Unique Challenges Influencing the Design and Construction Of Three Recent Australian RCC Dams

Size: px
Start display at page:

Download "Unique Challenges Influencing the Design and Construction Of Three Recent Australian RCC Dams"

Transcription

1 Unique Challenges Influencing the Design and Construction Of Three Recent Australian RCC Dams R. Herweynen Principal Consultant Civil, Entura, Australia T. Griggs Senior Engineer, Entura, Australia ABSTRACT: All dam sites are unique, they have different access conditions, different topography, different foundation geology, different available materials, different flow characteristics, different climatic conditions and different aquatic environments. In addition to this, construction contractors have preferred methodologies which will influence the final design of the dam. The end result is that we have specific challenges at each dam site, resulting in a different optimum design at each site and thus often leading to a unique design for that specific dam site. This paper will look at three recently completed RCC dams in Australia Paradise, Meander and Wyaralong dams, all of similar height, but each one unique in its design due to the specific characteristics of each site. This paper will demonstrate how the specific characteristics and challenges at these three dam sites, led to three unique RCC dam designs. Although it is important that we take our experience and learning from other projects and apply them to any new dam site, it is equally important that we do not force a past solution to a new dam site, without considering the uniqueness of that particular site. Keywords: RCC, Aggregate, Precast, Membrane, Spillway 1. INTRODUCTION Over the past decade the authors of this paper have been involved in three RCC dams within Australia, namely Paradise, Meander and Wyaralong dams. Although each of these dams were similar height, and the preferred dam type for each of these dam sites was an RCC dam, the adopted design for each site was significantly different. In each case, the experience and learning from the previous project was taken and applied to the subsequent project. However, all three dam sites were unique, they had different access conditions, topography, foundation geology, available materials, river flow characteristics, climatic conditions and aquatic environments. In addition to this, the different clients had their own business drivers, and the construction contractors had their own preferred methodologies, both of which influenced the decisions leading to the final designs. A key influence to the Paradise Dam design was the innovative approach to the diversion strategy providing both a solution to a foundation issue and an efficient source of RCC aggregate material. As a lean RCC mix, utilizing the natural pozzolan of the crushed basalt, it required no forced cooling, and ensured that permeability was not an issue by adopting an upstream PVC membrane sandwiched behind a precast concrete panel. With 400,000 m 3 of RCC, the most cost effective method of RCC delivery was a full conveyor system. In contrast, Meander Dam was located in a narrow valley, with low RCC volume (85,000 m 3 ). As a result a simple, yet effective RCC delivery method was developed, as high production rates were not critical. For this project, overhead costs were significantly reduced by keeping site plant and labour to a minimum by utilizing precast concrete solutions for all of the external faces, including the spillway crest. Finally, the Wyaralong Dam project utilized an inferior, onsite sandstone aggregate in the RCC, with a basalt conventional concrete skin to provide the necessary durability. The natural topography of the left abutment provided a natural ramp for an articulated truck delivery system. This paper will discuss in more detail the specific designs developed as a result of the unique characteristics of each of these sites. 2. PARADISE DAM Paradise Dam, which was previously called Burnett Dam, is an irrigation dam located on the Burnett River in

2 Queensland, Australia. It is a 50m high RCC dam, with an RCC volume of 400,000m 3. The project was delivered as an Alliance, with the designer, contractor and client all sharing the risks. Construction commenced in November 2003, and practical completion was achieved in December Due to drought conditions, the dam did not reach full supply level until February At Paradise Dam there were a number of specific site conditions, which had a significant impact on the final dam design arrangement (Herweynen et al, 2004 & 2006). These site conditions and their impact on the design and construction are discussed in detail below Diversion Arrangement The basement rock at the Paradise Dam site is a mudstone. The right abutment featured a basalt flow underlain by up to 2m of alluvial above the mudstone. This alluvial material posed both seepage and settlement issues and the final design solution was to locate the diversion channel through this problem area, thus: Addressing this foundation issue (for further details on this refer to Herweynen et al, 2004). Providing an efficient source material for RCC aggregate, utilising the basalt material. Enabling the diversion conduits to be utilised for the permanent outlet works. less critical, as the upstream PVC membrane provided this. Another benefit of the upstream membrane, along with the drainage system behind it, was that it was highly efficient at controlling the uplift pressures in the body of the dam. This has been confirmed by the piezometers within the body of the dam (Herweynen & Griggs, 2007). As a result of the very close proximity of the aggregate source to the dam, a very efficient RCC aggregate production process was developed, consisting of bulk excavation of the diversion channel, a crushing plant to produce an all-in-one aggregate stockpile, feeding a continuous mixer which supplied a high capacity conveyor system for RCC to the dam. Due to the clients concern that an exposed upstream membrane may be damaged by debris or vandalism, a decision was made to place the membrane behind an upstream precast concrete panel, which also provided the upstream formwork for the RCC. With the membrane not exposed, this solution also provided the necessary design life required by the client. Figure 2. Paradise Dam completed 2.3. Secondary Spillway and Downstream Facing Figure 1. Diversion channel excavation at Paradise 2.2. RCC Mix and Membrane For Paradise Dam adopting a lean RCC mix with an upstream PVC membrane was a very cost effective decision for this particular site (Herweynen et al, 2004). This lean RCC mix utilised the natural pozzolan generated from the crushed basalt, with the required RCC strengths being achieved with only 65 kg/m 3 of cement and no flyash. As a result of this, the transportation and storage of cementitious material was kept to a minimum, and no forced cooling was required to control thermal stresses. Required strengths were easily obtained with the adopted RCC mix (Lopez et al, 2005), while the permeability was The catchment area of Paradise Dam is 33,000 km 2, giving a peak estimated outflow for the PMP Design Flood of approximately 94,000 m 3 /s. There is very little flood routing effect provided by the storage, thus the inflow hydrograph is only slightly greater than the outflow hydrograph. For these extreme flood events the tailwater levels downstream of the dam are very high. As a result of these flood flow characteristics a key design decision was made to pass the flood rather than hold it back. This was achieved by allowing the right abutment to act as a secondary spillway, which was demonstrated to be possible through physical hydraulic modelling, predominantly due to the high tailwater levels (Herweynen & Griggs, 2006). During the maximum design flood, the surcharge over the primary spillway was over 18 metres, with high unit discharges and energy. To ensure the long term durability of the primary spillway it was decided to provide a

