1 A Tale of Two Wells: Reconstruction of Two Hand Dug Caisson Well Stations Joe Foote, PE May 2017 PNWS AWWA Kennewick WA

2 Outline Introduction Background Project Drivers Challenges Investigation / Assessment Design / Construction Summary 2

3 Background Well 4 Modern Electric Water Company Located in the Spokane Valley Constructed 1906 Hand dug, with wood cribbing Concrete caisson (~6 x 7 ) Perforated steel lower section Depth 113 feet Capacity Well Test 3,900 gpm with 2.5 foot of draw down (Specific capacity 1,500 gpm/foot of drawdown) Two pumps installed (1 3,000 gpm, 2 2,000 gpm) 3

4 Background Continued 4

5 Background Continued

6 Background Central Avenue Well No. 1 City of Spokane Located in north central Spokane Constructed 1959 Hand dug Brick lined caisson (8 diameter) Perforated steel lower section Depth 271 feet (215 feet is upper portion, 56 feet lower section) Capacity Estimated specific capacity 1,400 gpm/foot of drawdown Two submersible pumps installed (1 Offline, 2 3,500 gpm) 6

7 Background 7

8 Background 8

9 Project Drivers Well 4 Upgrading an old facility Building structure Mechanical equipment Electrical equipment Capacity Improved operations Central Avenue Well No. 1 Wellhead relocated above ground Convert to vertical line shaft turbine pump from submersible pumps Replacement of electrical equipment Improved operations and access Capacity 9

10 Challenges Construction of new facility over existing caisson well Maintaining existing well surface seal Structural integrity and load-bearing capacity Caisson Pump pedestal Retrofitting pump pedestal Protection of well from contaminates Site limitations Fixed well location Setback requirements Zoning ordinances 10

11 Investigation / Assessment As-builts Geotechnical investigation Structural evaluation Visual inspection Ground Penetrating Radar (GPR) Estimate on concrete thickness and existence of reinforcing Schmidt hammer Estimate on concrete strength 11

12 Ground Penetrating Radar (GPR) GPR Electromagnetic radio wave Defines different materials Immediate results StructureScan Mini XT by GSSI 12

13 Well 4 Design Approach Demo Existing Building Isolate Well Caisson Setback / Clearance Existing Plan View of Pump Pad Plan View of Pump Pad And Caisson Improvements 13

14 Well 4 Setback Wellhead E Valleyway Avenue 14

15 Well 4 Address Field Changes 15

16 Well 4 Facility Upgrades Retrofit Pump Pedestal Protect existing beams 16

17 Well 4 Facility Upgrades Maintaining some of the old 17

18 Central Avenue Well No. 1 Design Approach Demo Existing Vault Isolate Well Caisson Saw cut Concrete Section Plan 18

19 Central Avenue Well No. 1 Design Approach Integrate with existing structure 19

20 Central Avenue Well No. 1 Setback & Clearances Proposed Well Building 16 x 29 4 Property Boundary Overhead Power 24 E Central Avenue 30 20

21 Central Avenue Well No. 1 OHP Clearances Coordination with power utilities Building clearance Construction clearance and protection 21

22 Central Avenue Well No. 1 Demo Protection of well Installation of barrier Requirements for cleaning and disinfection 22

23 Central Avenue Well No. 1 Pump Pedestal Upgrade 23

24 Central Avenue Well No. 1 Facility Upgrades 24

25 Summary Well 4 Existing: Capacity 5,000 gpm (1-3,000 gpm, 1-2,000 gpm pumps) Update: Capacity 3,750 gpm (1-2,500 gpm, 1-1,250 gpm pumps) 25

26 Summary Central Avenue Well No. 1 Existing: Capacity 3,500 gpm (1-0 gpm, 2-3,500 gpm pumps) Update: Capacity 8,000 gpm pump 26

27 Existing Well Retrofit Considerations Availability of as-built information Visual inspection Field measurements Accommodating new equipment Space/clearance Available power Retrofit/demolition impacts Impacts to surface seal Structural Permitting Start early Zoning ordinance requirements Meeting current standards 27

