Facility Assessment and Project Study. New Prague Municipal Swimming Pool New Prague, MN

Size: px
Start display at page:

Download "Facility Assessment and Project Study. New Prague Municipal Swimming Pool New Prague, MN"

Transcription

1 Facility - For - New Prague, MN - By - AQUATIC CONSULTING & DESIGN

2 Executive Summary Statement of Understanding The City of New Prague owns and ISD #721 through its Community Education Department programs/operates the existing municipal outdoor pool facility that is aging, the facility has a number of operational concerns as well as a community / city concern for offering its pool users more facility amenities. The existing outdoor facility only generates around half of the revenue required to stay operational. The pools also have code and ADA compliance issues. USAquatics first conducted an assessment of the existing municipal pool in Almost five years have passed since the original assessment, and an updated study of this facility is clearly warranted to determine its condition to date, and provide some options for renovation or expansion to serve the changing aquatic needs of the community. The goal of this study is to aid in the making of important decisions concerning the facility and its future, including options for expansion and adding amenities. Assessment Process Tom Schaffer and Ryan Johnson from USAquatics have completed an onsite evaluation of the existing aquatic facility along with assistance from Maintenance Supervisor Glen Sticha, Operator Scott Warner and Planning Director Ken Ondich. The purpose of the assessment was to determine the facilities condition and usability to include record data from past seasons. In addition, a Community Survey has been created and results will be reviewed and included as part of this Study. Scope of Study The scope of this study covers the following areas of the facility: Swimming pool structure, recirculation, filtration, and sanitation equipment Pool deck area, diving boards, features, etc. Compliance with new Federal and State Main Drain Laws Compliance with new Americans with Disabilities Act Laws Attendance, revenues and expenses Provide options for renovation/new facility Provide possible location sites for a new facility Study Criteria The criteria used in our assessment include: Previous assessment completed by USAquatics Facility condition and other observable conditions Facility code requirements and compliance An understanding of cause and effect associated with various aquatic designs and operating procedures as presented to us through the assessment, review, and design of several thousand aquatic facilities Study area demographics used in determining community aquatic needs Study results of a Community Aquatics Survey Intent of Report The intent is to present a summary of needed improvements and added amenities including factors affecting patron usage, revenue potentials, and expenses associated with the operation and management of the aquatic facility. The goal is to provide stake holders with the necessary information to make informed decisions regarding the future of Aquatics in New Prague. Page 2

3 Summary Based on discussions with staff, a physical assessment of the existing outdoor facility, analysis of the existing condition and evaluation of the community survey at the New Prague Municipal Pool Facility, USAquatics has determined that the facility warrants a large number of improvements and expansion to better serve the needs of the community. Several amenity options for the expansion of the outdoor pool facility have been provided for consideration. These amenity options provide a range from repairing the existing outdoor facility, renovation and expansion to an entirely new facility. The main pool offers a very small variety of aquatic amenities including 1-meter diving, lap lanes, walk out stairs and varying water depths to meet some of the community s aquatic needs. This pool would be costly to expand as any aquatic program expansion to the pool would require larger filtration, recirculation and water treatment systems, as well as, major changes to the pool structure. The wading pool is undersized to adequately serve the younger patrons of New Prague, as well as the growing demand for an accessible zero depth beach type entry body of water. This pool would also be costly to expand due to filtration and recirculation requirements. It would be far more cost effective to demolish the existing wading pool and construct a new zero depth entry pool complete with a wide variety of amenities geared toward younger children. Neither pool meets requirements for ADA accessibility. Due to the size of the main pool, two means of ADA ingress/egress are required of which the primary entrance needs to be a ramp or zero-depth entry. It should be noted, the main pool having two means of ingress/egress for ADA was not a requirement at the time of the previous assessment. A fixed ADA lift was ordered in May of There is a sizeable added expense to make both pools ADA accessible. The main cost difference from the original assessment and budget estimate to the current preliminary cost estimate is simply inflation in construction costs since 2009 and current trends we have seen on outdoor aquatic projects. Additionally, the earlier assessment was done on the pool and did not include bathhouse work or associated costs. This study includes options and estimated pricing for expanding the current facility and adding amenities such as play features, a climbing wall and waterslide which were not part of the 2009 assessment. Regenerative media is shown as the replacement for the current sand filters as opposed to the prior assessment replacing sand with sand. The facility as a whole does not provide an appropriate aquatic venue for a community the size of New Prague. The facility is too small in relation to the New Prague area demographics. Any proposed aquatic facility solution should take into account the City demographics that show a high percentage of youth and young families. We recommend the expansion of program elements to serve the New Prague aquatic community. The aquatic expansion should also provide a secondary service area of approximately a mile radius. Given the growth and size of New Prague, the current pool site may not be the best location to service the community as a whole and alternative locations should be considered. The following is a list of possible options for the future of the existing outdoor pool facility: o Option 1: Close the existing outdoor pool. This would mean swimming lessons would no longer be offered in New Prague. The bathhouse, pools and decks would be demolished and removed. Utilities would be capped. The voids would be filled in and sod/seed placed over to create a lawn area. The current City subsidy would no longer be required. Patrons of the existing pool would travel elsewhere for lessons, recreation, etc. Estimated cost range: $47,400 - $55,200 o Option 1A: Close the existing outdoor pool. Same as above; however, the bathhouse and utilities would remain. The bathhouse could be utilized for other purposes (ex: baseball, etc.) Estimated cost range: $36,600 - $42,600 Page 3

4 o Option 2: Repair Existing. Make only the recommended repairs to the existing pools and facility to address operational issues, concerns and code issues including accessibility. This Option would not expand the facility or add any aquatic play elements. The wading pool would be modified to 600 s.f. splash pool and would include a zero-depth entry for accessibility. The coping brick around both pools would be removed and a new poured concrete edge installed. Both pools would receive a new epoxy paint finish. New pumps/filters would be installed along with associated piping. Decks would be selectively demolished and replaced as needed. This Option would create little if any increase of operational costs and revenues. The City subsidy would still be required to assist with operational expenses. Attendance would remain at current levels while decreasing slowly. Estimated cost range: $471,480 - $516,780 o Option 3: Renovate and Expand Existing. Make necessary repairs to the existing main pool and demo and remove the existing wading pool. Install a larger 1,200 s.f. zero-depth entry splash pool more appropriate sized to meet the needs of the community. This Option would include the addition of a climbing wall to the main pool and making necessary adjustments to the pool to allow for a waterslide to be installed in the shallow-end of the main pool. Shade structures would be added around the deck area. The coping brick around the main pool would be removed and a new stainless steel gutter with grating installed. Both pools would have a new quartz aggregate plaster with ceramic tile accents installed. New pumps/filters would be installed along with associated piping necessary for the new gutter recirculation system. All decks would be replaced. This Option would make for increased operational costs due to replacing the wading pool with a larger splash pool, as well as the addition of a waterslide. Adding aquatic features and amenities may increase attendance and revenue; however, the City subsidy would continue to be needed for operation. Attendance would increase with this Option; however, numbers would drop off after the first few years. Estimated cost range: $1,434,220 - $1,593,960 o Option 4: Spray Pad/Wet Deck. The existing pools would be demolished and back-filled in. A new 800-1,000 s.f. Spray Pad/Wet Deck would be constructed on the current site. The Spray Pad/Wet Deck would be complete with pump/filter and recirculation system including piping. Several spray features and interactive play features would be included. With this option, overall attendance would decrease as this Option only targets the younger age groups. Operational expenses would decrease due to less staffing being required, less water to treat with chemicals, etc. With this option there would be little to no revenue generated as typically facilities of this type charge no admission. The operational subsidy would decrease. Estimated cost range: $491,400-$558,600 o Option 5: New Aquatic Facility. This Option would allow for the existing facility to remain open for use during construction of a new facility. The new facility would be appropriately sized to meet the needs of the community while providing a wider range of aquatic amenities that better reflects the demographics of New Prague. A new facility would also be designed to accommodate for future growth and could potentially be located on the Armory site. No preliminary design work has been completed; however, a City the size of New Prague could support a facility with an estimated total project cost of around $4-$5 million. Estimated cost range: TBD Page 4

5 Table of Contents SECTION ONE: ASSESSMENT... 6 Main Pool... 6 Recirculation System... 6 Pool Equipment - General... 6 Pump... 7 Heater... 7 Pool Filter... 7 Flow Rate... 7 Chemical Control... 7 Wading Pool... 8 Wading Pool Recirculation System... 8 Wading Pool Heater... 8 Wading Pool Pump... 8 Wading Pool Filter... 8 Wading Pool Chemical Control... 8 Bathhouse... 9 Concessions... 9 Deck Area... 9 SECTION TWO: OPTIONS Option 1 (Close outdoor pool) Option 1A (Close outdoor pool Bathhouse remains) Option 2 (Repair Existing) Option 3 (Renovate and Expand) Option 4 (Wet Deck/Spray Pad) SECTION THREE: EXISTING FACILITY Facility Layout Admission Rates School Expenditures City Expenditures Revenue vs. Expense ( ) Revenue vs. Expenses Census Information Attendance Information Existing Facility Photographs SECTION FOUR: PRELIMINARY DESIGN Option 3 Renovate & Expand Existing Facility Option 4 Spray Pad/Wet Deck Option 5 New Family Aquatic Center SECTION FIVE: NEW AQUATIC FACILITY ANALYSIS APPENDIX A: EXISTING POOL DATA APPENDIX B: 2010 COMMUNITY EDUCATION PLANNING SURVEY RESULTS APPENDIX C: 2014 COMMUNITY SURVEY Page 5

