7 TABLE 13-4: IMPROVE-EXPAND PROJECTS 2010 IMPROVE-EXPAND PROJECTS 2010 East Lansing Coleman Road 0.78 West to Wood Construct 2 lane roadway including bike lanes East Lansing No 2010 MSU Farm Lane 0.80 Mt. Hope to Trowbridge Widen from 2 to 4 lanes with grade seperation of the railroads (under construction) Earmark MSU No 2010 LOCAL (IMPROVE-EXPAND) PROJECT COST: Exempt from Regional Emissions Modeling? 2010 LOCAL (IMPROVE-EXPAND) REVENUE AVAILABLE: 2010 ECRC Michigan Avenue 1.00 Canal to Creyts Construct 3 lane roadway 2010 ECRC Nixon Road 0.40 St. Joe to Rockbridge Widen from 2 to 3 lanes Urban STP ECRC No Urban STP ECRC No URBAN STP PROJECTS (INCLUDING PRESERVE): ASSUMED 2010 URBAN STP REVENUE AVAILABLE: IMPROVE-EXPAND PROJECTS 2011 Charlotte Parkland Drive 0.76 Lipsey to Packard Construct new 2 lane road in industrial park Charlotte No 2011 St. Johns Townsend Road 0.50 Oakland Street to US 127 BR 2012 Charlotte Reynolds Road; Kalamo Hwy 2010 URBAN STP (IMPROVE-EXPAND) PROJECTS COST: Widen from 2 to 3 lanes with non-motorized improvements 1.30 Reynolds from Construct Reynolds current end extension; pave 0.80 mile of extended 0.50 mile Kalamo Highway and south to Kalamo; upgrade Kalamo bridge Kalamo from Reynolds to Cochran LOCAL (IMPROVE-EXPAND) PROJECT COST: (potential CMAQ) St. Johns No (potential earmark) Charlotte No LOCAL REVENUE AVAILABLE:.09 mile west of Miller 2013 Eaton Rapids State Street.36 mile east to city 0.36 limit Reconstruct and add center left turn lane from Miller east.27 mile Small Urban Eaton Rapids SMALL URBAN (IMPROVE-EXPAND) PROJECT COST: SMALL URBAN REVENUE AVAILABLE: Page 1 of 9

8 TABLE 13-4: IMPROVE-EXPAND PROJECTS Windsor Highway to 2011 ECRC Canal Road 1.00 Lansing Road Widen from 2 to 3 lanes Urban STP ECRC No Exempt from Regional Emissions Modeling? 2011 ICRC Okemos Road 0.25 Sandhill to I-96 Widen from 2 to 3 lanes from Sandhill North to the existing multilane portion of Okemos Road (center left turn lane) Urban STP ICRC No 2011 ICRC Waverly Road 1.00 Miller to Jolly Widen from 2 to 3 lanes with paved shoulders Urban STP ICRC No 2013 ECRC St. Joe Highway 1.00 Broadbent to Canal Widen from 2 to 3 lanes Urban STP ECRC No I-69 BL (Saginaw) to 2014 ICRC Lake Lansing Road 0.70 Lac du Mont I-69 BL to Lac du Mont: widen from 2 to 3 lanes; Lac Du Mont to Marsh: reduce from 4 to 3 lanes; add roundabout at Okemos-Lake Lansing intersection; bike lanes on both sides Urban STP ICRC No URBAN STP (IMPROVE-EXPAND) PROJECTS COST: ASSUMED URBAN STP REVENUE AVAILABLE: IMPROVE-EXPAND PROJECTS 2016 CCRC State Road DeWitt Road to US BR Widen from 2 to 4 lanes Wilson - Fee intersection to Construct 4 lane boulevard 2015 MSU Wilson Road 0.28 Hagadorn connecting Wilson to Hagadorn LOCAL (IMPROVE-EXPAND) PROJECT COST: LOCAL REVENUE AVAILABLE: (potential earmark) CCRC No (potential local earmark) MSU No 2015 Webberville 2015 Mason Grand River extending Webberville Road Extension south.57 mile into 0.57 existing business park. Construct new 2 lane road Small Urban Webberville SMALL URBAN (IMPROVE-EXPAND) PROJECT COST: SMALL URBAN REVENUE AVAILABLE: Franklin Farms Drive LaVonne Drive to Kipp 0.20 Road Construct 2 lane extension from end of LaVonne Urban STP Mason 2015 ECRC St. Joe Highway 1.00 Broadbent to Nixon Widen from 2 to 3 lanes Urban STP ECRC No Page 2 of 9

9 TABLE 13-4: IMPROVE-EXPAND PROJECTS 2015 ICRC Forest/Farm Lane College to Farm Lane; Corridor 0.88 Forest to Mt. Hope 2016 ECRC Mt. Hope Highway 1.00 Canal to Guinea 2017 ECRC Mt. Hope Highway 1.00 Guinea to Nixon Widen from 2 to 4 lanes with roundabout at Forest and College; add curve radius; bike lanes on both sides Urban STP ICRC No Widen from 2 to 3 lanes and add paved shoulders Urban STP ECRC No Widen from 2 to 3 lanes and add paved shoulders Urban STP ECRC No Exempt from Regional Emissions Modeling? Lansing Road to 2018 ECRC Creyts Road 2.00 Dimondale village limit Widen from 2 to 3 lanes Urban STP ECRC No 2018 ECRC St. Joe Highway 1.00 Royston to Nixon Widen from 2 to 3 lanes Urban STP ECRC No URBAN STP (IMPROVE-EXPAND) PROJECTS COST: ASSUMED URBAN STP REVENUE AVAILABLE: IMPROVE-EXPAND PROJECTS 2020 MSU Bogue Street Service Road to Mount 0.52 Hope Construct new 3 lane road MSU No LOCAL (IMPROVE-EXPAND) PROJECT COST: LOCAL REVENUE AVAILABLE: ECRC Nixon Road 0.60 Rockbridge to M-43 Widen from 2 to 3 lanes Urban STP ECRC No 2019 ECRC Willow Highway 4.00 M-100 to Canal Widen from 2 to 3 lanes and add bike lanes and sidewalk Urban STP ECRC No 2019 ICRC Hagadorn Road 1.10 Bennett to Mt. Hope Widen from 2 to 4 lanes with possible roundabout at intersection with Bennett; includes bike lanes Urban STP ICRC No 2020 ECRC Mt. Hope Highway 2.00 Nixon to M-100 Widen from 2 to 3 lanes and add paved shoulders Urban STP ECRC No 2020 Mason West Columbia Street Extension through 0.25 Maple Grove Cemetary Willow to Delta 2022 ECRC Canal Road 0.64 Commerce Construct 2 lane road to connect with existing Columbia alignment Urban STP Mason No Widen from 2 to 3 lanes, add bike lanes and sidewalk Urban STP ECRC No Page 3 of 9

10 TABLE 13-4: IMPROVE-EXPAND PROJECTS 2025 East Lansing Lake Lansing Road 0.75 US 127 to Harrison Widen from 4 to 5 lanes; add intersection turn lanes; possible roundabout Lake Lansing and Coolidge Urban STP East Lansing No Exempt from Regional Emissions Modeling? 2025 ECRC St. Joe Highway 1.00 Royston to M-100 Widen from 2 to 3 lanes Urban STP ECRC No URBAN STP (IMPROVE-EXPAND) PROJECTS COST: ASSUMED URBAN STP REVENUE AVAILABLE: IMPROVE-EXPAND PROJECTS 2026 ICRC Jolly Road 2.10 Collins to Hagadorn Widen from 2 to 4 lanes; possible roundabout at College and Jolly intersection; bike lanes on both sides Urban STP ICRC No 2028 ICRC Holt Road 1.25 Washington to Eifert Widen from 2 to 4 lanes with center left turn lanes where necessary; possible roundabouts (not included in estimate) Urban STP ICRC No 2029 ECRC East-West Collector Creyts to Mall Drive 0.60 West Construct 3 lane roadway Urban STP ECRC No 2030 ECRC East-West Collector 1.00 Canal to Creyts Construct 3 lane roadway Urban STP ECRC No URBAN STP (IMPROVE-EXPAND) PROJECTS COST: ASSUMED URBAN STP REVENUE AVAILABLE: IMPROVE-EXPAND PROJECTS 2035 Eaton Rapids Eaton Rapids bridge and approaches Extensions of Grandview and Barnes Roads to serve as approaches to new bridge; includes bike 0.19 lanes Construct 2 lane bridge and approaches, including bike lanes (potential earmark) Eaton Rapids No LOCAL (IMPROVE-EXPAND) PROJECT COST: LOCAL REVENUE AVAILABLE: Page 4 of 9