28 Acknowledgements Modern Electric Water Company City of Spokane Project Team LSB Consulting Engineers Budinger & Associates ZBA Architecture GeoEngineers 28

29 Questions? Joe Foote, PE 421 W Riverside Ave, Suite 762 Spokane, Washington Joe.Foote@murraysmith.us

Perched Box Caisson Overview. January 2014

Perched Box Caisson Overview. January 2014 Perched Box Caisson Overview January 2014 Why perched box caissons? Perched box caissons are used to construct the portion of the river piers that will support the steel arch spans Construction can occur

More information

METHODS FOR NONDESTRUCTIVE EVALUATION OF UNDERGROUND MINE SEALS

METHODS FOR NONDESTRUCTIVE EVALUATION OF UNDERGROUND MINE SEALS METHODS FOR NONDESTRUCTIVE EVALUATION OF UNDERGROUND MINE SEALS KRAY LUXBACHER, PE, PHD ASSOCIATE PROFESSOR, DEPARTMENT OF MINING AND MINERALS ENGINEERING ASSOCIATE DIRECTOR, VIRGINIA CENTER FOR COAL AND

More information

2017 Temporary traffic control guidelines for pedestrians. v.2

2017 Temporary traffic control guidelines for pedestrians. v.2 2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered

More information

Lateral Load Analysis Considering Soil-Structure Interaction. ANDREW DAUMUELLER, PE, Ph.D.

Lateral Load Analysis Considering Soil-Structure Interaction. ANDREW DAUMUELLER, PE, Ph.D. Lateral Load Analysis Considering Soil-Structure Interaction ANDREW DAUMUELLER, PE, Ph.D. Overview Introduction Methods commonly used to account for soil-structure interaction for static loads Depth to

More information

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

Charlottetown Marine Terminal Pipeline Decommissioning Project Description Charlottetown Marine Terminal Pipeline Decommissioning Project Description 69 Marr Road Unit B Rothesay NB, E2E 3J9 Tel (506) 848-1920 Fax (506) 848-1929 Charlottetown Marine Terminal Pipeline Decommissioning

More information

Division of Environmental Quality Wellhead Protection Section

Division of Environmental Quality Wellhead Protection Section Division of Environmental Quality Wellhead Protection Section 1 10 CSR 23-3.110 Plugging of Wells Any well which is to be abandoned must be plugged in accordance with these rules. If a well has been determined

More information

REVISED SILT CURTAIN DEPLOYMENT PLAN

REVISED SILT CURTAIN DEPLOYMENT PLAN Contract No.: HY/2009/11 Central Wanchai Bypass, North Point Reclamation REVISED SILT CURTAIN DEPLOYMENT PLAN Name Prepared by: China Harbour Engineering Co., Ltd. China Road and Bridge Corporation Joint

More information

Federal Railroad Administration. HUDSON TUNNEL PROJECT: WEEHAWKEN COMMUNITY MEETING January 18, 2018

Federal Railroad Administration. HUDSON TUNNEL PROJECT: WEEHAWKEN COMMUNITY MEETING January 18, 2018 HUDSON TUNNEL PROJECT: WEEHAWKEN COMMUNITY MEETING January 18, 2018 Agenda Near Term Activity Hudson Tunnel Project Revisions to the Project to Address Community Concerns Description of Construction Activities

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

Permit and Inspection Requirements for Swimming Pools

Permit and Inspection Requirements for Swimming Pools Permit and Inspection Requirements for Swimming Pools Building Inspection Office (817) 503.1030 City of Colleyville 100 Main Street Colleyville, TX 76034 Inspection Request Line (817) 503.1172 Building

More information

RESIDENTIAL SWIMMING POOL REQUIREMENTS

RESIDENTIAL SWIMMING POOL REQUIREMENTS CITY OF GRANDVIEW / BUILDING SERVICES 1200 MAIN STREET, GRANDVIEW, MO 64030 PHONE: (816) 316-4817 FAX: (816) 316-4809 WWW.GRANDVIEW.ORG RESIDENTIAL SWIMMING POOL REQUIREMENTS Community Development Department

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

Item 404 Driving Piling

Item 404 Driving Piling Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.