3 reinforced concrete skin on the downstream face, which was anchored into the RCC. These anchors were placed between RCC lifts, and the reinforced concrete was constructed as a second stage operation. In contrast to this, the secondary spillway was designed to operate relatively infrequently, with discharge commencing at approximately the 1:1,000 AEP flood. As a result an RCC surface for the downstream face was considered to be acceptable. Where the section was relatively high the RCC downstream face was formed with bedding mix squeezed up against the form. While for the lower sections of the right abutment the RCC downstream face was over-placed and trimmed back with an excavator (refer to Fig. 3). As vertical faces in the foundation could cause the dam to crack, a number of options for the treatment were considered including: trimming to flatten the slope, providing dental concrete infill to flatten the slope, relocating the adjacent dam block monolith joint to the top of the face and reinforcing the RCC. The option most favoured was reinforcing the roller-compacted concrete. Reinforcing was placed on the RCC layers above vertical faces to prevent cracking between the top of the vertical face and the adjacent monolith joint (Griggs & Gibson, 2007). Similar to Paradise Dam, in order to pass the design flood a secondary spillway was utilized on the right abutment. However, unlike the foundations at Paradise Dam, the dolerite rock had a very high strength and was considered to be resistant to erosion. Therefore it was decided not to concrete line the spillway aprons. Dental concrete and rock anchors were provided in areas of concern but generally no additional treatment was required. Figure 4 is a view of the completed dam from downstream showing the lowered section of the central primary spillway and the unlined spillway apron of the secondary spillway on the right abutment. A feature of the arrangement is that a spillway training wall was only provided on the left abutment to protect the outlet works and mini-hydro station and not on the right abutment. Figure 3. RCC excavator trimmed face at Paradise 3. MEANDER DAM Meander Dam is an irrigation dam located on the Meander River in Tasmania, Australia. It is a 50m high, 85,000 m 3 RCC dam and used a low cementitious mix of 70kg cement per m 3 of RCC with no flyash. It was delivered through a single design and construction contract. Construction occurred over a two year period, with river diversion and foundation preparation occurring in 2006, and RCC placement in The dam reached practical completion in November The key issues that influenced the design at Meander was the foundation rock structure, the narrow topography and the need to keep project overheads low. The influence of these elements will be discussed in detail below Foundation Treatment and Spillway Arrangement The dam foundation was dolerite rock that was characterized by vertical columnar jointing as well as sheet jointing parallel to the abutments. Due to the nature of the jointing, the resultant excavation surface tended to be blocky, with some relatively high vertical faces on the abutments. Figure 4. Meander Dam spillway arrangement 3.2. RCC Delivery System Due to the narrow valley, the RCC volume was relatively small at 85,000 m 3. As a result it was not economical to install a high capacity delivery system for the RCC. The delivery system adopted was simple and consisted of a conveyor from the pugmill to a bin on the dam surface; with a loader from the bin to the required position. Figure 5 shows the conveyor system on the left abutment and bin on the dam surface. The conveyor was supported by feet on the dam surface. The lowest section was lifted up each layer until it was horizontal and could be

4 removed. This sequence was repeated until the top of the abutment was reached. the same time as the downstream face units and thus eliminate the second stage process. The spillway crest was originally design as a mass concrete structure with surface reinforcement for crack control. The design was modified to a precast structure with mass concrete infill to provide a simpler construction process. The spillway crest precast units consist of 1 m wide sections that form the top of the spillway crest. The units have reinforcement protruding on the underside to tie into the mass concrete below. The mass concrete is, in turn, anchored into the RCC. Fig. 7 shows a number of precast crest units in position. Figure 5. Simple RCC delivery system at Meander Dam 3.3. Use of Precast Concrete The contractor had a strong preference for precast concrete to minimize the cost and time involved in construction (Griggs & Gibson, 2007). Details of the key precast items are discussed below. The upstream facing system used precast concrete panels similar to Paradise Dam. However, in this case a membrane was placed on the upstream side after the dam was complete. This eliminated the interface between RCC placement and membrane welding that had caused some issues on Paradise Dam (Griggs & Herweynen, 2007). The downstream facing system consisted of L-Shaped precast concrete units. A second staged grouting operation was performed to fill the void between the horizontal portion and the RCC. Details of the precast downstream blocks are shown in Fig. 6. Figure 7. Precast spillway crest units at Meander Dam The abutment crest is shown in Figure 7 and consisted of a cast in situ slab anchored into the RCC, with 1.5 m high upstream and 1.24 m high downstream parapets. Using precast parapets reduced safety issues with pouring them in situ, in addition to saving time and cost. 4. WYARALONG DAM Wyaralong Dam, a water supply dam located on a tributary of the Logan River in Queensland, Australia, is a 48m high RCC dam, with an RCC volume of 190,000 m 3. It was delivered as an Alliance, with design and construction occurring over a 2 year period. Early closure of river diversion was achieved in December 2010, with the dam filling within one month. Practical completion was achieved in June Figure 6. Precast downstream facing at Meander Dam It was originally planned to construct the left-hand spillway training wall as a second stage process by leaving a recess in the RCC and then forming and pouring an in situ reinforced concrete wall. This design was revised to allow the use of precast units that could be installed at The key site specific conditions that influenced the design were the foundation bedding defects, the hydrology, the onsite aggregate and the left abutment topography. These, along with some innovations, are discussed in detail below River Diversion Flows in the Teviot Brook are generally very low, although there are years when there are sharp high flow events. However, given the generally low flows and the

