1 December, Mr. Jason Walsh State Pipeline Coordinator s Office Penland Parkway Anchorage, AK 0 RE: Supplemental Information for the Donlin Gold Natural Gas Pipeline State Pipeline Right-of-Way Lease Application (ADL 0) Dear Mr. Walsh: Donlin Gold submitted its application for a state pipeline right-of-way lease under AS. in. Since our submittal we have made several modifications to the Donlin Gold Natural Gas Pipeline, Plan of Development (PoD). The purpose of this letter is to make you aware and provide information regarding three such modifications to the PoD to assist you in continuing to process our application. The current Plan of Development (PoD Revision ) that we provided to you previously would be revised following completion of the federal issuance of the Environmental Impact Statement EIS Records of Decision. In the meantime, Donlin Gold s intent is to work with your office to ensure that you have the information you need at this point in your adjudication process to proceed with our ROW lease application. The following three proposed modifications to the Donlin Gold PoD for the Proposed Natural Gas Pipeline Project are addressed:. Electric Power Transmission Line from Beluga to Compressor Station no longer required. Modification of the Compressor Station to include electric power generation. Rerouting the proposed pipeline to include the North Route Alignment of approimately. miles (. km) from MP. to MP. Although there are or may be additional modifications or refinements in length of specific construction sections within Spreads and, camp movement sequence, construction seasons, and other changes, these more detailed items will be addressed in the Pipeline Construction Eecution Plan and in the PoD Revision when completed. The information provided in this letter is based on current information that is being reevaluated and refined. All locations remain approimate as actual requirements and locations will be more accurately determined as the project progresses to final design. If any additional information is needed, please do not hesitate to contact me. Sincerely, Dan Graham Permitting and Environmental Manager CC: Cathe Heroy, SPCO Donlin Gold, Business Park Blvd., Suite G-, Anchorage, AK 0 Tel (0) -00 Fa (0) -0
2 Proposed Modifications to the Donlin Gold PoD for Proposed Natural Gas Pipeline Project.0 Electric Power Transmission Line from Beluga to Compressor Station no Longer Required Donlin Gold proposed in its PoD Revision, Section..: Electric Transmission Line, to construct a medium voltage (MV) aboveground transmission line between the Beluga Power Plant substation and the Compressor Station at MP 0. to meet the operational needs of the Metering Station and Compressor Station. The distance of the proposed electric transmission line under that initial proposal was. miles ( km). Following additional review and evaluation of the proposed construction, use of the transmission line, and the alternative to utilize the compressor station facility after installation of additional equipment to generate power to both operate the compressor station as well as the metering station, Donlin now proposes to eliminate the proposed overhead transmission line and instead generate power at the compressor station. Donlin Gold proposes to run a short-buried transmission line approimately 0. miles (0. km) from the compressor station to the metering station. The buried line would be in a separate rightof-way (ROW) adjacent to or co-located with the pipeline ROW, in compliance with applicable regulatory requirements. Refer to Attachment : Electric Transmission line and Fiber Optic Cable, Figure - from PoD Rev.. This figure depicts the location of the electric transmission line that would no longer be required..0 Modification of the Compressor Station to include Electric Power Generation Donlin Gold proposed a Compressor Station (described in the PoD Rev., Section..), to supply electric power to the compressor station by constructing an. mile ( km) overhead transmission line from the Beluga Power Plant substation to the Compressor Station. Following additional review and evaluation of the proposed construction, use of the transmission line, and the alternative to utilize the compressor station facility after installation of additional equipment to generate power to both operate the compressor station as well as the metering station, Donlin Gold now proposes to instead generate electric power at the compressor station and run a buried electric transmission line the approimately 0. miles (0. km) to the metering station. The estimate of acreage identified in Table -, Calculation of Estimated ROW Acreage (PoD Rev., page -) for the transmission line would be reduced to reflect only the 0. miles (0. km) for the buried electric transmission line from the compressor station at MP 0. to the metering station at MP 0. The compressor station will have two main components: natural gas compression machinery with aftercoolers to reduce gas temperature following the compression process; and electrical generation machinery. Two microturbines would be used for electrical power generation (a 00% unit with a 00% backup) for the compressor station and metering station operations, station yard lighting, emergency lighting, and provide for emergency uninterrupted power. Please refer to Attachment for the location of the compressor station and metering station which would remain located at MP 0. and MP 0 as depicted in Figure -. Donlin Gold December
3 .0 Rerouting the Proposed Pipeline to include the North Route Alignment from Approimately Happy River to Threemile Creek Valley The North Route departs the PoD Rev. proposed alignment at approimately MP. and rejoins at approimately MP. The length of the North Route is approimately. miles (. km) and traverses only state lands although the North Route does cross the Happy River Remote Recreational Cabin Staking Area and proposed Happy River Remote Recreational Cabin Staking Area. The North Route also crosses an area of state mining claims held by Geoinformatics Alaska Eploration, Inc. and, at one location, the Iditarod Trail Public Access Easement and the Iditarod National Historical Trail easement (INHT), see Attachment. From approimately MP. east of the Happy River, the North Route veers northwesterly and passes beneath an unnamed tributary of the Happy River at approimately MP.0 (flowing from the west side of McDoel Peak) utilizing a,-foot ( m) horizontal directional drill (HDD). The North Route continues northwesterly, running roughly parallel to Happy River on the river s northeast side. Near approimately MP.0 the pipeline would pass beneath another unnamed tributary to the Happy River (flowing from the southeast side of Distin Peak) as a,0-foot ( m) HDD. The North Route then continues northwesterly along the northeast side of Happy River, crossing Glacier Creek and Moose Creek then continues northwesterly again to rejoin the PoD Rev. proposed alignment at approimately MP.0 The North Route is unique in that it maintains close proimity to the Happy River (approimately miles ( km) and holds to elevations within 0 ft ( m) of the Happy River canyon rim. The route typically traverses relic alluvial terraces associated with the Happy River. Consequently, the North Route includes very little significant elevation gain or loss. The route does cross numerous minor drainages and three significant streams that would involve open-cut pipeline installation. The two tributary drainages that include steep-walled canyons with depths of 0 and 0 ft ( and m) would both require an HDD crossing method and special effort to develop shoofly roads in and out of the canyons. In general, the soils that would be encountered along this route are likely very favorable for pipeline ROW development and trenching. The near absence of permafrost and poor soils precludes concerns with thaw consolidation and associated requirements for strain-based design. The North Route appears to minimize or avoid wetlands