1 Team A6 OCR Change-out Event Mean Time: 20 Minutes, Drop Dead Time: 25 Minutes EVENT SUMMARY: Replace a pole mounted oil circuit reclosure (OCR) on a single phase distribution line for scheduled maintenance. OCR will weigh approximately 180 lbs. Line will be considered energized upon entering the event. Switching will be done to de-energize line to drop reclosure then re-energized after reclosure is changed out. Switching to de-energize line will follow a specific sequence; OCR will be opened from ground to kill load side of line, meter will be pulled from meter base and checked for voltage to confirm OCR is open, once confirmed, switch at take-off pole can be opened to isolate line feeding OCR from source. Take off pole shall be tagged with pole banner and stick(s) placed back on tarp/mat. Switching to de-energize is complete and event pole can now be climbed. Rubber gloves shall be required when climbing/descending pole, testing for primary and secondary voltage, and installing/removing grounds. Line shall be tested and grounded on both sides of work area. Wire shall be brushed before installing grounds. Testing of primary and placing/removing grounds must be done below neutral. Contact with neutral during this time will be subject to penalty. After line is tested and grounded, linemen will have option to work in leather gloves. OCR can then be dropped, tested, and re-hung. OCR must be set in non-reclosing position sometime prior to energizing. New jumpers and hotline clamps will be installed during event. Once OCR is changed, grounds can be removed and linemen shall descend pole to assist with switching to re-energize line. No switching can take place until linemen are on ground. In sequence linemen shall close switch at take-off to energize source side of line to OCR, manual switch on OCR shall be closed to energize load side of line, linemen will then check for voltage at meter base to confirm line is hot, then re-set meter into base, non-reclosing lever on OCR will then be placed back in reclosing position. Time will stop when the pole banner, meters, and all extension sticks are placed back on mat/tarp. Items to be furnished at event: Bierer AV40 Primary Voltage Detector, Pole Banner, # 4 soft drawn cooper jumpers for OCR, and hotline clamps. Bierer AV40 will have a universal attachment so it can be attached to either end of grip/shotgun stick. Teams must furnish all other tools needed for event. 1 Teams will be given 5 minutes set up time in which questions can be asked, rubber gloves tested, and meters tested. Make sure judges are aware of testing. 2 Event will start with all sticks, meters, hand tools, and hardware placed on mat/tarp. Exception to the rule applies to blocks, handline, and climbing tools as they will be allowed to be laid out in work area during set up time. 3 All switching shall be done from ground with extension stick(s). Stick must be inserted into ring of barrel and ring of OCR lever during switching. 4 Hot/Grip Sticks shall be a minimum length of 8. 5 Time will start when extension stick is removed from mat to start switching procedures. 6 After switching to de-energize is complete pole can be climbed, primary tested for voltage, grounds
2 installed and OCR dropped. 7 A rated manufactured pole gin and at a minimum 2 way blocks must be used to lower and raise the reclosure. The pole gin and blocks can be of any brand or style the team chooses as long as they meet load requirements and are not altered in any way. 8 The OCR that is lowered to the ground will be used as the new OCR. The reclosure shall be lowered all the way to the ground but does not have to be detached from rigging. The groundman will test reclosure with ohm meter, in open and closed positions, to check for continuity. Once the OCR is verified as in good working condition it can be raised back up the pole, with the assistance of men on pole if needed, for re-installation. 9 There will be a 10' diameter circle around the bottom of the pole that the climbers must wear gaff guards if they go outside of. There will be an additional 40' diameter circle around the bottom of the pole that the ground man must remain in while raising and lowering the reclosure. 10 OCR shall be equipped with a non-reclosing lever and a manual operating lever( open/close ring ) 11 Jumpers in OCR shall be changed out and new hotline clamps installed. Existing jumpers can be removed at any time during the event, new jumpers can be installed any time after OCR is lowered to ground. All connections (jumpers, ground and stirrups) shall be brushed. Be sure to make the judge aware when you are brushing the connections. 12 Brushing of connections/wire can be simulated by running hand or stick over surface. 13 New jumpers shall be made up after time starts. 14 Climbers must wear class 2 or higher rubber gloves while ascending/descending pole, using hot sticks while testing primary for voltage, installing/removing grounds and setting/pulling meter. This is a team event requiring 2 climbers to perform work on the pole. 15 The first climber must carry the hand line up the pole and secure it to the pole with a choker. The hand line may be secured below or above the neutral, but the lineman must not make contact with the uncovered neutral in the process of attaching hand line. All tools and material, with the exception of the pole gin and blocks, must be sent up and down the pole in a bag. The pole gin and blocks may be sent up on the hand line hook or in a bag. 16 It is very important that all actions are verified vocally. Reclosure open, line dead, switch open, stirrups brushed, line coming hot, etc. need to be loud enough for judges to hear. 17 Proper transition with secondary safety/fall restraint will be required when ascending/descending. 18 Judging will start when participants enter the event and continue until they exit the event. Teams will be judged on their conduct and must adhere to the code of conduct listed in the general rules. You are required and responsible to sign your score sheet. Once the score sheet has been signed and the team leaves the event the score is final and ineligible for appeal. All general rules will apply that have not already been specifically covered.
