1 Traforming Tyso From An Auto Oriented Activity Center Into a Multi-Modal Center Martha Coello, Fairfax County DOT Jeffrey Hermann, Fairfax County DOT Abi Lerner, VDOT May 19, 2014

2 2

3 11 miles to Dulles Airport 11 miles to Downtown DC 3

4 Early Tyso Tyso Today Image source: Fairfax County EDA 4

5 Metrorail expaion to Dulles Airport Policy of higher deity, mixed use development in activity centers Tyso is not sustainable as exists today 17,000 residents to 105,000 jobs 167,000 parking spaces 5

6 The Vision A livable urban center with: Trait-oriented development A variety of modes for trip making Fewer parking spaces Pedestrian and bicycle friendly streets A defined see of place throughout Tyso Residents to Jobs mix of 100,000/200,000 6

7 Grid of Streets Tyso Corner Fairfax County Rosslyn Ballston Corridor Arlington County 7

8 Grid of Streets CONCEPTUAL Classification Block Size Implementation 8

9 Multi-Modal Network Proposed Bicycle Network Cross Sectio 9

10 Initial Implementation Issues Pedestrian Facilities and Walkability Streetscape Bike Lanes and Parking 10

11 Memorandum of Agreement (MOA) and Traportation Design Standards for Tyso Set up to implement the design standards and address permitting and maintenance issues Developed by Fairfax County and VDOT with input from numerous stakeholders Purpose Develop a platform by which the Tyso Compreheive Plan could be implemented Facilitate the provision of traportation facilities that accommodate low speed roadways, pedestrian and bicycle facilities and trait services 11

12 Tyso Memorandum of Agreement VDOT Review and approve pla using Tyso Standards Accept new streets that conform to VDOT and Tyso Standards including phased and stubbed streets Issue permits for work to be performed on the streets Maintain existing and future streets that have been accepted into the primary and secondary system Respoibilities Fairfax County Eure that the development is in conformance with the Tyso Standards Eure that access rights are provided on any new street cotructed as a phased or stubbed street to allow for maintenance and public safety vehicles to turn around safely 12

13 Tyso MOA Non-Standard Features The placement of non-standard features within the ROW are subject to VDOT review for safety and operational issues Such facilities when approved shall be subject to the following: Non-standard feature should be allowed only through the issuance of a permit by VDOT Permittee may be Fairfax County or private developer VDOT is not obligated to cotruct, itall, operate, maintain or replace any such feature Features will be operated and maintained by the holder of the VDOT permit 13

14 Facilities Not Included in the Standards Employed by VDOT (Non-Standard Features in Attachment A of MOA) 1. Decorative and ornamental lighting features 2. Decorative and ornamental traffic signals 3. Special landscaping materials, planting beds, raised planters, street trees, root cell structures, tree cages and other landscaping materials 4. Special and decorative roadway or sidewalk paving 5. Special drainage features, underground storage and mechanical vault structures, and innovative drainage features such as rain garde (conceptual graphic examples shown in Attachment B of the MOA) 6. Special signage such as way finding sig 7. Street furniture such as benches, trash receptacles, kiosks 8. Bus shelters and other trait related facilities 9. Parking meters 10. Decorative, non-standard retaining walls 14

15 Memorandum of Agreement on Urban Standards for Tyso 1. Functional Classification and Right-of-Way Limits 2. Level of Service Standards 3. Design and Operating Speeds 4. Access Management 5. Lane Widths and On-Street Parking 6. Median Islands and Center Turn Lanes 7. Turn Lane Lengths 8. Horizontal Radius 9. Length of Vertical Curve 10. Design and Control Vehicles 11. Driveway Widths 12. Intersection Sight Distance 13. Multi-Modal Design Characteristics 14. Pedestrian Facilities 15. Bicycle Facilities 16. Utility Placement 15

16 Level of Service Standards (1) The minimum designated standard for NHS designated streets is D, while the standard in the Tyso Compreheive Plan is E. The VDOT District Administrator may accept a lower standard for NHS routes upon review of an Operational Analysis. Where LOS D/E cannot be achieved, mitigation measures must be coidered. A LOS Waiver is required and is administered by the VDOT District Administrator. (2) Where LOS E standard cannot be achieved, mitigation measures must be coidered. LOS Waiver is not required. 16