6 SECTION ONE: ASSESSMENT Main Pool The main pool was built in 1983 and opened the following summer in The main pool consists of a 6- lane lap pool with attached deep water diving well, as well as multi-use area. Pool depths vary from 3-6 at the shallow end to 12-0 at the diving well. The diving well has two 1-meter diving boards. The 1-meter diving boards are in fair condition Since the pool perimeter is in excess of 300 feet, two means of ADA compliant access are required. Currently the Main Pool does not provide any means of ADA access. We recommend the addition of a fixed ADA lift to account for one means of access. In order to be compliant with ADA access requirements the primary means of access into the pool must be a ramp or beach type zero depth entry, which would account for the second means of access. It should be noted a fixed ADA lift was ordered in May and will be installed upon arrival. The Main Pool has very limited amenities for recreational aquatic activity, educational aquatic needs and aquatic fitness. The pool vessel is in poor shape and a large crack, which appears to be located at the construction cold joint, spans across the lap area. The main pool has been patched numerous times over the years and continues to require additional work. There are several areas of spalling where the paint finish is flaking off leaving bare concrete exposed. In addition, the ceramic tile in the pool and waterline tile is coming off in several locations and all areas of ceramic tile are in need of grout replacement. Due to the existing conditions of the main pool epoxy paint finish, we recommend sand blasting the shell to sound concrete, and the troweling of quartz aggregate plaster with ceramic tile accents. This would also be a longer lasting pool finish. The coping brick surrounding the entire Main Pool is in extremely poor condition. The bricks have become brittle with age and are cracking and breaking off in pieces or completely. This is a safety issue for patrons as the broken coping bricks are left with several sharp edges which can easily cut feet or hands. Overall, the main pool lacks the aquatic needs of the New Prague aquatic community. Recirculation System The Main Pool has surface skimmers rather than a gutter system, which would be ideal for a pool of this size. Based on Aquatic industry standards, pools wider than 30 or over 2,000 square feet should have a gutter system that allows for skimming around the entire perimeter. Several of the existing skimmers are either missing weirs or have broken weirs. In addition, the federal Virginia Graeme Baker Pool and Spa Safety Act (VGB) requires certified grate covers over the skimmer equalizer lines. At the time of the assessment none of the equalizer lines had covers; however, covers have since been installed. The Main Pool is in compliance with the State of Minnesota Abigail Taylor Pool Safety Act (ATA), which protects patrons from entrapment in pool suction openings. VGB requires all pool grates to be tested and stamped compliant with ANSI A The current grate covers were stamped in 2008 and should be replaced prior to the 2015 swimming season. Staff reported 2-3 broken pipe locations over the past few years that led to concrete decks settling. Those pipes were repaired; however, there is still suspicion that there are leaks within the recirculation piping. Pool Equipment - General The pool equipment is largely original to the facility with a few exceptions. The equipment met the needs of the community; however, for the most part it is outdated and inefficient in terms of operation. A number of the valves are cast iron, rusting, and not holding their seal. Valves should be replaced with non-metallic valves designed for pool use. Page 6

7 Pump The main pool pump is a horizontal pump located above water level which can make priming and servicing difficult. The existing pump is in poor condition and is very inefficient. A vertically mounted high efficiency pump with a premium motor installed below water level would solve priming difficulties and provide higher efficiency during operation. The current size and layout of the mechanical room does not allow for a recessed pump pit. In addition to a new pump located in a pump pit, we recommend adding a variable frequency drive to the motor. This provides significant energy cost savings and efficiency while extending the life of the pump and reducing maintenance. The pump strainer is original to the facility and is poor condition. It is cast iron and is badly rusted. Strainers of this age and condition become very difficult to open and close properly and have limited capacity. We recommend replacing the strainer at the same time the pump is replaced. It should be replaced with a nonmetallic strainer with a clear lid and large strainer basket. Heater The main pool has is serviced by a large Raypak natural gas fired heater. This heater was installed in Staff reported no issues or concerns with this equipment. Pool Filter The existing sand filter is original to the 1984 construction of this facility. As noted in the prior assessment, due to its age and condition, this filter poses a number of concerns and operational issues. The filter is constructed of mild steel and is completely covered in rust. Often times the interior of these tanks are in even worse condition and the integrity of the tank is of concern. The pressure gauges noted in the earlier report as not functioning properly have been replaced. According to the operator, the pool is backwashed on Monday, Wednesday and Friday during the regular swimming season. Backwashing should only take place when required based on pressure differential. As long as flow rates are met, backwashing the filter should be kept to a minimum to save on water, chemicals and heat. In addition, the filter sand has not been looked at in at least the past 17 years. Typical filter sand media should be replaced every 3-5 years. The pool filter also lacks the air gap to waste that is required. The valves on the face piping do not work properly due to age and corrosion. We recommend the installation of new regenerative media filters that are more efficient, take up a fraction of the current footprint, and are green friendly using 1/50 th of the water used by traditional sand filters. In addition, replacing the existing sand filters with regenerative media filters would allow for more open space in the mechanical room to service other equipment. Although we recommend regenerative media filters, we will provide filter replacement options for both regenerative media filters and traditional sand filters. At a minimum, if the filter is not replaced - the manholes should be removed and the filter sand should be inspected. The sand media should be loose with no clumping or hard top coating. Flow Rate The required flow rate for the Main Pool based on the maximum allowed 6-hour turnover is 584 gpm. Due to the facility being closed at the time of the inspection, we were unable to verify the current flow rate. The prior assessment noted the flow rate at 450 gpm; however, the accuracy of the flow meter was in question. It is possible the original design flow rate was greater than a 6-hour turnover. Additionally, the 6-inch suction pipe is limited to 529 gpm by code. The suction pipe should be sized at 8 to allow for full flow suction. Chemical Control The chemical control system is a Strantrol System 3. This controller is outdated technology and inadequate to meet the needs of the facility. We recommend a new, user-friendly, web-based chemical controller that can Page 7

8 reduce operational and maintenance issues. This new technology also allows operators the ability to access and control settings remotely. Wading Pool The Wading Pool is square in shape and located adjacent to the main pool. The wading pool depth varies from 1-0 to 1-6. There is a 3ft. chain link fence as a barrier separating the wading pool from the rest of the facility. As was the case with the Main Pool, the coping brick is in poor condition, with several cracks and broken pieces. The Wading Pool lacks any interactive features or water play elements and is not sized appropriately to service the younger demographics of the New Prague community. The wading pool also lacks any form of ADA access. The Minnesota State Department of Health now requires all wading pools to have a zero-depth entry. Due to the size, depth and condition of the Wading Pool we have determined that renovating it is not a viable option. We recommend demolishing the wading pool to allow for a larger splash pool with a zero depth entry. At a minimum, we recommend replacing the coping brick as needed or utilizing a form to pour a new coping as a short term solution. Wading Pool Recirculation System The Wading Pool has one surface skimmers located on a side wall. The Wading Pool has four inlets and a single main drain. The Wading Pool main drain is compliant for State and federal law; however, due to standing water in the pool at the time of inspection we were unable to verify the date on the grating. It is assumed the grate cover was purchased at the same time as the Main Pool cover meaning it is due for replacement. Wading Pool Heater There is no heater on the wading pool. Heated shallow water is the #1 or most commonly asked for amenity for aquatic facilities. We recommend the addition of a heater that is adequately sized to handle loads required for a new splash pool. Wading Pool Pump The Wading Pool is serviced by one pump, a 1.5HP high-rpm pump that is located above water level. This pump is aging and very inefficient. This pump handles recirculation with suction from the main drain and skimmer. As with the Main Pool pump, a vertically mounted high efficiency pump with a premium motor installed below water level would solve priming difficulties and provide higher efficiency during operation. Based on our recommendation to completely replace the existing wading pool, a new zero depth splash pool would require a new pump to handle the increased volume. At that time we recommend installation of vertical mount high efficiency pump in a recessed pump pit below water level, with a premium motor and variable frequency drive. Wading Pool Filter The sand filter dedicated to the Wading Pool is a Triton TR-100, which is a smaller residential style filter that has likely exceeded its life expectancy. Since the previous assessment, the multi-port valve has been replaced and staff reported no issues with the filter. It was unknown when the sand was last replaced. As noted earlier, sand media has an average life expectancy of 3-5 years and should be replaced. Wading Pool Chemical Control The chemical control system is a Strantrol System 3, the same as is used on the Main Pool. Again, this controller is outdated technology and inadequate to meet the needs of the facility. We recommend a new, Page 8

9 user-friendly, web-based chemical controller that can reduce operational and maintenance issues. This new technology also allows operators the ability to access and control settings remotely. Bathhouse The bathhouse is in fair condition for its age. The bathhouse had been modified recently to include a chemical storage addition on the south end of the building. The change rooms and shower facilities are also in fair condition; however, ADA accessibility is an issue and the building lacks appropriate ADA toilets and shower amenities. In addition, multiple showers are not allowed to have a single drain point. The current layout has the appropriate number of fixtures based on patron bather load: two urinals, two toilets and three sinks in the Men s locker room and the Women s has four toilets and three sinks. The women s change room has two private change booths that have partitions. The hot water heater for the showers is undersized to keep up with the demand required. Current trends show a need for family change rooms that allows for a parent or guardian to keep young children of either sex with them, rather than sending them into a locker room alone or bringing them into a locker room of the opposite sex. To remedy this, we recommend the addition of two family style change rooms. Other current trends for bathhouses include a central entrance from curbside to pool side with change rooms on one side of the entry and admissions, staff and concessions on the other side of the entry. This results in better control of users with minimal staffing. Concessions The current bathhouse configuration has the main entry area doubling as a concession area which is not very effective and lack of space is an issue. The current layout and amenities allows for a very limited number of products to be sold. A permanent dedicated concession area complete with a three compartment sink would be more efficient and allow for increased serving options such as pre-packaged food, etc. This is also an option that would allow for the facility to increase its revenue. Deck Area The majority of the deck area surrounding the Main Pool and Wading Pool is in good condition. There are a few areas around the diving well where shifting and settling has created a number of raised areas or toe stubbers. Sinking of slabs and extensive cracking has been caused by pipes leaking under deck along the south side of the Main Pool. The sunken deck areas should be replaced after compacting fill underneath. Several depth markers located around the Main Pool are missing the notation for inches. Code requires that water depths be plainly marked in feet AND inches. The Wading Pool lacks any depth marking notation. If the Wading Pool is not replaced, depth marking should be added. The surrounding fence has a few spaces where gaps between posts and between mesh and concrete deck exceeds the maximum allowed. Vinyl coated fence is preferred for aquatic facilities as it is more aesthetically pleasing and has a longer life expectancy. The gate into the Wading Pool area must be self-closing, latching and capable of being locked. The fence mesh should be adjusted as needed, as well as spacing between posts. A self-closing mechanism should be installed on the Wading Pool gate. The facility offers a small amount of shade and minimal table seating that allows patrons to stay longer which would result in additional revenue. We recommend the addition of several shade structures around the pools. Lighting for recreational swimming is required to be 10-foot candles and 30-foot candles for training and competition. Light readings were not taken as the inspection occurred during the day. We recommend reviewing lighting levels when lights are on, at least 1-hour after sunset. The deck along the east side of the Main Pool has starting block anchors; however, State Health Code requires a minimum pool depth of at least 5ft. Currently, starting blocks are not installed and should not be unless new anchors are installed where depth requirements are met. Page 9

