Riviera Draft Shaft Hole Boring
|
|
- Barry O’Brien’
- 5 years ago
- Views:
Transcription
1 Riviera Draft Shaft Hole Boring
2 a. Height from bottom of hull thru the hull to the center of the drive shaft. This will be calculated. b. Height of drop of strut. The strut for the Riviera is 7.5 c. Distance from rear of hull to center of rudder shaft. This is set at 6 per the plans. d. Distance from center of rudder shaft to front of strut. Adding 1 clearance between strut and prop, prop collar thickness, 1 for prop nut and space to take prop off (estimated at 3 ). Be sure to add the distance from center of rudder shaft to rear most point of rudder. The rudder I am using measures 2.5 from center of rudder shaft to rear edge. For my purposes, I needed 8 inches clearance between the strut and rear edge of the rudder. I determined to set this at 10. e. Distance from strut face to entry into hull as measured on center line of shaft Using an online calculator to determine the distances. The calculator can be found at In this measurement, I am using the 7.5 drop on the 16* strut to get the measure from face of strut to entry point in hull. The entry point measure is c or This is my e measurement on my engine drawing. Thus: c = 6 from rear of transom to center of rudder shaft
3 d = 12.5 : 2.5 (center of rudder shaft to rear edge of rudder) + 3 (clearance for prop removal) +1 (nut) + 3 (prop collar) + 1 (space clearance between prop and strut face) + 2 (just because) e= distance from face of strut to shaft entry as measured on centerline of shaft Total of distance from transom to shaft entry hole. I then wanted to verify the engine location to verify position between the frame members. To get the distance between the center line entry hole into the hull and middle of flange on rear of engine, I had to reverse some calculations on the calculator. I estimated my shaft at 10 coming out of the keel to the rear of the engine. This is a combination of the length of the shaft log, shaft bearing, thickness of the shaft mounting flange plus giving myself 2 extra between the flange face and shaft bearing. The calculator showed that my hole measured 8.16 thru the hull. This gives me a shaft length from the entry hole to the face to transmission at Thus, the measurement from the entry hole center line to face of transmission is 17.45
4 This is the f value in my original drawing So bringing it all together to determine the engine location From the original drawing C= 6 D= 12.5 E= F= Total from transom to face of transmission is perfectly fits in the engine compartment between the frame members
5 I cut a 4x4 block of wood to receive the drill bit and direct it cleanly into the hull. The face of the block was cut at 16 angle so that it was square with the line of the drill bit. I also cut the bottom of the block so that it fit over the angle of the keel at the anticipated point on the hull. The bottom measured about 8 degrees sloping in both directions from the keel. The cut was made on the table saw. I am working on the hull prior to final fairing in preparation for fiberglass.
6 On the face of the block I drew a 1 diameter circle and located the center. This was to emulate the drive shaft. The bid I will be using is a 1 ¾ Forstner bit so the circle was raised about ¾ from the bottom of the block to clear the hull at the this entry point. I used a spare batten for preliminary lineup. Remember, the block has to move forward from the expected entry point of the shaft into the hull.
7 I then insured my strut was in position and used a framing square to line up the center line of the shaft with the hull location measurement.
8 Checking to make sure my angles are right using an inexpensive angle finder from Lowe s. The keel has a little more than a degree rise from from the transom going forward so I expected the angle finder to show about 15 degrees. The strut is 16 but setting on the keel which lowered the angle closer to 15 degrees.
9 Time to flatten the area for the strut to be mounted. Since the Riviera has a relatively flat bottom near the transom, I did not feel it necessary to route a spot for the base of the strut and simply flattened the area with a belt sander. Any minor deviation in the sanding will be remedied with thickened epoxy. The sanding effectively lowered the position of the strut on the keel by about ½ inch. I recalculated how this effected the position of the entry hole and position of the engine. It shortened the distance by 1 ¾. This is great for it moved my engine rearward. I needed all the room I can get.
10
11 Setting the strut in the flattened area and checking the angle again. Here I am using the drill bit extension rod to hold the magnetic angle finder. The extension is only 5/8 in diameter so I had to insert a wedge to center it in the shaft. The angle is good.
12 Time to set everything up. I purchased an inexpensive rotating lazer from Lowes for about $60. I set it up on the transom straddling the keel over the rudder location. This allowed me to shoot a line down the strut, across the block and down the keel line to insure everything lined up. The drill is a 1 ¾ Forstner bit with 2 18 extensions. This was sufficient length to get me thru the hull and keel. The Forstner bit is hard work but it cleans as it goes. A hole saw is faster drilling but you have to stop and clean out the plug with a chisel every inch or so. Once the Forstner bit breaks thru the keel inside it will lock up. I used a hole saw to finish the hole all the way thru. It was simple to climb under the boat and break out the plugs at this point rather than working from inside the bored hole.
