1 FACING SYSTEMS FOR ROLLER-COMPACTED CONCRETE DAMS &SPILLWAYS Prepared by Gannett Fleming, Inc. P O R T L A N D C E M E N T A S S O C I A T I O N

2 Facing Systems for Roller-Compacted Concrete Dams & Spillways

3 Facing Systems for Roller-Compacted Concrete Dams & Spillways FACING SYSTEMS FOR ROLLER-COMPACTED CONCRETE DAMS & SPILLWAYS This document was prepared for the Portland Cement Association under the supervision of Mr. Randall P. Bass and Mr. Wayne Adaska. The primary authors were Paul G. Schweiger, Rodney E. Holderbaum, and Robert A. Kline, Jr. of Gannett Fleming, Inc. Technical review and editing were provided by: William B. Bingham, Gannett Fleming, Inc., Technical Review Amanda J. Hess, Gannett Fleming, Inc., Technical Review and Editing William F. Olberg, Gannett Fleming, Inc., Preparation of Figures Charlotte E. Weller, Gannett Fleming, Inc., Editing Note: This document is written in English units. To convert to metric units use the conversion table presented below. Selected Conversion Factors to SI Units To Convert Into Multiply by Square Yard (CY) Square Meter (m 2 ) Square Foot (Ft 2 ) Square Meter (m 2 ) Foot (Ft) Meter (m) Inch (In) Millimeter (mm) 25.4 Ton (2000 lb) Kilogram (kg) Pound (lb) Kilogram (kg) Pounds Per Square Inch (psi) Kilopascals (kpa) Cubic Yard (CY) Cubic Meter (m 3 ) Horsepower (HP) Kilowatt (kw) Fahrenheit ( F) Celsius ( C) 5/9( F 32) Cubic Foot (CF) Liter (l) Gallon (U.S) Liter (l) 3.78 Fluid Ounce per Pound (fl.oz.)/lb Milliliter per Kilogram (ml/kg) 65.2

4 Table of Contents Facing Systems for Roller-Compacted Concrete Dams & Spillways TABLE OF CONTENTS PAGE 1. INTRODUCTION Background Facing System Statistics for RCC Dams Worldwide Facing System Statistics for RCC Dams In the United States Recent Developments In RCC Dam Construction and Their Impact On Facing System Selection General Monolithic or Staged-Monolith Construction of RCC Dams Sloping Lift RCC Construction Thick Lift Placement Impacts of New RCC Construction Methods On Facing Systems UPSTREAM FACING SYSTEMS FOR RCC DAMS Criteria for Evaluating Upstream Facing Systems General Appearance Constructibility Seepage Control Durability Cost Facing System Impact on Structural Stability and RCC Mix Design Description of Most Popular Upstream Facing Systems General Formed/Exposed RCC Formed Unreinforced Conventional Concrete RCC Against Precast Panels Without A Liner RCC Against Precast Panels With An Internal Liner RCC Against Slip-formed Facing Elements Reinforced Conventional Concrete Against Formed RCC Formed RCC with External Liner Earth or Rock Fill Placed Concurrently With RCC Internally Vibrated Grout-Enriched RCC Other Upstream Facing Systems Composite Facing Systems Shotcrete Facing Unformed Sloping RCC Face Summary of Upstream Facing Systems

5 Facing Systems for Roller-Compacted Concrete Dams & Spillways TABLE OF CONTENTS (continued) PAGE 3. DOWNSTREAM FACING SYSTEMS FOR RCC DAMS AND RCC SPILLWAYS General Stepped Versus Smooth/Sloping Downstream Face Criteria for Evaluating Downstream Facing Systems General Public Accessibility and Safety Appearance Downstream Facing Systems for RCC Dams and RCC Spillways General Unformed RCC Formed RCC Formed Conventional Concrete Placed Concurrent with RCC RCC Against Precast Concrete Panels RCC Against Precast Concrete Blocks Reinforced Concrete Cast After RCC Placement RCC Against Slip-formed/Extruded Concrete Facing Elements RCC Placed Concurrently with Fill Mechanically Compacted Unformed RCC Summary of Downstream Facing Systems for RCC Dams and Spillways REFERENCES

6 Introduction CHAPTER 1 Introduction 1.1 Background Modern era concrete gravity dams have been constructed with conventional Portland Cement concrete mixes using temporary formwork to contain the plastic concrete until it set up and was self supporting. The majority of gravity dams have a vertical upstream face and the familiar sloping downstream face of about 45 degrees (examples: Shasta, Grand Coulee, and Folsom dams). The introduction of roller-compacted concrete (RCC) technology in the late 1970s - early 1980s was the result of intensive research and development carried out by dam designers throughout the 1970s. The primary objective of the new technology was to achieve radical cost reductions in every phase of concrete dam design and construction including materials, mix designs, temperature control, contraction joint grouting, forming, mixing, and placing. Prior to RCC dams, the upstream and downstream faces of conventional concrete dams were generally not considered as a separate design element, and there were no special costs allocated to the faces of the dam. The faces of the dam were simply the natural outcome of casting fluid concrete against temporary, removable forms. No special provisions were required other than specifying the quality and finish of the surface. The unit cost per cubic yard of concrete for constructing the dam body was inclusive of all costs associated with forming and placing the mass concrete with no special provision for the faces of the dam. The introduction of RCC construction techniques sought to reduce the cost of the form materials and the high labor costs of setting, stripping, and resetting the forms. This led to innovations for building both the upstream and downstream faces of RCC dams. Special treatments and construction techniques such as stay-in-place forms that become an integral part of the dam, and other methods were developed and continue to be refined. The innovations were intended to speed construction and to avoid the sunk costs of the forms and the labor costs of stripping and resetting of forms. As a result, engineers began to consider the dam faces as a separate design element and to break out the portion of costs allocated to building so-called facing systems from the single unit cost of the mass concrete. A variety of upstream and downstream facing systems have been used on RCC dams with varying degrees of success. Early RCC dams experienced significant seepage, either through horizontal lift joints and/or vertical transverse cracks. As a result, more sophisticated upstream facing systems using conventional concrete, precast concrete, geomembranes, or combinations of these systems have been incorporated in recent RCC dams with greater success. Downstream facing systems have also been quite varied, including un-faced RCC, and conventional concrete placed concurrently with RCC or following RCC placement. The exposed surface of the downstream face is most commonly configured to have either a continuous slope or stepped surface. Stepped configurations are often used in the overflow section to provide the added benefit of energy dissipation for spillway flows. Larger and higher RCC dams than those which have been constructed over the last two decades are scheduled for design and construction in the near future. As the body of RCC experience has increased, the cost, constructibility, and performance of various upstream and downstream facing systems have been closely studied and reported. As a result, some facing systems have gained wide acceptance and use while others have been abandoned. Most facing systems which have performed 1

7 Facing Systems for Roller-Compacted Concrete Dams & Spillways Introduction well and are widely used continue to be improved and refined with each new dam. Although the type of facing system selected for a new dam is site specific and is based on a number of criteria, all successful facing systems for RCC dams have one feature in common they do not impede the potential for high RCC placement rates. This should always be a consideration in selecting a facing system for an RCC dam. Selection of the facing system(s) for an RCC dam must also consider the intended purpose of the facility, operation and performance criteria, local climatic conditions, materials availability, dam size, owner preferences, and public perception. General selection criteria should be based on many factors including constructibility, watertightness, durability, appearance, and cost. The general selection criteria will and should differ between the upstream and downstream faces of the dam. This report presents a comprehensive summary and general evaluation of the upstream and downstream facing systems used on RCC dams and their spillways. Types of facing systems available, the general criteria for selecting a facing system, special site and structure considerations, and state-of-theart trends in facing system construction for RCC dams are emphasized. 1.2 Facing System Statistics for RCC Dams Worldwide To date, approximately 214 RCC dams with heights over 50 feet have been constructed worldwide. Of these dams, 37 (17.3 percent) are over 300 feet high. Seventeen different facing systems have been constructed on RCC dams worldwide. Table 1.1 presents statistics for these facing systems based on a published survey prepared by Dr. M. R. Dunstan (Dunstan, 2000). Some of the upstream facing systems are combinations of facing systems which provide redundant seepage protection. Several of the facing systems used are unique to a particular dam site and are generally not available or possible at most other dam sites. Other facing systems presented in Table 1.1 are unique to a country such as RCC against precast concrete panels with hot-poured Membrane which has been used exclusively in China, and conventional reinforced concrete cast before RCC placement which has been used predominantly in France. A close examination of the types of facing systems used in each country shows that the designers in some countries have a strong preference for a particular facing system. For example, all 37 RCC dams constructed in Japan, representing 17.3 percent of Formed RCC (13%) RCC Against Precast Concrete Panels (5%) Unreinforced Conventional Concrete Against Precast Concrete Panels (6%) RCC Against Slip-formed Facing Elements (4%) Reinforced Conventional Concrete Cast Against Precast Units or Slip-formed Facing Elements (4%) Unreinforced Conventional Concrete Against Precast Concrete Panels with Liner (3%) Eight Remaining Facing Systems (10%) Formed Unreinforced Conventional Concrete 55% Figure 1.1 Facing systems statistics for RCC dams in the United States. 2

8 Table 1.1. Summary of Facing Systems. Used on RCC Dams Worldwide with Heights Greater Than 50 Feet Based on Published Survey of 214 RCC Dams (Dunstan, 2000) Downstream Upstream Facing System Facing System Dam Spillway Description of Facing System System (Percent) (Percent) (Percent) 1 Formed Unreinforced Conventional Concrete 54.7 % 50.0% 67.0% 2 Formed RCC 12.6 % 21.2 % 9.6 % 3 Unreinforced Conventional Concrete Against Precast Concrete Panels 6.1 % 3.4 % 0.5 % 4 RCC Against Precast Concrete Panels 5.1 % 1.9 % 0.5 % 5 RCC Against Slip-formed Facing Elements.2 % 5.3 % 3.0 % 6 Reinforced Conventional Concrete Against Precast Units or Slip-formed Facing Elements 3.7 % 0.5 % 11.2 % 7 Unreinforced Conventional Concrete Against Precast Concrete Panels with Internal Liner 3.3 % 0.5 % 8 Unreinforced Conventional Concrete Against Formwork with External Liner 1.9 % 9 RCC Against Precast Concrete Panels with Hot Poured Membrane 1.9 % 10 RCC Against Formwork with External Liner 1.4 % 11 RCC Against Precast Concrete Panels with Liner 1.4 % 12 Reinforced Conventional Concrete Cast Before RCC Placement 1.4 % 13 Reinforced Conventional Concrete Cast After RCC Placement 1.4 % 1.0 % 5.6 % 14 RCC Against Precast Concrete Blocks 0.5 % 8.7 % 0.5 % 15 RCC Against Fill 0.5 % 0.5 % 16 Mechanically Compacted Unformed Face of RCC 1.9 % 17 Unformed Face of RCC 5.8 % 2.0 % Total 100 % 100 % 100 % Stepped Face 1.4 % 43.8 % 35.5% A pie chart showing the distribution of upstream facing systems used on RCC dams worldwide is presented in Figure

9 Facing Systems for Roller-Compacted Concrete Dams & Spillways Table 1.2. Summary of Upstream and Downstream Facing Systems on RCC Dams with Heights 40 Feet in the United States. Facing System: 1. Formed RCC 1 Vertical or Sloping Face 2. Earth or Rock Fill Placed Concurrently with RCC 3. Formed Conventional Unreinforced Concrete Stepped Face 4. Formed Reinforced Conventional Concrete Against RCC 5. RCC Against Precast Panels Purpose: 6. RCC Against Precast Panels with Internal Liner F Flood Control 7. Unformed RCC R Recreation 8. RCC Against Slipformed Facing Elements W Water Supply 9. RCC Against Precast Concrete Blocks/Elements H Hydropower 10. Formed Conventional Unreinforced Concrete with External Liner G Groundwater Recharge 11. Formed RCC with External Liner P Pollution Control RCC Dam RCC Upstream. Downstream Facing System Height Length Volume Facing System. Dam. Spillway State Date Purpose Feet Feet (CY) Willow Creek OR 1982 F,R 169 1, , Winchester KY 1984 W 74 1,192 32, Middle Fork CO 1984 F, W ,000 Conduit 4. Galesville OR 1985 W, F, R , Great Hills TX 1985 R , Grindstone Canyon NM 1986 W 139 1, , Monksville NJ 1986 W 157 2, , Lower Chase AZ 1987 F , Upper Stillwater UT 1987 W 294 2,673 1,471, Elk Creek OR 1988 F 83 1, , Stagecoach CO 1988 H, W, R , SW Freese (Stacy) TX 1989 W , Marmot OR 1990 H , Oxhide Mine #3A AZ 1990 W , Quail Creek South UT 1990 W 137 2, ,000 Conduit 16. Freeman CA 1990 G 55 1, , Cuchillo Negro NM 1991 F , Nickajack TN 1991 H 55 1, , Victoria MI 1991 H , Town Wash NV 1992 F , Lake Alan Henry TX 1992 W , Christian E. Siegrist PA 1992 W , Zintel Canyon WA 1992 F , Elmer Thomas OK 1993 R ,000 None 25. Spring Hollow VA 1993 W ,000 None 26. Hudson River #11 GA 1993 W , Rocky Gulch AZ 1994 P ,050 None 28. Reichs Ford MD 1994 F , Peterson Lake CO 1995 W , Big Haynes GA 1996 W 88 1,400 93, Tie Hack WY 1997 W , Penn Forest PA 1998 W 180 2, ,000 Separate 33. Buckhorn NC 1998 W 44 2,500 87, Bullard Creek OR 1999 F , Barnard Creek UT 1999 F ,400 * 36. Hughes River WV 2000 F,W,R 86 1,000 85, Pajarito NM 2000 F , Trout Creek CO 2000 R , Hunting Run VA 2001 W 89 2, , Olivenhain CA 2001 W 306 2,580 1,400,000 Total * Shotcrete Used as the upstream liner after RCC Placement 4

10 Introduction the dams constructed worldwide, were constructed using unreinforced conventional concrete to face both the upstream and downstream faces of the dams. None of these dams were constructed with a stepped downstream face. 1.3 Facing Systems Statistics for RCC Dams In the United States Of the 214 RCC dams with heights greater than 50 feet constructed worldwide, 32 (15 percent) were constructed in the United States. Three additional RCC dams with heights greater than 50 feet are currently under construction: Hughes River Dam in West Virginia, Hunting Run Dam in Virginia, and Olivenhain Dam in San Diego, California. When completed in the year 2003, Olivenhain Dam will be the tallest RCC dam in North America at feet, requiring approximately 1,420,000 cubic yards of RCC. Of the 17 facing systems used on RCC dams worldwide, 11 have been used on RCC dams in the United States. A summary of the facing systems used on RCC dams in the United States with heights greater than 40 feet is presented in Table 1.2. Of these facing systems, five were first used in the United States including: (1) RCC against precast panels (Willow Creek Dam), (2) RCC against precast panels with an internal liner (Winchester Dam), (3) Slip-formed facing elements (Upper Stillwater Dam), (4) Reinforced conventional concrete cast against RCC (Stacy Dam), and (5) Unformed downstream face (Willow Creek Dam). None of these 11 facing systems are unique to the United States. Middle Fork Dam was the first RCC dam in the world to have a stepped downstream face. Approximately 31 percent of the RCC dams constructed in the United States have a stepped downstream face in the non-overflow section, and approximately 50 percent have a stepped face in the overflow section. Conventional RCC construction in the United States has typically consisted of constructing one-foot thick lifts from one abutment to the other prior to initiating construction of the next lift. This approach results in the greatest lift joint maturity and, therefore, also results in the lowest lift joint strength and highest permeability unless special measures are taken. For dams in low to moderate seismic zones, adequate lift joint shear and tensile strength can usually be achieved with only minimal use of bedding mortar. In warm weather conditions, however, a retarding admixture may be needed to develop adequate bonding of lifts if bedding mortar is not used. Full bedding of lift joints and/or use of a retarding admixture is often required for dams in high seismic zones to maximize lift joint tensile and shear strengths. In the past several years, variations in RCC placement methods have been developed to dramatically improve lift joint quality and/or minimize the number of lift joints. These include the monolith or staged-monolith method of construction, thick lift placement, and the sloping lift method of placement developed in China. These new construction techniques and procedures can have a significant impact on the selection of the facing system(s) for the dam Monolithic or Staged-Monolith Construction of RCC Dams. Several recent RCC dams, including Big Haynes Dam and Penn Forest Dam in the United States, and others worldwide have been constructed either fully or partially in monoliths, similar to the practice traditionally used to construct gravity dams using conventional mass concrete. For monolithic construction, one or more monoliths between transverse contraction joints are constructed; then operations are moved to the next monolith or set of monoliths. The staged monolith 1.4 Recent Developments in RCC Dam Construction and Their Impact on Facing System Selection General. Although RCC has been used for construction of dams worldwide for nearly 20 years, new techniques, materials, and construction procedures are still being developed. Further, better understanding of RCC behavior is allowing the planning, design, and construction of RCC dams of unprecedented height. Figure 1.2. Monolithic construction of Big Haynes Dam, GA. 5