11 TABLE 13-4: IMPROVE-EXPAND PROJECTS Exempt from Regional Emissions Modeling? 2035 MDOT US 127 Kinley to Gratiot County Line (continuing to Ithaca, outside our region; cost is for 6.00 Clinton County portion) Expansion to limited access freeway NHS/ STP (state) Bridge MDOT No BRIDGE (IMPROVE-EXPAND) PROJECT COST: ECRC 2034 ECRC BRIDGE REVENUE AVAILABLE: St. Joe Highway Bridge at I-69/96 Widen bridge from 2 to 4 lanes Urban STP ECRC No Nixon Road and Willow to North Construct new bridge and bridge 0.50 Highway roadway Urban STP ECRC No 2035 ECRC Snow Road Bridge at I-496 Widen bridge from 2 to 4 lanes and add non-motorized pathways Urban STP ECRC No URBAN STP (IMPROVE-EXPAND) PROJECTS COST: ASSUMED URBAN STP REVENUE AVAILABLE: SECONDARY IMPROVE-EXPAND ("B") LIST. These projects have been modeled along with projects with capacity increases since they involve changes in lane configuration or directionality. These are not true capacity expansions. These projects are duel listed as Management and Operations projects (B LIST) IMPROVE-EXPAND PROJECTS 2010 Lansing Holmes Road 2.30 Waverly to Cedar (except Wash to Logan Sq) Reduce from 4 to 3 lanes (grinding, striping, signage) R Lansing No 2010 Lansing Mt. Hope Avenue at Washington Add left turn lanes R Lansing 2010 LOCAL (IMPROVE-EXPAND) PROJECT COST: LOCAL (IMPROVE-EXPAND) REVENUE AVAILABLE: (B LIST) IMPROVE-EXPAND PROJECTS 2011 Lansing Jolly Road 1.80 Waverly to MLK Reduce from 4 to 3 lanes (grinding, striping, signage) R Lansing No 2011 Lansing Mt. Hope Avenue 2.30 Moores River to Reduce from 4 to 3 lanes Washington (grinding, striping, signage) R Lansing No 2012 Lansing Capitol Avenue 1.25 Main to Oakland Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No Page 5 of 9

12 TABLE 13-4: IMPROVE-EXPAND PROJECTS 2012 Lansing Grand Avenue 0.15 St. Joe to Lenawee Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No 2012 Lansing Grand Avenue 1.05 Lenawee to Oakland Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No 2012 Lansing Townsend Street 0.25 Elm to Main Reduce from 4 to 3 lanes (grinding, striping, signage) R Lansing No 2013 ICRC Lake Lansing at Okemos Add possible roundabout at Road Okemos-Lake Lansing # R ICRC 2013 ICRC for Meridian Okemos Road Hamilton Road intersection Possible modern roundabout (2 to 3 lanes) Township DDA ICRC for Meridian # R Township DDA LOCAL (IMPROVE-EXPAND) PROJECT COST: Exempt from Regional Emissions Modeling? # Community may seek CMAQ funding at the appropriate time LOCAL REVENUE AVAILABLE: Reduce from 4 to 3 lanes; 2012 ICRC Cedar Street 0.64 Holt to Aurelius includes bike lanes Urban STP R ICRC No Reduce from 5 to 3 lanes, 2012 Lansing Washington 0.89 Mt. Hope to Main including bike lanes Urban STP R Lansing No No (roundabouts 2013 ICRC Lake Lansing Road 1.10 Lac du Mont to Marsh Reduce from 4 to 3 lanes Urban STP R ICRC are exempt) Saginaw to Lake Reconstruct and reduce from 4 to 2013 East Lansing Harrison Avenue 1.04 Lansing Road 3 lanes Urban STP R East Lansing No Restripe portion from Rosemary Waverly to Lansing city to city limit from 4 to 3 lanes; 2014 ICRC Michigan Avenue 1.00 limit includes bike lanes Urban STP R ICRC No URBAN STP (IMPROVE-EXPAND) PROJECTS COST: ASSUMED URBAN STP REVENUE AVAILABLE: Page 6 of 9

13 TABLE 13-4: IMPROVE-EXPAND PROJECTS Exempt from Regional Emissions Modeling? (B LIST) IMPROVE-EXPAND PROJECTS Forest/Farm Lane 2015 ICRC Corridor College at Forest with possible roundabout at Forest and College Urban STP R ICRC 2016 Lansing MLK Blvd at Willow Construct roundabout # R Lansing Shiawassee to 2016 Lansing Pine Street 0.43 Oakland 2016 Lansing Pine Street 0.82 Main to Shiawassee 2016 Lansing Walnut Street 0.82 Main to Shiawassee Shiawassee to 2016 Lansing Walnut Street 0.43 Oakland 2016 Lansing Willow Street 0.60 Sunset to MLK Blvd Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No Intersection improvements; acquire right of way R Lansing Reduce from 4 to 3 lanes (striping & signage only) R Lansing No 2018 Lansing East Grand River 0.60 Wood to Howard Railroad tracks east of East Grand River Larch to Reduce from 4 to 3 lanes 2018 Lansing Avenue 0.35 Massachusetts (grinding, striping, signage) R Lansing No ML King Blvd to 2018 Lansing Kalamazoo Street 0.15 Sycamore Add left turn lanes at intersection R Lansing 2018 Lansing Michigan Avenue Detroit Street to 0.60 Friendship Circle North of Oakland to 2018 Lansing MLK Jr. Blvd Grand River Boulevard reduced from 3 lanes to 2 lanes in each direction with the addition of bike lanes R Lansing No Reduce from 4 to 3 lanes (grinding, striping, signage) R Lansing No 2018 Lansing Mt. Hope Avenue at Cedar Add left turn lanes R Lansing Aurelius to east city Reduce from 4 to 3 lanes 2018 Lansing Mt. Hope Avenue 0.85 limit (grinding, striping, signage) R Lansing No Page 7 of 9

14 TABLE 13-4: IMPROVE-EXPAND PROJECTS Pleasant Grove Reduce from 4 to 3 lanes 2018 Lansing Road 1.15 MLK to Jolly (grinding, striping, signage) R Lansing No West of Stanley to Reduce from 4 to 3 lanes 2018 Lansing Saginaw Street 1.55 Grand Avenue (striping & signage only) R Lansing No Reduce from 4 to 3 lanes 2018 Lansing Saginaw Street 1.60 Larch to Merrill (striping & signage only) R Lansing No 2018 Lansing Cedar/Pennsylvania /Edgewood Complex 0.60 Cedar at Pennsylvania/American ; Pennsylvania at I-96 ramps; Cedar at Edgewood Construct 3 roundabouts; reconstruct Cedar and Edgewood between roundabouts Exempt from Regional Emissions Modeling? (potential earmark) R Lansing LOCAL (IMPROVE-EXPAND) PROJECT COST: # Community may seek CMAQ funding at the appropriate time LOCAL REVENUE AVAILABLE: Waverly to Lansing city Reduce from 4 to 3 lanes, 2016 ICRC Willow Road 0.95 limit includes bike lanes Urban STP R ICRC No URBAN STP (IMPROVE-EXPAND) PROJECTS COST: ASSUMED URBAN STP REVENUE AVAILABLE: (B LIST) IMPROVE-EXPAND PROJECTS Pennsylvania 2025 Lansing Avenue at Miller Add north bound right turn lane # R Lansing Add west bound right turn lane; convert south bound right turn 2025 Lansing Cedar Street at Willoughby lane to through/right turn lane R Lansing LOCAL (IMPROVE-EXPAND) PROJECT COST: # Community may seek CMAQ funding at the appropriate time LOCAL REVENUE AVAILABLE: Page 8 of 9

