1 Ratnagiri Gas & Power Pvt. Ltd. C&M Department Ref.: RGPPL/C&M/CS-2335/Pre-Bid queries Date: 24/09/2016 Clarifications to bidder Sr. No. 1 Clause No. of tender document Pg.12 (section- B) Prequalification Requirement/Criteria. Clause 1a-1f. Agency s Queries We have the experience of executing one contract for installation and operation of several Natural Gas Compressor packages of total capacity 3,00,000 SCMD. However, for the sake of clarity and unambiguity, we request you to modify the clause to: The bidder should have executed at least one contract for installation and operation of a natural gas compressor package (s) of capacity not less than 3,00,000 SCMD (Three lakhs Standard M3 Per Day) for a minimum period of one year. RGPPL Comments With reference to clause No. 1 (a), (b), (c), (d), (e), (f) of QR, natural gas compressor package may include multiple compressors under the package Pg 21, SectionC/Scope of supply/ special instruction to bidder/2.3.d supply/ special instruction to bidder/2.3.f Page 22 SectionC/Scope of supply/ special instruction to bidder/2.3.q supply/ special instruction to bidder/2.3.v The same use of Package (s), without any a before should be used uniformly in Clauses 1a, 1b, 1c, 1d,1e and 1f. We propose to supply a package conforming to international codes of design, construction and safety. Please confirm. We propose to provide all electrical apparatus, instrument items/ systems conforming to international codes/ standards. Please confirm. As a standard practice, the Tachometer sensing element will be attached to Engine flywheel. Please confirm. Please specify the statutory authorities from whom to obtain approvals. Applicable standards include international codes of Design also, hence accepted It is already mentioned that apparatus should be of National / International Standard. Hence accepted. Accepted. The contractor shall obtain necessary approvals from Statutory authorities as applicable such as PESO, MPCB, etc..
2 Pg. 26 supply/compressors / n supply/compressors / o Pg. 27 supply/compressors / q Pg. 27 supply/gas engines / c supply/instrumentation/4.14.c Pg. 55 & 56 Section F/Compressor Process DATA Sheet Note: 2 supply/compressors / a As a standard practice Suction side suppressors do not include drains (as they are not effective). Discharge side suppressors will be provided with drain connection. Please confirm. The compressor package noise will be above 88 dba and noise enclosures are not typically provided for such installations. Please confirm Annexure A is not provided with RFQ document. To be clarified what documents in referenced here that is to be "duly completed". 1. Exhaust emission levels may kindly be specified. 2. Please specify approval from which statutory authorities are to be arranged. 3. Residential type exhaust silencer is different from hospital type exhaust silencer. Please specify which is required. Only single instrument is used for shutdown and alarm. Please confirm. As specified ambient air shall be used for cooling and based on practical utilization of an air-cooled fin fan heat exchanger, it s not possible to achieve ambient temperature at the exit of after cooler. Request to modify the design maximum discharge temperature at exit of the After Cooler to be 50 C (based on maximum ambient temperature of 38 C). All compressor manufacturers/packagers try to strictly conform to the ISO requirements. However their own standards are sometimes better than the requirements of ISO As such deviation may result in efforts to implement constant up gradation of Accepted. Noise level upto 110 dba is acceptable. Annexure A is already provided on page no. 28 of 84 of tender documents. Exhaust emissions levels as per statutory norms on emissions/ environmental guidelines issued by Maharashtra Pollution Control Board (MPCB). Approval from MPCB is required. Residential or Hospital type exhaust silencer, both acceptable, provided it meets requirement of MPCB for noise limits & safe disposal of engine exhaust. prevails Exit temperature upto 50 0 C after Cooler is acceptable. ISO13631/national/ international standards are acceptable.
3 & product quality and manufacturing processes supply/gas engines / a Prequalification Requirement As stated on Page No. 12 of Tender Document Page No.24 - Required Capacity of compressor- Clause no-(f) Page No-25, Compressors, and Clause No (c) Please confirm acceptance of such deviations if any Requirement of Tender states bidder should have selfexperience or has to enter into JV or consortium to participate in tender. Govt. Agencies & PSU like ONGC, Oil etc. generally have provision to participate in tenders by extending technical support by way of entering into technical collaboration with experienced & reputed party. In this case, Bidder while submitting the documents in support of their experience shall also submit details of experience and past performance of technical collaborator by entering into Memorandum of understanding (MoU). However, this provision is not in this tender. The omission of this particular option straightaway dissuades new players from participating and gives the few bidders an unfair advantage. Therefore, we request you to review Qualification Criteria & incorporate technical Collaborator clause based on MoU, enable RGPPL to get healthy and competitive bidding. Kindly confirm whether we want recycle control valve for capacity control valve or recycle valve for continuous operation of compressor units or capacity control valve in discharge line, since discharge pressure is dependent on back pressure available at battery limit. Since RGPPL has asked for brand new compressor packages, we get confirmation from OEM for soundness and conformance to applicable codes. Mostly TPI certificates are required for old compressor packages. Contractor is required to provide suitable pressure control system in discharge line (bypass/recycle) so that in case back pressure increases due to any restriction of gas flow in the downstream of compressor package, the discharge line pressure shall not go beyond specified outlet battery limit pressure. OEM certificate is sufficient. 16 RGPPL to confirm regarding Clarity required with this Flow of discharge gas
4 17 measurement of Discharge and fuel gas measurement. Kindly confirm the scope of supply Para No. 24 (P- 7 of 54) regard how measurement will be done. What is scope of supply for measuring equipment i. Please clarify the number of days that will be considered for fuel charges in price bid evaluation. ii. Please indicate the approximate price of LNG rate for including in costs for bid evaluation. iii. We understand that Flow Meter for fuel line will be provided by RGPPL. Please confirm. and inlet fuel gas will be measured by orifice meter confirming to AGA-3/international standard in common header. Supply and installation of orifice meter is in the scope of supplier. (i) Operating days of package as per Bid Document is 386 days. (ii) Approximate rate of LNG is US $ 6 / MMBTU; However, for bid evaluation LNG purchase price plus re-gasification charges at the time of technical bid opening will be considered (iii) Flow Meter for Fuel Line and Discharge Line shall be provided by Bidder. 18 Para No. 2.2 (P - 20 of 84) Please inform maximum length of hook up lines for flare, suction, discharge and utilities etc to be laid by Contractor. Length of Hook-up line shall be maximum 50 Meter each. Standard working life of a Gas Compressor package is considered by other PSUs like ONGC as 22 years. In instant tender, RGPPL is demanding brand new compressors. We propose that vintage of compressors be kept as 7 years as on date of tender 19 Para No. 2.3 (P - 21 of 84) opening as period of contract is for 2 years only. In this Tender Condition shall way RGPPL will get most competitive rates. RGPPL may ask for a certificate from chartered engineer / TPI for residual life and health of the compressor packages for ensuring performance of equipment. Similar practice is being followed by ONGC / PLL
