1 olenoid-controlled systems This worksheet and all related files are licensed under the Creative Commons Attribution License, version 1.0. To view a copy of this license, visit or send a letter to Creative Commons, 559 Nathan Abbott Way, tanford, California 94305, UA. The terms and conditions of this license allow for free copying, distribution, and/or modification of all licensed works by the general public. 1

2 Question 1 Questions A burner management system (BM) monitors the status of the flame at the base of this incinerator, to ensure fuel gas does not keep entering the combustion chamber unless there is an established fire to burn it: F-1 INCIRATOR DP Atmosphere DT 1650 o F Res Time 1.5 sec minimum NOTE: 1. Gas safety pipes to extend 10 feet above grade, situated at least 30 feet from any source of ignition. 2. Burner management system supplied by vendor, located in MA4X enclosure at base of incinerator tower. ee drawing for wiring details. (3) - 3" nozzles 90 o apart at elev. 50 6" 67 above grade 1" 1" 1"x1/ AE 35 AE 34 O2 AT 35 O2 AT 34 AIR 34/35 AAH 35 1/ 3. Gas chromatograph supplied by vendor, located in analyzer shack at base of incinerator tower. ee drawing for wiring and tubing details. TIR 36 TAL TAH Rain shield from 24 to 67 Waste stream #1 Dwg T /4" TT TE " above grade thick from grade to 24 0" 3/4" TE TT " TIC 37 Waste stream #2 Dwg T 43 1" F-1 1" Waste stream #3 Dwg T 6"x 6"x 6"x 1" 1" BAL x3/4" 24" MW V 115 Vent (Note 1) V 102 V 101 V PH BE BE 109 PH 110 V V D FV FY b I / P FIC RP GC AT R-485 Modbus 33 (Note 3) Gateway AY 33 From natural gas header Dwg PL 105 PCV 39 BM (Note 2) 44 x1" x1" V 113 Vent (Note 1) FC BM (Note 2) PL 114 Ethernet H2 C2H2 NH3 HNO3 AIR AIR AIR AIR 33a 33b 33c 33d AIR 33e CH4 From fuel gas header Dwg PCV 40 Z FT HART FIQ FY c HART to analog TIR DIR FY a Explain the purpose of solenoid valve V-115, identifying whether it is normally energized () or normally de-energized (NDE). Also, explain the purposes of V-111, V-112, and V-113 in this incinerator control system. file i

3 Question 2 olenoid valve V-92 plays an important role in this compressor inlet separator control system. Level control valve LV-92 opens up when needed to drain liquid out of the boot of the separator vessel, which ideally contains only gas (vapor). Examine this P&ID and then answer the following questions: V-65 COMPREOR INL EPARATOR ize 3 5" ID x 12 0" length DP 450 PIG DT 100 deg F FIR P-8 COMPREOR deg F disch and 175 PID boost pressure 75 AND FL MCFH FY From natural gas source A-3 Dwg. 422 From natural gas source A-2 Dwg x6" 1x6" H 91 Vent stacks 20 above grade I M TIR PIR H L 132 PT FT 75 TE RTD 73 1x8" TG 72 To gas cooling Dwg M From natural gas source A-1 Dwg x6" PV PV PV TT 88 TE RTD 88 PT 89 1x8" 1/ 4" 4" 4" 1" 1 1 Anti-surge XC XA lope 1" V-65 1" lope 1"x1/ 1"x1/ PDT 93 LHH 231 HHLL = 2 6" (ED) HLL = 1 11" NLL = 1 4" LT 92 LG 93 L I / P XY IA 76a 1:1 XY 76b IA PDH PID PDIR H 93 OW FC LV 92 LLL = 0 7" Rod out NDE LIR 92 H L LIC 92 H L JAHH 220 VZE 221 JIR 220 JT 220 M 134 P TE RTD TT PDT " TH 325 deg F 232 P-8 V 92 DE IA VXE VYE RTD RTD TE TE VXE VYE VXE VYE ED To motor controls Dwg Vibration monitor I Bently-Nevada 3300 series H 230 (ee dwg for wiring details) Identify the statuses of V-92 and LV-92 when the separator boot liquid level is at or below the normal level of 1 foot 4 inches. Describe how this system responds to high liquid levels in the separator boot. What will be the consequence of an instrument air supply failure, as it relates to the separator boot liquid level? What will be the consequence of an AC power failure to LIC-92? file i

4 Question 3 This loop sheet shows a pneumatic reactor temperature control system utilizing a solenoid valve to assist in the actuation of process valve TV-: Loop: Reformer reactor #2 temperature o F A 20 PIG Reformer unit shelter TI Reformer unit control room TE TT O b I A 20 PIG TI a I O TIC PI In TH NC C In3 Com TY AC Out5 H N H N E 120 VAC Breaker #4 A 100 PIG TV P ATO 2 1 I 4 TAH A B 12 DE Determine the following, based on a close inspection and analysis of the diagram: The typical status of the output switch contact on TY- (NO or NC) The effect of an AC power loss from breaker #4 The effect of the solenoid becoming plugged or accidently capped by a technician file i