17 Level of Service (LOS) Standards The vehicular LOS needs to be balanced with a high LOS for walkability, cycling and trait The LOS needs to be balanced with economic development objectives To provide the balance, it is necessary to apply the tiered approach where the location does not meet the LOS standard 17

18 LOS Tiered Approach 1. Analyze the location not meeting the LOS standard providing aggressive TDM or multi-modal mitigation measures 2. Evaluate whether additional grid links can be cotructed 3. Coider temporary traffic mitigation measures 4. Determine whether an acceptable balance has been achieved between vehicular LOS and pedestrian, cycle and trait mobility 5. If acceptable balance has not been achieved, make land use adjustments 6. If acceptable balance has not been achieved, coider turn lanes to improve LOS without seriously compromising pedestrian, trait and bicycle mobility 18

19 Design and Operating Speed Tyso uses a modified functional classification Design speed is primary control for: Minimum intersection sight distance Minimum sight distances on horizontal and vertical curves 19

20 Access Management Existing intersectio are exempt Intersection spacing represents min and max to help implement the street grid It is very important to plan for Access Management early in the development process 20

21 Design and Control Vehicles for Designing Street Intersectio Design Vehicle is one that must be accommodated without encroachment into the opposing traffic lane The Control Vehicle is: Infrequent Must be accommodated: By allowing encroachment into opposing lanes or Minor encroachment into the streetside area or As a last option multiple-point tur of vehicle 21

22 Pedestrian Facilities 1. Building zone 2. Sidewalk 3. Landscape amenity panel 22

23 Coolidated Traportation Impact Analysis 23

24 CTIA Process Stakeholder outreach and participation Coeus on grid to be studied VISUM Tiered approach Minimizing ROW needs Balancing pedestria and vehicles Focus on intersectio with highest delay Rounds of mitigation Coeus of improvements needed Documentation and VDOT review 24

25 Use of CTIA Baseline for reviewing traportation improvements and proposed grid of streets Set expectatio for development community Traffic information that can be used to refine larger infrastructure projects. 25

26 Lesso Learned MOA and Design Standards has helped the review and approval process CTIA helped development of baseline There is always a need to provide additional clarificatio Addition of stakeholders complicates the process but is critical to buy in VDOT and Fairfax County don t always interpret the standard the same way but coordination makes it work 26

27 Questio? 27

28 Trait Infrastructure Circulator The Tyso Circulator Study identifies the internal routes to serve Tyso Portio of these routes will be on exclusive circulator lanes Identification of circulator statio critical for coordination with development 28

29 Trait Infrastructure - Metro The Metrorail Silver Line includes four statio in Tyso Some pedestrian and bike facilities to enhance connectio to Metro statio may not be provided until redevelopment 29

30 Tyso Planning Background Task Force & Community Workshops ( ) Planning Commission Committee & Staff ( ) Compreheive Plan, adopted June 22, 2010 Zoning Ordinance, adopted June 22, 2010 Planned Tyso Corner Urban District (PTC) 30

31 Purpose of Re-Planning Tyso Link land use planning to investments in traportation (Metro, circulator, ped and bike facilities) Regional growth management strategy to concentrate development in activity centers Reduce vehicle trips by providing multimodal optio 31

32 The Vision for Tyso 100,000 Residents/200,000 Jobs More housing Grid of streets Multimodal emphasis Reduced parking supply 32

33 Tyso Urban Design Street grid and urban block size (min & max) Urban streetscape Building heights up to 400 feet near Metro, lower in surrounding neighborhoods Build to Line (maximum setback rather than min setback requirement) 33

34 Tyso Traportation Infrastructure Requirements Implementation Issues 34

35 Grid of Streets 35

36 Grid of Streets Functional classification guides the application of design standards in Tyso Provide flexibility in Master Plan to Change the Grid 36

37 Parking On-Street parking required for Avenues, Collectors and Local Streets No minimum off-street parking for most uses adjacent to Metro Off-street parking maximum within the Tyso Area Make provisio to accommodate existing leases at redevelopment sites 37

