CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

Size: px
Start display at page:

Download "CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT"

Transcription

1 CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT October 1, 2018

2 CONSTRUCTION STATUS MONTHLY REPORT 10/2018 Project Description Contractor East Cherokee Dr at Old Hwy 5 Notice to Proceed Estimated Completion Date Current Contract Amount Earned to Date % Complete Intersection Improvements CMES, Inc. 2/15/2017 5/15/2018 $ 2,827, $ 2,713, % Project complete. Status East Cherokee Dr at Gaddis Rd/Chadwyck Ln Roundabout Baldwin Paving Company, Inc. 6/12/ /8/2017 $ 1,525, $ 1,561, % Project complete. Hickory Rd at Stringer Rd/ Carriage Ln Intersection Improvement and Traffic Signal Installation Glosson Enterprises 9/5/2017 9/30/2018 $ 1,228, $ 914, % Contractor working on correction items. Countywide Traffic Signal Upgrade and Timing Project; PI Traffic signal upgrades at 37 intersections - GDOT funded GTG Traffic Signals, Inc. 1/17/2018 7/15/2018 $ 517, $ - 0% Approximately 56% of the intersections have been upgraded with new signal heads, new traffic signal cabinets and flashing yellow leftturn arrows. Countywide Traffic Signal Signing and Striping Upgrade Project Signing and Striping upgrades at 37 intersections - County funded GTG Traffic Signals, Inc. 2/15/2018 5/15/2018 $ 239, $ - 0% 70% striping work completed. 100% concrete work completed. Signs still remaining to be installed. Work completed in conjunction with GDOT project. Bells Ferry Road at Ridge Road Intersection Improvement and Traffic Signal Installation Bartow Paving Company, Inc. 5/21/ /16/2018 $ 1,037, $ 647, % Project about 70% complete. Concrete work complete. Signal work to be completed mid October Final paving to be completed beginning November Batesville Road at Lower Birmingham Road Sixes Road at Wellstar Way (Gresham Mill Parkway) Intersection Improvement Bartow Paving Company, Inc. 7/23/ /19/2018 $ 412, $ - 0% Traffic Signal Installation GTG Traffic Signals, Inc. 8/6/ /3/2018 $ 154, $ 28, % Clearing work and utility relocation have started. Storm pipe work to take place in October All signal poles have been installed. Signal to be in operation by end of October Page 2 of 7

3 CONSTRUCTION STATUS MONTHLY REPORT 10/2018 Project Description Contractor Notice to Proceed Estimated Completion Date Current Contract Amount Earned to Date % Complete Status John Tate Road cul-desac Reconstruct Cul-de-sac Bobby Tucker Trucking, Inc. 6/11/2018 9/8/2018 $ 144, $ 111, % Paving completed. Contractor working on correction items Resurfacing Project Resurfacing 17.3 miles of roadways Bartow Paving Company, Inc. 5/29/ /24/2018 $ 3,535, $ 2,284, % Contractor has paved 65% of roads. On schedule to complete project by end of November East Cherokee Dr at Tripp Road Intersection Improvement and Traffic Signal Installation Bartow Paving Company, Inc. TBD TBD $ 689, $ - 0% Awaiting contracts to be executed. Pre-Construction Meeting scheduled for November 1, CCWSA relocation work in progress. SR 140 at Lower Burris Rd/Puckett Creek Rd Intersection Improvements & Traffic Signal Installation TBD TBD TBD TBD TBD TBD Project includes installation of left-turn lanes and a traffic signal on SR 140 at Lower Burris Road and Puckett Creek Road. Bids to be received October 11, Stover Road Improve substandard County road and realign intersection with Univeter Road In-house by Roads & Bridges 100% Project complete. Brick Mill Road Reconstruction - SR 140 to Buford West Way In-house by Roads & Bridges 45% Grading and re-alignment complete. Concrete curb, gutter and driveway apons complete. Stone base 50% setup. Paving expected week of 10/1. Recreation Lane Rosewood Circle Garland Mountain Trail Pave unpaved portion of a County road Pave unpaved portion of a County road Pave unpaved portion of a County road In-house by Roads & Bridges 100% Project complete. In-house by Roads & Bridges 10% In-house by Roads & Bridges 40% All utility conflicts to be resolved by 10/5/18. Base preparation and grading complete. Paving expected week of 10/15. Page 3 of 7