5 Question 4 Determine the normal energization states (e.g. or NDE) of each solenoid valve in this diagram, assuming the process valve needs to be closed when the process is running as it should: FO E IA D Also, determine whether one or both solenoids need to trip in order to make the process valve go to its fail-state. In other words, is this a 1oo2 to trip system, or a 2oo2 to trip system? uppose the ball valve refused to shut off when it should. Identify at least two possible faults that could cause this to happen. uggestions for ocratic discussion uppose the probability of each solenoid valve sticking in its regular operating position instead of tripping when commanded is Calculate the probability of the process valve refusing to trip when commanded as a result of this type of failure. uppose the probability of each solenoid valve sticking in its tripped position instead of going to its regular operating position when commanded is Calculate the probability of the process valve refusing to go to its regular operating position when commanded as a result of this type of failure. uppose the probability of each solenoid valve accidently tripping during regular operation is Calculate the probability of the process valve tripping accidently as a result of this type of failure. file i

6 Question 5 ketch arrows next to each of the two solenoid valves showing the directions of air flow in the energized (E) and de-energized (D) states, assuming both of the solenoid valves must trip in order to force the process valve to go to its fail position (i.e. 2oo2 to trip): NDE A.. A.. file i00982 Question 6 ketch arrows next to each of the two solenoid valves showing the directions of air flow in the energized (E) and de-energized (D) states, assuming the process control valve is supposed to be open in regular operation and close if both of the solenoid valves trip (i.e. 2oo2 to trip): NDE IA FO file i

7 Question 7 This fluid diagram shows the components and connections of a Bettis self-contained hydraulic module used to automatically shut off a line valve on a natural gas pipeline in the e of the pipeline pressure going outside of its limits (either falling below the low-pressure limit or rising above the high-pressure limit): HP gauge Hand pump Accumulator Regulator LP gauge Line valve FC (test) Relief, HP Relief, LP Reset Auto/Man olenoid trip Pressure pilot Identify all spool valve positions, and also trace the direction of oil flow, following a solenoid trip e. file i

8 Question 8 uppose this valve control system has a problem. The control valve (LV-104) does not move to the full-open position as it should when the solenoid is de-energized, although it will move when the 4-20 ma current signal to the I/P transducer is varied while the solenoid is energized: UY-104 DE Vent LY 104 I / P LV-104 A.. Identify the likelihood of each specified fault for this circuit. Consider each fault one at a time (i.e. no coincidental faults), determining whether or not each fault could independently account for all measurements and symptoms in this circuit. file i04692 Fault Possible Impossible Manual valve in bypass position olenoid coil failed open olenoid coil failed shorted olenoid valve (UY-104) spool stuck olenoid valve (UY-104) plugged Air supply to LY-104 failed 4-20 ma signal wiring to LY-104 failed open 4-20 ma signal wiring to LY-104 failed shorted Control valve (LV-104) stuck 8

9 Answer 1 Answers olenoid V-115 s all actuating air pressure from flow control valve FV- whenever its coil is de-energized. Thus, V-115 is normally energized to maintain actuating air pressure to FV-. olenoids V-111, V-112, and V-113 act to pre fuel gas from reaching the incinerator s burner assembly when the Burner Management ystem (BM) sends a trip signal. V-111 and V-112 are block valves, while V-113 is a bleed ( ) valve, making this a double-block and bleed valve arrangement. A similar solenoid valve arrangement can be seen on the pilot burner gas line with solenoids V-101, V-102, and V-103. Answer 2 Identify the statuses of V-92 and LV-92 when the separator boot liquid level is at or below the normal level of 1 foot 4 inches. LV-92 will be closed, and V-92 s coil will be de-energized. Describe how this system responds to high liquid levels in the separator boot. If LT-92 senses a high liquid level, controller LIC-92 will respond by applying electrical power to V-92. When V-92 actuates, it sends instrument air to the diaphragm actuator of LV-92 to cause that drain valve to open. As LV-92 drains liquid out of the boot, the level sensed by LT-92 decreases over time, eually to a point where controller LIC-92 stops sending power to the coil of V-92. What will be the consequence of an instrument air supply failure, as it relates to the separator boot liquid level? Without instrument air supply (IA), the level drain valve LV-92 can never open and the separator boot liquid level will rise unabated. Eually LHH-231 will detect the high-high level condition and command the Emergency hut-down (ED) system to turn the compressor off in order to avoid damaging that machine. What will be the consequence of an AC power failure to LIC-92? Without AC power to energized the coil of solenoid V-92, the level drain valve LV-92 will never be commanded to open by V-92 and the separator boot liquid level will rise unabated. Eually LHH-231 will detect the high-high level condition and command the Emergency hut-down (ED) system to turn the compressor off in order to avoid damaging that machine. Answer 3 The typical status of the output switch contact on TY- (NO or NC) TY- s output must typically be conducting (switch contacts closed) in order to pass AC power on to the coil of the solenoid valve and maintain its normally energized status. The effect of an AC power loss from breaker #4 the solenoid coil would de-energized, ing air pressure from the input of TV- and causing that process valve to go to its fail (closed) position. The effect of the solenoid becoming plugged or accidently capped by a technician If ever the discrete controller TY- commands the solenoid valve to trip, it would force TV- to hold its position rather than close as it should. 9

10 Answer 4 FO E IA D Answer 5 NDE A.. DE A.. E DE E 10

11 Answer 6 NDE D IA D E E FO Answer 7 HP gauge Hand pump Accumulator Regulator LP gauge Line valve FC (test) Relief, HP Relief, LP Reset Auto/Man olenoid trip Pressure pilot 11

12 Answer 8 Fault Possible Impossible Manual valve in bypass position olenoid coil failed open olenoid coil failed shorted olenoid valve (UY-104) spool stuck olenoid valve (UY-104) plugged Air supply to LY-104 failed 4-20 ma signal wiring to LY-104 failed open 4-20 ma signal wiring to LY-104 failed shorted Control valve (LV-104) stuck 12