13 Everything was fastened down. I used the strut to guide the drill extensions. The strut was screwed down to prevent moving. I did not drill the mounting holes at this time in the event something changed. The block as strapped down and 1 screws were set at each corner. I made sure the screws were out of the alignment of the drill bit. I found a piece of 1 aluminum rod to emulate the shaft and lined up the circle on the block perfectly. I wooden rod would have worked just as well.
14 One last check with the lazer and angle guage to make sure everything is lined up. Time to drill.
15 Hole Drilled. Upon cleaning up, the measure mark on the hull where the shaft center was anticipated was dead on the mark. Now time to clean the hull completely and fiberglass. I fiberglass insert will be made later when I have the engine and drive shaft so that everything has plenty of clearance. Some chips on the edge of hole did break loose which will be restored with the fiberglass work. Total time: About 2 1/2 hours including calculations Total cost: $180 including lazer, drill bits (both hole bit and forstner bit), two 18 drill bit extensions, and angle gauge. Everything was purchased at Lowe s and nothing had to fabricated. I am a simple guy and just do things with common sense. This was inexpensive and rather quick. Some purists would take objection to my methods but it worked so what can I say. Please pardon the work in progress on the hull. The final product will be much nicer looking than this. However, in all construction, the ugly stage is just prior to the final product. David V. Lott
Step 1: Block sand the transom to remove the seam joint. The end result should be a flat transom without a ledge where the seam joint is.
WhiplashGV Instruction Manual Email: Brian@Blazermarine.com Phone: 513-598-1769 Step 1: Block sand the transom to remove the seam joint. The end result should be a flat transom without a ledge where the
More informationSEADUCER BOATS GAS MONO COME VISIT US ON THE WEB AT
SEADUCER BOATS GAS MONO COME VISIT US ON THE WEB AT WWW.SEADUCERBOATS.COM 1 - Pkg. Of 440 push rod ends 1 - Pkg. of solder-on rod ends 2 -water outlet fitting 1-1/4" prop nut 1 -.250" x 24" flex shaft
More informationSEADUCER BOATS GAS SPORT HYDRO
SEADUCER BOATS GAS SPORT HYDRO COME VISIT US ON THE WEB AT WWW.SEADUCERBOATS.COM 2 - Pkg. Of 440 push rod ends 2 - Pkg. of solder-on rod ends 2 -water outlet fitting 1-1/4" prop nut 1 -.250" x 30" flex
More informationRudder Bearing Systems. Durable, water-tight and abrasion-resistant bearing products that eliminate metal-on-metal contact.
Rudder Bearing Systems Durable, water-tight and abrasion-resistant bearing products that eliminate metal-on-metal contact. PRODUCT CATALOG 2014 Specialists in innovative, high-quality marine systems for
More informationConstitution Instructions
Constitution Instructions This kit will build a 1:48 scale hull for the USS Constitution frigate. The kit contains the following parts. 1/8 deck with laser etched deck lines 1/8 railing Ribs Center keel
More informationTrim Tab Wind Vane for boats with transom mounted rudders
Trim Tab Wind Vane for boats with transom mounted rudders If your boat has a transom mounted rudder, you can build this self-steering windvane for around $150, using regular wood working tools and some
More informationPanoptix PS51-TH FrontVü/LiveVü Thruhull
Panoptix PS51-TH FrontVü/LiveVü Thruhull Transducer Installation Instructions Important Safety Information WARNING See the Important Safety and Product Information guide in the chartplotter or fishfinder
More informationBlazer Marine, Whiplash Sport Hydro
Blazer Marine, Whiplash Sport Hydro Thank you for choosing to build the Whiplash Sport Hydro. We have spent over 12 years perfecting this design, and finally we are making it available to the world. We
More informationBlazer Marine, Whiplash Sport 40
Blazer Marine, Whiplash Sport 40 Thank you for choosing to build the Whiplash 40. We have spent over 12 years perfecting this design, and finally we are making it available to the world. We are excited
More informationTANDEM plus BLUMOTION 563H/563. installation instructions
56H/56. installation instructions inside Full extension concealed runners Basic components ocking devices New side adjustment New rear side adjustment otate side adjustment left or right equally on both
More informationExtension Platform. Base Platform. Crossover. Exit railing. Exit Railing
Base Platform Galvanized With metal grate and two brackets Railing on the long side and a face side Extension Platform Galvanized With metal grate and one bracket Railing on the long side with rail connection
More informationTANDEM plus BLUMOTION 563F installation instructions