3
4
5
6
7
8
Journeyman Team Events
Journeyman Team Events Journeyman Team Rules Journeymen Teams Journeymen teams for the Florida Lineman Competition are comprised of three participants: 1. At least one of the climbers must be a Lineman
More informationWhiskey City Lineman Rodeo Competitive Events
Whiskey City Lineman Rodeo Competitive Events Team Events Hurt-man Rescue... 2 10 KVA Transformer Change-Out (Energized) 3 Crossarm Change-Out 4kv (Energized)... 4 3 Phase Conductor Tie- In (Dead & Grounded)..
More informationLawrenceburg. whiskey city rodeo. Event Summary and Rodeo Rules
Lawrenceburg whiskey city rodeo Event Summary and Rodeo Rules Events CROSS ARM CHANGE OUT ENERGIZED 12-minute mean time 18-minute drop-dead time Event Summary: Teams will be replacing an eight-foot fiberglass
More information2018 Public Power Lineworkers Rodeo General Rules for All Rodeo Competitors
2018 Public Power Lineworkers Rodeo General Rules for All Rodeo Competitors 1. All safety rules are to be observed during events. 2. A competitor may not compete if bleeding. 3. Rubber gloves are required
More informationApprentice Event Written Test Chief Judge: David Benenhaley
Apprentice Event Written Test Chief Judge: David Benenhaley Event Time: N/A Drop-Dead Time: 15 Minutes Summary: This event is a written test compiled of 24 true/false and multiple-choice safety knowledge
More informationFamilies are encouraged to attend and support their favorite lineworkers. This year family friendly activities will be scheduled throughout the day.
The 2017 Lineworkers Rodeo will be held on March 31 st and April 1 st at Horry-Georgetown Technical College. The Apprentice Written Test will take place at 1:00PM on Friday afternoon following the vendor
More informationCompetition Agenda FMEA 16 th Annual Florida Lineman Competition March 11-12, 2016 Orlando
Competition Agenda Friday, March 11 9:00 - Noon Competition Field Vendors/Trailer-truck registration and set up at the Lee Vista competition field site 10:00 - Noon Safety and Training Committee Meeting
More informationLADWP Lineman s Rodeo April 30, 2016
LADWP Lineman s Rodeo April 30, 2016 LINEMAN S RODEO SCHEDULE 7:00AM 8:00AM REGISTRATION JUDGE S MEETING 8:30 AM NATIONAL ANTHEM START OF COMPETITION 8:30 9:00am APPRENTICE QUIZ 10:00AM 2:00PM BALLOONS
More informationLADWP Lineman s Rodeo April 29, 2017
LADWP Lineman s Rodeo April 29, 2017 LINEMAN S RODEO SCHEDULE 7:00AM 8:00AM REGISTRATION JUDGE S MEETING 8:30 AM NATIONAL ANTHEM START OF COMPETITION 8:30 9:00am APPRENTICE QUIZ 10:00AM 2:00PM BALLOONS
More informationENMAX LINEMAN RODEO & SAFETY EXPO. July 14, 2018 CALGARY, ALBERTA
ENMAX LINEMAN RODEO & SAFETY EXPO July 14, 2018 CALGARY, ALBERTA Competition Events There will be four Journeyman Power Line Technician events and four Apprentice events. Journeyman Powerline Technician
More informationTVPPA Lineman Apprenticeship Program
Self-Study Modules Unit 1 Unit 2 Unit 3 Unit 4 Lineman Apprenticeship Program Skills Labs Pre-Apprentice Assessment Digger Derrick Training Fundamentals Lab 1 Construction Lab 2 Operations Lab 3 Underground
More informationAttached is a package of materials for the NCAMES 22nd Annual Lineman s Rodeo to be held in Fayetteville, North Carolina on May 16, 2019