4 PRE-CONSTRUCTION STATUS MONTHLY REPORT 10/2018 Project Description Consultant/Designer Earney Road Hames Road Roadway Reconstruction - Old Country Place to Capital City Club property Roadway Reconstruction - SR 92 to Jamerson Road; includes roundabout at S. Jett Road intersection Proposed Letting Date American Engineers, Inc. (AEI) Winter 2019 Atwell Group (LAI) TBD Design / Pre-Construction Status Updating utility plans, erosion control plans and quantities to prepare plans for bidding. Right-ofway acquisition is complete - verification of current owners still needed. Will need temporary construction easements from adjacent property owners; plans being updated with new right-of-way information. Project design is approximately 90% complete and under review. Right-of-way and construction easements still to be acquired. Designer addressing latest comments from Engineering. R/W Parcels (closed/req'd) 18/44 0/52 Comments Project includes reconstruction of Earney Road from Old Country Place to Capital City Club Project includes reconstruction of Hames Road from SR 92 to Jamerson Road, including the installation of a roundabout at the intersection of Hames Road and S. Jett Road. Curb and gutter and sidewalk will be installed along the entire length of Hames Road. East Cherokee Dr at SR 140 (PI ) Intersection Improvements & Traffic Signal Modification AMEC, Inc. & Moreland-Altobelli Assoc, Inc. (MAAI) Fall 2019 Plans updated to meet current GDOT standards. GDOT approved ROW plans. Appraisal preparation and review in progress. Utility certification complete. All comments from GDOT FFPR have been addressed. Right-of-way acquisition to proceed once appraisals are approved by GDOT. Designer and appraiser still working on some cost to cure issues for appraisals. 0/22 Project includes providing right-turn lanes on all quadrants of intersection. GDOT has committed to fund $1,000,000 of construction cost dependent upon approval of environmental document. NEPA document approved ; Utilities certified 4/2018. East Cherokee Drive at South Holly Springs Rd/Thornwood Dr. Intersection Improvements AECOM Winter 2019 Construction and right-of-way plans complete. Plans being updated to meet current GDOT and EPD ES&PC standards. Updated Traffic Signal Warrant Study completed - intersection still does not warrant a traffic signal installation. ACOE permit received on 10/16/2017. Right-of-way acquisition in progress. 0/15 Project includes providing left-turn lanes and deceleration lanes on East Cherokee Drive for both South Holly Springs Road and Thornwood Drive. SR 140 at Darnell Road Intersection Improvements BM&K Construction & Engineering, Inc. TBD Design is being reviewed by County. All utility companies have located their facilities that are in conflict. Plans submitted to GDOT for review. 0/6 Project includes adding left-turn lane from westbound SR 140 to Darnell Road. Canton Road Sidewalk Project (PI ) Installation of sidewalk on west side of Canton Road from Cobb Co line to Stockwood Drive Moreland-Altobelli (MAAI) Fall 2018 Project revised to include 5 ft sidewalk vs 6 ft sidewalk to minimize utility relocations and right-ofway acquisitions. Revised concept report approved by GDOT on 12/21/2017. Parcel appraisals being updated to reflect recent plan changes. Appraisals approved by GDOT. Notice to proceed with Right-of-way acquisition issued on 5/2/18. 13/16 Project is 80% federally funded, designed per GDOT PDP. Concept report has been approved. Bells Ferry Road South of Steels Bridge Road Trickum Road at Wagon Trail/Trickum Hills Dr Intersection Improvements - Improve sight distance on NB approach to Bells Ferry Rd/Steels Bridge Atwell Group (LAI) Construction and right-of-way plans complete. Project on hold. Plans will need updating. intersection Intersection Improvements Keck & Wood, Inc. Construction and right-of-way plans complete. Project on hold. Plans will need updating. Project includes providing a center left turn lane for both side roads. Page 4 of 7