More information

Development of a Non-Destructive Test Machine for Testing Tunnel Lining Concrete

Development of a Non-Destructive Test Machine for Testing Tunnel Lining Concrete Development of a Non-Destructive Test Machine for Testing Tunnel Lining Concrete Seiichi Matsui, Humihiro Osada Technical Research and Development Dept. Railway Operations Headquarters West Japan Railway

More information

Figure 1 - Photo of Surveyed Area. Figure 2 - Void Survey Results

Figure 1 - Photo of Surveyed Area. Figure 2 - Void Survey Results We have received the first PRELIMINARY results from several tests (science) conducted on the dam area. Per the engineers they are still refining the depths of the void areas (holes under the concrete areas).

More information

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation TYPES OF FOUNDATION Introduction: The lowest artificially built part of a structure which transmits the load of the structure to the soil lying underneath is called foundation. The supporting part of a

More information

Page 1 of 5 11/18/2013 9:17 AM

Page 1 of 5 11/18/2013 9:17 AM Refurbished H:\ACCOUNTING\BUDGETS\2014-2015 NEW\2014-2015 Budget Projection Worksheet.xlsx Page 1 of 5 11/18/2013 9:17 AM Total Annual Reserve Estima Remai Replacement Required ted ning and/or Refurbish

More information

Swimming Pool Requirements

Swimming Pool Requirements Swimming Pool Requirements 1. Definitions: Approved Safety Pool Cover. Means a manually or power-operated safety pool cover that meets all of the performance standards of the American Society for Testing

More information

SWIMMING POOL PERMITS ARE ABOUT HEALTH AND SAFETY

SWIMMING POOL PERMITS ARE ABOUT HEALTH AND SAFETY SWIMMING POOL PERMITS ARE ABOUT HEALTH AND SAFETY Swimming Pool Booklet Washington County, Maryland Published 2004 Revised 03/10/05 Revised 02/10/06 Department of Permits & Inspections 80 West Baltimore

More information

Baseball Stadium Renovations at US Cellular Field

Baseball Stadium Renovations at US Cellular Field Baseball Stadium Renovations at US Cellular Field Authors: Terry R. McDonnell, P.E., S.E., Senior Project Engineer, Thornton Tomasetti, Inc., 14 E. Jackson Boulevard, Chicago, IL 60604, tmcdonnell@thorntontomasetti.com

More information

HIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS

HIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS Proceedings of the First Middle East Turbomachinery Symposium February 13-16, 2011, Doha, Qatar HIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS Amer A. Al-Dhafiri Rotating Equipment Engineer Nabeel M. Al-Odan

More information

3. Types of foundation

3. Types of foundation Foundation Engineering CE 48. Types of foundation & foundation materials Contents Introduction Shallow Foundations Deep Foundations Introduction Why different types of? General types of Introduction Why

More information

RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS

RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS City of Redding 777 Cypress Avenue Redding CA 96001 Telephone: (530) 225-4013 FAX: (530) 225-4360 A Swimming Pool is any body of water 18 inches

More information

Swimming Pools, Hot Tubs and Spas

Swimming Pools, Hot Tubs and Spas OLATHE FIRE DEPARTMENT BUILDING CODES 1225 S. Hamilton Circle Olathe, KS 66061 / Main: (913) 971-7900 / Fax: (913) 971-9812 Swimming Pools, Hot Tubs and Spas Definitions: Swimming Pool- Any structure intended

More information

The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.

The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools. Building Information BURNABY PLANNING & BUILDING DEPARTMENT Swimming Pools The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.

More information

Tifft Water Supply Symposium

Tifft Water Supply Symposium Tifft Water Supply Symposium SEPTEMBER 21-22, 2016 BUFFALO, NEW YORK Impossible Journey: Underwater Inspection of Large Diameter Water Transmission Tunnel Kristin Wheaton, PE Jim Clark Bob Clarke, P.Eng,

More information

SPECIFICATION FOR CAISSON CONSTRUCTION

SPECIFICATION FOR CAISSON CONSTRUCTION SPECIFICATION FOR CAISSON CONSTRUCTION 1.0 METHOD OF EXCAVATION Caissons shall be hand-excavated, i.e. using of hand-held air tools. Full details of support measures and any dewatering and/or grouting