10 SECTION TWO: OPTIONS Option 1 (Close outdoor pool) Demolition Based on our review and analysis, we recommend the following demolition work to prepare for closing the facility: Demo and remove Main Pool, Wading Pool, and surrounding decks/fence Probable cost estimate: $20,000 - $22,000 Demolition of non-reusable Mechanical/Equipment Probable cost estimate: $4,000 - $5,000 In-fill existing pools Probable cost estimate: $3,000 - $4,000 Demo Bathhouse & Cap existing utilities Probable cost estimate: $9,000 - $10,500 Seed/sod lawn area Probable cost estimate: $3,500 - $4,500 Subtotal: $39,500 - $46,000 Soft Costs (20%) $ 7,900 - $ 9,200 Estimated Demolition Cost Range: $47,400 - $55,200 Option 1A (Close outdoor pool Bathhouse remains) Demolition Based on our review and analysis, we recommend the following demolition work to prepare for closing the facility: Demo and remove Main Pool, Wading Pool, and surrounding decks/fence Probable cost estimate: $20,000 - $22,000 Demolition of non-reusable Mechanical/Equipment Probable cost estimate: $4,000 - $5,000 In-fill existing pools Probable cost estimate: $3,000 - $4,000 Seed/sod lawn area Probable cost estimate: $3,500 - $4,500 Subtotal: $30,500 - $35,500 Soft Costs (20%) $ 6,100 - $ 7,100 Estimated Demolition Cost Range: $36,600 - $42,600 Option 2 (Repair Existing) Main Pool Based on our review and analysis, we recommend the following work for repair of the main pool area: Install new main drain covers prior to 2015 swim season Probable cost estimate: $1,000 - $1,500 Replace missing/damaged skimmer weirs Probable cost estimate: $700 - $800 Demolition of decks and installation of ADA access ramp along west side of pool Probable cost estimate: $70,000 - $80,000 Page 10

11 Page 11 Replacement of damaged brick/coping, form pour new edge (353 ) Probable cost estimate: $15,000 - $18,000 Re-paint pool floor Probable cost estimate: $14,000 - $15,000 Cold joint repair around entire pool perimeter Probable cost estimate: $4,000 - $5,000 Replace missing ceramic tile Probable cost estimate: $1,800 - $2,200 Re-grout all pool tile Probable cost estimate: $5,500 - $6,000 Subtotal: $112,000 - $126,900 Soft Costs (20%) $ 22,400 - $ 25,380 Estimated Main Pool Repair Cost Range: $134,400 - $152,280 Wading Pool Based on our review and analysis, we recommend the following work for repair of the wading pool area: For this option we recommend select demolition of the existing wading pool to allow for a zero-depth entry splash pool, poured concrete coping with no additional above ground features: Select demo of wading pool and removal of decks needed for zero-depth entry area Probable cost estimate: $3,500 - $4,000 Modify wading pool to into 600 s.f. zero-depth entry splash pool with imbedded ground sprays Probable cost estimate: $100,000 - $115,000 Replacement of damaged brick/coping, form pour new edge Probable cost estimate: $3,800 - $4,200 Install new splash pool heater Probable cost estimate: $5,500 - $6,500 Re-paint pool floor Probable cost estimate: $1,000 - $1,500 Install new main drain cover prior to 2015 swim season Probable cost estimate: $500 - $750 Subtotal: $ 114,300 - $131,950 Soft Costs (20%) $ 22,860 - $ 26,390 Estimated Wading Pool Repair Cost Range: $137,160 $158,340 Mechanical/Equipment Based on our review and analysis, we recommend the following work for repair of the pool equipment: New pump strainer Probable cost estimate: $5,000 - $6,000 Replace pool pump with vertical mount high efficiency pump and premium motors and vfd Probable cost estimate: $13,000 - $14,000 Replace existing sand filters with regenerative media filters Probable cost estimate: $72,000 - $80,000 Construct pump pit Probable cost estimate: $15,000 - $18,000 Update equipment room piping and valves Probable cost estimate: $10,000 - $12,000 Backwash standpipe Probable cost estimate: $1,600 - $1,800

12 Subtotal: $116,600 - $131,800 Soft Costs (20%) $ 23,320 - $ 26,360 Estimated Mech. Repair Cost Range: $139,920 - $158,160 Bathhouse Based on our review and analysis, we recommend any work for repair of the Bathhouse. Modify bathhouse, shower & toilets for proper ADA access Probable cost estimate: $15,000 - $17,000 Adjust shower area/drains to meet code requirements Probable cost estimate: $5,000 - $6,000 Subtotal: $ 20,000 - $23,000 Soft Costs (20%) $ 4,000 $ 4,600 Estimated Bathhouse Repair Cost Range: $24,000 - $27,600 Site Based on our review and analysis, we recommend the following work for repair of the site area: Select demo and removal of sunken/extensively cracked deck, compact fill and pour new Probable cost estimate: $11,000 - $12,500 Adjust fencing as needed, add-on to fencing around zero depth area & install self-closing gate Probable cost estimate: $4,000 - $4,500 Subtotal: $ 15,000 - $17,000 Soft Costs (20%) $ 3,000 $ 3,400 Estimated Site Repair Cost Range: $18,000 - $20,400 Option 2 Total Estimated Cost Range: $471,480 - $516,780 Option 3 (Renovate and Expand) Main Pool Based on our review and analysis, we recommend the following work for renovation and expansion of the main pool area to include added amenities and features: Install an aquatic climbing wall on side of the diving well. Installation of gutter cup anchors and rope & float to be included Probable cost estimate: $36,000 - $38,000 Install new main drain covers prior to 2015 swim season Probable cost estimate: $1,000 - $1,500 Replace missing/damaged skimmer weirs Probable cost estimate: $700 - $800 Demolition of decks and installation of ADA access ramp along west side of pool Probable cost estimate: $70,000 - $80,000 Demo & remove coping, installation of new stainless steel perimeter gutter and surgetank Probable cost estimate: $190,000 - $210,000 Prep surface & install new quartz aggregate plaster finish with ceramic tile accents Probable cost estimate: $85,000 - $95,000 Cold joint repair around entire pool perimeter Page 12

13 Replace missing ceramic tile Re-grout all pool tile Demo pool as needed for waterslide run-out Install waterslide, tower and related piping, etc. Probable cost estimate: $4,000 - $5,000 Probable cost estimate: $1,800 - $2,200 Probable cost estimate: $5,500 - $6,000 Probable cost estimate: $6,000 - $6,500 Probable cost estimate: $185,500 - $200,000 Subtotal: $585,500 - $645,000 Soft Costs (20%) $117,100 - $129,000 Estimated Main Pool Expansion Cost Range: $702,600 - $774,000 Wading Pool Based on our review and analysis, we have determined it is not feasible or cost effective to attempt to repair or renovate the existing wading pool. For this option we recommend the demolition of the existing wading pool, and installation of a new larger splash pool with embedded sprays and several additional above ground features: Demo and remove existing wading pool Probable cost estimate: $4,500 - $5,500 Construct new 1,200 s.f. zero-depth entry splash pool complete with interactive play features & quartz aggregate plaster finish Probable cost estimate: $265,000 - $290,000 Installation of new 3 fencing to replace existing Probable cost estimate: $1,500 - $2,000 Install new splash pool heater Probable cost estimate: $5,500 - $6,500 Subtotal: $276,500 - $304,000 Soft Costs (20%) $ 54,200 - $ 60,800 Estimated Wading Pool Renovation Cost Range: $330,700 - $364,800 Mechanical/Equipment Based on our review and analysis, we recommend the following work for repair of the pool equipment: New pump strainer Probable cost estimate: $5,000 - $6,000 Replace pool pump with vertical mount high efficiency pump and premium motors and vfd Probable cost estimate: $13,000 - $14,000 Replace existing sand filters with regenerative media filters Probable cost estimate: $92,000 - $110,000 Construct pump pit Probable cost estimate: $18,000 - $20,000 Update equipment room piping and valves Probable cost estimate: $10,000 - $12,000 Backwash standpipe Probable cost estimate: $1,600 - $1,800 New slide vertical mount high efficiency pump and premium motor Probable cost estimate: $20,000 - $23,500 Page 13