TO: Safety Contacts Rodeo Participants FROM: NCAMES Safety & Training Committee SUBJECT: NCAMES 22nd Annual Lineman s Rodeo DATE: January 12 th 2019 Attached is a package of materials for the NCAMES 22nd
More informationLADWP/ IBEW LOCAL 1 8 LINEMAN S RODEO. LADWP Lineman s Rodeo May 19, 2018
LADWP Lineman s Rodeo May 19, 2018 LINEMAN S RODEO SCHEDULE 7:00AM 8:00AM REGISTRATION JUDGE S MEETING 8:30 AM NATIONAL ANTHEM START OF COMPETITION 8:30 9:00am APPRENTICE QUIZ 10:00AM 2:00PM BALLOONS AND
More informationOriginal Date of Issue: 04/09
POLICIES AND PROCEDURES DEPARTMENT: Environmental Health and Safety SUBJECT: Electrical Safety Program Original Date of Issue: 04/09 Reviewed 12/2011 Revised 12/2011 BACKGROUND ELECTRIC SHOCK It is well
More informationChange Crossarm Insulator with Hotsticks
Change Crossarm Insulator with Hotsticks S T U D E N T M A N U A L March 31, 2005 2 STUDENT TRAINING MANUAL Prerequisites: Introduction to Hotsticks module Use and Care of Hotsticks module Weights & Forces
More informationOEM Manual MODEL 2305 ECONOMICAL DIGITAL SINGLE CYLINDER SCALE
OEM Manual MODEL 2305 ECONOMICAL DIGITAL SINGLE CYLINDER SCALE 1 These instructions generally describe the installation, operation, and maintenance of subject equipment. The manufacturer reserves the right
More informationCOOPER POWER SERIES. D-73P3 bypass switches installation instructions. Switches MN008005EN. Effective April 2016 Supersedes S June 2013
Switches MN008005EN Effective April 2016 Supersedes S328-120-1 June 2013 D-73P3 bypass switches installation instructions COOPER POWER SERIES DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY The information,
More informationRODEO INFORMATION Chehaw Park All participants need to have a picture ID for registration.
RODEO INFORMATION The Eighteenth Annual Georgia Lineman s Rodeo Competition will be held on May 4, 2013 at the Chehaw Park - 105 Chehaw Park Road - Albany, GA 31701. Teams will compete in two divisions:
More informationELECTRIC OPERATING PROCEDURES Date: 11/01/06
Doc No.: NG-USA EOP D001 Page: 1 of 5 ELECTRIC OPERATING PROCEDURES SUBJECT: Cutouts Open/Enclosed Type SECTION: Distribution/Overhead REFERENCE: National Grid Retail Company Safety Manuals National Grid
More informationD Square Construction LLC
D Square Construction LLC Lock Out-Tag Out (LOTO) and Zero Voltage Verification (ZVV) Process and Plan Energized Work Process and Permit - 1 - Table of Contents 1) Instruction for using Decision Tree Analysis
More informationRODEO INFORMATION Camp John Hope All participants need to have a picture ID for registration.
RODEO INFORMATION The Eighteenth Annual Georgia Lineman s Rodeo Competition will be held on May 3, 2014 at the Camp John Hope-281 Hope Entrance Rd Fort Valley, GA 31030. Teams will compete in two divisions:
More information2019 Gaff-n-Go Lineman s Rodeo
2019 Gaff-n-Go Lineman s Rodeo Hosted by the Electric Cooperatives of Virginia, Maryland & Delaware 2019 Registration Packet Make plans now to join us for the 17th ANNUAL GAFF-n-GO LINEMAN S RODEO & EXPO,
More informationAttached is a package of materials for the NCAMES 20th Annual Lineman s Rodeo to be held in New Bern, North Carolina on May 18, 2017.
