Crystal City Citizen Review Council Meeting. July 10, 2013

Size: px
Start display at page:

Download "Crystal City Citizen Review Council Meeting. July 10, 2013"

Transcription

1 Crystal City Citizen Review Council Meeting July 10, 2013

2 Topics to be covered Overview of Crystal City Transportation Projects Capital Program Investments Regional Coordination 9

3 Program Overview Crystal City Streets Program Crystal City Sector Plan & Multi-Modal Study Phased Street Improvements from Initial projects recommended to mitigate existing transportation issues in Crystal City Improvements & expansion to multimodal network Supports transit, future density, redevelopment

4 Crystal City Streets Projects Crystal Drive Two-Way Conversion (Phased Construction ) 12 th Street South Extension (Construction FY 2014) South Clark-Bell Street Extension (Construction FY 2014) 15 th Street South Realignment (Construction FY 2014) Projects in or Completed Concept Design: South Eads Street, 23 rd Street South, 18 th Street South, Crystal Drive Two-Way Conversion: 27 th Street South to Route 1 Crystal Drive Two-Way Conversion Ph 3 Crystal Drive Two-Way Conversion Ph 2 South Clark- Bell Street 12 th Street South Extensional j Crystal Drive Two-Way Conversion Ph 1 15 th Street South Extension

5 Crystal City Streets In-Construction Crystal Drive Two-Way Conversion Phase 1 & Phase 2 Redesign Crystal Drive from one direction to two directions, bicycle lanes, signals, street lights, street trees Challenges: Underground Garage Location, Private infrastructure in Public Right of Way, Coordination with Private Construction Waterproofing 1300 Crystal Drive s Underground Garage Crystal Drive Phase 1 Concept Plan

6 Crystal City Streets In-Construction 12 th Street South Extension Private and Public development o Arlington County 96-inch Stormwater Pipe Relocation Construction Start: August 2013 o Private Metropolitan Park 3 (Kettler) Eastbound Only Road Connection between South Fern and South Eads Street Challenges Coordination with Private Developers, Unknown Underground Utilities Crystal City Sector Plan

7 Crystal City Streets Program Anticipated Procurements in FY 2014 Construction of Crystal Drive Phase 3-26th St. South to 27th St. South Construction of 15th Street South Extension Construction of South Clark/Bell Street

8 South Clark-Bell Street Crystal City Streets Program Create Street Grid for North Portion of Crystal City Phased Improvements for Demolition of Elevated S Clark Street Establish Northbound Cycle Track for S Clark Street between 12 th Street South and 15 th Street South Crystal City Sector Plan Establish new street trees, on-street parking, traffic signal and street lights Create curb alignment for 15 th Street South Extension project Challenges: Temporary Construction Easements Needed from Private Developers, Underground Infrastructure, Utility Identification and Relocations S Clark-Bell Concept Plan

9 Crystal City Streets Program Crystal Drive Phase 3 26 th St S to 27 th St S Redesign Crystal Drive from one direction to two directions, bicycle lanes, signals, street lights, street trees Challenges: Underground Garage Location, Private infrastructure in Public Right of Way, Coordination with Private Construction Crystal Drive Phase 3 Concept Plan Challenge: Underground Garage Stormwater Catch Basin for Street

10 Crystal City Streets Program 15 th Street South Extension Realignment of 15 th Street South to include new bicycle facilities, on-street parking, new signals and street lighting Creation of Curb Alignment for 15 th Street Garden Park. DPR to Plan Park with Community Planning and Construction Paired with South Clark-Bell Street project Crystal City Sector Plan 15 th Street Challenges: Extensive Underground Infrastructure, Coordination with DPR and Private Developers

11 Crystal City Transit Projects Crystal City Multimodal Center Crystal City Station Access Improvements Crystal City Potomac Yard Transitway Crystal City Streetcar Bus Stop Improvement Program Transit Service Planning

12 Crystal City Multimodal Center Expanded capacity for buses and shuttles to serve Crystal City Metrorail Station and vicinity Interim solution in advance of streetcar and redevelopment Project is fully funded with local and state sources Currently in concept development