14 AQUATIC CONSULTING & DESIGN Subtotal: $159,600 - $187,300 Soft Costs (20%) $ 31,920 - $ 37,460 Estimated Mech. Repair Cost Range: $191,520 - $224,760 Bathhouse Based on our review and analysis, we recommend the following work for renovation and expansion of the bathhouse area: Reloconfigure bathhouse to create a dedicated concession area facing the pool deck to include required amenities needed for pre-packaged food service/sales. Probable cost estimate: $27,500 - $30,000 Add two family change rooms complete with bathroom/showers on to existing bathhouse. Probable cost estimate: $76,000 - $80,000 Modify bathhouse, shower & toilets for proper ADA access Probable cost estimate: $15,000 - $17,000 Adjust shower area/drains to meet code requirements Probable cost estimate: $5,000 - $6,000 Subtotal: $123,500 - $133,000 Soft Costs (20%) $ 24,700 - $ 26,600 Estimated Bathhouse Renovation Cost Range: $148,200 - $159,600 Site Based on our review and analysis, we recommend the following work for the renovation and expansion of the site area: Demo and remove all decking, install new decking properly sloped to new deck drains. Probable cost estimate: $25,000 - $30,000 Addition of six shade umbrellas around site Probable cost estimate: $21,000 - $23,000 Adjust fencing as needed, install new fencing around waterslide tower, zero depth area & install selfclosing gate Probable cost estimate: $5,000 - $6,000 Subtotal: $ 51,000 - $59,000 Soft Costs (20%) $ 10,200 - $11,800 Estimated Site Renovation Cost Range: $61,200 - $70,800 Option 3 Total Estimated Cost Range: $1,434,220 - $1,593,960 Option 4 (Wet Deck/Spray Pad) Pool Demolition Based on our review and analysis, we recommend the following demolition work to allow for the site to be prepared for a new Spray Pad/Wet Deck: Demo and remove Main Pool, Wading Pool and surrounding decks/fence Probable cost estimate: $24,000 - $26,000 Demolition of non-reusable Mechanical/Equipment Probable cost estimate: $4,000 - $5,000 In-fill existing pools Page 14

15 Seed/sod lawn area Probable cost estimate: $4,000 - $5,000 Probable cost estimate: $3,500 - $4,500 Subtotal: $35,500 - $40,500 Soft Costs (20%) $ 7,100 - $ 8,100 Estimated Demolition Cost Range: $42,600 - $48,600 Spray Pad/Wet Deck Based on our review and analysis, we recommend the following demolition work to allow for the site to be prepared for a new Spray Pad/Wet Deck: 800-1,000 s.f. Spray Pad/Wet Deck with recirculation system, imbedded features and surrounding concrete decking Probable cost estimate: $245,000 - $270,000 Above ground play features Probable cost estimate: $125,000 - $150,000 New 4 fencing around Spray Pad/Wet Deck Probable cost estimate: $4,000 - $5,000 Subtotal: $374,000 - $425,000 Soft Costs (20%) $ 74,800 - $ 85,000 Estimated Spray Pad/Wet Deck Cost Range: $448,800 - $510,000 Option 4 Total Estimated Cost Range: $491,400 - $558,600 Page 15

16 SECTION THREE: EXISTING FACILITY Facility Layout Page 16

17 2014 Admission Rates Daily Pass $4.25 (includes tax) Punch Card (10 sessions) $35 + tax Punch Card (over age 65) $20 + tax Season Pass o 1 adult $90 + tax o 1 couple or 1 child & parents $115 + tax o 2 children & parents $140 + tax o 3 children & parents $190 + tax o 4 or more children & parents $240 + tax 2013 School Expenditures Category Budget Salaries $56,173 Professional Services $2,320 Communications/Phone $182 Postage/Printing $740 Utilities $8,181 Liability Insurance $2,649 Travel/Mileage $400 General Supplies $9,377 Concessions Purchase $4,403 Credit Card $1,173 Red Cross fee $1,027 Total $86, City Expenditures Category Budget Repairs & Maintenance Supplies $3,777 Professional Services $10 Insurances $4,016 Repairs/Maintenance $170 Training/Seminars - License, Fees & Registration $650 Donation Civic Org. $6,500 *Capital Outlay $53,749 Pool Fill (water costs) $972 Salaries (staff time) $31,295 - Total $101, Expense total (School & City): $187,764 *Capital Outlay costs covered the added chemical room and pool heater Revenue vs. Expense ( ) 2013 Category Budget Revenue $85,247 Expense $187,764 Profit (Subsidy) ($102,517) 2012 Category Budget Revenue $86,681 Expense $144,847 Profit (Subsidy) ($58,166) 2011 Category Budget Revenue $78,649 Expense $123,703 Profit (Subsidy) ($45,054) 2010* Category Budget Revenue $76,495 Expense $120,768 Profit (Subsidy) ($44,273) Page 17

18 2009* Category Budget Revenue $71,833 Expense $117,437 Profit (Subsidy) ($45,604) 2008* Category Budget Revenue $69,667 Expense $121,488 Profit (Subsidy) ($51,821) 2007* Category Budget Revenue $63,908 Expense $115,576 Profit (Subsidy) ($51,668) *Indicates year(s) with estimated City operational expenses. Revenue vs. Expenses Page 18

19 Census Information Total Population: 7,378 (2012 estimate) Households: 2,727 Families residing within the city: 1,910 Families with children under 18 = 42.5% Population distribution by age: o 17 & under 31.5% o % o % o % o % When analyzing the estimated 2010 New Prague Census information the following information was determined: o o o The highest percentage of the population is those 17 and under at 31.5%. The second highest age range is at 29.1%, followed by the age range of that accounted for 20.4% of the population. This suggests an aquatic facility and added amenities that focuses on young families. The aquatic need is for a facility that offers a wider range of aquatic activities Page 19

20 2010 Attendance Information Total afternoon and evening swim users 7,837 Average afternoon open swim users 101 Average evening swim session 29 Pool passes sold session punch-cards 102 Swim lesson totals 693 o Afternoon admissions were split as 46% daily fee, 44% daily pass, 10% punch-card o Evening admissions were split as 60% season pass, 32% daily fee, 8% punch-card o Open swim was daily from 1-5pm and between 6pm 8:30 pm on various evenings and weekends o Average attendance for afternoon open swim was patrons o Average attendance for evening open swim was patrons *Note: attendance data was only collected during the 2010 swim season Page 20

21 Existing Facility Photographs Page 21

22 Page 22

23 Page 23

24 Page 24

25 SECTION FOUR: PRELIMINARY DESIGN Option 3 Renovate & Expand Existing Facility Page 25

26 Option 4 Spray Pad/Wet Deck (Sample shown on Existing Site) Page 26 of 30

27 Option 5 New Family Aquatic Center (Sample shown on Armory Site) Page 27 of 30

28 SECTION FIVE: NEW AQUATIC FACILITY ANALYSIS The following are approximate construction costs for similar facilities. These numbers should be used for planning purposes only as a guide in determining the relative cost of a new facility versus renovation of an existing facility. City: Population: Approx. Budget: Year Built: Glencoe 5,628 $2,500, Stewartville 5,926 $2,800, Waseca 9,410 $3,600, Redwood falls 5,253 $3,600, Sleepy eye 3,598 $3,000, Gaylord 2,307 $3,400, La Crescent 4,860 $3,200, Kasson 5,978 $3,200, Cannon Falls 4,083 $3,990,000 - Byron 4,965 $5,100,000 - Pine Island 3,272 $2,600,000 - Hutchinson 14,178 $5,500,000 - Farmington 21,086 $7,077,000 - New Prague 7,378 TBD - *Primary Service area of 15 miles Page 28 of 30

29 APPENDIX A: EXISTING POOL DATA SWIMMING POOL WADING POOL SIZE: 44 ft. x 75 ft. 1 in. 20 ft. x 20 ft. 42 ft. x 38 ft. 4 in. 15 ft. x 24 ft. SURFACE AREA: SHALLOW WATER (< 5 FT) 3,469 sq. ft. 400 sq.ft. DEEP WATER (> 5 FT) 1,609 sq. ft. --- TOTAL: 5,078 sq. ft. 400 sq.ft. SURGE CAPACITY: REQUIRED (in gal.) 5,078 gallons 400 sq.ft. SUPPLIED (in gal.) 5,078 gallons (in pool) 400 sq. ft. (in pool) POOL CAPACITY: 210,000 gallons ~2,500 gallons RATE OF FLOW: FLOW RATE REQUIRED 548 gpm (6 hr turnover) 37.5 gpm (30gpm skimmer + 20% m.d.) ACTUAL RATE OF FLOW ~ 450 gpm ~70 gpm TURNOVER: ~7.8 hours ~36 min. (6 hour max requ.) (2 hours max. requ.) FILTER SIZE: 300 sq. ft. 25 sq. ft. FILTER FLOW RATE: 7.33 gpm / s.f gpm / s.f. BATHER LOAD: SHALLOW WATER DEEP WATER TOTAL 291 persons 26 persons Page 29 of 30

30 APPENDIX B: 2010 COMMUNITY EDUCATION PLANNING SURVEY RESULTS APPENDIX C: 2014 COMMUNITY SURVEY Page 30 of 30

NEEDS ASSESSMENT STUDY HIDDLESON POOL

NEEDS ASSESSMENT STUDY HIDDLESON POOL NEEDS ASSESSMENT STUDY HIDDLESON POOL City of Woodland California October 2014 Submitted By: Aquatic Design Group, Inc. 2226 Faraday Avenue Carlsbad, CA 92008 760.438.8400 www.aquaticdesigngroup.com A.

More information

GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST

GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST GWINNETT COUNTY SWIMMING POOL PLAN REVIEW CHECKLIST Pool Name: Address: Contractor: Phone: Number of Pools Applied for: GENERAL INFORMATION Plan review paid Pool Piping plan stamped by Design Professional.

More information

ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW

ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW Pool Name: Address: Contractor: Phone: Number of Pools Applied for: The following is a list of facility requirements for opening a public pool. Read each requirement

More information

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE SEMI PUBLIC POOLS 1. POOL WALLS AND BOTTOM SMOOTH, LIGHT COLORED AND EASILY CLEANABLE. (.