5 for hiring of compressors. 1. We understand that RGPPL will provide leveled land of 36M x 16M x 6.0M for installation of compressors under the contract. Please confirm. 20 Para No. 4.3 (P - 24 of 84) 2. Please confirm and clarify whether compressors will be installed at the (i) Acceptable (ii) Same location existing location of installed compressors or other site will be provided by RGPPL for installation of compressors under the contract. In case of new compressor packages, Date of manufacturing of the compressor skid gas engine & associated items may not be feasible as manufacturing of 21 Para No a) (P - 25 of 84) standard items take long time and packager purchase these items from manufacturer in advance. We propose that date of packaging of compressor package could be kept after date of opening of technical bid. Since packager may be different than OEM of 22 Para No b) (P - 25 of 84) Compressor, certificate of adequacy of compressors / data sheet may be accepted from OEM / Packager. 23 Para No a)& b) (P - 28 of 84) It is requested that plant lay out drawing showing hook up points and location of Hook-up points and location of Compressor installation area shall be shown. Layout drawings shall be
6 compressor installation be provided. developed contractor. by 24 Para No (P - 33 of 84) Please confirm that Nitrogen gas will be provided by RGPPL for purging free of cost. Acceptable for purging only. 25 Para No.4.19 f) (P - 34 of 84) Please confirm that RGPPL will pay hiring / operational charges for successful 72 hours performance run. For 72 Hours performance test run, hiring / operational Charges shall not be payable by RGPPL. In case of pre-mature 26 Note No. V) of price schedule (P - 54 of 84) termination RGPPL shall pay 50 % of standby charges for balance period of contract as compensation to contractor. It will not be possible to achieve ambient temperature as the maximum discharge temperature after cooler exit 27 Compressor Process Data sheet (P - 55 of 84) as gas is cooled through Air Coolers only and there will be a float of 7 to 10 0 C with ambient temperature. Hence, 11 above. maximum discharge temperature after cooler exit shall be kept as Ambient C 1) Please confirm whether LNG purchase price will 28 Fuel gas consumption (Page 57 of 84) be considered for price evaluation or LNG price + regassification charges will be considered for price evaluation. 2) Please confirm that excess fuel consumption will be calculated based on actual fuel consumption in a year during monsoon period. 3) Please confirm whether (i) LNG Purchase price plus regasification charges will be considered for price evaluation. (ii) Excess fuel consumption will be calculated on monthly basis. (iii) Fuel consumption for compressor package for price evaluation will be based on OEM certified DATA Sheet. fuel consumption for the
7 Clause no Rotating Equipment, Sub Clause b) Clause no Rotating Equipment, Sub Clause f) Clause no Rotating Equipment, Sub Clause n) Clause no Rotating Equipment, Sub Clause o) Clause no 4.12 Piping, Sub Clause f) Clause no 4.14 Piping, Sub Clause c) Clause no 4.14 Piping, Sub Clause f) 36 Compressor Data Sheet Clause No. 2.3 (m) Page 22 of tender document Clause No q) page 22 of tender document Clause No. 3 (b) Page 23 of the tender document compressor package for price evaluation will be based on OEM s certified Data sheet or on fuel consumption specified by bidder at its discretion. Since Packager is owner of compressor package, Packager letter covering the aspects for adequacy of gas compressor will be acceptable. The assembly of finned tube exchangers with cooler being driven by gas engine shall be allowed. Threaded connection to be allowed. Please allow 110dBA for noise Whether analysis report to be submitted or not. Standard package provide only trip. Standard package do not provide device to monitor vibration, seal oil differential pressure, high bearing temperature. Max disch temp after cooler exist should ambient C. Please advise if a lubricated compressor package solution with a discharge Coalescer which will remove 99.98% of oil introduced into the compressor cylinders for the purpose of cylinder lubrication is acceptable or not? The standard solution used for engine driven compressor packages, therefore taking the read outs from the magnetic picks up is the most common practice for running hour registration, please advise if acceptable. Please advise if the mentioned flow should be understood as the sum of capacity of the number of units offered (eg. If 2 units offered, capacity of each compressor should be 6000 kg/hr or if 3 units are offered capacity for each compressor should be 4000 kg/hr.) Accepted Clarified as per Sr. No.07 above. Yes. To be submitted 11 above. Yes. Agreed.
8 Clause No (f) Page 26 of the tender document Clause No (g) Page 26 of the tender document Clause no (n) Page 26 of the tender document Clause No (c) Page 27 of the tender document 44 General 45 Page # 12 Clause 1 of Section B (Qualification Requirement for the Agency) Please confirm that one air cooled heat exchanger with water and gas section is required for each offered package? Please provide more details regarding the requirement to install the air cooled heat exchanger within the skid. Please note that due to the compressor package size (special when 2 units are considered) the main skid might get too large to accommodate the air cooler, therefore a bolt one skid solution might be preferable, please advise if acceptable. Please advise if EN13445 in lieu of ASME Sec VII Div 1 can be accepted of designing and fabrication of the pressure vessels. Please provide the value limits for the acceptable level of exhaust emission Since this is an DCB tender, kindly clarify whether bidder shall get benefits of Exemption on Excise Duties, In this regards should have to provide Project Authority Certificate (PAC), Certificate of Payment (COP), End use Certificate (EUD) and Certificate for local transportation (Inter state) of material. Kindly clarify. In all the case a, b, c, d, e and f for technical qualification criteria is limited to 150,000 SCMD or higher, but in India this particular qualification is also a limited and Due to this limitation RGPPL has to pay higher rates for the services. Further Oil and Natural Gas Corporation Limited (ONGCL) having the national highest gas production company and process the Gas Compression Hiring service tender at qualification criteria 20,000 SCMD for one year. In this contest we would like to draw your attention that Qualification experience criteria should be reasonable for the present market India. As per prevailing MPCB guidelines. Taxes are to be inclusive in the quoted rates. Only service tax extra. No certificate will be provided.