38 Parking (continued) Additional parking on a site not required with a change in land use Temporary parking facilities allowed near Metro statio Site plan approval for temporary parking facilities requires queue analysis for the gates 38

39 Bicycle Facilities Bullet on bicycle master plan Bullet on how to handle short section of bike lanes Bullet on using funds to connect facilities not provided by development 39

40 Example Tyso Rezoning Application 40

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5 SUMMARY PURPOSE AND NEED Chapel Hill Transit ridership has increased Buses operate every 4 minutes and have standing room only Exceeding seated capacity by 12% Corridor Need 1 by more than 20 percent between

More information

TRANSPORTATION STANDARDS

TRANSPORTATION STANDARDS INTRODUCTION LOCAL STREETS ON-STREET PARKING SIDEWALKS STREET LIGHTING STREET FURNISHINGS TRAFFIC CALMING STREET TREES MEDIAN PLANTING BOULEVARD LOCATIONS VILLAGE CENTER STREET LOCATIONS RESIDENTIAL STREET

More information

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City. A CHANGING CITY By the year 2040, Edmonton will be home to more than 1 million people. To accommodate growth and support a healthy and compact city, we need a new approach to development/redevelopment

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

UDC Street Cross Sections

UDC Street Cross Sections UDC Street Cross Sections Local Street - Downtown Local Street Mountable Curb Local Street Vertical Curb Alley Major Arterial Minor Arterial Residential Lane Residential Collector Residential Collector

More information

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections Roadway Cross-Sections Medford s roadway cross-section standards apply to new and reconstructed roads. The crosssections take into consideration roadway function and operational characteristics, including

More information

SECTION 1 - TRAFFIC PLANNING

SECTION 1 - TRAFFIC PLANNING SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification

More information

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith

More information

CURB EXTENSIONS BULB OUTS DPS 201 NECKDOWNS

CURB EXTENSIONS BULB OUTS DPS 201 NECKDOWNS CURB EXTENSIONS BULB OUTS DPS 201 NECKDOWNS WHY WHEN & WHERE When Limited Sight Distance Pedestrians & Vehicles Vehicles and Signs Want to put two curb ramps in Discourage High speed turning High number

More information

TYSONS CORNER BICYCLE MASTER PLAN

TYSONS CORNER BICYCLE MASTER PLAN TYSONS CORNER BICYCLE MASTER PLAN November 3, 2010 Key Project Elements and Outcomes Public input Stakeholder engagement Bicycle network plan Phased implementation plan Policy and program recommendations

More information

Stakeholder Meeting Handouts. January 2013

Stakeholder Meeting Handouts. January 2013 January 2013 Stakeholder Meeting Handouts The Case FOR Parking Minimum Requirements Reduce street congestion around the development site Avoid parking spillover Create orderly development patterns Anticipate

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. 4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification

More information

S T A T I O N A R E A P L A N

S T A T I O N A R E A P L A N The Circulation and Access Plan describes vehicle, pedestrian, and transit improvements recommended within the Concept Plan. In order to create and sustain a vibrant business district that provides pedestrian-friendly

More information

How to Develop a Pedestrian Safety Action Plan

How to Develop a Pedestrian Safety Action Plan How to Develop a Pedestrian Safety Action Plan Course Introduction Presented by: Peter Eun FHWA RC Safety Engineer Ryan Snyder President, Ryan Snyder Associates, LLC Paul Zykofsky Director, Land Use and

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

MEMORANDUM - CITY OF PASADENA Department Of Transportation DATE: OCTOBER 21, 2008 TO: ENVIRONMENTAL ADVISORY COMMISSION FROM: ~ FRED C. DOCK, DIRECTOR OF TRANSPORTATION SUBJECT: UPDATE ON DEPT. OF TRANSPORTATION

More information

102 Avenue Corridor Review

102 Avenue Corridor Review February 26, 2015 102 Avenue Corridor Review Transportation Association of Canada Road Safety Engineering Award Submission for the City of Edmonton Introduction Transportation Association of Canada Road

More information

A. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances

A. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances GENERAL 1. Description This standard identifies minimum requirements that shall be met for all accessible ramps in the design and construction of elements for Arlington County Horizontal Design Standards.