Troubleshooting problems in control system

Troubleshooting problems in control system Troubleshooting problems in control system This worksheet and all related files are licensed under the Creative Commons Attribution License, version 1.0. To view a copy of this license, visit http://creativecommons.org/licenses/by/1.0/,

More information

Pumps and compressors

Pumps and compressors Pumps and compressors This worksheet and all related files are licensed under the Creative Commons Attribution icense, version 1.0. To view a copy of this license, visit http://creativecommons.org/licenses/by/1.0/,

More information

Liquid level measurement using hydrostatic pressure and buoyancy

Liquid level measurement using hydrostatic pressure and buoyancy iquid level measurement using hydrostatic pressure and buoyancy This worksheet and all related files are licensed under the Creative Commons Attribution icense, version 1.0. To view a copy of this license,

More information

Digester Processes. 1. Raw Sludge Pumping System

Digester Processes. 1. Raw Sludge Pumping System Digester Processes 1. Raw Sludge Pumping System Removes accumulated sludge from the primary clarifiers, pumped through 1 of 2 pipes either 150 or 200mm in diameter (Fig. 1.1). Fig 1.1 Pipes feeding Digesters

More information

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve

36G22, 36G23, 36G24 & 36G52 36J22, 36J23, 36J24 & 36J52 DSI and HSI Single Stage Combination Gas Valve Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR OPERATING THIS CONTROL COULD CAUSE PERSONAL INJURY AND/OR PROPERTY DAMAGE. DESCRIPTION

More information

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module:

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module: FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS This work covers part of outcome 2 of the Edexcel standard module: UNIT 21746P APPLIED PNEUMATICS AND HYDRAULICS The material needed for outcome

More information

Unit 24: Applications of Pneumatics and Hydraulics

Unit 24: Applications of Pneumatics and Hydraulics Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 9 ACCUMULATORS The material needed for outcome 2 is very extensive so there are

More information

INSTALLATION OPERATION MAINTENANCE

INSTALLATION OPERATION MAINTENANCE Bermad Electrically Controlled On-Off Deluge Valve Model: 400E-3D INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 1. Safety First BERMAD believes that the safety of personnel working

More information

EXPERIMENT 2 LEVEL CONTROL SYSTEM

EXPERIMENT 2 LEVEL CONTROL SYSTEM EXPERIMENT 2 LEVEL CONTROL SYSTEM 1.0 OBJECTIVE To study the response of level control process in open tank using the PID controller. 2.0 INTRODUCTION TO THE APPARATUS (MODEL WLF922). a) The process consists

More information

MULTIFUNCTIONAL CONTROL FOR GAS BURNING APPLIANCE

MULTIFUNCTIONAL CONTROL FOR GAS BURNING APPLIANCE SIT Group SIT -3- SIGMA MULTIFUNCTIONAL CONTROL FOR GAS BURNING APPLIANCE 9.955. Subject to change without notice Application Domestic gas appliances: central heating boilers, combi boilers, instantaneous

More information

INST 180 (1-day Control Valves course) (8:30 AM to 9:30 AM) Control valve construction and types Questions 1 through 5

INST 180 (1-day Control Valves course) (8:30 AM to 9:30 AM) Control valve construction and types Questions 1 through 5 INST 180 (1-day Control Valves course) Recommended schedule (8:00 AM to 8:30 AM) Introduction and Quiz (8:30 AM to 9:30 AM) Control valve construction and types Questions 1 through 5 (9:30 AM to 9:45 AM)

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 5-3 Wet Reference Leg EXERCISE OBJECTIVE Learn to measure the level in a vessel using a wet reference leg. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Measuring

More information

EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM

EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM EXPERIMENT 1 AIR PRESSURE CONTROL SYSTEM 1.0 OBJECTIVE To study the response of gas pressure control using PID controller. 2.0 INTRODUCTION TO THE APPARATUS a) The process plant consists of two air vessels

More information

Process & Instrumentation Diagram (P&ID) Purpose. Howitisdone? Methodology?

Process & Instrumentation Diagram (P&ID) Purpose. Howitisdone? Methodology? Process & Instrumentation Diagram (P&ID) Purpose 1. To indicate the instruments or control devices attached to the process. 2. To indicate the control system architecture associated with the process. Howitisdone?

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! INLET PRESS TAP WHITE-RODGERS 36E93-304 Delay-Opening Combination Gas Valve INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY

More information

NORMAL OPERATING PROCEDURES Operating Parameter Information

NORMAL OPERATING PROCEDURES Operating Parameter Information Operating Parameter Information Each operator performing the normal operating procedures (routine checks) of the facility should be familiar with the current normal operating parameters of all systems

More information

36E03 and 36E38 DSI and HSI Step Opening Combination Gas Valve INSTALLATION INSTRUCTIONS

36E03 and 36E38 DSI and HSI Step Opening Combination Gas Valve INSTALLATION INSTRUCTIONS INLET PRESS TAP WHITE-RODGERS 36E03 and 36E38 DSI and HSI Step Opening Combination Gas Valve INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS

More information

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL OTHER FLUID POWER VALVES. This work covers part of outcome 2 of the Edexcel standard module:

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL OTHER FLUID POWER VALVES. This work covers part of outcome 2 of the Edexcel standard module: FLUID POWER FLUID POWER EQUIPMENT TUTORIAL OTHER FLUID POWER VALVES This work covers part of outcome 2 of the Edexcel standard module: UNIT 21746P APPLIED PNEUMATICS AND HYDRAULICS The material needed

More information

36E DSI and HSI Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS

36E DSI and HSI Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS INLET PRESS TAP WTE-RODGERS 36E54-214 DSI and HSI Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS

More information

BUBBLER CONTROL SYSTEM

BUBBLER CONTROL SYSTEM BUBBLER CONTROL SYSTEM Description: The HDBCS is a fully automatic bubbler system, which does liquid level measurements in water and wastewater applications. It is a dual air compressor system with, air

More information

SPECIFICATIONS ATTENTION

SPECIFICATIONS ATTENTION VPS 504 S06 Installation Manual - P/N 80122 - Ed. 01/09 VPS 504 S06 and S05 Valve Proving System Installation Instructions VPS 1 6 Gases Natural gas, air and other inert gases. NOT suitable for butane

More information

36H SERIES Combination Gas Valve

36H SERIES Combination Gas Valve FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR OPERATING THIS CONTROL COULD CAUSE PERSONAL INJURY AND/OR PROPERTY DAMAGE. DESCRIPTION The 36H series combination gas valve is

More information

Burner Management System DEMO Operating instructions

Burner Management System DEMO Operating instructions Burner Management System DEMO Operating instructions Burner Management System DEMO Operating Instructions Startup Summary - Normal startup is accomplished in four basic steps: 1. Leak Test a. Safety Valve

More information

36E DSI, HSI & Proven Pilot Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS

36E DSI, HSI & Proven Pilot Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS INLET PRESS TAP WTE-RODGERS 36E96-314 DSI, HSI & Proven Pilot Two-Stage Combination Gas Valve INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL

More information

Modeling Case Study: Surge Tanks, Valves, Level sensors, and modeling

Modeling Case Study: Surge Tanks, Valves, Level sensors, and modeling Modeling Case Study: Surge Tanks, Valves, Level sensors, and modeling By Peter Woolf (pwoolf@umich.edu) University of Michigan Michigan Chemical Process Dynamics and Controls Open Textbook version 1.0

More information

CPE562 Chemical Process Control HOMEWORK #1 PROCESS & INSTRUMENTATION DIAGRAM

CPE562 Chemical Process Control HOMEWORK #1 PROCESS & INSTRUMENTATION DIAGRAM Faculty of Chemical Engineering CPE562 Chemical Process Control HOMEWORK #1 PROCESS & INSTRUMENTATION DIAGRAM SUBMISSION DATE: 1 OCT. 2012 Question 1 Name the following equipments based on standard P&ID

More information

Cash Valve TYPE KP PILOT OPERATED BACK PRESSURE VALVE. ISSUED - DECEMBER 2000 CAVMC-0518-US-0208 ISO 9001 Certified

Cash Valve TYPE KP PILOT OPERATED BACK PRESSURE VALVE. ISSUED - DECEMBER 2000 CAVMC-0518-US-0208 ISO 9001 Certified Cash Valve PILOT OPERATED BACK PRESSURE VALVE ISSUED - DECEMBER 2000 CAVMC-0518-US-0208 ISO 01 Certified KP HIGH CAPACITY PILOT OPERATED BACK PRESSURE VALVE DESCRIPTION The Cash Valve Type KP is a pilot

More information

GAS FUEL VALVE FORM AGV5 OM 8-03

GAS FUEL VALVE FORM AGV5 OM 8-03 ALTRONIC AGV5 OPERATING MANUAL GAS FUEL VALVE FORM AGV5 OM 8-03 WARNING: DEVIATION FROM THESE INSTALLATION INSTRUCTIONS MAY LEAD TO IMPROPER ENGINE OPERATION WHICH COULD CAUSE PERSONAL INJURY TO OPERATORS

More information

Product Overview A DIVISION OF MARSH BELLOFRAM

Product Overview A DIVISION OF MARSH BELLOFRAM Product Overview P627 & P630 P627 Available with internal relief device - R627 version P627 & P630 - High Flow Regulators The P627 and P630 are spring loaded, direct-operated regulators for both low and

More information

FUEL GAS FIRING CONTROL RJ (Dick) Perry Safety Systems Consultant 6 June 2016

FUEL GAS FIRING CONTROL RJ (Dick) Perry Safety Systems Consultant 6 June 2016 INTRODUCTION Fired equipment such as Heaters and Boilers, normally have to comply with either NFPA 85/86 or API 556 for North America and some other countries which apply such standards, or EN 746-2 for

More information

Portable Oil Lube Air Compressors

Portable Oil Lube Air Compressors Portable Oil Lube Air Compressors 8003631 8003632 0410149 8018968 8018940 Owner s Manual Read and understand operating instructions before use Safety definitions The information listed below should be

More information

R E D I C O N T R O L S

R E D I C O N T R O L S R E D I C O N T R O L S Operation & Maintenance Manual Portable Service Purger for Low Pressure Chillers Model: PSP-LP-1B For Refrigerants R-11, R-113, R-114 & R-123 & Other Similar Refrigerants File Literature

More information

SERVICE MANUAL No. I-0043

SERVICE MANUAL No. I-0043 Bettis Canada Ltd. 4112 91A Street Edmonton, Alberta, Canada T6E 5V2 Tel: (403) 450-3600 Fax: (403) 450-1400 SERVICE MANUAL No. I-0043 Edmonton GAS/HYDRAULIC ADDITIONAL COMPONENTS CUSTOMER: P.O.#: W.O.#:

More information

Temperature Controllers

Temperature Controllers IM0004 April 2013 CONTENTS T-12 Thermostat PAGE Introduction 1 Scope 1 Description 1 Specification 1 Temperature Controllers 2 INTRODUCTION CAUTION Prior to installing, the instructions provided herein

More information

BUBBLER CONTROL SYSTEM

BUBBLER CONTROL SYSTEM BUBBLER CONTROL SYSTEM Description: The LDBCS is a fully automatic bubbler system, which does liquid level measurements in water and wastewater applications. It is a dual air compressor system with, air

More information

Gas Check. Short testing time, with automatic start-up if no leakage was detected from previous operation.