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE SEMI PUBLIC POOLS 1. POOL WALLS AND BOTTOM SMOOTH, LIGHT COLORED AND EASILY CLEANABLE. (. WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE SEMI PUBLIC POOLS A. DECKS 1. POOL WALLS AND BOTTOM SMOOTH, LIGHT COLORED AND EASILY CLEANABLE. (.13) 2. LIFELINE IN PLACE AND SECURE AND A 4" MINIMUM

More information

Jackson County Department of Public Health Application to Construct, Install, Remodel or Modify a Public Swimming Pool

Jackson County Department of Public Health Application to Construct, Install, Remodel or Modify a Public Swimming Pool Jackson County Department of Public Health 538 Scotts Creek Rd. Suite 100 Sylva, NC 28779 Tel: 828-586-8994 FAX: 828-586-3493 Shelley Carraway DIRECTOR Jackson County Department of Public Health Application

More information

Swimming Pool Plans and Specification Report

Swimming Pool Plans and Specification Report Swimming Pool Plans and Specification Report For TCHD Use Only Date Received by Employee Number: *Plans Received Yes No *$120.00 Plan Review Fee Paid Yes No *Facility Name: Phone: *Address: *Owner: *Phone:

More information

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN CLACKAMAS COUNTY COMMUNITY HEALTH DIVISION ENVIRONMENT & HEALTH SERVICES APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN APPLICATION IS HEREBY MADE

More information

Lincoln County Environmental Health Department 302 North Academy Street, Suite B Lincolnton, NC Phone: Fax:

Lincoln County Environmental Health Department 302 North Academy Street, Suite B Lincolnton, NC Phone: Fax: Lincoln County Environmental Health Department 302 North Academy Street, Suite B Lincolnton, NC 28092 Phone: 704-736-8426 Fax: 704-736-8427 APPLICATION FOR APPROVAL TO CONSTRUCT OR RENOVATE A PUBLIC SWIMMING

More information

City of Harrisburg, PA Swimming Pool Feasibility Study Harrisburg, PA

City of Harrisburg, PA Swimming Pool Feasibility Study Harrisburg, PA City of Harrisburg, PA Swimming Pool Feasibility Study Harrisburg, PA AGENDA INTRODUCTION PROCESS COMMUNITY FEEDBACK OPTIONS FOR CONSIDERATION QUESTIONS AND ANSWERS PROCESS PROCESS NEEDS ASSESSMENT COMMON

More information

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE RECREATIONAL POOLS 2. DECK AND COPING MUST BE IN GOOD REPAIR AND PROPERLY DRAINED. (.

WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE RECREATIONAL POOLS 2. DECK AND COPING MUST BE IN GOOD REPAIR AND PROPERLY DRAINED. (. A. DECKS WORCESTER COUNTY HEALTH DEPARTMENT PRE-OPENING GUIDE RECREATIONAL POOLS 1. FENCING MUST BE IN GOOD REPAIR. (.21) A. MINIMUM 6 FT FOR MAIN POOL. B. MINIMUM 3 FT FOR WADING POOL SEPARATION FENCE.

More information

Aquatic Facility Evaluation City of Merriam, Kansas. Kyle A. McCawley, P.E. Larkin Aquatics 4/9/2014

Aquatic Facility Evaluation City of Merriam, Kansas. Kyle A. McCawley, P.E. Larkin Aquatics 4/9/2014 2014 Aquatic Facility Evaluation City of Merriam, Kansas Kyle A. McCawley, P.E. Larkin Aquatics 4/9/2014 Table of Contents Introduction... 2 Executive Summary... 2 Applicable Codes and Standards... 3 Facility

More information

FINAL EXPRESS TERMS FOR PROPOSED BUILDING STANDARDS OF THE CALIFORNIA DEPARTMENT OF PUBLIC HELATH

FINAL EXPRESS TERMS FOR PROPOSED BUILDING STANDARDS OF THE CALIFORNIA DEPARTMENT OF PUBLIC HELATH FINAL EXPRESS TERMS FOR PROPOSED BUILDING STANDARDS OF THE CALIFORNIA DEPARTMENT OF PUBLIC HELATH REGARDING PROPOSED CHANGES TO THE CALIFORNIA BUILDING STANDARDS, ADMINISTRATIVE CODE CALIFORNIA CODE OF

More information

POOL AND SPA REPLASTERING AND/OR REMODELING REQUIREMENTS

POOL AND SPA REPLASTERING AND/OR REMODELING REQUIREMENTS POOL AND SPA REPLASTERING AND/OR REMODELING REQUIREMENTS Effective January 1, 2017 PLAN SUBMITTAL Any person proposing to renovate, replaster, reconstruct or alter a public pool or its ancillary facilities,

More information

Discussion on Super Splash USA. December 14, 2015

Discussion on Super Splash USA. December 14, 2015 Discussion on Super Splash USA December 14, 2015 Super Splash Elevated Sundeck Filter Water Slides Pebble Beach Concessions Avalanche Slide Main Pool Catalina Cove Drop Slides Filter/Admin Entry BH/ Restrooms

More information

Pool Inspection. Your Street San Diego, California Prepared for: Your Name Prepared by: Priority Inspection Service

Pool Inspection. Your Street San Diego, California Prepared for: Your Name Prepared by: Priority Inspection Service Pool Inspection Your Street San Diego, California 92106 Prepared for: Your Name Prepared by: Page 1 of 10 Table of Contents Standards of Practice 2 Definitions 3 General Information 3 General Pool Information

More information

Honey Lake Valley Recreation Authority Pool Community Workshop Presentation

Honey Lake Valley Recreation Authority Pool Community Workshop Presentation PREVIOUS WORK UNDERTAKEN BY HLVRA Phase I 19 sites were explored and scored for viability Phase II 3 finalists emerged 800 South Street Site Credence School Site* Mesa Street Site March 2014 Aquatic Design

More information

Swimming Pools, Hot Tubs and Spas

Swimming Pools, Hot Tubs and Spas OLATHE FIRE DEPARTMENT BUILDING CODES 1225 S. Hamilton Circle Olathe, KS 66061 / Main: (913) 971-7900 / Fax: (913) 971-9812 Swimming Pools, Hot Tubs and Spas Definitions: Swimming Pool- Any structure intended

More information

REQUEST FOR PROPOSAL FOR WATERPROOFING STRUCTURAL ENGINEERING

REQUEST FOR PROPOSAL FOR WATERPROOFING STRUCTURAL ENGINEERING DATE: November 13, 2018 REQUEST FOR PROPOSAL FOR WATERPROOFING STRUCTURAL ENGINEERING PROJECT: OWNER: Corbett Pool Renovation Office of the University Engineer NC A&T State University 1601 East Market

More information

Fidalgo Pool and Fitness Center Facility Audit Anacortes, WA

Fidalgo Pool and Fitness Center Facility Audit Anacortes, WA Fidalgo Pool and Fitness Center Facility Audit Anacortes, WA In Association With ARC Architects Table of Contents Table of Contents... 2 INTRODUCTION... 3 FIDALGO POOL AND FITNESS CENTER SWIMMING POOL

More information

KERN COUNTY PUBLIC HEALTH SERVICES DEPARTMENT ENVIRONMENTAL HEALTH DIVISION

KERN COUNTY PUBLIC HEALTH SERVICES DEPARTMENT ENVIRONMENTAL HEALTH DIVISION KERN COUNTY PUBLIC HEALTH SERVICES DEPARTMENT ENVIRONMENTAL HEALTH DIVISION 2700 M Street, Suite 300 Bakersfield, CA 93301 Phone (661) 862-8740 Fax (661) 862-8701 POOL DATA PUBLIC SWIMMING POOL, SPA, WADING

More information

Chapter 10 SWIMMING POOLS

Chapter 10 SWIMMING POOLS 4-10-1: COMPLIANCE REQUIRED: Chapter 10 SWIMMING POOLS It shall be unlawful to construct, maintain, install or enlarge any swimming pool in the City except in compliance with the provisions of this Chapter.

More information

ANTI-ENTRAPMENT PLAN

ANTI-ENTRAPMENT PLAN ANTI-ENTRAPMENT PLAN Anti-Entrapment Plan Presenters: Kevin Jeroncic, Alberta Health Services Wade Goin, Alberta Health Services Kelly Carter, Lifesaving Society Session Objectives Defining Entrapment

More information

FACILITY CONDITION ASSESSMENT

FACILITY CONDITION ASSESSMENT FACILITY CONDITION ASSESSMENT R. C. Icabone Swimming Pool 1131 College Ave. Cañon City, CO Terracon Project No. BE186084 Prepared For: Cañon City Area Recreation and Park District, 575 Ash Street Cañon

More information

1 Exam Prep NSF/ANSI Tabs and Highlights

1 Exam Prep NSF/ANSI Tabs and Highlights 1 Exam Prep NSF/ANSI 50 2015 Tabs and Highlights These 1 Exam Prep Tabs are based on ANSI/NSF 50-2015, Equipment for Swimming Pools, Spas, Hot Tubs and Other Recreational Water Facilities. Each 1 Exam

More information

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

SWIMMING POOL, SPA, & HOT TUB GUIDELINES SWIMMING POOL, SPA, & HOT TUB GUIDELINES A. Adopted construction codes and installation requirements 1. 2015 edition of the International Residential Code and Appendix Q, 2. 2014 edition of the National

More information

Swimming Pool Requirements

Swimming Pool Requirements Swimming Pool Requirements 1. Definitions: Approved Safety Pool Cover. Means a manually or power-operated safety pool cover that meets all of the performance standards of the American Society for Testing