15 TABLE 13-4: IMPROVE-EXPAND PROJECTS Harper (west leg) to 2020 ICRC Aurelius Road 1.50 Holt Road 2025 Lansing Waverly Road 1.80 Jolly to Moores River Harper to Wilcox: widen from 2 to 3 lanes; Wilcox to Holt: reduce from 4 to 3 lanes; add possible roundabout at Holt-Aurelius intersection; bike lanes on both sides Urban STP R ICRC No Add center left turn; acquire right of way Urban STP R Lansing No Exempt from Regional Emissions Modeling? URBAN STP (IMPROVE-EXPAND) PROJECTS COST: ASSUMED URBAN STP REVENUE AVAILABLE: (B LIST) IMPROVE-EXPAND PROJECTS 2026 Lansing Aurelius Road at Miller Construct roundabout # R Lansing 2030 MSU North Shaw and South Shaw (two way pair) 0.25 Red Cedar to Farm Lane Eliminate North Shaw; reduce south Shaw to emergency and bus access only R MSU No LOCAL (IMPROVE-EXPAND) PROJECTS COST: ASSUMED LOCAL REVENUE AVAILABLE: # Community may seek CMAQ funding at the appropriate time (B LIST) IMPROVE-EXPAND PROJECTS 2031 ICRC Okemos Road 1.50 Central Park to Haslett 2035 ICRC Marsh Road 0.50 Central Park to Tihart Raise grade and install turn pockets Urban STP R ICRC possible roundabouts at Central Park, Times Square and Tihart Urban STP R ICRC (Roundabouts are exempt) URBAN STP (IMPROVE-EXPAND) PROJECTS COST: ASSUMED URBAN STP REVENUE AVAILABLE: Page 9 of 9

16 TABLE 13-6: PRESERVE PROJECTS 2010 St. Johns Walker Street Clinton Transit Transit facility, Phase I St. Johns headquarters 2010 Webberville Main Street 0.41 Grand River to Pardee 2011 Potterville Main Street 0.50 Clinton to Whittemore (US Reconstruct BR) Small Urban R St. Johns Dunbar to Hartel and east of Dawn Court Construct new administration and maintenance building Reconstruct with curb and gutter, non-motorized lanes and parallel parking spaces Reconstruct with curb and gutter and sidewalk SMALL URBAN PROJECT COST: SMALL URBAN REVENUE AVAILABLE: 2010 Meridian Along north side of Interurban Off-Road Canadian National rail 1.10 Trail Phase II track from Okemos to Marsh LOCAL NON-MOTORIZED ENHANCEMENT COST: LOCAL NON-MOTORIZED ENHANCEMENT REVENUE (ALL ENHANCEMENT) AVAILABLE Construct non-motorized 2010 MDOT I-69 BL (Saginaw) 2.20 Coolidge to Alton pathway MDOT ENHANCEMENT COST: MDOT ENHANCEMENT REVENUE AVAILABLE: Small Urban R Small Urban R Small Urban R 1, , ,875.0 Construct paved off road trail Enhancement - Non-Motorized R Clinton Transit Webberville Webberville MDOT Enhancement Non-Motorized MDOT CCRC County Farm Road Over Spaulding Extension Bridge replacement Bridge (BRRP) R CCRC 2010 Eaton Rapids East Knight Street Over Grand River Preventative maintenance Bridge (BRRP) R Eaton Rapids 2010 ICRC Dobie Road Over Red Cedar River Replace bridge 1, ,355.0 Bridge (BRRP) R ICRC 2010 Lansing Kalamazoo Street Over the Grand River Preventative maintenance Bridge (BRRP) R Lansing 2010 Lansing Pennsylvania Avenue Over Red Cedar River Preventative maintenance Bridge (BRRP) R Lansing 2011 CCRC Herbison Road Over Looking Glass River Replace bridge ,000.0 Bridge (BRRP) R CCRC 2011 CCRC Anderson Road Over Hayworth Creek Replace bridge Bridge (BRRP) R CCRC LOCAL BRIDGE (BRRP) COST (PRESERVE): LOCAL BRIDGE (BRRP) COST (INCLUDING IMPROVE-EXPAND): LOCAL BRIDGE (BRRP) REVENUE AVAILABLE: Page 1 of 11

17 TABLE 13-6: PRESERVE PROJECTS Forest Hill to the east CCRC Grand River Highway * 0.40 Resurface mile EDFD R Columbia to Pleasant 2010 ICRC Waverly Road * 2.75 River Resurface and add paved shoulders R D EDFD/ STPR R ICRC 2010 CCRC Howe Road 5.00 Grange to Wacousta Seal coat (force account)/arra STPR 2010 ECRC Cochran Road 3.37 M-50 to Pinch Seal coat (force account)/arra STPR 2010 ECRC Mulliken and Needmore Roads 5.46 M-50 to Cochran Seal coat (force account)/arra STPR 2010 ECRC Cochran Road 5.06 Butterfield to Five Pont Highway Seal coat (force account)/arra STPR Lacey Lake Road to Battle 2010 ECRC Five Point Highway; Creek Road; Battle Creek 4.84 Seal coat (force account)/arra Ainger Road Road to Five Point 68.2 Highway 68.2 STPR 2010 ECRC Cochran Road; Benton Mt. Hope to M-43; M Road to Eaton Highway Seal coat (force account)/arra STPR 2010 ECRC Vermontville Highway 2.37 Hager Road to Vermontville village limit Seal coat (force account)/arra STPR 2010 ECRC Canal Road 5.50 Bentley to Vermontville Highway Seal coat (force account)/arra STPR 2010 ECRC Five Point Highway 4.60 Freeman to Narrow Lake Road Seal coat (force account)/arra STPR 2010 ECRC Kelly Highway 4.12 Hager to Brown Seal coat (force account) STPR ECRC 2010 ECRC Sunfield Road 2.69 M-43 to M-50 and north of Sunfield Seal coat (force account) STPR ECRC 2010 ECRC Hartel Road 3.55 Island to King Seal coat (force account) STPR ECRC 2010 ECRC Dow Road 4.69 M-43 to M-50 Seal coat (force account) STPR ECRC 2010 ECRC Otto Road 5.50 Kinsel to Doane Seal coat (force account) STPR ECRC 2010 ECRC Ionia Road; Nashville Nashville to valley; Curtis 5.01 Seal coat (force account) Hwy to Ionia Rd STPR ECRC 2010 ECRC Kalamo Highway 3.02 Pease to Shaytown Seal coat (force account) STPR ECRC 2010 ECRC Kalamo Highway 3.07 Ainger to Battle Creek Road Seal coat (force account) STPR ECRC 2010 ECRC Ionia Road 4.20 Bellevue Village limit to Five Point Seal coat (force account) STPR ECRC 2010 ECRC Narrow Lake Road; Bellevue Roads 5.50 Baseline to Bellevue; Narrow Lake to Royston Seal coat (force account) STPR ECRC Page 2 of 11