11 Facing Systems for Roller-Compacted Concrete Dams & Spillways approach raises one or more monoliths several lifts; then adjacent monoliths are advanced. The main advantage of this approach is that lift joint maturity can be dramatically decreased by rapid placement of lifts within the active work area. As a result, lift joint tensile and shear strengths are increased, and the use of bedding mortar for cold joints can be decreased. Additionally, the approach allows for construction to begin in one area while excavation, gallery construction, foundation drilling, final foundation cleanup operations, or other work activities are ongoing in another area. The main disadvantage of monolithic or staged-monolith construction is the need for formwork at the end of each monolith. The 88-foot-high Big Haynes Dam in Georgia is an example of an RCC dam constructed using the staged-monolith method (Figure 1.2). The 304-foot high Balambano Dam in Indonesia also used the staged-monolith construction method (Figure 1.3). use of construction equipment. Each individual layer is compacted with vibratory rollers. The goal is to reduce the time between placement of each individual layer, thereby increasing lift joint quality without the use of bedding mortar. Bedding mortar and extensive lift surface cleaning are only required on the surface of each block of RCC. Figure 1.4. Illustration of sloping lift placement (exaggerated scale). Figure 1.3. Monolithic construction of Balambano Dam, Indonesia Sloping Lift RCC Construction. Another new RCC construction method that favors increasing the rate of RCC placement while minimizing lift surface exposure is sloping lift RCC construction. For this method of placement, a thick block of RCC is advanced by placing a number of individual layers sloping from the top of the block down to the top of the previous block of layers. The slope of the layers is set according to placing capacity, the scale of the placing area, and what is determined to be an acceptable length of time between placement of each individual layer. A steeper slope decreases the length of time between placement of each layer; however, too steep a slope can result in inefficient The sloping lift method of construction was first used at the Jiangya Dam project in China in The method was termed Horizontally Advancing Sloped Layer Construction. For this project, the best slope varied from 15H:1V to 20H:1V depending on the elevation in the dam. The slope was established to provide a large enough placing area for efficient use of the construction equipment, while also keeping the area small enough to maintain exposure of the individual layers at 2 to 4 hours. At the Jiangya project, 12-inch individual layers were used, and a total block thickness or vertical height of 10 feet was advanced from abutment to abutment (Changquan, 1999). Although the sloping lift method of RCC placement has several advantages, it also has the disadvantages of a more complicated grade control and the need for treatment of considerably more lift edges as compared to conventional RCC placement in horizontal or near-horizontal lifts. In addition, if sloping lifts are advanced from abutment to abutment (most cases), forming steps on the downstream face is very difficult. On very large dams, if the lifts are advanced in the upstream/downstream direction, a stepped face could be constructed without difficulty Thick Lift Placement. Horizontal lifts with a one-foot thickness have more or less become standard worldwide. However, both designers and contractors have investigated the use of horizontal lifts 6

12 Introduction with a thickness up to 24 inches, or double the standard practice. Both monolithic and sloping lift RCC construction are conducive to using thicker horizontal lifts. Construction of thicker horizontal lifts is typically limited by the capacity of the mix plant, delivery system, and spreading equipment. While thick lift placement does not necessarily increase lift joint shear strength, it does decrease the number of lift joints that might require treatment such as cleaning and application of bedding mortar. Thicker lifts can be accomplished either by placement and compaction of a single, thicker layer or by spreading RCC in several advancing horizontal layers to build a thicker final lift similar to the procedure used at Elk Creek Dam, constructed in At Elk Creek Dam, RCC was spread in 6-inch layers, each individually compacted by dozer action. After four 6-inch layers were placed, the 24-inch thick lift was then compacted with vibratory rollers. Successful consolidation of the thicker lifts at Elk Creek Dam required both a low Vebe time of 8 to 10 seconds, and significant reworking of the RCC by dozers during the spreading operation of each individual 6-inch layer. According to nuclear density test results, compaction was essentially completed by the dozer action alone (Hopman, 1988). Placement of RCC in lifts thicker than the standard 12 inches was investigated as part of the design phase for Olivenhain Dam. Lift thicknesses of 15, 18, and 24 inches were investigated. Extensive density testing was performed using a lift thickness of 18 inches spread in two 9-inch layers. As with Elk Creek Dam, it was determined that a lower Vebe time was required to obtain adequate consolidation of thicker lifts. For the Olivenhain Dam thick lift trials, a Vebe time of about 14 to 16 seconds was used. In addition to the lower Vebe time, 8 passes with a 20-ton vibratory roller were required to complete the compaction process to an acceptable level. As a comparison, for 12-inch thick lifts placed in a single layer at a Vebe time of 20 to 25 seconds, adequate compaction was achieved with 8 passes of a 10-ton vibratory roller. It was decided that placement of the RCC in thicker lifts was not appropriate for the Olivenhain Dam project in part due to additional exposure of uncompacted material to the hot, dry climate, damage to the upper zone of the lift caused by the heavier roller, and the need for additional mix water to provide the necessary low Vebe times (and thus additional cement to meet the required strength). Although not adopted for the Olivenhain Dam project, thicker lift construction may be a viable alternative for other projects Impacts of New RCC Construction Methods On Facing Systems. Monolithic construction, sloping lift construction, and thicker RCC lifts all involve minimizing lift surface exposure by concentrating RCC placement within a more narrow area. This in turn can result in increasing the rate of lift placement or rate of vertical rise of sections of the dam. These construction methods can impact facing systems that are conducive to traditional RCC construction that involves placing one lift at a time across the entire length of the dam. For example, facing systems such as RCC against slip-formed or extruded elements, that require long continuous runs across the dam to be economical, are not compatible with monolithic or sloped lift construction. Increasing the lift thickness can impact the construction of facing systems that require other materials to be placed concurrently with RCC placement, such as unreinforced conventional concrete against formwork or RCC placed against earth/rock fill. Additional temporary bracing of the forms may be required if RCC lifts are placed rapidly, such that the rate of vertical RCC placement does not permit adequate time for the RCC to gain strength. This may affect the cost of facing systems that use stay-inplace forms such as precast concrete panels, where the lower panels provide the lateral support for the upper panels. If vertical placement of RCC is too rapid, the construction limitations for some facing systems may become critical and prohibit their use. As previously noted, construction of the facing system must not impede the potential for high RCC placement rates. 7

13 Facing Systems for Roller-Compacted Concrete Dams & Spillways CHAPTER 2 Upstream Facing Systems for RCC Dams 2.1 Criteria for Evaluating Upstream Facing Systems General. The general criteria for evaluating upstream facing systems for most RCC dams during the design phase includes the following five factors: 1. Appearance 2. Constructibility 3. Seepage Control 4. Durability 5. Cost The importance or weight that each factor has on the selection of the upstream facing system depends on the intended purpose of the dam, local climatic conditions, materials availability, dam size, and owner preferences. Most RCC dams with a permanent reservoir require that the upstream facing system provide proven, reliable, long-term seepage control, whereas RCC dams intended to impound water for infrequent and short durations for the purpose of flood control may use a less impermeable facing system. A brief discussion of each of the evaluation criteria is presented below. A general assessment of the overall rating of each of the upstream facing systems for each of the evaluation factors is presented at the end of this section Appearance. Appearance is normally a standard established to satisfy aesthetic requirements set by owners or local agencies. The appearance of the facing system can be very important where public perception of the condition, stability, and safety of the structure is essential. The appearance of some upstream facing systems such as exposed RCC can evoke unwarranted concern from those who are unfamiliar with this technology. For screening purposes, appearance is categorized as Good, Fair, and Poor Constructibility. Constructibility includes an assessment of: (1) the availability of the construction materials and specialized labor and/or equipment required to perform the installation, (2) the impact that the installation/construction of the upstream facing system has on the overall construction schedule, (3) the impact that the construction of the facing system has on the RCC placement operations, and (4) the complexity of the construction techniques needed to construct the facing system. For screening purposes, constructibility is categorized as Routine, Moderate, and Difficult. A primary consideration when evaluating the constructibility of the upstream facing system for RCC dams is the impact it has on the placement of RCC. The selected facing system should not impede or control the rate of RCC placement Seepage Control. Key factors related to seepage control include the permeability of the facing system, whether or not the facing system is drained or undrained, and the performance of the facing system should the dam experience minor movements or cracking. A drained upstream facing system can accomplish the removal of water migrating through lift joints in the body of the dam, thus lowering saturation levels and pore pressures in the dam, with beneficial effects on the stability safety factors, on AAR phenomena, and on appearance. A drained upstream facing system also permits more accurate monitoring and control of seepage. For screening purposes, seepage control is categorized as Good, Fair, and Poor Durability. Durability can be influenced by a number of site-specific factors including (1) chemical attack, (2) solar radiation, (3) thermal expansion and contraction, (4) wave and ice loading, (5) freeze/thaw cycles, (6) seismic loading, and (7) vandalism. The relative weight of consideration 8

14 Upstream Facing Systems for RCC Dams placed on the ice loading and freeze/thaw cycle factors should be climate-dependent. Other durability considerations include maintenance requirements and the anticipated service life of the facing system. Durability also includes an assessment of what would be involved to repair or replace the facing system once its design life is exceeded or should a defect in, or failure of, the facing system occur. For screening purposes, durability is categorized as Good, Fair, and Poor Cost. The total cost of an upstream facing system must include other costs besides the cost of installing or constructing the upstream face. Additional costs to be considered include: (1) construction coordination and inspection costs paid by the owner, (2) the cost of delays that the system may have on production rates of other work items, (3) the cost of limiting the range of RCC construction methods such as the sloped RCC placement method, or constructing the dam in monoliths, (4) the additional cost of financing the project or lost revenue if installing the facing system delays filling the reservoir, (5) maintenance and replacement costs, (6) patent or royalty fees, and (7) savings that the facing system may have on the design of the dam due to uplift reduction Facing System Impact on Structural Stability and RCC Mix Design. The U.S. Army Corps of Engineers (Corps) current design standards for evaluating uplift within gravity dams, including RCC dams, is presented in EM Gravity Dam Design (U.S. Army Corps of Engineers, 1995). For conventional concrete dams, uplift within the body of the dam is assumed to vary linearly from 50 percent of maximum headwater at the upstream face to 50 percent of tailwater, or zero, as the case may be, at the downstream face. This guideline accounts for the relative impermeability of intact concrete which precludes the buildup of internal pore pressures. The Corps notes, however, that cracking at the upstream face or weak horizontal construction joints in the body of the dam may affect this assumption. For RCC dams, the Corps stipulates that the uplift within the dam is a function of the permeability of the facing system and the properties of the RCC. The Corps cautions that a porous upstream face and lift joints in conjunction with an impermeable downstream face could result in a pressure gradient through a cross section of the dam considerably greater than that outlined above for conventional concrete. When drilled drains are installed in the foundation or within the body of the dam, their effectiveness is assumed to vary from 25 to 50 percent. When performance of the drainage system can be verified, the effectiveness of the drains can be increased to a maximum of 67 percent. Facing Systems with Fully Drained Face. Internal uplift reduction can be achieved with facing systems that provide a drainage layer on the downstream side of the facing system, such as an external geomembrane liner with a geonet drainage layer, or precast panels and an internal geomembrane liner and drainage layer. This type of facing system is normally installed on the upstream face of dams to eliminate seepage through the dam and dehydrate the body of the dam to prevent freeze-thaw damage. The drainage system installed with this system can be verifiable and has been proven to perform as intended. Using a facing system that has a fully drained face, 100 percent uplift reduction is likely at the upstream face of the dam; however, a 50 percent uplift reduction is probably appropriate for design. The full benefits of this system, however, cannot be realized unless the same uplift reduction can be achieved in the foundation. That is, the cross section or dimensions of the RCC Figure 2.1. Installation of drainage layer to create fully drained face, (photo courtesy of CARPI). 9

15 Facing Systems for Roller-Compacted Concrete Dams & Spillways dam to achieve adequate structural stability will be governed by the maximum uplift reduction achieved in the foundation through grouting and installation of a foundation drainage system. Although not recommended, benefits of a substantial uplift reduction at the upstream face could include eliminating drilled drain holes in the body of the dam, relaxation of lift quality and treatment standards, eliminating construction of contraction joints in the dam, and savings in the RCC mix used to build the dam. Using this facing system and including the aforementioned features in the dam, the factors of safety for stability within the body of the dam will be conservatively high. Facing Systems without Fully Drained Face. Internal uplift reduction for facing systems that do not have a fully drained face, such as a conventional unreinforced and reinforced concrete face, depends primarily on the watertightness of the face, permeability of the RCC, and internal dam drainage. Without a face drain and adopting current design guidelines for concrete dams, a reinforced conventional concrete face with waterstopped joints can result in a 50 percent reduction in uplift at the face of the dam by accounting for the relatively high impermeability of the reinforced concrete. Additional reduction in uplift pressure can be achieved by drilling drains within the body of the dam a short distance from the upstream face or by installing strip drains on the face of the RCC dam concurrent with RCC placement, or just prior to placing the reinforced concrete. Like the geomembrane systems, the full benefits of this system cannot be realized unless the same uplift reduction can be achieved in the foundation. For formed RCC and formed unreinforced conventional concrete facing systems, the Corps stipulates that the determination of the percent of uplift pressure depends on the RCC mix permeability, lift joint treatment, placement techniques specified for minimizing RCC segregation, RCC compaction methods, and the treatment for watertightness at the upstream and downstream faces. Construction of a test section in accordance with EM , Roller-Compacted Concrete, can be used as a prototype for determining the permeability of the RCC facing system, thereby providing some guidance on uplift distribution for use by the designer. 2.2 Description of the Most Popular Upstream Facing Systems General. Although 17 upstream facing systems have been used worldwide, for discussion these systems can be categorized into nine basic types of facing systems. Variations within each type of facing system are discussed along with their generally accepted advantages and disadvantages Formed/Exposed RCC. This upstream facing system simply consists of forming the RCC face with conventional removable forms. It is generally selected for dams where seepage and aesthetics are not a concern. The dams presented in Table 1.2 where this upstream facing method was used are mostly flood control or stormwater detention dams and tailings dams where there is no permanent impoundment. The tallest RCC dam constructed with this facing system is Shibanshui Dam in China at a height of 285 feet. The tallest dam in the United States with this facing system is Bullard Creek Dam in Oregon at a height of 52 feet. In some cases the upstream face is formed against a concurrently placed earthfill berm or existing smaller earthfill dam. TYPICAL PLAN TYPICAL SECTION Formed RCC Figure 2.2. Typical plan and section of formed/exposed RCC upstream facing system. ACI Committee 207 addresses RCC permeability in Roller-Compacted Mass Concrete (ACI, 1997). As noted in the report, permeability of RCC is dependent upon the voids in the compacted mass together with porosity of the mortar matrix, and therefore is almost totally controlled by mixture proportioning, placement method, and degree of 10