More information

WAKE COUNTY POOL PERMIT PRE-SEASON AUDIT 2014

WAKE COUNTY POOL PERMIT PRE-SEASON AUDIT 2014 A DEPTH MARKINGS There are Depth Markings on and around a. On the vertical wall of the pool and on this pool that are at least 4 inches high; in contrasting color to the background; of a slip resistant

More information

MDX² INSTALLATION MANUAL (RETROFIT FIBERGLASS, VINYL & CONCRETE POOLS WITH MDX)

MDX² INSTALLATION MANUAL (RETROFIT FIBERGLASS, VINYL & CONCRETE POOLS WITH MDX) Only for Pools with an existing MDX sump ANTI-ENTRAPMENT DEBRIS DRAIN MDX² INSTALLATION MANUAL (RETROFIT FIBERGLASS, VINYL & CONCRETE POOLS WITH MDX) Safety compliant according to the Virginia Graeme Baker

More information

Cynthia Arias Pollution Control Coordinator

Cynthia Arias Pollution Control Coordinator Cynthia Arias Pollution Control Coordinator cynthia.arias@cityofcarrollton.com 972-466-3059 28 cities surveyed 100% were inspecting public and semi-public pools Based on Texas Department of State Health

More information

Forest River Park Pool Evaluation-DRAFT. City of Salem, Massachusetts 93 Washington Street Salem, MA 01970

Forest River Park Pool Evaluation-DRAFT. City of Salem, Massachusetts 93 Washington Street Salem, MA 01970 Forest River Park Pool Evaluation-DRAFT City of Salem, Massachusetts 93 Washington Street Salem, MA 01970 JUNE 2017 0 ENGINEER S REPORT The City of Salem is located in Essex County, Massachusetts. It is

More information

Dan Johnson, CBP Swim, Incorporated Lead Dog Aquatic Consulting

Dan Johnson, CBP Swim, Incorporated Lead Dog Aquatic Consulting Dan Johnson, CBP Swim, Incorporated Lead Dog Aquatic Consulting APSP/ANSI-7 Writing Committee APSP/ANSI/ICC-15 Writing Committee APSP/ANSI/ICC-5 Writing Committee (Chairman) International Swimming Pool

More information

LAKE BLUFF PARK DISTRICT BLAIR PARK SWIMMING POOL Questions and Answers OVERVIEW

LAKE BLUFF PARK DISTRICT BLAIR PARK SWIMMING POOL Questions and Answers   OVERVIEW LAKE BLUFF PARK DISTRICT BLAIR PARK SWIMMING POOL Questions and Answers www.lakebluffparks.org OVERVIEW Q: How did the community rate the pool on the Community Wide survey? A: The top three highest rated

More information

New Jersey State Sanitary Code Chapter IX Public Recreational Bathing N.J.A.C. 8:26 Changes 1/16/18

New Jersey State Sanitary Code Chapter IX Public Recreational Bathing N.J.A.C. 8:26 Changes 1/16/18 ALL POOLS The definition of Altered and Alteration has changed to include the change of any item that is not with the same or newer model number. Definitions changed for aquatic recreation facility, Operator

More information

Jennifer Hatfield FSPA Government Relations Consultant J. Hatfield & Associates, PL

Jennifer Hatfield FSPA Government Relations Consultant J. Hatfield & Associates, PL Jennifer Hatfield FSPA Government Relations Consultant J. Hatfield & Associates, PL Topics to cover: Pool & Spa Energy Code Requirements Residential Code Requirements Building (Public) Code Requirements

More information

Tampa: Davis Islands Recreation Area

Tampa: Davis Islands Recreation Area 1) PROCESS a) Provide As-Built Documentation i) Elements Design Team completed measured as-built drawings as well as extensive photo documentation of the building. ii) Elements Design Team met and held

More information

1 Exam Prep State Pool Contractor Feedback Questions and Answers

1 Exam Prep State Pool Contractor Feedback Questions and Answers 1 Exam Prep State Pool Contractor Feedback Questions and Answers 1. What valves are not part of the pool recirculation system? a. Rotary Valve b. Butterfly Valve c. Ball valves d. Hydrostatic Valves 2.

More information

GRIDLEY SWIMMING POOL Gridley, California REHABILITATION / RENOVATION FEASIBILITY REPORT. February 22, 2016

GRIDLEY SWIMMING POOL Gridley, California REHABILITATION / RENOVATION FEASIBILITY REPORT. February 22, 2016 GRIDLEY SWIMMING POOL Gridley, California REHABILITATION / RENOVATION FEASIBILITY REPORT February 22, 2016 Prepared By SIEGFRIED ENGINEERING, INC. 111 Scripps Drive Sacramento, CA 95825 McCLELLAND ARCHITECTURE

More information

PUBLIC POOL CHECKLIST. (This checklist is based on the Ministry of Municipal Affairs and Housing checklist)

PUBLIC POOL CHECKLIST. (This checklist is based on the Ministry of Municipal Affairs and Housing checklist) Planning and Building Department City of Mississauga 300 City Centre Drive, 3th Floor Mississauga ON L5B 3C1 PUBLIC POOL CHECKLIST (This checklist is based on the Ministry of Municipal Affairs and Housing

More information

ENVIRONMENTAL HEALTH DIVISION POOL SAFETY 2017 UPDATES

ENVIRONMENTAL HEALTH DIVISION POOL SAFETY 2017 UPDATES EN[Type text]vironmental HEALTH DEPARTMENT OF PUBLIC HEALTH Kathleen Grassi, R.D., M.P.H. Director Ron Rowe, R.E.H.S., M.P.A. Environmental Health Director ENVIRONMENTAL HEALTH DIVISION POOL SAFETY 2017

More information

FINDLAY TOWNSHIP BUILDING INSPECTION DEPT

FINDLAY TOWNSHIP BUILDING INSPECTION DEPT Page 1 of 7 FINDLAY TOWNSHIP BUILDING INSPECTION DEPT. RESIDENTIAL SWIMMING POOLS Permit application submittal requirements (As per the 2009 International Residential Code) NOTE: A building permit is required

More information

North Liberty, Iowa. Aquatic Master Plan

North Liberty, Iowa. Aquatic Master Plan North Liberty, Iowa Aquatic Master Plan November 2016 North Liberty, Iowa Aquatic Master Plan Table of Contents Introduction 3 Executive Summary 3 Aquatic History 6 The Traditional Pool 6 The Trend in

More information

Public Swimming and Bathing Facilities Operators Guide 2018

Public Swimming and Bathing Facilities Operators Guide 2018 Public Swimming and Bathing Facilities Operators Guide 2018 The Inspection Form The Inspection Form (* Denotes critical violation on inspection) The Inspection Form (* Denotes critical violation on inspection)

More information

Boise Municipal Code. Chapter 9-17 SWIMMING POOLS

Boise Municipal Code. Chapter 9-17 SWIMMING POOLS Chapter 9-17 SWIMMING POOLS Sections: 9-17-01 PERMITS 9-17-02 INSPECTION 9-17-03 POOL ATTENDANT OR SUPERVISOR 9-17-04 BACTERIAL QUALITY OF WATER 9-17-05 RECORDS 9-17-06 CONSTRUCTION 9-17-07 RECIRCULATION

More information

Town of Carbondale John M. Fleet Municipal Pool

Town of Carbondale John M. Fleet Municipal Pool Town of Carbondale John M. Fleet Municipal Pool History Master Plans Survey Data Present Pool Funding RSUT Budget Actuals- 2014-2017 Budget FY 2018 Pool admittance numbers comparison 2015-2017 Cost Recovery

More information

The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.

The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools. Building Information BURNABY PLANNING & BUILDING DEPARTMENT Swimming Pools The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.

More information

Providing quality commercial equipment since 1998 for pool, spa, fountain and spray ground

Providing quality commercial equipment since 1998 for pool, spa, fountain and spray ground b R!-2019 www.segaquatics.com Providing quality commercial equipment since 1998 for pool, spa, fountain and spray ground Fountain components, landscape / under water lights and equipment systems jets,

More information

RESIDENTIAL SWIMMING POOL REQUIREMENTS

RESIDENTIAL SWIMMING POOL REQUIREMENTS CITY OF GRANDVIEW / BUILDING SERVICES 1200 MAIN STREET, GRANDVIEW, MO 64030 PHONE: (816) 316-4817 FAX: (816) 316-4809 WWW.GRANDVIEW.ORG RESIDENTIAL SWIMMING POOL REQUIREMENTS Community Development Department

More information

PUBLIC POOL INSPECTIONS DEPARTMENT OF PUBLIC HEALTH ENVIRONMENTAL HEALTH SECTION RECREATION PROGRAM (860)

PUBLIC POOL INSPECTIONS DEPARTMENT OF PUBLIC HEALTH ENVIRONMENTAL HEALTH SECTION RECREATION PROGRAM (860) PUBLIC POOL INSPECTIONS DEPARTMENT OF PUBLIC HEALTH ENVIRONMENTAL HEALTH SECTION RECREATION PROGRAM (860)509-7334 DPH WEB SITE www.ct.gov/dph Click on A-Z Topics tab on left side of screen Click on P and

More information

SWIMMING POOLS/SPAS/HOT TUBS PLAN REVIEW GUIDE SHEET

SWIMMING POOLS/SPAS/HOT TUBS PLAN REVIEW GUIDE SHEET SWIMMING POOLS/SPAS/HOT TUBS PLAN REVIEW GUIDE SHEET Sect. 106-748, City Code of Ordinances: Regulations are applicable to both above and inground swimming pools, spas and hot tubs. POOL PLACEMENT Measurement

More information

Private Swimming Pool Permit Application

Private Swimming Pool Permit Application Private Swimming Pool Permit Application Pool Address: Legal: Lot: Block: Plan: Subdivision: Applicant Information: Are you also the primary contact? Yes No Name: Address: Postal Code: Phone: Email Address:

More information

Non-Residential: Any swimming pool or spa that is not used at a single-family residence.

