1 S E C T I O N 1 Purpose and Need for Proposed Action Section 1 describes the purpose of, and the need for, the proposed US Highway 14 (US 14) improvements. Because this is a long-range study, this section evaluates the need for improvements based on both existing transportation problems and anticipated future problems through Introduction The Minnesota Department of Transportation (Mn/DOT) prepared this Draft Environmental Impact Statement (Draft EIS or DEIS) to study improvements proposed to US 14 from Front Street, near the western terminus of the US 14 Minnesota River bridge in New Ulm, to County Road 6, near North Mankato (see Exhibit 1-1, Study Area Map). This 22.5-mile long corridor includes portions in the cities of New Ulm (in Brown County), as well as Courtland and Nicollet (in Nicollet County). US 14 is a major east-west highway, located in southern Minnesota that is part of the Minnesota Trunk Highway system, as well as the U.S. Department of Transportation s National Highway System (NHS). The highway extends approximately 1,500 miles from the entrance of Yellowstone National Park near Cody, Wyoming to Chicago, Illinois. Within Minnesota, US 14 extends from the South Dakota border through New Ulm, Mankato, and Rochester and then east to La Crescent, MN, where it crosses the Mississippi River into Wisconsin. In 1999, Mn/DOT identified the stretch of US 14 from New Ulm to Rochester as a Medium Priority Interregional Corridor (IRC). The IRC designation means that US 14 is among 2,930 miles of highway that tie Minnesota s largest economic centers together. The portion of US 14 studied in this DEIS is the western-most part of a designated interregional travel corridor, connecting the growing regional centers of New Ulm and Mankato (see Section 3 for more information about land use and growth in the study area). The portion of US 14 studied in this DEIS is the western-most part of a designated interregional travel corridor, connecting the growing regional centers of New Ulm and Mankato (see Section 3 for more information about land use and growth in the study area). The goal of the IRC System is to provide efficient connections among regional trade centers. The existing 2-lane highway is classified as a principal arterial. It serves daily commuters and commercial or truck traffic, and also provides access to homes, farms, and businesses. The majority of the land within the study area is rural in nature, partially due to zoning policies enacted by Nicollet County in 1981 to preserve agricultural land. The Swan Lake Wildlife Management Area (WMA), located primarily north of US 14 between Courtland and Nicollet, is another major feature of the study area (see Section 3 for more details regarding land use features and growth in the study area). 1-1 NEW ULM N. MANKATO, MN

2 US 14 Draft EIS New Ulm to North Mankato Exhibit 1-1 Study Area Map

3 1.2 Project Purpose Mn/DOT s long-term objective for US 14 is to provide safe and reliable transportation. This goal is consistent with Mn/DOT s vision and mission, as stated in its Strategic Plan: 1 Vision A coordinated transportation network that meets the needs of Minnesota's citizens and businesses for safe, timely, and predictable travel. Mission Improve access to markets, jobs, goods and services and improve mobility by focusing on priority transportation improvements and investments that help Minnesotans travel safer, smarter and more efficiently. The purpose of the proposed US 14 improvements from New Ulm to North Mankato is based on more specific performance objectives for a Minnesota IRC, while seeking compatibility with local communities and the area s natural resources. The proposed project must, therefore, be based on a sound and balanced plan that will: Provide for system continuity to the west end of the US 14 IRC at New Ulm; Address and reduce the potential for safety problems; Support US 14 s function as an interregional trade corridor, specifically by maintaining or improving travel conditions to meet performance; and Fit the context of the area s communities, resources, land uses, and transportation demands (the Cities of New Ulm, Courtland, and Nicollet; the area s farms, neighborhoods, businesses, topography/bluffs, and other social and natural resources). This DEIS was prepared to identify highway improvements necessary to meet these project goals. It builds upon the planning and environmental review documents that have been completed to-date, ultimately to identify a preferred alternative. The preferred alternative will include a decision regarding the location of improvements, as well as the proposed design. 1.3 Need for Project Improvements to US 14 are proposed to address a variety of traffic operational needs that have long been recognized and identified along the highway. These include: access management needs, capacity needs, crash problems, and geometric deficiencies, as summarized in Exhibit 1-2. Improving the highway would also serve the corridor s interregional trade function and respond Improvements to US 14 are proposed to address a variety of safety and capacity needs including: access management, capacity issues, crash history, and operational and geometric deficiencies. 1 See: NEW ULM N. MANKATO, MN

4 US 14 Draft EIS New Ulm to North Mankato Exhibit 1-2 Summary of Deficiencies from US 14 Scoping Document

5 to governmental and public support for continuity of improvements to US 14. This section discusses how these functions combine to create a need for the project. The project needs, in turn, shape the development of viable transportation improvement alternatives, which are described in Section 2. Documented deficiencies along the US 14 corridor are discussed further in the subsections below and more detailed mapping of the corridor is provided in the attached Aerial Photo Exhibit. More detailed analysis that supports the safety, capacity, operational, and geometric deficiencies is available in the Corridor Management Plan (CMP), Chapter 3 Existing and Forecast Conditions, and Chapter 4 Identification of Deficiencies. The 14 West Interregional Corridor Scoping Document reports in detail on the corridor s existing and forecasted safety, capacity, and operational deficiencies. The key deficiencies and issues that must be addressed include: S y s t e m C o n t i n u i t y ( s e e S e c t i o n ) The New Ulm to North Mankato section is one of two pieces of the US 14 IRC between New Ulm and Rochester that is not already a four-lane expressway, or is not in an advanced stage of project approval (the other section is from Owatonna to Dodge Center a section that is now being re-evaluated in a Draft EIS). Within the New Ulm to North Mankato section, highway design characteristics are inconsistent, especially with regards to intersection improvements. S a f e t y D e f i c i e n c i e s a n d N e e d s ( s e e S e c t i o n ) Crash rates that often exceed statewide averages, including a crash severity rate that is three times the average at the US 14/MN 15/CR 21 intersection (at the corridor s west end), where four fatalities and 70 percent of the injury crashes occurred (1996 through 2000). Lack of passing zones which affects the high crash rates, including head-on crashes. C a p a c i t y D e f i c i e n c i e s a n d N e e d s ( s e e S e c t i o n ) A forecasted increase in traffic congestion for the entire corridor resulting from high traffic volumes, a high percentage of trucks, and the lack of passing opportunities. Failure to meet or exceed Mn/DOT s IRC performance target for maintaining average speeds above 55 mph. Increasing traffic, including through-town truck traffic, will have a continuing and mounting adverse impact on the growing communities of Courtland and Nicollet including growing levels of congestion and crashes. Multiple intersections are at high risk for placing traffic signals, which reduce speeds/mobility and (contrary to popular belief) can also reduce highway safety when compared to interchanges or other approaches see Section H i g h w a y a n d B r i d g e D e s i g n D e f i c i e n c i e s a n d N e e d s ( s e e S e c t i o n ) Two-lane highway design; along with vertical and horizontal highway geometry (including skewed intersections, limited sight distances, and horizontal curves) increases collision risk. Two-lane Minnesota River bridge which would be nearly 50 years old at the time highway improvements are made and in need of future improvements; not expanding the bridge may create a bottleneck effect as traffic transitions from four lanes on both bridge ends. 1-5 NEW ULM N. MANKATO, MN