13 Crystal City Station Access Improvements Additional access point to Crystal City Metrorail Station in vicinity of Crystal Drive Improve access for all users and modes of access Identified in CIP, but full funding plan not developed Currently in conceptual planning

14 Crystal City/Potomac Yard Transitway Dedicated lanes for transit and station stops with unique architecture and passenger amenities Next step in evolution of surface transit in Arlington Fully funded with local, state, and federal sources Two phases First Phase Bus, Second Phase Streetcar Final design is complete 21

15 Route 1 Corridor Streetcar Streetcar line connecting Pentagon City, Crystal City, and Potomac Yard Connects to Columbia Pike Streetcar line with potential for future extension into Alexandria Funding plan in CIP with local and state sources Currently in conceptual design and environmental clearance

16 Capital Project Planning Arlington Transportation Program Characteristics Adopted FY year total = $981 million * does not include new regional funding TIF Revenue Bonds 6% PAYG 9% TIF 5% TCF Revenue Bonds 13% Revenues Federal 12% State 14% Developer 4% Local Initiatives 2% Paving 12% Complete Streets 28% Expenditures Transit 58% TCF 23% GO Bond 14% capitalimprovementprogram/page78312.aspx 23

17 Capital Project Planning (Adopted FY13 FY 22 CIP) Crystal City, Potomac Yard, Pentagon City ($1,000 s) Project/ Program Prev. Funding TCF TIF County PAYG GO Bond Rev. Bond Fed State Funding Through 2022 Total Project Cost Crystal City Streets 8,680 28,626 20, ,327 60,269 Boundary Channel Drive Interchange , ,500 10,835 10,835 Army Navy Drive Street Improvements , ,775 5,843 5,843 Potomac Yard/Four Mile Run Trail Connector Route 1 Corridor Streetcar 2,730 12,896 13,459-20,000 64,430-32, , ,805 Crystal City Interim Multimodal Center ,160 1,160 Crystal City Potomac Yard Transitway 37, ,291 37,291 Crystal City Station Access Improvements - - 8, ,000 3,750 17,500 TBD Pentagon City Pedestrian Tunnel 1, ,292 1,292 Pentagon City Station Second Elevator 5, ,085 5,085 24

18 Capital Project Planning (Adopted FY13 FY 22 CIP) County-wide ($1,000 s) Project/ Program Prev. Funding TCF TIF County PAYG GO Bond Rev. Bond Fed State Funding Through 2022 Total Project Cost WALK Arlington 1,770 2, ,831-2,680 1,520 11,789 11,789 BIKE Arlington 2, ,287 2,831-2,000 1,729 11,755 11,755 Capital Bikeshare 1, , ,850-5,544 5,544 Destination, Parking, and Regulatory Signage 5,485 1, ,268 2,268 Fiber Project 2,460 1,200 1,000-7,620-5,115-17,395 17,395 Parking Technology - 2, ,550 2,550 Parking Meters , ,226 2,226 Streetlight Energy Efficiency , ,419 5,419 Transportation Systems and Signals 1,060 4,472-4, ,136-10,972 10,972 ART Fleet Rehabilitation 7, , ,410 8,925 8,925 ART Fleet & Equipment Replacement and Expansion 4,160 11, ,867 20,386 20,386 Bus Stop and Shelter Program , ,576 2,576 Transit ITS & Security 515 1, , ,315 3,315 Paving ,719 74, , ,235 25

19 Regional Coordination Quarterly VDOT/Arlington County Meeting with key staff members VDOT Tours: 6/19/13, 6/21/11 Formal VDOT Plan Reviews Only required when impacting VDOT Right of Way Quarterly District of Columbia Department of Transportation (DDOT) /Arlington County Quarterly Department of Defense (DOD)/Arlington County Alexandria, Fairfax County Agency Coordination

20 Contact Information: Thomas Bruccoleri Transportation Planning Bureau Chief Arlington County Department of Environmental Services Division of Transportation & Development