9 Page # 53 Clause VI of Section E, Price Schedule / BOR / SOR Page # 54 Clause VI of Section E, Price Schedule / BOR / SOR Page # 54 Clause VII of Section E, Price Schedule / BOR / SOR Page # 54 Clause X of Section E, Price Schedule / BOR / SOR Page # 27 Clause 4.11 (O ) Scope of work, Rotating Equipment Page # 55 Clause Section F, Compressor Process Data Sheet Page # 56 Clause Section F, Compressor Process Data Sheet Technical Page# 25, (b) 54 Mobilization time 55 Page#55 & page # 26 We have experience of 100,000 to 120,000 SCMD Kindly review and consider our experience technical qualification criteria and amend the same in tender. Kindly confirm the any upper cap limit on quote of mobilization charges. Please confirm contract period shall be start on earlier mobilization of Gas Compressor Packages. As per OEMs Natural Gas Compressor operation life minimum 22 years with good O & M practices, similar facts accepted by ONGC for Hiring of Gas Compression Services and vintage conditions as described below for reference 1. Service Period 5 Years then 6 years old equipment shall be accepted. 2. Service Period 3 Years then 8 years. We understand technical bid evaluation shall be done on the basis of offered packages, Kindly clarify. As the Gas Engine is running on high speed rpm so kindly allow the noise level around 110 dba. Kindly accept the Compressor design with lubricating type. As BOG Compressor is required for LNG Boil of Gas (Vapors) at Atmospheric pressure, Kindly amend the both the design parameters of Temperature as Positive. In general practice Gas Compressor Package is packaged by the Packagers. OEM s of Gas Compressor and Gas Engine may be different manufacturer. Kindly accept the data sheet signed and stamped by Packager. 12 months mobilization is less as per the requirement. Inlet temp mentioned as 25 0 C. and as per page no. 26 clause f, requirement of suction cooler not required. No Confirmed Yes Evaluation will be made on complete package basis including BOQ item No. 01, 02 & 03 including fuel charges and taxes. Clarified at Sr. No. 07 above. Already stated in tender document (page # 55, line No 6) Acceptable 56 Point(o) of Engine Working Noise Level
10 , pg 27 will be 110 dba at 1 mtr distance. Compressor process Compressor will be datasheet, pg 55 Lubricating type. Maximum discharge Temperature after cooler will Compressor process be : Ambient plus 11 i.e. datasheet, pg C (Considering ambient temp C as mentioned on page 57 of 84). Compressor process datasheet, pg 56 Pre Qualification, Clause 1 OR 2 Special Instructions to Bidder, clause 2.3 a) Rotating Equipment: Compressors, clause (f) Rotating Equipment: Compressors, clause (o) Contract, clause 3.1 Contract, clause 8.1 Please confirm the necessity of (-)29/28 design temperature. Generally minimum design temperature depend on minimum ambient temperature or minimum process gas temperature. ( Min. ambient temp is 10 0 C as mentioned in page 57 of 84, whereas inlet temp 25 0 C as mentioned on page 55 of 84) 'NEA India has executed huge amount of projects in the oil refineries of India since The capacities of compressor have been upto 70,000 Nm3/Hr and hence we request you to consider NEA India without any pre qualification requirement. 'We request you extend the time period to supply, install and commission the compressor package within 15 months from the date of award of contract since the requirement is for new compressor packages. 'If the process gas is available at suction of compressor at 25 0 C, then there is no requirement of gas suction cooler. Please clarify the requirement of suction gas cooler. 'Please note that the noise level gas compressor package including the compressor + engine + air coolers is very high and hence we request you to consider the noise level as 110 dba. The price shall be reduced by 0.5% per week upto a maximum of 5% of the undelivered portion only instead of the total contract price The quoted prices will be inclusive of all taxes and duties as applicable at the 07 above. 51 above. 11 above. Carbon steel can withstand temp upto minus (-) 29 0 C. Hence mentioned as (-)29 0 C Clarified as per Sr. no. 55 above. 07 above.
11 Contract, clause 11 Contract, clause 12 Contract, clause 25 Contract, clause 30 Contract, clause Section-B, QR time of bid submission. However, all taxes and duties shall be as applicable on the date of bill / invoice generation. Any increase in taxes and duties due to statutory regulations during contract execution shall be paid by RGPPL to the vendors. Price may vary on account of change in statutory regulations due to increase in taxes and duties applicable during the time of contract execution. 10% PBG will be submitted at the time of dispatch of material which will be valid till the contract completion date without any claim period. The down time experienced during onshore work due to adverse weather conditions shall be extended accordingly If the work / contract is suspended due to reasons not attributable to the contractor, then the work suspension charges shall be paid to the contractor. In the event the work is suspended for 4 weeks, then contractor will put the project on HOLD till further instructions from the customer. If the contract is terminated due to reasons not attributable to the contractor, the contract cancellation / termination charges shall be paid to the contractor as per the cancellation schedule attached with the offer. Technical collaboration alternative not recommended by RGPPL, we are unable to bid for this compressor project. If technical collaboration will be allowed, we can bid for this compressor project 13 above.