6 A high number of accesses per mile increases the likelihood of crashes resulting from lack of gaps for motorists to enter the highway. The 14 West Interregional Corridor Scoping Document divided the study corridor into eight corridor segments as shown in Table 1-1. The rest of this section documents the need for improvements to US 14 between New Ulm and North Mankato based on these eight segments. TABLE 1-1 US 14 Corridor Segments from New Ulm to North Mankato Segment Location Typical Section Segment Length (Miles) 1 MN 15/CR 21 to CR 37 2-Lane Rural CR 37 to Zieske Road 2-Lane Rural Zieske Road to CR 12 2-Lane Urbanizing CR 12 to CR 25 2-Lane Urban CR 25 to MN 99 2-Lane Rural MN 99 to MN 111/CR 23 2-Lane Urbanizing MN 111/CR 23 to CR 72 2-Lane Urban CR 72 to CR 6 2-Lane Rural 6.8 TOTAL The CMP did not study the segment of highway between Front Street in New Ulm and the US 14/MN 15 intersection. The addition of this 0.8 mile segment to the DEIS study area results in a 22.5 mile corridor. Source: 14 West Interregional Corridor North Mankato to New Ulm Corridor Management Plan, June 2003, p Need for Improved System Continuity System continuity refers to the concept of having consistent road design along the length of a corridor. Consistent road design allows drivers to correctly anticipate how to make necessary maneuvers. For example, if turn lanes are used consistently, drivers know to enter the turn lane to decelerate instead of slowing down substantially in the travel lanes. Design that is consistent throughout the corridor thus benefits safety and capacity by eliminating surprises for drivers S ystem Continuity on the U S 14 I nterregional Corridor US 14 from New Ulm to Rochester is part of Minnesota s interregional corridor (IRC) system. The IRC system emphasizes efficient connections between regional trade centers and the goal is to enhance the economic vitality of the state by providing safe, timely, and efficient movement of goods and people. 1-6 NEW ULM N. MANKATO, MN

7 Since the 1960s, Mn/DOT has been upgrading US 14 between New Ulm and Rochester to four lanes. As shown in Exhibit 1-3, several sections of US 14 between North Mankato and Rochester have been expanded, or have had the planning for expansion completed. These expansion projects include: 1960s & 1970s completed upgrade to four lanes from Kasson to Rochester (13 miles) 1979 completed Mankato bypass upgrade to four lanes (8 miles) 1997 completed upgrade to four lanes from Mankato to Eagle Lake (8.0 miles) 1999 completed the EIS for the corridor between MN 60 to I-35; the Preferred Alternative is a 4-lane expressway with bypasses of Janesville and Waseca and a new connection at Owatonna (32 miles) 2001 completed upgrade to four lanes from Dodge Center to Kasson (9 miles) 2003 completed upgrade to four lanes from MN 60 to Smiths Mill (4.8 miles) 2004 completed an Environmental Assessment (EA) to upgrade to a 4-lane divided expressway from west of CR 6 in Belgrade Township to Lookout Drive in North Mankato and construction of an interchange at CR 41 in Nicollet County; construction is currently unscheduled (2.7 miles) 2006 completed upgrade to four lanes from Janesville to Waseca (9.8 miles) 2006 began preparation of a new EIS for upgrade to four lanes between Owatonna and Dodge Center; a previous EIS determined that the highway would be upgraded, but the location is in question (19 miles) 2008 scheduled start of construction from Waseca to I-35 at Owatonna (17.5 miles) Upon completion of the projects that are planned for US 14, the New Ulm to North Mankato segment will be the only remaining two-lane section on the interregional corridor. Upgrading this segment will complete the development of the US 14 interregional corridor as a four lane expressway. 1-7 NEW ULM N. MANKATO, MN

8 US 14 Draft EIS New Ulm to North Mankato Exhibit 1-3 Relation of Proposed Project to Other US 14 Expansion Projects

9 Design Consistency within the New U lm to North M a nkato S e g ment US 14 between New Ulm and North Mankato has undergone numerous localized projects to improve safety and enhance mobility along the corridor. While these improvements have addressed the local issues, the corridor does not have a consistent design that allows drivers to anticipate what comes next. For most of the length of the corridor between New Ulm and North Mankato, US 14 is a rural, two lane, undivided roadway with paved shoulders and right turn lanes at public roadway intersections. The following are notable deviations from the typical design: Minnesota River bridge has very narrow shoulders The US 14/MN 15/CR 21 intersection has left turn lanes on both US 14 and the MN 15 approach and free right turns to go north on MN 15 and east on US 14 and a stop on US 14 westbound At CR 37 there is a left turn lane from US 14 onto CR 37 and a free right from CR 37 to an acceleration lane on eastbound US 14 At 571 st Avenue there is a westbound bypass lane to allow through traffic to go around vehicles waiting to make a left turn onto 571 st ; there is a truck climbing lane going eastbound At 561 st Avenue there are left turn lanes in each direction on US 14 Within Courtland, parking is allowed along US 14 At 466 th Street there is no westbound right turn lane on US 14 There is a right turn lane into the hog buying station west of Nicollet There is no right turn lane into the wildlife management area US 14 becomes divided with a grass median for a short segment at MN 99 to allow for an eastbound left turn lane The grass median ends and is replaced by a painted median through Nicollet There are left turn lanes in both directions at the intersection with MN 111 and CR 27 There are left turn lanes through Nicollet that, for a short segment, become a two way center left turn lane There are no right turn lanes at the unpaved east-west road crossing just east of Nicollet There is a westbound right turn lane at an entrance to a farm just west of CR 25 While all of these anomalous designs were constructed to address specific needs, the list demonstrates the fact that there is not a consistent design for US 14 through the study area. 1-9 NEW ULM N. MANKATO, MN

10 1.3.2 Need for Safety Improvements Crashes Safety on the US 14 corridor was studied in-depth in the Corridor Management Plan (CMP), including documentation of crash rates, critical crash rates, crash severity, and the distribution of crash types along the entire corridor, and at intersections. The data used were for the years 1996 through Although the following discussion is not based on the most recent data, the analysis in the CMP is used because it is the most exhaustive. A less comprehensive review of recent data indicates generally slightly improved crash and severity rates, especially at the MN 15 intersection. C r a s h e s b y C o r r i d o r S e g m e n t Between 1996 and 2000, a total of 209 crashes occurred on the study corridor. Table 1-2 documents the crash rate, severity rate, and critical rate of the eight segments studied in the CMP. The CMP analysis identified considerable safety deficiencies along the segment between MN 15 and CR 37. This segment has a crash rate of 2.0 crashes per million vehicle miles, which is about twice the statewide average for a rural expressway (0.9) and Mn/DOT s IRC performance target of 1.0; this also exceeds the critical crash rate for that segment. Additionally, six of the eight segments in Table 1-2 exhibit severity rates above the average of 1.9 severe crashes per million vehicle miles (see the bold text in the crash rate and severity rate columns in Table 1-2). In summary, these data indicate that safety problems are already apparent along much of the US 14 corridor and these problems can be expected to worsen as traffic volumes increase. The location of greatest concern for crashes is the US 14/MN 15/CR 21 intersection at the western end of the segment. Within this segment, 50 percent of the crashes were turn-related (right angle and left turn), which exceeds the average rate of around 32 percent. Additionally, the severity rate is more than three times the average rate because of four fatalities; also, 70 percent of the injuries along US 14 occurred at this intersection NEW ULM N. MANKATO, MN