5 ability to sequence the construction activities to limit the exposure period, a cost effective river diversion was designed, which had a high likelihood of overtopping. The final diversion arrangement consisted of a 6m high cofferdam which was designed, with reno mattresses, to be overtopped and had a sheetpile cutoff down to the foundation rock through the more permeable alluvial materials in the main river channel. The river was diverted into a 2.4m diameter steel pipe which was concrete encased in the dam footprint. The maximum capacity of the diversion arrangement was 25 m 3 /s (Herweynen et al, 2010). The diversion closure procedure consisted of cutting the steel pipe, attaching a blank flange to it, and pumping in the plug concrete from the upstream face. It was particularly exposed to river inflows, requiring it to be planned well and completed in a single day, which occurred in December 2010 (Herweynen et al, 2011) Dam Cross Section and Spillway The bedrock at the Wyaralong Dam site is Gatton Sandstone overlain by alluvium. The Gatton Sandstone predominantly consists of feldspathic to lithic-feldspathic sandstone with a clay matrix. The average dip of the bedding at the site is approximately 14 degrees, generally dipping downstream and into the right abutment. Several sub-vertical joint sets are also present at the site. Weak layers identified at the site generally followed bedding. The rock at the damsite was classified based on the degree of weathering. Weathering classifications used for classifying the rock were: distinctly weathered with seams, distinctly weathered without seams, and slightly weathered to fresh. The foundation excavation profile was defined to remove all of the distinctly weathered with seams, as the cost to treat this foundation would have been excessive. Similar to both Paradise Dam and Meander Dam, there was significant savings with a spillway arrangement that adopted a secondary spillway. As a result the general arrangement adopted for Wyaralong Dam consisted of a 135m long primary spillway, with a smooth downstream face and stilling basin at the base; and a 150m long secondary spillway located on the left abutment, with a stepped downstream face and an apron channel directing the flow back to the river (refer to Fig. 9). The secondary spillway was designed to operate for floods greater than the 1:100 AEP flood, with the secondary spillway apron channel able to contain the 1:2,000 AEP flood. For more extreme floods, the capacity of the secondary spillway apron channel would be exceeded and the secondary spillway discharge would flow over the left abutment. A detailed erodibility assessment study, which took a holistic approach to dam safety, indicated that this solution was acceptable for the Wyaralong Dam site (Herweynen & Stratford, 2010). A key design feature of the secondary spillway was the anchoring of the apron slab to the foundation rock. These anchors were important to the structural integrity of the dam should the downstream rock erode. As a result double corrosion protection was specified. Figure 9. Wyaralong Dam secondary spillway 4.3. RCC Aggregate Figure 8. Wyaralong Dam spillway cross-section It was the weaker bedding planes that dictated the stability of the dam and the corresponding dam cross-section that was adopted (refer to Fig. 8). There were significant advantages in using the on-site sandstone for RCC aggregate due to greater control of aggregate supply, reduced cost and reduced haulage; resulting in fewer impacts to the existing road infrastructure and on the local community. However, at the feasibility stage of the project the on-site aggregate was reported as being unsuitable for RCC due to: High water absorption ( %) A 68% wet/dry strength variation Clay index values of %, with some swelling Not meeting Australian Standards for concrete aggregate Potential durability issues However, the initial trial mix program showed very positive results, leading the design team to go through an extensive evaluation process (Herweynen et al, 2010a). The conclusions of this extensive testing and evaluation