More information

Use of Underwater Dry Welding for In Situ Repair to Offshore Structures. Sabine Powell 02/12/2016

Use of Underwater Dry Welding for In Situ Repair to Offshore Structures. Sabine Powell 02/12/2016 Use of Underwater Dry Welding for In Situ Repair to Offshore Structures Sabine Powell engineering@neptunems.com 02/12/2016 In Situ Welding Steel Structures Suitability of Repair Methods Mobile Offshore

More information

RECOMMENDATION: 1) that the existing Traffic Bridge be replaced with a modern steel truss bridge as outlined in this report;

RECOMMENDATION: 1) that the existing Traffic Bridge be replaced with a modern steel truss bridge as outlined in this report; E) Traffic Bridge Needs Assessment and Functional Planning Study Final Report (File: CK 6050 8; IS 6332 24; and IS 6050 2) RECOMMENDATION: 1) that the existing Traffic Bridge be replaced with a modern

More information

A PPLICATION. Water Filled Tubes. Drilled Shafts S TANDARDS. Depth Wheel & Cables. CT Method. Signal goes around defect or is blocked.

A PPLICATION. Water Filled Tubes. Drilled Shafts S TANDARDS. Depth Wheel & Cables. CT Method. Signal goes around defect or is blocked. CT Method N D E C R O S S H O L E T O M O G R A P H Y A PPLICATION Crosshole Tomography testing is used to accurately characterize the size, location and severity of defects commonly found within newly

More information

Phasing and Cost Estimate of Downtown Oxford Master Plan Prepared By: Phasing and Cost Estimate of Downtown Oxford Master Plan Purpose of the Study The primary objective of this study is to identify priority

More information

h o l l o w poles for foundat i o n s

h o l l o w poles for foundat i o n s TTT Products Limited July 2017. 1 of 6 The MultiPole advantage The TTT MultiPole is an incredibly versatile pole due to its unique hollow core. The MultiPole is a multifunctional pole suitable for structural

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

ETL listed for installations within 5 ft. (1.5M) of outer edge of water

ETL listed for installations within 5 ft. (1.5M) of outer edge of water Fiberstars Light Streams Mini Laminar Installation Manual (LSML) 3072091 ETL listed for installations within 5 ft. (1.5M) of outer edge of water 79-15056-00 Rev. A Page 1 of 6 SAVE THESE INSTRUCTIONS!

More information

Twinning Hwy 11/17 Thunder Bay to Nipigon

Twinning Hwy 11/17 Thunder Bay to Nipigon Twinning Hwy 11/17 Thunder Bay to Nipigon 55 th Annual Engineering and Technology Conference Lakehead Chapter PEO November 4, 2016 Presented by: Bruce Caldwell, P. Eng., MBA Manager Program Planning Ministry

More information

7th Street Bridge Project. Public Presentation February 24, :30pm-8pm

7th Street Bridge Project. Public Presentation February 24, :30pm-8pm 7th Street Bridge Project Public Presentation February 24, 2014 6:30pm-8pm Public Meeting Agenda Welcome and introductions Judith Buethe Opening remarks - David Leamon, PE/Hans Strandgaard, PE Project

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

CONE PENETRATION TESTS

CONE PENETRATION TESTS February 25, 2015 John Doe, P.E. Acme Engineering and Testing 1234 Test Avenue, Suite 204 Lake Wales, FL 33853 Re: Sample CPT Soundings Dear Mr. Doe, Direct Push Services, LLC (DPS) was retained by Acme

More information

City of Crystal Lake Community Development Department

City of Crystal Lake Community Development Department City of Crystal Lake Community Development Department 100 W. Woodstock Street Crystal Lake, IL 60014 www.crystallake.org Phone (815) 356-3605 Fax (815) 479-1647 building@crystallake.org STORABLE ABOVE

More information

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS PSH HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective December 10, 2013

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS PSH HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective December 10, 2013 1 HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM Effective December 10, 2013 PSH 265 Roberts Avenue Santa Rosa, Ca. 95407 (707) 575-9014 Construction Engineering Resource 1837 Wright Street Santa Rosa, Ca. 95404