11 TABLE 1-2 Crash and Severity Rates along US 14 Corridor Segments ( ) Segment Crash Rate 1 MN Avg. Crash Rate by Hwy. Type 2 Critical Rate 3 Severity Rate MN 15/CR 21 to CR 37 (rural) CR 37 to Zieske Road (rural) Zieske Road to CR 12 (rural) CR 12 to CR 25 (urban) CR 25 to MN 99 (rural) MN 99 to MN 111/CR 23 (urban) MN 111/CR 23 to CR 72 (urban) CR 72 to CR 6 (rural) Crash Rate by Segment crashes per million vehicle miles (MVM) of travel. 2 The average statewide crash rate for a 2-lane rural highway is 1.0/MVM; the average statewide crash rate for a 2- lane urban highway is 3.0/MVM. 3 Critical Crash Rate crash rate that is statistically significant above the average crash rate for similar facilities (the critical rate defines an unusual safety problem for the roadway segment; in this case it is exceeded only in segment 1, primarily because of the MN 15 intersection). 4 Severity Rate crash severity rate accounts for property damage only crashes; injury crashes; and fatal crashes. The average severity rate is 1.9/MVM for a Minnesota rural expressway (as highlighted above, six segments have exhibited severity rates above this average). Source: TH 14 North Mankato to New Ulm CMP, June 2003, p and 3-72 C r a s h e s a t I n t e r s e c t i o n s As shown in Table 1-3, three of the intersections analyzed in the CMP had crash rates above both the average crash rate (for through stop intersections) and the critical rate: US 14/MN 15/CR 21; US 14/CR 37; and US 14/MN 111/CR 23). Problems at these three intersections are also apparent based on severity rates that exceed the averages of 0.75 to 1.0 severe crashes per million entering vehicles (see the bolded values in Table 1-3 under the Crash Rate column) NEW ULM N. MANKATO, MN

12 TABLE 1-3 Crash Rates at Corridor Intersections Intersection Crash Rate 1 Avg. Crash Rate (for through stop intersections) Critical Rate 2 Severity Rate 3 US 14 & MN 15/CR US 14 & CR US 14 & CR US 14 & MN US 14 & MN 111/CR US 14 & CR Crash Rate by Intersection number of crashes per million entering vehicles (MEV) into the intersection. 2 Critical Crash Rate crash rate that is statistically significant above the average crash rate for similar facilities (the critical rate defines an unusual safety problem for the intersection; in this case it is exceeded at three intersections). 3 Severity Rate crash severity rate accounts for: property damage only crashes; injury crashes; and fatal crashes. The average severity rate for comparable Minnesota intersections is 0.75 to 1.0/MEV (as highlighted above, the same three intersections exhibit rates above that average range). Source: 14 West Interregional Corridor Management Plan, June 2003, Section 3. US 14/MN 15/CR 21 Intersection This intersection has the highest crash rate along the corridor, with 1.4 crashes per million entering vehicles (MEV). Forty-five percent of the crashes involve left turns while 36 percent involve right turns. The severity rate at this intersection (5.5) is more than four times greater than the average severity rate of 1.0. All four fatalities and nearly 70 percent of the injuries that occurred along this 22.5-mile long corridor were at this intersection. One key factor that contributes to the frequency and severity of crashes at this intersection is a 90 degree turn that motorists must make to continue traveling on US 14. Also, vehicles traveling on MN 15 toward New Ulm are coming down a steep grade with a curve. As noted below in Section 1.5, Mn/DOT implemented interim safety improvements to this intersection in The data from show a crash rate of 1.1 crashes per MEV and a severity rate of 1.9. There were no fatalities at the intersection during that time period. The reduced crash rate suggests that the improvements are helping. However, the severity rate is still nearly double the statewide average for similar intersections; additionally, future increased traffic volumes will increase the risk for more crashes. Finally, note that the reduction in severity rate based on the most recent data is primarily due to an absence of fatal crashes which has a strong influence on severity rate. US 14 at CR 37 Intersection (T-intersection) Vehicles on CR 37 are required to stop for through traffic on US 14. The crash rate is 25 percent higher than the Minnesota average for this type of intersection. The severity rate of 2.2 is over two times the expected rate of 1.0. Two-thirds of the crashes at this intersection occur when a vehicle is turning onto or off of CR 37. Further review 1-12 NEW ULM N. MANKATO, MN

13 indicated that from the stop sign on CR 37, motorists have adequate intersection sight distance; however, it appears that they have difficulty selecting a safe gap. This intersection underwent a slight reconfiguration, including an extension of the US 14 eastbound acceleration lane for right turning traffic during Summer 2004 as an interim safety measure (see Section 1.5 below). US 14/MN 111/CR 23 Intersection US 14 traffic is the through movement while traffic on MN 111/CR 23 stops at this through stop controlled intersection in Nicollet. Overhead warning flashers were in place until September 2001 when they were replaced with warning flashers mounted on the stop signs. The existing crash rate is 10 percent higher than Mn/DOT s IRC intersection goal. The severity rate of 2.2 is nearly three times the average rate of More than 90 percent of the crashes at this intersection were right angle crashes which is much higher than the Minnesota average of 28 percent at urban intersections. Analysis of the intersection indicated that a large portion of the crashes occurred on the far side of the intersection when motorists were attempting to cross US 14 from the minor street. The skewed angle of minor street approaches appears to be a key factor to the higher than expected frequency of angle crashes No Passing Z ones Three of the five passing-related crashes occurred on sections of the highway striped for passing. The other two occurred where passing is not allowed. Most of these crashes occurred during daylight, in clear and dry conditions. US 14 through Courtland (referred to as Segment 4 in the CMP) experienced a substantially higher rate of passing related crashes than Minnesota averages. This is the only corridor segment where parking is allowed along the highway. One third of the study corridor does not have passing zones (see Table 1-4). Mn/DOT s goal is that the state s 2-lane rural roads should have no passing zones along less than 10 percent of the route miles. Between New Ulm and Courtland, nearly 60 percent of the roadway is no passing, and between Courtland and Nicollet, nearly 50 percent of the highway is no passing. The entire corridor through Nicollet is a no passing zone. This high percentage of no passing zones will ultimately continue to degrade highway safety performance as increased traffic and different vehicle types combine to create more exposure to crash risks, including head-on crashes, along the corridor (see Table 1-4). 2 The Mn/DOT Road Design Manual recommends that the alignment of intersecting highways should be as close to 90 degrees as possible. Recent studies show that skewed intersections increased the potential for crashes (an 18% increase in crash rate for a 30 degree skew angle) and impaired driver views (NCHRP 500, Strategy 17.1 B 16 - Realign Intersection Approaches). The AASHTO, Policy on Geometric Design of Highways and Streets (2004) recommends a maximum skew of 30 degrees, noting that the ideal is no skew at all. The skew at this intersection is 29 degrees NEW ULM N. MANKATO, MN

14 TABLE 1-4 Analysis of No Passing Zones along Corridor Segments Segment Segment Length (Miles) Length of No Passing (miles) Percentage No Passing Number of Head on Crashes 1 - MN 15/CR 21 to CR CR 37 to Zieske Road Zieske Road to CR CR 12 to CR CR 25 to MN MN 99 to MN 111/CR MN 111/CR 23 to CR CR 72 to CR % 0 59% 1 0% 0 0% 0 48% 1 100% 0 100% 0 2% 3 TOTAL % 5 Source: 14 West Interregional Corridor North Mankato to New Ulm Scoping Document, March 2003, p.2-2 and 14 West Interregional Corridor North Mankato to New Ulm Corridor Management Plan, June 2003, p Need for Highway Capacity Traffic V olumes a nd Level of S e r v ice The CMP analyzed traffic patterns on the corridor from 1980 to Forecasts for the year 2025 were developed based on the identified trends. The discussion in the DEIS utilizes the forecasts in the CMP extended to Recent traffic counts are also included to illuminate the trends, but the forecasts are still based on the comprehensive study performed in the CMP. As shown in Table 1-5, the year 2006 average daily traffic (ADT) volumes on the corridor ranged from 5,000 to 8,700 vehicles per day (vpd). A regression analysis of historic volumes (completed for the CMP in 2003) predicted that by 2025, the ADT will range from 9,000 vpd to 12,800 vpd, an increase of between 60 and 80 percent. An additional forecast through 2030 was completed to provide more appropriate design year traffic volumes (see Table 1-5). 3 3 The design year, for highway planning purposes, is the forecast year that represents the construction timeframe plus 20 years. Because no major construction is anticipated for this project prior to 2010, the soonest reasonable design year is NEW ULM N. MANKATO, MN