and thaw-unstable permafrost. In shifting to the North Route, Donlin would eliminate any crossing of the Happy River, and reduce impacts to wetlands and permafrost conditions, and would also have the potential for summer season construction. Wildlife impacts would vary but would not be significantly different from the PoD Rev. proposed alignment, although future survey studies would be necessary to confirm. The North Route crosses streams, of which are listed as anadromous in the Anadromous Water Catalog (AWC). Cut-and-fill stream crossing construction methods over fish spawning habitat would be used. The anadromous streams crossed are Moose Creek and Threemile Creek, both of which have documented sockeye salmon spawning habitat and would be crossed by cut-and-fill methods. The North Route is the only alternative of those considered in this region that eliminates crossings of all documented Chinook spawning habitats. However, thirteen of the streams crossed by the North Route have not been sampled and some may provide for resident and anadromous fish. Spawning habitat appears unlikely in any of the thirteen. None of the shoofly access routes for the North Route would cross documented anadromous fish habitat. Although the North Route has not been surveyed to identify potential additional cultural resource sites, of the cultural sites currently noted in the region by the Alaska Heritage Resources Survey (AHRS), all the sites are farther away from the North Route than from the PoD Rev. proposed alignment. Aside from the INHT crossing, no site is within a half-mile of the North Route, and five are more than a mile away. Donlin Gold December
4 Attachment : North Route Footprint and Land Details also identifies the approimate locations of the shoofly access routes, temporary construction camps, material sites, airstrips, water etraction sites, pipe storage yards, and HDD Crossing locations. It also identifies that segment of the PoD Rev. proposed alignment that would be eliminated by the proposed reroute to the North Route segment. Table -, Calculation of Estimated ROW Acreage (PoD Rev., page -) would not change significantly for the estimated acreage for the pipeline, because of using the North Route. The following modified PoD Rev. tables show the changes that are the result of utilizing the North Route alignment for that segment of the proposed gas pipeline from approimately Happy River (MP.) to Threemile Creek Valley (MP ). Location and Description of Mainline Block Valves- The mainline valve location at approimately MP 0. shown in the PoD Rev. would be relocated to the North Route at approimately MP 00.. Refer to the PoD Rev. Section.0 Location and Description of Mainline Block Valves, pages -, and Table - below for the repositioning of MLV-0 to the North Route. PoD Rev., Table -: Mainline Valve Location Summary No. TAG Approimate Milepost (MP) MLV-0 MP 0.0 MLV-0 MP 0. A MLV-0A MP. MLV-0 MP. MLV-0 MP. MLV-0 MP. MLV-0 MP. (New-North Route) MLV-0 MP 0.0 MLV-0 MP 00. MLV-0 MP. MLV-0 MP.0 0 MLV-0 MP. MLV- MP. MLV- MP.0 MLV- MP. MLV- MP. MLV MP. MLV- MP. MLV- MP. MLV- MP 0. MLV- MP. Donlin Gold December
5 Iditarod Trail- The Iditarod National Historic Trail (INHT) corridor includes the original Iditarod Trail and Iditarod Race Trail (IRT) are treated as one linear cultural site. The INHT crosses the North Route only once, just east of the INHT s Happy River crossing. The INHT and North Route run along opposite sides of the Happy River, and the average distance between the pipeline and INHT is approimately.0 mile (. km). Less than 0.-mile (0. km) of the pipeline would fall within the 00-foot ( m) easement for the INHT. Visibility of the pipeline from the INHT is epected to be relatively low. The North Route passes through heavily timbered areas and would be typically located on low benches above the Happy River canyon rim, and therefore likely to be below the horizon from much of the INHT. Refer to the current PoD Rev. Section.. Iditarod Trail, pages - through -. The overall number pipeline crossings of the INHT corridor is substantially reduced as shown in the table below by use of the North Route. The crossings no longer required and the one crossing of the INHT are identified in PoD Rev., Table - below. PoD Rev., Table -: Pipeline Crossings of INHT, State of Alaska Public Access Easements for the Iditarod Trail and non-section line RS Rights-of-Way MP From MP To Description Case ID Map ID Iditarod National Historic Trail MAP State Public Access Easement for Iditarod Trail, 00 ft wide, Susitna to Rainy Pass ADL 0 MAP-0.. Iditarod National Historic Trail MAP-0.. State Public Access Easement for Iditarod Trail, 00 ft wide, Susitna to Rainy Pass ADL 0 MAP-0. Susitna-Rainy Pass Trail RST MAP-0. Susitna-Rainy Pass Trail RST MAP-0. Susitna-Rainy Pass Trail RST MAP-0. Susitna-Rainy Pass Trail RST MAP-0. Susitna-Rainy Pass Trail RST MAP-0. Susitna-Rainy Pass Trail RST MAP-0. Susitna-Rainy Pass Trail RST MAP-0.. Iditarod National Historic Trail TBD State Public Access Easement for Iditarod Trail, 00 ft wide State Public Access Easement for Iditarod Trail, 00 ft wide, Susitna to Rainy Pass Susitna-Rainy Pass Trail Iditarod National Historic Trail State Public Access Easement for Iditarod Trail, 00 ft wide, Susitna to Rainy Pass Susitna-Rainy Pass Trail Iditarod National Historic Trail State Public Access Easement for Iditarod Trail, 00 ft wide, Susitna to Rainy Pass Iditarod National Historic Trail ADL 0 ADL 0 RST ADL 0 RST ADL 0 TBD MAP-0 MAP-0 MAP-0 MAP-0 MAP-0 MAP-0 MAP-0 MAP-0 Donlin Gold December
6 0. 0. State Public Access Easement for Iditarod Trail, 00 ft wide, Susitna to Rainy Pass ADL 0 MAP Susitna-Rainy Pass Trail RST MAP Iditarod National Historic Trail MAP State Public Access Easement for Iditarod Trail, 00 ft wide, Susitna to Rainy Pass ADL 0 MAP-0.. Iditarod National Historic Trail MAP-0.. State Public Access Easement for Iditarod Trail, 00 ft wide, Susitna to Rainy Pass ADL 0 MAP-0.. Susitna-Rainy Pass Trail RST MAP-0.. Susitna-Rainy Pass Trail RST MAP-0.. Susitna-Rainy Pass Trail RST MAP-0.. Iditarod National Historic Trail MAP-0.. State Public Access Easement for Iditarod Trail, 00 ft wide, Susitna to Rainy Pass ADL 0 MAP-0.0. Iditarod National Historic Trail MAP-0.0. State Public Access Easement for Iditarod Trail, 00 ft wide, Susitna to Rainy Pass ADL 0 MAP-0.0. Iditarod National Historic Trail MAP-0.0. State Public Access Easement for Iditarod Trail, 00 ft wide, Susitna to Rainy Pass ADL 0 MAP Susitna-Rainy Pass Trail RST MAP State Public Access Easement for Iditarod Trail, 00 ft wide, Susitna to Rainy Pass ADL 0 MAP Iditarod National Historic Trail MAP State Public Access Easement for Iditarod Trail, 00 ft wide, Susitna to Rainy Pass ADL 0 MAP Susitna-Rainy Pass Trail RST MAP Iditarod National Historic Trail MAP State Public Access Easement for Iditarod Trail, 00 ft wide, Rainy Pass to Rohn ADL 0 MAP-0.. Iditarod National Historic Trail over State-Owned navigable water MAP-.. Iditarod National Historic Trail MAP-.. Rainy Pass-Big River Trail RST MAP-.. State Public Access Easement for Iditarod Trail, 00 ft wide, Rohn to Takotna ADL 0 MAP- Donlin Gold December
7 Mainline Camps and Camp Locations- One additional mainline camp, Glacier Creek Camp, would be constructed and utilized. The camp would be located at approimately MP.. Refer to the PoD Rev. Section.. Mainline Camps and Camp Locations, page - through - and the revised table shown below that identifies the additional camp requirement. PoD Rev., Table -: Mainline Pipeline Campsite Locations Spread Campsite Approimate Location Type of Camp/ Site Area Season of Use Summer Winter Donlin Gold Camp Mine Site TBD Kuskokwim West Camp MP 00 Person Camp/. acres (. ha) Kuskokwim East Camp MP. 00 Person Camp/. acres (. ha) Big River Camp MP 00 Person Camp/. acres ( ha) Jones Camp MP 00 Person Camp/ 0. acres (. ha) Bear Paw Camp MP. 00 Person Camp/. acres (0. ha) Threemile Camp MP. 00 Person Camp/. acres (. ha) Glacier Creek Camp MP. 00 Person Camp/ Acres TBD Happy River Camp MP 00 Person Camp/. acres (. ha) Shell Camp MP 00 Person Camp/ acres ( ha) Deep Creek Camp MP 00 Person Camp/. acres (. ha) Beluga Camp Beluga TBD Donlin Gold December