18 TABLE 13-6: PRESERVE PROJECTS 2010 ECRC Eaton Raids city limit to Kinneville Road; 6.00 Waverly; Bellevue to VFW Seal coat (force account) Waverly Road Highway 54.6 STPR ECRC 2010 ECRC VFW Highway to Tolles; Waverly Road; Plains 5.40 Eaton Rapids city limit to Seal coat (force account) Road Waverly 62.4 STPR ECRC 2011 CCRC Wright Rd 1.50 Fowler village limit to Colony Overlay existing HMA surface R STPR CCRC 2011 ECRC Marshall Road * 2.80 Five Point to Nye Rehabilitation R EDFD/ STPR D R 2012 CCRC Clintonia Rd 1.50 Price to.50 mile north of Centerline Overlay existing HMA surface STPR CCRC 2012 CCRC Hollister Road * 4.00 French to north county R Resurface EDFD/ STPR line D R CCRC 2012 ECRC Marshall Road * 1.40 Nye to Stine Resurface and construct paved R EDFD/ STPR shoulder D R 2013 CCRC Upton Rd 2.00 Herbison to Cutler Overlay existing HMA surface STPR CCRC 2013 ICRC Zimmer Road * 2.00 Sherwood to Haslett 1.40 Stine to Village of Olivet Resurface and add paved shoulder Resurface and construct paved shoulder R D R D R D R D EDFD/ STPR 2013 CCRC Hollister Road * 4.00 M-21 to French Resurface EDFD/ STPR CCRC R 2013 ECRC Marshall Road * EDFD/ STPR Resurface and construct paved 2014 ECRC Battle Creek Highway * 1.40 Carlisle to Kalamo EDFD/ STPR shoulder R 2014 CCRC Airport Road 3.00 Cutler to Pratt Resurface STPR CCRC 2014 ICRC Countywide chip seal Various locations Chip seal where appropriate STPR ICRC R R COMBINED EDFD/RURAL STP COST: COMBINED EDFD/RURAL STP REVENUE AVAILABLE: # * Federal column includes both federal and state D funds. # FY 2009 unspent appropriations account for the difference between costs and available revenue. Page 3 of 11

19 TABLE 13-6: PRESERVE PROJECTS 2010 ICRC Waverly Road 1.50 Willow to Grand River Resurface TEDF R ICRC 2011 ICRC Cedar Street 0.83 Dallas to Keller Resurface TEDF R ICRC 2012 ICRC Marsh Road 0.45 Grand River (M-43) to Central Park Resurface TEDF R ICRC 2013 St. Johns Tolles Road/Technical Drive/Zeeb Road 0.76 US 127 BR to Technical/Tolles to end/us 127 BR to Tolles Resurface TEDF R 2014 ICRC Marsh Road 0.45 Central Park to Tihart Resurface TEDF R ICRC TEDF "F" COST: TEDF "F" REVENUE AVAILABLE: MDOT I College Road to Meridian Road Reconstruct IM MDOT 2010 MDOT Okemos Rest Area -- I-96 wb east of Okemos Road Reconstruct rest area IM MDOT 2011 MDOT I-96 EB at the Grand Ledge Rest Area #825 Rest Area Bld./Site Work IM MDOT INTERSTATE MAINTENANCE COST: INTERSTATE MAINTENANCE REVENUE AVAILABLE: St. Johns 2010 MDOT M-43 (both directions) 0.57 Westmoreland to Walnut Reconstruct NHS MDOT 2011 MDOT US-127 NB 0.52 at the Lansing Rest Area Building Replacement/Site #810 Work NHS MDOT 2011 MDOT M East of Canal to west of Rosemary Mill and Resurface NHS MDOT NHS COST: NHS REVENUE AVAILABLE: Page 4 of 11

20 TABLE 13-6: PRESERVE PROJECTS 2010 MDOT US Clinton County Wetland Mitigation STP Flexible MDOT 2010 MDOT M structures on M-50 in Eaton County 2010 MDOT M Five structures on M-50 Bridge and culvert replacement (preliminary engineering) Bridge and culvert replacements STP Flexible MDOT STP Flexible MDOT 2010 MDOT M Noble Road to M-43 Mill & 2 course HMA resurface STP Flexible MDOT 2010 MDOT M WB over Grand Trunk Western Railroad Superstructure replacement STP Flexible MDOT 2010 MDOT M-43 EB (Saginaw) 0.13 Over Grand River Bridge replacement (preliminary engineering) STP Flexible MDOT 2010 MDOT Capital preventive maintenance CSM Regionwide CPM CSM bridge trunk line Bridge Trunkline STP Flexible MDOT 2010 MDOT CPM Road Trunkline -- Regionwide CPM Road Trunkline STP Flexible MDOT 2010 MDOT EPE/PE/ROW Trunkline -- Regionwide EPE/PE/ROW Trunkline STP Flexible MDOT 2010 MDOT Highway Safety Trunkline -- Regionwide Highway Safety trunkline STP Flexible MDOT 2010 MDOT M Railroad bridge over Oversite of traffic flagging and Oakland Avenue operations STP Flexible MDOT 2011 MDOT I-96 BR -- at I-96 northeast quadrant Expand and resurface Lot STP Flexible MDOT 2011 MDOT M ECL Williamston to east Jct of M-52 Mill and resurface STP Flexible MDOT STP FLEXIBLE COST: STP FLEXIBLE REVENUE AVAILABLE: MDOT I-96 under M-100 in Clinton County Bridge Repl & Interchg Reconst Bridge MDOT 2011 MDOT US Under Kipp Road, City of Mason Superstructure replacement Bridge MDOT MDOT Bridge COST: MDOT Bridge AVAILABLE: MDOT I-69 and I-69BL in the Northwest Quadrant Mill and Resurface carpool lot Carpool MDOT MDOT CARPOOL LOT COST: MDOT CARPOOL LOT AVAILABLE: 43.6 Page 5 of 11

21 TABLE 13-6: PRESERVE PROJECTS URBAN STP PRESERVE PROJECTS 2010 East Lansing Harrison Avenue 0.64 Trowbridge to Kalamazoo Reconstruct existing four lane boulevard; replace curb and gutter Urban STP East Lansing 2010 ICRC Mt. Hope Road 0.67 Farm Lane to Hagadorn Resurface Urban STP ICRC 2010 Lansing Kalamazoo St 0.34 Larch to Pennsylvania Reconstruct Urban STP Lansing 2010 Grand Ledge Spring Street/West Reconstruct with curb and 0.15 Pleasant to Jenne Lincoln gutter Urban STP Grand Ledge 2010 ICRC Waverly Road 0.50 St. Joseph to Michigan Resurface, repair curb and gutter Urban STP ICRC 2010 CCRC State Road 1.00 US 127 BR to Wood Resurface Urban STP CCRC 2010 Lansing Executive Drive 0.39 Keystone to Miller Restore & Rehabilitate Urban STP Lansing 2010 Lansing Keystone Ave 0.47 Pennsylvania to Enterprise Restore & Rehabilitate Urban STP Lansing 2010 Lansing Moores River Drive Mount Hope to Frances Reconstruct and add nonmotorized lanes 0.41 (ACC) Park Urban STP Lansing 2011 ICRC Waverly Road 0.50 Grand River bridge to Resurface, bridge Lansing Rd. superstructure repairs Urban STP ICRC Reconstruct existing 4 lane 2011 East Lansing Harrison Avenue (AC) 0.55 Mount Hope to boulevard; replace curb and East Lansing Trowbridge gutter Urban STP 2011 ICRC Mt. Hope Road 1.60 Hagadorn to Okemos Resurface Urban STP ICRC 2011 ECRC Canal Road 1.90 Bridge Highway to Lansing Road Restore and rehabilitate Urban STP ECRC 2011 Lansing Clippert St 0.23 Michigan to Kalamazoo Reconstruct Urban STP Lansing 2011 Lansing Turner St 0.27 Sheridan to Carrier Reconstruct Urban STP Lansing 2011 Lansing Jolly Road 0.51 Aurelius to Dunckel Restore & Rehabilitate Urban STP Lansing 2011 CCRC Clark Road 0.75 Watson to Webster Resurface Urban STP CCRC 2011 Grand Ledge DeGroff Street (AC) 0.25 M-43 to Edwards Reconstruct and add nonmotorized lanes Urban STP Grand Ledge 2011 Lansing Clippert St 0.52 Saginaw to Michigan Reconstruct Urban STP Lansing 2012 ICRC Cedar St 0.64 Holt to Aurelius Reduce from 4 to 3 lanes including bike lanes Urban STP R ICRC No 2012 East Lansing Harrison Avenue (ACC) 0.55 Mount Hope to Trowbridge 2012 ICRC Willoughby Road 2.30 Washington to Beryl Reconstruct existing 4 lane boulevard; replace curb and gutter Resurface and reconfigure intersection with Aurelius Road Urban STP East Lansing Urban STP ICRC 2012 ICRC Washington Road 1.10 Holt Road to Willoughby Resurface Urban STP ICRC 2012 Lansing Washington Ave 0.39 CN Railroad to Main St Reduce from 5 to 3 lanes 1, ,678.8 Urban STP R Lansing No Page 6 of 11