Transportation. Pages E-3 to E-145 PROPOSED FY CAPITAL IMPROVEMENT PLAN (CIP) CCCRC Presentation Thursday, June 14, 2018

Transportation. Pages E-3 to E-145 PROPOSED FY CAPITAL IMPROVEMENT PLAN (CIP) CCCRC Presentation Thursday, June 14, 2018 PROPOSED FY 2019-2028 CAPITAL IMPROVEMENT PLAN (CIP) Pages E-3 to E-145 CCCRC Presentation Thursday, June 14, 2018 in the CIP Continues Arlington s commitment to a transportation system that expands travel

More information

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices FY 2017-2026 Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices November 1, 2017 Forecasted Growth Arlington continues to grow with a shift towards multi-family

More information

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016 Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing May 2016 Overview 10-Year Transit Development Plan Premium Transit Network Columbia Pike service concept Premium amenities

More information

Crystal City-Potomac Yard Transitway Extension

Crystal City-Potomac Yard Transitway Extension FINAL Crystal City-Potomac Yard Transitway Extension PREPARED FOR Department of Environmental Services 2100 Clarendon Boulevard, Suite 900 Arlington, VA, 22201 703.228.3344 PREPARED BY 8300 Boone Boulevard,

More information

PenPlace SPRC #6. September 27, DRAFT

PenPlace SPRC #6. September 27, DRAFT PenPlace SPRC #6 1 Agenda Site and Project Overview Multiple Transportation Options Traffic Analysis Neighborhood Analysis Street Network Street Sections/Sidewalk Width Pedestrian/Bicycle Circulation Secure

More information

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update Enforcement Ordinance & Construction Update December 2015 Project Purpose Provide high-capacity, high-quality transit service Support redevelopment in Crystal City and in Potomac Yard in Alexandria and

More information

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update January 23, 2015 Travel Forecasting Subcommittee What is the CLRP? Federally

More information

Washington DC Section of ITE Project Briefing

Washington DC Section of ITE Project Briefing Washington DC Section of ITE Project Briefing November 5, 2015 Renée Hamilton, VDOT, Deputy District Administrator I-66 Outside the Beltway Improvement Area Project Location Virginia 2 Purpose and Need

More information

PUBLIC HEARING QUESTIONS AND COMMENTS

PUBLIC HEARING QUESTIONS AND COMMENTS Columbia Pike Multimodal Street Improvements Preliminary Engineering Phase PUBLIC HEARING QUESTIONS AND COMMENTS A public hearing for the Columbia Pike Multimodal Street Improvements project was held on

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information

Integrating Community Development and Transportation Strategies. November 13, 2014

Integrating Community Development and Transportation Strategies. November 13, 2014 R-B CORRIDOR 1970 R-B CORRIDOR TODAY Integrating Community Development and Transportation Strategies November 13, 2014 The Community Development Transportation Question Can communities support increased

More information

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project. TRAVEL PLAN Central European University Campus Redevelopment Project Page 1 Table of Contents Introduction... 3 Background... 7 Building Users... 7 Transportation in Community Consultation... 7 Summary

More information

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016 I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016 Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager

More information

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66

More information

Technical Working Group November 15, 2017

Technical Working Group November 15, 2017 Technical Working Group November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

Planned Improvements from Sector & Area Plans that have been added to the MTP

Planned Improvements from Sector & Area Plans that have been added to the MTP Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle

More information

Metropolitan Park 4/5

Metropolitan Park 4/5 Traffic Impact Study and Transportation Management Plan Metropolitan Park 4/ Arlington County, VA July 3, 0 Prepared by: 40 Connecticut Avenue Suite 00 Washington, DC 003 Tel: 0.9. Fax: 0.. 394 Centreville

More information

Arlington County, Virginia Proposed CIP Program Summary

Arlington County, Virginia Proposed CIP Program Summary CIP Program Summary The FY 2019-2028 CIP includes typical capital projects such as maintenance capital, parks, transportation, metro, community conservation, government facilities, information technology