15 TABLE 1-5 Actual and Forecasted Traffic Volumes Segment (length) Typical Section ADT a ADT 2025 ADT 2030 ADT 2000 LOS LOS 0 - MN River Crossing to MN 15 (0.8 mile) 2-lane urbanizing & Bridge Deck 7, ,500 14,600 D E 1 - MN 15/CR 21 to CR 37 (1.8 miles) 2 - CR 37 to Zieske Road (3.8 miles) 3 - Zieske Road to CR 12 (0.4 miles) 4 - CR 12 to CR 25 (1.2 miles) 5 - CR 25 to MN 99 (6.5 miles) 6 MN 99 to MN 111/CR 23 (0.6 miles) 7 - MN 111/CR 23 to CR 72 (0.6 miles) 8 - CR 72 to CR 6 (6.8 miles) 2-lane rural 5, ,700 10,500 C E 2-lane rural 6, ,300 13,300 D E 2-lane urbanizing 6, ,300 13,300 C E 2-lane urban 6, ,400 11,400 C E 2-lane rural 5, ,400 10,200 C E 2-lane urbanizing 4, ,000 9,700 C E 2-lane urban 7, ,800 13,900 D E 2-lane rural 7, ,800 13,900 C E Sources: 14 West Interregional Corridor North Mankato to New Ulm Scoping Document, March 2003, p.2-10 (the 2030 forecast volumes were developed as part of the DEIS analysis). a The latest traffic volume data for the US 14 corridor is through 2004 and is not broken out to the level of detail provided in this table. A comparison of 2000 data to 2004 data indicates similar volumes. The primary measure used by transportation professionals to assess operations is Level of Service (LOS). LOS is typically presented in the form of a letter grade (A through F) much like an academic report card. LOS A represents conditions with free-flow traffic with little or no delays. Conversely, LOS F conditions are represented by extreme congestion with long delays and queuing. The typical maximum capacity of a 2-lane rural road ranges from 10,000 vpd to 12,000 vpd, which corresponds to LOS E-F. Given the rural nature of the roadway and Mn/DOT s objective for mobility along interregional corridors, the LOS C-D boundary has been selected as the threshold of congestion along the corridor. LOS declines along with speeds as traffic volume increases on 2-lane and multilane facilities. Any location falling below that threshold would be considered for some type of corrective action (including added travel lanes) to return to acceptable operations. As shown in Table 1-5, three segments (0, 3 and 7) of US 14 are currently congested relative to expected performance (noting that a lower level of performance through the towns of Courtland and Nicollet is expected versus the rural areas). If no improvements are made by 1-15 NEW ULM N. MANKATO, MN

16 2025, congestion is forecast for the entire corridor. In summary, the traffic forecasts show that future volumes will reach a point where a 2-lane highway will no longer provide sufficient capacity, which will also substantially magnify the safety problems discussed above Truck Traffic Truck traffic (heavy commercial vehicles) refers to a wide assortment of vehicles, including semi-trucks with trailers, cement trucks, smaller single-unit moving/shipping trucks, or other similar vehicle classifications. In 2004, trucks comprised about 13 percent of all traffic on US 14 between New Ulm and Mankato. 4 The statewide average percentage of truck traffic on US highways in Minnesota in 2004 was 9 percent. 5 Traditionally, the highest level of truck traffic occurs on interstate highways. Because the US 14 corridor is a 2-lane highway with limited passing opportunities, the presence of a high volume of trucks has a greater impact on traffic operations. Mn/DOT is currently completing a freight planning study for District 7, which includes the EIS study area. Some of the most relevant preliminary findings and recommendations include references to: Extraordinary growth in the biofuels industry (ethanol and soy-diesel) Freight volume increases driven by growth of the agricultural economy (production of corn, soybeans, and hogs have grown steadily since 1970) Trends toward larger farm and semi tractor trailer equipment, creating potential weight issues and other transportation challenges in rural areas Performance-based planning and management for freight movements in non-metropolitan areas These factors affecting freight traffic, while difficult to measure precisely, demonstrate a general trend toward more trucks and larger loads. As previously noted, the presence of many trucks on a 2-lane highway will adversely affect overall traffic operations S ignal Proliferation The probability of needing to install a traffic signal at an intersection is a primary component used to estimate future levels of congestion and travel times. An intersection is considered at risk of requiring a traffic signal if traffic volumes at the intersection exceed the thresholds identified in the Minnesota Manual on Uniform Traffic Control Devices. A signal risk evaluation in the CMP identified the following intersections as high risk for signal installation: US 14/MN 15/CR 21 US 14/CR 37 US 14/MN 111/CR 23 4 State of Minnesota 2004 Truck Highway Traffic Volume Map from Mn/DOT s Office of Transportation Data and Analysis 5 Data from Mn/DOT Office of Transportation and Data Analysis 1-16 NEW ULM N. MANKATO, MN

17 IRC guidelines strongly discourage traffic signals on high- and medium-priority corridors due to negative impacts on mobility and safety. These at-risk intersections are being studied for potential interchanges (see Section 2 of this Draft EIS, which discusses alternatives) I nterregional M obility Goals Mn/DOT s target goal for mobility on medium priority IRCs, including US 14, is 55 mph and above. The existing and future travel speeds in each segment are shown on Table 1-6. Currently, three of the four deficient segments are located in Courtland and Nicollet, which have posted speed limits of 35 and 45 mph, respectively. The IRC goals were set to address long-distance travel on major Minnesota highways and average performance over those distances in this case more than 22 miles. The corridor is currently operating at an average speed of 57 mph. However, over time, the average speed will decline to operate at about 50 mph by 2025, more than 17 mph less than the previously measured average speeds. Review of the analysis (Table 1-6) shows that the reduced overall speed performance is anticipated as a result of delays in all segments not just those segments through Courtland and Nicollet (segments 3, 4, 6, and 7). At the same time, we can see the emerging need for community bypasses reflected in these data. Again, the goals being to maintain a high average speed over a relatively long distance and to minimize potential for undue delay all along the corridor. TABLE 1-6 Existing and Future Speed Performance Segment (length) 2002 Travel Speed (mph) 2002 Performance 2025 Travel Speed (mph) 2025 Performance 1 - MN 15/CR 21 to CR 37 (1.8 miles) 2 - CR 37 to Zieske Road (3.8 miles) 3 - Zieske Road to CR 12 (0.4 miles) 4 - CR 12 to CR 25 (1.2 miles) 5 - CR 25 to MN 99 (6.5 miles) 6 MN 99 to MN 111/CR 23 (0.6 miles) 7 - MN 111/CR 23 to CR 72 (0.6 miles) 8 - CR 72 to CR 6 (6.8 miles) 55.0 At 49.1 Below 60.7 At 50.8 Below 56.6 At 31.2 Below 41.9 Below 27.9 Below 59.8 At 57.7 At 53.5 Below 41.0 Below 53.0 At 27.8 Below 58.8 At 55.5 At Average 57.3 At 50.2 Below Source: 14 West Interregional Corridor North Mankato to New Ulm Scoping Document, June 2003, p The analysis of future travel speeds for consistency with Mn/DOT s IRC guidelines indicates that estimated 2025 peak hour travel speeds are expected to drop below the 55 mph goal to 50 mph. The segments with the lowest travel speeds are located within urban or urbanizing areas NEW ULM N. MANKATO, MN