5 PRE-CONSTRUCTION STATUS MONTHLY REPORT 10/2018 Project Description Consultant/Designer Bells Ferry Road - Southfork Way to Victoria Road (PI ) Proposed Letting Date Widening from 2 to 4 lanes VHB, Inc Design / Pre-Construction Status GDOT restarted design phase. Survey is complete. Logical termini approved by FHWA in May Public Information Open House held in April Consultant reviewing and responding to comments received at PIOH. R/W Parcels (closed/req'd) 141 Comments GDOT design and construct. County to acquire right-of-way. Project limit revised to end at Victoria Road. GDOT is proposing to use HB 170 funds for construction. Bells Ferry Road over Little River/Lake Allatoona (PI ) Bridge Replacement Project VHB, Inc GDOT restarted design phase. Survey is complete. Updated concept report has been submitted to GDOT. Working with ACOE and marina owners regarding permitting needs and impacts to marina operations. Public Information Open House held in April Consultant reviewing and responding to comments received at PIOH. 1 GDOT design and construct. County to acquire right-of-way. GDOT working to bid with Bells Ferry Road project. County will look at possibility of advanced acquisition of restaurant parcel. Bells Ferry Road at Kellogg Creek Road and Victory Drive Towne Lake Area Multi-use Path Intersection Improvement - Design Southeastern Engineering, Inc. (SEI) 2019 Multi-use Trail - Design Moreland-Altobelli (MAAI) Fall 2018 Heard Road Extension Scoping Study VHB, Inc. Field surveys are complete. Public Information Open House held in April Plans update per new traffic count information and comments received at PIOH. Field surveys are complete. Designer working on concept layout. Designer completing Phase I - Towne Lake Hills South Dr to Towne Lake Hills East/West Dr. Consultant has completed preliminary alignment and is working on details and cost estimate. Concept with new typical section and project phasing has been submitted to the County for review. Intersection improvement(s) to improve traffic flow at the Bells Ferry Road/Kellogg Creek Road/Victory Drive intersection(s). Project also includes improving horizontal alignment on Victory Drive in vicinity of Patriots Park. Current curve does not meet standards for posted speed limit. Multi-use trail along Parkside Lane and Towne Lake Parkway, from Towne Lake Hills South Drive to Bells Ferry Road. Will be constructed in phases. Scoping study to determine project scope, schedule and budget. Determine path for potential roadway and right-of-way needs. Determine environmental permitting requirements and potential utility conflicts. Noonday Creek Trail Extension Scoping Study Heath & Lineback Engineers Cobb County has approved alignment to Noonday Park. Revised concept report submitted to GDOT on 12/15/2017. Federal funds have been awarded for design, right-of-way and construction phases. City of Woodstock to solicit RFP's for design services in Fall Scoping study to determine feasibility of extendin Noonday Creek Trail from SR 92 south to Shallowford Road/Noonday Park in Cobb County. County is the project manager - City of Woodstock is funding project. Little Road Widening and improvements - Hickory Road to Vaughn Road Moreland-Altobelli (MAAI) TBD Preliminary plan comments have been addressed. Plan revisions continue as a result of right-of-way negotiations. Right-of-way acquisition complete. Plans being revised to address right-of-way acquisitions. Completed Plans originally designed in-house. An EPD stream buffer variance and an ACOE Nationwide permit for stream impacts have both been obtained in summer Union Hill Road - Bridge over Canton Creek Bridge replacement/upgrade project Heath & Lineback Engineers 30% plans received in September Geotechnical work scheduled for October Project includes replacement of substandard bridge on Union Hill Road over Canton Creek. Union Hill Road - Bridge over Mill Creek Bridge replacement/upgrade project Heath & Lineback Engineers Field surveying in progress. Geotechnical work scheduled for October Project includes replacement of substandard bridge on Union Hill Road over Mill Creek. Lower Dowda Mill Road - Bridge over Sharp Mountain Creek Bridge replacement/upgrade project Heath & Lineback Engineers Field surveying in progress. Geotechnical work scheduled for October Project includes replacement of substandard bridge (one lane - wood deck) on Lower Dowda Mill Road over Sharp Mountain Creek Page 5 of 7