8 HDD Camps and Camp Locations and Work Pads- In utilizing the North Route, the HDD crossing described in the PoD Rev. for the Happy River is no longer required. However, the North Route would require using HDD to cross two unnamed tributaries of the Happy River. Refer to the PoD Rev. Section.. HDD Camps and Camp Locations and Work Pads, pages - and - and the table below which shows the HDD site no longer required and the HDD sites required by the North Route. PoD Rev., Table -: HDD Camps and Campsite Locations Spread Campsite/ Workspace Area Approimate Milepost Location (MP) North Fork George HDD Site North Fork George (HDD Entry). acres (0. ha) MP. North Fork George (HDD Eit). acres (0. ha) MP. George River HDD Site George River (HDD Entry). acres (0. ha) MP. George River (HDD Eit). acres (0. ha) MP. East Fork George HDD Site East Fork George (HDD Entry). acres (0. ha) MP. East Fork George (HDD Eit). acres (0. ha) MP. Kuskokwim River HDD Site Season of Use Kuskokwim River (HDD Entry). acres (0. ha) MP. Kuskokwim River (HDD Eit). acres (0. ha) MP. Kusko West Landing MP. Kusko East Landing MP. Unnamed Tributary # of Happy River HDD Site (McDoel) Unnamed Tributary # HDD Entry Unnamed Tributary # HDD Eit Unnamed Tributary # of Happy River HDD Site (Distin) Unnamed Tributary # HDD Entry Unnamed Tributary # HDD Eit Geohazard Avoidance- Pipe Pass #, #, # MP. MP. MP. MP.0 Pipe Pass # HDD Entry (. mi) MP. X Pipe Pass # HDD Eit MP. X Pipe Pass # HDD Entry (. mi) MP. X Pipe Pass # HDD Eit MP. X Pipe Pass # HDD Entry (0.0 mi) MP. X Pipe Pass # HDD Eit MP. X Happy River HDD Site Happy River (HDD Entry). acres (0. ha) MP. Summe X r Winter All Season Donlin Gold December
9 Happy River (HDD Eit). acres (0. ha) Skwentna River HDD Site MP. Skwentna River (HDD Entry). acres (0. ha) MP. Skwentna River (HDD Eit). acres (0. ha) MP 0. Beluga Landing MP -0.0 HDD used for geohazard area avoidance in area located approimately between MP to. Donlin Gold December
10 Airstrips- One new airstrip would be constructed and used at approimately MP. in support of construction activities for the North Route. Refer to the PoD Rev. Section.. Airstrips, pages - through -, the table below supplements that information with the additional airstrip needed for the North Route construction. PoD Rev., Table -: Airstrip Locations and Construction Spread Name Approimate Milepost Location Length (ft/m) Construction/Area Summer Season of Use Winter All Season Beluga Airstrip Beluga,000 ft (, m) Deep Creek Airstrip MP.,00 ft (,0 m) Shell Airstrip MP.0,000 ft (, m) Happy River Airstrip MP.,000 ft (, m) Glacier Creek Airstrip (New- North Route) MP.,000 ft (, m) Threemile Airstrip MP.,00 ft (,0) Bear Paw Airstrip MP.,000 ft (, m) Jones Airstrip MP.,000 ft (, m) Farewell Airstrip MP.,000 ft (, m) Big River Airstrip MP.,000 ft (, m) Kuskokwim East Airstrip Kuskokwim West Airstrip Donlin Gold Airstrip MP. MP. Donlin Gold Camp,000 ft (, m),000 ft (, m),000 ft (, m) Eisting-No work New- Grade, cut/ fill. acres (. ha) New- Grade, cut/ fill 0. acres ( ha) New- Grade, cut/ fill. acres (. ha) New- grade cut/fill. acres (. ha) New- Grade, cut/ fill. acres (. ha) New- Grade, cut/ fill. acres (0. ha) New- Grade only, flood plain. acres (. ha) Eisting- Grade only, surface course. acres (. ha) New- Grade, cut/fill. acres (. ha) New- Grade only. acres ( ha) New- Grade only acres (. ha) Eisting- No work Use of the eisting airstrip in Skwentna was evaluated and determined to not meet Donlin Gold s needs. Donlin Gold December
11 Roads- Access to water etraction sites, material sites and shoofly roads are needed for the North Route. Refer to the PoD Rev. Section.. Roads, pages - through -, and the revised table below which includes the addition of roads needed for the North Route. PoD Rev., Table -: Temporary Site Access Roads Season of Use Name Milepost (MP) Length (m) Length (km) Type Description Summer Winter All Season Public Road Easement Eisting access from Beluga airstrip to MP 0 Public Road Easement Eisting Pretty Creek Road AWES-000 MP Water Etraction Site Access AWES-00 MP Water Etraction Site Access AWES-000 MP 0.. Water Etraction Site Access AWES-00 MP Water Etraction Site Access AWES-0 MP.. Water Etraction Site Access AWES-00 MP 0.. Water Etraction Site Access AWES-0 MP Water Etraction Site Access AWES-00 MP Water Etraction Site Access AWES-00 MP Water Etraction Site Access AWES-0 MP Water Etraction Site Access AWES-0 MP Water Etraction Site Access AMS- MP 0..0 Material Site Access AWES-0 MP Water Etraction Site Access AWES- MP Water Etraction Site Access AWES-000 MP Water Etraction Site Access AWES-00 MP AWES-0 MP AWES-00 MP AWES-00 MP AWES-00 MP AWES-00 MP AWES-00 MP Water Etraction Site Access Water Etraction Site Access Water Etraction Site Access Water Etraction Site Access Water Etraction Site Access Water Etraction Site Access Water Etraction Site Access AWES-0 MP Water Etraction Site Access AMS-C MP Material Site Access AWES-00 MP Water Etraction Site Access AWES-0 MP Water Etraction Site Access AWES-00 MP Water Etraction Site Access AWES-0 MP Water Etraction Site Access Donlin Gold 0 December
12 AAS-Farewell MP..0 Airstrip Access Name Milepost (MP) Length (m) Length (km) Type Description Season of Use AWES-0 MP Water Etraction Site Access AWES-0 MP Water Etraction Site Access AWES-0 MP Water Etraction Site Access AWES-0 MP Water Etraction Site Access AWES-00 MP Water Etraction Site Access AWES-00 MP Water Etraction Site Access AWES-00 MP Water Etraction Site Access AMS- MP Material Site Access AMS- MP Material Site Access AWES-00 MP Water Etraction Site Access AWES-00 MP.. Water Etraction Site Access AWES-00 MP Water Etraction Site Access AMS-0 MP Material Site Access AWP-Kusko NE MP Work Pad AWES-00 MP Water Etraction Site Access AWES-00 MP Water Etraction Site Access Donlin Gold December
13 Refer to the PoD Rev. Section.. Roads, pages - through -. Shoofly access route additions and deletions for the north route are included in the table below. PoD Rev., Table -: Shoofly Access Routes Season of Use Name Approimate Milepost (MP) Length (m) Length (km) Summe r Winter All Season SHOO-000 MP. 0.. SHOO-000 MP. 0.. SHOO-00 MP SHOO-000 MP SHOO-000 MP..0. SHOO-000 MP SHOO-000 MP SHOO-000 MP SHOO-000 MP 0.. SHOO-000 MP SHOO-000 MP SHOO-00 MP SHOO-0 MP SHOO- MP..0. SHOO-00 MP... SHOO-0 MP SHOO-00 MP.. SHOO-00 MP SHOO-00 MP SHOO-00 MP SHOO-00 MP SHOO-00 SHOO-00 SHOO-00 SHOO-00 SHOO-00 SHOO-00 MP. 0.. MP MP MP MP MP Donlin Gold December
14 Season of Use Name Approimate Milepost (MP) Length (m) Length (km) Summer Winter All season SHOO-00 SHOO-0 MP MP SHOO-00 MP SHOO-0 MP. 0.. SHOO-0 MP SHOO-00 MP SHOO-0 MP SHOO-0 MP SHOO-0 MP. 0.. SHOO-0 MP... SHOO-0 MP SHOO-0 MP SHOO-000 MP. 0.. SHOO-00 MP SHOO-0 MP SHOO-00 MP SHOO-00 MP... SHOO-00 MP SHOO-00 MP...0 SHOO-00 MP SHOO-00 MP..0. SHOO-00 MP SHOO-000 MP SHOO-00 MP SHOO-0 MP SHOO-00 MP..0. SHOO-00 MP...0 SHOO-00 MP.. SHOO-00 MP... SHOO-00 MP SHOO-00 MP....0 SHOO-00 MP... SHOO-000 MP... SHOO-00 MP... SHOO-0 MP...0 Donlin Gold December
15 SHOO-00 MP... SHOO-00 MP. 0.. SHOO-00 MP SHOO-00 MP SHOO-00 MP SHOO-00 MP SHOO-00 MP SHOO-000 MP SHOO-00 MP. 0.. SHOO-0 MP. 0.. SHOO-00 MP.. SHOO-00 MP... SHOO-00 MP... SHOO-00 MP 0.. SHOO-00 MP SHOO-00 MP..0 SHOO-00 MP SHOO-000 MP... SHOO-00 MP... SHOO-0 MP SHOO-00 MP SHOO-00 MP.. 0. Donlin Gold December