18 1.3.4 Need to Correct Highway and Bridge Design Deficiencies H ighway Design in General Generally, a 4-lane divided highway is safer than a 2-lane highway. Medians separate oncoming traffic and multiple lanes allow more passing opportunities to avoid potential collisions and reduce congestion. The entire 22-mile long segment of US 14 is a 2-lane road. Additionally, as shown in Table 1-4, passing is not permitted along one-third of the corridor M innesota River Bridge ( M N Bridge I D No. 9200) B r i d g e D e s c r i p t i o n a n d S u f f i c i e n c y R a t i n g As noted previously, this DEIS evaluates highway improvements within a long-term context, with little likelihood of beginning construction until sometime between 2015 and Because the existing bridge over the Minnesota River (at the corridor s west end) was built in 1963, it will be about 50 years old by that time. This bridge is also moderately large and complex it is 566 feet long with 6 spans crossing a large river, with each span about 94 feet long. The cast-inplace deck is supported by five 4.5-feet deep prestressed concrete girders. The deck area is 20,107 square feet and includes a 2-lane roadway that is 30 feet wide. The bridge has an overall sufficiency rating of 69.7 (out of a scale up to 100). 6 That rating compares to general guidance used by Mn/DOT and most transportation agencies, which says that a sufficiency rating below 50 indicates the bridge is a candidate for reconstruction or replacement. In some cases, repair or rehabilitation may be recommended when the sufficiency rating is below 80. This DEIS does not include a detailed engineering This DEIS does not include a detailed engineering analysis of the need to rehabilitate or replace the US 14 Minnesota River bridge. However, with this study ongoing today, now is an appropriate time to plan ahead for possible bridge actions. analysis of the need to rehabilitate or reconstruct the bridge because the study s main purpose is to evaluate highway corridor location alternatives. However, with this study ongoing today, now is an appropriate time to plan ahead for possible bridge actions (which will be needed eventually). Because the existing bridge provides for only two lanes of traffic, it is also appropriate to review it from the standpoint of capacity. H i g h w a y C a p a c i t y a n d C o n n e c t i v i t y a t t h e B r i d g e As shown in Table 1-5, above, future traffic volumes at the Minnesota River bridge will reach 13,500 by 2025, and 14,600 by 2030, when the need for an improved US 14 will be fully felt. This is the highest forecasted traffic volume anywhere along the corridor, as should be expected from the combined traffic demands of both US 14 and MN 15. The existing bridge provides for only two lanes of traffic and thus it is expected that the bridge will begin to create a bottleneck effect as traffic transitions from a possible improved 4-lane highway. The city s street design 6 The sufficiency rating of a bridge is determined through regular bridge inspections. The rating is a numeric value with a maximum of 100. The sufficiency rating takes into consideration a number of factors, including structural adequacy, functional capacity, and essentiality for public use, load carrying capacity, the average daily traffic (p. 12, Mn/DOT Bridge Inspection Manual Version December, 2006) NEW ULM N. MANKATO, MN

19 on the west end of the bridge in New Ulm is also four lanes, adding to the potential capacity problem at the bridge. Based on the information above, there is a need to evaluate the proposed expansion of the bridge to four lanes in this DEIS, either with a new parallel bridge or through expansion of the existing bridge. There is, however, no need to consider a new location for the Minnesota River bridge. That conclusion is based on the results of a vehicle origin-destination (O-D) study completed for the 2003 CMP (see the US 14 Project Website for more information). The O-D study revealed that approximately 85 percent of all the vehicles entering and exiting New Ulm on US 14 either started or stopped their trips in New Ulm. This finding shows that a bypass of New Ulm, which would include a new river crossing location, would not divert enough traffic from existing US 14 through the city to make construction of a New Ulm bypass economically feasible Access Control An Origin-Destination Study (2003) showed that a bypass of New Ulm, which would include a new Minnesota River crossing location, would not divert enough traffic from existing US 14 through the city to make construction of a New Ulm bypass economically feasible. Access is typically one of the key factors contributing to high crash rates. The higher the number of accesses per mile, the more exposure there is to conflicts and the more likely crashes will increase. As traffic increases, crash risk at access points also increases due to the lack of gaps for motorists to enter the highway (particularly for left turns). The US 14 corridor between New Ulm and North Mankato averages about 10 access points per mile (Table 1-7). However, some of the areas classified as urban along the corridor have considerably higher access densities. The highest access density through the business district in Courtland contains 58 access points in one mile. According to the Mn/DOT Traffic Safety Fundamentals Handbook, the statewide average is eight accesses per mile in rural areas and 28 accesses per mile in urban areas. IRC guidelines recommend access density ranging between one access per mile to 18 accesses per mile depending on whether the area is rural or urban (more access points are acceptable in urban areas, where operating speeds are lower and use of auxiliary turning lanes is more prevalent). TABLE 1-7 Summary of Access Inventory by Segment Segment (length) Segment Type # of Access Points Average Access Density/Mile 1 - MN 15/CR 21 to CR 37 (1.8 miles) Rural Area CR 37 to Zieske Road (3.8 miles) Rural Area Zieske Road to CR 12 (0.4 miles) Urbanizing Growth Area CR 12 to CR 25 (1.2 miles) Urban Growth Area CR 25 to MN 99 (6.5 miles) Rural Area NEW ULM N. MANKATO, MN

20 TABLE 1-7 Summary of Access Inventory by Segment Segment (length) Segment Type # of Access Points Average Access Density/Mile 6 MN 99 to MN 111/CR 23 (0.6 miles) Urbanizing Growth Area MN 111/CR 23 to CR 72 (0.6 miles) Urban Growth Area CR 72 to CR 6 (6.8 miles) Rural Area 49 7 TOTAL Source: 14 West Interregional Corridor North Mankato to New Ulm Scoping Document, March 2003, p.2-2. Interchanges are one way to control access by providing a safe means for converging and diverging traffic along two or more roads. The primary safety benefits are derived from the elimination of at grade turning and crossing movements at grade with through traffic movement. Mn/DOT is proposing and planning, ultimately, to add interchanges at appropriate locations with potential interim designs to include two-way stop intersections at crossroads or possible roundabouts. Section 2 includes more information on consideration of interchanges. Also, the US 14 Project Website includes the full Interchange Report that contains information on the US 14 Interchange Workshop Mn/DOT hosted in June 2004, as well as several conceptual interchange designs that were developed during the workshop V e r tical a nd H orizontal Geometry Highway geometry influences sight distances, as well as the roadway driving characteristics. A roadway design with long sight distances allows drivers more time to react to and to avoid potential collisions. Properly designed geometry allows traffic to flow at a more constant speed, reducing the potential for driver error or collisions when accelerating or decelerating on curves. US 14 includes skewed angles, sight distance deficiencies, and horizontal curves. Table 1-8 documents in detail the existing geometric deficiencies on US 14. Skewed Intersections The basic alignment of the US 14 corridor typically runs at an oblique angle relative to intersecting north-south roadways. This results in multiple intersections with skewed minor street approaches. Such intersections are notably less safe as drivers must look back over their shoulder to see approaching traffic. Safety deficiencies at the US 14/MN 111/CR 23 intersection appear to be related to this type of skew angle (also see Section ). Sight Distance Sight distance is the length of roadway visible to a driver. Several intersections along the corridor are noted in Table 1-8 as having poor sight distances. Horizontal Curves The curve radius on the east leg of MN 15 at the US 14/MN 15 intersection does not meet the 60-mph design speed NEW ULM N. MANKATO, MN