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Bus Rapid Transit Plans

Bus Rapid Transit Plans Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area

More information

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017 ` SR 976 BIRD ROAD/SW 40TH STREET FROM SR 821/HEFT TO SR 5/US-1 Miami-Dade County, Florida FPID No.: 434845-4-22-01 Planning Study Project Advisory Team Meeting May 24, 2017 1 Agenda Introductions Project

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

Making Phoenix Streets Complete. City of Phoenix Complete Streets Initiative

Making Phoenix Streets Complete. City of Phoenix Complete Streets Initiative Making Phoenix Streets Complete City of Phoenix Complete Streets Initiative City of Phoenix Planning Commission March 2014 Presentation Outline What are Complete Streets? Benefits of Complete Streets Complete

More information

Bicycle and Pedestrian Access in Transit Oriented Developments. Bruce Wright Chairman, Fairfax Advocates for Better Bicycling April, 2009

Bicycle and Pedestrian Access in Transit Oriented Developments. Bruce Wright Chairman, Fairfax Advocates for Better Bicycling April, 2009 Bicycle and Pedestrian Access in Transit Oriented Developments Bruce Wright Chairman, Fairfax Advocates for Better Bicycling April, 2009 Overview Reasons to encourage bicycling Compare bike and walk distances

More information

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback. City of Carlsbad Pedestrian Master Plan: WELCOME WELCOME Please Sign In Provide Input at Flip Charts Review Boards Presentation of Draft Plan Thank you for joining us at the Second Public Workshop for

More information

Miami Health District

Miami Health District Miami Health District Streetscapes, Gateways, and Signage Basis of Design Report Study Miami Partnership Meeting July 21, 2008 Gannett Fleming EDAW The Corradino Group Sponsored by the Miami Partnership:

More information

5. Automobile Circulation, Wayfinding and Signage

5. Automobile Circulation, Wayfinding and Signage 5. Automobile Circulation, Wayfinding and Signage Policy: The City Center should have a balanced, safe, and interconnected circulation system that provides expanded travel opportunities for transit, pedestrian,

More information

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan STEERING COMMITTEE MEETING June 17, 2015 Streetscape Overview Burlington Comprehensive Master Plan 1 Introduction Slide This slide show was presented to the Burlington Steering Committee on June 17, 2015

More information

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016 Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing May 2016 Overview 10-Year Transit Development Plan Premium Transit Network Columbia Pike service concept Premium amenities

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN Preferred Plan Community Presentation September 27, 2017 City of El Paso de Robles in partnership with: Local Government Commission, W-Trans,

More information

Ocean Park Boulevard Green Street Project Community Workshop

Ocean Park Boulevard Green Street Project Community Workshop Ocean Park Boulevard Green Street Project Community Workshop 2.2.10 Project Objectives Community Priority: reclaim OPB for public open space. Build upon LUCE principles; neighborhood enhancement, connectivity,

More information

MOVING PASSAIC COUNTY

MOVING PASSAIC COUNTY MOVING PASSAIC COUNTY COMPLETE STREETS GUIDELINES OCTOBER 2012 Prepared By: Passaic County Department of Planning and Economic Development with assistance from Parsons Brinckerhoff PASSAIC COUNTY COMPLETE

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community Riverside Station A green, transit-oriented community October 6, 2011 TONIGHT S AGENDA: 1. Project Update (5 min.) 2. Master Plan Update (10 min.) 3.Traffic Plan Update (10 min.) Questions & Answers MASTER

More information

FONTAINE AVENUE STUDY Final Report

FONTAINE AVENUE STUDY Final Report FONTAINE AVENUE STUDY Final Report March 28, 2005 FONTAINE AVENUE STUDY City of Charlottesville March 28, 2005 Renaissance Planning Group Kenneth Schwartz, FAIA, AICP Director of Design Leigh Wilkerson,

More information

Welcome to the Quebec Alternatives Analysis Public Meeting

Welcome to the Quebec Alternatives Analysis Public Meeting Welcome to the Public Meeting Please sign in. Public Comment Please fill out a comment card and tell us what you think. Check back or comment any time at: www.quebecalternatives.com Project Area Technical