56F installation instructions inside Full extension concealed runners Basic components ocking devices New side adjustment New rear side adjustment otate side adjustment left or right equally on both locking
More informationTANDEM plus BLUMOTION 569F/569A installation instructions
TANDEM plus 569F/569A installation instructions inside Heavy duty full extension concealed runners Basic components Locking devices Runners New side adjustment New rear side adjustment Rotate side adjustment
More informationAMYA Soling 50 Class Rules
AMYA Soling 50 Class Rules - 2009 Overall General Specifications Length = 50 Overall Beam = 12 1/8 Overall Draft = 11 Sail Area = 800 Square Inches Displacement = 17 lbs. Minimum Mast Height = 61-1/4 Maximum
More informationIMPORTANT: RECEIVING INSTRUCTIONS:
Instruction Sheet Sidewinder Mechanical Bender IMPORTANT: RECEIVING INSTRUCTIONS: Visually inspect all components for shipping damage. If any shipping damage is found, notify carrier at once.shipping damage
More informationA Low Cost Digital Angle Gage, version 3
A Low Cost Digital Angle Gage, version 3 By R. G. Sparber Copyleft protects this document. 1 Sometimes re-inventing the wheel has advantages. What you see here is just a variation on a sine bar. The accuracy
More informationHow to Set-Up an 18-Cell Monohull for 4 Minute Offshore & Sprint Oval Racing Using the FDM Turbo Transmission
How to Set-Up an 18-Cell Monohull for 4 Minute Offshore & Sprint Oval Racing Using the FDM Turbo Transmission By Ralph von Eppinghoven Metro Marine Modelers Toronto, Canada Offshore style, Fast Electric
More informationAVA Building Instructions
Suggested Assembly Sequence: AVA Building Instructions 1. Insert fittings in rudder and trial fit rudder on boom 2. Attach stab to v-mount and position ahead of rudder ¼, sanding the v-mount as needed.
More information1/10 th Scale 1956 Ted Jones Classic Hydroplane
1/10 th Scale 1956 Ted Jones Classic Hydroplane Preparation These plans show outside sheeting of 3/32 balsa laminated with 1/64 birch ply. This makes a light and strong skin for this boat. Optionally you
More informationTroyer s Gourd Rack 8 unit F R H O P
B E A D I M-N L Vertical Parts F R H O P Horizontal Parts C G J Updated 11/16 Parts List A: Top of Pole B: Bottom of Pole C: 48 Ground Stake D: Top Perch rods 48 long E: Hub F: Rope Winder w/ attached
More informationBelow are the instructions to build a roller-furling unit for under $10. Read the entire process before beginning the project.
Greg Cowens' $10 PVC Roller Reefing for CP-16's by Greg Cowen Below are the instructions to build a roller-furling unit for under $10. Read the entire process before beginning the project. Materials: 2
More information18. Tailplane torque-tube
18. Tailplane torque-tube Step 1 Fu se lage rear bulkhead Remove the three part templates of the rear bulkhead: an A4 size sheet from Annex A (page 5) and two A3 size sheets from Annex F of the manual,
More informationSoling Building Tips II
Soling Building Tips II Prepared: Arthur Deane Jan 20, 2002 adeane@ic.net Introduction The following are some lessons learned and experience gained in building a Soling kit. The plan developed is based
More informationStevenson Projects Building the Hull Top Deck and Bulkheads
Stevenson Projects Building the Hull 1. Print out both piece sheets. 2. Cut out one keel piece and glue it to a piece of balsa wood or dense cardboard. Cut out the second keel piece and glue it to the
More informationUser Manual GRI- 1500Li
User Manual GRI- 1500Li Your Cart Tek caddy cart was thoroughly quality control checked and road tested before being shipped to your address. We do everything possible to assure that your caddy is in perfect
More informationPaper Tiger Catamaran International Association MEASUREMENT FORM
Paper Tiger Catamaran International Association MEASUREMENT FORM Amended June 2000: July 2002: April 2012 Name of boat: Sail No: Owner s name: Owner s address: Postcode: Phone: (H) (B) (Mob.) Email: Owner
More informationLectric Cycles Mid-Drive Electric Motor Installation
Lectric Cycles Mid-Drive Electric Motor Installation This write-up describes the installation of a Lectric Cycles electric motor. The model is the e-rad Mid-Drive 750 Watt conversion kit, installed on
More informationRAI-M series RUDDER ANGLE INDICATOR SYSTEM
RUDDER ANGLE INDICATOR SYSTEM RAI-M series SEAFIRST ENGINEERING CO 45-16, Ga Um Dong, Chang Won, Kyong Nam Korea Tel : 82 55 267 1645 Fax ; 82 55 266 1646 http://www.seafirst.co.kr GENERAL Seafirst Rudder
More informationLITTLE TRI construction
LITTLE TRI construction I have built almost anything that can sail. At the age of 12 my first sail thing, an ice boat. I used skates which had to be mounted on shoes as runners. Big fun, very fast, only
More informationMUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.