16 Upstream Facing Systems for RCC Dams compaction. When care is taken to proportion and compact the RCC, the permeability of the RCC should be similar to that of conventional mass concrete. Test values for RCC permeability range between 0.3x10-9 to 30x10-9 feet per minute. If seepage occurs in RCC dams, it is usually along the horizontal lift joints, uncontrolled cracks, or monolith joints, rather than through the compacted mass. The best method of minimizing seepage is to install contraction joints at strategic locations transverse to the dam axis, installing waterstops at the transverse contraction joints, and using bedding mortar between horizontal RCC lifts within a zone at the upstream face of the dam. Seepage through RCC dams has also been found to gradually decrease with time as horizontal lift and contraction joints are filled by sedimentation and calcification. Lift joint permeability can be decreased by using bedding mortar between the lifts and chemical grout or other sealants to seal contraction joints at the upstream face after construction. Most designers who are concerned with minimizing seepage through the dam will not use this facing method alone. Figure 2.3 Formed RCC (below average quality). The appearance of the exposed RCC face can be improved by using an RCC mix with smaller aggregates and a low vebe time. An example of an RCC dam with an above average quality formed RCC face is Bullard Creek Dam in Oregon. Exposed RCC in harsh climates where freeze/thaw cycles occur can experience varying degrees of weathering. The rate of weathering may appear rapid at first; however, it should dramatically decrease with time. This is primarily due to the fact that it is difficult to achieve a high degree of compaction near the base of the lift when RCC is placed directly against formwork. This results in lower Figure 2.4. Formed RCC (above average quality) Bullard Creek Dam, OR, (photo courtesy of Benjamin Doerge). density and lower strength at the exposed face. As weathering progresses, the lower strength, less dense, and therefore weaker RCC sloughs away from the exposed surface; the stronger, more resistant RCC becomes exposed. To improve the density and surface appearance at the exposed face, a wedge or fillet of bedding mix can be placed against the form prior to placing the RCC. The dozer operator can spread the RCC against the form in a manner which causes the bedding mix to ride up the face of the form. If the RCC is then carefully compacted, the texture of the finished face can approach that of conventional concrete; however, this is difficult to achieve on a continuous basis. In a reservoir environment, most weathering of the upstream face will occur at and above the waterline where there is exposure to wave action, wind, and greater temperature variations. The rate of deterioration is a function of the climate, the RCC mix design properties, aggregate quality, cement content, and the degree of compaction achieved at the face. Typically, greater strength of the mix and aggregates produce greater durability. Advantages of this facing system are that it involves routine construction procedures except for waterstop installation, does not impede or otherwise complicate RCC placement, and is the most economical facing system. Disadvantages include marginal seepage control, rough unfinished appearance, and sometimes poor durability in moderate to severe climates Formed Unreinforced Conventional Concrete. This is the most popular upstream facing system used on RCC dams, and has been used on 132 of the 214 dams constructed worldwide. There are several 11

17 Facing Systems for Roller-Compacted Concrete Dams & Spillways Figure 2.5. Elk Creek Dam, OR. variations of this facing system. The first generation of this type of facing system had no vertical crack control joints or only widely spaced joints. This method was used at Elk Creek Dam in Oregon where watertightness comparable to that of a conventional concrete gravity dam was desired. The method involved first placing a thin, 1/4- to 1/2-inch, layer of bedding mortar evenly over the entire lift surface just ahead of the dozer spreading the RCC for the next lift. Later it was concluded that the necessary watertightness between lifts could have been achieved by placing the bedding mortar on the upstream 1/3 portion of each lift (Hopman, 1992). The upstream face of the dam used forms tied to the dam with steel tie bolts. A 2-foot lift of RCC was then placed to within 3 feet of the upstream form. The 3-foot wide zone between the upstream form and the placed RCC was then filled with air-entrained conventional concrete having a 3-inch maximum size aggregate. This zone of conventional concrete was intended to provide a first line defense against water leakage through the structure (Hopman, 1992). The 3-foot wide zone of conventional concrete was consolidated using emersion type vibrators. Waterstop was installed in the conventional concrete at the full dam height at vertical transverse contraction joints. The transverse contraction joints were installed with a maximum spacing of 300 feet across the 2,580-foot-long dam. Construction of Elk Creek Dam was halted after 348,000 cubic yards of the total 1,041,000 cubic yards of RCC were placed. During this shut down period an evaluation of the upstream facing method was performed. It was concluded that this upstream facing system was costly and slow to construct, and did not fit well with the other fast track construction operations. Problems included: coordination of the conventional concrete placement with the RCC placement, concentration of pockets of segregated RCC at the bottom of the interface between the RCC and conventional concrete, and lack of continuous consolidation of the RCC/conventional concrete interface. Core drilling and water testing at the interface between the conventional concrete and the RCC showed that voids along the interface could interconnect facing cracks and contraction joints and act as a conduit for seepage (Hopman, 1992). It was decided that prior to resuming construction of Elk Creek Dam, changes would be made to the specifications to tighten procedural requirements for consolidation of the RCC/conventional concrete interface and to reduce the maximum size aggregate of the conventional concrete from 3 inches to inches. However, before improvements to construction techniques to the upstream facing system could be fully implemented and further evaluated, final construction of Elk Creek Dam was terminated due to environmental issues. TYPICAL PLAN TYPICAL SECTION Formed Unreinforced Concrete Figure 2.6. Typical plan and section for formed unreinforced conventional concrete upstream facing system. 12

18 Upstream Facing Systems for RCC Dams A second-generation variation of this facing system involved installing closely spaced joints within the face, and has been the most commonly used variation of this facing method. A consensus has not been reached with regard to the lateral width or thickness of conventional concrete at the upstream face or whether it should be placed before or after the adjoining RCC lift. The lateral width of conventional concrete normally ranges between 1 to 3 feet; however, RCC dams in Japan have used a layer as wide as 10 feet (Hansen, 1991). Wide thermal cracking is reduced to hair-line fractures by including notches and/or closely spaced control joints or crack inducers in the facing concrete between dam contraction joints 10 to 20 feet on center, extending from the top to the bottom of the dam. For Stagecoach Dam in Colorado, two alternatives for the facing system were included in the contract bid documents: (1) an 18-inch thick cast-in-place conventional concrete face with closely spaced crack control joints, and (2) precast concrete panels with a geomembrane liner. Based on bids received, the cast-in-place facing system was selected. It was reported that the precast concrete panels with a liner would have added approximately 4.4 percent to the total construction cost (Arnold, 1992). At Stagecoach Dam, bedding mortar was placed in a 12-foot wide zone at the upstream end of each RCC lift. Crack inducers in the facing concrete were constructed at 10-foot centers using vertical strips, 1.5 inches deep and 0.75 inches wide. These slots were later filled with a backer rod and AquataPoxy sealant. After completion of the dam, narrow cracks were observed in the facing concrete. All of the cracks occurred within the crack-inducer strips. Total seepage from the gallery, including abutment drains, is reported to be less than 25 gal/min (Arnold, 1992). Natural seepage reduction has been observed due to silt and calcification filling the seepage paths. Figure 2.8. Vertical notch with sealant, New Elmer Thomas Dam, OK. At New Elmer Thomas Dam, similar crack-control notches were formed in a 2.5-foot wide cast-in-place conventional concrete face. Bedding mortar was placed in a 10-foot wide zone at the upstream end of each RCC lift surface. Vertical notches were also spaced at 10-foot centers and extended the full height of the dam. A waterexpandable seal and a polymer seal were placed in the notches to prevent water seepage into the upstream face through the notches (Figure 2.8) (Choi, 1994). At Monksville Dam, waterstopped vertical joints were placed in the facing concrete every 20 feet as shown in Figure 2.9. Figure 2.7. Upstream face of New Elmer Thomas Dam, OK. Figure 2.9. Installation of waterstop at vertical joints, Monksville Dam, NJ. 13

19 Facing Systems for Roller-Compacted Concrete Dams & Spillways Figure Formed unreinforced conventional concrete face of Monksville Dam, NJ. As previously noted, horizontal construction joints in conventional concrete can have high permeability due to cold joints and/or drying shrinkage in concrete. Temperature shrinkage-induced cracking commonly occurs in unreinforced conventional concrete that is restrained at one face and exposed on the opposite face. Cold joints and cracking increase the facing s permeability. Drying and temperature shrinkage-induced cracking are difficult to control for this facing system. Installation of waterstops at transverse contraction joints is often difficult to perform during construction and these waterstops have been suspected as the source of seepage at some dams. Drainage for the purpose of relieving pore pressure within the RCC mass downstream of the upstream facing system is generally provided by drilling inclined or vertical drain holes during or after construction from the top of the dam and/or gallery. Trout Creek Dam in Colorado was the first to incorporate horizontal waterstops at the end of each day s placement. On average, the waterstop was placed in every third or fourth lift. Figure Waterstopped contraction joint at Quail Creek Dam, UT. Figure 2.11 shows a typical waterstopped dam contraction joint at Quail Creek Dam in Utah. Advantages of this facing system include readily available construction materials, no additional installation time requirement after RCC placement, and the durability and attractiveness of the exposed face if attention is paid to setting the forms and properly consolidating the conventional concrete. Disadvantages include the need to coordinate multiple construction materials and activities that are time-critical. The production, delivery, and placement of the conventional concrete must be completed within a limited time frame (30-45 minutes) concurrent with RCC placement in order to ensure adequate bond at the conventional/rcc interface within the initial set times of the two materials. In addition, conventional concrete placing equipment further congests the lift surface, waterstops are not easily installed at contraction joints, horizontal joints may not be watertight, the face is prone to cracking because of differences in elastic and shrinkage properties from those of the RCC, consolidation at the conventional concrete and RCC interface can be difficult to achieve, and sealants placed in crack inducing joints tend to separate from the concrete. The tallest dam in the world to use this facing system is Miyagase Dam in Mexico at a height of 508 feet. The tallest dam in the United States with this facing system is Monksville Dam in New Jersey at a height of 157 feet RCC Against Precast Panels Without A Liner. Willow Creek Dam in Oregon was the first RCC dam constructed in the world and, therefore, the first to use this upstream facing system. The tallest dam in the world constructed with this facing system is Shuidong Dam in China at a height of 14

20 Upstream Facing Systems for RCC Dams Figure Typical dam section showing RCC against precast panels. 187 feet. This First Generation upstream facing method provided an innovative means of forming the upstream face with an economical stay-in-place form which is both durable and aesthetically pleasing, but by itself does not reduce the potential for seepage through the dam. Although Willow Creek Dam was designed to be stable with full uplift pressure along each horizontal lift joint, the seepage which emerged from the lift joints at the downstream face of the dam during filling of the reservoir was found to be undesirable. This condition can be mitigated by providing internal drains to intercept the seepage before it reaches the downstream face of the dam. This facing system has been repeated at three dry detention dams: Cuchillo Negro Dam in New Mexico, Zintel Canyon Dam in Washington, and Reichs Ford Dam in Maryland. For Zintel Canyon Dam (Figure 2.14) it was reported that using the precast panels to form the upstream face of the dam was less expensive than placing a conventional concrete facing against movable temporary formwork (Hansen, 1994). The most common size of the unlined precast panels is 4 feet high, 16 feet long and 4 inches thick. Panels are normally erected by first bracing them with exterior strongbacks (Figure 2.15) and then threading steel anchor rods into inserts located in the downstream face of the panels. Typical 4 x16 panels have 4 anchor bars each with a pullout resistance of 10,000 lbs. The anchor rods are embedded into the RCC as lift placement progresses. After previously placed RCC lifts progress to sufficient height and strength, anchor rods installed in lower panels provide support for the upper panels through the external strongback system as subsequent lifts of RCC are placed. To improve the density and watertightness of the RCC at the upstream face, a wedge of bedding mix can be placed against the downstream face of the panel prior to placing the next RCC lift. The dozer operator can spread the RCC against the panel/form in a manner which causes the bedding mix to ride up the face of the panel. TYPICAL PLAN TYPICAL SECTION RCC Against Precast Concrete Panels Figure Typical plan and section of RCC against precast concrete panels. Figure Upstream face of Zintel Canyon Dam, WA. Variations of this system have included the placement of low-slump conventional concrete between the RCC and the panels to improve impermeability at the upstream face of the dam. The conventional concrete and RCC are consolidated in an 15

21 Facing Systems for Roller-Compacted Concrete Dams & Spillways attempt to provide a monolithic joint at the interface. The conventional concrete at the upstream face acts as the seepage barrier. Horizontal construction joints in the conventional concrete, however, can still have high permeability due to cold joints and/ or drying and temperature shrinkage in concrete. The tallest RCC dam in the world to use this variation is Trigomil Dam in Mexico at a height of 329 feet, with Spring Hollow Dam being the tallest in the United States. seepage, and the need to coordinate an additional construction material and activity that is time-critical in the use of the low-slump conventional concrete variation. Removing out of specification RCC is complicated by anchor rods embedded in the RCC. TYPICAL PLAN Figure Upstream face of Penn Forest Dam, PA showing support of precast panels using strongbacks. Precast panels can be installed with several alignment options. Precast panel alignment options include: 1. Both horizontal and vertical panel joints are aligned (North Fork Hughes River Dam) 2. Horizontal joints aligned with vertical joints staggered (Penn Forest Dam, Big Haynes) 3. Vertical joints aligned with horizontal joints staggered (Zintel Canyon Dam, Siegrist Dam) In general, panels that are aligned horizontally can be installed faster because each panel simply abuts against the other in a continuous row. When panels are aligned vertically, each panel must be fitted between two adjoining panels, and, if tolerances are not met, this can be difficult. Regardless of the alignment option selected, the panel anchor rod holes must line up vertically so that a strongback support system can be used. In addition, the vertical panel joints must line up with the dam contraction or monolith joints. This requires use of half panels at contraction joints if vertical panel joints are staggered. Advantages of this facing system include a durable and attractive finished face, and no additional installation time requirement after RCC placement. Disadvantages can include excessive TYPICAL SECTION Unreinforced Concrete Against Precast Concrete Panels Figure Typical plan and section of unreinforced conventional concrete against precast panels upstream facing system. This facing system led to a very successful Second Generation upstream facing method which includes an impervious liner attached to the downstream face of the panel RCC Against Precast Panels With An Internal Liner. This popular second generation system uses the first generation precast panel system with the addition of a liner to provide a watertight seepage barrier. In most cases the liner material is a mil thick PVC material. However, low density polyethylene (LDPE) liner material was successfully used at Christian E. Siegrist Dam and high density polyethylene (HDPE) has been used on other projects. The first five dams in the U.S. to use this method were Winchester Dam, Christian E. Siegrist Dam, Spring Hollow Dam, Hudson River 16

22 Upstream Facing Systems for RCC Dams # 11 Dam, and Big Haynes Dam. They relied on a T-Lock surface anchor system manufactured by Poly Tee and Ameron in the United States to attach the sheets of liner material to the downstream side of the panels. Except for Big Haynes Dam, these dams used the common panel size of 4 feet high, 16 feet long and 4 inches thick. The tallest dam in the world to use this method is Spring Hollow Dam in Virginia at a height of 240 feet. TYPICAL PLAN TYPICAL SECTION RCC Against Precast Concrete Panels With Geomembrane Figure Typical plan and section of RCC against precast concrete panels with liner upstream facing system. The two most recent RCC dams to use this method, Penn Forest Dam and Buckhorn Dam, used an alternate method of attaching the sheets of liner material. The PVC liner material (Sibelon CNT 2800) was manufactured by CARPI of Italy, and consists of an 80 mil thick high performance PVC coupled with a non-woven geotextile. The liner is attached to the panels by first placing fresh concrete into the casting bed, followed by rolling and vibrating the liner material onto the exposed concrete surface of the panel with the geotextile side of the material placed on the fresh concrete (Figure 2.19). The liner remains attached to the panel through the bond made by the absorption of concrete paste into the geotextile material. This method of attaching the PVC liner to the precast panels was initially tested for the Penn Forest Dam project by pulling apart several panels partially connected by PVC joint strips welded to the liner material on each adjacent panel. The destructive testing demonstrated that the stress concentrations in the PVC liner material did not concentrate at the welds between panels, but became distributed within the liner over much of the panel area. It was observed that as the panels were pulled apart, the bond between the geotextile and the PVC liner failed first, allowing the liner material to behave elastically and stretch more than 18 inches at the joints before failing. This method of liner attachment offers several benefits over the traditional T-Lock surface anchor system for liner attachment, including: greater flexibility, improved liner elongation, and better resistance to stress concentrations. Both the T-Lock and CARPI systems have been successful. The selection of the type of geomembrane to use depends on specific project requirements. Panel Insert and Anchor Rod Detail Figure Typical panel insert and anchor rod detail. 17