More information

Plant City Walk-Bike Plan

Plant City Walk-Bike Plan Plant City Walk-Bike Plan Plant City Commute Mode Share 2.2% 1.4% 2.9% Drove alone 10.2% Carpooled Public transportation (0.1%) Walked Used a Bike (0.4%) 82.9% Taxicab, motorcycle, or other means Worked

More information

GENERAL. 1. Description

GENERAL. 1. Description GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Bus Stops in the design and construction of elements for Arlington County Horizontal Design Standards. This

More information

Access Management Regulations and Standards

Access Management Regulations and Standards Access Management Regulations and Standards Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while simultaneously preserving

More information

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011 The Purpose of GIS Based Network Planning GIS Based Data Collection / Network Planning Healthy Communities Active Transportation Conference Tuesday, May 10, 2011 10:00 AM Norman Cox, LLA, ASLA. Ann Arbor,

More information

SPRINGFIELD REVITALIZATION REPORT

SPRINGFIELD REVITALIZATION REPORT SPRINGFIELD REVITALIZATION REPORT August 2015 Homewood Suites Springfield Town Center Promenade 2 SPRINGFIELD OVERVIEW This report covers recent development activity in the Springfield Commercial Revitalization

More information

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE 2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE COMMITTEE RECOMMENDATIONS AS AMENDED That Council approve: 1. The endorsement

More information

Appendix 3 Roadway and Bike/Ped Design Standards

Appendix 3 Roadway and Bike/Ped Design Standards Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.

More information

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Susan Shaw, PE, CCM, DBIA Megaprojects Director Northern Virginia

More information

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015 COMPLETE STREETS A STEP FORWARD 2015 ITE District 10/FSITE Annual Meeting November 3, 2015 About Lakeland Incorporated: 1885 Population: 100,728 Area: Approx. 75 sq. mi Major Employers: Publix, Lakeland

More information

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need Chapter 2 Purpose and Need 2.1 Introduction The El Camino Real Bus Rapid Transit (BRT) Project (Project) would make transit and other transportation improvements along a 17.6-mile segment of the El Camino

More information

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 McPhail Transportation Planning Services Ltd. AGENDA 6:00 7:00 pm Viewing Boards / Q & A with the Team 7:00 7:50

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, 2015 Susan Shaw, P.E., VDOT, Megaprojects Director I-66 Corridor Conditions Steady population growth Employment growth in activity centers Congestion

More information

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle SDOT SR0 Design Refinements RES August, 0 Version #D 0 CITY OF SEATTLE RESOLUTION..title A RESOLUTION relating to the State Route 0, Interstate to Medina Bridge Replacement and High Occupancy Vehicle Project;

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

6.4 RECOMMENDED IMPROVEMENTS

6.4 RECOMMENDED IMPROVEMENTS 6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides

More information

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years) 12 RECOMMENDATIONS Recommendations are based on the technical analysis of existing and future road and active transportation conditions, the results of the review of existing City policies and public feedback.

More information

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND COUNCIL POLICY NAME: COUNCIL ADVISORY COMMITTEES - TERMS OF REFERENCE ISSUED: APRIL 3, 2006 AMENDED: NOVEMBER 27, 2006 NOVEMBER 23, 2009 JANUARY 11, 2010 DECEMBER 17, 2012 POLICY COUNCIL REFERENCE: 06/119

More information

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Project Overview Coordinate roadway improvements with other major projects HUB Flood Control

More information

Prince George s County plans, policies, and projects

Prince George s County plans, policies, and projects Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail

More information

9. TRANSIT ACCOMMODATIONS

9. TRANSIT ACCOMMODATIONS 9. TRANSIT ACCOMMODATIONS INTRODUCTION...1 Broward County County-Wide Community Design Guidebook...1 FDOT District Four Transit Facilities Guidelines...2 ESSENTIAL PRINCIPLES OF DESIGNING STREETS FOR TRANSIT...3

More information

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices FY 2017-2026 Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices November 1, 2017 Forecasted Growth Arlington continues to grow with a shift towards multi-family