22 TABLE 13-6: PRESERVE PROJECTS 2012 Grand Ledge Bridge/Jenne corridor 0.20 Scott to Jenne/Lincoln to Reconstruct and add nonmotorized lanes Lamson Urban STP Grand Ledge 2012 CCRC Turner Road 1.00 Stoll to Clark Resurface Urban STP CCRC 2012 Grand Ledge DeGroff Street (ACC) 0.25 M-43 to Edwards Reconstruct and add nonmotorized lanes Urban STP Grand Ledge 2012 Lansing Holmes Road 0.76 MLK to Pleasant Grove Restore & Rehabilitate Urban STP Lansing 2012 DeWitt Main Street 0.61 Norris to Scott Resurface and sidewalk repair to include ADA ramps Urban STP DeWitt 2012 Lansing Jolly Road 0.76 Pennsylvania to Aurelius Restore & Rehabilitate Urban STP Lansing Resurface and restripe from ICRC Lake Lansing Road 1.10 Lac du Mont to Marsh to 3 lanes with addition of nonmotorized lanes Urban STP R ICRC No 2013 ICRC Kipp Road 2.23 US 127 to Dexter Trail Resurface and replace curb and gutter Urban STP ICRC 2013 ICRC Haslett Road 1.00 Okemos to Marsh Resurface and replace curb and gutter Urban STP ICRC 2013 Lansing Lowcroft Ave (including one block of Washington, N of Jolly) 1.04 Holmes to Jolly (AC) Reconstruct ac ,093.2 Urban STP Lansing Saginaw to Lake Lansing Road Reconstruct and replace curb and gutter 2013 East Lansing Harrison Avenue ,055.0 East Lansing Urban STP 2013 CCRC Turner Road 1.00 State to Stoll Resurface Urban STP CCRC 2013 Lansing Holmes Road 0.98 Cedar to MLK Restore & Rehabilitate Urban STP Lansing 2014 Lansing Lowcroft Ave (including one block of Washington, N of Jolly) 2014 ICRC Michigan Avenue Holmes to Jolly (ACC) Reconstruct acc Waverly to Lansing city limit Resurface from Waverly to Rosemary; restripe portion from Rosemary to city limit from 4 to 3 lanes with addition of non-motorized lanes Urban STP Urban STP R No 2014 ECRC Elmwood 1.00 M-43 to Willow Resurface Urban STP ECRC Lansing ICRC 2014 Lansing Pennsylvania 0.58 Cedar to Miller Reconstruct ,228.5 Urban STP Lansing Page 7 of 11

23 TABLE 13-6: PRESERVE PROJECTS 2014 East Lansing Kalamazoo Street 0.71 West city limit to Harrison Resurface Urban STP East Lansing 2010 ICRC Waverly Road * 1.50 Willow to Grand River Resurface Urban STP 2010 Lansing Edgewood Blv * 1.33 Washington to Cedar Resurface Urban STP Reconstruct from Berwick to Deerfield; resurface Deerfield 2010 Lansing Holmes Road * 0.80 Berwick to Pleasant Grove Lansing to Pleasant Grove at City's Urban STP expense URBAN STP (PRESERVE) COST: URBAN STP (PRESERVE PLUS IMPROVE-EXPAND) COST: URBAN STP REVENUE AVAILABLE: * These projects are funded through the American Resource and Recovery Act (ARRA) stimulus funding that was released in These costs are not tabulated for purposes of documenting financial constraint except for the local portion of Holmes Road. LANSING GENERAL PROGRAM ACCOUNT () UPDATE # 2010 MDOT Highway Safety Regionwide Highway Safety ST MDOT 2010 MDOT Bridge Regionwide Bridge BRO MDOT 2010 MDOT Enhancements Lcoal Regionwide Enhancements STE MDOT 2010 MDOT Capital Preventative Maintenance (CPM) Regionwide CPM CSM bridge trunkline CSM Bridge BRO R MDOT 2010 MDOT CPM Road Trunkline Regionwide CPM road trunkline ST R MDOT 2010 MDOT EPE/PE/RPW Trunkline Regionwide EPE/PE/ROW trunkline ST MDOT 2010 MDOT Highway Safety Trunkline Regionwide Highway safety trunkline ST MDOT 2010 MDOT Rail Crossings Regionwide Highway rail crossings ST MDOT 2010 MDOT Trunkline Enhancement Regionwide Trunkline enhancement STE MDOT 2010 MDOT Highway Rail Crossing Regionwide Trunkline rail crossings ST MDOT 2010 GENERAL PROGRAM ACCOUNT: # s beyond 2010 are compiled by TCRPC staff based on historical trends. Page 8 of 11

24 TABLE 13-6: PRESERVE PROJECTS MDOT Highway Safety Regionwide Highway Safety ST MDOT MDOT Bridge Regionwide Bridge BRO MDOT MDOT Enhancements Lcoal Regionwide Enhancements STE MDOT Capital Preventative MDOT Maintenance (CPM) Regionwide CPM CSM bridge trunkline CSM Bridge BRO R MDOT MDOT CPM Road Trunkline Regionwide CPM road trunkline ST R MDOT MDOT EPE/PE/RPW Trunkline Regionwide EPE/PE/ROW trunkline ST MDOT MDOT Highway Safety Trunkline Regionwide Highway safety trunkline ST MDOT MDOT Rail Crossings Regionwide Highway rail crossings ST MDOT MDOT Trunkline Enhancement Regionwide Trunkline enhancement STE MDOT MDOT Highway Rail Crossing Regionwide Trunkline rail crossings ST MDOT GENERAL PROGRAM ACCOUNT: MDOT Highway Safety Regionwide Highway Safety ST MDOT MDOT Bridge Regionwide Bridge BRO MDOT MDOT Enhancements Lcoal Regionwide Enhancements STE MDOT MDOT Capital Preventative Maintenance (CPM) Regionwide CPM CSM bridge trunkline CSM Bridge BRO R MDOT MDOT CPM Road Trunkline Regionwide CPM road trunkline ST R MDOT MDOT EPE/PE/RPW Trunkline Regionwide EPE/PE/ROW trunkline ST MDOT MDOT Highway Safety Trunkline Regionwide Highway safety trunkline ST MDOT MDOT Rail Crossings Regionwide Highway rail crossings ST MDOT MDOT Trunkline Enhancement Regionwide Trunkline enhancement STE MDOT MDOT Highway Rail Crossing Regionwide Trunkline rail crossings ST MDOT GENERAL PROGRAM ACCOUNT: # s beyond 2010 are compiled by TCRPC staff based on historical trends. Page 9 of 11