Installation Instructions manual MUELLER table of contents PAGE A-20814 Wall Type General Information 2 Technical Data/ Dimensions Installation 4-5 Maintenance 6 Parts 7 Indicator Post! WARNING: 1. Read
More informationConstruction Chapters Index
Construction Chapters Index 9 7 8 Chapters Index c. c. c. c. c. c. c7. c8. c9. c0. c. c. c. c. c. c. c7. Balsa Wood Skeleton Strip Planking Hull Fairing Keel Bulb Mould Lead Bulb Casting Keel Construction
More informationINSTALLING YOUR CLC RUDDER
INSTALLING YOUR CLC RUDDER These instructions are written to help you install the CLC rudder kit on your wooden kayak. The rudder can be fitted to your boat during construction or after completion. Please
More informationFairlane & Meteor Instruction Package RC-114K. Rear Coilover Suspension Kit NOTE...
ROD & CUSTOM Motorsports INCORPORATED 1962-1965 Fairlane & Meteor Instruction Package RC-114K Rear Coilover Suspension Kit NOTE... PLEASE READ ALL INSTRUCTIONS INCLUDED WITHIN THIS PACKAGE. IF AFTER READING
More informationPT 11 trouble-shooting and maintenance.
PT 11 trouble-shooting and maintenance. Does your rudder not stay down?...your back seat slip off?...your knobs tight and your leather pads loose? Maybe we can help. We have used our PT 11 s hard enough
More informationTruckSkin System Installation Manual
TruckSkin System Installation Manual TruckSkin 877-866-SKIN www.truckskin.com How to Install a TruckSkin Page 1...Questions? Call us at 877-866-7546 TruckSkin.com 1 2 Open your package and verify that
More informationTUNE YOUR SAILS SPEED. Optimist Tuning Guide. Photo Wavelength
TUNE YOUR SAILS FOR OUTRIGHT SPEED Photo Wavelength PEAK / HEAD THROAT TACK CLEW THANK YOU for choosing North Sails for your Optimist. Whether you are just starting out in an Optimist you are an experienced
More informationQUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift
INSTRUCTIONS Dominator Lake Lift PHONE:251-986-3882 * FAX:251-986-3136 QABLDOMINATORINST.2014 P a g e 1 Quality Aluminum Boat Lifts, INC. Installation Instructions: Dominator Lake Lift Thank you for your
More informationHere's the comparison of the stock rock shaft vs. a 3pt rock shaft.
This documents a build of a Category 0 3 point hitch for the John Deere 316 Onan, 318, 322, 330, 332, 420 and 430 tractors. This is Neil Koch's build for his 318. Here's the comparison of the stock rock
More informationw w w. t e i g n b r i d g e. c o. u k
Propulsion Systems for Leisure and Commercial Boats Teignbridge Standard Propellers Teignbridge have been manufacturing standard propellers for the world s production boat builders for decades. The company
More informationSide-of-Pole Mount for 1 Module (SPM1) For Module Types A & B
Side-of-Pole Mount for 1 Module (SPM1) For Module Types A & B ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A PCN 080311-2 SP3363-1 Side-of-Pole Mount for 1 Module (SPM1)
More informationRowing Terminology. The person at the starting dock who aligns the boats evenly for a fair start.