More information

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

12/4/2016 VIA  . RE: Grocery Outlet Del Paso (DR16-328) 12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS INTRODUCTION The thoroughfare plan will assist public officials in the development of a specialized system for efficient and safe movement of vehicular traffic while minimizing potential conflicts with

More information

Town of Babylon Sustainable Complete Streets Policy

Town of Babylon Sustainable Complete Streets Policy Town of Babylon Sustainable Complete Streets Policy Steve Bellone, Supervisor Adopted July 14, 2010 1 Table of Contents Vision... 3 Policy Statement... 3 Definition... 3 Road Users... 4 Network... 4 Roads...

More information

Circulation and Streetscape

Circulation and Streetscape AGUA CALIENTE BAND OF CAHUILLA INDIANS Complete Streets Planning Effort for the Section 14 Master Plan Update Circulation and Streetscape Prepared by IBI Group in association with Alta Planning + Design

More information

Master Thoroughfare Plan Roadway Design Guidelines

Master Thoroughfare Plan Roadway Design Guidelines WACO METROPOLITAN AREA Master Thoroughfare Plan Roadway Design Guidelines May 2012 DRAFT Waco Metropolitan Planning Organization Waco Master Thoroughfare Plan Context-Sensitive Roadway Design Guidelines

More information

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Sarah Rocchi, Vice-President, Projects, Opus International Consultants (Main Presenter) Catherine Mohoruk,

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

City of Margate, Florida. Neighborhood Traffic Management Manual

City of Margate, Florida. Neighborhood Traffic Management Manual City of Margate, Florida Neighborhood Traffic Management Manual Table of Contents Page No. I. INTRODUCTION... 1 II. TRAFFIC CALMING REQUEST AND PROCESSING PROCEDURES... 2 1. COMPLETE AND SUBMIT PROJECT

More information

ABOUT THE PROJECT. DOWNTOWN WEST Transportation Planning Study. Pennsylvania Ave. NW: H Street NW: Farragut. K St. NW. North. I St.

ABOUT THE PROJECT. DOWNTOWN WEST Transportation Planning Study. Pennsylvania Ave. NW: H Street NW: Farragut. K St. NW. North. I St. ABOUT THE PROJECT Downtown West seeks to improve east-west travel for pedestrians and cyclists on Pennsylvania Avenue NW and persons using public transit along H and I Streets NW. K St. NW North I St.

More information

Complete Streets Policies in Charlotte

Complete Streets Policies in Charlotte Complete Streets Policies in Charlotte Complete Streets Peer Exchange Baton Rouge, LA January 19, 2016 Norm Steinman, AICP Charlotte DOT Changing what we do to change what will happen 1. Inventory of Conditions

More information

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan 5 System Components Wakefield Street Photo Simulation showing Sharrows Introduction The Master Plan identifies various system components that, together, create a comprehensive greenway system. These components

More information

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE NASHVILLE, TENNESSEE EXECUTIVE SUMMARY Executive Summary A world-class multi-modal transportation system is essential to a vibrant city and better quality of life. -Mayor Barry The WalknBike plan aims

More information

Proposed White Flint Separated Bike Lane Network September 2015

Proposed White Flint Separated Bike Lane Network September 2015 Proposed White Flint Separated Bike Lane Network September 2015 Abstract This report includes a proposed separated bike lane network for the White Flint Sector Plan area. Separated bike lanes create a

More information

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014 Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio Traffic Engineering Workshop June 4, 2014 Complete Streets Streets that enable safe access for users

More information

ALTERNATIVES SCREENING REPORT

ALTERNATIVES SCREENING REPORT VAN NESS AVENUE BUS RAPID TRANSIT (BRT) ALTERNATIVES SCREENING REPORT Revised Draft, 3/28/08 San Francisco County Transportation Authority 1 Introduction The San Francisco County Transportation Authority

More information

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION June 2015 CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION Introduction The Alpharetta Downtown Master Plan was developed in the fall

More information

Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area

Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area Agenda Designing for all Cyclists Background on