Gas Check. Short testing time, with automatic start-up if no leakage was detected from previous operation. Quality Products at Competitive Prices Gas Check Automatic testing of the down-stream installation to check that all valves are closed and that pipework and fittings are gas tight before each system start-up.

More information

NGP-250/500 Nitrogen Generator Quick Start Guide

NGP-250/500 Nitrogen Generator Quick Start Guide NGP-250/500 Nitrogen Generator Quick Start Guide Version: A July 2013 Potter Electric Signal Company, LLC 5757 Phantom Dr., Suite 125 P. O. Box 42037 Hazelwood, MO 63042 Phone: (314) 595-6900 Document

More information

Instruction Manual VCG-6

Instruction Manual VCG-6 Specifications Amps / Volts requirements 400 ma @ 24 VDC Propane pressure (VCG-6LP) 11 WC / 2.8 kpa Natural Gas pressure (VCG-6NG) 4.5 WC / 1.15 kpa Cu ft per hour / CO2 3-6 SCFH BTU Rating (Variable)

More information

Modulating Valves for Atmospheric, Infrared, and Direct Fired Burners

Modulating Valves for Atmospheric, Infrared, and Direct Fired Burners BULLETIN MT2035-07/05 Modulating Valves for Atmospheric, Infrared, and Direct Fired Burners M/MR Series M411, M511, M611 M420, M520, M620, MR410, MR510, MR610 MR212D, MR212E, MR212G and MR212J (Flanged),

More information

SINGLE VALVE WITH LOW-FLOW BYPASS

SINGLE VALVE WITH LOW-FLOW BYPASS CONTROL VALVES Pressure Reducing Valve Sizing Guide Sizing pilot operated reducing valves is not a complicated process. It starts with determining requirements and following these guidelines in valve size

More information

MWEA MAINTENANCE SEMINAR SPECIALTY VALVES POWER GLOBES

MWEA MAINTENANCE SEMINAR SPECIALTY VALVES POWER GLOBES MWEA MAINTENANCE SEMINAR SPECIALTY VALVES POWER GLOBES J O H N G. H U N T E R Types of Valves P A U L M A R C H I Accessories Principals of Operation Maintenance Control Valve Types Common Problems Key

More information

OPERATION MANUAL NTF-15

OPERATION MANUAL NTF-15 OPERATION MANUAL NTF-15 Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81235-00 (Rev B) TABLE

More information

ANL Bubble Chamber Superheated Active Target System

ANL Bubble Chamber Superheated Active Target System ANL Bubble Chamber Superheated Active Target System N 2 O and C 2 F 6 as Active Fluids B. DiGiovine Physics Division and Bubble Chambers April 2009 First Bubble Chamber Received Full Operation Authorization

More information

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289 3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS Item #31289 The EASTWOOD 3 GALLON, OILLESS PANCAKE COMPRESSOR, with an Integral Air Regulator, efficiently supplies all compressed air requirements for

More information

Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION

Exercise 2-2. Second-Order Interacting Processes EXERCISE OBJECTIVE DISCUSSION OUTLINE. The actual setup DISCUSSION Exercise 2-2 Second-Order Interacting Processes EXERCISE OBJECTIVE Familiarize yourself with second-order interacting processes and experiment with the finer points of controller tuning to gain a deeper

More information

OPERATION MANUAL NTF-60 Plus

OPERATION MANUAL NTF-60 Plus OPERATION MANUAL NTF-60 Plus Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81264-00 (Rev A)

More information

Lab Assessments Workshop

Lab Assessments Workshop Lab Assessments Workshop Gary Hicks Brazosport Jeff Laube Kenai Peninsula College Dorothy Ortego - Sasol plus Materials from University of Alaska Brian Ellington Why Assess? Improve knowledge and skill

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 11 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES

More information

Automatic Valve Proving Control

Automatic Valve Proving Control ISO 9001 Automatic Valve Proving Control 7 696 LDU11 UL recognized FM approved Features Performs leak test of the gas shut-off valves before start-up and/or immediately after burner shut-down No inlet

More information

CompAir provide high quality and reliable Nitrogen solutions

CompAir provide high quality and reliable Nitrogen solutions Nitrogen Compressor Guide CompAir provide high quality and reliable Nitrogen solutions Technical Data Model Typical Inlet Pressure Max Pressure Typical FAD Drive Bar PSI Bar PSI m³/hr CFM kw HP 5209 B

More information

EDUCATION DEPARTMENT ACCU-TEST

EDUCATION DEPARTMENT ACCU-TEST ABN 17 100 208 964 EDUCATION DEPARTMENT ACCU-TEST GAS SAFETY SHUT OFF SYSTEM Operating & Installation Manual Head Office (Melbourne) Sydney Brisbane (Distributor) 1/5 Samantha Court 2/14 Welder Road 17

More information

Master Control Systems, Inc. Variable Speed Fire Pump Controllers

Master Control Systems, Inc. Variable Speed Fire Pump Controllers Master Control Systems, Inc. Variable Speed Fire Pump Controllers Meets NFPA 20-2019 UL/FM Listed and Approved for fire protections * Pressure Limiting Control * Suction Limiting Control Why Variable Speed?