Non-Residential: Any swimming pool or spa that is not used at a single-family residence. SECTION 1: INTRODUCTION TO POOL AND SPA SAFETY Purpose Protect the public from possible safety and health hazards Establish minimum operating and construction standards for swimming pools and spas Provide

More information

Understanding and Compliance of the Virginia Graeme Baker Pool & Spa Safety Act

Understanding and Compliance of the Virginia Graeme Baker Pool & Spa Safety Act Understanding and Compliance of the Virginia Graeme Baker Pool & Spa Safety Act Sponsored by the U.S. Consumer Product Safety Commission Presented By: Rick English, Certified Building Professional, CPOI

More information

CUSTOMER ASSISTANCE GUIDE BUILDING PERMIT APPLICATION SUBMITTAL REQUIREMENTS

CUSTOMER ASSISTANCE GUIDE BUILDING PERMIT APPLICATION SUBMITTAL REQUIREMENTS CUSTOMER ASSISTANCE GUIDE BUILDING PERMIT APPLICATION SUBMITTAL REQUIREMENTS SWIMMING POOLS (IN-GROUND OR ABOVE-GROUND), SPAS AND HOT TUBS (CONTAINS WATER OVER 24 INCHES DEEP) Please read all of the following

More information

RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS

RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS RESIDENTIAL SWIMMING POOLS AND SPAS A GUIDE FOR HOMEOWNERS City of Redding 777 Cypress Avenue Redding CA 96001 Telephone: (530) 225-4013 FAX: (530) 225-4360 A Swimming Pool is any body of water 18 inches

More information

Swimming Pool IAQUALINK WEB CONNECT

Swimming Pool IAQUALINK WEB CONNECT Swimming Pool For all pool equipment, two rules apply: consult the manufacturer documentation and hire professionals. The recommendations made in this section are general to products typically installed

More information

AMITY TWP POOL REQUIREMENTS

AMITY TWP POOL REQUIREMENTS AMITY TWP POOL REQUIREMENTS Construction In-ground, Above-ground and Storable pools and Spas shall be designed and constructed in conformance with International Swimming Pool & Spa Code (ISPSC) Location

More information

Nottingham Township 909 Sugar Run Road Eighty Four PA (724) Fax (724)

Nottingham Township 909 Sugar Run Road Eighty Four PA (724) Fax (724) Nottingham Township 909 Sugar Run Road Eighty Four PA 15330 (724) 348-5622 Fax (724) 348-8822 Swimming Pool Application Requirements SWIMMING POOL Any structure intended for swimming or recreational bathing

More information

Aquatic Concepts. July 23, 2018

Aquatic Concepts. July 23, 2018 Aquatic Concepts July 23, 2018 DESIGN DIRECTION Lazy River Zero Depth Entry Water slides at least one for 48 + and one for little kids Spray features Indoor lap lanes Outdoor lap lanes that can accommodate

More information

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual LoneStar Fiberglass Pools Do-It-Yourself Installation Manual Chris 1/3/2008 Do-It-Yourself The installation of a LoneStar Fiberglass pool is a much simpler task than most people think. What is important

More information

Tom Swift President & COO

Tom Swift President & COO Tom Swift President & COO tomswift@asppoolco.com 478-254-4495 ASP Who are We? ASP Who are We? Swimming Pool Basics ASP Who are We? Swimming Pool Basics Leak Identification ASP Who are We? Swimming Pool

More information

Existing Rule Language Compared to Proposed Rule Language

Existing Rule Language Compared to Proposed Rule Language Existing Rule Language Compared to Proposed Rule Language MINNESOTA RULES, CHAPTER 4717; REVISOR S ID NUMBER 4442 The following table is a summary of existing and proposed rules. For complete regulations

More information

Office Use Only Fee Paid

Office Use Only Fee Paid WASHOE COUNTY HEALTH DISTRICT ENVIRONMENTAL HEALTH SERVICES DIVISION 1001 East Ninth Street PO Box 11130 Reno, Nevada 89520 Telephone (775) 328-2434 Fax (775) 328-6176 www.washoecounty.us/health APPLICATION

More information

MOREHEAD CITY COUNTRY CLUB POOL BUILDING

MOREHEAD CITY COUNTRY CLUB POOL BUILDING Coastal Planning MOREHEAD CITY COUNTRY Interiors Member of the American Institute of Architects DRAWING LIST CLUB POOL BUILDING www.coastal.net MOREHEAD CITY, RTH CAROLINA Coastal USE OF Coastal, DRAWINGS,

More information

Swimming Pools, Spas & Hot Tubs Construction requirements for outdoor private swimming pools (in-ground and above-ground), spas and hot tubs

Swimming Pools, Spas & Hot Tubs Construction requirements for outdoor private swimming pools (in-ground and above-ground), spas and hot tubs PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Swimming Pools, Spas & Hot Tubs Construction requirements for outdoor private swimming pools (in-ground and above-ground), spas and hot tubs November December

More information

2017 Pool Manager s Report Hawthorne Memorial Pool

2017 Pool Manager s Report Hawthorne Memorial Pool 2017 Pool Manager s Report Hawthorne Memorial Pool Overall the 2017 Hawthorne Memorial Pool season was a success. We had a successful Memorial Day opening. We ran the facility regularly throughout the

More information

B o a r d o f H e a l t h

B o a r d o f H e a l t h B o a r d o f H e a l t h April 3, 2018 2018 Public Recreational Bathing License Application Dear Pool Owner: Enclosed you will find an application for the 2018 Public Recreational Bathing License and

More information

SR: FA: PR: CT: All plans must be at least 18 x 24 and drawn to scale (min. ¼ per foot for pools or 1 per foot for spas and wading pools)

SR: FA: PR: CT: All plans must be at least 18 x 24 and drawn to scale (min. ¼ per foot for pools or 1 per foot for spas and wading pools) County of Sacramento Environmental Management Department Environmental Health Division Application for Recreational Health Plan Review New Construction / Major Remodel Complete the following form and mail

More information

PLAN REVIEW NEW CONSTRUCTION AND MAJOR REMODEL WORKSHEET

PLAN REVIEW NEW CONSTRUCTION AND MAJOR REMODEL WORKSHEET DATE RECEIVED: (FOR OFFICE USE ONLY) (FOR OFFICE USE ONLY) POOL SPA FACILITY ID: PR#: SR#: PLAN REVIEW NEW CONSTRUCTION AND MAJOR REMODEL WORKSHEET NEW CONSTRUCTION TYPE OF APPLICATION (CHECK ALL THAT

More information

SWIMMING POOL / SPA PLAN REVIEW CHECKLIST

SWIMMING POOL / SPA PLAN REVIEW CHECKLIST SWIMMING POOL / SPA PLAN REVIEW CHECKLIST This checklist must be submitted with a Building Permit Application for any SWIMMING POOL or SPA. Job Information Property Address: Suite # Contractor: Residential

More information

Check with local zoning official for property line distance requirements.

Check with local zoning official for property line distance requirements. RESIDENTIAL POOL PLAN SUBMITTAL GUIDELINES The following guidelines are intended to assist municipal residents with the permit acquisition process with regard to pools, spas and hot tubs for single family

More information

CITY COUNCIL AGENDA REPORT

CITY COUNCIL AGENDA REPORT CITY COUNCIL AGENDA REPORT Subject: GROSVENOR POOL REPORT Recommendation(s) 1. That the Grosvenor Outdoor Pool Report Part 2, 2015, provided as Attachment 1 to the Grosvenor Pool Report agenda report dated

More information

Cordova Community Pool Replacement Cordova Recreation and Park District Community Workshop #2 October 23, 2018

Cordova Community Pool Replacement Cordova Recreation and Park District Community Workshop #2 October 23, 2018 Cordova Community Pool Replacement Cordova Recreation and Park District Community Workshop #2 October 23, 2018 Fall 2017 Jan. 2018 Feb. 2018 May 2018 May 2018 Aug. 2018 Oct. 2018 Oct. 2018 LPA hired by

More information

Aquatic Center Feasibility Study

Aquatic Center Feasibility Study Chico Area Recreation & Park District Aquatic Center Feasibility Study Prepared By Aquatic Design Group & The Sports Management Group March 4, 2016 Final Report Chico Area Recreation & Park District Aquatic

More information

POOL BARRIER AMENDMENTS & GUIDELINES: APPENDIX G SWIMMING POOLS, SPAS AND HOT TUBS

POOL BARRIER AMENDMENTS & GUIDELINES: APPENDIX G SWIMMING POOLS, SPAS AND HOT TUBS SECTION AG101 - GENERAL POOL BARRIER AMENDMENTS & GUIDELINES: APPENDIX G SWIMMING POOLS, SPAS AND HOT TUBS AG101.1 General. The requirements of this appendix shall apply to the design and construction

More information

Arizona Swimming Pool Design and Planning Guide Copyright AZWPC, All Rights Reserved

Arizona Swimming Pool Design and Planning Guide Copyright AZWPC, All Rights Reserved Just so you know There is no way to can cover every aspect of designing a swimming pool for every particular set of circumstances. This guide is just that, a guide. It s designed to help you understand

More information

SWIM POOL MANAGEMENT City of Blue Springs, Missouri

SWIM POOL MANAGEMENT City of Blue Springs, Missouri Request for Qualifications SWIM POOL MANAGEMENT City of Blue Springs, Missouri The City of Blue Springs, Missouri will accept Request for Qualifications (RFQ) statements from interested firms to provide

More information

Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED

Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED Installation Guide Fiji Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED In planning for the installation of a new Viking pool, there are many important considerations that must be evaluated in order

More information

RESIDENTIAL SWIMMING POOLS, SPAS and HOT TUBS PERMITTING and INSPECTIONS GUIDE

RESIDENTIAL SWIMMING POOLS, SPAS and HOT TUBS PERMITTING and INSPECTIONS GUIDE Inspections & Permits Department 316 North Academy Street Cary, NC 27513 (919) 469-4046 Fax: (919) 462-3840 Email: BuildingSafety@townofcary.org www.townofcary.org RESIDENTIAL SWIMMING POOLS, SPAS and

More information

ADA Access Standards for Swimming Pools, Wading Pools, and Spas

ADA Access Standards for Swimming Pools, Wading Pools, and Spas ADA Access Standards for Swimming Pools, Wading Pools, and Spas The sports, places of amusement, and outdoor developed areas subcommittees each provided recommendations in this area. The recommendations

More information

PROPERTY EVALUATION AND RESERVE FUND STUDY ~UPDATE~

PROPERTY EVALUATION AND RESERVE FUND STUDY ~UPDATE~ 808 S. College, Ste. 225A McKinney, Texas 75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com PROPERTY EVALUATION AND RESERVE FUND STUDY ~UPDATE~ RIVERCHASE OF WYLIE

More information

Welcome to the PMG Educational Program. Sponsored by:

Welcome to the PMG Educational Program. Sponsored by: Welcome to the PMG Educational Program Sponsored by: www.iccsafe.org/conference #ICCAC18 Today s Presenter Layers of Protection 2018 ISPSC Carvin DiGiovanni Vice President, Technical and Standards Association

More information

The expenditure exceeds the income generated, creating an annual shortfall of around 17,447 per annum.