6 process was that the on-site sandstone could be used for RCC aggregate and that any long term durability concerns were eliminated. The only outstanding concern was the abrasion resistance of the RCC, and as a result a decision was made to use conventional facing concrete using a basalt aggregate. Further structural analysis indicated that the difference in modulus between the sandstone RCC and the basalt conventional concrete would not cause any bond issues between the two. A photo of the trial embankment is given in Fig CONCLUSION Using the case study of three similar height RCC dams, this paper has demonstrated that all dam sites are different due to their unique combination of site specific characteristics. As a result there is no one standard RCC dam solution, as these specific site characteristics will lead to a unique design. Therefore, although it is important that we take our experience and learning from other projects and apply them to any new dam site, it is equally important that we do not force a past solution to a new dam site, without considering the uniqueness of that particular site. REFERENCES Figure 10. Trial RCC embankment at Wyaralong 4.4. Truck Delivery down Left Abutment The natural slope of the left abutment is approximately 1V:6H, providing an ideal ramp for an articulated truck delivery system. This proved to be a very cost effective solution for this particular site. As a result, the quarry was located on the left side of the river, with a suitable quarry located downstream of the dam. The crushing plant and all-in-one stockpile was located on the left abutment, just above the final dam crest level. The all-in-one stockpile was considered to be critical for the sandstone aggregate as it ensured that point-to-point contact of the larger aggregate did not occur. The ramp for the trucks was positioned along the secondary spillway apron, thus protecting the sandstone dam foundation from deteriorating due to the high traffic associated with the articulated trucks delivering the RCC from the continuous mixer to the dam lift surface. Initially it was proposed to form the drainage gallery in the dam, however, this created significant restriction with the truck delivery system, resulting in very low RCC production rates. An innovative solution developed at Wyaralong was to excavate the gallery with a rock-trenching machine once the RCC reached the roof of the gallery level. The solution involved carving the 120m long horizontal gallery through the previously placed RCC using a rock trenching machine. With a 450mm cutting edge capable of cutting 3.6m, the trencher was required to form the 2m wide gallery in three longitudinal passes. With the high tolerance that could be achieved the gallery floor and drain could be directly cut into the RCC (Herweynen et al, 2011). Deible, J., Herweynen, R. and Dow, G. (2010): Challenges associated with identifying and analysing potential failure mechanisms in dam foundations Taum Sauk upper reservoir dam & Wyaralong dam case studies, Proceedings of ANCOLD Conference 2010, Hobart, Nov Griggs, T. and Herweynen, R. (2007): Hydro Tasmania Consulting s Recent RCC Dam Experience, Proceedings of the 5 th International Conference on Dam Engineering, Lisbon, Feb Griggs, T. and Gibson, G. (2007): Design and construction of Meander Dam, Tasmania, Proceedings of NZSOLD ANCOLD Conference 2007, Queenstown, Nov Herweynen, R., Griggs, T., Schrader, E. and Starr, D. (2004): Burnett RCC dam design an innovative approach to site specific conditions, Proceedings of ANCOLD Conference 2004, Melbourne, Nov Herweynen, R. and Griggs, T. (2006): Burnett RCC dam an innovative approach to floods, ICOLD 22 nd Congress on Large Dams, Q. 84 R. 18, pp Herweynen, R. and Griggs, T. (2007): Effectiveness of an upstream membrane on an RCC dam Paradise dam case study, Symposium ICOLD 75 th Annual Meeting, St. Petersburg. Herweynen, R., Stratford, C. and Deible, J. (2010): Construction of the Wyaralong RCC dam in Australia, The International Journal in Hydropower & Dams, Journal of Dam Engineering, Issue 3, pp Herweynen, R. and Stratford, C. (2010): A unique and holistic approach to the erodibility of dam foundations, Proceedings of ANCOLD Conference 2010, Hobart, Nov Herweynen, R., Montalvo, R. and Ager, J. (2010a): Using a clay cemented sandstone as RCC aggregate a major breakthrough at Wyaralong dam, Proceedings of ANCOLD Conference 2010, Hobart, Nov Herweynen, R., Stratford, C. and Watson, A. (2011): An innovative gallery solution for an RCC dam, The International Journal in Hydropower & Dams, Issue 4, pp Lopez, J., Griggs, T., Montalvo, R.J., Herweynen, R. and Schrader, E. (2005): RCC construction & quality control for Burnett dam, Proceedings of ANCOLD Conference 2005, Fremantle, Nov

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

5th International Symposium on RCC Dams General Introduction

5th International Symposium on RCC Dams General Introduction OVERVIEW OF THE DESIGN, CONSTRUCTION, MATERIALS AND INNOVATIVE INSTRUMENTATION FOR ROLLER COMPACTED CONCRETE DAMS By Engr. Ch. Foad Hussain 1 Introduction to the Author Engr. Chaudhry Foad Hussain has

More information

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October Invited Lecture

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October Invited Lecture 6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, 23 25 October 2012 Invited Lecture INNOVATIONS OF SIGNIFICANCE AND THEIR DEVELOPMENT ON SOME RECENT RCC DAMS Brian A. FORBES

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title: Watana Project, Briefing document on RCC considerations SuWa 109 Author(s)

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN Elsa Alves *, Felix Hernando and Rafael Chacón * Laboratório Nacional de Engenharia Civil (LNEC) Av. do Brasil, 101, 1700-066 Lisboa, Portugal

More information

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection TOPIC: COMMON PROBLEMS FOR SMALL DAMS WITH CONCRETE CHANNEL SPILLWAYS The State Dam Safety Program has inspection requirements for state regulated dams. A dam, like any man-made structure, will change

More information

Huntington District. For More Information Contact (304)

Huntington District. For More Information Contact (304) Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation

More information

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION Abstract Lonie I * Tailings and Dams, GHD Brisbane, QLD, Australia Queensland Alumina Limited operates

More information

Design and Construction of Cerro Del Águila Gravity Dam in Peru

Design and Construction of Cerro Del Águila Gravity Dam in Peru Design and Construction of Cerro Del Águila Gravity Dam in Peru Sayah S. M. 1, Bianco V. 2, Ravelli M. 1, and Bonanni S. 2 1, Lombardi Engineering Limited, 6648 Minusio, Switzerland, selim.sayah@lombardi.ch

More information

LESSONS LEARNED AT THE TAUM SAUK REBUILD. Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT INTRODUCTION

LESSONS LEARNED AT THE TAUM SAUK REBUILD. Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT INTRODUCTION LESSONS LEARNED AT THE TAUM SAUK REBUILD Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT The Authors served in key roles for the design and rebuild of the Dam for the Taum Sauk Rebuild

More information

UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS

UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS Shaw QHW 1 1, Director: ARQ (PTY) Ltd, +27 12 348 6669, Fax,quentin@arq.co.za Abstract: The original 2003 ICOLD Bulletin 126 on Roller Compacted Concrete dams proved

More information

Annex E Bridge Pier Protection Plan

Annex E Bridge Pier Protection Plan Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central

More information

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION STRUCTURE S-65 This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated, vertical lift gates, and a reinforced concrete lock structure with two pairs of

More information

Stability of Concrete Macro-Roughness Linings for Overflow Protection of Earth Embankment Dams ( 1 ) - Discussion

Stability of Concrete Macro-Roughness Linings for Overflow Protection of Earth Embankment Dams ( 1 ) - Discussion Stability of Concrete Macro-Roughness Linings for Overflow Protection of Earth Embankment Dams ( 1 ) - Discussion H. Chanson (Reader) Dept of Civil Engineering, The University of Queensland, Brisbane QLD