More information

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective August 25, 2015

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM. TABULATED DATA Effective August 25, 2015 1 HEAVY DUTY HYDRAULIC WALER RAIL SYSTEM Effective August 25, 2015 PSH 265 Roberts Avenue Santa Rosa, Ca. 95407 (707) 575-9014 Construction Engineering Resource 1837 Wright Street Santa Rosa, Ca. 95404

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Lecture 8&9: Construction Dewatering

Lecture 8&9: Construction Dewatering Arab Academy for Science, Technology & Maritime Transport Colleague of Engineering & Technology Construction & Building Engineering CB 523 Methods and Equipment for Construction 1 Lecture 8&9: Construction

More information

CHEMICAL. Straight cut rod is provided in the materials listed below and includes nuts / washers.

CHEMICAL. Straight cut rod is provided in the materials listed below and includes nuts / washers. 161 STRAIGHT CUT ROD Straight cut rod is provided in the materials listed below and includes nuts / washers. Straight Rod 22-1/2 Bent Rod A 307 THREADED ANCHOR ROD, ZINC PLATED (ASTM B633, CLEAR CHROMATE)

More information

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 02545 CR NO. 116 OVER THE RUM RIVER METRO DISTRICT - ANOKA COUNTY SEPTEMBER 9, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY OCTOBER 22, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY

More information

Water Main Break Response Protocols for Chlorinated Systems (In Development Version )

Water Main Break Response Protocols for Chlorinated Systems (In Development Version ) Water Main Break Response Protocols for Chlorinated Systems (In Development Version 4.30.14) Steve Deem, P.E. PNWS AWWA May 2014 Eugene, Oregon Mission To protect the health of the people of Washington

More information

HUGH THOMPSON FRA RDT RADIM BRUZEK ENSCO, INC. CHRIS MOALE

HUGH THOMPSON FRA RDT RADIM BRUZEK ENSCO, INC. CHRIS MOALE Characterization of Fouled Ballast Track Demonstration with Multiple Technologies 2017 RIVIT Conference June 20-21, 2017 HUGH THOMPSON FRA RDT RADIM BRUZEK ENSCO, INC. CHRIS MOALE CSX TRANSPORTATION DAVE

More information

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc. Design Manual Chapter 4 - Water Mains 4C - Facility Design 4C-1 Facility Design A. General Water mains and appurtenances, including hydrants and valves, should be provided along all streets including connections

More information

Pile Gripper Systems

Pile Gripper Systems Pile Gripper Systems Accurate positioning and restraint of offshore construction piles + + Accurate handling of piles up to 8.0m in diameter + + Pile positioning and adjustment within large envelopes +

More information

Route 47 (North Main Street) Reconstruction

Route 47 (North Main Street) Reconstruction TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related

More information

studio 646 ARCHITECTURE, LLC

studio 646 ARCHITECTURE, LLC ZONING DATA AND EXPLANATION FOR THE SPECIAL PERMIT APPLICATION: The present zoning for this project is R-2. The proposal includes eight residential townhome units accommodated within two buildings, with

More information

h o l l o w poles for foundat i o n s

h o l l o w poles for foundat i o n s TTT Products Limited Feb 2016. 1 of 6 The MultiPole advantage Introducing the TTT MultiPole an incredibly versatile pole due to its unique hollow core. The MultiPole is a multifunctional pole suitable

More information

APPENDIX K CULVERT INSPECTION MEMO

APPENDIX K CULVERT INSPECTION MEMO APPENDIX K CULVERT INSPECTION MEMO McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO

More information

Берг АБ Тел. (495) , факс (495) Turning Ideas Into Engineered Solutions KAYDON RING & SEAL, INC.

Берг АБ Тел. (495) , факс (495) Turning Ideas Into Engineered Solutions KAYDON RING & SEAL, INC. Turning Ideas Into Engineered Solutions RING & SEAL, INC. K-CBS Series Circumferential Barrier Seals Kaydon s high performance circumferential barrier seals back up DGS systems with performance & economy.