16 Potential Material Sites- New material sites are proposed along the North Route and some of those proposed in the PoD Rev. identified below in the table would no longer be required. Refer to the PoD Rev. Section.. Material Sites, pages - through -0, and the table below for material site locations, including additions and deletions. PoD Rev., Table -: Potential Material Sites Material Site Name Nearest Milepost (MP) Area in Acres (ha) Material Type Estimated Available Volume (yd ) Estimated Epected Usage (yd ) Summer Season of Use Winter All Season MS-00 MP 0.. acres (. ha) MS-0 MP.. acres (. ha) MS-0 MP 0.. acres (. ha) MS-0 MP.. acres (. ha) MS-0 MP.. acres (. ha) MS-0 MP.. acres (. ha) MS-0 MP.. acres (. ha) MS-0 MP.. acres (. ha) MS-0 MP. acres (. ha) MS-0 MP. acres (. ha) MS-0 MP 0.. acres (. ha) MS- MP.. acres (. ha) MS- MP.. acres (. ha) MS- MP.. acres (. ha) MS- (No longer required) MS- (No longer required) MS-A (No longer required) MS-A (New-North Route) MS-A (New-North Route) MP MP 0. MP 0. MP. MP.. acres (. ha). acres (. ha). acres (. ha). acres (. ha). acres (. ha) 0,000 0,000,000,000 Bedrock,000,000 Bedrock,000,000 Bedrock,000,000 0,000,000,000,000,000,000 0,000 0,000 00,000 0,000,000,000,000,000,000,000 00,000 00,000,000,000,000,000,000,000,000 0,000 0,000,000 Donlin Gold December
17 MS-A (New-North Route) MS-B (New-North Route) MP 0. MP.. acres (. ha). acres (. ha) MS-C MP.. acres ( ha) MS-A MP.. acres (. ha) MS-B MP.. acres (. ha) MS-C MP.. acres (. ha) MS-A MP.. acres (0. ha) MS-B MP.. acres (. ha) MS- MP. acres (. ha) MS- MP 0.. acres (0. ha) MS- MP.. acres (. ha) MS- MP.. acres (. ha) MS- MP.. acres (. ha) MS- MP.. acres (. ha) MS- MP. acres (. ha) MS- MP. acres (. ha) MS-A MP.. acres (. ha) MS- MP 0.. acres ( ha) MS-A MP.. acres (. ha) MS- MP.. acres ( ha) MS-0 MP. acres (. ha) MS- MP 0.. acres ( ha) MS- MP.. acres (. ha) MS- MP. acres (. ha) MS- MP. acres ( ha) 0,000 0,000 0,000 0,000 Course Colluvial Coarse Colluvial Outwash Bedrock & Glacial/,000,000,000 0,000,000 0,000,000 0,000,000 0,000,000,000 00,000 0,000 00,000 0,000 00,000 00,000 0,000,000,000 0,000,000,000,000,000,000 0,000,000 0,000 00,000 00,000 0,000 0,000 0,000,000 0,000,000,000,000 0,000 0,000,000 00,000 00,000 0,000,000 0,000 Donlin Gold December
18 MS- MP.. acres (. ha) MS- MP.. acres (. ha) MS- MP 0.. acres (. ha) MS- MP.. acres ( ha) MS-0 MP. acres (. ha) MS- MP.. acres (. ha) MS- MP.. acres ( ha) MS- MP.. acres (. ha) MS- MP.. acres (. ha) MS- MP. acres (. ha) MS- MP.. acres (. ha) MS- MP.. acres (. ha) MS- MP.. acres ( ha) MS- MP.. acres (. ha) MS-0 MP.. acres (0. ha) MS- MP. acres (. ha) MS- MP.. acres (. ha) MS- MP. acres (. ha) MS- MP.. acres (. ha) MS- MP.. acres (. ha) MS- MP.. acres (. ha) MS- MP.. acres (. ha) MS- MP. acres (. ha) MS-0 MP. acres (. ha) MS-0A MP. acres ( ha) MS- MP.. acres (. ha) MS-A MP. acres (. ha) 00,000 0,000 00,000 00,000 0,000 0,000 0,000 0,000 0,000,000 00,000 0,000 Bedrock,000,000 0,000 Bedrock,000,000 Bedrock,000,000 0,000 Bedrock 00,000,000 Bedrock,000,000 Bedrock 0,000 0,000 Bedrock,000 00,000 Bedrock 0,000 0,000 Bedrock 0,000 0,000 Bedrock &,000,000,000 Bedrock 0,000,000 Bedrock 00,000 00,000 Bedrock 0,000,000 Bedrock 0,000,000 Bedrock 0,000,000 Bedrock 0,000,000 Bedrock 0,000 0,000 Bedrock 0,000 0,000 Bedrock 0,000 0,000 Bedrock 0,000 0,000 Bedrock 0,000 0,000 Donlin Gold December
19 MS- MP.. acres (. ha) MS- MP. 0 acres ( ha) Bedrock 00,000 00,000 Bedrock 0,000 00,000 Donlin Gold December
20 Pipe Storage Yards- New potential pipe storage yards are proposed along the North Route and five proposed in the PoD Rev. identified below in the table that would no longer be required. Refer to the PoD Rev. Section.. Pipe Storage Yards, pages - through - (Table -). PoD Rev., Table -: Pipe Storage Yards Name Approimate Milepost (MP) Beluga Yard Area (acres/ hectares) Summer Season of Use Winter All Season Planned Pipe Source Beluga PSY-0 MP.. acres (0. ha) Beluga PSY-0 MP.. acres (0. ha) Beluga PSY-0 MP.. acres (0. ha) Beluga PSY-0 MP.. acres (0. ha) Beluga PSY-0 MP.. acres (0. ha) Beluga PSY-0 MP.. acres (0. ha) Beluga PSY-0 MP.. acres (0. ha) Beluga PSY-0 MP.. acres (0. ha) Road system than via ice road PSY-0 MP.. acres (0. ha) Road system than via ice road PSY-0 MP 0.. acres (0. ha) Road system than via ice road PSY- MP.. acres (0. ha) Road system than via ice road PSY- MP.. acres (0. ha) Road system than via ice road PSY- MP.. acres (0. ha) Road system than via ice road PSY- MP.. acres (0. ha) Road system than via ice road PSY- MP 0.. acres (0. ha) Road system than via ice road PSY- MP.. acres (0. ha) Road system than via ice road PSY- MP.. acres (0. ha) Road system than via ice road PSY- MP. acres (0. ha) PSY- MP 0.. acres (0. ha) PSY- MP.. acres (0. ha) PSY- MP 0.. acres (0. ha) PSY- MP 0.. acres (0. ha) Road system than via ice road Road system than via ice road Road system than via ice road Road system than via ice road Road system than via ice road PSY- (New-North Route) MP.0. acres (0. ha) X Road system than via ice road PSY-A (New-North Route) MP.. acres (0. ha) X Road system than via ice road PSY- (New-North Route) MP.. acres (0. ha) X Road system than via ice road PSY- (New-North Route) MP.. acres (0. ha) X Road system than via ice road PSY-A (New-North Route) MP 0.. acres (0. ha) X Road system than via ice road PSY- (New-North Route) MP 0.. acres (0. ha) X Road system than via ice road Donlin Gold December
21 PSY- (New-North Route) MP 0.0. acres (0. ha) X Road system than via ice road PSY-A (New-North Route) MP 0.. acres (0. ha) X Road system than via ice road PSY- (New-North Route) MP.. acres (0. ha) X Road system than via ice road PSY- (New-North Route) MP.. acres (0. ha) X Road system than via ice road PSY- MP.. acres (0. ha) Road system than via ice road PSY- MP.. acres (0. ha) Road system than via ice road PSY- MP.. acres (0. ha) Road system than via ice road PSY- MP.. acres (0. ha) Road system than via ice road PSY- MP.. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko East PSY-0 MP. acres (0. ha) Kusko East PSY- MP. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko East PSY-0 MP.. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko East PSY- MP.. acres (0. ha) Kusko West PSY- MP.. acres (0. ha) Kusko West PSY- MP.. acres (0. ha) Donlin Gold December Kusko West PSY- MP.. acres (0. ha) Kusko West PSY- MP.. acres (0. ha) Donlin Mine PSY- MP.. acres (0. ha) Donlin Mine PSY-0 MP.. acres (0. ha) Donlin Mine PSY- MP.. acres (0. ha) Donlin Mine PSY- MP.. acres (0. ha) Donlin Mine PSY- MP.. acres (0. ha) Donlin Mine PSY- MP.. acres (0. ha) Donlin Mine PSY- MP.. acres (0. ha) Donlin Mine PSY- MP 0.. acres (0. ha) Donlin Mine PSY- MP 0.. acres (0. ha) Donlin Mine Notes: This yard is not laid out; it is assumed there is adequate room at Beluga. Start pipe haul from Beluga. Actual winter access route options (Oilwell Road Route or Willow Landing Route) are still being evaluated and are discussed in Section...
22 Potential Water Etraction Sites- New potential water etraction sites are proposed along the North Route and those proposed in the PoD Rev. identified below in the table would no longer be required. Refer to the PoD Rev. Section.. Water Use and Potential Water Etraction Sites, pages - through - and the table below. PoD Rev., Table -: Potential Water Etraction Sites Water Etraction Site Name Nearest Milepost (MP) Summer Season of Use Winter All Season Waterbody Type Years of Use Rate (gpm) Etraction Annual Volume (gal) WES-000 MP 0 River 00,0,000 WES-00 MP River 00,0,000 WES-000 MP 0 Pond 00 00,000 WES-00 MP Pond 00 00,000 WES-000 MP Tributary 00 0,000 WES-000 MP Tributary 00 0,000 WES-000 MP Creek 00,0,000 WES-000 MP Tributary 00,0,000 WES-000 MP Tributary 00,0,000 WES-00 MP Creek 00 00,000 WES-000 MP Creek,0,000 WES-00 MP Creek,00,000 WES-00 MP Creek 00,0,000 WES-000 MP 0 Tributary 00,0,000 WES-00 MP Creek 00,00,000 WES-0 MP Creek 00,0,000 WES-0 MP Creek 00,0,000 WES-00 MP Tributary 00,0,000 WES-00 MP Creek 00,0,000 WES-0 MP Creek 00,0,000 WES- MP Creek 00,0,000 WES-00 MP Creek 00,0,000 WES-00 MP Creek,0,000 WES- MP Pond 00 00,000 WES-00 MP Pond 00,0,000 WES-00 MP 0 River 00,,000 WES-00 MP Creek 00 00,000 WES-00 MP Creek 00,0,000 WES-0 MP River 00,0,000 WES-0 MP Pond 00,0,000 WES-00 MP Stream 00,0,000 WES- MP Stream 00,0,000 WES-0 MP Stream 00,0,000 WES-0 MP Stream 00,0,000 WES-0 MP Stream 00,0,000 WES-0 MP Stream 00 00,000 WES-0 MP Stream,0,000 WES-0 MP Pond 00,0,000 WES-0 MP Stream 00,0,000 Donlin Gold December