More information

Retrofitting Urban Arterials into Complete Streets

Retrofitting Urban Arterials into Complete Streets Retrofitting Urban Arterials into Complete Streets John N. LaPlante, P.E., P.T.O.E., T.Y. Lin International Prepared for: Illinois Traffic Engineering & Safety Conference Urbana, Illinois October 18, 2007

More information

INTRODUCTION... 1 STREET STANDARDS... 2

INTRODUCTION... 1 STREET STANDARDS... 2 TABLE OF CONTENTS Page INTRODUCTION... 1 STREET STANDARDS... 2 HIGHWAY 99... 4 Background... 4 Highway 99 in the Existing City... 7 Highway 99 in the Planned Growth Area... 8 BICYCLE AND PEDESTRIAN STANDARDS...

More information

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) A: Class 2 Pedestrian / Cycle Ways. Pedestrian and Cycle Ways:

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) A: Class 2 Pedestrian / Cycle Ways. Pedestrian and Cycle Ways: A: Class 2 Pedestrian / Cycle Ways PLAN VIEW Pedestrian and Cycle Ways: Layout and Geometry (Refer to A): Walkways and cycle to be provided adjacent to all Class 2 Roads (these facilities should always

More information

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview IBI GROUP 18401 Von Karman Avenue Suite 110 Irvine CA 92612 USA tel 949 833 5588 fax 949 833 5511 ibigroup.com Memorandum To/Attention Steering Committee Members Date February 17, 2016 From IBI Group Project

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

ORDINANCE NO AN ORDINANCE ADOPTING THE CITY OF AUSTIN COMPLETE STREETS POLICY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF AUSTIN:

ORDINANCE NO AN ORDINANCE ADOPTING THE CITY OF AUSTIN COMPLETE STREETS POLICY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF AUSTIN: ORDINANCE NO. 20140612-119 AN ORDINANCE ADOPTING THE CITY OF AUSTIN COMPLETE STREETS POLICY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF AUSTIN: PARTI. Findings. (A) (B) (C) (D) (E) Austin City Council

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1 Financial Management Number: 432639-6-22-01 Federal Aid Project Number: 0202-054-P Efficient Transportation Decision Making Number: 14230 Project Development & Environment (PD&E) Study SR 90 (SW 8th Street

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

The DC Pedestrian Master Plan

The DC Pedestrian Master Plan The DC Pedestrian Master Plan September 28, 2010 George Branyan Pedestrian Program Coordinator District Department of Transportation Presentation Agenda Scope of the Plan Methodology Recommendations Implementation

More information

Tallinn Region Sustainable Urban Mobility Plan 2035

Tallinn Region Sustainable Urban Mobility Plan 2035 Estonian Road Administration Tallinna Transport Department Tallinn Region Sustainable Urban Mobility Plan 2035 Mari Jüssi, SUMP expert Estonian Road Administration/ Tallinn Transport Department FESM Steering

More information

integrated action plan

integrated action plan public presentation. june 24, 2009. city of portsmouth, nh islington corridor integrated action plan richardson & associates, landscape architects evan haynes, public arts consultant Islington Street Corridor

More information

Sandwich Pedestrian/Bicycle Planning

Sandwich Pedestrian/Bicycle Planning Sandwich Pedestrian/Bicycle Planning Improved Pedestrian and Bicycle Connections with the Cape Cod Canal Multi-use Path February 2014 Table of Contents Introduction... 1 Background... 1 Study Goals...

More information

The seamless journey The seamless journey: Public transport links with walking and cycling

The seamless journey The seamless journey: Public transport links with walking and cycling The seamless journey The seamless journey: Public transport links with walking and cycling The PEP Workshop Kyiv, Ukraine June 8-9, 2011 Susanne Stölting UITP - A global membership UITP is... The network

More information

Walkability Audit Cities of Olympia, Tumwater and Lacey, Washington. Next Steps Memorandum September FINAL

Walkability Audit Cities of Olympia, Tumwater and Lacey, Washington. Next Steps Memorandum September FINAL Walkability Audit Cities of Olympia, Tumwater and Lacey, Washington Memorandum September 2012 - FINAL 1. INTRODUCTION The U.S. Environmental Protection Agency (EPA) selected the Thurston Regional Planning

More information