TO: FROM: SUBJECT: Safety Contacts Rodeo Participants NCAMES Safety & Training Committee NCAMES 20th Annual Lineman s Rodeo DATE: January 23, 2017 Attached is a package of materials for the NCAMES 20th
More informationInstallation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning
OWNER'S MANUAL Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System Model # s: 6000, 6001, 6010 Warning You must read and fully understand all instructions, or
More informationRODEO INFORMATION Camp John Hope:
2 RODEO INFORMATION The Twenty-Third Annual Georgia Lineman s Rodeo Competition will be held on May 6, 2017 at Camp John Hope: 281 Hope Entrance Rd, Fort Valley, GA 31030. Teams will compete in two divisions:
More informationANNUAL INTERNATIONAL LINEMAN S RODEO
Apprentices will test on Friday, October 12 th, 2018 at the ground floor of the Overland Park Convention Center. Testing will begin at 1:00 pm and run thru 4:00 pm The 35th ANNUAL INTERNATIONAL LINEMAN
More informationApplications and Considerations Section 11
11 Applications and Considerations Section 11 www.hubbellpowersystems.com E-mail: hpsliterature@hps.hubbell.com Phone: 573-682-5521 Fax: 573-682-8714 210 North Allen Centralia, MO 65240, USA Copyright
More informationC O M P E T I T I O N E V E N T S S U M M A R Y T I M E L I N E G O V E R N O R S C O N F E R E N C E R E G I S T R A T I O N
2017 Pole Top Rescue Competition Registration / Judging / Scoring Guidelines September 18-20, 2017 in Tacoma C O M P E T I T I O N E V E N T S S U M M A R Y T I M E L I N E Monday 9/18/2017 Tacoma Power
More informationCLIMBING Pads. Straps Gaffs Spikes Hardware
CLIMBING Pads Straps Gaffs Spikes Hardware Quick Change Aluminum Climbers CTB Tree and Pole Climbing Kit Kit with straps and L pads Patented design give these climbers strength, durability and style Utilizes
More informationLEADER NOTES FOR MAY 2012 STAND-DOWN
LEADER NOTES FOR MAY 2012 STAND-DOWN BEST PRACTICES PHILOSOPHY Properly executed Insulate and Isolate ( I&I ) techniques allow line workers to safely work on and/or around energized parts. The Best Practices
More informationSafety Manual: Hazardous Energy. January, 2017
Safety Manual: Hazardous Energy January, 2017 9.0 Hazardous Energy Introduction Energized equipment in the workplace pose a significant risk of injury and death. If the unexpected energization or start-up
More informationNESC WORKSHOP Revisions to Part 4 (Work Rules) Sam Stonerock. October 18, 2016
NESC WORKSHOP 2017 Revisions to Part 4 (Work Rules) Sam Stonerock October 18, 2016 Work Rules for the Operation of Electric Supply and Communications Lines and Equipment 2017 edition Reconcile existing
More informationLOCKOUT/TAGOUT PROGRAM
0 Appendix C OCCUPATIONAL SAFETY AND HEALTH PROGRAM LOCKOUT/TAGOUT PROGRAM Hazardous Energy Control Lockout/Tagout Program TABLE OF CONTENTS Section Page I. Purpose and Scope. 1 II. Definitions 1 III.
More informationOEM Manual. MODEL ½ Digit DRUM SCALE
OEM Manual MODEL 4020-3 ½ Digit DRUM SCALE Scaletron Industries, Ltd. Bedminster Industrial Park 53 Apple Tree Lane P.O. Box 365 Plumsteadville, PA 18949 USA Toll Free: 1-800-257-5911 (USA & Canada) Phone:
More information2015 KMU OVERHEAD ELECTRIC DISTRIBUTION WORKSHOP
2015 KMU OVERHEAD ELECTRIC DISTRIBUTION WORKSHOP SEPT. 30 - OCT. 2, 2015 MCPHERSON, KANSAS 2015 KMU OVERHEAD ELECTRIC DISTRIBUTION WORKSHOP SEPT. 30 - OCT. 2, 2015 MCPHERSON, KANSAS KMU is pleased to offer
More informationRemoving Yourself from Hazards During Equipment Operation
Removing Yourself from Hazards During Equipment Operation The safest way to work around electrical equipment is to turn it off. This is usually required by OSHA and NFPA 70E, but with some exceptions.
More informationPOWER DELIVERY. Contractor Health & Safety General Terms and Conditions. Appendix B Personal Protective Equipment
Personal Protective Equipment ( PPE ): All PPE worn on IPL job sites must have ANSI and/or approval ratings. Hard hats and safety glasses with side shields (including prescription eyewear) shall be worn
More informationHORSE RIDING CLUBS ASSOCIATION OF VICTORIA INC.
HORSE RIDING CLUBS ASSOCIATION OF VICTORIA INC. OBSTACLE GUIDELINES (Including Style Phase directives) The design of the obstacle course will depend on the size and shape of the available area, the footing,
More informationOverhead School. MMUA/APPA/MREA September 12-15, 2017 MMUA Training Center, Marshall, MN
Overhead School MMUA/APPA/MREA September 12-15, 2017 MMUA Training Center, Marshall, MN Minnesota Municipal Utilities Association (MMUA), along with our partners Minnesota Rural Electric Association (MREA)
More informationSAFETY DIRECTIVE 2.0 DEPARTMENTS AFFECTED. This Administrative Directive shall apply to all Town of Marana departments and employees.