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

Transportation Management Program Office Newsletter N O V E M B E R

Transportation Management Program Office Newsletter N O V E M B E R Transportation Management Program Office Newsletter N O V E M B E R 0 8 I N S I D E THIS I S S U E : Pork Chop/Eads Street Construction Continues in the Winter FSD Director s Message Upcoming Events Pentagon

More information

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1

More information

Business owner or commercial property owner in Arlington, 8. Visitor in Arlington, 17

Business owner or commercial property owner in Arlington, 8. Visitor in Arlington, 17 1. How do you currently travel around your neighborhood? (Select your top 3) Resident of Arlington 86.72% 222 Worker in Arlington 20.70% 53 Business owner or commercial property own 3.13% 8 Visitor in

More information

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 Susan Shaw, PE, Megaprojects Director, Virginia Department of Transportation Amanda Baxter, Special Projects

More information

RZC Appendix 8A Marymoor Subarea Street Requirements

RZC Appendix 8A Marymoor Subarea Street Requirements RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS

More information

I-395 Express Lanes Northern Extension Project Public Hearings

I-395 Express Lanes Northern Extension Project Public Hearings I-395 Express Lanes Northern Extension Project Public Hearings Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager Virginia Department of

More information

TLC GRANT K / WATER STREETSCAPE ENHANCEMENTS WILL HANDSFIELD, AICP TRANSPORTATION DIR, GEORGETOWN BID

TLC GRANT K / WATER STREETSCAPE ENHANCEMENTS WILL HANDSFIELD, AICP TRANSPORTATION DIR, GEORGETOWN BID TLC GRANT K / WATER STREETSCAPE ENHANCEMENTS Applied Fall 15 Awarded Winter 15/ 16 Notice to Proceed Spring 16 Completion Summer 16 Community Outreach Ongoing WILL HANDSFIELD, AICP TRANSPORTATION DIR,

More information

Enhancing Downtown

Enhancing Downtown Enhancing Downtown 2014-2015 Process Masterplan reviewed TIF scope, fund availability, and timing Conceptual cost estimate stage things may change with full engineering Sequencing Coordination with businesses

More information

TRANSPORTATION & ACCESS

TRANSPORTATION & ACCESS STATE OF CENTER CITY PHILADELPHIA TRANSPORTATION & ACCESS Matt Stanley Center City is well-positioned at the center of an extensive, multi-modal transportation system. It is located just seven miles from

More information

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 Mike Snare, PE, Project Manager Virginia Department of Transportation GEC Michelle Holland, Megaprojects

More information

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia

More information

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017 MCA Member Meeting: Tysons Update Fairfax County Department of Transportation November 13, 2017 Presentation Overview Balancing Land Use and Transportation How Are We Doing? Studies and Projects Neighborhood

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 5 Date: 12/3/15 Draft White Flint Separated Bike Lanes Network David Anspacher, Functional

More information

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION ALTERNATIVES ANALYSIS TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION Alternatives Analysis Technical Report City of Alexandria,

More information

Interstate 66 Tier 1 Environmental Impact Statement (EIS)

Interstate 66 Tier 1 Environmental Impact Statement (EIS) WELCOME Welcome to the second Citizen Information Meeting for the Tier 1 Environmental Impact Statement (EIS). As an integral part in the environmental study process, the study team is seeking your comments

More information

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3,

FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3, FY 2018 I-66 Commuter Choice Program Presentation to the Northern Virginia Transportation Commission May 3, 2018 www.novatransit.o rg 703-524-3322 Presentation Overview I-66 Commuter Choice Program Overview

More information

Appendix P (Version 2) Bikeway Projects in Currently Approved Plans. Planned Improvements from Sector & Area Plans that have been added to the MTP

Appendix P (Version 2) Bikeway Projects in Currently Approved Plans. Planned Improvements from Sector & Area Plans that have been added to the MTP Appendix P (Version 2) Bikeway Projects in Currently Approved Plans Key: Removals Scope Changes Question Keep this in plan? = Included on map O = Not Included on map Planned Improvements from Sector &

More information

DOT Performance Measurement and Reporting System

DOT Performance Measurement and Reporting System November 2016 DOT Performance Measurement and Reporting System 1 2015 Transportation & Development Division Overview Arlington County is a national leader in sustainable transportation and smart growth.