More information

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual

LoneStar Fiberglass Pools. Do-It-Yourself. Installation Manual LoneStar Fiberglass Pools Do-It-Yourself Installation Manual Chris 1/3/2008 Do-It-Yourself The installation of a LoneStar Fiberglass pool is a much simpler task than most people think. What is important

More information

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS. 7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion

More information

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation TYPES OF FOUNDATION Introduction: The lowest artificially built part of a structure which transmits the load of the structure to the soil lying underneath is called foundation. The supporting part of a

More information

TECHNICAL MEMORANDUM 002 EMORANNO. 001

TECHNICAL MEMORANDUM 002 EMORANNO. 001 TECHNICAL MEMORANDUM 002 EMORANNO. 001 To: Jack Synder, P.E. EES Consulting From: Mort McMillen, P.E. Paul Larson, SE Date: October 13, 2010 Project: Cc: Taylor Bowen Subject: Technical Memorandum (TM)

More information

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES (These notes are guidelines only and must not be included in the Contract Documents). 1. SCOPE These Notes are guidelines

More information

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY FLOW RELEASES DOWNSTREAM OF THE LESOTHO HIGHLANDS WATER PROJECT (LHWP) STRUCTURES (April 2003 to September 2003) TOWER ON MALIBAMATŠO RIVER @ KAO MARCH 2004 OPERATIONS,

More information

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods

Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Designing Labyrinth Spillways for Less than Ideal Conditions Real World Application of Laboratory Design Methods Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Blake Tullis, Ph.D., Utah Water Research

More information

Dams as Systems. Pat Regan Federal Energy Regulatory Commission (FERC)

Dams as Systems. Pat Regan Federal Energy Regulatory Commission (FERC) Dams as Systems Pat Regan Federal Energy Regulatory Commission (FERC) FERC >2,500 jurisdictional dams 770 feet to 0.5 feet high Five Regions Atlanta, Chicago, New York, Portland, San Francisco ~120 staff

More information

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM Akshay Haldankar 1, Mahesh Bhadra 2, Rahul Harad 3, Darpan Kapre 4, Dipali Patil 5 1,2,3,4 Under graduate,dept. of Civil Engineering, DRIEMS Neral. 5Assistant

More information

Water Storage for Agriculture

Water Storage for Agriculture Water Storage for Agriculture Ted van der Gulik, P.Eng. Partnership for Water Sustainability in BC Water Storage Options Dam! usually constructed within a watercourse! must follow the dam safety regulation!

More information

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION STRUCTURE 65-B This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated vertical lift gates and a reinforced concrete lock structure with two pairs of sector

More information

HISTORY OF CONSTRUCTION

HISTORY OF CONSTRUCTION HISTORY OF CONSTRUCTION CFR 257.73(c)(1) West Boiler Slag Pond Clifty Creek Plant Madison, Indiana October, 2016 Prepared for: Indiana Kentucky Electric Corporation Prepared by: American Electric Power

More information

Logue Brook Dam Outlet Works Upgrade Sofia Vargas, Dams Engineer, GHD, Perth WA Robert Wark, Technical Director Dams, GHD, Perth WA

Logue Brook Dam Outlet Works Upgrade Sofia Vargas, Dams Engineer, GHD, Perth WA Robert Wark, Technical Director Dams, GHD, Perth WA Logue Brook Dam Outlet Works Upgrade Sofia Vargas, Dams Engineer, GHD, Perth WA Robert Wark, Technical Director Dams, GHD, Perth WA Logue Brook Dam, 130 km south east of Perth, was completed in 1963 and

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue

More information

Plan B Dam Breach Assessment

Plan B Dam Breach Assessment Plan B Dam Breach Assessment Introduction In support of the Local Sponsor permit applications to the states of Minnesota and North Dakota, a dam breach analysis for the Plan B alignment of the Fargo-Moorhead

More information

DIRECTIONAL DRILLING

DIRECTIONAL DRILLING DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

Lecture 8&9: Construction Dewatering

Lecture 8&9: Construction Dewatering Arab Academy for Science, Technology & Maritime Transport Colleague of Engineering & Technology Construction & Building Engineering CB 523 Methods and Equipment for Construction 1 Lecture 8&9: Construction

More information

MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK)

MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK) COMPREHENSIVE REHABILITATION / REPAIR OF MANERI DAM IN DIST. UTTARKASHI MANERI DAM D/S VIEW Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK) sandysinghal14@hotmail.com ABSTRACT Severe

More information

TECHNICAL SPECIFICATIONS SECANT CAISSON WALL TECHNICAL SPECIFICATIONS. October 19, Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC

TECHNICAL SPECIFICATIONS SECANT CAISSON WALL TECHNICAL SPECIFICATIONS. October 19, Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC SECANT CAISSON WALL TECHNICAL TECHNICAL Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC Submitted to: Toby Seward City of Nanaimo 455 Wallace Street Nanaimo, BC V9R 5J6 Report Number: Distribution:

More information

U.S. ARMY CORPS OF ENGINEERS INSTITUTE FOR WATER RESOURCES RISK MANAGEMENT CENTER PRELIMINARY LESSONS LEARNED FROM OROVILLE INCIDENT

U.S. ARMY CORPS OF ENGINEERS INSTITUTE FOR WATER RESOURCES RISK MANAGEMENT CENTER PRELIMINARY LESSONS LEARNED FROM OROVILLE INCIDENT U.S. ARMY CORPS OF ENGINEERS INSTITUTE FOR WATER RESOURCES RISK MANAGEMENT CENTER PRELIMINARY LESSONS LEARNED FROM OROVILLE INCIDENT BRIEFING FOR: Eric Halpin, Deputy DSO DATE: 7 April 2017 PURPOSE OF