SAFETY DIRECTIVE Title: Control of Hazardous Energy Lock-out/Tag-out/Try-out Issuing Department: Town Manager s Safety Office Effective Date: July 1, 2014 Approved: Gilbert Davidson, Town Manager Type
More informationArc Flash. Safety 21
Arc Flash Safety 21 Arc Flash Introduction Electrical Hazards Safety Planning De-Energizing Equipment Working Hot Summary Introduction Most people don t think about electricity very much, which is surprising
More information: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA
1910.269: Electric Power Generation, Transmission, and Distribution Region IV - OSHA Scope This standard covers the operation and maintenance of electric power generation, control, transformation transmission,
More informationDuPage County Environmental, Safety, Health & Property Loss Control Program Hazardous Energy Control (Lockout/Tagout)
Purpose: To provide the minimum requirements for the lockout or tagout of energy isolating devices whenever work is performed or servicing is done on County of DuPage machinery, equipment, vehicles and
More informationSunbrite LTC Large Underwater Pool Lights
Sunbrite LTC Large Underwater Pool Lights O W N E R S M A N U A L 3050 0997 ASB INSTALLATION, OPERATION & PARTS This manual should be furnished to the end user of this light; its use will reduce service
More information2018 Kentucky Lineman s Rodeo
2018 Kentucky Lineman s Rodeo SEPTEMBER 13-14, 2018 REGISTRATION PACKET Table of Contents Our Goal, Rules of Eligibility, Journeyman Team Definition, Ground-Man Definition, Description of a Climber, Individual
More informationLOCKOUT/TAGOUT PROGRAM
Santa Clarita Community College District LOCKOUT/TAGOUT PROGRAM Revised March 2018 TABLE OF CONTENTS PURPOSE... 3 COMPLIANCE...4 DEFINITIONS...5 SECTION I - ENERGY CONTROL PROCEDURES... 7 SECTION II -
More informationTower Accessories & Hardware
Safety-Climb Cable System for Climbing Ladder These Safety-Climb Cable products clamp to climbing ladder rungs up to 1-1/4" (32 mm) in diameter. The products meet or exceed OSH requirements for climbing
More informationSAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT
SAMPLE WRITTEN PROGRAM for Control of Hazardous Energy LOCKOUT TAGOUT SAMPLE WRITTEN PROGRAM The objective of this procedure is to establish a means of positive control to prevent the accidental starting
More informationPROPORTIONING VALVE. Model 150 INSTRUCTION MANUAL. March 2017 IMS Company Stafford Road
PROPORTIONING VALVE Model 150 INSTRUCTION MANUAL March 2017 IMS Company 10373 Stafford Road Telephone: (440) 543-1615 Fax: (440) 543-1069 Email: sales@imscompany.com 1 Introduction IMS Company reserves
More informationKMU SUBSTATION WORKSHOP
Rick Aguilar, Director of Job Training & Safety KMU SUBSTATION WORKSHOP JUNE 29-30, 2016 OTTAWA, KS Hazards & Safety Rules Qualified Personnel & Task-Based Hazard Mitigation Worksite Applications & Considerations
More informationINSTRUCTION MANUAL. 840 Transmitter. Loop Powered Dissolved Oxygen Transmitter
INSTRUCTION MANUAL Loop Powered Dissolved Oxygen Transmitter Contents Contents...2 Introduction...3 Range and Display Settings...4 Installation...5 Electrical Installation...6 Calibration...7 EasyCal...8
More informationCATHOLIC YOUTH ORGANIZATION FOOTBALL RULES/REGULATIONS
CATHOLIC YOUTH ORGANIZATION FOOTBALL RULES/REGULATIONS I. PLAYING RULES: 1 October 2017 A. Official Rules: The rules of the CYO Football League are those of the National Federation of State High School
More informationHazardous Energy Control (Lockout-Tagout)
Hazardous Energy Control (Lockout-Tagout) The purpose of this program is to prevent inadvertent operation or energization of machines, equipment, or processes in order to protect employees and establish
More informationUnderwater Wet Welding Products Operating Instructions
BROCO Inc. 400 S. Rockefeller Ave. Ontario, CA 91761 USA (909) 483-3222 (909) 483-3233 Fax (800) 845-7259 Underwater Wet Welding Products Operating Instructions Product Warnings WARNING Please read and
More informationWLCC BULLETIN. OSHA ET&D 10 Hour Refresher Training