23 Facing Systems for Roller-Compacted Concrete Dams & Spillways Figure Photographs showing casting of precast panels with internal liner (left) and destructive testing of liner weld between two precast panels for Penn Forest Dam, PA. Figure Liner welding and testing at Penn Forest Dam, PA. At Penn Forest Dam the first rows of panels were 4 feet high and 16 feet long. Later, the contractor exercised a contract option to increase the height of the panels to 6 feet. Using larger panels decreased the time required to place panels, and reduced the total length of heat-welded horizontal and vertical PVC liner joints by approximately 35 percent. The total length of liner joint welding on Penn Forest Dam was approximately 10 miles. The task of welding the liner joints can be time consuming, must be performed by certified welders, and adds to the total cost of the facing system. The largest panel size used on an RCC Dam is 7.2 feet high, 16.4 feet long, and 4 inches thick. Panels of this size were used on the 253-foot-high Urugua-I Dam in Argentina. Figure Construction photo of upstream face of Penn Forest Dam, PA. 18

24 Upstream Facing Systems for RCC Dams A variation of this facing system is to place unreinforced conventional concrete between the lined panels and the RCC as shown in Figure With the benefits to durability and watertightness already provided by the precast panel and liner material, respectively, the need for conventional concrete, however, is questionable from a technical standpoint and increases the overall cost. Conventional concrete was used at Hudson River Dam in Georgia. The integrated precast concrete panel and liner system, commonly referred to as the Winchester Method, is patented and payment of royalty fees is required when it is used. On Penn Forest Dam the total panel area for the upstream face of the dam is approximately 230,000 ft 2. Patent fees were approximately $0.40/ft 2. The patent for the Winchester Method (U.S. Patent 4,659,252) was issued on April 21, 1987 and is owned by Donald L. Sexton et al. of Perrott, Ely and Hurt Consulting Engineers, Inc. CARPI has the rights to this patent both inside and outside of the United States. Two more recent RCC dams designed with this upstream facing system include North Fork Hughes River Dam in West Virginia, and Hunting Run Dam in Virginia. During the bid phase for Hunting Run Dam, contractors were required to submit bids for two facing systems: RCC against precast panels with a liner, and reinforced conventional concrete placed after RCC construction. The bids received from all of the contractors for the precast panel facing system were lower than the bids for the reinforced concrete facing system. The low bid accepted for construction of the dam was $18.76 million versus $19.53 million for the dam with the reinforced concrete facing system. This represents a difference of $765,000 between the two facing systems, or approximately $6.47 per square foot for the 118,200 ft 2 face of this dam. The contractor for Hunting Run Dam elected to use a larger and thicker precast panel than that which was originally specified in the contract with the contractor s alternate having dimensions of 6 feet high, 16 feet long, and 5 inches thick. Advantages of this facing system include a durable and attractive finished face, excellent seepage control, protection of the liner from ultra-violet radiation exposure and vandalism, and no additional installation time required after RCC placement. Disadvantages include the need for intense inspection of liner welds and panel anchor installation, and occasional difficulty controlling panel alignment. Figure Slip-formed facing, Upper Stillwater Dam, UT RCC Against Slip-formed Facing Elements. The only two examples of a dam in the United States which used this innovative method are Upper Stillwater Dam in Utah and Town Wash Dam in Nevada. The cast-in-place upstream facing for Upper Stillwater Dam was constructed using a laser-guided slipform curbing machine. This facing system was primarily intended as a forming method and means of protecting the RCC from severe weather, rather than as a seepage reduction measure (Moler, 1988). The 2-foot-high interlocking curbs were constructed of 0.5-inch-slump conventional concrete in continuous lengths from 500 feet at the base to 2673 feet at the crest. Each curb element required 4 hours to set before RCC could be placed against the element. Challenges encountered with this system included controlling line and grade, excessive slumping of the placed elements, and some delays in RCC placement while the placed elements were curing. A total of 98 miles of slip-formed elements were placed requiring a total of 87,000 cubic yards of concrete (Hansen, 1991). Horizontal and vertical tolerances of inch were maintained during construction. No contraction joints were formed in the RCC or the slip-formed elements during construction. At Town Wash Dam, the curb was placed only one foot high. During first filling of Upper Stillwater Dam, a 0.26-inch-wide crack appeared in the dam, producing about 1,300 gal/min leakage into the gallery and about 1,800 gal/min leakage from the crack on the downstream face (Smoak, 1991). The crack extended from the foundation to the crest of the dam and from the upstream face to the downstream face. The crack was believed to be a result of high thermal stress induced during RCC cooling and foundation deformation. Similar but smaller cracks 19

25 Facing Systems for Roller-Compacted Concrete Dams & Spillways Figure Casting of slip-formed facing element. developed at three other locations. The total seepage from all the cracks in the dam was over 3,000 gal/min. The selected repair procedure involved injecting polyurethane resin into the cracks. After grouting the cracks in 1990, total leakage through TYPICAL PLAN TYPICAL SECTION (Upper Stillwater) RCC Against Slip-Formed/Extruded Facing Elements Figure Typical plan and section of RCC against slip-formed/extruded facing elements upstream facing system. the cracks was approximately 800 gal/min. Treatment to further reduce leakage was planned, including the possibility of installing an external liner/waterstop system over the crack. An important finding from the performance evaluation of Upper Stillwater dam is that RCC dams should incorporate waterstopped contraction joints to avoid development of uncontrolled transverse cracks (Richardson, 1992). For small dams with short crest lengths or for large dams constructed monolithically, this system is not practical since construction of the facing elements will impede RCC construction. Porce Dam II in Columbia with a crest length of 1,400 feet and a height of 403 feet is the tallest RCC dam in the world to use this facing system. Advantages of this system include a facing system that has a durable finish and requires no additional installation time after RCC placement. Disadvantages include cracking because of differences in elastic and shrinkage properties of the conventional concrete from those of RCC, difficulty in controlling concrete slump to required ± 1/4-inch tolerance, complicated construction of contraction joints, the presence of a slip-form machine and ready mix trucks on the lift surface, and horizontal cold joints every 1 to 3 feet vertically that may not be watertight Reinforced Conventional Concrete Against Formed RCC. This facing system is an adaptation of the modern facing system used on concrete-faced rockfill dams (CFRDs). It involves placing a reinforced concrete facing against the upstream face of the dam after RCC placement is completed. Steel anchors, embedded in the RCC, support the reinforced concrete facing. Steel reinforcement is placed at both faces and in each direction to control thermal and shrinkage cracking. Waterstops are installed at every construction and contraction joint. Two dams have been constructed in the United States using this facing system: SW Freese Dam (Stacy Dam) and Lake Alan Henry Dam, both in Texas. No seepage from the RCC has been reported. This system was selected over precast panels with a geomembrane liner because of concerns that wave action on these reservoirs, which have a large fetch, might eventually damage the precast panels (Lemons, 1994). The tallest RCC dam constructed with this facing system is Longmentan Dam in China at a height of 190 feet. Although there are only four RCC dams in the world constructed with this upstream facing system, there are over 300 concrete-faced rockfill dams 20

26 Upstream Facing Systems for RCC Dams holes can be drilled a short distance from the upstream face within the body of the RCC dam to reduce pore pressure. An alternative drain system would be to install strip drains on the face of the dam concurrently with RCC placement or just prior to casting the reinforced concrete face. TYPICAL PLAN Figure Freese Dam, TX. TYPICAL SECTION Reinforced Concrete Placed Against RCC Figure Typical plan and section of reinforced concrete placed against RCC upstream facing system either constructed or in planning stages worldwide. Concrete-faced rockfill dams have been built over 700 feet high. Recent trends in face slab design indicate that the current practice is to set the slab thickness equal to 1 foot x (dam height) (Cooke, 1998). For CFRDs less than 300 feet high, uniform slab thicknesses of 9 to 12 inches have often been adopted. For practical placement against a vertical face, a minimum thickness of 18 inches is recommended. For very high dams, the controlling criterion is the thickness that is needed to safely resist shear and bending of the cantilevered portion of the slab on each side of the waterstop at the joints (Schrader, 1995). Concrete is normally formed in panels approximately 20 feet long by 10 feet high using conventional forming methods. Appearance of facing concrete completed on existing RCC dams is good. Seepage control and durability has also proven to be good provided adequate quality control measures are taken during concrete mixing and placement. A curtain of equally spaced vertical drain The reinforced concrete facing system is best installed during cool weather to minimize the potential for temperature cracking as the concrete cools. However, additional measures such as increased reinforcement, pre-cooling of concrete, and use of water-reducing admixtures can be incorporated to compensate for placing the concrete during warm weather. Waterstops are generally available in two material types: metallic and non-metallic. Metallic waterstops are normally made of copper, stainless steel, or galvanized steel, and are used in large dams where strength rather than flexibility is needed, and very little movement at the joints is expected. Non-metallic waterstops are normally composed of a synthetic rubber such as PVC, and provide flexibility rather than strength. They must possess good extensibility, recovery, chemical resistance, and fatigue resistance. An adhesive bond is formed between the metallic waterstop material and the concrete. Non-metallic waterstops such as PVC rely on a mechanical bond or interlock formed with the concrete and ribs or bulbs of the waterstop rather than a chemical or adhesive bond. Either metallic or non-metallic waterstops can be used. If non-metallic (PVC) waterstops are used, they should be non-tapered, with a 12-inch width, having a minimum 1/2-inch thickness with serrations or ribs and a center bulb. Factory fabricated T s, L s and Crosses should be used to ensure quality of splice welds. Hog ring or grommet fasteners spaced at 12 inches on center should be used to keep the waterstop in place during concrete placement. For the upper portion of the 21

27 Facing Systems for Roller-Compacted Concrete Dams & Spillways dam or relatively low dams subject to less hydrostatic head, consideration could be given to reducing the size and thickness of the waterstop. Waterstops must be installed at the perimeter joint along the foundation and at every contraction joint in the dam. One of the principal causes of leakage in CFRD s has been the faulty installation of the waterstop and placement of face concrete. Current CFRD practice is to continue longitudinal reinforcing through the vertical joints without waterstops. This is considered good practice, is more economical, and has been adopted on many CFRD s (Cooke, 1987). Waterstops are not used in CFRD face-slab horizontal construction joints (Cooke, 1987). Advantages of this system include an attractive durable appearance, easily installed joints to accommodate expansion and contraction, the potential for crack-control through reinforcement, the lack of a requirement for bedding mix or higher cementitious content in the RCC mix for seepage control, the lack of interference from facing operations during RCC placement, and the easier control of materials since construction is independent of RCC placement. Drawbacks include a longer construction period and higher construction costs. As previously noted in the discussion for the precast panel facing system with an internal liner, Hunting Run Dam in Virginia received bids for both facing systems. The low bid for the precast panel facing system was approximately $6.47 per square foot less than the low bid for the reinforced concrete facing system. This example is considered indicative for most cases Formed RCC with External Liner. Galesville Dam is the only RCC dam in the United States constructed using this type of upstream facing system. At Galesville Dam, the liner consisted of a coal-tar-based elastomeric membrane that was sprayed on the upstream face in two 20-mil-thick layers. When the reservoir was filled, seepage occurred through several transverse cracks in the dam. The spray-on coating did not effectively bridge the cracks, but did reduce seepage through the area between the cracks. Seepage was subsequently reduced by having underwater divers caulk the cracks with a quick-set cement. Painting or spraying a waterproof coating onto the upstream face of a dam is usually dismissed as being nonpermanent and impractical to tie into the foundation. There are also concerns about moisture being trapped between the membrane and the concrete facing, resulting in saturation of the concrete and damage from freezing (Schrader, 1985). The external liner is normally installed after the dam has been fully constructed. Many external liner facing systems have been tried on the vertical faces of concrete dams including: shotcrete, metal sheets, bituminous liners, spray-on geomembranes, and synthetic geomembrane in rolls or sheets. The seven main types of geomembranes include: 1. Polyvinyl Chloride (PVC) 2. High Density Polyethylene (HDPE) 3. Chlorosulfonated Polyethylene (CSPE) 4. Chlorinated Polyethylene (CPE) - commonly called Hypalon 5. Butyl (rubber) 6. Polypropylene (PE) 7. Bituminous Geomembranes Over the last six years several agencies with international reputations for excellence in dam design have expressed an interest in using geomembrane facing systems as a repair method for aging concrete gravity dams. Both Hydro-Québec and the U.S. Army Corps of Engineers have performed significant research to evaluate the performance of various geomembrane systems. In addition, the Enté Nazionale Energia (ENEL) of Italy and Electricité De France have installed upstream geomembrane facings on both new and aging concrete gravity dams, and have performed long-term durability evaluations of the installed geomembranes. The findings of the research and testing efforts performed by each of the aforementioned agencies are summarized below. Hydro-Québec s Evaluation of Geomembrane Materials For Dams. In 1995, the Research Institute of Hydro-Québec published the results of their research to investigate all types of waterproofing liners, to ascertain properties and performance, to evaluate, and finally to recommend the most suitable materials for waterproofing of dams in cold climates (IREQ, 1998). This research was prompted by the fact that Hydro-Québec has many concrete gravity dams exposed to severe climatic conditions which entail frequent wetting-dehydrating and freeze-thaw cycles, and sometimes chemical attack and alkali-aggregate reaction (AAR). Consequently, many of their dams have experienced severe deterioration at the upstream face and are in need of repair. As a result, Hydro-Québec is considering installing long-lasting watertight synthetic liners on the upstream face of some of their aging dams which have seepage problems. The abridged version of the findings of Hydro-Québec s research was published in a 1998 report under the auspices of ICOLD (IREQ, 1998). The objectives and findings 22

28 Upstream Facing Systems for RCC Dams of Hydro-Québec provide a timely independent evaluation of geomembranes currently available on the market. The experimental phase determined that the PVC geomembrane heat-coupled during extrusion to a nonwoven geotextile, and a polyurethane geomembrane were found to have the best properties, and were recommended for use as a protection system on the upstream face of dams. project resulted in the installation procedure being incorporated into the Corps Engineering Manual titled Evaluation and Repair of Concrete Structures. Figure CARPI PVC liner system being installed on Lost Creek Dam, CA. Figure CARPI liner system on dam in Alps. The U.S. Army Corps of Engineers Evaluation of Geomembrane Facing Systems for Dams. Like Hydro-Québec, the U.S. Army Corps of Engineers (Corps) has many concrete dams located in harsh environments. Identifying and evaluating ways to repair and maintain deteriorating concrete dams has been a recent focus of the Corps Repair, Evaluation, Maintenance Program (REMR). Since most geomembrane installations have involved dewatering the structure, which is often undesirable, the Corps set out to investigate a procedure to install geomembranes without dewatering (McDonald, 1998). Phase I of the study included research and material testing. Phase II was a demonstration of underwater installation of the system on a specially fabricated concrete structure. Of the materials tested, CARPI s PVC membrane backed with a nonwoven geotextile showed the best combined rupture resistance, conformability, and elastic recovery. The recommended underwater design consisted of a HDPE geonet drainage layer and CARPI s PVC geomembrane backed with a geotextile. The procedures were subsequently successfully demonstrated in 1997 on the first fullscale project, Lost Creek Dam, a concrete arch dam located in northern California. The success of this The Enté Nazionale Energia Elettrica (ENEL) of Italy Experience. ENEL of Italy has used the CARPI geomembrane system on nine of their aging concrete and masonry dams. Their first dam to use this system was Lago Baitone in The tallest ENEL dam where this system has been installed is Piano Barbellino Dam. Piano Barbellino Dam is 226 feet high and the geomembrane liner was installed in Beginning in 1995, ENEL began a research program to evaluate the long-term performance of the CARPI liners on their dams (Cazzuffi, 1995; Cazzuffi, 1998). The program involved collecting a variety of samples from six of their dams for various exposure conditions. The samples were tested for the following characteristics: plasticizer content, hardness, longitudinal and transverse tensile strain capacity, longitudinal and transverse tensile strength, permeability, and hardness. Review of the plots of the raw data from the six ENEL dams shows that the noted changes in the tested properties are very minor and that the liner material remained very stable with time. CARPI has estimated that the service life of their PVC liner material is at least 50 years above water and 200 years below water. However, if the liner is permanently exposed and accessible, the liner may be susceptible to damage by vandalism. If damage were to occur due to vandalism, debris impact, or any other means, the liner can be repaired in the dry by simply heat welding a patch of the same material over the damaged area. Below water, repairs 23