6 PRE-CONSTRUCTION STATUS MONTHLY REPORT 10/2018 Project Description Consultant/Designer Wrights Mill Road Hunter Trail/Hunter Road Widen, improve and resurface a substandard width roadway Widen, improve and resurface a substandard width roadway BM&K Construction & Engineering, Inc. Southeastern Engineering, Inc. (SEI) Proposed Letting Date Design / Pre-Construction Status Designer is looking at improvements at both ends of the project - up to Wrights Mill Court from south and Wright Mill Way from north. Construction plans 95% complete. Designer working on completing right-ofway plans. Designer updating the final plans with utility comments and has submitted plans to County for review. Right-of-way acquisition authorized on 10/4/2018. R/W Parcels (closed/req'd) 0/12 0/19 Comments Project includes improving vertical alignment and pavement widening of Wrights Mill Road to bring it up to current County standards. Project includes bringing Hunter Trail/Hunter Road up to current County standards. S. Cherokee Lane Improve a substandard County roadway BM&K Construction & Engineering, Inc. Construction plans have been submitted to the County for review. Project includes improving horizontal and vertical alignment on 3,000 feet of substandard roadway. Martin Lane Widen and pave a substandard width roadway In-house design In-house Right-of-way agent has visited all property owners. Approximately half support project and are willing to donate right-of-way. The other half are opposed to widening. Based upon results of right-of-way acquisitions, it is recommended that we pave this roadway as-is and achieve maximum pavement width within existing right-of-way. Kellogg Creek Road at Jacobs Road Toonigh Road Trickum Road - Sycamore Lane to Belles Lane Trickum Road - Gunnin Road to Barnes Road Univeter Road at Pinecrest Road Univeter Road at New Light Road Woodstock Road at Victory Drive Wiley Bridge Road at Cox Road Lower vertical curve at intersection with Jacobs Road Lower vertical curve at Deerfield Drive Southeastern Engineering, Inc. (SEI) In-house design In-house In-house Awaiting utility companies to locate and redesign their facilities on the latest construction plans. Rightof-way acquisition authorized on 10/1/2018. Plans are complete. Minimal right-of-way and easements required. Installation of a center left-turn lane Arcadis Project kick-off meeting scheduled for 10/24/2018. Installation of left-turn lanes Arcadis Project kick-off meeting scheduled for 10/24/2018. Intersection Improvement Intersection Improvement and Traffic Signal Installation Roundabout Roundabout MaesAwyr, LLC Southeastern Engineering, Inc. (SEI) Southeastern Engineering, Inc. (SEI) Southeastern Engineering, Inc. (SEI) Project kick-off meeting to be scheduled for end of October. Project kick-off meeting to be scheduled for end of October. Project kick-off meeting to be scheduled for end of October. Project kick-off meeting to be scheduled for end of October. 0/6 Project includes improving vertical geometry on Kellogg Creek Road to improve visibility at Jacobs Road intersection and approach to 90 degree curve. This improvement will improve sight distance at approach to Blalock Road. Roadway improvements include installation of a center left-turn lane for entire length and installation of sidewalk along the west side of the corridor. Consultant will evaluate the corridor and make a recommendation as to the best solutions and configurations for a proposed typical section - including left-turn lanes, operational improvements and sidewalk. Project includes intersection realignment and installation of a left-turn lane on Univeter Road at Pinecrest Road. Project includes intersection realignment and installation of a left-turn lane on Univeter Road at New Light Road and the installation of a traffic signal. Intersection improvements that include the installation of a roundabout. Intersection improvements that include the installation of a roundabout. Copper Creek Drive Sidewalk Installation of sidewalk on the east side of Copper Creek Drive Keck & Wood, Inc. Project kick-off meeting to be scheduled for end of October. This project includes the construction of sidewalk along the east side of Copper Creek Drive, between Sixes Road and Garnet Court. Page 6 of 7