23 WES-0 MP Stream 00,0,000 WES-0 MP Creek 00,0,000 WES-0 MP Creek 00,0,000 WES-000 MP Pond 00,0,000 WES-00 MP River 00,,000 WES-0 (No longer required) MP WES-00 (No longer required) MP 0 WES-00 (No longer required) MP WES-00 (No longer required) MP WES-00 (No longer required) MP 0 WES-00 (No longer required) MP 0 WES-00 (No longer required) MP 0 WES-00 (No longer required) MP 0 WES-0 (New- North Route) MP. X WES-0 (New- North Route) MP. X WES-00 (New- North Route) MP. X WES-00 (New- North Route) MP. X WES-00 (New- North Route) MP 0. X WES-00 (New- North Route) MP. X WES-00 (New- North Route) MP. X WES-00 (New- North Route) MP. X WES-00 (New- North Route) MP 00. X WES-000 (New- North Route) MP 0. X Lake 00,000,000 Lake 00,000,000 Creek 00,00,000 Creek,0,000 Creek 00,0,000 Creek 00,000,000 Creek 00,0,000 River 00,,000 Creek TBD TBD TBD Creek TBD TBD TBD Creek TBD TBD TBD Creek TBD TBD TBD Creek TBD TBD TBD Creek TBD TBD TBD Creek TBD TBD TBD Creek TBD TBD TBD Creek TBD TBD TBD Creek TBD TBD TBD Donlin Gold December
24 WES-00 (New- North Route) MP 0. X Creek TBD TBD TBD WES-0 MP. Stream 00,,000 WES-0 MP. Creek 00 00,000 WES-0 MP Tributary 00 00,000 WES-0 MP Tributary 00 00,000 WES-00 MP Tributary 00 00,000 WES-0 MP Tributary 00 00,000 WES-0 MP Tributary 00 00,000 WES-00 MP Creek 00 00,000 WES-0 MP Tributary 00 00,000 WES-0 MP Tributary 00 00,000 WES-00 MP River 00,000,000 WES-00 MP 0 Pond 00 0,000 WES-0 MP River 00 0,000 WES-0 MP Tributary 00 00,000 WES-0 MP Tributary 00 0,000 WES-0 MP Spring 00 0,000 WES-00 MP River 00 0,000 WES-0 MP River 00 0,000 WES-00 MP 0 Tributary 00 0,000 WES-00 MP Tributary 00,,000 WES-000 MP River 00,0,000 WES-00 MP Tributary 00,00,000 WES-00 MP 0 Creek 00,0,000 WES-0 MP Creek 00,00,000 WES-00 MP Creek 00,00,000 WES-00 MP Creek 00,00,000 WES-0 MP Pond 00,00,000 WES-00 MP River 00,,000 WES-00 MP Creek 00 00,000 WES-00 MP Creek 00 00,000 WES-0 MP Creek 00,00,000 WES-00 MP Creek 00 00,000 WES-00 MP Creek 00 00,000 WES-0 MP 0 Creek 00,00,000 WES-000 MP River 00,,000 WES-00 MP Creek 00,,000 WES-0 MP Pond 00,0,000 WES-0 MP Pond 00,0,000 WES-0 MP Pond 00,0,000 WES-00 MP River 00,,000 WES-00 MP Pond 00,000,000 WES-00 MP Pond 00,000,000 WES-00 MP Pond 00,000,000 WES-00 MP Creek,000 WES-00 MP Creek 00,000 WES-00 MP Creek,000 Donlin Gold December
25 WES-00 MP River 00,,000 WES-0 MP Creek 00,0,000 WES-0 MP Creek 00,0,000 WES-00 MP Creek 00,00,000 WES-00 MP Creek 00 00,000 WES-00 MP Creek 00,00,000 WES-00 MP Creek 00,0,000 WES-00 MP Creek 00,0,000 WES-00 MP Tributary 00 0,000 WES-00 MP Creek 00,000 WES-000 MP Creek 00 0,000 WES-00 MP Creek 00,000 WES-0 MP Creek 00 0,000 WES-0 MP Creek 00,0,000 WES-0 MP Creek 00 00,000 WES-00 MP River 00,,000 WES-0 MP Creek 00 0,000 WES-0 MP Creek 00 00,000 WES-00 MP River 00 0,000 WES-00 MP River 00,,000 Donlin Gold December
26 PoD Rev., Table -: HDD Estimated Water Use HDD Crossing Name Skwentna River Happy River Unnamed Tributary # to Happy River- McDoel Unnamed Tributary # to Happy River- Distin Kuskokwim River East Fork George River George River North Fork George River Length (ft/m), ft 0 m, ft,0 m,. ft. m,0. ft. m,0 ft, m, ft, m, ft 0 m, ft,000 m Estimated Total Water Requirement (gal) 0,000-,000 0,000-00,000 0,000-00,000 0,000-00,000 00,000-,000 00,000-,000,000-0,000,000-0,000 Estimated Total Volume Solids/Cuttings Needing Disposal (cyd) Estimated Total Volume of Drilling Mud for Disposal (gal) - 0,000-0,000 -,000-,000 -,000-,000 -,000-, ,000-0,000 -,000-,000-0,000-0,000 -,000-,000 Note: Estimated volume ranges rely on assumptions regarding drilling methods and ground conditions to be encountered, therefore actual volumes can vary significantly and operations would be planned accordingly. Estimates would be refined during final design. Donlin Gold December
27 Pipeline Construction Fuel Estimate- With the establishment on one additional airstrip in the North Route the estimated fuel required would be modified as shown in the table below. Refer to the PoD Rev. Section.. Fuel, pages - and -. PoD Rev., Table -: Pipeline Construction Fuel Estimate Pipeline Construction Fuel Estimate (Gallons) Airstrips,000,000 Beluga Airstrip 00,000 Deep Creek Airstrip 00,000 Shell Airstrip,000 Happy River Airstrip TBD Glacier Creek Airstrip 00,000 Threemile Airstrip 00,000 Bear Paw Airstrip 00,000 Jones Airstrip 0,000 Farewell Airstrip 00,000 Big River Airstrip 00,000 Kuskokwim East Airstrip 00,000 Kuskokwim West Airstrip 00,000 Donlin Airstrip Total Gallons:,00,000 (plus Glacier Creek Estimate TBD) Donlin Gold December
28 Donlin Gold gas pipeline compressor station buried electric transmission line from MP- to metering station at MP-0 Fiber optic cable in buried mode from MP-0 at metering station tie-in with BPL to compressor station Beluga power plant substation is an option for fiber optic cable point of beginning Beluga River TL- TL- TL- TL- MP- MP- MP- MP- MP- TL- MP- MP- TL- MP- MP-0 MP- TL- MP- # MP-0 Fiber optic cable would continue with pipeline to mine site in buried mode Donlin Gold gas pipeline point of beginning (MP-0) Medium voltage above-ground transmission line is no longer proposed for use to provide electric power to compressor or metering station Potential Beluga construction-phase camp location/storage yard!.!( Landing area/storage yard C O O K I N L E T K Proposed Transmission Milepost (TL-) Proposed Gasline Milepost (MP-) # Compressor Station Proposed Natural Gas Pipeline Alingment Proposed Transmission Line!. Eisting Power Plant Eisting Camp Eisting Storage Yard Attachment SCALE: 0 mi 0. km USGS Tyonek Quad K Seward Meridian, UTM Zone, NAD ELECTRIC TRANSMISSION LINE AND FIBER OPTIC CABLE DONLIN GOLD PROJECT FIGURE: DG: PER0.md, 0//, R
29 MP- MP MP-0 MP-0 MP-0 MP-0 S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W MP MP-0 MP-0 MP-0 0 MP-0 0 MP-0 S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W MP- S0N0W S0N0W S0N0W S0N0W MP-00 MP MP- MP- S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W MP- MP- MP- 0 MP- MP S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W MP- S0N0W S0N0W S0N0W S0N0W 0000 MP- MP- MP- MP- MP- MP- Copyright: National Geographic Society, i-cubed CURRENT PIPELINE ALIGNMENT/FOOTPRINT HDD Entry/Eit Airstrip Water Etraction Site Camp Current Milepost (MP-) Material Site Current Pipeline Alignment Previous Pipeline Alignment Pipe Storage Yard Temporary HDD Workspace Work Pad Shoofly Access Route Site Access Route 0000 DETAILED LAND STATUS () Happy River, Remote Recreational Cabin Staking Area Commercial Guide Camp Permit or Lease or Easement Applicaiton State-Identified RS Public Right-of-Way (Non-section line) Iditarod Trail, Public Access Easement (00' Wide) Iditarod National Historical Trail (INHT), Easement (00' Wide) Geoinformatics Alaska Eploration, Inc. BRI Alaska Corp. State-Owned, Tentatively Approved (TA) or Patented Land e e e Federal Land, Federal e e e Aviation Administration Private Land INHT Easement (ADNR, Pre-) Attachment K NORTH ROUTE FOOTPRINT AND LAND DETAILS DONLIN GOLD PROJECT FIGURE: SCALE: mi km Seward Meridian, UTM Zone, NAD DG: PER0.md, /0/, R0
30 Donlin Gold gas pipeline compressor station buried electric transmission line from MP- to metering station at MP-0 Fiber optic cable in buried mode from MP-0 at metering station tie-in with BPL to compressor station Beluga power plant substation is an option for fiber optic cable point of beginning Beluga River TL- TL- TL- TL- MP- MP- MP- MP- MP- TL- MP- MP- TL- MP- MP-0 MP- TL- MP- # MP-0 Fiber optic cable would continue with pipeline to mine site in buried mode Donlin Gold gas pipeline point of beginning (MP-0) Medium voltage above-ground transmission line is no longer proposed for use to provide electric power to compressor or metering station Potential Beluga construction-phase camp location/storage yard!.!( Landing area/storage yard C O O K I N L E T K Proposed Transmission Milepost (TL-) Proposed Gasline Milepost (MP-) # Compressor Station Proposed Natural Gas Pipeline Alingment Proposed Transmission Line!. Eisting Power Plant Eisting Camp Eisting Storage Yard Attachment SCALE: 0 mi 0. km USGS Tyonek Quad K Seward Meridian, UTM Zone, NAD ELECTRIC TRANSMISSION LINE AND FIBER OPTIC CABLE DONLIN GOLD PROJECT FIGURE: DG: PER0.md, 0//, R