More information

Chutes Part 2: Synthetic linings

Chutes Part 2: Synthetic linings s Part 2: Synthetic linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] s can

More information

Lecture 10 : Sewer Appurtenances

Lecture 10 : Sewer Appurtenances 1 P age Module 8 : Sewer Appurtenances Lecture 10 : Sewer Appurtenances 2 P age The structures, which are constructed at suitable intervals along the sewerage system to help its efficient operation and

More information

Performance of RCC Used for Overtopping Protection and Spillways

Performance of RCC Used for Overtopping Protection and Spillways Protections 2016 2 nd International Seminar on Dam Protection Against Overtopping ISBN: 978-1-1889143-27-9 DOI: Ft. Collins, Colorado, USA, 7-9 September 2016 ABSTRACT Performance of RCC Used for Overtopping

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October 2012

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October 2012 6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, 23 25 October 2012 HRB WALDBÄRENBURG: FIRST RCC DAM EXPERIENCE IN GERMANY Birgit LANGE LTV, Dam Authority of Saxony, Germany

More information

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00) General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS

More information

Performance Standards for Non-Turf Cricket Pitches Intended for Outdoor Use [TS6] ecb.co.uk

Performance Standards for Non-Turf Cricket Pitches Intended for Outdoor Use [TS6] ecb.co.uk Performance Standards for Non-Turf Cricket Pitches Intended for Outdoor Use [TS6] ecb.co.uk 01 Introduction and Scope This Standard describes the requirements for non-turf cricket pitch systems intended

More information

FACING SYSTEMS FOR ROLLER-COMPACTED CONCRETE DAMS &SPILLWAYS. Prepared by Gannett Fleming, Inc.

FACING SYSTEMS FOR ROLLER-COMPACTED CONCRETE DAMS &SPILLWAYS. Prepared by Gannett Fleming, Inc. FACING SYSTEMS FOR ROLLER-COMPACTED CONCRETE DAMS &SPILLWAYS Prepared by Gannett Fleming, Inc. P O R T L A N D C E M E N T A S S O C I A T I O N Facing Systems for Roller-Compacted Concrete Dams & Spillways

More information

Guidance on piling, heavy loads, excavations, tunnelling and dewatering

Guidance on piling, heavy loads, excavations, tunnelling and dewatering Guidance on piling, heavy loads, excavations, tunnelling and dewatering thameswater.co.uk/developerservices Contents 1 Introduction... 3 2 Works That Can Impact Our Assets And Cause Damage... 3 3 What

More information

HYDRAULIC JUMP AND WEIR FLOW

HYDRAULIC JUMP AND WEIR FLOW HYDRAULIC JUMP AND WEIR FLOW 1 Condition for formation of hydraulic jump When depth of flow is forced to change from a supercritical depth to a subcritical depth Or Froude number decreases from greater

More information

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES 3 4 5 6 7 8 9 0 3 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Kissimmee River Vol December 005 Version Draft 4 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 0 3 4 5 6 7 8 9 30 3 3 33 34 35 36 37 38 39 40 4 4 43

More information

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00) General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND

More information

General Information for Culvert Design

General Information for Culvert Design Design Manual Chapter 2 - Stormwater 2E - Culvert Design 2E-1 General Information for Culvert Design A. Introduction A culvert is a conduit under an embankment that transports stormwater from one side

More information

Historic dam failures and recent incidents. Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman

Historic dam failures and recent incidents. Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman Historic dam failures and recent incidents Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman 1 Agenda 1. Dams in all their beauty 2. Hazards associated with dams

More information

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines.

Dry Hydrants. The installation of a non-pressurized pipe system into local water sources provides a ready means of supplying water to fire engines. Dry Hydrants What is a Dry Hydrant? A dry hydrant is a non-pressurized pipe system permanently installed in existing lakes, ponds and streams that provides a suction supply of water to a fire department

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

FP McCann Tunnels and Shafts 1

FP McCann Tunnels and Shafts 1 FP M c Cann FP McCann Tunnels and Shafts 1 The McCann range of shaft and tunnel products have been developed to meet the requirements of the latest industry standards which include the British Tunnelling

More information

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS

SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS SAFE WALKS PROGRAM FREQUENTLY ASKED QUESTIONS Why does the City have a Safe Walks Program? The Safe Walks program was initiated in 2006 at the request of City Council in order to address the increasing

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

Components of a Barrage

Components of a Barrage Components of a Barrage Definition The only difference between a weir and a barrage is of gates, that is the flow in barrage is regulated by gates and that in weirs, by its crest height. Barrages are costlier

More information

AMEC010570_0001. Via . Mt. Polley Mine Tailings Facility Optimization Potential- Follow Up from Dam Safety Review 1.

AMEC010570_0001. Via  . Mt. Polley Mine Tailings Facility Optimization Potential- Follow Up from Dam Safety Review 1. { TIME\@ "d MMMM yyyy" } AMEC Project Number VM00448 Via EMAIL Imperial Metals Corporation 200-580 Hornby Street Vancouver, B.C. V6C 3B6 Attention: Mr. Ron Martel Environmental Superintendent Reference:

More information

Green CCR Surface Impoundment

Green CCR Surface Impoundment Green CCR Surface Impoundment Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment 2017 Annual Inspection Report January 11, 2018 Prepared By: Project ID: 170138A

More information

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD 4-3-21-4 W5M and 1-4-21-4 W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between

More information

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Seventeenth Statewide Conference on Local Bridges Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Tuesday, October 25, 2011 Training Session: Culvert Design, Analysis - talk 2 Presented