The expenditure exceeds the income generated, creating an annual shortfall of around 17,447 per annum. Dear Parents, 24th January 2018 It is with a heavy heart that we have to inform you that the swimming pool, based at Mundesley Infant school will close at the end of this term (March 28th 2018). Throughout

More information

COURSE SYLLABUS. Program for Resource Efficient Communities University of Florida PO BOX Gainesville, FL

COURSE SYLLABUS. Program for Resource Efficient Communities University of Florida PO BOX Gainesville, FL COURSE SYLLABUS Provider: Program for Resource Efficient Communities University of Florida PO BOX 110940 Gainesville, FL 32611-0940 Provider #: 0001129 Course Name: Florida Building Code Advanced Training:

More information

Reston Community Center Terry L. Smith Aquatics Center. Preliminary Assessment

Reston Community Center Terry L. Smith Aquatics Center. Preliminary Assessment Reston Community Center Reston Community Center INTRODUCTION In February 2017, Hughes Group Architects (HGA) was commissioned to perform a of the condition of the (TLSAC) at Reston Community Center (RCC)

More information

Residential Swimming pools

Residential Swimming pools City of Republic Community Development Department Residential Swimming pools REVISION DATE: JANUARY 2017 Swimming Pool Safety Definitions: Barrier Requirements: A) Application All swimming pools over 24

More information

!!!!!!! GENERAL!INFORMATION!INSTRUCTION! FOR! PEBBLECRETE!

!!!!!!! GENERAL!INFORMATION!INSTRUCTION! FOR! PEBBLECRETE! GENERALINFORMATIONINSTRUCTION FOR PEBBLECRETE I. GENERAL INFORMATION FOR PEBBLECRETE INTRODUCTION PebbleCrete is a quartz-based aggregate designed especially for swimming pools that is imported from overseas

More information

List of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4

List of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4 City of Columbia Engineering Regulations PART 31: SPECIFICATIONS FOR COMMERCIAL SWIMMING POOL BACKWASH AND DRAINAGE Table of Contents Paragraph Description Page No. 31.1 General 31-1 31.2 Definitions 31-1

More information

2009 NEW MEXICO SWIMMING POOL, SPA AND HOT TUB CODE

2009 NEW MEXICO SWIMMING POOL, SPA AND HOT TUB CODE TITLE 14 CHAPTER 8 PART 3 HOUSING AND CONSTRUCTION PLUMBING CODES 2009 NEW MEXICO SWIMMING POOL, SPA AND HOT TUB CODE 14.8.3.1 ISSUING AGENCY: Construction Industries Division (CID) of the Regulation and

More information

Parks & Recreation Karin Richard-Jacobi. OPERATIONAL BUDGET HIGHLIGHTS Augustus Brown Swimming Pool and Dimond Park Aquatic Center FY 11 / FY 12

Parks & Recreation Karin Richard-Jacobi. OPERATIONAL BUDGET HIGHLIGHTS Augustus Brown Swimming Pool and Dimond Park Aquatic Center FY 11 / FY 12 Parks & Recreation Karin Richard-Jacobi OPERATIONAL BUDGET HIGHLIGHTS Augustus Brown Swimming Pool and Dimond Park Aquatic Center FY 11 / FY 12 INTRODUCTION While developing the FY 11 and FY 12 budgets

More information

PUBLIC SPA CHECKLIST. Planning and Building Department City of Mississauga 300 City Centre Drive, 3th Floor Mississauga ON L5B 3C1

PUBLIC SPA CHECKLIST. Planning and Building Department City of Mississauga 300 City Centre Drive, 3th Floor Mississauga ON L5B 3C1 Planning and Building Department City of Mississauga 300 City Centre Drive, 3th Floor Mississauga ON L5B 3C1 PUBLIC SPA CHECKLIST This checklist is prepared for purposes of convenience only. For accurate

More information

TECHNICAL DATA. than the water inlet pressure to the concentrate

TECHNICAL DATA. than the water inlet pressure to the concentrate Foam102a 1. DESCRIPTION The Viking Low Flow Foam/Water proportioning system, is a UL Listed and FM Approved system, for use with 3M foam concentrates. This system consists of a standard wet pipe sprinkler

More information

Building Code Guidelines for Residential Pools

Building Code Guidelines for Residential Pools Building Code Guidelines for Residential Pools KEEP YOUR POOL SAFE Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor Chesapeake, VA 23322 Phone: (757) 382-6018 E-mail: develop-permits@cityofchesapeake.net

More information

1 & 3 Meter Tower CAT 1M 203R RIGHT MOUNT CAT 3M 203R CAT 1M 203L LEFT MOUNT CAT 3M 203L CAT 1M 203D DUAL MOUNT CAT 3M 203D

1 & 3 Meter Tower CAT 1M 203R RIGHT MOUNT CAT 3M 203R CAT 1M 203L LEFT MOUNT CAT 3M 203L CAT 1M 203D DUAL MOUNT CAT 3M 203D 1 & 3 Meter Tower CAT 1M 203R RIGHT MOUNT CAT 3M 203R CAT 1M 203L LEFT MOUNT CAT 3M 203L CAT 1M 203D DUAL MOUNT CAT 3M 203D CAT 1M 203H HEEL MOUNT CAT 3M 203H WARNING CAUTION: DIVING BOARD AND TOWER COMBINATIONS

More information

RESIDENTIAL SWIMMING POOLS, SPAS and HOT TUBS PERMITTING and INSPECTIONS GUIDE

RESIDENTIAL SWIMMING POOLS, SPAS and HOT TUBS PERMITTING and INSPECTIONS GUIDE Inspections & Permits Department 316 North Academy Street Cary, NC 27513 (919) 469-4046 Fax: (919) 462-3840 Email: BuildingSafety@townofcary.org www.townofcary.org RESIDENTIAL SWIMMING POOLS, SPAS and

More information

Table of Contents. We also carry a wide range of supplemental products for splash pad systems and pools.

Table of Contents. We also carry a wide range of supplemental products for splash pad systems and pools. Table of Contents WATER UMBRELLA 4 WATER MUSHROOM (40 ) 5 WATER MUSHROOM (30 ) 6 FLOWER SHOWER - 1 7 FLOWER SHOWER - 2 8 FLOWER SHOWER - 3 9 FLOWER SHOWER - 4 10 FIRE HYDRANT SOAKER 11 RAIN STICK 12 RAINY

More information

A Comparison for Ames, Iowa

A Comparison for Ames, Iowa A Comparison for Ames, Iowa Overview Comparative analysis not concept planning Costs based on defined pool types and sizes Costs indexed to 2017 Pool examples shown Pool Types Considered Option 1 --- competition

More information

Summary of Standards CMR : Minimum Standards for Swimming Pools

Summary of Standards CMR : Minimum Standards for Swimming Pools Local Public Health Institute of Massachusetts www.masslocalinstitute.org Summary of Standards - 105 CMR 435.000: Minimum Standards for Swimming Pools Table of Contents Definitions - 435.01... 2 Construction...

More information

Aquatic Facility Feasibility Study Falmouth, MA. Presented By: James Preisig: Falmouth Aquatics Kevin Post: Counsilman-Hunsaker

Aquatic Facility Feasibility Study Falmouth, MA. Presented By: James Preisig: Falmouth Aquatics Kevin Post: Counsilman-Hunsaker Aquatic Facility Feasibility Study Falmouth, MA Presented By: James Preisig: Falmouth Aquatics Kevin Post: Counsilman-Hunsaker Agenda 1. Introduction to Falmouth Aquatics 2. Counsilman-Hunsaker Process

More information

The Future of Quarterpath Pool. October 8, 2012

The Future of Quarterpath Pool. October 8, 2012 The Future of Quarterpath Pool October 8, 2012 The Big Questions Primary Purpose: Swimming lessons or recreation? What can Williamsburg do that others can t or that differentiates us? Pool Open: How do

More information

City of Cerritos SWIMMING POOL, SPA AND EQUIPMENT APPLICATION. (Please print or type) Name: Phone: ( )

City of Cerritos SWIMMING POOL, SPA AND EQUIPMENT APPLICATION. (Please print or type) Name: Phone: ( ) City of Cerritos Civic Center 18125 Bloomfield Avenue P.O. Box 3130 Cerritos, California 90703-3130 Phone: (562) 916-1201 Fax (562) 916-1371 SWIMMING POOL, SPA AND EQUIPMENT APPLICATION (Please print or

More information