29 Facing Systems for Roller-Compacted Concrete Dams & Spillways can be performed by patching using adhesives or by battening (McDonald, 1998). The CARPI system is the most popular and proven external geomembrane system. It consists of a 100-mil-thick high performance PVC geomembrane coupled with a geotextile fastened to the upstream face of the dam using a stainless steel clamping system referred to as profiles. The CARPI system is a proprietary system requiring installation by the manufacturer. The sheets of geomembrane material are attached vertically to the face of the dam with the steel profiles spaced approximately 13 feet apart. The sheets of membrane can normally cover the full height of the dam as one piece without horizontal joints. The vertical joints are sealed with heat-welded PVC strips. facing. Water is collected and conveyed through the profiles to a collection system installed at the heel of the dam. When a drained system is used, allowances can be made to the design of the dam to account for the reduction of internal hydrostatic pressure. The external geomembrane system can be installed at any time following completion of RCC placement. Installation is not significantly affected by climatic conditions. TYPICAL PLAN TYPICAL PLAN TYPICAL SECTION TYPICAL SECTION Formed RCC with External Liner Figure Typical plan and section of formed RCC with external liner upstream facing system. This system is termed a drained system as the geotextile attached to the downstream face of the geomembrane can be designed to act as a drain. For some applications an HDPE geonet, 4 mm thick with a diamond-shaped mesh, is installed behind the geocomposite to increase the drainage capacity of the system; however, the drainage net is optional. The steel profiles serve to tension the sheets snugly against the dam face as well as provide a conduit for any seepage or condensation. The metal profiles leave a gap between the geomembrane and the dam Formed Unreinforced Concrete with External Liner Figure Typical plan and section of formed conventional concrete placed concurrently with RCC, with external liner, upstream facing system. Use of the CARPI external geomembrane system is much more popular outside of the United States and has been used for over 30 years on both small and large existing conventional concrete and new RCC dams. Approximately 39 dams outside the United States, mostly rehabilitation projects in Italy and France, have used this system. The dams range in height from 16 feet to 570 feet and are located in a range of different climates including extreme cold climates such as the Alps, and hot tropical climates such as Honduras. Olivenhain Dam in San Diego, California will be the first RCC dam in the United States to use an exposed geomembrane system. Olivenhain Dam will be 306 feet high and is scheduled to be com- 24

30 Upstream Facing Systems for RCC Dams Figure Typical CARPI contraction joint detail. Contraction Joint Detail pleted in La Miel Dam in Columbia is currently under construction and when completed (2003) will be the tallest RCC dam in the world to use the CARPI facing system at a height of 617 feet. CARPI has also developed and patented an external waterstop system for waterproofing RCC dam contraction joints and cracks. The external waterstop system, shown in Figures 2.33 and 2.34, consists of a series of geocomposite layers secured over the joint or crack. The geocomposite layers generally include a transition or anti-puncture membrane against the face of the dam, a central support membrane, and on the outside, a waterproofing membrane sealed against the upstream face of the dam. Flat metal profiles are anchor bolted to the dam at the sides to provide a watertight seal. CARPI s external waterstop system has been installed on four RCC dams with heights ranging from 165 to 400 feet. Figure CARPI liner system on Balambano Dam, Indonesia. A potential refinement to a drained system includes the use of a smart geotextile. The concept has its origins in damage and leak control systems which were developed beginning in the early 1990s to detect damage to geomembrane liners used for municipal and hazardous waste landfills, industrial wastes, lagoons, tanks, and similar facilities that use geomembranes. Damage to the geomembrane liner is detected by electric current. Special sensors are installed behind the geomembrane liner during construction. These sensors are connected by wire to a central control box or computer. The data acquired can be interpreted by customized software which produces plots or three dimensional graphics identifying actual damage positions. Should a leak in the liner develop, the sensor system would send electric signals to a control station which would provide information concerning the time and location of the leak. Figure CARPI external waterstop System (drawing courtesy of CARPI). Advantages of the this facing system include a proven record of performance on many dams, including several in the Alps, and extensive independent testing and evaluation, providing a high degree of confidence in its use. Disadvantages include the possibility of damage from vandalism, a service life of the liner material which may be less than the life of the project, a proprietary system, and lack of a long-term performance record for the smart geotextile installed in similar installations. 25

31 Facing Systems for Roller-Compacted Concrete Dams & Spillways Figure CARPI external waterstop system (photographs courtesy of CARPI) Earth or Rock Fill Placed Concurrently With RCC. As the name implies, successive lifts of earth or rock fill are placed upstream of the RCC dam concurrently with each RCC lift. With this facing system either the lift of earth or rock fill can be placed before the lift of RCC, or the RCC can be placed first. RCC material quantity can be minimized by placing the RCC lift before the upstream lift of fill material by using a temporary 1-foot-high form supported by the previous lift of fill to create a vertical upstream RCC face. A zone of impervious earth fill can be placed at the upstream face to improve watertightness. The soil fill covering the upstream face of the RCC will protect the untreated RCC face from weathering and provide an insulating zone to reduce cracking from thermally-induced stresses. This facing system has primarily been used to construct small detention dams. (The North Loop detention dams and the Great Hills Dam in Texas, and Pajarito Dam in New Mexico are examples of dams using this facing method.) For these dams the upstream earth fill or rock fill embankment section of the dam supports most of the roadway while the narrow downstream RCC section provides embankment overtopping protection Internally Vibrated Grout-Enriched RCC. Grout-enriched RCC (GE-RCC) has been used extensively in China for upstream and downstream facing of RCC dams, for RCC placement against formwork and rock abutments, and at embedded items such as waterstops. This technology is currently under investigation in the United States and was evaluated as part of the design phase RCC trial placements for the Olivenhain Dam Project. Its development, current applications, and limitations are described in the following paragraphs. GE-RCC was developed to enhance the workability and/or durability of RCC for use adjacent to formwork, around embedded items such as waterstops, adjacent to rock abutment surfaces, and at the upstream and downstream faces of RCC dams. The process of placing GE-RCC basically consists of altering the composition of RCC by adding a cement and water grout mixture to the RCC mixture. Theoretically, the grout is proportioned and distributed into the RCC to produce a mixture that 26

32 Upstream Facing Systems for RCC Dams Figure Earth fill placed concurrently with RCC at upstream face of Pajarito Dam, NM (photo courtesy of Terrence Arnold). has characteristics similar to those of conventional non-air-entrained concrete. The typical construction process for placing GE-RCC includes the following steps: (1) place bedding mix consisting of a sand-cement mortar mix on previously compacted RCC lift surface, (2) place and spread RCC on top of bedding mix, (3) manually spread grout on top of uncompacted RCC lift surface, (4) consolidate GE- RCC with internal pneumatic vibrators, and (5) compact remainder of RCC lift. While this process sounds relatively straightforward, its successful use requires special attention to several details. Use of Grout-Enriched RCC in China. The first use in China was in the Yantan cofferdam in It has also been used at several other dams including Jiangya Dam, a 420-foot-high RCC dam completed in At Jiangya a 3/8-inch to 3/4-inch layer of bedding mix was placed on the previous RCC lift surface prior to spreading the next lift of RCC. A 12-inch-thick layer of RCC was spread over the bedding mix, a thin layer of grout was spread over the RCC, and the RCC was internally vibrated with gang 6-inch pneumatic vibrators mounted on a tracked backhoe. The RCC contained approximately 326 pounds per cubic yard of cementitious material and had a Vebe time of about 10 seconds or less (Brian Forbes, Et Al., 1999), (William Moler, 1998). From all accounts, the Chinese appear to have had very good success with GE-RCC. However, some Chinese engineers report that GE-RCC used at the upstream or downstream faces of dams has experienced more cracking than expected. Grout-Enriched Placing Trials in the United States. In 2000, interest in GE-RCC developed in the United States. Although earlier placing trials may have occurred, the most recent experiences with GE-RCC occurred at Atlanta Road Dam in Cobb County, Georgia and at Olivenhain Dam in San Diego County, California. The trials at Atlanta Road Dam, however, used plate tampers to externally vibrate the GE-RCC instead of using internal vibration to consolidate the concrete. The trials at Olivenhain Dam attempted to duplicate the approach developed in China. Experience at Olivenhain Dam Trial Placement. The RCC placing trials for the Olivenhain Dam included investigation of GE-RCC as a potential facing system and treatment at rock abutments for the project. The first step of the process was to select target mix proportions for the GE-RCC. The basic approach of the mix design process was to convert the RCC into a non-air-entrained conventional concrete with a slump of about 3 to 4 inches and a compressive strength of 3000 pounds per square inch. Using the standard practices in ACI 211, the GE- Figure Placement and internal vibration of grout-enriched RCC at Jiangya Dam in China (photo courtesy of William A. Moler). 27

33 Facing Systems for Roller-Compacted Concrete Dams & Spillways RCC required a cementitious content of approximately 475 pounds per cubic yard (ppcy), and a water content of 285 ppcy. Since the RCC mix proportions were pre-established, the grout proportions and the ratio of grout to RCC were the remaining variables to obtain the desired GE-RCC mix. TYPICAL PLAN TYPICAL SECTION Grout-Enriched RCC Against Formwork Figure Typical plan and section of grout-enriched RCC against formwork upstream facing system. Several techniques were tried for placing and consolidating the GE-RCC. The first technique was to spread the RCC, then backblade a inch-deep by 3-foot-wide trench along the formwork. The grout was then poured to fill the trench and vibrated with a inch-diameter Micon high-cycle electric vibrator operating at 10,800 vibrations per minute. For the first trial, most of the grout remained on the surface and did not penetrate or blend with the RCC. A second trial was performed using the Micon high-cycle electric vibrator. For the second trial, only a small portion of grout was placed on top of the RCC, thus allowing better observation of the response of the RCC to the internal vibration. Additional water was added to the RCC mix, lowering the Vebe time from 25 seconds to about 15 seconds. Based on observation of the second trial, it was apparent that the high-cycle vibrator was not consolidating the RCC, nor blending the grout into the mix. The vibrator also left open holes where it had been inserted into the RCC Two additional trials were performed using the GE-RCC as a facing system. For these trials, two 3-inch-diameter Malon pneumatic vibrators were used. The vibrators were gang mounted 12 inches apart on a backhoe. The pneumatic vibrators did hit considerably harder than the high-cycle vibrator due to higher amplitudes, and they did consolidate the RCC within a few inches of the vibrators. However, the vibrators still left holes upon extraction, the consolidation did not appear to be complete, and the consolidation was very localized around the vibrators. Based on the results of internal vibration for the facing system trials, it was decided to eliminate trials of GE-RCC as an abutment treatment for the Olivenhain Dam. It was concluded that since the RCC design mix had a 15 to 20 second Vebe time and considerably less cementitious content compared to RCC mixes used by others for GE-RCC, it was too dry to be successfully consolidated by internal vibration, and thus would not allow for penetration and proper blending of the grout. It was concluded that for GE-RCC to work, the RCC mix has to be sufficiently workable so that it alone can be consolidated by internal vibration, thus allowing for penetration and blending of the grout. The U.S. Army Corps has undertaken a research program on GE-RCC to study among other things, construction techniques, air entrainment of GE- RCC, and optimum RCC mix proportions to facilitate GE-RCC Other Upstream Facing Systems Composite Facing Systems. The best features of two or more upstream facing systems can be realized by selectively using them within different zones of the dam. For example, a reinforced concrete facing system or precast panel facing system can be installed near the top of the dam to cover and protect the normal exposed area of the dam, and an exposed geomembrane liner could be installed below this zone. Advantages of selective use of two or more systems may include: (1) the exposed face of the dam would be protected from vandalism, (2) the service life of the liner under water would be similar to the service life of the project, and (3) the lined portion of the dam would benefit from the 28

34 Upstream Facing Systems for RCC Dams Figure Transition detail from an exposed liner facing system to a concrete facing system. unique features only provided by an exterior liner facing system. A detail illustrating a potential transition from an exposed liner system to a concrete facing system is presented in Figure The 38-foot high North Tyger River Dam in South Carolina used a combination of precast panels with the T-Lock liner system and formed RCC. Where the upstream face had water directly against it, the panels were used. In the areas where soil was backfilled against the face, the face was formed vertically with RCC. The backfill soil was a select clayey type that served as a waterproofing system for that portion of the upstream face. Figure Construction of upstream face of Barnard Creek Dam, UT Shotcrete Facing. Barnard Creek Dam in Utah is a 59-foot-high debris/flood control structure where the RCC was placed in only four 24-hour days. Because of its narrow width, the forming of the upstream face of the dam was on the critical path in the overall RCC placement schedule. The contractor proposed to use a combination of Tensar Strips, twosided wire baskets, and a geotextile to form a vertical upstream face. Figure 2.39 shows the installation process. Each installation of the wire baskets would allow for two lifts of RCC to be placed. Upon completion of the dam, the exposed geotextile and Tensar strips were removed and a 6-inch layer of shotcrete was applied over the entire upstream face of the dam Unformed Sloping RCC Face. For low height applications it may be cost effective to forgo a vertical formed face and place the RCC on a 1:1 slope. This was the design for Grace Lake Dam in Alabama in This 35-foot-high dam was constructed in 48 hours with both the upstream and downstream slopes placed at 1: Summary of Upstream Facing Systems A review of the nine basic facing systems described above and the frequency of their use on new RCC dams constructed in the United States, as presented in Table 1.2, shows that formed unreinforced conventional concrete and precast panels with an internal liner are the most popular facing systems. However, a variety of other facing systems have also been effectively used. Each facing system has its advantages and disadvantages. It should be recognized that an upstream facing system that is suitable for one dam may not be adequate or appropriate for other dams. Selection of the facing system must consider the intended purpose of the facility, local climatic conditions, materials availability, dam size, service life, and owner preferences. The primary criteria for selecting an upstream facing system should therefore include the following five factors: (1) cost, (2) appearance, (3) watertightness, (4) durability, and (5) constructibility. Preliminary screening of the various facing options can be performed by assigning a point rating to each factor. The applicability of each factor is then weighed against its overall importance for the specific project in question and the total points for each factor are summed to obtain a final score. When comparing facing systems, care must be exercised to compare systems on an equal basis, noting that some facing systems can include features such as drainage that may offset other project features such as the need for drilled drain holes in the body of the dam, the need for bedding mix, and the RCC mix design. 29