More information

Martha Coello, Fairfax County DOT Jeffrey Hermann, Fairfax County DOT Abi Lerner, VDOT. May 19, 2014

Martha Coello, Fairfax County DOT Jeffrey Hermann, Fairfax County DOT Abi Lerner, VDOT. May 19, 2014 Traforming Tyso From An Auto Oriented Activity Center Into a Multi-Modal Center Martha Coello, Fairfax County DOT Jeffrey Hermann, Fairfax County DOT Abi Lerner, VDOT May 19, 2014 2 11 miles to Dulles

More information

Preliminary Engineering Study

Preliminary Engineering Study Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary

More information

M Street SW-Southeast Federal Center

M Street SW-Southeast Federal Center Section 1 M Street SW-Southeast Federal Center 1 2 M Street SW M Street SW and the Southeast Federal Center, located in Southeast and Southwest Washington, DC, comprise an activity center area that is

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

Welcome to the Quebec Alternatives Analysis Public Meeting

Welcome to the Quebec Alternatives Analysis Public Meeting Welcome to the Public Meeting Please sign in. Public Comment Please fill out a comment card and tell us what you think. Check back or comment any time at: www.quebecalternatives.com Project Area Technical

More information

ABOUT THE PROJECT. DOWNTOWN WEST Transportation Planning Study. Pennsylvania Ave. NW: H Street NW: Farragut. K St. NW. North. I St.

ABOUT THE PROJECT. DOWNTOWN WEST Transportation Planning Study. Pennsylvania Ave. NW: H Street NW: Farragut. K St. NW. North. I St. ABOUT THE PROJECT Downtown West seeks to improve east-west travel for pedestrians and cyclists on Pennsylvania Avenue NW and persons using public transit along H and I Streets NW. K St. NW North I St.

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 Item 31, Report No. 39, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report UPC 70762 Locally Administered PE Phase VDOT Administered CN Phase 4/6/17 1 Project

More information

Working Group Meeting

Working Group Meeting Working Group Meeting February 6, 2018 Parks and Natural Resources Operations Building Transportation Analysis Draft Policy Framework Agenda 7:05 pm Welcome 7:10 pm Follow-up from Previous Meetings Schedule

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

Omaha s Complete Streets Policy

Omaha s Complete Streets Policy Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets

More information

Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING. Stakeholder Meeting #1 October 24, 2016

Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING. Stakeholder Meeting #1 October 24, 2016 Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING Stakeholder Meeting #1 October 24, 2016 May 2017 1 WHAT IS THE DTC? 1.5 mile corridor between Providence Station and the Hospital

More information

Engineering - Bicycle and Pedestrian

Engineering - Bicycle and Pedestrian Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman

More information

MONTGOMERY COUNTY COUNCIL

MONTGOMERY COUNTY COUNCIL MONTGOMERY COUNTY COUNCIL R O C K V I L L E, M A R Y L A N D October 20, 2015 The Honorable Isiah Leggett Montgomery County Executive 101 Monroe Street, 2nd Floor Rockville, MD 20850 Dear County Executive

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

VIRGINIA RAILWAY EXPRESS

VIRGINIA RAILWAY EXPRESS PREPARING FOR THE NEXT QUARTER-CENTURY Arlington County Board Work Session June 28, 2017 1 TODAY S PRESENTATION VRE Overview VRE in Arlington County VRE System 2040 Plan Future Vision for Crystal City

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report UPC Design 70762 / CN 109813 Locally Administered PE Phase VDOT Administered

More information

Community Task Force November 15, 2017

Community Task Force November 15, 2017 Community Task Force November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

integrated action plan

integrated action plan public presentation. june 24, 2009. city of portsmouth, nh islington corridor integrated action plan richardson & associates, landscape architects evan haynes, public arts consultant Islington Street Corridor