More information

MIL-STD-883H METHOD EXTERNAL VISUAL

MIL-STD-883H METHOD EXTERNAL VISUAL * EXTERNAL VISUAL 1. PURPOSE. The purpose of this test method is to verify the workmanship of hermetically packaged devices. This test method shall also be utilized to inspect for damage due to handling,

More information

Gerald P. Oliveto, P.E. George Franz NJDOT

Gerald P. Oliveto, P.E. George Franz NJDOT Gerald P. Oliveto, P.E. George Franz NJDOT Bridge preservation is defined as actions or strategies that prevent, delay or reduce deterioration of bridges or bridge elements, restore the function of existing

More information

New Orleans Municipal Yacht Harbor

New Orleans Municipal Yacht Harbor New Orleans Municipal Yacht Harbor Marina Schematic Design Update 601 Poydras St., Suite 1860 New Orleans, LA, 70130 504-648-3560 Post-Katrina Municipal Yacht Harbor: Introduction The MYH was an approximate

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 07542 CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

CASE STUDY OXLEY HIGHWAY SLIP STABILISATION

CASE STUDY OXLEY HIGHWAY SLIP STABILISATION MAY 2015 CASE STUDY OXLEY HIGHWAY SLIP STABILISATION IRF & ROADS AUSTRALIA REGIONAL CONFERENCE ASIA AND AUSTRALASIA DR SUDAR ARYAL LOCATION STOPPING BAY, OXLEY HIGHWAY 2 Armidale Nambucca Heads Tamworth

More information

DRAFT. Table of Contents. Background

DRAFT. Table of Contents. Background Douglas County Table of Contents Existing Infrastructure 86 Funding 89 Policy and Program Recommendations 90 Infrastructure Recommendations 92 Conclusion 95 Background Home to 4,500 residents and Baker

More information

Extension Platform. Base Platform. Crossover. Exit railing. Exit Railing

Extension Platform. Base Platform. Crossover. Exit railing. Exit Railing Base Platform Galvanized With metal grate and two brackets Railing on the long side and a face side Extension Platform Galvanized With metal grate and one bracket Railing on the long side with rail connection

More information

TOWN/VILLAGE OF LIMA POOL PERMIT APPLICATION

TOWN/VILLAGE OF LIMA POOL PERMIT APPLICATION TOWN/VILLAGE OF LIMA POOL PERMIT APPLICATION Type of Permit: Hot Tub Above ground In Ground Permit Number: Permit Fee: Address of Proposed Work: Town Zoning district: (Check one) Village Zoning district:

More information

Fulton Market Streetscape

Fulton Market Streetscape Fulton Market Streetscape Ogden Avenue to Halsted Street Public Meeting Recommended Improvements December 10th, 2014 Meeting Purpose and Goals Present Existing Conditions Community Input and Charrette

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58551 CSAH NO. 41 OVER THE KETTLE RIVER DISTRICT 1 PINE COUNTY JULY 28, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

POOL BARRIER AMENDMENTS & GUIDELINES: APPENDIX G SWIMMING POOLS, SPAS AND HOT TUBS

POOL BARRIER AMENDMENTS & GUIDELINES: APPENDIX G SWIMMING POOLS, SPAS AND HOT TUBS SECTION AG101 - GENERAL POOL BARRIER AMENDMENTS & GUIDELINES: APPENDIX G SWIMMING POOLS, SPAS AND HOT TUBS AG101.1 General. The requirements of this appendix shall apply to the design and construction

More information

Fall Protection. 29 CFR Appendix C 29 CFR 1926 Subpart M

Fall Protection. 29 CFR Appendix C 29 CFR 1926 Subpart M Fall Protection 29 CFR 1910.66 Appendix C 29 CFR 1926 Subpart M Duty to Have Fall Protection Provide fall protection systems which meet the criteria of 1926 and 1910 Make fall protection an integral part

More information

CERTIFYING DRAINLAYER

CERTIFYING DRAINLAYER No. 9198 REGISTRATION EXAMINATION, NOVEMBER 2017 CERTIFYING DRAINLAYER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2017. All rights reserved. No part of this publication may be reproduced