31 MP- MP MP-0 MP-0 MP-0 MP-0 S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W MP MP-0 MP-0 MP-0 0 MP-0 0 MP-0 S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W MP- S0N0W S0N0W S0N0W S0N0W MP-00 MP MP- MP- S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W MP- MP- MP- 0 MP- MP S0N0W S0N0W S0N0W S0N0W S0N0W S0N0W MP- S0N0W S0N0W S0N0W S0N0W 0000 MP- MP- MP- MP- MP- MP- Copyright: National Geographic Society, i-cubed CURRENT PIPELINE ALIGNMENT/FOOTPRINT HDD Entry/Eit Airstrip Water Etraction Site Camp Current Milepost (MP-) Material Site Current Pipeline Alignment Previous Pipeline Alignment Pipe Storage Yard Temporary HDD Workspace Work Pad Shoofly Access Route Site Access Route 0000 DETAILED LAND STATUS () Happy River, Remote Recreational Cabin Staking Area Commercial Guide Camp Permit or Lease or Easement Applicaiton State-Identified RS Public Right-of-Way (Non-section line) Iditarod Trail, Public Access Easement (00' Wide) Iditarod National Historical Trail (INHT), Easement (00' Wide) Geoinformatics Alaska Eploration, Inc. BRI Alaska Corp. State-Owned, Tentatively Approved (TA) or Patented Land e e e Federal Land, Federal e e e Aviation Administration Private Land INHT Easement (ADNR, Pre-) Attachment K NORTH ROUTE FOOTPRINT AND LAND DETAILS DONLIN GOLD PROJECT FIGURE: SCALE: mi km Seward Meridian, UTM Zone, NAD DG: PER0.md, /0/, R0
Union Pacific Railroad
Input Questions: 404/401 Pre Application Meeting, December 18, 2013, Portland, Oregon 1. What is the project purpose and need? The purpose of the project is to improve the efficiency and average velocity
More informationFreshwater Fish Assessment
Alaska Department of Transportation & Public Facilities Seward Highway MP 7-9 6-7 Freshwater Fish Assessment March 14, 8 Prepared by HDR Alaska C Street, Suite 3 Anchorage, Alaska 993 Project Number: BR-BH-NH-OA3
More informationSOLITUDE MOUNTAIN RESORT MASTER DEVELOPMENT PLAN AMENDMENT PROPOSAL
SOLITUDE MOUNTAIN RESORT MASTER DEVELOPMENT PLAN AMENDMENT PROPOSAL 6/02/14 INTRODUCTION Solitude Mountain Resort s (Solitude) current Master Development Plan (MDP) was accepted by the Wasatch-Cache National
More informationTrout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9
October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement
More informationRabbit Creek Community Council
Rabbit Creek Community Council P.O. Box 112354, Anchorage, AK 99511-2354 Page 1 To: Troy Swanson, Office of the Mayor Christine Chesnut, OMB Budget Analyst Gary Jones, Public Works Dear Staff, May 31,
More informationPre-Application Document Kaweah Project (FERC Project No. 298)
TABLE OF CONTENTS Page 3.12 Aesthetic Resources... 3.12-1 3.12.1 Information Sources... 3.12-1 3.12.2 Setting... 3.12-1 3.12.3 Project Facilities... 3.12-2 3.12.4 Previous Visual Resources Assessment...
More informationKasaan to Goose Creek Road Project Project Description U.S. Army Corps of Engineers Permit The following table presents the mile point of the culverte
Kasaan to Goose Creek Road Project Project Description U.S. Army Corps of Engineers Permit The following table presents the mile point of the culverted open water crossings, name of water crossing if known,
More informationCook Inlet pipeline crossing is about making the best choices
Cook Inlet pipeline crossing is about making the best choices By Larry Persily lpersily@kpb.us Aug. 26, 2015 (This update, provided by the Kenai Peninsula Borough mayor s office, is part of an ongoing
More informationMINISTRY OF ENVIRONMENT ENVIRONMENTAL STEWARDSHIP DIVISION FISH AND WILDLIFE BRANCH. Horsefly River Angling Management Plan
MINISTRY OF ENVIRONMENT ENVIRONMENTAL STEWARDSHIP DIVISION FISH AND WILDLIFE BRANCH Horsefly River Angling Management Plan January 30 th, 2006 Area/Fishery Description The Horsefly River watershed provides
More informationAPPENDIX F. Stream Crossings
APPENDIX F s - Page Intentionally Left Blank - A. Mainline s Note: This list was originally published December 29, 2015 in the ASAP Joint Application for Permit (404 / 10) (last revised June 28, 2017).
More informationFEDERAL ENERGY REGULATORY COMMISSION FIELD INSPECTION REPORT
FIELD INSPECTION REPORT Date September 25 and 26, 2016 Project Kern River Gas Transmission Company (Kern River) Apex Expansion Project Utah, Millard, Beaver, Morgan, Davis, and Salt Lake Counties, Utah;
More informationLawrence Loop SWOT Analysis
Alignment: A1 (Map Color: Red) Description: This alignment connects to the Sandra Shaw Trail on the north side of the pond and heads north through undeveloped property and then west to Michigan Street
More informationSTATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER LAND USE PERMIT APPLICATION AS
STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER LAND USE PERMIT APPLICATION AS 38.05.850 Applicants must complete all sections of this application. In addition, applicants
More informationSusitna-Watana Hydroelectric Project (FERC No ) Salmon Escapement Study Study Plan Section 9.7
(FERC No. 14241) Salmon Escapement Study Study Plan Section 9.7 Part D: Supplemental Information to June 2014 Initial Study Report Prepared for Prepared by LGL Alaska Research Associates, Inc. & Alaska
More informationSAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS
SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS Project Name: SAWS Water Job No.: CSJ No. (if applicable): Date: AWS Consultant: PROJECT INFORMATION N/A Yes No Joint Bid (COSA/TxDOT) N/A Yes
More informationTECHNICAL MEMORANDUM 002 EMORANNO. 001
TECHNICAL MEMORANDUM 002 EMORANNO. 001 To: Jack Synder, P.E. EES Consulting From: Mort McMillen, P.E. Paul Larson, SE Date: October 13, 2010 Project: Cc: Taylor Bowen Subject: Technical Memorandum (TM)
More informationHDD Wire Guided Waterway Crossing ATON Plan. Augwick Creek (S-L28)
HDD Wire Guided Waterway Crossing ATON Plan Augwick Creek (S-L28) Mariner East Phase 2 Pipeline Project Prepared for: Sunoco Pipeline, L.P. 535 Friztown Road Sinking Spring, PA 19608 Prepared by: Tetra
More informationB-36
B-35 B-36 B-37 B-38 B-39 B-40 B-41 B-42 B-43 B-44 B-45 B-46 From: Oliver, Ross C. Sent: Friday, November 08, 2002 8:41 PM To: Kenneth Sims Cc: Badger, Phil C.; Schaefer, Hillary; Richey, Alan C Subject:
More informationSite Tour, August 24, Fish Science - Big Lake Coho Salmon Migration and Habitat Use
Matanuska-Susitna Basin Salmon Habitat Partnership Site Tour, August 24, 2015 Part 1 of Tour Big Lake watershed Fish Science - Big Lake Coho Salmon Migration and Habitat Use Presenter: Jon Gerken (U.S.
More information62. Gulkana River, Main Fork, Middle Fork, and West Fork
62. Gulkana River, Main Fork, Middle Fork, and West Fork The Gulkana, a National Wild and Scenic River, is one of Alaska s most popular whitewater rivers because of its road accessibility and because of
More informationInterim Guidance Fish Presence Absence
Interim Guidance Fish Presence Absence Source: Forest Practices Act Guidance for Division 635 of the forest practices act dealing with stream classification when no fish surveys have been done (referenced
More informationStream Assessment Cut-block: For: Island Timberlands Limited Partnership, Cameron Operation
Stream Assessment Cut-block: 171214 For: Island Timberlands Limited Partnership, Cameron Operation Tony Norris Area Engineer Island Timberlands Cameron Operation Port Alberni D.G. Rigets E.I.A. CTech.
More informationSECTION 3 STREET DESIGN
3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed
More information3 CONSTRUCTION. 3.1 Construction Methods and Sequence. 3.2 Construction Sequence
3 CONSTRUCTION 3.1 Construction Methods and Sequence The Construction Strategy for the offshore field and pipeline is described in the 2001 Offshore EIS. Some construction activities have taken place since
More informationMinnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.