More information

GEOTHERMAL WELL COMPLETION TESTS

GEOTHERMAL WELL COMPLETION TESTS GEOTHERMAL WELL COMPLETION TESTS Hagen Hole Geothermal Consultants NZ Ltd., Birkenhead, Auckland, New Zealand. ABSTRACT This paper reviews the measurements that are typically made in a well immediately

More information

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN

CHAPTER 4 SPALDING COUNTY, GEORGIA 4.0 CULVERT DESIGN SPALDING COUNTY, GEORGIA CHAPTER 4 4.0 CULVERT DESIGN... 4-1 4.1 INTRODUCTION... 4-1 4.2 SYMBOLS AND DEFINITIONS... 4-1 4.3 ENGINEERING DESIGN CRITERIA... 4-2 4.3.1 FREQUENCY FLOOD... 4-2 4.3.2 VELOCITY

More information

Notice of Intent to Close Inactive CCR Surface Impoundments

Notice of Intent to Close Inactive CCR Surface Impoundments Notice of Intent to Close Inactive CCR Surface Impoundments Virginia Electric and Power Company Possum Point Power Station Coal Combustion Residual Surface Impoundments A, B, C, D, and E Dumfries, Virginia

More information

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian

More information

MIRABAY PILOT PROJECT REPORT

MIRABAY PILOT PROJECT REPORT MIRABAY PILOT PROJECT REPORT 9/25/2014 By: Ingenium, Inc./Carl A. Hazenberg, P.E. Seawalls along the MiraBay canal system started experiencing problems shortly after construction. Following the issues,

More information

Access Management Standards

Access Management Standards Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards

More information

THE APPLICATION OF RCC IN SOUTH AFRICA. Johann Geringer

THE APPLICATION OF RCC IN SOUTH AFRICA. Johann Geringer THE APPLICATION OF RCC IN SOUTH AFRICA Johann Geringer INTRODUCTION The initial application of roller compacted concrete (RCC) in the USA (Willow Creek Dam, 1975) and Pakistan (Tarbela Dam repairs, 1974-1986),

More information

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010.

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010. BChydro CD FOR GEf\lE IONS B-2 Joanna Sofield Chief Regulatory Officer Phone: (604) 623-4046 Fax: (604) 623-4407 bchydroregulatorygroup@bchydro.com January 19, 2010 Ms. Erica M. Hamilton Commission Secretary

More information

Meath County Council. Meath County Council Boat Slipways. Technical Engineering Report. Job No. : Date: Jan 2018

Meath County Council. Meath County Council Boat Slipways. Technical Engineering Report. Job No. : Date: Jan 2018 Job No. : 16009 Date: Jan 2018 Meath County Council Meath County Council Boat Slipways Technical Engineering Report 2B Richview Office Park Clonskeagh Dublin 14 CONTENTS Page No. 1 INTRODUCTION... 1 1.1

More information

Module 4 Hydraulic Structures for Flow Diversion and Storage

Module 4 Hydraulic Structures for Flow Diversion and Storage Module 4 Hydraulic Structures for Flow Diversion and Storage Lesson 3 Design of Barrage Appurtenant Structures and Rules for Barrage Operation Instructional objectives On completion of this lesson, the

More information

ADA Training Standard Plans

ADA Training Standard Plans ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb

More information

SPECIFICATION FOR CAISSON CONSTRUCTION

SPECIFICATION FOR CAISSON CONSTRUCTION SPECIFICATION FOR CAISSON CONSTRUCTION 1.0 METHOD OF EXCAVATION Caissons shall be hand-excavated, i.e. using of hand-held air tools. Full details of support measures and any dewatering and/or grouting

More information

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes The Pothole Solution... p.2 Specifications... p.3 Using Perma-Patch in Severe Weather... p.4 www.permapatch.com Frequently

More information

3. Types of foundation

3. Types of foundation Foundation Engineering CE 48. Types of foundation & foundation materials Contents Introduction Shallow Foundations Deep Foundations Introduction Why different types of? General types of Introduction Why

More information

Fall Protection Resource Guide P AGE 1

Fall Protection Resource Guide P AGE 1 Fall Protection Resource Guide P AGE 1 As a Home Builder, we do not self-perform any work. This section is a resource guide only and is not intended to put any requirements on the company. All subcontractors,

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2019 LIBERTY UTILITIES Empire District Prepared by: Rachel

More information

AIR-WATER FLOW STRUCTURES AT AN ABRUPT DROP WITH SUPERCRITICAL FLOW

AIR-WATER FLOW STRUCTURES AT AN ABRUPT DROP WITH SUPERCRITICAL FLOW AIR-WATER FLOW STRUCTURES AT AN ABRUPT DROP WITH SUPERCRITICAL FLOW H. CHANSON and L. TOOMBES Department of Civil Engineering, The University of Queensland, Brisbane QLD 4072, Australia 1. Introduction

More information

COMPARING PLUG & SEAT REGULATORS & CONTROL VALVES. Lamar Jones. Equipment Controls Company 4555 South Berkeley Lake Road Norcross, GA 30071

COMPARING PLUG & SEAT REGULATORS & CONTROL VALVES. Lamar Jones. Equipment Controls Company 4555 South Berkeley Lake Road Norcross, GA 30071 COMPARING PLUG & SEAT REGULATORS & CONTROL VALVES Lamar Jones Equipment Controls Company 4555 South Berkeley Lake Road Norcross, GA 30071 INTRODUCTION The purpose of this paper will be to compare a plug

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

Innovative spillways. PK-weirs. Franska exempel 10/04/2018. Speaker : A. Chapuis,

Innovative spillways. PK-weirs. Franska exempel 10/04/2018. Speaker : A. Chapuis, Innovative spillways PK-weirs. Franska exempel 10/04/2018 Speaker : A. Chapuis, Member of CFBR - French Committee on Dams and Reservoirs Member of CFBR technical mirror group of ICOLD Committee C Hydraulic