More information

TANDEM MODULATOR FOR OUTLET GAS FLOW: STEPPED (836 TANDEM) - CONTINUOUS (837 TANDEM) SERVO-CONTROLLED PRESSURE REGULATOR

TANDEM MODULATOR FOR OUTLET GAS FLOW: STEPPED (836 TANDEM) - CONTINUOUS (837 TANDEM) SERVO-CONTROLLED PRESSURE REGULATOR SIT Group 836-837 TANDEM MULTIFUNCTIONAL GAS CONTROL MODULATOR FOR OUTLET GAS FLOW: STEPPED (836 TANDEM) - CONTINUOUS (837 TANDEM) SERVO-CONTROLLED PRESSURE REGULATOR ALL ADJUSTMENTS ACCESSIBLE FROM ABOVE

More information

3-Way Decoking Valve Option - Installation and Operation Instructions Accessory G Background

3-Way Decoking Valve Option - Installation and Operation Instructions Accessory G Background 3-Way Decoking Valve Option - Installation and Operation Instructions Accessory G6600-60058 Background Accumulation of contaminants, such as column bleed, impurities in detector gases and even carbon from

More information

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units Models: EPS Single Pump EPT Twin Pump EPS-HP EPT-HP Single Pump High Pressure Twin Pump High Pressure

More information

OPERATING PROCEDURES

OPERATING PROCEDURES OPERATING PROCEDURES 1.0 Purpose This element identifies Petsec s Operating Procedures for its Safety and Environmental Management System (SEMS) Program; it applies to all Petsec operations. Petsec is

More information

Operator: Save these instructions for future use!

Operator: Save these instructions for future use! WHITE-RODGERS 6C8-5 Combination Gas Control INSTALLATI INSTRUCTIS Operator: Save these instructions for future use FAILURE TO READ AND FOLLOW ALL INSTRUCTIS CAREFULLY BEFORE INSTALLING OR OPERATING THIS

More information

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves

Tech Tips. Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves Service Call: Adjustable Hydraulic Valves Flow controls Pressure controls Sequence valves Holding valves Tools Required: Flow Meter Pressure gauge Holding valve test block Wrenches for installation of

More information

CRYOGENIC EXPERTS, INC. World Wide Web Toll Free FOR CEXI Phone (805) Facsimile (805)

CRYOGENIC EXPERTS, INC. World Wide Web   Toll Free FOR CEXI Phone (805) Facsimile (805) CRYOGENIC EXPERTS, INC. World Wide Web http://www.cexi.com E-mail cexi@cexi.com Toll Free 1-800-FOR CEXI Phone (805) 981-4500 Facsimile (805) 981-4501 I. Installation Instructions Installation And Operating

More information

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION Install your Blue River Technologies Port-A-Poly mixing system in a clean dry area.

More information

System Pressure Manager Standard & System Pressure Manager Plus

System Pressure Manager Standard & System Pressure Manager Plus System Pressure Manager Standard & System Pressure Manager Plus Installation, Commissioning & Servicing Instructions Note: THESE INSTRUCTIONS MUST BE READ AND UNDERSTOOD BEFORE INSTALLING, COMMISSIONING,

More information

Valve Proving System VDK 200 A S06*

Valve Proving System VDK 200 A S06* Valve Proving System VDK 200 A S06* Valve proving system with the following approvals. UL Recognized File # MH17004 CSA Certified File # 1637485 CSA Requirement No. 4-01 (USA) Technical Information Letter

More information

Intrinsically safe solenoid valves on/off controls - ATEX certification

Intrinsically safe solenoid valves on/off controls - ATEX certification www.atos.com Table E130-17/E Intrinsically safe solenoid valves on/off controls - ATEX certification valve body valve spool intrinsically safe solenoid electrical connector manual override DHW-0611/WP/6

More information

Liquid Level Controllers

Liquid Level Controllers Liquid Level Controllers ALL PUMPS LLC-2Y For both pump up and down control. Variable On/Off set points. NDP-15/20/25/32, DP-10/15 & *NDP-40/50/80 LLC-1 Pump up and down versions available. 6 to 12 differential

More information

Installation and operation Manual. Bermad Surge Anticipation Valve. Model No 435

Installation and operation Manual. Bermad Surge Anticipation Valve. Model No 435 Instruction manual Bermad surge anticipation manual Model No 435 Installation and operation Manual Bermad Surge Anticipation Valve Model No 435 Bermad Water Technologies Rev 0 5/05/2015 7 Inglewood Drive,

More information

High-Pressure Boiler Inspection Procedures: A Complete Checklist

High-Pressure Boiler Inspection Procedures: A Complete Checklist High-Pressure Boiler Inspection Procedures: A Complete Checklist Inspecting high-pressure boilers is a complex process requiring preparation, planning, and a multitude of safety precautions. Regular inspections

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 348a 1. Description Viking supervised Surefire Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated Viking G-6000P Valve comes complete