PRE BID QUERIES FOR CNG & CITY GAS DISTRIBUTION FOR HYDERABAD. Clause No. Description in tender documents Clarifications / Request for change
Tender : Bid Document : BGL/100/2010-11 PRE BID QUERIES FOR CNG & CITY GAS DISTRIBUTION FOR HYDERABAD Sl. Clause Description in tender documents Clarifications / 1. ARTICLE 19 :Price If the contractor
More informationARAI/TA(4G)/HORIBA/MEXA 584L/ Dated 19 th Jun 2008 CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES
CERTIFICATE FOR COMPLIANCE TO THE CENTRAL MOTOR VEHICLES RULES M/s Horiba India Pvt. Ltd. Room 1521, 15 th Floor, Eros Corporate Tower Nehru Place New Delhi 110 019 Cert Annex Drg Tot al 1 6 0 7 pgs Exhaust
More informationFor Department of CSSD
Kasturba Health Society's Mahatma Gandhi Institute of Medical Sciences, P.O. Sevagram, District - Wardha MAHARASHTRA - 442 102 For Department of CSSD SUPPLY OF MEDICAL GASES (Refilling) Sr No Name of Gas
More informationNIT LIMITED NO. NC-105-P-SCS-NOCB CYLINDERS & REGULATORS
NIT LIMITED NO. CYLINDERS & REGULATORS NATIONAL INSTITUTE OF SCIENCE EDUCATION & RESEARCH JATNI CAMPUS, P.O.: JATNI, Khurdha-752050 Tender Notice No. NIT Limited NO. Sealed Tenders are invited on behalf
More informationNIT LIMITED NO. NC-185-SCS-P-NOCB ARGON & NITROGEN CYLINDER WITH REGULATOR
NIT LIMITED NO. NC-185-SCS-P-NOCB-15-16 ARGON & NITROGEN CYLINDER WITH REGULATOR NATIONAL INSTITUTE OF SCIENCE EDUCATION & RESEARCH JATNI CAMPUS, P.O.: BHIMPUR-PADANPUR, VIA:-JATNI Khurdha-752050 Tender
More informationOIL INDIA LIMITED (A Government of India Enterprises) 4, India Exchange Place Kolkata -1 INVITATION TO E-BID UNDER COMPOSITE BID SYSTEM
OIL INDIA LIMITED (A Government of India Enterprises) 4, India Exchange Place Kolkata -1 TELEPHONE NO. (033) 222301657 FAX NO: (033) 22302596 Email: oilcalmn@dataone.in;oilcalmn@oilindia.in TENDER NO.
More informationCSIR-NATIONAL GEOPHYSICAL RESEARCH INSTITUTE (COUNCIL OF SCIENTIFIC & INDUSTRIAL RESEARCH) Uppal Road, Hyderabad (Telangana.
CSIR-NATIONAL GEOPHYSICAL RESEARCH INSTITUTE (COUNCIL OF SCIENTIFIC & INDUSTRIAL RESEARCH) Uppal Road, Hyderabad - 500 007 (Telangana.) India FAX: +91-40-27012486, 27012533, e-mail: purchase@ngri.res.in
More informationBOXING FEDERATION OF INDIA
BOXING FEDERATION OF INDIA REQUEST FOR PROPOSAL (RFP) FOR PROCUREMENT SPORTS EQUIPMENTS - 1 HOSTING AIBA WOMEN S WORLD BOXING CHAMPIONSHIP, DELHI, 2018 DATE OF ISSUE: September 18, 2018 LAST DATE & TIME
More informationGUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service
GUIDELINES Pressure Systems Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service Document Reference: PSG 16 Issue 04 Dated 13/09/16 The Safety Assessment Federation
More informationASSE International Product (Seal) Listing Program
ASSE International Product (Seal) Listing Program ASSE 1070-2015 / ASME A112.1070-2015 / CSA B125.70-15 Performance Requirements for Water Temperature Limiting Devices Manufacturer: Contact Person: E-mail:
More informationEXPRESSION OF INTEREST
EXPRESSION OF INTEREST Contractor: WorleyParsons Canada Services Ltd. Project: Hebron Topsides Project Package: SC-64 GBS Caisson Field Welding Services Category: XXXXX-XXXXX Closing Date: 19 June 2013
More informationMAHARASHTRA NATURAL GAS LIMITED
Replies to Queries of the Bidders Date: 01.12.2018 SUB: Replies to queries of the bidders for Tender for annual rate contract for procurement of SRM for CGD Network of MNGL, Pune REF: Bid Document No.
More informationNIT LIMITED NO. RD-NC-40-SPS-PH
NIT LIMITED NO. RD-NC-40-SPS-PH1302-14-15 ARGON GAS & CO2 with CYLINDER NATIONAL INSTITUTE OF SCIENCE EDUCATION & RESEARCH INSTITUTE OF PHYSICS CAMPUS, P.O.: SAINIK SCHOOL, BHUBANESWAR-751 005 Tender Notice
More informationNATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB)
NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB) Aryabhata Block, C.R. Rao Advanced Institute of Mathematics, Statistics and Computer Science (AIMSCS), UoH Campus, Gachibowli, Hyderabad-500 046 TENDER
More informationPresented to the IAPMO Standards Review Committee on March 7, 2016
Summary of Substantive Changes between the 2015 edition of ASSE 1070/ASME A112.1070/CSA B125.70, Water Temperature Limiting Devices, the 2004 edition of ASSE 1070, Water Temperature Limiting Devices, and
More informationNORMAL OPERATING PROCEDURES Operating Parameter Information
Operating Parameter Information Each operator performing the normal operating procedures (routine checks) of the facility should be familiar with the current normal operating parameters of all systems
More informationTHE MAHARASHTRA STATE CO-OPERATIVE BANK LTD
THE MAHARASHTRA STATE CO-OPERATIVE BANK LTD ( Incorporating The Vidarbha Co-operative Bank Ltd.) Scheduled Bank P.O. Box No. 654, Plot No.10, Town Center, CIDCO Aurangabad - 431003 TENDER NOTICE Sealed
More informationDEPARTMENT OF CHEMICAL ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI , INDIA
DEPARTMENT OF CHEMICAL ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI 600036, INDIA Ref. No. CHE/17-18/CHE/006/GAIM/RAJN Date: 25 APRIL, 2018 Due date: 9 MAY, 2018 Item: High Pressure Gas Hydrate
More informationInstallation Guide - C01202 & C01203 Thermostatic Mixing Valve TMV2
The following information is required for use when the Saracen range of thermostatic mixing valves is used in a TMV2 Applications under the requirements of BS EN 1111: 1999 Sanitary tap ware Thermostatic
More informationBelow this line not for printing
MAHAGENCO INVITATION FOR EXPRESSION OF INTEREST (EOI) MAHARASHTRA STATE POWER GENERATION CO. LTD CIN:U40100MH2005SGC153648 Name of work:- Sale of fly ash on cost and as is where is on long term basis from
More informationTENDER FOR THE SUPPLY OF MEDICAL OXYGEN AND NITROUS OXIDE GASES CYLINDERS FOR ONE YEAR.