25 TABLE 13-6: PRESERVE PROJECTS MDOT Highway Safety Regionwide Highway Safety ST MDOT MDOT Bridge Regionwide Bridge BRO MDOT MDOT Enhancements Lcoal Regionwide Enhancements STE MDOT Capital Preventative MDOT Maintenance (CPM) Regionwide CPM CSM bridge trunkline CSM Bridge BRO R MDOT MDOT CPM Road Trunkline Regionwide CPM road trunkline ST R MDOT MDOT EPE/PE/RPW Trunkline Regionwide EPE/PE/ROW trunkline ST MDOT MDOT Highway Safety Trunkline Regionwide Highway safety trunkline ST MDOT MDOT Rail Crossings Regionwide Highway rail crossings ST MDOT MDOT Trunkline Enhancement Regionwide Trunkline enhancement STE MDOT MDOT Highway Rail Crossing Regionwide Trunkline rail crossings ST MDOT GENERAL PROGRAM ACCOUNT: MDOT Highway Safety Regionwide Highway Safety ST MDOT MDOT Bridge Regionwide Bridge BRO MDOT MDOT Enhancements Lcoal Regionwide Enhancements STE MDOT MDOT Capital Preventative Maintenance (CPM) Regionwide CPM CSM bridge trunkline CSM Bridge BRO R MDOT MDOT CPM Road Trunkline Regionwide CPM road trunkline ST R MDOT MDOT EPE/PE/RPW Trunkline Regionwide EPE/PE/ROW trunkline ST MDOT MDOT Highway Safety Trunkline Regionwide Highway safety trunkline ST MDOT MDOT Rail Crossings Regionwide Highway rail crossings ST MDOT MDOT Trunkline Enhancement Regionwide Trunkline enhancement STE MDOT MDOT Highway Rail Crossing Regionwide Trunkline rail crossings ST MDOT GENERAL PROGRAM ACCOUNT: # s beyond 2010 are compiled by TCRPC staff based on historical trends. Page 10 of 11

26 TABLE 13-6: PRESERVE PROJECTS MDOT Highway Safety Regionwide Highway Safety ST MDOT MDOT Bridge Regionwide Bridge BRO MDOT MDOT Enhancements Lcoal Regionwide Enhancements STE MDOT Capital Preventative MDOT Maintenance (CPM) Regionwide CPM CSM bridge trunkline CSM Bridge BRO R MDOT MDOT MDOT MDOT MDOT MDOT MDOT CPM Road Trunkline EPE/PE/RPW Trunkline Highway Safety Trunkline Rail Crossings Trunkline Enhancement Highway Rail Crossing # s beyond 2010 are compiled by TCRPC staff based on historical trends. Regionwide CPM road trunkline ST R MDOT Regionwide EPE/PE/ROW trunkline ST MDOT Regionwide Highway safety trunkline ST MDOT Regionwide Highway rail crossings ST MDOT Regionwide Trunkline enhancement STE MDOT Regionwide Trunkline rail crossings ST MDOT GENERAL PROGRAM ACCOUNT: Page 11 of 11

27 TABLE 13-18: MANAGEMENT AND OPERATIONS PROJECTS 2010 St. Johns N. Lansing Street 0.35 Lewis to 200 feet north of Daisy Lane 2010 St. Johns Morton Street 0.28 Sickles to Park 2011 CCRC Clark Road -- Intersection with Wood 2011 CCRC North county line road 0.25 Ely Road to east.25 mile 2012 CCRC Wright Road 0.50 Walker to south.50 mile Safety improvements on vicinity of Gateway North Elementary, including addition of sidewalks, crossings, and curb and gutter, plus concrete joint repair Construct 10 foot sidewalk in vicinity of Gatewood Elementary, middle school and high school, fairgrounds and city park to improve safety Lengthen transition on Wood to accommodate a signal; add signal Verticle curve modification to improve site distance Replace 3 large narrow culverts, widen shoulder and relocate county drain to eliminate narrow shoulder Safety R St. Johns Safety R St. Johns Safety R CCRC HRRR R CCRC HRRR R CCRC 2012 ICRC Cedar St 0.64 Holt to Aurelius Reduce from 4 to 3 lanes including bike lanes Urban STP R ICRC No 2012 Lansing Washington Ave 0.39 CN Railroad to Main St Reduce from 5 to 3 lanes 1, ,678.8 Urban STP R Lansing No Resurface and restripe from 4 to 3 lanes with 2013 ICRC Lake Lansing Road 1.10 Lac du Mont to Marsh addition of non-motorized lanes Urban STP R ICRC No 2014 ICRC Michigan Avenue 1.00 Waverly to Lansing city limit 2010 Lansing Holmes Road 2.30 Waverly to Cedar (except Wash to Logan Sq) Resurface from Waverly to Rosemary; restripe portion from Rosemary to city limit from 4 to 3 lanes with addition of non-motorized lanes Reduce from 4 to 3 lanes (grinding, striping, signage) Urban STP R ICRC No R Lansing No 2010 Lansing Mt. Hope Avenue at Washington Add left turn lanes R Lansing 2011 Lansing Jolly Road 1.80 Waverly to MLK Reduce from 4 to 3 lanes (grinding, striping, signage) R Lansing No 2011 Lansing Mt. Hope Avenue 2.30 Moores River to Washington Reduce from 4 to 3 lanes (grinding, striping, signage) R Lansing No 2012 Lansing Capitol Avenue 1.25 Main to Oakland Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No 2012 Lansing Grand Avenue 0.15 St. Joe to Lenawee Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No # Community may seek CMAQ funding at the appropriate time. Page 1 of 4

28 TABLE 13-18: MANAGEMENT AND OPERATIONS PROJECTS 2012 Lansing Grand Avenue 1.05 Lenawee to Oakland Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No 2012 Lansing Townsend Street 0.25 Elm to Main Reduce from 4 to 3 lanes (grinding, striping, signage) R Lansing No 2012 ICRC Cedar Street 0.64 Holt to Aurelius Reduce from 4 to 3 lanes; includes bike lanes Urban STP R ICRC No 2012 Lansing Washington 0.89 Mt. Hope to Main Reduce from 5 to 3 lanes, including bike lanes Urban STP R Lansing No 2013 ICRC Lake Lansing Road at Okemos Add possible roundabout at Okemos-Lake Lansing # R ICRC 2013 ICRC for Okemos Road Hamilton Road intersection Possible modern roundabout (2 to 3 lanes) Meridian Meridian Township Township DDA # R DDA 2013 ICRC Lake Lansing Road 1.10 Lac du Mont to Marsh Reduce from 4 to 3 lanes Urban STP R ICRC No 2013 East Lansing Harrison Avenue 1.04 Saginaw to Lake Lansing Reconstruct and reduce from 4 to 3 lanes East Road Urban STP R Lansing No 2014 ICRC Michigan Avenue 1.00 Waverly to Lansing city limit Restripe portion from Rosemary to city limit from 4 to 3 lanes; includes bike lanes Urban STP R ICRC No 2015 ICRC Forest/Farm Lane College at Forest Possible roundabout at Forest and College Corridor # R ICRC 2016 Lansing MLK Blvd at Willow Construct roundabout # R Lansing 2016 Lansing Pine Street 0.43 Shiawassee to Oakland Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No 2016 Lansing Pine Street 0.82 Main to Shiawassee Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No 2016 Lansing Walnut Street 0.82 Main to Shiawassee Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No 2016 Lansing Walnut Street 0.43 Shiawassee to Oakland Switch from one way to two way (intersection improvements, signal upgrades, signing & striping) R Lansing No 2016 Lansing Willow Street 0.60 Sunset to MLK Blvd Intersection improvements; acquire right of way R Lansing 2016 ICRC Willow Road 0.95 Waverly to Lansing city limit Reduce from 4 to 3 lanes, includes bike lanes Urban STP R ICRC No 2018 Lansing East Grand River 0.60 Wood to Howard Reduce from 4 to 3 lanes (striping & signage only) R Lansing No # Community may seek CMAQ funding at the appropriate time. Page 2 of 4