21 TABLE 1-8 Existing Geometric Deficiencies Deficiency Location Description Horizontal Curvature East leg of US 14 to MN 15 Curve radius does not meet 60 mph design speed, however, meets 55 mph posted speed limit Vertical Grades East of New Ulm; Minnesota River Valley Above 3% maximum for Flat Classification; in range for Rolling Classification Poor Sight Distance CR 21 Enters mainline on inside of curve Poor Sight Distance CR 37 Horizontal and vertical curves to west limit sight distance to approximately 10 seconds (NOTE: this was partially addressed by recent minor construction) Poor Sight Distance/High Intersection Skew Angle Lack of Left Turn Lanes 446 th St., 561 st Av., 551 st Av., Zieske Rd., CR 12, CR 24, MN 99, MN 11 Pine St., Elm St., CR 72, TC-217, 451 st Av., 478 th St., 490 th St., CR 25, CR 17, CR 6, and a number of other minor roads and driveways 446 th St., 551 st Av., 547 th Ln., Zieske Rd., CR 12, downtown Courtland, Fiemeyer dr., 531 st Av., CR 25, CR 21, 466 th St., 491 st Av., 481 st Av., 471 st Ln., 451 st Av., CR 72, TC 217, 478 th St., 490 th St., CR 25, CR 17, and a number of other minor roads and driveways Skew angle approaching or above upper limit, creates poor driver sight line Oncoming traffic causes left-turning vehicles to stop unsheltered from other vehicles, creating congestion and higher potential for crashes Source: 14 West Interregional Corridor North Mankato to New Ulm Corridor Management Plan, June 2003, p.4-19; completed by Howard R. Green Company using Mn/DOT Design Guidelines S upporting Roadways The ability of US 14 to continue to meet speed, mobility, access, and safety objectives established by Mn/DOT is dependent to some extent on the existence of the local and supporting road system. The local and supporting road system along US 14 is made up of frontage roads, parallel minor arterial/collector roads, and roads that intersect US 14 that are all discussed below. F r o n t a g e R o a d s Currently, there are only two frontage roads within the study area. One road in Courtland begins at the western eastern city limit on the north side of US 14 and extends approximately 1,000 feet into Courtland. The other frontage road is the Hewitt Service Road in the south part of Nicollet. The rural nature of the corridor makes frontage roads generally not feasible. However, other roadways, such as 6 th Street in Nicollet serve as frontage roads by providing east-west circulation along US NEW ULM N. MANKATO, MN

22 The access density problem in Courtland caused by a high concentration of direct private and public access indicates the lack of an effective frontage road system to serve the direct access function in place of US 14. P a r a l l e l M i n o r A r t e r i a l / C o l l e c t o r R o a d s Adequate north-south and east-west minor arterials and collectors spaced at roughly regular intervals generally exist to support US 14. MN 68 is a minor arterial that parallels the entire length of US 14 within the study area. Several miles to the north CR 5, a major collector, also roughly parallels the highway. CR 21, CR 11, and CR 25 also parallel some portions of US 14. The lack of a southern, parallel roadway to offer an alternative to US 14 for traveling between Courtland and Nicollet was documented as a local and supporting roadway deficiency in the CMP (p and Figure 4.1-1). While CR 25 parallels US 14 to the south from just northwest of North Mankato to Courtland, there is a gap between CR 23 in Nicollet and CR 24 in Courtland. This limits the travel options between Courtland and Nicollet, increasing the importance of US 14. N o r t h - S o u t h R o a d s t h a t I n t e r s e c t U S 1 4 Direct access across US 14 is provided by 1 st Street, 2 nd Street, 3 rd Street and 4 th Street in Courtland. In Nicollet, MN 111/CR 23 (Main Street) and Elm Street provide direct access for vehicles crossing the highway. Outside Courtland and Nicollet, CR 17, CR 77 and some township roads provide access across the highway. The CMP noted another north-south roadway deficiency within Courtland motorists traveling north and south within Courtland must complete part of their trip on US 14 because CR 12 (north of Courtland) does not directly tie into CR 24 (south of Courtland). 1.4 Proposed Action and Schedule Proposed Action and Funding Status The proposed action evaluated in this DEIS is based on the needs and alternatives considered during corridor planning and scoping phases of study, with particular reference to the needs stated above. As discussed further in Section 2, this includes upgrading the existing 2-lane highway to a 4-lane divided expressway with interchanges or at-grade intersections at crossroads where necessary, safe, and feasible. 7 The proposed upgraded highway may use existing and/or new alignment that meets applicable standards for a rural expressway with access to the highway only at interchanges and a limited number of intersections. The alternatives under consideration to satisfy purpose and need are described in detail in Section 2. The proposal to improve this portion of US 14 has also been identified, evaluated, and selected through Minnesota s highway planning process. Planning and constructing needed 7 Early scoping studies ( also evaluated whether US 14 could be upgraded to an improved 2-lane highway, but determined that future performance goals could be satisfied only with development of a 4-lane divided expressway. The posted speed limit along the proposed roadway should be 65 mph; certain portions may also be designed and posted at lower speeds because of curves, intersections, or other access points. See also Section 2 for more information on project alternatives and how they were developed NEW ULM N. MANKATO, MN

23 improvements along US 14 is one of the highest priorities for Mn/DOT s District 7 (southwest Minnesota, with headquarters in Mankato). The District s emphasis stems from a steady history of increasing traffic and safety problems along 2-lane portions of the highway. But, as previously noted, the proposed timeframe for the action evaluated in this DEIS is long-term with the majority of the funds needed to start construction not anticipated until the 2015 to 2023 timeframe. This timing is based on Mn/DOT s longrange transportation plan, Minnesota Statewide Transportation Plan: Moving People and Freight from 2003 to This plan serves as Mn/DOT s framework for making transportation investment decisions. The funds needed to start construction are not anticipated to be available until the 2015 to 2023 timeframe. The current goal is to establish a sound long-term plan for the preservation of right-of-way and for project funding and construction. Mn/DOT s current goal is to establish a sound long-term plan for the preservation of right-ofway and secure project funding for construction. This will be done after a preferred alternative has been selected (scheduled to occur in 2008). A preferred alternative will serve as a transportation and land use planning tool that will allow the local communities to appropriately plan for and guide future development Schedule for Environmental Review Table 1-9 below summarizes the anticipated schedule for environmental review of this project prior to letting for construction. A key component of this process is a 45-day comment period, during which input from the public and agencies will be solicited. Comments received during this time will be incorporated into the Final EIS, or FEIS. 8 See NEW ULM N. MANKATO, MN

4.0 IDENTIFICATION OF DEFICIENCIES

4.0 IDENTIFICATION OF DEFICIENCIES 4.0 IDENTIFICATION OF DEFICIENCIES 4.1 PERFORMANCE MEASURES AND RESULTS OF ANALYSIS 4.1.1 Roadway Safety As documented in Chapter 3, there were four key factors that were used to analyze the occurrence

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

5.0 Roadway System Plan

5.0 Roadway System Plan Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Parks Highway: MP Lucus Road to Big Lake Road

Parks Highway: MP Lucus Road to Big Lake Road 2 Purpose and Need 2.1 Corridor History The Parks Highway is a 324-mile long Rural Interstate Highway that extends from its intersection with the Glenn Highway north to Fairbanks, Alaska. The Parks Highway

More information

HIGHWAY 11 CORRIDOR STUDY

HIGHWAY 11 CORRIDOR STUDY HIGHWAY 11 CORRIDOR STUDY Executive Summary August 2016 Roseau County?æA@?çA@ Warroad Lake of the Woods Roseau Roosevelt Badger?ÄA@ Greenbush Legend N Hwy 11 Study Area Figure 1: Corridor Study Limits

More information

Executive Summary June 2015

Executive Summary June 2015 Executive Summary June 2015 Highway 112 Corridor Study Benton and Washington Counties Executive Summary June 2015 Prepared by Transportation Planning and Policy Division Arkansas State Highway and Transportation

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

Access Location, Spacing, Turn Lanes, and Medians

Access Location, Spacing, Turn Lanes, and Medians Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including

More information

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on

More information

Chapter 6: Transportation

Chapter 6: Transportation Chapter 6: Transportation I. INTRODUCTION The purpose of the Transportation Plan element of the Comprehensive Plan is to provide guidance to the City of North Mankato, as well as existing and future landowners

More information

CHAPTER 7 ACCESS MANAGEMENT. Background. Principles of Access Management. Hennepin County Transportation Systems Plan (HC-TSP)