L E S 1 Government of Karnataka BELGAUM INSTITUTE OF MEDICAL SCIENCES, BELGAUM AUTONOMOUS INSTITUTE (Registered Under Societies Registration Act) Dr. B. R. Ambedkar Road, Belgaum 590 001. Phone No: 0831-2420320,
More informationM-06 Nitrogen Generator (Nitrogen Making Machine)
Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains
More informationBid Document/Request for Proposal. For
Pakistan Telecommunication Company Limited Tender No. RFQ/NW-Ops LHR/Frame Contract/DG-Filters/2018-2019 Bid Document/Request for Proposal For Frame Contract of Unit Based Rates of Different Types of DG
More informationAll technical data may be changed MADE IN ITALY BY NARDI COMPRESSORI
PACIFIC MX NITROX BREATHING AIR according to DIN EN 12021 MAX OXYGEN 40% DELIVERY l/min 600 m 3 h 36 PRESSURE BAR 225 PSI 3250 Quality system certified to iso 9001 BREATHING AIR is a product line that
More informationASME and PED Requirements for Drum Level Instrumentation. Presented by: Amir Hedayatnia Clark-Reliance Corp.
ASME and PED Requirements for Drum Level Instrumentation 2017 Presented by: Amir Hedayatnia Clark-Reliance Corp. Topics Gage Glasses and Remote Reading Instruments ASME Code Section I Requirements for
More informationANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS
Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This
More informationBHAGYANAGAR GAS LIMITED (A JOINT VENTURE OF HPCL & GAIL)
(A JOINT VENTURE OF HPCL & GAIL) BID DOCUMENT FOR PROCUREMENT OF METERS AND REGULATORS FOR SUPPLY OF PNG IN HYDERABAD UNDER DOMESTIC COMPETITIVE BIDDING Bid Document No.: BGL/093/2010-11 -II of II BHAGYANAGAR
More information1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)
1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor) 1. According to NFPA 99, SCFM is an acronym for. a) Surface Conditions at Fahrenheit Mercury b) Standard Conditions
More informationSpecification for Medical Gas Pipeline s
M.S Specification for Medical Gas Pipeline s Supply, installation and commissioning of medical gas pipelines at pediatric emergency and Outborn NICU S. No. Area Beds Gas outlet Oxygen- O2 Flow meter Ward
More informationCalera Fire Department Breathing Air System Technical Specifications
Calera Fire Department Breathing Air System Technical Specifications I. General Arrangement The air compressor system shall be a turnkey, packaged appliance designed to deliver high pressure breathing
More informationWorking in Gas Hazard Areas
/ Health & Safety OPERATIONS STANDARDS Ref.: Aperam Safety ST 012 Working in Gas Hazard Areas Issue: 15.05.2012 Vers.: v0 Rev.: AM Safety ST 012 v1.2 08.05.2012 Working in Gas Hazard Areas Controlled Updated
More informationPressure on Demand. Air Pressure Amplifiers
Pressure on Demand Air Pressure Amplifiers Introduction Haskel air pressure amplifiers offer the most comprehensive range in the industry combining simple principles of operation with rugged construction
More informationINVITATION FOR QUOTATION. TEQIP-III/2019/mmug/Shopping/51
INVITATION FOR QUOTATION TEQIP-III/2019/mmug/Shopping/51 22-Feb-2019 To, Sub: Invitation for Quotations for supply of Goods Dear Sir, 1. You are invited to submit your most competitive quotation for the
More informationInstallation, Operation, and Maintenance Manual Parker Balston Model N2-04 Nitrogen Generator
Installation, Operation, and Maintenance Manual Parker Balston Figure 1 - N2-04 Nitrogen Generator These instructions must be thoroughly read and understood before installing and operating this product.
More informationSTANDARD HIGH PRESSURE COMPRESSORS COMPACT PACKAGE FOR DEMANDING APPLICATIONS
STANDARD HIGH PRESSURE COMPRESSORS COMPACT PACKAGE FOR DEMANDING APPLICATIONS 2 STANDARD HIGH PRESSURE COMPRESSORS BURCKHARDT COMPRESSION GLOBAL TECHNOLOGY LEADER IN THE RECIPROCATING COMPRESSOR WORLD
More informationISO INTERNATIONAL STANDARD. Hydraulic fluid power Filter elements Determination of resistance to flow fatigue using high viscosity fluid
INTERNATIONAL STANDARD ISO 23181 First edition 2007-08-15 Hydraulic fluid power Filter elements Determination of resistance to flow fatigue using high viscosity fluid Transmissions hydrauliques Éléments
More informationDistribution Connection Forms
Distribution Connection Forms Form No. DR01 DR02 DR03 DR04 DR05 DR06 DR07 DR08 DR09 DR10 DR11 GDP101 GDP102 GDP105 GDP106 GDP107 GDP108 GDP111 KG-D01 KG-D02 KG-D03 KG-D04 Description Application For Gas
More informationSERVICE PROVIDERS FOR GAMES PROMOTION
BOXING FEDERATION OF INDIA REQUEST FOR PROPOSAL (RFP) FOR ENGAGING SERVICE PROVIDERS FOR GAMES PROMOTION HOSTING AIBA WOMEN S WORLD BOXING CHAMPIONSHIP, DELHI, 2018 DATE OF ISSUE: October 15, 2018 LAST
More informationApplication of Double Vs Tandem Dry gas seal Advantages.