35 Facing Systems for Roller-Compacted Concrete Dams & Spillways Table 2.1 is presented as a general guide to help select one of the nine upstream facing systems discussed in this guide manual. The evaluations for each factor are based on the performance of the facing system at existing dams and the authors experience and judgment. Note that these represent a general evaluation and could vary considerably depending on local climatic conditions, equipment availability, dam layout, quality of workmanship, and many other factors. Table 2.1. Design Factor Ratings for Upstream Facing Systems Cost Water- Construct- Upstream Facing System $/Ft (1) Appearance tightness Durability ibility 1. Formed/Exposed RCC Low Poor-Fair Poor Poor-Fair Routine $4-$8 2. Earth or Rock Fill Placed Depends Concurrently with RCC Low Good on Fill Good Routine 3. RCC Against Precast Panels Moderate Without A Liner $8-$16 Good Poor Good Routine 4. RCC Against Slip-formed Facing Moderate Moderate- Elements $6-$10 Fair-Good Poor-Good Good Difficult 5. Formed Conventional Moderate Unreinforced Concrete $5-$19 Fair Good Good Moderate 7. RCC Against Precast Panels Low-Moderate Routine- With Liner $10-$20 Good Good Good Moderate 8. Exposed Liner 0n Formed High RCC $18-$30 Good Good Fair Proprietary 9. Reinforced Concrete Placed High After RCC $20-$35 Good Good Good Difficult i Costs are approximate and in year 2000 US dollars. Actual costs can vary depending on location, site conditions, and many other factors. 30

36 Downstream Facing Systems for RCC Dams and RCC Spillways CHAPTER 3 Downstream Facing Systems For RCC Dams and RCC Spillways 3.1 General Whereas the selection of an upstream facing system is often centered on the issue of seepage control, the selection of the downstream facing system is primarily concerned with durability, constructibility, aesthetics, and sometimes energy dissipation for overtopping flows. Here again, the designer must consider the intended purpose of the facility, local climatic conditions, materials availability, dam size and shape, safety, owner preferences, and cost. 3.2 Stepped Versus Smooth/Sloping Downstream Face Stepped spillways have been in use on dams for more than 3,000 years (Chanson, 2000). The use of stepped spillways from ancient times to the early 20th century appears to result from a natural outgrowth in the use of stone masonry for dam construction. However, the energy dissipating characteristics of early stepped spillway designs do not appear to have been investigated in detail. Likewise, primarily because of the recent trend in the use of RCC technology and the easy adaptation to stepped configurations this technology affords, stepped spillways are experiencing renewed attention. In general, the steps act as roughness elements that reduce the terminal flow velocity and provide significant energy dissipation. Recent model studies by the USDA Agricultural Research Service, the Bureau of Reclamation, and others were performed to evaluate the flow transition from the level spillway crest to the sloping steps, the energy dissipation of the steps, and stilling basing performance. These physical model studies show that the energy dissipation provided by the steps can allow significant reduction in the size of the stilling basin as compared to a conventional chute spillway (Chanson, 1997), (Rice, 1996), (Chamani, 1994), (Christodoulou, 1993), and (McLean, 1993). Figure 3.1. Unformed RCC stepped spillway, Ringtown Dam No. 5, PA. 31

37 Facing Systems for Roller-Compacted Concrete Dams & Spillways Figure 3.2. Formed conventional unreinforced concrete spillway steps, Monksville Dam, NJ. From the current body of research on stepped spillways, there appears to be a general agreement on a number of issues, including the presence of nappe and skimming flows, and the significance of air entrainment on stepped chutes. Although progress has been achieved, more research is needed to gain a sound understanding of the complex flow patterns. Experimental studies suggest that cavitation is not an issue on stepped spillways because the flow velocities remain low. Step damage caused by pressure fluctuations in the step cavities, however, may be a problem. A book titled Hydraulic Design of Stepped Cascades, Channels, Weirs and Spillways by Dr. H. Chanson, published in 1995, presents a comprehensive treatment of stepped spillways. Most designers continue to rely on intuition and, when possible, small scale physical models to design stepped spillways. stability perspective, but may not be acceptable for public perception and aesthetic reasons. An additional evaluation criterion not considered in the evaluation of upstream facing systems is public accessibility and safety which is discussed below. Additional concerns regarding appearance that are unique to the downstream face of RCC dams are also discussed herein. For a discussion of the other four evaluation criteria refer to Paragraph 2.1 Criteria for Evaluating Upstream Facing Systems. A general assessment of the overall rating of each downstream facing system for each of the evaluation factors is presented at the end of this section. 3.3 Criteria for Evaluating Downstream Facing Systems General. The general criteria for evaluating the downstream facing system for most RCC dams includes the following five evaluation factors: 1. Appearance 2. Constructibility 3. Durability 4. Cost 5. Public Accessibility and Safety These factors are generally the same as those used to evaluate upstream facing systems except that seepage control at the downstream face is primarily concerned with collection, transmission, and monitoring seepage rather than watertightness. In some cases, seepage emerging from the downstream face of the dam may be acceptable from a structural Figure 3.3. Downstream stepped face of Bullard Creek Dam (photo courtesy of Benjamin Doerge) Public Accessibility and Safety. Depending upon the location and site conditions for a given dam, public accessibility to the downstream face, especially if the face is moderately sloped or stair-stepped, can pose a serious concern for public safety and the potential for vandalism. Public accessibility to the downstream face of the dam determines the degree of 32

38 Downstream Facing Systems for RCC Dams and RCC Spillways concern for the designer regarding this issue. For certain instances, other natural or man-made barriers, such as fencing, may negate or minimize the relevance of this issue. Situations could occur where a person(s) could view climbing the downstream face as a challenge and may attempt to scale the face. Any of the available downstream facing systems can be constructed with either a sloping or a stepped surface. Some RCC dams, like Bullard Creek Dam, were designed and constructed with a stepped face where steps with different heights and widths were used (see Figure 3.3). For any dam, a stepped surface, as opposed to a sloping surface, increases the potential danger of a fall injury by improving access to the face. However, depending upon the grade, even a sloping surface presents a similar danger. Minimizing public access to the downstream face must be weighed against providing access for future inspection and maintenance Appearance. The downstream face of any dam is typically the most noticeable feature of the entire project. This is especially true for large RCC dams. With regard to the public eye, the history of dams, including RCC dams, has demonstrated that the need to provide a structure with a sound structural appearance is often very important. In the past, less-than-perfect concrete finishes and water leakage at the downstream face of a dam has caused the public to react with alarm. This reaction can arise when the public compares the appearance of the concrete finish on the downstream dam face to more familiar concrete structures. For an RCC dam using unformed or formed RCC on the downstream face, the raveled and/or irregular surface can cause a false perception of poor quality workmanship, which can place the structural integrity of the entire project in question. Even though the public's alarm Figure 3.4. Seepage from downstream face, Willow Creek Dam, OR. is unwarranted, once initiated it is very difficult to dispel. Therefore, not only the aesthetics, but also the dam's appearance in terms of structural integrity, can be important features to be considered during design. 3.4 Downstream Facing Systems for RCC Dams and RCC Spillways General. Twelve different downstream facing systems have been constructed on RCC dams (Dunstan, 2000). Some of the downstream facing systems are combinations of facing systems, particularly where the downstream face extends above and below surface grade. Several of the downstream facing systems used are unique to a particular dam site and are generally not available or possible at most other dam sites. The twelve downstream facing systems used worldwide are summarized in Table 1.1. Approximately 44 percent of the RCC dams constructed worldwide have a stepped chute face and 36 percent of the RCC spillways have a stepped downstream face. In the United States, approximately 37 percent of the RCC dams have a stepped downstream face, and approximately 50 percent of the RCC spillways have a stepped chute. Whether sloped or stepped, the slope of the downstream face for RCC dams constructed to date ranges between 0.5:1 (Horizontal:Vertical) to 1:1 (H:V) with the majority having a slope of 0.80:1 (H:V). Although twelve different downstream facing systems have been used worldwide, for discussion, these systems can be categorized into nine basic systems. Variations within each type of facing system are discussed along with their advantages and disadvantages Unformed RCC. An unformed RCC face can be constructed on RCC dams where the downstream slope of the dam is generally flatter than 0.8 H : 1.0 V. For constructibility, a slope of at least 0.85 H : 1.0 V is sometimes preferred. Steeper slopes require downstream forms to maintain the slope as the natural angle of repose of the RCC mix is exceeded. The angle of repose of RCC mix mainly depends on the shape and grading of the aggregates, and mix workability. When using an unformed RCC face, the face is normally overbuilt 1 to 2 feet to insure the design neat line is never compromised and to account for long- term loss of RCC due to raveling or weathering. This allowance accounts for the fact that it is difficult to achieve a high degree of compaction on the exposed RCC slope, resulting in lower density 33

39 Facing Systems for Roller-Compacted Concrete Dams & Spillways A common occurrence for RCC dams which have been constructed with an unformed downstream face is the emergence of vegetation on the face after several years. The vegetation can be especially prolific and dense where the face is kept wet from seepage. Vegetation can be observed on the downstream faces of Willow Creek Dam and Galesville Dam in Oregon and Monksville Dam in New Jersey. Public and owner perception of the dam must also be considered when using this facing system. Even though the dam is designed to accept loss of some RCC material at the downstream face through weathering, the public's and/or owner's perception of the rough and irregular concrete surface may draw undo criticism and alarm. Figure 3.5. Unformed RCC face, Monksville Dam, NJ. and lower strength material at the face. As weathering progresses and the weaker, less dense RCC ravels, the stronger, more dense RCC is exposed at the surface. Attempts to compact the exposed slope have included motorized hand compactors, running the wheels of heavy equipment along the outer edge, and using specially designed compaction equipment mounted on hydraulic tractors. To minimize raveling, the contractor is often required to trim the loose RCC from the slope. A heavy chain or dozer track can be dragged up and down the slope to remove most of the uncompacted RCC. TYPICAL SECTION Unformed RCC Figure 3.6. Typical section of unformed RCC downstream facing system. Figure 3.7. Unformed RCC face with vegetation, Willow Creek Dam, OR. Advantages of this facing system include uncomplicated RCC placement and low cost. Disadvantages include a rough unfinished appearance, poor durability in harsh climates if low-paste RCC mixes or low quality aggregates are used, and vegetative growth on the face that can increase maintenance costs and accelerate surface deterioration. Approximately 45 percent of the dams constructed in the United States use this facing system on the non-overflow section of the dam and about 9 percent of the RCC spillways have this facing system. The tallest dam in the world constructed with this facing system is Trigomil Dam in Mexico at a height of 328 feet Formed RCC. This downstream facing system is simply constructed by forming the RCC face with conventional removable forms. Using formwork to construct the downstream face of an RCC dam has primarily been used where the downstream slope is steeper than 0.8 H : 1.0 V, and/or where a stepped surface is desired for energy dissipation of overtopping flows or for aesthetics. Due to the method of construction, a formed RCC face is limited to a stepped configuration. Forming the RCC provides a finished surface that has fewer irregularities than unformed RCC. However, variations in the finished appearance of the RCC steps will occur. Isolated honeycombing and rock pockets will occur, and lift lines will likely be visible. To improve the density and surface appearance at the formed RCC face, a fillet of bedding mix can be placed against the base of the form prior to plac- 34

40 Downstream Facing Systems for RCC Dams and RCC Spillways Figure 3.8. Examples of formed RCC steps of poor, fair, and good quality (left to right). Figure 3.9. Formed RCC face, Long Run Dam, PA. ing the next RCC lift. The fillet of bedding mortar serves to fill any voids which can commonly occur at the bottom of RCC lifts placed against formwork due to inability to achieve sufficient compaction. If the RCC is then carefully compacted, the texture of the finished face can approach that of conventional concrete. Examples of dams which have used this downstream facing system include: Long Run Dam in Pennsylvania, and Hudson River #11 Dam and Big Haynes Dam, both in Georgia. Formed RCC steps are currently planned for Olivenhain Dam in California. Figure RCC slip-formed face, Woody Branch Dam, TX. A paving machine was used to place the majority of the RCC at Woody Branch Dam in Texas. The paving machine has an attachment which formed 9- inch-high RCC steps as seen in Figure 3.11 and Figure TYPICAL SECTION Formed RCC Figure Typical section of formed RCC downstream facing system Figure Paving machine and attachment used to form 9-inch-high steps at Woody Branch Dam, TX. Advantages of this facing system include low cost and no additional installation time required after RCC placement. Disadvantages include the 35

41 Facing Systems for Roller-Compacted Concrete Dams & Spillways installation and removal of formwork, the generally rough unfinished appearance, and, in harsh climates, the potential for poor durability if lowpaste RCC mixes or low-quality aggregates are used. This facing system is normally selected for dams where severe weathering or aesthetics are not a primary concern Formed Conventional Concrete Placed Concurrently with RCC. This facing system is the most popular downstream facing system for both non-overflow and overflow sections. It is very similar to the formed RCC facing system except that a 1- to 3-foot-wide strip of unreinforced conventional concrete is placed against the downstream form prior to or following placing and compacting the RCC. If the facing is placed first, the RCC is spread and compacted into the conventional concrete. The minimum compressive strength of the conventional concrete is 3,000 psi and the concrete should be air entrained. Generally, a retarder is added to extend the set time of the concrete. Advantages of this facing system include readily available construction materials, no additional installation time after RCC placement, and a durable and attractive exposed face if attention is paid to setting forms and consolidating the conventional concrete. This facing system is often used to provide an inexpensive protective layer for RCC dams located in moderate to severe climates. Disadvantages include the need to coordinate multiple construction materials and activities that are time-critical. The production and delivery of the conventional concrete must be placed within a limited time frame (30-45 minutes) concurrent with RCC placement. In addition, conventional concrete placement equipment further congests the lift surface, and the exposed face of the conventional concrete is prone to cracking because of differences in elastic and shrinkage properties from those of the RCC. Consolidation at the conventional concrete and RCC interface can also be difficult to achieve. Figure Formed conventional concrete face, New Elmer Thomas Dam, OK. TYPICAL SECTION Conventional Unreinforced Concrete Figure Typical section of formed unreinforced concrete downstream facing system. Figure Formed conventional concrete face of New Elmer Thomas Dam, OK. Middle Fork Dam and Stagecoach Dam in Colorado, and New Elmer Thomas Dam in Oklahoma are examples of dams which have used this method. Over 50 percent of the RCC dams worldwide and in the United States were constructed with this facing system RCC Against Precast Concrete Panels. This facing system consists of precast concrete panels with typical heights of 2-6 feet, lengths of 8-16 feet, and thicknesses of 4-6 inches. This system uses the pre-cast concrete panel as a stay-in-place form for RCC placement. As RCC placement progresses, lower panels with anchor bars that are embedded in the lower lifts of RCC provide support for the panels at the placement level through the use of a temporary bracing system commonly referred to as strongbacks." One important advantage to the integral process of this system is that when RCC 36

42 Downstream Facing Systems for RCC Dams and RCC Spillways placement is complete, construction of the facing system is also complete. Precast panels with heights equal to 1 or 2 RCC lift heights (1-2 feet) could possibly be used to construct the sloping or stepped portion of the downstream face. However, a sloping or stepped face does not as easily accommodate a temporary bracing system as would a vertical face. Inadequately braced panels have a tendency to displace during RCC placement, causing further panel and bracing alignment difficulties with successive lifts. A selfsupporting configuration such as an L or inverted T shaped panel could possibly be used to help combat this difficulty. Figure RCC against precast concrete panels. Due to the economy in using a thin panel with a comparatively larger height and width dimension, it is best-suited for applications where a vertical facing is desired. It is commonly used in the chimney section of RCC gravity dams to form the vertical downstream face. The most economical use of this system is when a similar system is also used for the upstream face of the dam. Every RCC dam that used precast panels on the upstream face of the dam also used precast panels on the downstream face of the chimney section. Figure Precast panels used to construct steps at Tongue River Dam, MT. Precast concrete panels were used at the overtopping spillway project at Tongue River Dam in Montana (see Figures 3.18 and 3.19). The 2 foot 10 inch tall panels were used to form the vertical faces of the 22 steps of the spillway. The panels served as forms for the RCC and were left in place as the exposed wearing surface of the spillway. RCC was placed to within 6-8 inches of the tops of the panels and then conventional concrete was placed over the TYPICAL SECTIONS RCC Against Precast Panels Figure Typical sections of RCC against precast panels downstream facing system. Figure Completed RCC stepped spillway at Tongue River Dam, MT. 37