More information

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL

More information

TYSONS CORNER BICYCLE MASTER PLAN

TYSONS CORNER BICYCLE MASTER PLAN TYSONS CORNER BICYCLE MASTER PLAN November 3, 2010 Key Project Elements and Outcomes Public input Stakeholder engagement Bicycle network plan Phased implementation plan Policy and program recommendations

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, 2015 Susan Shaw, P.E., VDOT, Megaprojects Director I-66 Corridor Conditions Steady population growth Employment growth in activity centers Congestion

More information

Arterial Transitway Corridors Study. Ave

Arterial Transitway Corridors Study. Ave Arterial Transitway Corridors Study Ave January 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles 86,000 daily rides and half of existing

More information

SPRINGFIELD REVITALIZATION REPORT

SPRINGFIELD REVITALIZATION REPORT SPRINGFIELD REVITALIZATION REPORT August 2015 Homewood Suites Springfield Town Center Promenade 2 SPRINGFIELD OVERVIEW This report covers recent development activity in the Springfield Commercial Revitalization

More information

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Susan Shaw, PE, CCM, DBIA Megaprojects Director Northern Virginia

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations. The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible

More information

Environment and Public Works Committee Presentation

Environment and Public Works Committee Presentation Mixed Use Centers Complete Streets Guidelines Project Environment and Public Works Committee Presentation December 10, 2008 Project Objectives: Conduct an inter-departmental and agency process to study

More information

1 PROJECT DESCRIPTION PROBLEM STATEMENT PROJECT PURPOSE AND NEED Study Purpose Study Need... 4

1 PROJECT DESCRIPTION PROBLEM STATEMENT PROJECT PURPOSE AND NEED Study Purpose Study Need... 4 January 2014 Table of Contents 1 PROJECT DESCRIPTION... 1 2 PROBLEM STATEMENT... 2 3 PROJECT PURPOSE AND NEED... 3 3.1 Study Purpose... 3 3.2 Study Need... 4 4 GOALS AND OBJECTIVES... 9 4.1 Short-term

More information

First and Last Mile Plan. April 2016

First and Last Mile Plan. April 2016 First and Last Mile Plan April 2016 1 First and Last Mile refers to the portion of a transit trip between a transit stop and one s destination, and can include walking, biking, carpooling, rolling or driving,

More information

This chapter describes the proposed circulation system and transportation alternatives associated with

This chapter describes the proposed circulation system and transportation alternatives associated with 5.0 Circulation 5.1 OVERVIEW This chapter describes the proposed circulation system and transportation alternatives associated with West Landing, and summarize the information contained in the Existing

More information

Proposed White Flint Separated Bike Lane Network September 2015

Proposed White Flint Separated Bike Lane Network September 2015 Proposed White Flint Separated Bike Lane Network September 2015 Abstract This report includes a proposed separated bike lane network for the White Flint Sector Plan area. Separated bike lanes create a

More information

Update of the Master Transportation Plan s (MTP) Bicycle Element

Update of the Master Transportation Plan s (MTP) Bicycle Element Update of the Master Transportation Plan s (MTP) Bicycle Element April 23, 2019 Background & Context Arlington has an established reputation for advanced bicycle infrastructure and planning Bicycling addresses

More information

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING 4. IMPLEMENTATION PHASES & FUNDING HOOPA DESIGN FAIR 4-1 4. IMPLEMENTATION PHASES & FUNDING Phase One Development 1. Implementation The Conceptual Plan recommends five concept elements to revitalize downtown

More information

Bus Rapid Transit Plans

Bus Rapid Transit Plans Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area

More information

Introductions John Carten noted that Linda Massaro has resigned from the TAC.