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue

More information

MIRABAY PILOT PROJECT REPORT

MIRABAY PILOT PROJECT REPORT MIRABAY PILOT PROJECT REPORT 9/25/2014 By: Ingenium, Inc./Carl A. Hazenberg, P.E. Seawalls along the MiraBay canal system started experiencing problems shortly after construction. Following the issues,

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7635 CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY JUNE 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7780 CSAH 133 OVER A DITCH ST. LOUIS COUNTY SEPTEMBER 27, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED

Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED Installation Guide Fiji Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED In planning for the installation of a new Viking pool, there are many important considerations that must be evaluated in order

More information

A New Strategy for Harbor Planning and Design

A New Strategy for Harbor Planning and Design A New Strategy for Harbor Planning and Design Xiuying Xing, Ph.D Research Associate Sonny Astani Department of Civil and Environmental Engineering University of Southern California Los Angeles, CA 90089-2531

More information

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives. TECHNICAL MEMORANDUM Albany - Washington Avenue Traffic Calming Evaluation Matrix of Conceptual Alternatives Date: May 17, 2017 Project #: 17356 To: Aleida Andrino-Chavez From: Laurence Lewis, Sara Muse,

More information

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015 EPA R6 Dive Team Operations Report San Jacinto Waste Pits Channelview, TX December 9-10, 2015 BACKGROUND The San Jacinto River Waste Pit Site history has been documented in several documents prepared for,

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

FINALIZATION OF THE HAND DUG WELL. Version : April 2009 Published by : Foundation Connect International Autors : Henk Holtslag & John de Wolf

FINALIZATION OF THE HAND DUG WELL. Version : April 2009 Published by : Foundation Connect International Autors : Henk Holtslag & John de Wolf ST 1.6 FINALIZATION OF THE HAND DUG WELL Version : April 2009 Published by : Foundation Connect International Autors : Henk Holtslag & John de Wolf Disclaimer This manual is part of the main manual, named

More information

Asheville s Fairview Water System Improvements: from Modeling to Contract Documents. April 19, 2016 Meg Roberts, PE

Asheville s Fairview Water System Improvements: from Modeling to Contract Documents. April 19, 2016 Meg Roberts, PE Asheville s Fairview Water System Improvements: from Modeling to Contract Documents April 19, 2016 Meg Roberts, PE City of Asheville Water Distribution System Customer elevations range 1,950 feet to 3,650

More information

Hydraulic Modeling to Aid TDG Abatement at Boundary and Cabinet Gorge Dams

Hydraulic Modeling to Aid TDG Abatement at Boundary and Cabinet Gorge Dams Hydraulic Modeling to Aid TDG Abatement at Boundary and Cabinet Gorge Dams Joe Orlins, P.E., Ph.D. NWHA Technical Seminar May 15, 2014 Boundary and Cabinet Gorge Dams The Problem: Too Much Gas Boundary

More information

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1 CENGRS GEOTECHNICA PVT. LTD. Job No. 214030 Sheet No. 1 INTERIM REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED 66 KV GRID PLOT AT G-7, DWARKA, NEW DELHI. 1.0 INTRODUCTION 1.1 Project Description M/s.

More information

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

SWIMMING POOL, SPA, & HOT TUB GUIDELINES SWIMMING POOL, SPA, & HOT TUB GUIDELINES A. Adopted construction codes and installation requirements 1. 2015 edition of the International Residential Code and Appendix Q, 2. 2014 edition of the National

More information

ORDINANCE NO AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS

ORDINANCE NO AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS ORDINANCE NO. 1267 AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER 14.28 OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS THE CITY COUNCIL OF THE CITY OF FOLSOM HEREBY DOES

More information

SWIMMING POOLS/SPAS/HOT TUBS PLAN REVIEW GUIDE SHEET

SWIMMING POOLS/SPAS/HOT TUBS PLAN REVIEW GUIDE SHEET SWIMMING POOLS/SPAS/HOT TUBS PLAN REVIEW GUIDE SHEET Sect. 106-748, City Code of Ordinances: Regulations are applicable to both above and inground swimming pools, spas and hot tubs. POOL PLACEMENT Measurement

More information

Grading Plan - Drawing No. C-2 - Project Revision 1 dated January 30, 2018.