43 Facing Systems for Roller-Compacted Concrete Dams & Spillways RCC to the tops of the panels. By completely encapsulating the RCC with panels and conventional concrete, a lean RCC mix could be used for the spillway mass. Because of the severe weather in that region, if the RCC was not protected, a rich RCC mix would have been required to provide the necessary durability. Due to their comparatively thin cross section, panels are more susceptible than other available sections to hairline cracking at their surface and spalling along their edges during handling and RCC placement. However, the problem can be overcome with adequate attention to design and construction details. planter across the dams as shown in Figure 3.21 (Hansen, 1991). Figure Downstream face of North Loop Detention Dam, TX. Advantages of this facing system include no additional installation required after RCC placement, a durable and attractive exposed face, and potential use of color pigmentation additives as an aesthetic treatment. Disadvantages include higher cost RCC Against Precast Concrete Blocks. This type of facing system consists of precast concrete blocks with heights of 1 to 2 feet and lengths of 8 to 24 feet. This system is very similar to the precast concrete panel system because the blocks also serve as a stay-in-place form during RCC placement. This system also involves an integral process, which means that when RCC placement is complete, the construction of the downstream facing system is also complete. TYPICAL SECTIONS Unreinforced Concrete Against Precast Panels Figure Typical sections of unreinforced concrete against precast panels downstream facing system. Precast concrete elements were first used to form the downstream face of an RCC dam in 1984 to construct the downstream face of the North Loop Detention Dams in Texas. Aesthetics were important for the dams, which were part of a business park development. In addition to forming the downstream face of the dams, the precast concrete panels were used to form a three-level continuous TYPICAL SECTION Precast Concrete Elements Figure Typical section of precast concrete elements/blocks downstream facing system. 38

44 Downstream Facing Systems for RCC Dams and RCC Spillways The stepped downstream slope of the spillway at Big Haynes Dam in Georgia was constructed using large rectangular precast concrete blocks. At North Fork Hughes River Dam in West Virginia, the exposed portion of the 0.6 H : 1.0 V downstream slope of the dam above the toe berm will be constructed using precast facing blocks with a sloped face. Each element will be centered on alignment dowels placed in the element below, and shimmed onto a bed of mortar. Each precast unit will be tied to the RCC dam with anchor rods which are threaded into an insert cast in the unit and embedded in a lift of RCC. A similar system was also used at Big Haynes Dam in Georgia. elimination of the need for external temporary bracing, no additional installation time required after RCC placement, a durable and attractive exposed surface, and potential use of color pigmentation additives for an aesthetic treatment. Disadvantages include higher cost due to the higher precast concrete volume and difficulty with setting and leveling blocks in fresh RCC and in achieving adequate alignment during installation, and heavy lifting requirements with a long reach for high dams. The tallest dam in the world constructed with this downstream facing system is Capanda Dam in Angola at a height of 361 feet. Figure Precast concrete blocks used to construct face of spillway at Big Haynes Dam, GA. An important difference between pre-cast panels and blocks is that the blocks typically have a square, trapezoidal, or L shaped cross section making them free-standing or self-supporting, thus eliminating or minimizing the need for temporary bracing. Since the blocks overlap one another, they can be designed with internal connection pins, which assist with bracing during construction. Steel dowels have been used to interlock elements to prevent displacement during RCC placement. Steel rods are threaded into inserts at the inside face of each element. The rods extend into the RCC placement area and serve as additional means of anchorage for the system. Due to RCC s inherent uneven surface, bedding mortar is used at the contact of the block with the previously placed RCC lift to serve as a leveling mortar. Neoprene gaskets or expansion joint filler can be used where the block contacts the previously placed block to accommodate shrinkage of the mass RCC, which is especially important for high dams. The block section also provides better security against hairline cracking and spalling during handling and RCC placement. Advantages of this facing system include the Figure Precast concrete block spillway face, Big Haynes Dam, GA Reinforced Concrete Cast After RCC Placement. This type of system is constructed by placing a reinforced concrete slab against the RCC after placement and offers the most durable and finished surface of the facing systems discussed herein. It is also the most expensive facing system. The slab is typically 1-2 feet thick, depending upon the structural requirements for the system. The details for this system are similar to concrete facing for rockfill dams. Conventional reinforced concrete placed after RCC completion has been used to construct dams with smooth sloped faces and stair-stepped faces. At Siegrist Dam in Pennsylvania, the 0.8 H : 1.0 V smooth downstream face of the dam was first constructed by placing the RCC to the approximate template of the slope. Anchor bars were placed for a length of 8 feet into the lifts of RCC at the downstream slope before compaction. Final trimming and cleanup of the RCC slope was performed after all RCC was placed. Placement of the reinforced conventional concrete followed using both slipforming and conventional methods. Strip drains and waterstops were installed into the facing to intercept and eliminate any seepage from emerging at the downstream face. 39

45 Facing Systems for Roller-Compacted Concrete Dams & Spillways TYPICAL SECTION Conventional Reinforced Concrete Figure Typical section of reinforced concrete downstream facing system. Since the RCC is typically placed unformed for this type of system, removal of the uncompacted layer of RCC at the exposed face must be performed prior to conventional concrete placement to provide adequate anchorage and to prevent fouling of drainage strips between the RCC and conventional concrete facing. Construction of this facing system must be performed after construction of the RCC due to the hazards and difficulties of working below RCC placement operations. This system is bestsuited for dams in narrow canyons with large principal spillway widths where surface area is minimized and where the facing also serves the more primary purpose of forming the spillway chute. Christian E. Siegrist Dam in the United States at a height of 130 feet RCC Against Slip-formed/Extruded Concrete Facing Elements. This cast-in-place downstream facing system can be constructed using a laser guided slip-form curbing machine. This facing system was primarily intended as a forming method and means of protecting the RCC from severe weather environments, but may also be used to form steps for energy dissipation. On Upper Stillwater Dam, the 2-foot high interlocking curbs were constructed of 0.5-inch-slump conventional concrete in continuous lengths from 500 feet at the base to 2,673 feet at the crest. Each curb element required 4 hours to set before RCC could be placed against the element. The geometry of the facing elements was different from the dam to the overflow section. The facing elements for the dam created a smooth sloping downstream face, while the facing elements for the overflow section created steps with a 2-foot rise and 1-foot ± run. The finished downstream slopes of the dam were 0.6 H : 1.0 V and 0.32 H : 1.0 V. Challenges encountered with this system included grade control, excessive slumping of the placed elements, and some delays in RCC placement while the placed elements were curing. A total of 98 miles of slip-formed elements were placed requiring a total of 87,000 cubic yards of concrete. Horizontal and vertical tolerances of inch were maintained during construction. No contraction joints were formed in the RCC or slipformed elements during construction. Figure Slip-formed downstream face, Elk Creek Dam, OR. Figure Reinforced concrete facing placed after RCC, Siegrist Dam, PA. Advantages of this system include its attractive and durable finish. Disadvantages include the highest cost of all facing systems and long installation time after RCC placement. The tallest dam in the world constructed with this facing system is Advantages of this system include a durable finish with no installation time required after RCC placement. Disadvantages include cracking because of differences in elastic and shrinkage properties from those of RCC, difficulty installing contraction joints, and additional equipment on the lift surface. It is also noted that this system has a higher unit 40

46 Downstream Facing Systems for RCC Dams and RCC Spillways TYPICAL SECTION Slip-Formed Facing Elements Figure Typical section of slip-formed/extruded concrete downstream facing system. cost for increasingly flatter downstream slopes due to the higher volume of conventional concrete needed for the slip-form element. For small dams with short crest lengths, this system is not practical since construction of the facing elements will impede RCC construction. The tallest RCC dam in the world to use this downstream facing system is Porce II Dam in Columbia at a height of 403 feet RCC Placed Concurrently with Fill. This facing method has been used when the downstream face of the RCC dam was steeper than 0.8 H : 1.0 V and in unique cases where fill material was readily available. Where seepage through the RCC is anticipated, a drainage system consisting of a layer of drainage material between the RCC and downstream earth or rock fill should be considered. RCC waste material or overbuild can be minimized by placing the downstream end of the RCC lift against a temporary 1-foot-high form before placing the earth or rock fill. This downstream facing system was used to construct the 180-foot-high, 0.5 H : 1.0 V downstream slope of Penn Forest Dam in Pennsylvania. The earth and rock fill placed at the downstream face was taken from the existing embankment dam at this site and was used to buttress the new RCC dam. In addition to providing a form for the RCC, the fill covering the downstream face of the RCC protects the untreated RCC face from weathering, provides an insulating zone to reduce cracking from thermally induced stresses, and increases the sliding and overturning stability of the dam. TYPICAL SECTION Earth or Rock Fill Placed Concurrently With RCC Figure Typical section of earth or rock fill placed concurrently with RCC downstream facing system Mechanically Compacted Unformed RCC. This downstream facing system, which was popularized by French dam engineers, is constructed by mechanically compacting the unformed face of the RCC. It is generally selected for dams and spillways where aesthetics are not the primary concern. This method has been used for slopes of 0.75 horizontal to 1.0 vertical or flatter. The face is normally overbuilt 1 to 2 feet to allow for some deterioration due to low densities and to account for some compression of the material during compaction. Methods to mechanically compact the unformed face have included using motorized hand compactors, running the wheels of heavy equipment along the outer edge, and using specially designed compaction equipment mounted on hydraulic tractors as illustrated in Figures 3.31 and The tallest RCC dam in the world constructed with this facing system is Petit Saut Dam in French Guyana at a height of 157 feet. Figure RCC placed concurrently with earth fill, Penn Forest Dam, PA. 41

47 Facing Systems for Roller-Compacted Concrete Dams & Spillways Figure Mechanically compacted unformed RCC. Figure Mechanically compacted unformed RCC (photo by Barnard Construction). 42

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection TOPIC: COMMON PROBLEMS FOR SMALL DAMS WITH CONCRETE CHANNEL SPILLWAYS The State Dam Safety Program has inspection requirements for state regulated dams. A dam, like any man-made structure, will change

More information

UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS

UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS Shaw QHW 1 1, Director: ARQ (PTY) Ltd, +27 12 348 6669, Fax,quentin@arq.co.za Abstract: The original 2003 ICOLD Bulletin 126 on Roller Compacted Concrete dams proved

More information

5th International Symposium on RCC Dams General Introduction

5th International Symposium on RCC Dams General Introduction OVERVIEW OF THE DESIGN, CONSTRUCTION, MATERIALS AND INNOVATIVE INSTRUMENTATION FOR ROLLER COMPACTED CONCRETE DAMS By Engr. Ch. Foad Hussain 1 Introduction to the Author Engr. Chaudhry Foad Hussain has

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title: Watana Project, Briefing document on RCC considerations SuWa 109 Author(s)

More information

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October Invited Lecture

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October Invited Lecture 6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, 23 25 October 2012 Invited Lecture INNOVATIONS OF SIGNIFICANCE AND THEIR DEVELOPMENT ON SOME RECENT RCC DAMS Brian A. FORBES

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue

More information

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA Use of Roller Compacted Concrete By GDOT Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA First Use of RCC By Georgia DOT I-285 Atlanta, GA 2005 Traffic:

More information

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient

More information

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS 5.1 Introduction Using surcharging as the sole soil consolidation mean can take a long time to reach the desired soil settlement. Soil consolidation using prefabricated

More information

Effective Mixing Method for Stability of Air Content in Fresh Mortar of Self-Compacting Concrete in terms of Air Diameter

Effective Mixing Method for Stability of Air Content in Fresh Mortar of Self-Compacting Concrete in terms of Air Diameter ORIGINAL ARTICLE Effective Mixing Method for Stability of Air Content in Fresh Mortar of Self-Compacting Concrete in terms of Air Diameter Sovannsathya RATH*, Masahiro OUCHI** *Kochi University of Technology

More information

Annex E Bridge Pier Protection Plan

Annex E Bridge Pier Protection Plan Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central

More information

Design of Spillway Upgrades

Design of Spillway Upgrades USACE Dam Safety Program Design of Spillway Upgrades Sal Todaro, P.E. Senior Hydraulic Structures Engineer U.S. Army Corps of Engineers Risk Management Center 1 Presentation Overview 1. USACE (RMC) approach

More information

Notice of Intent to Close Inactive CCR Surface Impoundments

Notice of Intent to Close Inactive CCR Surface Impoundments Notice of Intent to Close Inactive CCR Surface Impoundments Virginia Electric and Power Company Possum Point Power Station Coal Combustion Residual Surface Impoundments A, B, C, D, and E Dumfries, Virginia

More information

Item 404 Driving Piling

Item 404 Driving Piling Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.

More information

LESSONS LEARNED AT THE TAUM SAUK REBUILD. Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT INTRODUCTION

LESSONS LEARNED AT THE TAUM SAUK REBUILD. Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT INTRODUCTION LESSONS LEARNED AT THE TAUM SAUK REBUILD Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT The Authors served in key roles for the design and rebuild of the Dam for the Taum Sauk Rebuild

More information

2018 Annual Inspection Report

2018 Annual Inspection Report 2018 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Comanche Station 2005 Lime Road Pueblo, Colorado 81006 January 18, 2019 Table of Contents Certification...

More information

DIRECTIONAL DRILLING

DIRECTIONAL DRILLING DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation

More information

VACUUM TESTING PRECAST CONCRETE MANHOLES

VACUUM TESTING PRECAST CONCRETE MANHOLES 1 OF 5 testing is a quick, safe and practical way to validate manhole system integrity. Manhole sections can be tested at the precast concrete plant prior to delivery or on site prior to backfilling. Here

More information

Outlet Structures T-12

Outlet Structures T-12 Description This section provides guidance and details for outlet structures for use primarily with BMPs utilizing sedimentation, (i.e., extended detention basins (EDBs), retention ponds, and constructed

More information

ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS

ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS James N. McLeod, P.Eng. Regional Manager - Rail Adam Laughlin, EIT Project Engineer Telephone: (780) 486-7000 Fax: (780) 486-7070

More information

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes The Pothole Solution... p.2 Specifications... p.3 Using Perma-Patch in Severe Weather... p.4 www.permapatch.com Frequently

More information

Caltrans compendium of underwater sound data from pile driving 2014 update

Caltrans compendium of underwater sound data from pile driving 2014 update Caltrans compendium of underwater sound data from pile driving 2014 update Richard RODKIN 1 ; Keith POMMERENCK 2 1 Illingworth & Rodkin, Inc., United States 2 Illingworth & Rodkin, Inc., United States

More information

Compaction Theory and Best Practices

Compaction Theory and Best Practices Compaction Theory and Best Practices 2017 Idaho Asphalt Conference Moscow Idaho October 26, 2017 Dave Johonson, P.E. Senior Regional Engineer Asphalt Institute Understanding the Importance of Density 1

More information

AMEC010570_0001. Via . Mt. Polley Mine Tailings Facility Optimization Potential- Follow Up from Dam Safety Review 1.

AMEC010570_0001. Via  . Mt. Polley Mine Tailings Facility Optimization Potential- Follow Up from Dam Safety Review 1. { TIME\@ "d MMMM yyyy" } AMEC Project Number VM00448 Via EMAIL Imperial Metals Corporation 200-580 Hornby Street Vancouver, B.C. V6C 3B6 Attention: Mr. Ron Martel Environmental Superintendent Reference:

More information

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS. 7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C Exercise 2-3 EXERCISE OBJECTIVE C C C To describe the operation of a flow control valve; To establish the relationship between flow rate and velocity; To operate meter-in, meter-out, and bypass flow control

More information

Dams as Systems. Pat Regan Federal Energy Regulatory Commission (FERC)

Dams as Systems. Pat Regan Federal Energy Regulatory Commission (FERC) Dams as Systems Pat Regan Federal Energy Regulatory Commission (FERC) FERC >2,500 jurisdictional dams 770 feet to 0.5 feet high Five Regions Atlanta, Chicago, New York, Portland, San Francisco ~120 staff

More information

D.B. Wilson Station CCR Landfill

D.B. Wilson Station CCR Landfill D.B. Wilson Station CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Closure and Post-closure Care Plan October 11, 2016 Prepared By: Project ID: 160030A Big

More information

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES (These notes are guidelines only and must not be included in the Contract Documents). 1. SCOPE These Notes are guidelines

More information

Rennick Yard Roller-Compacted Concrete Pavement

Rennick Yard Roller-Compacted Concrete Pavement RCC Pavement Council Rennick Yard Roller-Compacted Concrete Pavement February 12, 2016 Submitted By: NCE 1885 S. Arlington Ave., Suite 111 Reno, NV 89509 Phone: 775.329.4955 Site Plan and Pavement Sections

More information

Reinforced Soil Retaining Walls-Design and Construction

Reinforced Soil Retaining Walls-Design and Construction Lecture 32 Reinforced Soil Retaining Walls-Design and Construction Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Example calculation An 8 m high

More information

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Unique Challenges Influencing the Design and Construction Of Three Recent Australian RCC Dams

Unique Challenges Influencing the Design and Construction Of Three Recent Australian RCC Dams Unique Challenges Influencing the Design and Construction Of Three Recent Australian RCC Dams R. Herweynen Principal Consultant Civil, Entura, Australia richard.herweynen@entura.com.au T. Griggs Senior

More information

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS ENGINEERS

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

Figure 1 - Photo of Surveyed Area. Figure 2 - Void Survey Results

Figure 1 - Photo of Surveyed Area. Figure 2 - Void Survey Results We have received the first PRELIMINARY results from several tests (science) conducted on the dam area. Per the engineers they are still refining the depths of the void areas (holes under the concrete areas).