Rowing Terminology ALIGNER BACK ARM BACK CHOCKS BLADE BOW BOW(MAN) BOW BALL BOW SIDE BUTTON CANVAS CATCH CHECK IT COCKPIT The person at the starting dock who aligns the boats evenly for a fair start. Supports
More informationEt's Skeg: the full story
Et's Skeg: the full story Having used pie-slice skegs on mass-market boats with big floppy slots and finding them ok, but not ideal, I researched a bit online looking for a skeg or skeg design for my North
More informationSprocket Selection Guidelines
Sprocket Selection Guidelines Table 1 Information Necessary to Order Sprockets 1. Chain Size Number, type, or drawing number of the chain to be used on the sprocket. (The suitability of a sprocket depends
More informationRudder Kit Assembly Instructions for Quest 13
Rudder Kit Assembly Instructions for Quest 13 Revised 4/2/2015 78501 Rudder System The Hobie Quest is designed for the addition of an optional rudder system. Rudder systems in boats like this allow you
More informationBoat Boat Loader Fitting Instructions
Aerodynamic & Heavy Duty Roof Rack Systems Australian Made - Australian Owned www.rhinorack.com Boat Boat Loader Fitting Instructions CONTROLLED Balance point 3 Front eye nuts position 3 Transom eye nut
More informationStar 45 Short Kit Build by Bob Szczepanski
Star 45 Short Kit Build by Bob Szczepanski An old used Star 45 showed up at our pond one day last Fall. Nostalgia struck and I was hooked! A flood of memories sailing an International Star boat on Lake
More informationODOM CLASS SPECIFICATIONS
ODOM CLASS SPECIFICATIONS Effective March 1, 2004 1. GENERAL 1.1 Purpose of the Measurement Rules 1.1.1 The ODOM is a One-Design Class as defined by the American Model Yachting Association (AMYA). However,
More informationTHE OWNER'S MANUAL IS IN TWO VOLUMES: VOLUME 2 TECHNICAL SPECIFICATIONS - ASSEMBLY PROCEDURE ZODIAC
CAUTION NOTICE: CAREFULLY READ THIS MANUAL BEFORE OPERATING YOUR BOAT. THIS OWNER S MANUAL IS IN TWO VOLUMES THAT MUST BE KEPT TOGETHER. THE OWNER'S MANUAL IS IN TWO VOLUMES: - VOLUME 1 DEALS WITH OPERATING
More information1939 STOUT TROPHY WINNER
1939 STOUT TROPHY WINNER This model's 36-minute flight won the Stout Trophy and qualified the builder as captain of the American Moffett team. Bob Toft. Has won a second in gas, first in rubber at Nationals.
More informationRemember that you must check your boat before every outing. Visual check of the general condition of the shoes, stretcher, etc.
Heel Restraints Visual check of the general condition of the shoes, stretcher, etc. Each heel to be restrained to prevent it from rising higher than 7cm, as measured at right angles from the footplate.
More informationOPERATOR S MANUAL SPREADER. CSS, VNQ [For Combine Harvester AW82V] Original instructions
OPERATOR S MANUAL SPREADER CSS, VNQ [For Combine Harvester AW82V] en Original instructions Introduction Introduction Please read this operator s manual before using your spreader. We would first like to
More informationCHAINLESS ANCHORING SYSTEM USER MANUAL
CHAINLESS ANCHORING SYSTEM USER MANUAL Introduction..................................................... 1 Setting up the Chainless Anchoring System............................ 4 Set up Procedure............................................
More informationPuffin Sport Assembly and User Information
Puffin Sport Assembly and User Information ScanSport, Inc. / Pakboats Post Office Box 700 May Street Enfield, New Hampshire 03748 USA Phone: (888) 863-9500 (toll free) From outside the US: +1 (603) 632-9500
More information15ME-014 INSTRUCTION MANUAL OF STERN TUBE SEALING TYPE EVK2RV. URL
15ME-014 E INSTRUCTION MANUAL OF STERN TUBE SEALING TYPE EVK2RV URL http://www.kemel.com CONTENTS [A] Installation [B] Piping [C] Inspection [D] Handling [E] Parts replacement intervals [F] Handling check
More informationRudder Bearing Systems
Rudder Bearing Systems Durable, water-tight and abrasion-resistant bearing products that eliminate metal-on-metal contact. PRODUCT CATALOG Specialists in innovative, high-quality marine systems for propeller
More informationPPM-8240 JEEP XJ REAR SPRING HANGER BRACKET Version 1.1
SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397 PPM-8240 JEEP XJ REAR SPRING HANGER BRACKET Version 1.1 GENERAL NOTES: These instructions are also available on our website; www.synergymfg.com.
More informationFigure 8: Looking Down on a Three Thruster Vehicle
Moving and Maneuvering 2 Cornerstone Electronics Technology and Robotics III (Notes primarily from Underwater Robotics Science Design and Fabrication, an excellent book for the design, fabrication, and
More informationEZ-1 QUADRIBENT. By Blackbird Designs Inc. and Blackbird Sales. Mark May 2007 Assembly Instructions And User Guide.