CHAPTER 7 ACCESS MANAGEMENT. Background. Principles of Access Management. Hennepin County Transportation Systems Plan (HC-TSP) CHAPTER 7 ACCESS MANAGEMENT Background Principles of Access Management Hennepin County Transportation Systems Plan (HC-TSP) Chapter 7 Access Management 7.1 Background Access management has become an important

More information

Owl Canyon Corridor Project Overview and Summary

Owl Canyon Corridor Project Overview and Summary Owl Canyon Corridor Project Overview and Summary December 22, 2008 The Owl Canyon corridor (generally the connection between the I-25 / Larimer County Road 70 interchange and the US 287 / Larimer County

More information

Defining Purpose and Need

Defining Purpose and Need Advanced Design Flexibility Pilot Workshop Session 4 Jack Broz, PE, HR Green May 5-6, 2010 Defining Purpose and Need In your agency s project development process, when do design engineers typically get

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

Safety and Design Alternatives for Two-Way Stop-Controlled Expressway Intersections

Safety and Design Alternatives for Two-Way Stop-Controlled Expressway Intersections Safety and Design Alternatives for Two-Way Stop-Controlled Expressway Intersections Thomas H. Maze Center for Transportation Research and Education Iowa State University 2901 South Loop Drive, Suite 3100

More information

Appendix A: Safety Assessment

Appendix A: Safety Assessment Appendix A: Safety Assessment Safety Assessment Appendix A A Statement of Philosophy The efficient and responsible investment of resources in addressing safety problems is a difficult task. Since crashes

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Geometric Categories as Intersection Safety Evaluation Tools

Geometric Categories as Intersection Safety Evaluation Tools Geometric Categories as Intersection Safety Evaluation Tools John R. Campbell Ayres Associates N19 W24075 Riverwood Drive, Suite 300 Waukesha, WI 53188 campbellj@ayresassociates.com Keith K. Knapp Engineering

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS Geometric Design Guide for Canadian Roads 1.3.4 CHARACTERISTICS OF CLASSIFICATIONS The principal characteristics of each of the six groups of road classifications are described by the following figure

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL

Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL Jan 2006 SIGHT DISTANCE 28(i) Chapter Twenty-eight SIGHT DISTANCE Table of Contents Section Page 28-1 STOPPING SIGHT DISTANCE

More information

MnPASS System Today and the Future

MnPASS System Today and the Future MnPASS System Today and the Future April 2010 By Nick Thompson Minnesota Department of Transportation Topics Minnesota s Current and Future MnPASS High Occupancy Toll Systems Overview of the MnPASS System

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

Iowa Corridor Management Pilot Project Overview. Recommendations For A Corridor Management Program August 2004

Iowa Corridor Management Pilot Project Overview. Recommendations For A Corridor Management Program August 2004 Iowa Corridor Management Pilot Project Overview Recommendations For A Corridor Management Program August 2004 Presentation Overview Project goals Pilot project selection process Analysis results Segment

More information

Roundabout Feasibility Memorandum

Roundabout Feasibility Memorandum Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01

More information

Safety Performance of Two-Way Stop-Controlled Expressway Intersections

Safety Performance of Two-Way Stop-Controlled Expressway Intersections Safety Performance of Two-Way Stop-Controlled Expressway Intersections UNDERSTANDING THE SAFETY PERFORMANCE OF TWO-WAY STOP- CONTROLLED RURAL EXPRESSWAY INTERSECTIONS WILL HELP CORRIDOR PLANNERS AND DESIGNERS

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS INTRODUCTION The thoroughfare plan will assist public officials in the development of a specialized system for efficient and safe movement of vehicular traffic while minimizing potential conflicts with

More information

Access Management Regulations and Standards

Access Management Regulations and Standards Access Management Regulations and Standards Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while simultaneously preserving

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

Lessons Learned from the Minnesota County Road Safety Plans. Richard Storm CH2M HILL

Lessons Learned from the Minnesota County Road Safety Plans. Richard Storm CH2M HILL Lessons Learned from the Minnesota County Road Safety Plans Richard Storm CH2M HILL May 21, 2014 Overview of the MN CRSP: Why Prepare Safety Plans for Local Systems? MAP-21: Requires states to address

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Design of Turn Lane Guidelines

Design of Turn Lane Guidelines Design of Turn Lane Guidelines CTS Transportation Research Conference May 24, 2012 Howard Preston, PE Minnesota Department of Transportation Research Services Office of Policy Analysis, Research & Innovation

More information

INTERSECTIONS AT GRADE INTERSECTIONS

INTERSECTIONS AT GRADE INTERSECTIONS INTERSECTIONS 1 AT GRADE INTERSECTIONS INTERSECTIONS INTERSECTIONS = INTERRUPTED FACILITIES Definitions and key elements An intersection is defined as an area where two or more roadways join or cross.

More information

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Recommended Roadway Plan Section 2 - Land Development and Roadway Access Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines

More information

Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona

Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona Analysis from January 1, 1991 to June 30, 2002 Richard C. Moeur, PE Traffic Design Manager, Northern Region Michelle N. Bina

More information

91

91 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 As previously depicted in Exhibit 4-J, vehicular accidents are shown along Forrester Road. The contributing factors may be due to its current two

More information

Mobility and Congestion

Mobility and Congestion Technical Memorandum Mobility and Congestion Prepared for: Prepared by: September 25, 2013 1 Table of Contents 1. Introduction... 1 2. Congestion Forecasting Process... 1 2.1 Mobility and Congestion Terms...

More information

Report. Typical Sections. City of Middleton, WI

Report. Typical Sections. City of Middleton, WI Report Typical Sections City of Middleton, WI December 2006 Report for City of Middleton, Wisconsin Typical Sections repared by: Traffic Associates LLC and STRAND ASSOCIATES, INC. 910 West Wingra Drive

More information

Access Management in the Vicinity of Intersections

Access Management in the Vicinity of Intersections Access Management in the Vicinity of Intersections FHWA-SA-10-002 Technical Summary Photo: Ralph Bentley (used with permission) 0 Access Management is: The design, implementation and management of entry

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Phase I-II of the Minnesota Highway Safety Manual Calibration. 1. Scope of Calibration

Phase I-II of the Minnesota Highway Safety Manual Calibration. 1. Scope of Calibration TECHNICAL MEMORANDUM Phase I-II of the Minnesota Highway Safety Manual Calibration PREPARED FOR: PREPARED BY: Minnesota Department of Transportation Richard Storm, CH2M HILL Veronica Richfield, CH2M HILL

More information

#!! "$% ##! &! # '#! % $ #!

#!! $% ##! &! # '#! % $ #! Executive Summary US Highway 16 (US 16) is the primary corridor connecting Rapid City to the Black Hills region. It serves a growing population of commercial and residential traffic, as well as seasonal

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

PRELIMINARY DRAFT FIRST AMENDMENT TO VISION 2050: A REGIONAL LAND USE AND TRANSPORTATION PLAN FOR SOUTHEASTERN WISCONSIN

PRELIMINARY DRAFT FIRST AMENDMENT TO VISION 2050: A REGIONAL LAND USE AND TRANSPORTATION PLAN FOR SOUTHEASTERN WISCONSIN PRELIMINARY DRAFT FIRST AMENDMENT TO VISION 2050: A REGIONAL LAND USE AND TRANSPORTATION PLAN FOR SOUTHEASTERN WISCONSIN ESTABLISHING TARGETS FOR FEDERAL PERFORMANCE MEASURES: HIGHWAY SAFETY SOUTHEASTERN

More information

Geometric and Trafc Conditions Summary

Geometric and Trafc Conditions Summary 2 Geometric and Trafc Conditions Summary m, RETHNKNG -94 APPENDX T2 GEOMETRC AND TRAFFC CONDTONS SUMMARY ntroduction This memorandum summarizes the geometric and traffic conditions within the Rethinking