More information

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Initial Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS

More information

Burns Cooley Dennis, Inc. Geotechnical and Materials Engineering Consultants Performance of Permeable Friction Courses NCHRP 9-41

Burns Cooley Dennis, Inc. Geotechnical and Materials Engineering Consultants Performance of Permeable Friction Courses NCHRP 9-41 Burns Cooley Dennis, Inc. Geotechnical and Materials Engineering Consultants Performance of Permeable Friction Courses NCHRP 9-41 L. Allen Cooley, Jr. Presentation Outline Definition Benefits Maintenance

More information

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report Preparedby: ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1

More information

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No October 17, 2016 Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop 100406 San Antonio, Texas 78296 Project No. 0352436 Subject: Compilation of Construction History Calaveras Power Station San

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

Design and Construction of Cerro Del Águila Gravity Dam in Peru

Design and Construction of Cerro Del Águila Gravity Dam in Peru Design and Construction of Cerro Del Águila Gravity Dam in Peru Sayah S. M. 1, Bianco V. 2, Ravelli M. 1, and Bonanni S. 2 1, Lombardi Engineering Limited, 6648 Minusio, Switzerland, selim.sayah@lombardi.ch

More information

DIRECT AND INVERTED PENDULUMS. Model DP & RP. Roctest Limited, All rights reserved.

DIRECT AND INVERTED PENDULUMS. Model DP & RP. Roctest Limited, All rights reserved. INSTRUCTION MANUAL DIRECT AND INVERTED PENDULUMS Model DP & RP Roctest Limited, 2006. All rights reserved. This product should be installed and operated only by qualified personnel. Its misuse is potentially

More information

SECTION PRESSURE TESTING OF PIPING

SECTION PRESSURE TESTING OF PIPING SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01

More information

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report CITY OF COOS BAY CITY COUNCIL Agenda Staff Report MEETING DATE February 4, 2014 AGENDA ITEM NUMBER TO: FROM: Through: ISSUE: Mayor Shoji and City Councilors Randy Dixon, Operations Administrator ( Jim

More information

Eclipse Extern-A-Therm Recuperators

Eclipse Extern-A-Therm Recuperators Design Guide 540 3/9/2009 Eclipse Extern-A-Therm Recuperators Models 300 MA - 2500 MA Copyright Copyright 2007 by Eclipse, Inc. All rights reserved worldwide. This publication is protected by federal regulation

More information

Stop Chasing & Start Managing Density

Stop Chasing & Start Managing Density Stop Chasing & Start Managing Density Session: TH-78 Presented by: Todd Mansell, Caterpillar Inc. What is chasing density Measuring, then thumbs up or thumbs down Roller move on www.conexpoconagg.com 2

More information

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP Technical Note 802 Leak Testing of Polyethylene Pipe For Municipal and Industrial Applications Part 1 Pre-Test Considerations Leak testing may be used to find leaks in a newly constructed or newly modified

More information

U.S. COAST GUARD APPROVED to ASTM F EXCLUSIVELY PHENOLIC FIRE INTEGRITY COMPOSITE GRATING

U.S. COAST GUARD APPROVED to ASTM F EXCLUSIVELY PHENOLIC FIRE INTEGRITY COMPOSITE GRATING U.S. COAST GUARD APPROVED to ASTM F3059-15 EXCLUSIVELY PHENOLIC FIRE INTEGRITY COMPOSITE GRATING FIRE INTEGRITY COMPOSITE GRATING DURAGRID Phenolic Grating continues to set the world offshore standard

More information

On the Use of Pickets and Flukes as Snow Anchors

On the Use of Pickets and Flukes as Snow Anchors On the Use of Pickets and Flukes as Snow Anchors ART FORTINI Sierra Madre Search & Rescue International Technical Rescue Symposium Denver, CO November 2002 Pickets Placements Traditional vertical Horizontal

More information

SECTION [ ] [02730] STABILIZED DECOMPOSED GRANITE SURFACING

SECTION [ ] [02730] STABILIZED DECOMPOSED GRANITE SURFACING SECTION [32 15 40] [02730] STABILIZED DECOMPOSED GRANITE SURFACING EDIT SPECIFICATION: Edit the following guide specification to comply with project requirements. This document is available in word processing

More information

maintaining storage tank dissolved oxygen levels utilizing gas transfer membranes

maintaining storage tank dissolved oxygen levels utilizing gas transfer membranes Water Technologies & Solutions technical paper maintaining storage tank dissolved oxygen levels utilizing gas transfer membranes Authors: W.E. Haas, SUEZ, J. Helmrich, Florida Power and Light and J.E.

More information

MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK)

MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK) COMPREHENSIVE REHABILITATION / REPAIR OF MANERI DAM IN DIST. UTTARKASHI MANERI DAM D/S VIEW Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK) sandysinghal14@hotmail.com ABSTRACT Severe

More information

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56) 5.9.56 RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method ) 1. SCOPE This test covers preparation of specimens and measurement of the change of tensile strength resulting

More information

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research 2007-18 Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation TYPES OF FOUNDATION Introduction: The lowest artificially built part of a structure which transmits the load of the structure to the soil lying underneath is called foundation. The supporting part of a

More information

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS Why does the City have a Safe Walks Program? The Safe Walks program was initiated in 2006 at the request of City Council in order to address the increasing

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

AD-A II~lllII I I 7

AD-A II~lllII I I 7 AD-A284 157 II~lllII CONSTRUCTION OF BREAK WATERS AND BEACEFILL AT THE NAVAL AIR STATION, PATUXENT RIVER, MARYLAND C D.W.Yang, J.McWilliams 2, S.Ming 2 ABSTRACT Construction of the breakwaters and beach

More information

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) CM 510 Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In

More information

Regulation Summary: Walking-Working Surfaces & Personal Protective Equipment (Fall Protection Systems); OSHA s Final Rule

Regulation Summary: Walking-Working Surfaces & Personal Protective Equipment (Fall Protection Systems); OSHA s Final Rule Regulatory Update Regulation Summary: Walking-Working Surfaces & Personal Protective Equipment (Fall Protection Systems); OSHA s Final Rule General Industry 29 CFR 1910 On November 17, 2016, OSHA published

More information

NUMERICAL AND PHYSICAL MODELING

NUMERICAL AND PHYSICAL MODELING POINTE DU BOIS GENERATING STATION SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING Kara Hurtig, Northwest Hydraulic Consultants, North Vancouver, BC, Canada David S. Brown, KGS Group, Winnipeg,

More information

Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios

Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios Yunlong (Jason) Liu, PhD, PE HNTB Corporation Sean Cassady, FPE HNTB Corporation Abstract Extraction

More information

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting

Squeeze Cementing. Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting Squeeze Cementing Brett W. Williams Cementing Technical Advisor January 2016 Tulsa API Meeting Definition Squeeze Cementing is the process of applying hydraulic pressure to force or squeeze a cement slurry

More information

product manual H-4166 & H-4167 Voluvessel

product manual H-4166 & H-4167 Voluvessel 11.09 product manual H-4166 & H-4167 Voluvessel this is a blank page corrector This unit has been calibrated and is ready for use as received. After set-up, calibration is recommended. Calibration Check:

More information

Moyno ERT Power Sections. Operational Guidelines

Moyno ERT Power Sections. Operational Guidelines Moyno ERT Power Sections Operational Guidelines Moyno ERT Power Section Operational Guidelines Index 1. Introduction... 3 2. ERT Performance Graph Interpretation... 3 3. Elastomer Compression (Fit) Recommendations...

More information

Lecture 8&9: Construction Dewatering

Lecture 8&9: Construction Dewatering Arab Academy for Science, Technology & Maritime Transport Colleague of Engineering & Technology Construction & Building Engineering CB 523 Methods and Equipment for Construction 1 Lecture 8&9: Construction

More information

A N C H O R T A B S N O R T H W E S T ANCHOR TAB VF. Patented. User Instructions

A N C H O R T A B S N O R T H W E S T   ANCHOR TAB VF. Patented. User Instructions A N C H O R T A B S N O R T H W E S T www.anchortabs.com ANCHOR TAB VF Patented User Instructions National standards, and state, provincial, and federal laws, require installer/user of this product to

More information

FAST 2K Fence Post Backfill

FAST 2K Fence Post Backfill 1 - Where can I buy Fast 2K? Consult: Where to Buy tab at www.fast2k.com 2 - What is Fast 2K? Fast 2K is an award winning innovation, much better and more convenient than concrete for setting fence posts,

More information

WATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity

WATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity WATER HEATER THERMAL EXPANSION TANKS Owner s Manual Safety Instructions Installation Maintenance Warranty Models: 2-5 Gallon Capacity Thank You for purchasing this Thermal Expansion Tank. Properly installed

More information

TECHNICAL SPECIFICATIONS SECANT CAISSON WALL TECHNICAL SPECIFICATIONS. October 19, Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC

TECHNICAL SPECIFICATIONS SECANT CAISSON WALL TECHNICAL SPECIFICATIONS. October 19, Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC SECANT CAISSON WALL TECHNICAL TECHNICAL Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC Submitted to: Toby Seward City of Nanaimo 455 Wallace Street Nanaimo, BC V9R 5J6 Report Number: Distribution:

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Closure Plan for Existing CCR Rev. 0 Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION AND PURPOSE... 1 2. CLOSURE PLAN NARRATIVE DESCRIPTION... 2 3. FINAL COVER SYSTEM DESCRIPTION... 3

More information

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER +)) SNC LAVALIN Lower Churchill Project RIPRAP DESIGN FOR SLI Document No. 505573-3001-4HER-0011-00 Nalcor Reference No. MFA-SN-CD-0000-CV-RP-0006-01 Rev. 81 Date: 07 -Dec-2012 Prepared by: Checked by:

More information

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering REVETMENTS Ijsseldam, the Netherlands Orson P. Smith, PE, Ph.D. Instructor Purposes and Operational Constraints Purposes Erosion control o o Embankment Toe protection for a seawall, retaining wall or other

More information

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Presented to: APWA Nor Cal November 3 rd, 2016 Presenters: Jason Shykowsi, P.E., T.E. City of Roseville Debbie Haldeman RCC Council

More information

Design Guide. Table of Contents

Design Guide. Table of Contents DESIGN GUIDE Table of Contents Table of Contents... 1 1.0 Introduction... 2 2.0 Product Information... 3 3.0 Structural Design... 8 4.0 Subsurface Foundation Requirements... 9 5.0 Installed Storage Volumes

More information

Huntington District. For More Information Contact (304)

Huntington District. For More Information Contact (304) Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation

More information

Selective Fit Pins and Bushings Precision Guiding for Dies Innovation, Quality, and a Full Line, both Inch and Metric

Selective Fit Pins and Bushings Precision Guiding for Dies Innovation, Quality, and a Full Line, both Inch and Metric THE INNOVATOR OF OUR INDUSTRY Selective Fit Pins and Bushings Precision Guiding for Dies Innovation, Quality, and a Full Line, both Inch and Metric Protected by U.S. and International Patents Overview

More information

Water Hammer In Irrigation Systems 1

Water Hammer In Irrigation Systems 1 CIR828 1 G. A. Clark and D. Z. Haman 2 Irrigation system design includes pump sizing and selection, valve sizing and selection, and pipe sizing as well as the proper selection and placement of many other

More information

HYDRAULIC JUMP AND WEIR FLOW

HYDRAULIC JUMP AND WEIR FLOW HYDRAULIC JUMP AND WEIR FLOW 1 Condition for formation of hydraulic jump When depth of flow is forced to change from a supercritical depth to a subcritical depth Or Froude number decreases from greater

More information

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In areas

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.015.003 Report issued: July 03, 2017 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

RoaDrain Synthetic Subsurface Drainage Layer (SSDL)

RoaDrain Synthetic Subsurface Drainage Layer (SSDL) RoaDrain Synthetic Subsurface Drainage Layer (SSDL) INSTALLATION QUALITY ASSURANCE MANUAL Contents 1.0 INTRODUCTION... 1 2.0 ROLL PACKAGING... 1 3.0 MATERIAL DELIVERY... 1 4.0 UNLOADING & STORAGE PROCEDURES...

More information

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels 12.09 product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels Introduction: This manual covers the installation and operation of Humboldt FlexPanels for Triaxial and Permeability

More information

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention

More information

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station

CCR Closure Plan. CCR Certification: Written Closure Plan (b) & (c) for the. Landfill Sedimentation Pond. A. B. Brown Generating Station Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 525 Vine Street, Suite 1800 Cincinnati, Ohio 45202

More information

CORPORATE SAFETY MANUAL

CORPORATE SAFETY MANUAL CORPORATE SAFETY MANUAL Procedure No. 32-0 Revision: Date: May 2005 Total Pages: 10 PURPOSE To provide general guidelines for the inspection of all ropes, chains, cables, slings, etc. used for personnel

More information

3 1 PRESSURE. This is illustrated in Fig. 3 3.

3 1 PRESSURE. This is illustrated in Fig. 3 3. P = 3 psi 66 FLUID MECHANICS 150 pounds A feet = 50 in P = 6 psi P = s W 150 lbf n = = 50 in = 3 psi A feet FIGURE 3 1 The normal stress (or pressure ) on the feet of a chubby person is much greater than

More information

ADA Training Standard Plans

ADA Training Standard Plans ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb

More information

GATOR BASE Case Study

GATOR BASE Case Study GATOR BASE Case Study INTRODUCTION THE KEY ISSUES Installing outdoor pavers comes with a few challenges. That should not come as a surprise to anyone. A prime concern is how freeze and thaw cycles will

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Closure Plan for Existing CCR Revision: 1 Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED

More information

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8 OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8 Scope This test method describes a test procedure for determining the density of bituminous mixes by means of a nuclear gauge

More information

Engineered solutions for complex pressure situations

Engineered solutions for complex pressure situations SPECIAL SERVICES Engineered solutions for complex pressure situations Cudd Energy Services (CES) delivers custom engineered solutions to resolve complex pressure situations resulting from equipment failure

More information

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016

CLOSURE PLAN. CCR (b) GERS East and West Bottom Ash Ponds. Pirkey Power Plant Hallsville, Texas. October, 2016 CLOSURE PLAN CCR 257.102(b) East and West Bottom Ash Ponds Pirkey Power Plant Hallsville, Texas October, 2016 Prepared for : Southwest Electric Power Company - Pirkey Plant Hallsville, Texas Prepared by:

More information

TABLE OF CONTENTS LEGAL NOTICE

TABLE OF CONTENTS LEGAL NOTICE Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENT CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

Colorado Mountain Club Youth Education Program

Colorado Mountain Club Youth Education Program This avalanche awareness curriculum was produced to create a partnership between the Conservation Department of the Colorado Mountain Club s Backcountry Snowsports Initiative and as well as the 10 th Mountain

More information