Application of Double Vs Tandem Dry gas seal Advantages. John Sears WW Director, Compressor Products. Flowserve Corporation. Unit #2207, 220 Fisher Street, SE, Calgary, Alberta, T2H 2H8 Canada; World Wide
More informationFlexible Metal Hose Products
Flexible Metal Hose Products Specialty Flexible Hose Solutions of Stainless Steel The AEROCOM Advantage Aerocom offers engineered solutions that address specific flexible piping challenges such as vibration,
More informationGUJARAT STATE ELECTRICITY CORPORATION LIMITED
TECHNICAL BID Tender Notice No. : 160/15/W for Works RFQ NO: 32995 NAME OF WORK: Tender for WORK OF HYDRO TESTING, PAINTING AND REFILLING OF CO2 CYLINDERS AND CO2 CARTRIDGES AS AND WHEN REQUIRED BASIS.
More informationBrief history in the Biogas sector. Compressor features. Applications. Product range. Experience
March 2018 Brief history in the Biogas sector Compressor features Applications Product range Experience 2005 FORNOVO GAS supplied the first compressor in a biogas plant in Iceland to compress biomethane
More informationSystem Pressure Manager Standard & System Pressure Manager Plus
System Pressure Manager Standard & System Pressure Manager Plus Installation, Commissioning & Servicing Instructions Note: THESE INSTRUCTIONS MUST BE READ AND UNDERSTOOD BEFORE INSTALLING, COMMISSIONING,
More informationBOXING FEDERATION OF INDIA
BOXING FEDERATION OF INDIA REQUEST FOR PROPOSAL (RFP) FOR ENGAGING SERVICE PROVIDERS FOR ACCREDITATION SYSTEM AND/OR TICKETING SYSTEM HOSTING AIBA WOMEN S WORLD BOXING CHAMPIONSHIP, DELHI, 2018 DATE OF
More informationT E N D E R Tender # T SCOTT SCBA AIR PACKS AND ACCESSORIES SAINT JOHN FIRE DEPARTMENT
T E N D E R Tender # 2011-424002T SCOTT SCBA AIR PACKS AND ACCESSORIES SAINT JOHN FIRE DEPARTMENT Sealed tenders addressed to the Purchasing Agent, c/o Materials and Fleet Management, 2 nd Floor, 175 Rothesay
More informationGuideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society
Guideline No.M-05(201510) M-05 AIR COMPRESSOR Issued date: 20 October 2015 China Classification Society Foreword This Guideline constitutes the CCS rules, and establishes the applicable technical requirements
More informationThe Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times
Tseries Series AB AB Air Air Boosters Boosters The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times.01/1 MANIFOLD MOUNTED VALVES FOR EASY SERVICING
More informationTechnical Information
Technical Information Installation, Operation, Installation, Operation and Maintenance and Maintenance Manual Manual Balston Model 75700-K728 Nitrogen Generator Figure 1-75700-K728 Overall Dimensions These
More informationCENTRE OF BIOMEDICAL RESEARCH
CENTRE OF BIOMEDICAL RESEARCH (Formerly Centre of Biomedical Magnetic Resonance) An Autonomous Centre of Govt. of U.P. Sanjay Gandhi Postgraduate Institute of Medical Sciences Campus, Raebareli Road, Lucknow
More informationBHEL/Trichy-14 CCDP SYSTEM DESCRIPTION FOR DOME VALVE:
BHEL/Trichy-14 CCDP SYSTEM DESCRIPTION FOR DOME VALVE: The Dome Valve is a pressure tight, power operated Valve for application in Material Inlet / Vessel Discharge / Line Change over etc. The Valves should
More informationLiquid ring vacuum pumps in compact design
Liquid ring vacuum pumps in compact design LEM 25, LEM 5 Pressure range: Suction volume flow: 33 to 113 mbar 4 to 6 m³/h CONSTRUCTION SIHI liquid ring vacuum pumps are displacement pumps of uncomplicated
More informationSummary of the MRA LPG Codes of Practice
Summary of the MRA LPG Codes of Practice COP A1 DESIGN and INSTALLATION Code COP A1 deals with above ground installations where LPG is stored under pressure at ambient temperatures in fixed vessels larger
More informationCOMMERCIAL CORRIGENDUM#1 TO BIDDING DOCUMENT
COMMERCIAL CORRIGENDUM#1 Dated: 29.06.2018 TO BIDDING DOCUMENT BIDDING DOCUMENT NO. : MEC/23TS/01/51/D2/T05/SU/0004 SUBJECT OF BIDDING DOCUMENT : SUPPLY OF CNG RECIPROCATING COMPRESSORS (ANNUAL RATE CONTRACT
More information/ /
GN 4- kw/5.5-0 hp Dual Output Compressors (Air/Nitrogen) Driving Nitrogen Forward GN: the dual output solution From cargo blanketing in LNG vessels to the inflation of Formula tires, nitrogen is used in
More informationModel Series 62 Constant Differential Relay
Siemens Industry, Inc. INSTALLATION AND SERVICE INSTRUCTION INTRODUCTION Model Series 62 Constant Differential Relay Rev 11 March 2011 Supersedes Rev 10 The Constant Differential Relay maintains a constant
More informationBOXING FEDERATION OF INDIA REQUEST FOR PROPOSAL (RFP) FOR ENGAGING SERVICE PROVIDERS FOR UNIFORMS FOR
BOXING FEDERATION OF INDIA REQUEST FOR PROPOSAL (RFP) FOR ENGAGING SERVICE PROVIDERS FOR UNIFORMS FOR HOSTING AIBA WOMEN S WORLD BOXING CHAMPIONSHIP, NEW DELHI, 2018 DATE OF ISSUE: October 08, 2018 LAST
More informationInstallation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger
OM008 Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger The operating and maintenance instructions contained within this package are for Pacific water/water
More informationSAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE
SAPAG IMPORTANT NOTICE Contents Important notice 1 0 Valve identification 2 1 Storage 2 2 Installation 2 3 Operation 2 4 Maintenance 3 4.1 Dismantling 3 4.2 Inspection 3 4.3 Repair 3 4.4 Assembly 4 4.5
More informationSr. No. General points CPCB Comments 1. Print option, acknowledgement of submission for CPCB OCEMS Protocol
Dated: - 18-06-2018 General Points Discussed with CPCB on OCEMS Protocol Sr. No. General points CPCB Comments 1. Print option, acknowledgement of submission for CPCB OCEMS Protocol Agreed. After final