7 PRE-CONSTRUCTION STATUS MONTHLY REPORT 10/2018 Project Description Consultant/Designer Proposed Letting Date Design / Pre-Construction Status R/W Parcels (closed/req'd) Comments Trickum Road at SR 92 Intersection Improvement Project TBD Federal funds have been awarded for right-of-way and construction phases. County is soliciting for engineering design services. Intersection improvements project to include dualleft-turn lanes and receiving lanes on northbound and southbound Trickum Road approaches to SR 92. Also includes reconfiguration of Trickum Road at Gunnin Road intersection. 575 at Towne Lake Parkway Interchange Operational Improvements Scoping Study TBD Federal funds have been awarded for additional scoping studies/concept report development. County is soliciting for engineering design services. Scoping study to determine project scope, schedule and budget to program possible State funds and future SPLOST funds. 575 at Ridgewalk Parkway Interchange Operational Improvements Scoping Study TBD Federal funds have been awarded for additional scoping studies/concept report development. County is soliciting for engineering design services. Scoping study to determine project scope, schedule and budget to program possible State funds and future SPLOST funds. Rhine Road Right-of-way Research In-house Engineering. In-house Complete. Roper Road Right-of-way Research In-house Engineering. In-house Complete. McCurley Road Right-of-way Research In-house Engineering. In-house Complete. Collett Drive Right-of-way Research In-house Engineering. In-house Complete. Old Jones Road Right-of-way Research In-house Engineering. In-house In-progress. Brown Road Right-of-way Research In-house Engineering. In-house In-progress. Rampley Trail Right-of-way Research In-house Engineering. In-house Complete. Gannt Road Right-of-way Research In-house Engineering. In-house In-progress. Lula Payne Trail Right-of-way Research In-house Engineering. In-house Complete. Westbrook Road Right-of-way Research In-house Engineering. In-house Complete. Page 7 of 7

8 HICKORY ROAD AT STRINGER ROAD INTERSECTION

9 BELLS FERRY ROAD AT RIDGE ROAD INTERSECTION IMPROVEMENT

10 JOHN TATE ROAD CUL-DE-SAC PROJECT

11 2018 RESURFACING PROJECT AT BALLGROUND HWY

12 BRICK MILL ROAD RECONSTRUCTION

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT December 10, 2018 CONSTRUCTION STATUS MONTHLY REPORT 12/2018 Project Description Contractor Notice to Proceed Estimated Completion

More information

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT

CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT CHEROKEE COUNTY ROADWAY CAPITAL PROGRAM MANAGEMENT PROJECT STATUS REPORT December 29, 2017 CONSTRUCTION STATUS MONTHLY REPORT 12/2017 Project Description Contractor Notice to Proceed Estimated Completion

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Fleur Drive Reconstruction

Fleur Drive Reconstruction Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths

More information

SC 41/Joe Rouse Intersection Improvements

SC 41/Joe Rouse Intersection Improvements SC 41/Joe Rouse Intersection Improvements Scope: Add dual left-turn lanes from Joe Rouse Road onto southbound SC 41 to reduce re-occurring peak hour congestion, particularly the AM peak. Construction Cost

More information

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7

More information

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Route 47 (North Main Street) Reconstruction

Route 47 (North Main Street) Reconstruction TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Readington Road (C.R. 637) Construction

Readington Road (C.R. 637) Construction Public Information Meeting Thursday, August 2, 2012 Readington Road (C.R. 637) Construction from Dreahook Road to Harlan School Road Branchburg Township, Somerset County Readington Township, Hunterdon

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge

More information

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

APPENDIX E GRADE CROSSING LOCATIONS

APPENDIX E GRADE CROSSING LOCATIONS APPENDIX E GRADE CROSSING LOCATIONS 1 2 3 Citrus Avenue Riverside County and City Palmyrita Avenue Columbia Avenue MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3 027303M 1. Existing

More information

Washington St. Corridor Study

Washington St. Corridor Study FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs

More information

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project City of RE 4APNOIPF Vh, X` W\ YII PTC ING, CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: From: Agenda Item: Honorable Mayor and City Council Members Ron Rosenthal, Engineering

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

Meeting Notes. PIM Meeting #1 CTH D Reconstruction Nenno Road to Canadian National Railroad Town of Wayne Washington County

Meeting Notes. PIM Meeting #1 CTH D Reconstruction Nenno Road to Canadian National Railroad Town of Wayne Washington County Meeting Notes PIM Meeting #1 CTH D Reconstruction Nenno Road to Canadian National Railroad Town of Wayne Washington County Attendees: Date/Time: Location: See attached sign in sheet October 25, 2017; 6:00

More information

Cincinnati Dayton Rd Widening

Cincinnati Dayton Rd Widening Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project

More information

Rio Intersection Traffic Restrictions Begin Monday

Rio Intersection Traffic Restrictions Begin Monday May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report UPC Design 70762 / CN 109813 Locally Administered PE Phase VDOT Administered

More information

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017 EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses

More information

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004 Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3

More information

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. 4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification

More information

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM,

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, PROJECT NAME: Glade Road/Clark Creek Bridge PROJECT #: CB101 PROJECT DESCRIPTION: Safety improvements of Estimated Cost: 8,316,364 section of Glade Road from Misty Valley Drive to County: Brandy Lane including

More information

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018 Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road

More information

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building. CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED

More information

Multi-Modal Traffic Analysis. Parisi and Associates

Multi-Modal Traffic Analysis. Parisi and Associates Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report UPC 70762 Locally Administered PE Phase VDOT Administered CN Phase 4/6/17 1 Project

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION

GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION 1 of 7 June 20, 2007 GENERAL: The following guidelines shall be used in the determination of the requirement for left turn lanes for development projects and

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

Route 15 Congestion Report Findings

Route 15 Congestion Report Findings Route 15 Congestion Report Findings Briefing To Loudoun County Board of Supervisors May 18, 2016 1 Overview: Previous Studies: Route 15 Corridor, Leesburg to Maryland Route 15 Congestion Report: Between

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities Approved: Policy: 20-004(P) Responsible Office: Planning Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities I. POLICY STATEMENT: This policy

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

I-70 NEW STANTON INTERCHANGE

I-70 NEW STANTON INTERCHANGE I-70 NEW STANTON INTERCHANGE Westmoreland County, PA Submitted by: PROJECT DESCRIPTION Situated adjacent to the PA Turnpike (I-76) and Interstate 70 in Westmoreland County, New Stanton bills itself as

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

SECTION 3 STREET DESIGN

SECTION 3 STREET DESIGN 3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed

More information

David Agacinski FDOT District One Bicycle & Pedestrian Coordinator Daniels Parkway Ft. Myers, Florida 33913

David Agacinski FDOT District One Bicycle & Pedestrian Coordinator Daniels Parkway Ft. Myers, Florida 33913 Meeting Notes Date: December 20, 2018 Project #: 20166 To: David Agacinski FDOT District One Bicycle & Pedestrian Coordinator 10041 Daniels Parkway Ft. Myers, Florida 33913 From: Project: Subject: Patty

More information

Mark Malone, P.E. SD DOT

Mark Malone, P.E. SD DOT Mark Malone, P.E. SD DOT SD10 Grading & Surfacing From 8 th Ave W to 8 th Ave E 1 mile plus transition lengths Complete Urban Reconstruction Grading, C&G, Storm Sewer, Sidewalk, Concrete Surfacing Railroad

More information

Revisions to Larimer County Urban Area Street Standards (2016 Update)

Revisions to Larimer County Urban Area Street Standards (2016 Update) 1.9.2 B 1-18 Street Construction Policy 1.14 (new) 1-29 Complete Streets in Fort Collins 4.1.1 04-01 General 4.1.3 04-01 Capacity and Safety Issues 4.1.3 B 04-02 Pedestrian Traffic Considerations 4.1.4