WESTERN LINE CONSTRUCTORS CHAPTER BULLETIN 3/7/2016 WLCC BULLETIN ETD 10-HOUR COURSE IN THIS ISSUE OSHA ET&D 10 Hour Refresher Training The OSHA ETD Partnership has released the 1 st Quarter 2016 refresher
More informationService Instructions. Syntron Control Model: CSCR-1-B (115V)
Service Instructions Syntron Control Model: CSCR-1-B (115V) Syntron CSCR-1-B (115V) Control INSTALLATION OPERATION MAINTENANCE Thank you for buying your equipment from Syntron Material Handling. This manual
More informationCONNECT-N-CLIMB Climbing Aids
CONNECT-N-CLIMB Climbing Aids INCLUDES MODEL #'s: RE723, 20' CONNECT-N-CLIMB RE72, 15' CONNECT-N-CLIMB RE725, 5' CONNECT-N-CLIMB EXTENSION Wear Your Harness! Maximum Height - 20' Maximum Field Rating -
More informationMini-Mac Applicator Specification Sheet Part No (Replaces )
Mini-Mac Applicator Specification Sheet Part No. 63801-2900 (Replaces 19814-1000) FEATURES Œ Quick set-up time; plus the crimp height, track and feed adjustments can be preset in applicator Œ Conductor
More informationInspection Recommendations
S&C Vista SD Underground Distribution Switchgear Pad-Mounted and Vault-Mounted Styles Outdoor Distribution (17.5 kv and 29 kv) With Visi-Gap Load Interrupter Switches and Visi-Gap Fault Inetrrupters Inspection
More information32374 R. Jazowski 4/4/ D. W. Mudge G. Sivik 1 of 8 ODN TITLE: Installation & Operation Manual for Nautilus G2 Connectors
PER CO # Approved By: 32374 R. Jazowski Originator: Checked By: W. Mudge G. Sivik 1 of 8 ODN-342-23 23 TITLE: Installation & Operation Manual for Nautilus Teledyne Oil & Gas 1026 North Williamson Blvd.
More informationBIG FOOT TREE LADDER WE ARE HUNTERS. Operator's Manual MODEL RE729. Maximum Height. Maximum Field Rating. Tree Diameter Range. Wear Your Harness!
WE ARE HUNTERS BIG FOOT TREE LADDER MODEL RE729 Maximum Height 23' to top Maximum Field Rating 300 lbs Tree Diameter Range 8" to 20" Wear Your Harness! PRODUCT MEETS INDUSTRY STANDARDS RECOGNIZED BY Get
More information2012 NFPA 70E: Electrical Safety In The Workplace
ERI Safety Videos Preventing Injuries Through Employee Training 2984 2012 NFPA 70E: Electrical Safety In The Workplace Leader s Guide ERI Safety Videos 2012 NFPA 70E: Electrical Safety In The Workplace
More informationIsolation of power supplies
Isolation of power supplies Guidance Note 14 Jan 14 1 Isolation of power supplies Legal Obligations The Health and Safety at Work Act 1974 sets out the general health and safety duties of employers, employees
More informationAPPENDIX A. for 6-17-A and B ACCIDENT PREVENTION, EDUCATION, FIRST AID AND SAFE PRACTICE PROCEDURE COMPILED BY
APPENDIX A S A F E T Y R U L E S for 6-17-A and B ACCIDENT PREVENTION, EDUCATION, FIRST AID AND SAFE PRACTICE PROCEDURE COMPILED BY JOINT SAFETY COMMITTEE CONSISTING OF MEMBERS OF LOCAL UNION 17, INTERNATIONAL
More informationInstallation and Operation
S&C TripSaver Dropout Recloser Outdoor Distribution (15 kv and 25 kv) Installation and Operation Table of Contents Section Page Section Page Introduction Qualified Persons.... 2 Read this Instruction Sheet....
More informationDEPARTMENT of PUBLIC SAFETY DIVISION of FIRE COLUMBUS, OHIO
DEPARTMENT of PUBLIC SAFETY DIVISION of FIRE COLUMBUS, OHIO SUBJECT: Administration TITLE: SOP Revisions- 02-03-17 Electrical Emergencies PURPOSE: Implementation ORIGINATING BUREAU: Emergency Services
More informationCLIMBING STEEL POLES INSTRUCTOR GENERAL LESSON OUTLINE ONLINE/CLASSROOM SESSION
INSTRUCTOR GENERAL LESSON OUTLINE ONLINE/CLASSROOM SESSION This lesson describes different steel pole steps and discusses strategies for climbing, descending, and positioning steel poles to reach work
More informationMODEL WEIGH MODULE
MODEL 65082 WEIGH MODULE INSTALLATION & OPERATING MANUAL P.O. Box 775 - Farmington, NH 03835 Tel: 603-755-3885 email: cands_nh@msn.com www.candscontrols.com Model 65023 Cantilever Beam Transducer Nickel-Plated
More informationART. 4...A foul throw is one which is counted as a trial but which is not measured because of some violation of the rule.