More information

POWELL BUTTE HIGHWAY/NEFF ROAD INTERSECTION Interim Report: Existing Conditions, Needs, and Alternatives Review

POWELL BUTTE HIGHWAY/NEFF ROAD INTERSECTION Interim Report: Existing Conditions, Needs, and Alternatives Review POWELL BUTTE HIGHWAY/NEFF ROAD INTERSECTION Interim Report: Existing Conditions, Needs, and Alternatives Review Date: December 30, 2013 Project #: 13963.0 To: Chris Doty PE and George Kolb, Deschutes County

More information

4.0 ACCESS CONTROL PLAN - SH 14 (JEFFERSON STREET/RIVERSIDE AVENUE)

4.0 ACCESS CONTROL PLAN - SH 14 (JEFFERSON STREET/RIVERSIDE AVENUE) 4.1 Existing Conditions Roadway Physical Characteristics Typical Sections Jefferson Street 4.0 ACCESS CONTROL PLAN - SH 14 (JEFFERSON STREET/RIVERSIDE AVENUE) The existing typical cross-section for SH

More information

Freeway System Considerations

Freeway System Considerations Session 11 Jack Broz, PE, HR Green May 5-7, 2010 Freeway System Considerations Mainline Transit: Shoulder Operations, BRT, Stations HOV, HOT, UPA Interchanges Exit Ramps Entrance Ramps Bridges Local Crossings

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

NEIGHBORHOOD TRAFFIC CALMING POLICY

NEIGHBORHOOD TRAFFIC CALMING POLICY NEIGHBORHOOD TRAFFIC CALMING POLICY I. PURPOSE The City of Kent continually strives to strengthen and protect its neighborhoods by improving the quality of life in residential areas. Traffic conditions

More information

3.0 Future Conditions

3.0 Future Conditions 3.0 Future Conditions In order to be able to recommend appropriate improvements to the transportation system of the Town, it is important to first understand the nature and volume of traffic that is expected

More information

Pavement Markings (1 of 3)

Pavement Markings (1 of 3) Pavement Markings (1 of 3) DESCRIPTION AND DEFINITION Disadvantages Relatively high cost (over typical Crash reduction as yet unknown painted edge line) No tactile effect The STOP AHEAD pavement marking

More information

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan #70421 Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan Public Information Meetings and Hearings May June 2002 1 Reason for Freeway System Study 270-mile

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES

Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES 5.1 PURPOSE (1) The purpose of the Traffic Safety Studies chapter is to provide guidance on the data collection requirements for conducting a

More information

Road Safety Audit Review

Road Safety Audit Review U.S. Highway 14: Mankato to New Ulm Road Safety Audit Review Technical Report April 17, 2012 Prepared By 1.0 INTRODUCTION... 2 1.1 ROAD SAFETY AUDIT REVIEW (RSAR) TEAM... 2 1.2 ROAD SAFETY AUDIT REVIEW

More information

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

Chapter 5 FUNCTIONAL CLASSIFICATION

Chapter 5 FUNCTIONAL CLASSIFICATION Chapter 5 FUNCTIONAL CLASSIFICATION Functional classification is a system by which streets and roadways may be distinguished by types according to their function within the entire transportation network.

More information

Access Management Benefits & Techniques. Access Management Workshop June 2, 2006

Access Management Benefits & Techniques. Access Management Workshop June 2, 2006 Access Management Benefits & Techniques Access Management Workshop June 2, 2006 1 Benefits of Access Management Safety As access density increases, crash rates increase Increasing the density of access

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

Overview. Existing Conditions. Corridor Description. Assessment

Overview. Existing Conditions. Corridor Description. Assessment Overview A study of the 23 rd Street corridor was undertaken to document the existing conditions, analyze traffic operations, and recommend remedies for deficient situations Although 23 rd Street is frequently

More information

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects Word Count: 4,305 Submission Date: August 1, 2015 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 1420 South

More information

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE April, 2012 1 INTRODUCTION The need for transit service improvements in the Routes 42/55/676 corridor was identified during the Southern

More information

Technical Memorandum. Subject: Interchange Ramp Terminal Configuration. Expiration. Implementation. Introduction

Technical Memorandum. Subject: Interchange Ramp Terminal Configuration. Expiration. Implementation. Introduction Minnesota Department of Transportation Engineering Services Division Technical Memorandum To: Electronic Distribution Recipients From: Nancy T. Daubenberger, P.E. Assistant Commisioner, Engineering Services

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Abstract. Background. protected/permissive operation. Source: Google Streetview, Fairview/Orchard intersection

Abstract. Background. protected/permissive operation. Source: Google Streetview, Fairview/Orchard intersection ITE 2015 Western District Annual Meeting Ada County Highway District s Flashing Yellow Arrow Initiative Primary Author: Tim Curns, PE Ada County Highway District Traffic Engineer Author: Andrew Cibor,

More information

Highway 217 Corridor Study. Phase I Overview Report

Highway 217 Corridor Study. Phase I Overview Report Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

CIRCLE DRIVE TRAFFIC AND ACCESS MANAGEMENT POLICY GUIDE. Management Principles and Implementation Concepts

CIRCLE DRIVE TRAFFIC AND ACCESS MANAGEMENT POLICY GUIDE. Management Principles and Implementation Concepts CIRCLE DRIVE TRAFFIC AND ACCESS MANAGEMENT POLICY GUIDE A. PREFACE Management Principles and Implementation Concepts The intent of this policy guide is to provide interim guidance on the implementation

More information

JCE 4600 Transportation Engineering. Traffic Control

JCE 4600 Transportation Engineering. Traffic Control JCE 4600 Transportation Engineering Traffic Control Human Factors Primary Driving Tasks NAVIGATION GUIDANCE CONTROL What makes a Traffic Control Device Effective? Fulfill a need Command Attention Convey

More information

Access Management Regulations and Standards

Access Management Regulations and Standards Access Management Regulations and Standards January 2014 Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while preserving

More information

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK TRAFFIC IMPACT STUDY FOR THE DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK MARCH 14, 2017 PREPARED FOR: 1950 Brighton Henrietta Town Line Rd Rochester, NY 14623 PREPARED

More information

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX ADOT Statewide Bicycle and Pedestrian Program Summary of Activities APPENDIX B PEDESTRIAN DEMAND INDEX May 24, 2009 Pedestrian Demand Index for State Highway Facilities Revised: May 29, 2007 Introduction

More information

STANLEY STREET December 19, 2017

STANLEY STREET December 19, 2017 STANLEY STREET December 19, 2017 Welcome Mike Wiza, Mayor Scott Beduhn, Director of Public Works Agenda 1. Introduction 2. Existing Roadway Conditions 3. Current Alternative Improvements 4. Summary of

More information

FOR HISTORICAL REFERENCE ONLY

FOR HISTORICAL REFERENCE ONLY To: From: Subject: Electronic Distribution Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 12-14-B-03 December 18, 2012 Jon M. Chiglo, P.E. Division

More information

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES INNER LOOP EAST TRANSFORMATION PROJECT AIA Rochester Annual Meeting November 13, 2013 Bret Garwood, NBD Erik Frisch, DES Why? We are building a city that encourages walking, biking and enjoying the outdoor

More information

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016 Managed Lanes Steve Schilke, P.E. Major Projects Unit Head District 1 Illinois Traffic Engineering and Safety Conference October 2016 Agenda Managed Lanes Projects I-55 (Stevenson Expressway) Express Toll

More information

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY The Caledon Transportation Needs Study has been undertaken as a joint project by the Town of Caledon and the Region of Peel to determine the existing

More information

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas 133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS Overland Park, Kansas September 1, 2017 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. LITERATURE REVIEW... 1 3. CONCEPT

More information

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02 1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT

More information

3.9 - Transportation and Traffic

3.9 - Transportation and Traffic Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.

More information