EZ-1 QUADRIBENT By Blackbird Designs Inc. and Blackbird Sales Mark 4.1 - May 2007 Assembly Instructions And User Guide 1 FOR TECHNICAL SUPPORT CONTACT: Blackbird Designs Inc. Jim Black, President 12721
More informationVK/VP SERIES : Sealless Vertical Pump. Assembling Instructions 2010
VK/VP SERIES : Sealless Vertical Pump Assembling Instructions 2010 20610 Manhattan Place Suite 116 Torrance, CA 90501 Phone: 310-328-9114 Fax: 310-328-9441 1. Motor Shaft and Pump Base (1) (2) Place a
More informationThe USA Canterbury J. Class Rules
Canterbury J Class Owners Association The USA Canterbury J Class Rules 2010 As Accepted 2008 and Revised February 2010 Published March 2010 The Canterbury J Class Rules ~ 2008 Page 1 of 10 THE CANTERBURY
More informationV-PLOW. ACCUFLO Conveyor Belt Cleaning System MAX SYSTEMS GUIDE. Engineering. LIB-CP-SYS-01-E Rev.9. Page 1
ACCUFLO Conveyor Belt Cleaning System Page 1 Conveyor Belt Cleaning System - System Nomenclature CATGORY MAINFRAM INFORMATION BLAD INFORMATION CP=CONVYOR PRODUCTS CP - PA - 36 M - G 83 SYSTM TYP BLT WIDTH
More informationTHE GARRISON BINDER ...
Did you ever wonder why (to quote Andy Rooney) the Garrison binder is for many rodmakers the source of contentious problems while other rodmakers never seem to have problems. One of the primary reasons
More informationAssembly Instructions. for. Puffin Saranac. ScanSport, Inc. P.O. Box 700 (234 May Street) Enfield, New Hampshire Phone: (603)
Assembly Instructions for Puffin Saranac ScanSport, Inc. P.O. Box 700 (234 May Street) Enfield, New Hampshire 03748 Phone: (603) 632 9500 Fax: (603) 632 5611 info@pakboats.com www.pakboats.com Assembling
More informationNAVIGATOR PROP BUILDING INSTRUCTIONS & PHOTOS
NAVIGATOR PROP BUILDING INSTRUCTIONS & PHOTOS Science under the ice Ice sheet At regional competitions the ice is simulated by 8 ft x 4 ft ½-inch foam sheeting (Home Depot part #703990 [in store only],
More informationThis document to be used with Hurley traditional Davits
~ InstructIon Manual ~ This document to be used with Hurley traditional Davits WarnIngs WarnIng - Failure to install, maintain, protect, and operate the system properly can cause malfunction resulting
More informationADVENTURES WITH. Both of my grandfathers fished, my dad fished, and. creating unique handles for custom rods. 22 RodMaker
From RodMaker Magazine Volume 7 Issue #4 WOOD creating unique handles for custom rods ADVENTURES WITH story by Ray Jergensen photos by Les Jergensen 22 RodMaker Both of my grandfathers fished, my dad fished,
More informationPuffin Sport and Saco
Puffin Sport and Saco Assembly and User Information Pakboats/ScanSport, Inc. Post Office Box 700 May Street Enfield, New Hampshire 03748 USA Phone: (888) 863-9500 (toll free) From outside the US: +1 (603)
More informationSeadog One Design Rules DRAFT
Seadog One Design Rules DRAFT Wickford Frostbite Fleet #166 Sachems Head Frostbite Fleet 1. Seadog One Design Rules 1.1 Mission and Purpose Racing shall be strictly one design in intent and the following
More informationWe hope you ll enjoy the Drifter as much as we have! Scott DeTray Model Aero Specifications:
We are excited to bring you the Drifter RC airboat. You re probably thinking it doesn t fly so what is Model Aero thinking??? We have always liked RC vehicles of all types and have had a fondness for airboats
More informationELECTRON PRO 245A: ASSEMBLY GUIDE. Revision Valid for MY2017 Electron Pro
ELECTRON PRO 245A: ASSEMBLY GUIDE Revision 2.0 04-19-2017 Valid for MY2017 Electron Pro ELECTRON PRO 245A: Table of Contents 1. Tools Needed and First Aid Kit...3 2. Specifications...4 3. Configurations...5
More informationFalcon 3 145, 170, 195 and Tandem Owner / Service Manual
Falcon 3 145, 170, 195 and Tandem Owner / Service Manual January 2007 - Second Edition Removing The Sail From The Airframe And Short Packing The Glider Many maintenance and repair procedures will require
More informationQuattrocycle BV. Quattrocycle. User Manual. Last update February Quattrocycle BV Bremkant EJ Middelbeers. User Manual Quattrocycle 1
Quattrocycle User Manual Last update February 2010 Quattrocycle BV Bremkant 6 5091 EJ Middelbeers User Manual Quattrocycle 1 Table of Contents Page Chapter 1: Introduction 3 Chapter 2: Instructions for
More informationINSTALLATION INSTRUCTIONS. Parts List. Tools Required. Before You Begin. Installation. Customer Information BICYCLE ATTACHMENT JUL.