More information

upvc MANHOLES APPLICATIONS Sewerage applications: Vacuum sewerage applications: Landfill applications: Valve boxes:

upvc MANHOLES APPLICATIONS Sewerage applications: Vacuum sewerage applications: Landfill applications: Valve boxes: upvc MANHOLES upvc MANHOLES upvc manholes can be used in conjunction with various outflow processes covering a variety of applications including drainage, foul water overflow, soil and waste and sewerage

More information

A LOOK AT EARTH SPILLWAY DESIGN AND EVALUATION AFTER MORE THAN 50 YEARS OF EXPERIENCE

A LOOK AT EARTH SPILLWAY DESIGN AND EVALUATION AFTER MORE THAN 50 YEARS OF EXPERIENCE A LOOK AT EARTH SPILLWAY DESIGN AND EVALUATION AFTER MORE THAN 50 YEARS OF EXPERIENCE Paul G. Schweiger, P.E. 1, Darrell M. Temple, P.E. 2 Danny McCook 3, P.E., & Amanda J. Hess, P.E. 4 ABSTRACT More than

More information

Transitional Steps Zone in Steeply Sloping Stepped Spillways

Transitional Steps Zone in Steeply Sloping Stepped Spillways Transitional Steps Zone in Steeply Sloping Stepped Spillways Jalal Attari 1 and Mohammad Sarfaraz 2 1- Assistant Professor, Power and Water University of Technology, Iran 2- Graduate Student, Department

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

SECTION PRESSURE TESTING OF PIPING

SECTION PRESSURE TESTING OF PIPING SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01

More information

STEEL TRENCH SHIELDS DW MODELS

STEEL TRENCH SHIELDS DW MODELS STEEL TRENCH SHIELDS DW MODELS 3330 S. SAM HOUSTON PKWY E. HOUSTON, TEXAS 77047 Phone: 713.943.0750 Toll Free: 800.231.6662 Fax: 713. 943.8483 COPYRIGHT, U.S.A., SPEED SHORE CORPORATION, 2009 April 16,

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

Figure 2 Existing Track Condition: Concrete patches along track length. Grass/Weeds growing through numerous cracks. Page 1

Figure 2 Existing Track Condition: Concrete patches along track length. Grass/Weeds growing through numerous cracks. Page 1 INTRODUCTION Located along the western coast of Kauai, the Mana Drag Racing Strip (MDRS) at the Kauai Raceway Park was originally constructed in 1971. This 40+ year old track, once home to taro fields

More information

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT PRELIMINARY RISK ASSESSMENT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT RIDM PROJECT MAY 3, 2018 DAVID S. BOWLES AND LOREN R. ANDERSON RAC ENGINEERS AND ECONOMISTS, LLC AND UTAH STATE UNIVERSITY

More information

Reinforced Soil Retaining Walls-Design and Construction

Reinforced Soil Retaining Walls-Design and Construction Lecture 32 Reinforced Soil Retaining Walls-Design and Construction Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Example calculation An 8 m high

More information

ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS

ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS James N. McLeod, P.Eng. Regional Manager - Rail Adam Laughlin, EIT Project Engineer Telephone: (780) 486-7000 Fax: (780) 486-7070

More information

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM

INFILTRATION PRACTICE MAINTENANCE INSPECTION FORM Facility Number: Date: Time: Subdivision Name: Watershed: Weather: Inspector(s): Date of Last Rainfall: Amount: Inches Streets: Mapbook Location: GPS Coordinates: Property Classification: Residential 9

More information

NUMERICAL AND PHYSICAL MODELING

NUMERICAL AND PHYSICAL MODELING POINTE DU BOIS GENERATING STATION SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING Kara Hurtig, Northwest Hydraulic Consultants, North Vancouver, BC, Canada David S. Brown, KGS Group, Winnipeg,

More information

Engineering Data Sheet

Engineering Data Sheet Page 1 of 6 CE MARKING AND THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC Valves must be installed into a well designed system and it is recommended that the system be inspected in accordance with the appropriate

More information

SEMINAR ON RCC DAMS Organized by VNCOLD Hanoi, xx September RCC DAMS WORLDWIDE AND IN VIETNAM M. Ho Ta Khanh (VNCOLD)

SEMINAR ON RCC DAMS Organized by VNCOLD Hanoi, xx September RCC DAMS WORLDWIDE AND IN VIETNAM M. Ho Ta Khanh (VNCOLD) SEMINAR ON RCC DAMS Organized by VNCOLD Hanoi, xx September 2011 RCC DAMS WORLDWIDE AND IN VIETNAM M. Ho Ta Khanh (VNCOLD) RCC Dams Worldwide Design Criteria and Analysis for Gravity

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2017 EMPIRE DISTRICT ELECTRIC COMPANY Prepared by: Rachel

More information

SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs

SPEED SHORE MANUFACTURER S TABULATED DATA MHS MODELS. STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs SPEED SHORE MANUFACTURER S TABULATED DATA "MHS" MODELS STEEL MANHOLE SHIELDS 4 Single Wall 4 Double Wall 4 Double Wall with Cut-Outs January 01, 2005 3330 S. SAM HOUSTON PKWY E. HOUSTON, TEXAS 77047 Tel:

More information

Evaluation of step s slope on energy dissipation in stepped spillway

Evaluation of step s slope on energy dissipation in stepped spillway International Journal of Engineering & Technology, 3 (4) (2014) 501-505 Science Publishing Corporation www.sciencepubco.com/index.php/ijet doi: 10.14419/ijet.v3i4.3561 Research Paper Evaluation of step

More information