Grading Plan - Drawing No. C-2 - Project Revision 1 dated January 30, 2018. patersongroup consulting engineers memorandum re: Geotechnical Recommendations Reinforced Slope Details Proposed Commercial Building 2510 Walkley Road - Ottawa to: Christopher Simmonds Architect Inc. -

More information

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST EXPRESSION OF INTEREST Contractor: WorleyParsons Canada Services Ltd. Project: Hebron Topsides Project Package: SC-64 GBS Caisson Field Welding Services Category: XXXXX-XXXXX Closing Date: 19 June 2013

More information

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017

Development of Self-Installing Deepwater Spar. Ashit Jadav February 2017 Development of Self-Installing Deepwater Spar Ashit Jadav February 2017 Contents Introduction & Background ACE Spar breakdown Installation Sequence Main particulars, Hull design and Weight control Stability

More information

Made in the USA. For Fall Protection Only. SafeLok Part Description

Made in the USA. For Fall Protection Only. SafeLok Part Description Operations and Instruction Manual SafeLok Anchorage - Model # 4011 IM-0051 REV A Portable Concrete and Steel Anchorage Connector ANSI Z359.1-07 5,000 lbs / 22kn Made in the USA The 3/4 Fall Protection

More information

MSA Confined Space Entry Equipment

MSA Confined Space Entry Equipment MSA Confined Space Entry Equipment Because every life has a purpose... MSA Confined Space Entry Equipment MSA XTIRPA Manhole Guard System Use for confined space vertical entry and fall protection when

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66546 MSAS 123 (2 ND AVE. SW) OVER THE CANNON RIVER CITY OF FARIBAULT, RICE COUNTY SEPTEMBER 13, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Road Side Design: When is a Barrier Required?

Road Side Design: When is a Barrier Required? Road Side Design: When is a Barrier Required? Jennifer Schmidt, Ph.D., P.E. University of Nebraska-Lincoln Department of Civil Engineering Guide Rail Safety Symposium Brampton, ON October 24, 2017 Research

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components

More information

FINDLAY TOWNSHIP BUILDING INSPECTION DEPT

FINDLAY TOWNSHIP BUILDING INSPECTION DEPT Page 1 of 7 FINDLAY TOWNSHIP BUILDING INSPECTION DEPT. RESIDENTIAL SWIMMING POOLS Permit application submittal requirements (As per the 2009 International Residential Code) NOTE: A building permit is required

More information

CAISSON SHAFT SYSTEM

CAISSON SHAFT SYSTEM CAISSON SHAFT SYSTEM Installation Guide INSTALLATION GUIDE FOR DN2000 TO DN3660 UNITS PLATE JOINTING SYSTEM This guide is to be used for the Installation of CPM Group Ltd caisson shaft units which use

More information

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report

Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number Annual RCRA CCR Unit Inspection Report REPORT Northern Indiana Public Service Company Michigan City Generating Station Primary Settling Pond Number 2 2018 Annual RCRA CCR Unit Inspection Report Submitted to: Northern Indiana Public Service

More information

SECTION BUTTERFLY VALVES

SECTION BUTTERFLY VALVES SECTION 15112 BUTTERFLY VALVES PART 1 GENERAL 1.01 SUMMARY A. All butterfly valves shall be of the tight closing, rubber seated type and fully comply with the latest revision of AWWA Standard C504, Class

More information

Fall Protection Resource Guide P AGE 1

Fall Protection Resource Guide P AGE 1 Fall Protection Resource Guide P AGE 1 As a Home Builder, we do not self-perform any work. This section is a resource guide only and is not intended to put any requirements on the company. All subcontractors,

More information

Building Standards Department Pool Requirements 111 N. Michigan AV, Bradley, IL Phone Fax PRIVATE SWIMMING POOLS

Building Standards Department Pool Requirements 111 N. Michigan AV, Bradley, IL Phone Fax PRIVATE SWIMMING POOLS Building Standards Department Pool Requirements 111 N. Michigan AV, Bradley, IL 60915 Phone 815-933-5008 Fax 815-933-5068 PRIVATE SWIMMING POOLS GENERAL PERMIT PROCEDURES: Call J.U.L.I.E. at 1-800-892-0123

More information