INSTALLATION INSTRUCTIONS JUL. 2006 Parts List Bicycle attachment Key plates (2) Tools Required Phillips screwdriver Flat-tip screwdriver Before You Begin Customer Information This Bicycle Attachment is
More informationBladerider X8 Assembly Help Notes
2.1 Remove All Parts & Have Some Tools Handy Remove all items from the box and identify each part as per the packing sheet and check that nothing is missing. If there is something missing, please email
More information400/488 Rotating Davit Installation Instructions
400/488 Rotating Davit Installation Instructions These instructions were written with the owner in mind. If you are the installer make sure these instructions are passed along to the owner of the boat.
More informationVERSA BIKE RACK INSTRUCTIONS
VERSA BIKE RACK INSTRUCTIONS Models #8, 8 Important This rack is designed for use with a or. receiver hitch. The rack is designed to hold a maximum of two bicycles. Do not use it for anything other than
More informationDornier Do R 4 Super-Wal
Dornier Do R 4 Super-Wal Model Aviation Laddie Mikulasko s Dornier Do R 4 Super-Wal Build the multiengine, record-setting seaplane. Article, plans, instructions, and photos by Laddie Mikulasko. Complete
More informationDIRECT DRIVE DIXIE DOUBLE SEAMER Model 25D
OPERATOR'S MANUAL DIRECT DRIVE DIXIE DOUBLE SEAMER Model 25D LUBRICATE DAILY: A. Gears inside gear housing at chuck shaft (1) Oil B. Seam rolls and cam rolls (4) - Oil C. Seam roll levers through gear
More informationELECTRON PRO: ASSEMBLY GUIDE. Revision Valid for MY2017 Electron Pro
ELECTRON PRO: ASSEMBLY GUIDE Revision 1.0 10-20-2016 Valid for MY2017 Electron Pro ELECTRON PRO: Table of Contents 1. Tools Needed and First Aid Kit...3 2. Specifications...4 3. Configurations...5 4. Geometry...7
More informationTugster. Tug Boat. Competition or Sport Tug Kit. A Zippkits R/C Boat. Building Instructions
Z I P P M A N U FA C T U R I N G Tugster Tug Boat Competition or Sport Tug Kit A Zippkits R/C Boat Building Instructions 2016 JMP Hobby Group St. Paul, Indiana 47272 www.zippkits.com Toll Free (866) 922-ZIPP
More informationWooden Dummy Construction
Wooden Dummy Construction Mook Yan Jong - (pronounced moohk yàhn jàng) literally translates "wood man post", but is usually just called a "wooden dummy" in English, or "jong" for short. The dummy consists
More informationVALDIVIA BUILD LOG Dr Ron
VALDIVIA BUILD LOG Dr Ron The Robbe kit of the two-masted schooner Valdivia was purchased in 2007, along with the fitting set and propulsion accessories, and has been staring me in the face since then
More informationApollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual
I854000.D Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual Introduction This manual presents guidelines for the Installation, Operation and
More information1982 Hydrostream Viking Restoration
1982 Hydrostream Viking Restoration Part 2c: The Rebuild Daniel W. Rickey Winnipeg, Manitoba Canada daniel@cancercare.mb.ca 2000-09-22 Introduction Part one of this report showed how the shoddy manufacturing
More informationPUNE TECHTROL PVT LTD. Instruction and Maintenance Manual for Float and Tape Gauge FTG
PUNE TECHTROL PVT LTD Instruction and Maintenance Manual for and Tape Gauge FTG INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR FLOAT AND TAPE GAUGE FTG 1 Introduction : It is used to measure and indicate
More informationSERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.
SERIES 2 RAMP OWNER S MANUAL BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup. Use caution and care for your back when lifting, pushing, pulling, folding or unfolding
More informationA. TO PREPARE THE MACHINE FOR USE.