DISCUS ******************************************** RULE 6 -- THROWING EVENTS ******************************************** SECTION 1 DEFINITIONS ART. 1...A trial is an attempt in a throwing event. Each
More informationLockout/Tagout - Energy Control Program
Lockout/Tagout - Energy Control Program Lockout and Tagging of ELECTRICAL Circuits This portion of the K.R. Miller Contractors, Inc. safety program has been created to maintain a written copy of procedures
More informationRush Fire District DEUS Training
Rush Fire District DEUS Training Firefighter Bailout Parts of a Vertical Descent/Rescue System Parts of a DEUS 3000-Series Controlled Descent Device Parts of a DEUS 3000-Series Controlled Descent Device
More informationLOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS
LOCKOUT/TAGOUT: Operating Procedure TABLE OF CONTENTS A. PURPOSE 1 B. FACILITIES STAFF RESPONSIBILITIES 2 C. TRAINING AND RETRAINING of AFFECTED and EUTHORIZED EMPLOYEES 3 NINE POINTS TO REMEMBER 5 LOCKOUT/TAGOUT
More informationPRESCOTT SCHOOL DISTRICT NO South A Street Prescott, WA The Control of Hazardous Energy (Lockout/Tagout)
PRESCOTT SCHOOL DISTRICT NO. 402-37 207 South A Street Prescott, WA 99348 509-849-2217 The Control of Hazardous Energy (Lockout/Tagout) I. Purpose The Control of Hazardous Energy (Lockout/Tagout) This
More informationHealth & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY
SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY 1. CONTROL OF HAZARDOUS ENERGY POLICY AND PROCEDURES A. OSHA References: 29 CFR 1910.147, 29 CFR 1910.332, 29 CFR 1910.333, 29 CFR 1926.417 B.
More informationLOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM
LOCK-OUT/TAG-OUT (LO/TO) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.147 BASIS: Approximately three million workers in the United States face risks from uncontrolled energy when servicing machinery
More informationIce Protection System
Cirrus Design Section 9 Pilot s Operating Handbook and FAA Approved Airplane Flight Manual Supplement for Ice Protection System When the Ice Protection System is installed on the Cirrus Design, this POH
More informationSAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures
SAFETY QUALITY TECHNOLOGY Guidance on Safe Isolation Procedures Introduction Every year, people working on construction sites suffer electric shock and burn injuries some of which, tragically, are fatal.
More informationS Surge Arresters
Surge Arresters UltraSIL Polymer-Housed VariSTAR Type US, UH, and UX Station-Class Surge Arresters Installation and Maintenance Instructions Service Information S235-88-1 Contents Product Information...........................1
More informationHealth and Fire Safety Review 2/15
Health and Fire Safety Review 2/15 1 TABLE OF CONTENTS Page 3 Scope 3 Control of Hazardous Energy (Introduction) 3 Authorized Employee 3 Employer Responsibility 4 Tagout Devices 4 Lockout Devices 5 General
More informationCOOPER POWER SERIES. 50 A 2:1 series multiple (dual voltage) switch cap/wrench, lever or hotstick operable handles installation instructions
Voltage Regulators MN800013EN Effective February 2016 Supersedes S800-70-1 August 2012 COOPER POWER SERIES 50 A 2:1 series multiple (dual voltage) switch cap/wrench, lever or hotstick operable handles
More informationColor My Ride Obstacle Challenge
Class (s): 1-In Hand Arena: Main Arena Start Time: 8 Am When it is your turn to compete, enter the arena and halt. Acknowledge judge, then begin course. You will have one minute to complete each obstacle.
More informationRevised on : 05. Jun TECHNICAL GUIDE PARTS CATALOGUE. Cal.VD51C ANALOGUE QUARTZ. SII Products
Revised on : 05. Jun. 2018 TECHNICAL GUIDE & PARTS CATALOGUE ANALOGUE QUARTZ [SPECIFICATION] Item PARTS CATALOGUE / TECHNICAL GUIDE Cal. No. Movement Movement size Outside diameter Casing diameter Total
More informationDK ton, Double-acting, Die-type Crimping Tool
INSTRUCTION MANUAL DK6040 60-ton, Double-acting, Die-type Crimping Tool Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Register
More informationLockout/Tagout Training Overview. Safety Fest 2013
Lockout/Tagout Training Overview Safety Fest 2013 Purpose of Lockout/Tagout The standard covers the servicing and maintenance of machine and equipment in which the unexpected energization or start up of
More informationKERSPLASH POOL CLIMBING WALL INSTALLATION INSTRUCTIONS
TOLL FREE: 1-800-476-7366 VOICE 651-665-9131 FAX 651-665-9130 EMAIL: INFO@POOLCLIMBINGWALLS.COM EVERLAST CLIMBING 1335 MENDOTA HEIGHTS ROAD MENDOTA HEIGHTS, MN 55120 2012 EVERACTIVE BRANDS Congratulations!