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1

More information

TRANSPORTATION IMPROVEMENT PLAN

TRANSPORTATION IMPROVEMENT PLAN Administration -- $675,000 $692,000 $709,000 -- -- 1 Interfund Transfer (Rural Roads) -- $1,280,000 $1,296,000 $1,312,000 -- -- 2 Economic Development Fund -- $7,000,000 -- -- -- -- 3 City of Cottleville

More information

Board of Supervisors February 27, 2017

Board of Supervisors February 27, 2017 : Traffic Analysis Results & Draft Conceptual Plan Board of Supervisors February 27, 2017 Transportation Solutions Building Better Communities Presentation Overview Background Summary of Traffic Analysis

More information

ADA PRESENTATION (CURB RAMPS)

ADA PRESENTATION (CURB RAMPS) ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly

More information

APPENDIX L. Design Criteria

APPENDIX L. Design Criteria APPENDIX L Design Criteria DRAFT PRELIMINARY DESIGN CRITERIA Page 1 of 18 APPROVALS MANAGER, ENGINEERING CITY OF HAMILTON MANAGER, ENGINEERING REGION OF HALTON DATE This Design Criteria for the New East-West

More information

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd. DRAFT PROJECT PAGE July 12, 2007 Main St / Broadway Rd (SR 1579) Project Statement Project Recommendation: From Avent Ferry Rd (NC 42) to the Harnett County line, Broadway Rd/Main St is recommended to

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement. 1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening

More information

Transportation and General Civil Engineering Projects

Transportation and General Civil Engineering Projects Continuing Engineering Services for Transportation and General Civil Engineering Projects Broward County, Florida Why Atkins 2 Existing and Past Clients 3 25+ years Experienced in Civil Engineering PM

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Building Great Neighbourhoods STRATHEARN

Building Great Neighbourhoods STRATHEARN Building Great Neighbourhoods STRATHEARN Public Involvement Community League Meeting #1: October 5, 2015 Public Meeting #2: March 15, 2016 Public Meeting #3: January 17, 2017 Building Great Neighbourhoods

More information

ROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12

ROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12 ROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12 3.0 HARLEM VALLEY TRANSPORTATION PLAN Incorporates transportation systems management and safety improvements. Location: Route 22 corridor

More information

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 1 Edric Kwan, Public Works Director Josh Peterman, Principal, Fehr and Peers Shawn Knapp, Senior

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD

SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD FINAL ROUTE AND POND STUDY PROJECT NO. C-9570.10 Prepared for: Pasco County

More information

State Route 160 (Blue Diamond Highway)

State Route 160 (Blue Diamond Highway) State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.

More information

Swamp Road Residents Study

Swamp Road Residents Study Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA PROJECT CONCEPT REPORT

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA PROJECT CONCEPT REPORT DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA PROJECT CONCEPT REPORT Project Type: Intersection P.I. Number: 0012625 Improvement GDOT District: 7 Federal Route Number: State Route Number: 9 Project Number:

More information

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Recommended Roadway Plan Section 2 - Land Development and Roadway Access Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison 20 minute presentation on proposed project Comments and Questions following presentation 2016 2017 Replace concrete pavement & base Replace curb and sidewalk as needed Proposed contra-flow bike lane Replace

More information

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION The City of Starke is currently a bottleneck for traffic traveling along U.S. 301 in Bradford County. Local urban traffic combined with increasing

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

RED BANK CORRIDOR. Community Partners Committee Meeting Madisonville Recreation Center. May 21,

RED BANK CORRIDOR. Community Partners Committee Meeting Madisonville Recreation Center. May 21, RED BANK CORRIDOR Community Partners Committee Meeting Madisonville Recreation Center May 21, 2013 RED BANK CORRIDOR PROJECT Create a balance of mobility and access to better serve local communities, businesses

More information

State Street and Pierce Park Lane Intersection Concept Report

State Street and Pierce Park Lane Intersection Concept Report State Street and Pierce Park Lane Intersection Prepared for September 2017 Prepared by CITATION Parametrix. 2017. State Street & Pierce Park Lane Intersection. Prepared by Parametrix, Boise, ID. September

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information