More information

SECTION P4 SEPARATION SYSTEMS

SECTION P4 SEPARATION SYSTEMS SEPARATION SYSTEMS The H.P. Separation System begins with the H.P. Production Header (GAY-1000). This header directs flow to the H.P. Production Separator (MBD-1000). Gases from the H.P. Production Separator

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 333a 1. Description Viking supervised Surefire Preaction Systems Utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated Viking G-3000P Valve comes complete

More information

Valve Proving System VDK 200 A S02

Valve Proving System VDK 200 A S02 Valve Proving System VDK 200 A S02 Valve proving system with the following approvals. UL Recognized File # MH17004 CSA Certified File # 1637485 CSA Requirement No. 4-01 (USA) Technical Information Letter

More information

Master Control Systems, Inc. Variable Speed Fire Pump Controllers

Master Control Systems, Inc. Variable Speed Fire Pump Controllers Master Control Systems, Inc. Variable Speed Fire Pump Controllers Meets NFPA 20-2013 UL/FM Listed and Approved for fire protections 1 Why Variable Speed? Huge Sprinkler System and Standpipe Cost Savings

More information

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents Owner: HSE Performance Assurance ALL HSE PRC 172 Approved By: Manager, HSE Performance Assurance Retention Code: CG01 CA Revised: March 2015 Review Frequency: Five years or less Table of Contents 1.0 Purpose...

More information

Time-Delay Electropneumatic Applications

Time-Delay Electropneumatic Applications Exercise 3-4 EXERCISE OBJECTIVE & & & To introduce time delays; To describe the operation of a time-delay valve; To describe the operation of a time-delay relay. DISCUSSION Time-Delays Time delays are

More information

South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System. Designed for: Dry or Preaction Fire Protection Systems (FPS)

South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System. Designed for: Dry or Preaction Fire Protection Systems (FPS) South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System Designed for: Dry or Preaction Fire Protection Systems (FPS) 1.0 Description of Work 1.1 The Fire Sprinkler Contractor shall provide

More information

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501).

SEPARATION SYSTEMS. The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501). SEPARATION SYSTEMS The Separation Systems consists of the Test Header (GAY-0302) and the Test Separator (MBD-4501). The Header System is designed to collect and direct the well stream to the corresponding

More information

WW-730. Pressure Sustaining/Relief Control Valve

WW-730. Pressure Sustaining/Relief Control Valve WW-730 Pressure Sustaining/Relief Control Valve Installation Operation & Maintenance Page 1 of 6 1. DESCRIPTION The Model 730 Pressure Relief / Sustaining Valve is an automatic control valve designed to

More information

SINGER MODEL 106/206-RPS-L&H

SINGER MODEL 106/206-RPS-L&H DESCRIPTION: Model 106/206-RPS-L&H dissipates surges caused by power failure to pumps. The valve anticipates the surge by opening on low line pressure associated with sudden stopping of pumps. This assures

More information

LENNOX SLP98UHV DIAGNOSTIC CODES

LENNOX SLP98UHV DIAGNOSTIC CODES Code Status of Equipment Action required to clear and recover - Idle mode (Decimal blinks at 1 Hertz -- 0.5 second ON, 0.5 second OFF) A Cubic feet per minute (cfm) setting for indoor blower (1 second

More information

SUBMITTAL NOTES PROJECT: Ross Model 50RWR-A Pilot Operated Surge Relief Valve with Hydraulic Anticipation. Size: inch / mm

SUBMITTAL NOTES PROJECT: Ross Model 50RWR-A Pilot Operated Surge Relief Valve with Hydraulic Anticipation. Size: inch / mm SUBMITTAL NOTES PROJECT: Ross Model 50RWR-A Pilot Operated Surge Relief Valve with Hydraulic Anticipation Size: inch / mm Every Ross Valve shall be hydrostatically tested for body integrity and tight seating

More information

C645A-E Pressure Switches

C645A-E Pressure Switches C645A-E Switches FEATURES PRODUCT DATA C645A,B,D,E GENERAL C645A,B with Window C645C The C645 pressure switches are safety devices used in positive-pressure or differential-pressure systems to sense gas

More information

BERMAD Waterworks. Level Control Valve with Altitude Pilot. 700 Series. Model X. Features and Benefits. Major Additional Features

BERMAD Waterworks. Level Control Valve with Altitude Pilot. 700 Series. Model X. Features and Benefits. Major Additional Features Level Control Valve with Altitude Pilot High level reservoirs & water towers Energy cost critical systems Systems with poor water quality Inherent refreshing Level sustaining at reservoir outlet The Level

More information

HYDROGEN UNIT CHAPTER-4 UTILITY SYSTEM DESCRIPTIION

HYDROGEN UNIT CHAPTER-4 UTILITY SYSTEM DESCRIPTIION CHAPTER-4 UTILITY SYSTEM DESCRIPTIION The different utility systems provided in Hydrogen Generation Unit for its smooth operation are described in this chapter. They include 1. Service water 2. Cooling

More information

PVQ 13 A2 R SE 1 S 20 C-11 D

PVQ 13 A2 R SE 1 S 20 C-11 D PVQ - Variable Displacement Piston Pump PVQ 13 A2 R SE 1 S 2 C-11 D 1 2 3 4 6 7 8 9 1 1 Model Series PVQ Inline Piston Pump Variable Volume Quiet Series 4 Rotation Viewed from shaft end R Right hand, standard

More information

WW-720. Pressure Reducing Control Valve

WW-720. Pressure Reducing Control Valve WW-720 Pressure Reducing Control Valve (Size Ranges: 2-4 and 6-14 ) Installation Operation & Maintenance Page 1 of 6 1. DESCRIPTION The Model 720 Pressure Reducing is an automatic control valve (powered

More information

Incorrect installation, adjustment, or misuse of this burner could result severe personal injury, or substantial property damage.