29 TABLE 13-18: MANAGEMENT AND OPERATIONS PROJECTS 2018 Lansing East Grand River 0.35 Railroad tracks east of Reduce from 4 to 3 lanes (grinding, striping, Avenue Larch to Massachusetts signage) R Lansing No 2018 Lansing Kalamazoo Street 0.15 ML King Blvd to Sycamore Add left turn lanes at intersection R Lansing 2018 Lansing Michigan Avenue 0.60 Detroit Street to Friendship Boulevard reduced from 3 lanes to 2 lanes in Circle each direction with the addition of bike lanes R Lansing No 2018 Lansing MLK Jr. Blvd North of Oakland to Grand Reduce from 4 to 3 lanes (grinding, striping, River signage) R Lansing No 2018 Lansing Mt. Hope Avenue at Cedar Add left turn lanes R Lansing 2018 Lansing Mt. Hope Avenue 0.85 Aurelius to east city limit Reduce from 4 to 3 lanes (grinding, striping, signage) R Lansing No 2018 Lansing Pleasant Grove Road 1.15 MLK to Jolly Reduce from 4 to 3 lanes (grinding, striping, signage) R Lansing No 2018 Lansing Saginaw Street 1.55 West of Stanley to Grand Reduce from 4 to 3 lanes (striping & signage Avenue only) R Lansing No 2018 Lansing Saginaw Street 1.60 Larch to Merrill Reduce from 4 to 3 lanes (striping & signage only) R Lansing No 2018 Lansing Cedar/Pennsylvania/Edg Construct 3 roundabouts; reconstruct Cedar and ewood Complex Edgewood between roundabouts 0.60 Cedar at Pennsylvania/American; Pennsylvania at I-96 ramps; Cedar at Edgewood 2020 ICRC Aurelius Road 1.50 Harper (west leg) to Holt Road Harper to Wilcox: widen from 2 to 3 lanes; Wilcox to Holt: reduce from 4 to 3 lanes; add possible roundabout at Holt-Aurelius intersection; bike lanes on both sides (potential earmark) R Lansing Urban STP R ICRC No 2025 Lansing Pennsylvania Avenue at Miller Add north bound right turn lane # R Lansing 2025 Lansing Cedar Street at Willoughby Add west bound right turn lane; convert south bound right turn lane to through/right turn lane R Lansing 2025 Lansing Waverly Road 1.80 Jolly to Moores River Add center left turn; acquire right of way Urban STP R Lansing No 2026 Lansing Aurelius Road at Miller Construct roundabout # R Lansing 2030 MSU North Shaw and South Shaw (two way pair) 0.25 Red Cedar to Farm Lane Eliminate North Shaw; reduce south Shaw to emergency and bus access only R MSU No 2031 ICRC Okemos Road 1.50 Central Park to Haslett Raise grade and install turn pockets Urban STP R ICRC 2035 ICRC Marsh Road 0.50 Central Park to Tihart Widen from 4 to 5 lanes; add possible roundabouts at Central Park, Times Square and Tihart intersections with Marsh Urban STP R ICRC No # Community may seek CMAQ funding at the appropriate time. Page 3 of 4

30 TABLE 13-18: MANAGEMENT AND OPERATIONS PROJECTS LANSING GENERAL PROGRAM ACCOUNT () UPDATE Capital Preventative 2010 MDOT Maintenance (CPM) CSM Regionwide CPM CSM bridge trunkline Bridge Urban STP R MDOT 2010 MDOT CPM Road Trunkline Regionwide CPM road trunkline Urban STP R MDOT Capital Preventative MDOT Maintenance (CPM) CSM Regionwide CPM CSM bridge trunkline Bridge Urban STP R MDOT MDOT CPM Road Trunkline Regionwide CPM road trunkline Urban STP R MDOT MDOT Capital Preventative Maintenance (CPM) CSM Regionwide CPM CSM bridge trunkline Bridge Urban STP R MDOT MDOT CPM Road Trunkline Regionwide CPM road trunkline Urban STP R MDOT MDOT Capital Preventative Maintenance (CPM) CSM Regionwide CPM CSM bridge trunkline Bridge Urban STP R MDOT MDOT CPM Road Trunkline Regionwide CPM road trunkline Urban STP R MDOT MDOT Capital Preventative Maintenance (CPM) CSM Regionwide CPM CSM bridge trunkline Bridge Urban STP R MDOT MDOT CPM Road Trunkline Regionwide CPM road trunkline Urban STP R MDOT MDOT Capital Preventative Maintenance (CPM) CSM Regionwide CPM CSM bridge trunkline Bridge Urban STP R MDOT MDOT CPM Road Trunkline Regionwide CPM road trunkline Urban STP R MDOT MANAGEMENT AND OPERATIONS PROJECT COSTS *: MANAGEMENT AND OPERATIONS PROJECT REVENUE AVAILABLE: MANAGEMENT AND OPERATIONS PROJECT REVENUE AVAILABLE: * Management and Operations costs are identified for informationl purposes. These projects costs are tabulated by funding program for purposes of documenting financial constraint. # Community may seek CMAQ funding at the appropriate time. Page 4 of 4

31 APPENDIX D: ILLUSTRATIVE LIST OF UNFUNDED PROJECTS Location Proposed Improvement Federal Non-Fed Total Federal Non-Fed Construct LT at 6 intersections, head up County Farm with L St. Johns Townsend 0.70 Oakland to US 127 BR Swegles and bike paths CMAQ St. Johns Add dedicated left and right turn L Eaton County St. Joe Highway Intersection with Broadbent lanes CMAQ Eaton County L CATA Public education Areawide Public education CMAQ CATA L CATA Commute alternative Areawide Commute alternatives CMAQ CATA L Lansing Raodway sensors/adaptive signal timing Citywide S MDOT NB US 127-off ramp Exit ramps at Grand River S MDOT NB US 127-off ramp Exit ramps at Grand River S MDOT NB US Grand River to Lake Lansing S MDOT NB US Grand River to Lake Lansing S MDOT NB US Kalamazoo to Grand River S MDOT Michivan program support Countywide Roadway sensors and adaptive signal timing plans at up to 44 intersections Design 2 lane exit ramp with dedicated lanes on exit ramp to separate traffic for LT and RT to Grand River Construct 2 lane exit ramp with dedicated lanes on exit ramp to separate traffic for LT and RT to Grand River Design auxiliary weave lane by connecting Grand River off ramp to Lake Lansing off ramp Construct auxiliaryweave lane by connecting Grand River off ramp to Lake Lansing off ramp Design auxiliary weave lane by connecting I-496 ramp to the Grand River ramp Continuation of Ingham County Michi Van Program TOTAL 2010 CMAQ: CMAQ Lansing CMAQ MDOT CMAQ MDOT CMAQ MDOT CMAQ MDOT CMAQ MDOT CMAQ MDOT Page 1 of 7

CAPACITY EXPANDING LONG RANGE PLAN OPTIONS FOR ALTERNATIVES ANALYSIS

CAPACITY EXPANDING LONG RANGE PLAN OPTIONS FOR ALTERNATIVES ANALYSIS CAPACITY EXPANDING LONG RANGE PLAN OPTIONS FOR ALTERNATIVES ANALYSIS Based on Applications Submitted to TCRPC and Presented to Town Hall Forums in December, 2008 and Additional Updates and LRP Task Force

More information

Tri County Regional Planning Commission FY Transportation Improvement Program Nominated Projects January 8, 2016

Tri County Regional Planning Commission FY Transportation Improvement Program Nominated Projects January 8, 2016 1 West Lovett Cochran Ave. (M-50) Clinton Street City of Charlotte 0.20 2 Reconstruct existing Central Business Dist. road. PASER Ratings 2/3. 2017 $375,000 $335,000 $710,000 2 East Harris Cochran Ave.