INSTRUCTION MANUAL FOR THE ML120 STRINGING MACHINE. CONTENTS: A. TO PREPARE THE MACHINE FOR USE. 1. The assembly of frame with console and tooltray. 2. Fixing the lever of the tension unit. 3. Putting
More informationAirwalker. Installation and Safety Information. Stretch Products for Dance, Therapy, Education, and Fitness
Airwalker Installation and Safety Information Stretch Products for Dance, Therapy, Education, and Fitness www.dyenamicmovement.com Airwalker is a Registered Trademark of Dye namic Movement Products, Inc.
More informationPAY N PAK, 1/12 th Scale, Limited Sport Hydro P Sport Hydro
1980 82 PAY N PAK, 1/12 th Scale, Limited Sport Hydro P Sport Hydro Introduction: The 1980 turbine Pay N Pak is a good subject for a model race boat. It has a low profile, mild pickle-fork setback, long
More informationThank you for purchasing a WIKE BOX BIKE!
Thank you for purchasing a WIKE BOX BIKE! Contents Safety.....3 Front wheel.4 Kickstand..5 Handle Bar & Box 6 Seat post and Saddle 7 Final pre-ride check 8 Tools needed to assemble Bike: -High table or
More informationSeamax Boat Bimini Top User Manual
Seamax Boat Bimini Top User Manual Size A / B / C 3 BOW Size D / E / F 4 BOW Thanks for your purchase. Seamax Bimini Top has built-in the aluminum eye-end fitting to install on standard oar lock pin (diameter
More informationBRONZE BUSHING REPLACEMENT PROCEDURE DN345 & NL450C
1 BRONZE BUSHING REPLACEMENT PROCEDURE V.2 12/3/2014 DN345 & NL450C 2 Safety Instructions Removing Walking Beams 3 1. Position spreader on a flat concrete surface capable of supporting weight of spreader
More informationBuilding a Wind Tunnel
Technical Report TR-5 Building a Wind Tunnel Estes Industries 1963 These reports are published as a service to its customers by Estes Industries, Inc., Box 227, Penrose, Colorado 81240 Building a Wind
More informationMANUAL OF HANDLING, TRANSPORTATION AND STORAGE OF ELECTRICAL CABLE REELS
MANUAL OF HANDLING, TRANSPORTATION AND STORAGE OF ELECTRICAL CABLE REELS OBJECTIVE Establish conditions for the proper handling, transportation and storage of electric cable reels, in order to keep the
More informationRAVE SUP STAND UP PADDLE BOARD User Guide/Owner s Manual
RAVE SUP STAND UP PADDLE BOARD User Guide/Owner s Manual ! W A R N I N G This product is not a lifesaving device. Always wear a nationally approved personal floatation device when using this product. Not
More information1 Tuning Platform Reseating Beam Pads Rudder alignment Noisy Foils Rig Tension...
Contents 1 Tuning... 2 1.1 Platform... 2 1.2 Reseating Beam Pads... 2 1.3 Rudder alignment... 3 1.4 Noisy Foils... 3 1.5 Rig Tension... 4 1.6 Mast rake... 4 1.7 Spreader rake... 5 1.8 Diamond tension...
More informationINSTALLATION INSTRUCTIONS FOR ROLLOVER PROTECTION SYSTEM (ROPS)
INSTALLATION INSTRUCTIONS FOR ROLLOVER PROTECTION SYSTEM (ROPS) This manual contains assembly, operating, maintenance and safety instructions for your ROPS. Before Installing the ROPS or operating a machine
More informationPARTS - FORWARD. Kayaking + Fishing Parts & Accessories Hook HATCH SEAL "TRIM-LOC" (TOP MOLDED) 5 REQ
PARTS - FORWARD 72104001 Hook 71301001 HATCH SEAL "TRIM-LOC" (TOP MOLDED) 5 REQ 71302001 HULL FLANGE SEAL (pre 2012 ADV) "TRIM-LOC" (SIDE GLUED) 5 REQ 80012001 Pedal Retainer Bungee w/ Hook 84560001 Mast
More informationASSEMBLY MANUAL HOBIE CATSY
ASSEMBLY MANUAL HOBIE CATSY HOBIE CAT EUROPE ZI Toulon Est, BP 50 8078 Toulon cedex 9, France Tel : + (0)9 08 78 78 - Fax : + (0)9 08 99 Email : hobiecat@hobie-cat.net - http://www.hobie-cat.net ASSEMBLY
More informationInstallation and Operation Instruction Manual
Installation and Operation Instruction Manual Toggle Lok Anchor - Model #7442 Portable Concrete Anchorage Connector ANSI Z359.1 5,000 lbs / 22.24 kn FallTech, Inc 1306 Alameda Street Compton, CA 90221
More information