Introductions John Carten noted that Linda Massaro has resigned from the TAC. Arlington Transit Advisory Committee Meeting Notes September 11, 2018 7:00 p.m. Ellen M. Bozman Government Center 2100 Clarendon Boulevard Cherry and Dogwood Conference Room TAC Members Present: John Carten

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

Transportation Management Program Office Newsletter J U L Y

Transportation Management Program Office Newsletter J U L Y I N S I D E T H I S I S S U E : Traffic Changes at Eads Street; Temporary Relocation of Slug Stations FSD Director s Message 1 1 Upcoming Events 2 Transportation Management Program Office Newsletter J

More information

Decision on North Waterloo Routing

Decision on North Waterloo Routing Next Steps Decision on North Waterloo Routing Two route variations remain in north Waterloo. The final preferred route will include only one of the two variations. Please consider these two variations

More information

Columbia Pike Implementation Team (CPIT) Meeting

Columbia Pike Implementation Team (CPIT) Meeting Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number: APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET I. GENERAL INFORMATION A. Project name: B. Subdivision/Site Development Plan/Grading Permit Name and Number: C. Project address: D. Project

More information

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Dulles Area Transportation Association October 11, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Transform 66: Outside the Beltway 2 Project Overview Multimodal improvements

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

Section 7 Complete Green Street Guidelines DRAFT

Section 7 Complete Green Street Guidelines DRAFT Section 7 Complete Green Street Guidelines DRAFT 1 Section: 7.0 COMPLETE GREEN STREET GUIDELINES These guidelines serve as options to mitigate the environmental impact of a project as well as guide the

More information

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee 2100 Clarendon Boulevard, Suite 700, Arlington, VA 22201 TEL 703-228-3525 FAX 703-228-3543 www.arlingtonva.us

More information

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional

More information

McLEAN CITIZENS ASSOCIATION

McLEAN CITIZENS ASSOCIATION McLEAN CITIZENS ASSOCIATION RESOLUTION DULLES RAIL SUPPLEMENTAL EIS With ATTACHMENT A - PEDESTRIAN AND BICYCLE ACCESS ISSUES DULLES CORRIDOR RAIL STATIONS IN TYSONS CORNER (Charts - 7 pages) Approved by

More information

102 Avenue Corridor Review

102 Avenue Corridor Review February 26, 2015 102 Avenue Corridor Review Transportation Association of Canada Road Safety Engineering Award Submission for the City of Edmonton Introduction Transportation Association of Canada Road

More information

Community Task Force July 25, 2017

Community Task Force July 25, 2017 Community Task Force July 25, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

THE CORPORATION OF THE DISTRICT OF CENTRAL SAANICH. COMMITTEES - 7:00 PM Monday, April 27, 2015 Council Chambers AGENDA

THE CORPORATION OF THE DISTRICT OF CENTRAL SAANICH. COMMITTEES - 7:00 PM Monday, April 27, 2015 Council Chambers AGENDA THE CORPORATION OF THE DISTRICT OF CENTRAL SAANICH COMMITTEES - 7:00 PM Monday, April 27, 2015 Council Chambers AGENDA 1. CALL TO ORDER 2. ADOPTION OF AGENDA 3. ADOPTION OF MINUTES 4. PRESENTATIONS AND

More information

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006 Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006 Public Hearing Regulations Chapter 23 of United States Code 128 Title 40 of the Code of Federal Regulations Parts 1500

More information

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Federal and state agencies provide funding for local bikeway and trail projects. Descriptions follow for programs that

More information

North Coast Corridor:

North Coast Corridor: North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast

More information

CHAPTER 7.0 IMPLEMENTATION

CHAPTER 7.0 IMPLEMENTATION CHAPTER 7.0 IMPLEMENTATION Achieving the vision of the Better Streets Plan will rely on the ability to effectively fund, build and maintain improvements, and to sustain improvements over time. CHAPTER

More information

OVERVIEW OF CIRCULATION

OVERVIEW OF CIRCULATION OVERVIEW OF 1.Beijing Circulation 2. Development of Haidian District 3. Future Development 4. Project Site Overview 5. Road Types 6. Rail Corridor 7. Findings 8. Recommendations 1 of 22 BEIJING 2 of 22

More information

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling ontario.ca/climatechange Contents 1. Minister of Transportation s message... 3 2. Introduction... 5 3. Sector Overview and Support

More information