Minnesota F-29-R(P)-24 Area 315 Study 3 March 2016 Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries Stream Survey Report Luxemburg Creek 2015 Mark Pelham Sauk
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationJANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO
JANUARY 2017 STUDY UPDATE Logan City, Cache Co., CMPO Purpose of the presentation To provide an update on the status of the Study To present the Study Purpose and Need To present the results of Level 1
More informationSusitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page
Alaska Resources Library & Information Services Document ARLIS Uniform Cover Page Title: Wildlife harvest analysis study, Study plan Section 10.20 : Final study plan SuWa 200 Author(s) Personal: Author(s)
More informationRabbit Creek Community Council
Rabbit Creek Community Council P.O. Box 112354, Anchorage, AK 99511-2354 Troy Swanson, Office of the Mayor 632 West 6th Avenue Anchorage, Alaska 99501 May 30, 2014 RE: Rabbit Creek Community Council Survey
More informationD.B. Wilson Station CCR Landfill
D.B. Wilson Station CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Closure and Post-closure Care Plan October 11, 2016 Prepared By: Project ID: 160030A Big
More informationSTREAM SURVEY File form No..
scanned for KRIS THE RESOURCES AGENCY OF CALIFORNIA California Department of Fish and Game STREAM SURVEY File form No.. Date: September 4, 1969. NAME: North Fork Schooner Gulch Creek COUNTY: Mendocino.
More informationCity of Burnaby Environmental Review Committee (ERC) Guide for Applicants
City of Burnaby Environmental Review Committee (ERC) Guide for Applicants 2017-2018 This Guide summarizes the ERC process for project review including applications for a relaxation (variance) to the development
More informationAppendix J: Q1-Highway 35 Route Construction Plan
PSC REF#:150055 Wisconsin CPCN Appendix J Appendix J: Q1-Highway 35 Route Construction Plan Public Service Commission of Wisconsin RECEIVED: 06/29/11, 8:51:24 AM Hampton Rochester La Crosse 345 kv Transmission
More informationHard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563
Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.003 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com
More information22. Specialty Valves.
22. Specialty Valves. a. Types of Specialty Valves. 1) Use of the following specialty valves is covered in this section: Altitude Valve, Pressure Reducing Valve, Pressure Relief Valve, Swing Check Valve,
More informationONSHORE GAS GATHERING FAQS
ONSHORE GAS GATHERING FAQS These Frequently Asked Questions (FAQs) are intended to clarify, explain, and promote better understanding of the gas gathering line rules. These FAQs are not substantive rules
More informationRocky Water Ranch 1375+/- Acres Hamilton County, Texas $4,812,500 ($3,500/acre)
1375+/- Acres Hamilton County, Texas $4,812,500 ($3,500/acre)! Bret Polk Mobile: (254) 965-0349 Office: (214) 361-9191 LOCATION: The Rocky Water Ranch is located approximately 4 miles South of Hico, Texas,
More informationGas Gathering System Modeling The Pipeline Pressure Loss Match
PETROLEUM SOCIETY CANADIAN INSTITUTE OF MINING, METALLURGY & PETROLEUM PAPER 2005-230 Gas Gathering System Modeling The Pipeline Pressure Loss Match R.G. MCNEIL, P.ENG. Fekete Associates Inc. D.R. LILLICO,
More informationNew Stuyahok-Ekwok Intertie Route Wind Power Site Options
New Stuyahok-Ekwok Intertie Route Wind Power Site Options November 30, 2015 Douglas Vaught, P.E. V3 Energy, LLC Anchorage, Alaska www.v3energy.com New Stuyahok-Ekwok Intertie Wind Power Site Options Page
More informationPublic Notice. Corps File No. LRE Date: March 19, 2017 Expires: March 18, 2022
US Army Corps of Engineers Detroit District Public Notice Corps File No. LRE-2016-00006-100 Date: March 19, 2017 Expires: March 18, 2022 PUBLIC NOTICE ANNOUNCING REGIONAL CONDITIONS AND WATER QUALITY CERTIFICATIONS
More informationFINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:
FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project
More informationComments EXECUTIVE SUMMARY
Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal
More informationPROJECT LOCATION & VICINITY MAP PROJECT LOCATION RAINBOW INDIAN BOP: MP LAT LONG
ARCTIC OCEAN BARROW KOTZEBUE SOUND KOTZEBUE ALASKA CANADA BERING SEA YUKON RIVER FAIRBANKS BETHEL ANCHORAGE KENAI HAINES PROJECT LOCATION JUNEAU PACIFIC OCEAN KODIAK GULF OF ALASKA McHugh Creek SEWARD
More informationFile Code: 1950:2720 Date: March 21, Dear Interested Party,
United States Department of Agriculture Forest Service White River National Forest 900 Grand Ave Glenwood Springs, CO 81601-3602 File Code: 1950:2720 Date: March 21, 2017 Dear Interested Party, The White
More informationRedd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River,
Redd Dewatering and Juvenile Salmonid Stranding in the Lower Feather River, 2005-2006 Interim Report for NOAA Fisheries Prepared by: California Department of Water Resources Division of Environmental Services
More informationAlaska Recreation Survey 2013
Alaska Recreation Survey 2 Alaska Outdoor Recreation (page 2) Thank you for helping us learn more about outdoor recreation activities in Alaska. The next four pages contain questions about your snow machining,
More informationMUCKLESHOOT INDIAN TRIBE Fisheries Division nd Avenue SE Auburn, Washington Phone: (253) Fax: (253)
MUCKLESHOOT INDIAN TRIBE Fisheries Division 39015-172nd Avenue SE Auburn, Washington 98092-9763 Phone: (253) 939-3311 Fax: (253) 931-0752 U.S. Army Corps of Engineers Regulatory Branch Attn: Karen Urelius
More informationTHE ECONOMIC GEOGRAPHY OF SALMON
THE ECONOMIC GEOGRAPHY OF SALMON A conceptual framework and preliminary characterization of the spatial distribution of economic values associated with salmon in the Mat-Su Basin, Alaska Davin Holen, Principal,
More informationRising Tide Oyster Company 2.0 Acre Bellamy Site Marine Aquaculture License Application
Rising Tide Oyster Company 2.0 Acre Bellamy Site Marine Aquaculture License Application Joshua and Jessica Carloni 264 Swain Road Barrington, N.H. 03825 Summary This is an amendment to our existing license
More informationEncampment River-Elk River drainage divide area landform origins along USA Missouri River drainage basin landform origins research project
10/5/12 7:30 PM Encampment River-Elk River drainage divide area landform origins along the continental divide in the Wyoming and Colorado Sierra Madre Mountains and Park Range, USA October 5, 2012! Colorado,
More informationDugout Sizing Worksheet. Joe Agricola Example
Dugout Sizing Worksheet Joe Agricola Example This example is provided to help you size your farm dugout and determine if the runoff area selected will supply sufficient water. A blank copy of this worksheet
More informationSub-watershed Summaries
Project Description The Salmon Drift Creek Watershed Council (SDCWC) has focused their efforts in the Salmon River estuary for the past few years. The multifaceted partnership effort is nearing completion
More informationNEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT
NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-52 2016 Lake Tahoe Rainbow Trout Study WESTERN REGION NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION
More informationINDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA
INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA These regional conditions are in addition to but do not supersede the requirements in the Federal Register (Volume 82 No. 4 of January 6, 2017).
More informationLakelse Sockeye Recovery Program
Lakelse Sockeye Recovery Program The Ninth Annual BC Interior Stewardship Workshop May 7 th and 8 th, 2013 DFO North Coast Resource Restoration Unit Presentation Overview History/background Stock and habitat
More informationDUNBOW ROAD FUNCTIONAL PLANNING
DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report
More informationPublic Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])
Public Notice U.S. Army Corps In Reply to Application Number of Engineers CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA]) 88-01361 PN 14-05 Comment Period: January 16, 2014 to
More informationEastern Brook Trout Joint Venture Annual Report The Nature Conservancy 2013
Eastern Brook Trout Joint Venture Annual Report The Nature Conservancy 2013 2013 Annual Performance Report Enhancing Connectivity in the Ash-Black Rock Sub-basin of the West Branch Narraguagus River. Project
More informationDescription of Road Management Objectives, Existing Use, and Proposed Use:
Engineering Report White River National Forest Eagle-Holy Cross Ranger District Analysis of Road # 700 Red Sandstone Road for Motorized Mixed Use Designation Page 1 of 12 Forest: White River District:
More information2016 Annual Inspection Report
2016 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Pawnee Station 14940 Morgan County Road 24 Brush, Colorado 80723 January 18, 2017 Table of Contents
More informationThe Lake Creek Ranch. Located in the foothills of the Owl Creek Mountains in western Hot Springs County, Wyoming
The Lake Creek Ranch Located in the foothills of the Owl Creek Mountains in western Hot Springs County, Wyoming Experienced Professional Ranch Brokers Specializing in the sale of ranches, farms, & recreational
More informationNWS 44: Mining Activities Location #1, Stanislaus River
NWS 44: Mining Activities Location #1, Stanislaus River Permit is for the use of a single 8 dredge on a federal mining claim at the location described on the map and as Twp 02N Range 14E, Section 04, MDM
More informationCall for more informa on
43.4 acres 659 feet road front Fronts Dill Brook Power Phone Mountain Views Lakes The Bottle Lake Forest has 43.4 surveyed acres with year round access on a paved road with electric and phone at the street.