More informationAIRMASTER SERIES RF AUTOMATIC DEWATERING VALVES. For the purging of water from compressed air systems WHERE DO YOU NEED AUTOMATIC DEWATERING VALVES
R SERIES RF AUTMATIC DEWATERING VALVES For the purging of water from compressed air systems The series RF is a high capacity automatic dump valve specifically designed to continuously purge water from
More informationHANDBOOK SAFETY DEVICES. Ed SAFETY DEVICES DS-ED 01/ ENG 1
HANDBOOK Ed. 2017 DS-ED 01/2017 - ENG 1 CHAPTER 9 BURSTING DISC DEVICES IN SERIES 3070 SCOPE Use: protection against possible overpressure of the apparatuses listed below, with regard to the operating
More informationGUJARAT STATE ELECTRICITY CORPORATION LIMITED
GUJARAT STATE ELECTRICITY CORPORATION LIMITED ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 CERTIFIED THERM AL PO WE R ST A TION, U K AI U K A I D A M 3 9 4 6 8 0, D I S T R I C T : T A P I Phone
More informationCase study. Rotating Equipment Engineer Qatargas Operating Company. Sr. Rotating Equipment Engineer
Case study Fluctuation of Seal Gas Supply Differential Pressure of Dry Gas Seals Rotating Equipment Engineer Qatargas Operating Company Sr. Rotating Equipment Engineer Qatargas Operating Company Outline
More informationCustomer Responsibilities. Important Customer Information. Cary 4000/5000/6000i UV-Vis spectrophotometer Site Preparation Checklist
Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation
More informationBecker* Products Below Ground Ball Valve Regulators
GE Oil & Gas Becker* Products Below Ground Ball Valve Regulators Reduce Noise Levels at Large Volume Regulator Stations GE s Becker* Below Ground ball valve regulator has the long-term proven reliability,
More informationFIELD TROUBLESHOOTING COMMON MECHANICAL SEAL PIPING PLANS. Michael Huebner Principal Engineer Flowserve Corporation Pasadena, TX USA
FIELD TROUBLESHOOTING COMMON MECHANICAL SEAL PIPING PLANS Michael Huebner Principal Engineer Flowserve Corporation Pasadena, TX USA Ronald Hurst Manager, Application Engineering Flowserve Corporation Pasadena,
More informationSafety Selector Valves Dual Pressure Relief Device System
ANDERSON GREENWOOD Features and enefits Provides a safe, efficient method of switching from an active pressure relief device to a standby, maintaining system overpressure protection regardless of Safety
More informationADDENDUM NO. 1 Tender for Procurement of Catalyst Testing Pilot Plant for Corporate R & D Centre, Greater Noida
ADDENDUM NO. 1 Tender for Procurement of Catalyst Testing Pilot Plant for Corporate R & D Centre, Greater Noida CRFQ Number 1000298594 E-Tender System ID: 34790 1.0 SCOPE OF THIS ADDENDUM 1.1 This Addendum
More informationGuide for Evaluating Your Hose Assembly Supplier
Guide for Evaluating Your Hose Assembly Supplier Supplier Evaluation Checklist, and How to Clearly Define Application Requirements Safe, reliable hose assemblies require appropriate specification work
More informationVPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES 10
/ ED VPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES OPERATING PRINCIPLE The VPPL are variable displacement axial-piston pumps with variable swash plate, suitable for applications
More informationThe routine maintenance and inspection of local exhaust ventilation (LEV)
The routine maintenance and inspection of local exhaust ventilation (LEV) This document details the standards for inspection and maintenance that should be achieved for all local exhaust ventilation owned
More informationTECHNICAL INFORMATION
TECHNICAL INFORMATION Installation, Operation, and Maintenance Balston Model 75-77 Nitrogen Generator Figure 1-75-77 Overall Dimensions These instructions must be thoroughly read and understood before
More informationPressure Systems Safety Regulation
Pressure Systems Safety Regulation Introduction This document informs Faculty of the key requirements of the UK and Chinese Pressure Systems Safety regulations. The aim of these regulations is to prevent
More informationNatural Gas Connection Policy and Procedures
s Updated on: 1 April 18 Table of Contents 1. General Information... 1 1.1 Purpose of this Document... 1 1.2 Singapore Gas Transportation System... 1 1.3 Definitions... 2 1.4 Codes of Practices and Regulatory
More informationREFRIGERATION SYSTEM COMPONENTS
REFRIGERATION SYSTEM COMPONENTS henrytech.com Conventional Oil Separators The function of an Oil Separator is to remove oil from the discharge gas and return it to the Compressor either directly or through
More informationIndian Institute of Technology Kanpur Samtel Centre for Display Technologies
Fax: + 91-0512-2596620 Phones: + 91-0512-2596622,6088 Indian Institute of Technology Kanpur Samtel Centre for Display Technologies Enquiry number: SCDT/FlexE/2016-17/02 Date:05/05/2016 Sealed Quotations
More information776 Cryogenic Safety Valve
776 Cryogenic Safety Valve INTRODUCTION 776 Cryogenic Safety Valve The effects of exceeding safe pressure levels in an unprotected pressure vessel or system, can have catastrophic effects on both plant
More informationWaterSense Specification for Spray Sprinkler Bodies. Version 1.0
Version 1.0 September 21, 2017 WaterSense Specification for Spray Sprinkler Bodies 1.0 Scope and Objective This specification establishes the criteria for labeling bodies of spray sprinklers 1 under the
More informationRequirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants
the pressure equipment safety authority Requirements for Reduced Supervision of Power Plants, Thermal Liquid Heating Systems, and Heating Plants AB-528 Edition 2, Revision 1 Issued 2016-09-12 Table of
More informationREDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2
RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2 REDUNDANT PROPULSION JANUARY 1996 CONTENTS PAGE Sec. 1 General Requirements... 5 Sec. 2 System
More informationFrequently Asked Questions Directive 056 Facilities Technical
Frequently Asked Questions Directive 056 Facilities Technical October 2017 This document clarifies and supports some of the technical requirements related to Directive 056: Energy Development Applications
More information(AS AT 31 st MARCH, 2002)
ACACA PROTOCOL 2000 (AS AT 31 st MARCH, 2002) ACACA PROTOCOL 2000 INCLUDES (A) CODE OF PRACTICE FOR MANUFACTURERS AND/OR SUPPLIERS OF COMMERCIAL AIR COMPRESSORS AND METHOD FOR DETERMINING (B) RECIPROCATING
More informationSEPARATION SEAL UPGRADE TO OVERCOME REPETITIVE FAILURES
SEPARATION SEAL UPGRADE TO OVERCOME REPETITIVE FAILURES Author : Rasgas Pradip B Sonavane (Senior Engineer - Rotating Equipment) AbdelKhalek, Mohamed H (Advisor - Rotating Equipment) Quraisy Shatri (Head
More informationF.No DM(RH)U-16/19/2/ Med. Gases/2003 Dt
EMPLOYEES STATE INSURANCE HOSPITAL Rohini, Sector-15, New Delhi 110089 ` Website: www.esic.nic.in Fax: 27553098 F.No DM(RH)U-16/19/2/ Med. Gases/2003 Dt. 04.12.2014 To TENDER FOR THE SUPPLY OF MEDICAL
More informationCLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)
Page 1 of 10 CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) 1. SCOPE 1.1 To provide definitive requirements for HIGH PRESSURE PNEUMATIC testing of piping systems according to ASME B31.3. This
More informationTENDER SPECIFICATION No: 12/ of SUPERINTENDING ENGINEER (CTI & ENQUIRIES), Dt
1 TENDER SPECIFICATION No: 12/2018-19 of SUPERINTENDING ENGINEER (CTI & ENQUIRIES), Dt. 08.01.2019 Specification for Supply of Standard Calibration Gas Mixture in the ranges of 5PPM and 100PPM filled in
More informationCity of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid
City of Conway Mayor s Office 1201 Oak Street Conway, AR 72032 www.cityofconway.org Invitation and Bid 2010-25 INVITATION TO THE VENDOR ADDRESSED: Bidders are invited to furnish the items listed herein
More informationImage courtesy of CGG NEUMAN & ESSER SEISMIC AIR POWER SYSTEMS
Image courtesy of CGG NEUMAN & ESSER SEISMIC AIR POWER SYSTEMS COMPANY Profile NEUMAN & ESSER GROUP (NEA) was founded in 1830 and is headquartered in Übach-Palenberg, Germany. The manufacturer of reciprocating
More informationCompAir provide high quality and reliable Nitrogen solutions
Nitrogen Compressor Guide CompAir provide high quality and reliable Nitrogen solutions Technical Data Model Typical Inlet Pressure Max Pressure Typical FAD Drive Bar PSI Bar PSI m³/hr CFM kw HP 5209 B
More information97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO
97C COMPRESSOR KIT 12V PART NO. 00097 97C COMPRESSOR KIT 24V PART NO. 02497 98C COMPRESSOR KIT PART NO. 00098 97C 98C IMPORTANT: It is essential that you and any other operator of this product read and
More informationNATIONAL CENTER FOR COMBUSTION RESEARCH AND DEVELOPMENT (NCCRD) INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI , INDIA
NATIONAL CENTER FOR COMBUSTION RESEARCH AND DEVELOPMENT (NCCRD) INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI 600036, INDIA Ref. No. ICS/11-12/013/DSTX/TSUN Date: 14 July 2016 Due date: 4 Aug. 2016 Item
More informationHOW TO NOT MEASURE GAS - ORIFICE. Dee Hummel. Targa Resources
HOW TO NOT MEASURE GAS - ORIFICE Dee Hummel Targa Resources Introduction Measuring natural gas is both a science and an art. Guidelines and industry practices explain how to accurately measure natural
More informationSTANDARD FOR CONTROL VALVE SEAT LEAKAGE
11-3 STANDARD FOR CONTROL VALVE SEAT LEAKAGE 1. PURPOSE 1.1 This standard establishes a series of seat leakage classes for control valves and defines the test procedures. 2. SCOPE & LIMITATIONS 2.1 Selection
More informationCommittee on NFPA 85
Committee on NFPA 85 M E M O R A N D U M TO: FROM: NFPA Technical Committee on Heat Recovery Steam Generators Jeanne Moreau DATE: April 23, 2010 SUBJECT: NFPA 85 F10 ROC Letter Ballot The ROC letter ballot
More informationAirSep PSA Nitrogen Systems
AirSep PSA Nitrogen Systems For Commercial Applications AirSep Corporation An Organization with a Global Presence Quality and long-term value are built into every AirSep product for total customer satisfaction.
More informationHYDROGEN UNIT CHAPTER-4 UTILITY SYSTEM DESCRIPTIION
CHAPTER-4 UTILITY SYSTEM DESCRIPTIION The different utility systems provided in Hydrogen Generation Unit for its smooth operation are described in this chapter. They include 1. Service water 2. Cooling
More informationSPORTS AUTHORITY OF INDIA NETAJI SUBHAS REGIONAL CENTRE, SAROJINI NAGAR, KANPUR ROAD, LUCKNOW
SPORTS AUTHORITY OF INDIA NETAJI SUBHAS REGIONAL CENTRE, SAROJINI NAGAR, KANPUR ROAD, LUCKNOW TENDER FOR SUPPLY OF TWO COMPLETE SET BOXING RING SAI/NSRC/46/Boxing Ring/2014 Tenders are invited by Sports
More informationPROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES
NB16 0603 NR Task Group 1 9 16 1. One update by NR task group page 3: 7/17/19 2. Two updates to S6.1 and S6.3 on page 1: 7/19/17 SUPPLEMENT 6 PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES
More information4-7 kw/ hp. Dual Output Compressors (Air/Nitrogen) Driving Nitrogen Forward
GN 4-7 kw/5.5-10 hp Dual Output Compressors (Air/Nitrogen) Driving Nitrogen Forward Total capability, total responsibility Right at the heart of your business, Atlas Copco delivers quality compressed air
More informationAB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS
AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS 1. AB Amber Grid Rules for Natural Gas Transmission System Balancing (hereinafter - the Rules) are designed to identify
More information