More information

PUBLIC SERVICE DEPARTMENT

PUBLIC SERVICE DEPARTMENT PUBLIC SERVICE DEPARTMENT Engineering Division 732 City Hall 124 West Michigan Avenue Lansing, Michigan 48933 (517) 483-4455 FAX: (517) 483-6082 http://publicservice.cityoflansingmi.com March 30, 2011

More information

S/TIP LIST OF PROJECTS

S/TIP LIST OF PROJECTS LI OF PROJECTS : October 04, 2018 Page: 1 of 5 Responsible GPA Type Name Limits Length Primary 2017 120683 Berrien Berrien Line Dayton Rd Multiple 2.448 Segments $69,210 $0 $24,742 $93,952 $93,952.00 U

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

FY Regional Transportation Improvement Program

FY Regional Transportation Improvement Program FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

Annual Listing of Obligated MPO Projects

Annual Listing of Obligated MPO Projects Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,

More information

2019 Federal Transportation Improvement Program

2019 Federal Transportation Improvement Program VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017 DES MOINES AREA MPO Presentation to Iowa Commercial Real Estate Association April 6, 2017 Presentation Outline MPO Overview Trends We re Watching Plans, Projects, Initiatives, Regional Transportation Priorities

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

Agenda Item No. 6C ATTACHMENT 1

Agenda Item No. 6C ATTACHMENT 1 ATTACHMENT District Bike Plan Proposed s Hillside Ln Livermore D TAC

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Planned Improvements from Sector & Area Plans that have been added to the MTP

Planned Improvements from Sector & Area Plans that have been added to the MTP Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018 Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road

More information

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

APPENDIX M FOR THE JEFFERSON COUNTY PORTION OF THE VISION 2050 PLAN RECOMMENDATIONS MILWAUKEE URBANIZED AREA INTRODUCTION

APPENDIX M FOR THE JEFFERSON COUNTY PORTION OF THE VISION 2050 PLAN RECOMMENDATIONS MILWAUKEE URBANIZED AREA INTRODUCTION INTRODUCTION Following the 2010 U.S. Census, 70 the Milwaukee urbanized area boundary extends beyond the Southeastern Wisconsin Region across the boundary line between Waukesha and Jefferson Counties,

More information

City of East Lansing Non-motorized Transportation Plan

City of East Lansing Non-motorized Transportation Plan City of East Lansing Non-motorized Transportation Plan Prepared for: City of East Lansing Prepared by: May 11, 2011 Contents 1. Introduction...1 1.1 Glossary of Terms... 2 2. Existing Conditions...7 2.1

More information

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Trans-Canada Highway 1 RW Bruhn Bridge Replacement Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

CORVALLIS AREA METROPOLITAN PLANNING ORGANIZATION

CORVALLIS AREA METROPOLITAN PLANNING ORGANIZATION CORVALLIS AREA METROPOLITAN PLANNING ORGANIZATION 301 SW 4 th Street, Suite 240 Corvallis, Oregon 97333 Phone: 541-758-1911 Fax: 541-758-1903 www.corvallisareampo.org PROJECT ADVISORY COMMITTEE (PAC) Friday,

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

RZC Appendix 8A Marymoor Subarea Street Requirements

RZC Appendix 8A Marymoor Subarea Street Requirements RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS

More information

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009 Road Projects Project Project Description TIP # Location NC 51 SC state line to Downs Circle U-3447 Pineville NC 218 I-485 to US 74 R-5114 Meck/Union/Anson Little Rock Road Intersection improvement U-5116

More information

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007 Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

Applications for Funding

Applications for Funding Coordinated Call for Projects Second Cycle of OBAG, TLC and PBTF Funding Applications for Funding As of The following table lists the applications for funding available through the Coordinated Call for

More information

San Tomas Expressway

San Tomas Expressway Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

APPENDIX E GRADE CROSSING LOCATIONS

APPENDIX E GRADE CROSSING LOCATIONS APPENDIX E GRADE CROSSING LOCATIONS 1 2 3 Citrus Avenue Riverside County and City Palmyrita Avenue Columbia Avenue MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3 027303M 1. Existing

More information

State Highway 44/State Street High Capacity Corridor

State Highway 44/State Street High Capacity Corridor Background State Highway 44/State Street runs from I-84 in Canyon County through parts of the cities of Middleton, Star, Eagle, and Garden City to downtown Boise. It is a commuter route from several communities

More information

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1) Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

West End Connectivity Master Plan

West End Connectivity Master Plan West End Connectivity Master Plan Office of Commissioner Juan C. Zapata District 11 Page 1 of 13 Juan C. Zapata MIAMI- DADE COUNTY COMMISSIONER Introduction I am pleased to announce the West End Connectivity

More information

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Phone: Fax: Project Reference No. (to be filled out by MassHighway): Massachusetts Highway Department District 3 Project Need Form (PNF) This form is intended to provide preliminary information about the proposed project. It is not expected that all information that is

More information

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.

More information

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek, INDIANA PROJECTS 1558 Bridge 51 1601823 1601971 I 64 Blackiston Mill Road Phase II Charlestown Rd. Clark State Forest Road Maintenance E. Main Street Improvements to Blackiston Mill Road from just north

More information

CY2017 Summary of STP applications

CY2017 Summary of STP applications CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run

More information

City Avenue Projects

City Avenue Projects City Avenue Projects City Avenue Special Services District Conceived in the early 1990 s Lita Cohen, Jim Ettelson, Joe Manko, and Michael Nutter Saint Joseph s provided key start-up support. True Public/Private

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

HIGHWAY CAPITAL IMPROVEMENT PLAN

HIGHWAY CAPITAL IMPROVEMENT PLAN 2018 2023 HIGHWAY CAPITAL IMPROVEMENT PLAN 0.5% Sales Tax CIP July 25, 2017 6-Year CIP Summary 2018-2023 CALENDAR YEAR 2018 Highway & Bridge Improvement Projects COUNTY PROJECT LANE IMPROVEMENT TOTAL FEDERAL

More information

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices FY 2017-2026 Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices November 1, 2017 Forecasted Growth Arlington continues to grow with a shift towards multi-family

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

Roadway Project Recommendations:

Roadway Project Recommendations: Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 MAJOR WIDENING TO 4 LANES FROM 1.0 MI E OF DENIS JONES RD TO BETHEL CHURCH RD. B0060 1.10 BALLARD US 60 3.700 INCLUDES KEVIL BYPASS.

More information

Evolving Roadway Design Policies for Walking and Bicycling

Evolving Roadway Design Policies for Walking and Bicycling Evolving Roadway Design Policies for Walking and Bicycling The 2016 Michigan Transportation Planning Conference Kalamazoo, MI July 13, 2016 Title 23 of the Code of Federal Regulations Title 23 was originally

More information

2.0 Existing Conditions

2.0 Existing Conditions 20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural

More information

FUNDING SOURCES CHAPTER 6

FUNDING SOURCES CHAPTER 6 CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2

More information

INTERSTATE 540 IMPROVEMENT STUDY

INTERSTATE 540 IMPROVEMENT STUDY INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY APRIL, 2006 INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY April, 2006 Prepared by Parsons Transportation Group

More information

Lake Waterford Community Association Meeting. November 15, 2016

Lake Waterford Community Association Meeting. November 15, 2016 Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

Chapter 3 DESIGN SPECIFICATIONS

Chapter 3 DESIGN SPECIFICATIONS Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Hennepin County Transportation Department

Hennepin County Transportation Department Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation

More information

City Avenue Projects

City Avenue Projects City Avenue Projects City Avenue Special Services District Conceived in the early 1990 s Lita Cohen, Jim Ettelson, Joe Manko, and Michael Nutter Saint Joseph s provided key start-up support. True Public/Private

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL Today s Agenda 1. 2. 3. 4. 5. Overview of the MEPA Process Project Overview

More information

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING 4. IMPLEMENTATION PHASES & FUNDING HOOPA DESIGN FAIR 4-1 4. IMPLEMENTATION PHASES & FUNDING Phase One Development 1. Implementation The Conceptual Plan recommends five concept elements to revitalize downtown

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

Prince George s County plans, policies, and projects

Prince George s County plans, policies, and projects Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information