More informationDATE: October 20, Planning Commission. Beth McKibben, Planner Community Development Department FILE NO.: CSP
DATE: October 20, 2014 TO: FROM: Planning Commission Beth McKibben, Planner Community Development Department FILE NO.: CSP2014 0017 PROPOSAL: Local consistency review of DOT&PF project to remove and replace
More informationAppendix H RESPONSES TO PUBLIC COMMENTS
Appendix H TO PUBLIC COMMENTS A-1 This comment letter confirms receipt and distribution of the draft IS/ MND and documents project compliance with State Clearinghouse review requirements for the draft
More informationInterstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017
EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses
More informationIntroduction Parks Open Space Standards Recreation & Open Space Land Use Design Principles
Chapter Seven: Parks, Recreation, & Open Space Chapter Seven: Parks, Recreation, & Open Space Introduction Parks Open Space Standards Recreation & Open Space Land Use Design Principles September 2008 Page
More informationJob Performance Report, Project F-73-R-9 Subproject II: SALMON AND STEELHEAD INVESTIGATIONS Study I: Salmon Spawning Ground Surveys
FEDERAL AID IN FISH RESTORATION Job Performance Report, Project F-73-R-9 Subproject II: SALMON AND STEELHEAD INVESTIGATIONS Study I: Salmon Spawning Ground Surveys By Judy Hall-Griswold, Fishery Technician
More informationChinook Salmon Spawning Study Russian River Fall 2005
Chinook Salmon Spawning Study Russian River Fall 2005 Sonoma County Water Agency 2150 West College Avenue Santa Rosa, California 95401 Prepared by David Cook - Senior Environmental Specialist March 27,
More informationMiles PROJECT LOCATION EOP, MP STATION BOP, MP 379 STATION
K avik River Barrow Prudhoe Bay Kotzebue Nome Fairbanks Eagle Tok McGrath Glennallen Bethel Valdez Kenai Dillingham Homer Seward Kodiak Cold Bay Unalaska PROJECT LOCATION Haines Juneau Sitka Ketchikan
More informationBlue Creek Chinook Outmigration Monitoring Technical Memorandum
Blue Creek Chinook Outmigration Monitoring 2012 Technical Memorandum Prepared by: Andrew Antonetti and Erika Partee Yurok Tribe Fisheries Program PO Box 1027 Klamath, California 95548 In Partnership with:
More informationSusitna-Watana Hydroelectric Project (FERC No ) Salmon Escapement Study Study Plan Section 9.7
(FERC No. 14241) Salmon Escapement Study Study Plan Section 9.7 Initial Study Report Part C: Executive Summary and Section 7 Prepared for Prepared by LGL Alaska Research Associates, Inc. & Alaska Department
More informationAbundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California
scanned for KRIS Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California Prepared for: Marin Municipal Water District 220 Nellen Drive Corte Madera, California
More informationDeveloped by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA
Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by
More informationCT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP. Submitted by:..
CT EXPANSION PROJECT SILT FENCE DESIGN CRITERIA AND METHODOLOGY CONNECTICUT LOOP Submitted by:.. Tennessee Gas Company L.L.C. 1001 Louisiana St, Suite 1000 Houston, TX 77002 July 2014 Revised March 2015
More informationProject 184 Preferred Canal Drainage Structure and Release Point Plan
Project 184 Preferred Canal Drainage Structure and Release Point Plan September 2011 Version 5.0 REVISION HISTORY Page Description Date 7 Added Section 5.1 Plan Modifications 09/08/11 9 Modified Table
More informationHard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563
Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.015.003 Report issued: July 03, 2017 Hard Hat Services ph: 877-630-7428 hardhatinc.com
More informationALASKA DEPARTMENT OF FISH AND GAME DIVISION OF COMMERCIAL FISHERIES NEWS RELEASE
ALASKA DEPARTMENT OF FISH AND GAME DIVISION OF COMMERCIAL FISHERIES NEWS RELEASE Sam Cotten, Commissioner Scott Kelley, Director Contact: Pat Shields, Area Management Biologist or Phone: (907) 262-9368
More informationNILES FERRY INDUSTRIAL PARK Vonore, Monroe County, Tennessee
NILES FERRY INDUSTRIAL PARK Vonore, Monroe County, Tennessee A. GENERAL Located on Tellico Reservoir one mile northeast of Vonore, 12 miles northeast of Madisonville and 36 miles southwest of Knoxville;
More informationThe Calawah River System
The Calawah River System The Calawah River is the largest tributary of the Bogachiel River and is formed by the confluence of the north and south forks of the Calawah. The two forks of the Calawah, CALAWAH
More informationInformation for File # SEW
Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street
More informationAPPENDIX F SUPPLEMENTAL TRAFFIC DATA
APPENDIX F SUPPLEMENTAL TRAFFIC DATA Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax: 212 213-3191 www.akrf.com Draft Memorandum To: Michael
More informationStudy 9.5 Fish Distribution and Abundance in the Upper Susitna River
Initial Study Report Meeting Study 9.5 Fish Distribution and Abundance in the Upper Susitna River October 15, 2014 Prepared by R2 Resource Consultants, Inc. 10/15/2014 1 Study 9.5 Objectives 1. Describe
More informationFEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS
March 2, 2011 FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS STANLEY STORM DRAINAGE IMPROVEMENTS, 151sT TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS DESCRIPTION: This report relates
More informationPipeline Integrity Valve Spacing Engineering Assessment (CDN) Grande Prairie Mainline Loop 2 (Progress Section) NPS 36
APPROVALS Library: EDMS General Page 1 of 10 TABLE OF CONTENTS APPROVALS 1 1. PURPOSE... 3 2. BACKGROUND... 3 3. VALVE SPACING ASSESSMENT APPROACH... 6 4. OPERATIONS AND MAINTENANCE CONSIDERATIONS... 6
More informationIf you have any questions, please do not hesitate to contact me at (412) or Thank you.
625 Liberty Avenue, Suite 1700 Pittsburgh, PA 15222 844-MVP-TALK mail@mountainvalleypipeline.info www.mountainvalleypipeline.info March 26, 2018 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory
More informationJuneau Douglas Harbor
Juneau Douglas Harbor Douglas Harbor Page 2 of 8 Condition of Improvements 31 December 2015 Douglas Harbor, Alaska (CWIS No. 072789, 180942) Authorization Rivers and Harbors Act, 3 July 1958 (House Doc.
More informationKorell Outfitter and Guide Special-Use Permit Amendment
State said westward I N: R.3E.) z - a Decision Memo Korell Outfitter and Guide Special-Use Permit Amendment U.S. Forest Service Emmett Ranger District Boise National Forest Gem and Valley Counties, Idaho
More informationNEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT
NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-52 2016 REDBAND TROUT EASTERN REGION NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION ANNUAL JOB PROGRESS
More informationHillside STA Extension
Hillside STA 2017 Extension History of STA Hillside Singletrack Advocates formed in 2004 to represent mountain bikers amongst the various user groups First STA project completed in 2005 Brown Bear trail
More informationFrequently Asked Questions About Revised Critical Habitat and Economic Analysis for the Endangered Arroyo Toad
Q Frequently Asked Questions About Revised Critical Habitat and Economic Analysis for the Endangered Arroyo Toad Q. What is the arroyo toad? The arroyo toad (Bufo californicus) is a small, light greenish-grey
More informationSUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD
SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD FINAL ROUTE AND POND STUDY PROJECT NO. C-9570.10 Prepared for: Pasco County
More informationOctober 16, GRDA CCR Landfill Compliance Report Grand River Dam Energy Center 8142 Hwy 412B PO Box 609 Chouteau, OK Dear Mr.
October 16, 2018 Mr. Mike Bednar Superintendent of Environmental Compliance GRDA-Ecosystems and Education Center PO Box 70 420 Hwy 28 Langley, OK 74350-0070 RE: GRDA CCR Landfill Compliance Report Grand
More information------CHUG POWERING ALASKA'S futulle
------CHUG POWERING ALASKA'S futulle March 15, 2018 ELECTRONICALLY FILED WITH RCA Regulatory Commission of Alaska 701 W. 8 th Avenue, Suite 300 Anchorage, AK 99501 Subject: Tariff Advice N. 454-8; Annual
More informationEXTENT OF OBSERVATION
scanned for KRIS THE RESOURCES AGENCY OF CALIFORNIA Department of Fish and Game STREAM SURVEY Date: May 25 and 31, 1977. NAME: Unnamed Stream (Tributary to Sonoma Creek) COUNTY: Sonoma. STREAM SECTION:
More informationTuolumne River Gravel Introduction
Tuolumne River Gravel Introduction 2000 2003 Tuolumne River La Grange Gravel Addition, Phase II Course Sediment Replenishment Program Tuolumne River Salmonid Habitat Improvement Project River Mile 49.9
More informationAPPLICANT: Pacific Northwest National Laboratory Attention: Mr. Charles Brandt 1529 West Sequim Bay Road Sequim, Washington 98382
US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management
More informationNewaukum Watershed Culvert Assessment
Newaukum Watershed Culvert Assessment Water Resource Inventory Area 23 Lewis County Conservation District Final Report By: Kelly Verd and Nikki Wilson July 2002 Funded by: Chehalis Fisheries Restoration
More informationSpearfish Canyon State Park & Bismarck Lake
Spearfish Canyon State Park & Bismarck Lake Land Exchange Between the U.S. Forest Service and the State of South Dakota July 12, 2016 Background In 2006, the State of South Dakota received title to several
More information2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage
2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000
More information