 1,b, Joewono Prasetijo 2,b
Impact of Signalized Intersection on Vehicle Queue Length At Uthm Main Entrance Mohd Zulhilmi Abdul Halim 1,b, Joewono Prasetijo 2,b 1,2 Smart Driving Research Center, Faculty of Civil and Environmental
More information