More information2. The purpose of this program is to achieve the following objectives:
Section 16A. Lockout and Tagout Program 1. In the course of their duties, personnel at the TFREC may need to secure controls, switches, and equipment in order to prevent injury caused by the sudden, unexpected
More informationControl of Hazardous Energy Program (Lockout/Tagout)
Control of Hazardous Energy Program (Lockout/Tagout) 1 The Control of Hazardous Energy (Lockout/Tagout) Program 1910.147 The following lockout/tagout program is provided to assist employees in complying
More informationBlue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION
Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION Install your Blue River Technologies Port-A-Poly mixing system in a clean dry area.
More informationArbor Terminator Press Operation Manual For IDT Connectors Order No Engineering No: AM
Arbor Terminator Press Operation Manual For IDT Connectors Order No. 11-20-0815 Engineering No: AM7223-140 Description Operation Maintenance Order No: TM-011200815 Release Date: 03-08-12 UNCONTROLLED COPY
More informationLockout/Tagout - Control of Hazardous Energy Program
Lockout/Tagout - Control of Hazardous Energy Program The University Of Iowa Environmental Health & Safety 122 Grand Avenue Court Iowa City, IA 52242-1000 Phone: 319-335-8501 Date Revised/Reviewed: 6/8/2018
More informationWINCH USER GUIDE WARN 3000ACI Utility Winch Part Number: 93000
WINCH USER GUIDE WARN 3000ACI Utility Winch Part Number: 93000 Your safety, and the safety of others, is very important. To help you make informed decisions about safety, we have provided installation
More informationHSE guidelines. SMay 2015 ELECTRICAL SAFETY HSE LIFE THE NATIONAL OIL&GAS INDUSTRY STANDARD FOR PROFESSIONALS
HSE guidelines SMay 2015 ELECTRICAL SAFETY HSE LIFE THE NATIONAL OIL&GAS INDUSTRY STANDARD FOR PROFESSIONALS Work safely or do not work at all There are strict procedures when working on electrical installations
More informationE. Test, and if needed, adjust tips of antenna. 1. Mark will test antennas with meter at ground end of feedline bundle. Will take 10 minutes.
Project Steps Overview: A. Prepare: B. Raise up small antenna. C. Raise up large antenna. D. Connect to new bundle of 4-feedlines pulled up from ground. E. Test, and if needed, adjust tips of large antenna.
More informationHIGH-IMPACT SAFETY TRAINING FOR QUALIFIED ELECTRICAL WORKERS
HIGH-IMPACT SAFETY TRAINING FOR QUALIFIED ELECTRICAL WORKERS This easy-to-use Leaders Guide is provided to assist in conducting a successful presentation. Featured are: INTRODUCTION: A brief description
More informationStone Container 987 Auger Packer Manual
Stone Container 987 Auger Packer Manual SAFETY INSTALLATION OPERATION MAINTENANCE, Ltd. (512) 352-3694 Phone (512) 352-3648 Fax 1 Table of Contents Topic Reconditioned Machine Information Page Insert Chapter
More informationErik Backström, High Voltage breakers, After Sales & Service High voltage SF 6 live tank circuit breakers After Sales & Service Training course
Erik Backström, High Voltage breakers, After Sales & Service High voltage SF 6 live tank circuit breakers After Sales & Service Training course description LTB72,5-170 D with BLK222 & FSA1 Level A & B
More informationLockout Tagout Program
Lockout Tagout Program 1.0 INTRODUCTION Public Safety Department Environmental, Health and Safety (EHS) Division Standard Operating Procedure (SOP) #18 Purpose To ensure that machinery or equipment is
More informationLO/TO LOCKOUT/TAGOUT PROGRAM
LO/TO LOCKOUT/TAGOUT PROGRAM April 2017 CONTENTS Section 1: Introduction...1 Section 2: Purpose... 1 Section 3: Application... 1 Section 4: Definitions... 2 Section 5: Roles and Responsibilities... 4 Section
More informationTECH TIPS TZ34/20 & TZ50/30. Service Call: Machine will not automatically level. Tools Needed: Multi Meter Jumper wire 7/16 Combination wrench.
Service Call: Machine will not automatically level. Tools Needed: Multi Meter Jumper wire 7/16 Combination wrench Model: TZ34/20 & TZ50/30 Tech Tips Safety Rules Danger Failure to obey the instructions
More informationOwner s Manual
Owner s Manual sales@startracks.org www.startrackslifts.com 1-574-596-5331 Please do not use your new Easy-Reach until you have read this manual thoroughly. Table of Contents Welcome Your New Easy-Reach
More information