Incorrect installation, adjustment, or misuse of this burner could result severe personal injury, or substantial property damage. Operating instructions GB VD Burners Incorrect installation, adjustment, or misuse of this burner could result severe personal injury, or substantial property damage. To the Equipment Owner: Please read

More information

PumpAgents.com - Click here for Pricing/Ordering Nominal psi (bar) Cut-In Cut-Out

PumpAgents.com - Click here for Pricing/Ordering Nominal psi (bar) Cut-In Cut-Out PumpAgents.com - Click here for Pricing/Ordering Model 31670-Series Dual Max 7.5 GPM (28 LPM) AUTOMATIC TWO STAGE WATER SYSTEM WITH ACCUMULATOR TANK AND PUMPGARD STRAINER IDEAL FOR PLEASURE AND COMMERCIAL

More information

36C/36D HSI, DSI Proven Pilot Gas Valves INSTALLATION INSTRUCTIONS

36C/36D HSI, DSI Proven Pilot Gas Valves INSTALLATION INSTRUCTIONS 36C/36D HSI, DSI Proven Pilot Gas Valves INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR OPERATING

More information

V5197A. Firing Rate Gas Valve APPLICATION FEATURES PRODUCT HANDBOOK

V5197A. Firing Rate Gas Valve APPLICATION FEATURES PRODUCT HANDBOOK V5197A Firing Rate Gas Valve PRODUCT HANDBOOK APPLICATION The V5197A are firing rate valves used to provide variable flow control of air, natural gas, liquefied petroleum (LP), and manufactured gases.

More information

GH & GHL Series Gas-Over-Oil Valve Actuators

GH & GHL Series Gas-Over-Oil Valve Actuators GH & GHL Series Gas-Over-Oil Valve Actuators Introduction Paladon s GH and GHL-Series use high pressure process gas to provide the energy required to power the actuator. To provide increased safety and

More information

TECHNICAL DATA. Q= Cv S

TECHNICAL DATA. Q= Cv S Page 1 of 13 1. DESCRIPTION The Viking 4 inch Model G-4000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry

More information

Technical

Technical Control Settings SETTING Set point Range HOT Set point Differential ECO Limit Timings TECHNICAL SERVICE DEPARTMENT VALUE 90 F (32 C) to 160 F (71 C) 120 F (49 C) 15 F (9 C) 199 F (93 C) Notice the BLUE

More information

VR46.5V(A)/VR86.5V(A) SERIES

VR46.5V(A)/VR86.5V(A) SERIES VR46.5V(A)/VR86.5V(A) SERIES COMACT COMBINATION GAS CONTROS WITH INTEGRATED 1:1 GAS/AIR REGUATOR FOR AUTOMATIC IGNITION SYSTEMS SECIFICATIONS INSTRUCTION SHEET Subject to change without notice. rinted

More information

TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3

TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3 TWC Services, Inc. Structured On-The-Job Training for JT- 1, 2, 3 The following tasks parallel the Jr. Tech (JT-1, 2, 3) description and development plan and use the Refrigeration and Air conditioning

More information

Electro-Pneumatic Converter YT-940 SERIES

Electro-Pneumatic Converter YT-940 SERIES Electro-Pneumatic Converter YT-940 SERIES PRODUCT MANUAL VERSION 1.00 Contents 1. Introduction 3 1.1 General information for the users. 3 1.2 Manufacturer Warranty 3 1.3 Explosion Proof Warning. 4 2. Product

More information

Valve Communication Solutions Axiom

Valve Communication Solutions Axiom Axiom Detect automated valve problems... before they shut down your process Reasons for Automated On/Off Valve Failures Monitor Fail Solenoid Fail Actuator Fail Coupling Break Too Slow Leaking Sticking

More information

XDF BURNERS DUAL FUEL EXCESS AIR BURNER FEATURES DESCRIPTION EXCESS AIR OPERATION

XDF BURNERS DUAL FUEL EXCESS AIR BURNER FEATURES DESCRIPTION EXCESS AIR OPERATION DUAL FUEL EXCESS AIR BURNER MODEL: 3610, 3651 Revision: 0 FEATURES Burns all fuel gases or light oils Nozzle mix design for on ratio control or excess air 350% excess air all sizes on gas or oil Turndown

More information

PROCESS MONITORING AND CONTROL

PROCESS MONITORING AND CONTROL Chemical Engineering Process Design PROCESS MONITORING AND CONTROL Keith Marchildon David Mody Monitoring means Measurement 1. There is no Control without Monitoring 2. Monitoring should not be done without

More information

FUNDAMENTALS OF PRESSURE REGULATORS ROBERT BENNETT MANAGER OF TRAINING ELSTER AMERICAN METER

FUNDAMENTALS OF PRESSURE REGULATORS ROBERT BENNETT MANAGER OF TRAINING ELSTER AMERICAN METER FUNDAMENTALS OF PRESSURE REGULATORS ROBERT BENNETT MANAGER OF TRAINING ELSTER AMERICAN METER SUPPLY = DEMAND FUNCTION OF A REGULATOR A regulator may be defined as a "mechanism for controlling or governing

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Page 1 of 13 1. DESCRIPTION The Viking 6 Model G-6000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler