SEMINAR ON RCC DAMS Organized by VNCOLD Hanoi, xx September RCC DAMS WORLDWIDE AND IN VIETNAM M. Ho Ta Khanh (VNCOLD)

Size: px
Start display at page:

Download "SEMINAR ON RCC DAMS Organized by VNCOLD Hanoi, xx September RCC DAMS WORLDWIDE AND IN VIETNAM M. Ho Ta Khanh (VNCOLD)"

Transcription

1 SEMINAR ON RCC DAMS Organized by VNCOLD Hanoi, xx September 2011 RCC DAMS WORLDWIDE AND IN VIETNAM M. Ho Ta Khanh (VNCOLD)

2 RCC Dams Worldwide

3 Design Criteria and Analysis for Gravity RCC Dams The same as for CVC gravity dams but with different values for the parameters. Mechanical conditions - Strength and Sliding stability - Deformation, settlement : FEM analysis Hydraulic conditions - Permeability - Hydraulic gradient Adopt Vietnamese code if any, but it is possible to use all available codes or guidelines (USA, Canada, GB, France, Germany, Russia, China, Japan, India, etc). No code is better or worse than the others! All these codes are coherent and adopt the same general principles (which are a simplification of the reality). They differ mainly by the presentation and lead to very comparable results! The most important is to adopt homogeneous parameters and criteria (global safety factors and partial safety factors for friction, cohesion and max tensile strength). Don t mix these codes and don t retain, for safety reason, the most unfavourable results! Application with good judgment by experimented engineers is more important than the origine of the code!

4 The conception of a RCC dam must be adapted to the particularities of the RCC technique (Basic principles) Use as much as possible the local materials (aggregates, cementitious materials). Reduce as much as possible the quantities of cementitious materials, in particular the fly ash if it is not available near the site (< 200 km). Adapt the cross-section of the dam to the characteristics of the RCC, and not the opposite! (See examples of the Moroccan and French RCC dams). Each RCC dam must be optimized according to the conditions of the site (flexibility of the design) : avoid to normalize the conception of the dam and the composition of the RCC materials! Facilitate as much as possible the placement of the RCC: Avoid if possible the structures including large openings. Separate, if possible the location of the dam and the the powerhouse (example of Long Tan and Salto Caxias HPP). Select the construction equipment adapted to the rate of placement. If useful, the design can separate the mechanical and the watertight functions.

5 Design and Construction Trends in the U.S RCC Dams by F.Y.Abdo (2010) Perhaps the most notable development in recent RCC gravity dams in U.S.A in the design is: Increasing the dam size in order to reduce the required RCC strength provided an opportunity to use marginal on-site aggregates. Designing the dam to resist full hydrostatic uplift pressure eliminated the need for foundation drains and drainage gallery (for low and medium-sized dam). Eliminating the construction of a stilling basin. The purpose of the next slides is to illustrate these recommendations by some examples of recent RCC dams worldwide.

6 Flexibility of RCC Dam Designs Very different cross-sections according to the quality of the foundation, the aggregates, the type and content of the cementitious materials

7 Longtan Dam (China) 2007

8 Very good aspect of the downstream face with the GEV-RCC method and an intact core 15 m long in the dam. No seepage in the gallery

9 LONGTAN DAM A good example of separation between the dam and the powerhouse. This implementation allows a separation between the CVC and the RCC placements, a continuous regular placement of the RCC and a commissionnig of the 3 first units before the end of construction of the dam (shorter delay than for the powerhouse).

10 SALTO CAXIAS (Brazil)1998 A good example of separation between the dam and the powerhouse and a RCC without fly ash. Same advantage as for the Long Tan Dam concerning the powerhouse implementation.

11 Miel I RCC Dam (Colombia) H = 192 m V = m 3 A good example of a very high dam with cement contents adjusted to the stresses and without fly ash.

12 MIEL I RCC Dam in a seismic area RCC cement contents in the different parts of the dam = 85 to150 kg/m 3. No fly ash.

13 Breña II RCC dam in Spain, H= 119 m, V= 1.6 hm 3 The largest RCC dam in Europe Limestone filler used as cementitious material in the mix. Fixed crest spillway. Stepped spillway on the downstream face. Large crest width to increase the dam volume and lower the max stress.

14 Number of dams Rapid Development of Dams in Morocco since 1985 due to RCC advent (low cost and rapid construction) RCC advent Year

15 The Aoulouz RCC dam in Morocco H= 79 m, V= m 3 First large RCC dam in Morocco (designed in 1987) End of construction Flow over the spillway

16 Construction of the RCC Aoulouz dam in 1990 (Note the aspect of the RCC with low cement content and no flyash)

17 AOULOUZ DAM RCC with 100 kg cement/m 3 and clayey fines, no flyash. R 365 =10 MPa

18 Progress in RCC Dams in Morocco since 1987 Various cross-sections of RCC dams No flyash in all the RCC Moroccan dams

19 Low RCC Dams Since 1987, the Moroccan experience proved that RCC technique, in place of masonry or CVC, is an economical solution even for low dam (< 30m).

20 UCS (MPa) UCS (MPa) Examples of unconfined compressive strengths for 3 Moroccan RCC dams with additional fines With100 kg cement/m 3 and additional fines (clayey for Aoulouz, limestone for Sidi Saïd and high quality limestone for Rmel), no flyash Aoulouz Sidi Said Rmel Aoulouz Sidi Said Rmel Days Days

21 Hassan II RCC dam in Morroco (2005):120 m high, 660 m long Granit + limestone filler Dmax: 63mm Cement content : 80 to 100 kg/m 3 R 365 =16 MPa

22 Hassan II RCC dam: Cross-sections and details

23 Cement content = 100 kg/m 3 with filler. Wirgane RCC dam with gated spillway H=70 m (2008) First placement of RCC by the sloped layer method. The advantages of this method were so evident that it was adopted for all the next Moroccan RCC dams, even with medium sizes. Note the 3m high steps on the downstream face corresponding to the height of the10 continuous layers of 0.3m high each.

24 The Taskourt RCC dam in Morocco (2011) Low cement content (100 kg/m 3 ), no flyash and no leakage on the downstream face!

25 Taskourt dam, H= 75 m, L= 416 m Cross sections through spillway and bottom outlet

26 Taskourt dam : placement of the RCC by the sloped layer method

27 Visit of the Taskourt dam (06/06/2011)

28 The Tiouine RCC dam (H= 84m) in Morocco 2011 Cross sections through the spillway and the bottom outlet

29 Production of the inert filler and grading curves of filler and sands The RCC (100 kg cement/m 3, no fly ash, 7% of inert filler) is placed by the sloped layer method

30 Tiouine RCC material Local fine sand and ground inert filler, without fly ash, provide sufficient density, strength and watertightness for the dam, with the minimal cost!

31 Tiouine dam: Placement of the RCC (Note the dry aspect of the RCC very easy to compact)

32 Visit of the Tiouine RCC dam (07/06/2011)

33 Rizzanese dam (France), H= 40.5 m An example of RCC dam on weak foundation, low quality aggregates and low percentage of cement, without fly ash.

34 Rizzanèse dam Spreading the RCC (100 kg of cement/m 3 without F.A) on the bedding mix (mortar)

35 Cementitious content High paste (> 150 kg/m 3 cementitious material) Medium paste (100 < CM < 145) Lean RCC (CM< 99 kg/m 3 ) % 53.4 % 21.7 % 16.9 % 12.7 % 13.3 % Hardfill 0.6 % 2.9 % RCD (Japan) 18.5 % 12.8 % Unknown 3.2 % 0.8 % Comments Increase of «High paste RCC» is due mainly Chinese RCC dams (China has a lot of coal fired thermoplants with low cost of fly ash). Increase of Lean RCC is due mainly to Brazilian RCC dams (The Brazilian RCC dams are far from thermoplants). High increase of the proportion of Hardfill dams (they are not numerous, although very interesting on weathered foundation). Relative decrease of RCD (higher cost, only adopted in Japan). These values reflect the particularities of the site and the conception of the dam but not the proof of the superiority of one technique on the others!

36 Cement + low-lime FA Cement + highlime FA Cement + ground - granulated slag Combination of pozzolans (no cement) Cement + natural pozzolans Cement + manufactured pozzolans Portland cement alone Unknown 3.2 % % 60.8 % 1.3 % 0.9 % 4.5 % 5.1 % 4.5 % 2.1 % 7.6 % 15.3 % 2.5 % 1.2 % 10.2 % 14.7 % Cementitious materials Comments Decrease of the use of (cement + lowlime FA), which remains however the large majority of cases. Increase of the use of (cement + natural pozzolans), due to the expansion of RCC dams to regions where fly ash (and slag) are not available. Increase of the use of (Portland cement alone), due to the expansion of RCC dams to regions where fly ash (and slag) are not available.

37 Cementitious content of Brazilian Dams

38 Cementitious content of Brazilian Dams

39 RECENT TRENDS IN RCC MATERIALS High or low paste content? All recent RCC materials are in reality «High paste content», it is more exact to replace in this classification : «paste» by «cementitious». The cementitious content The «cementitious materials» include cement and slag but also all the materials that present a «pozzolanic reactivity» (fly ash, natural or artificial pozzolan, some natural fines and rock powder, etc). The use of powdered aggregates More and more used everywhere fly ash or pozzolan are too costly. The use of admixtures in RCC More and more used as they can lengthen the setting time of the RCC (to improve the bonding between the layers) and reduce the water content and consequently the cementitious content.

40 Use of admixtures Without admixture With admixture VB (s) Comments Density VB (kg/m 3 ) Mix efficiency at 180 days (MPa)/(kg/m 3 ) Cementitious content in (kg/m 3 ) Retarding admixtures Cost savings (cement) Construction under high temperature Brazil Morocco To avoid cracks (China) 10 kg/m 3 40 kg/m 3 - Use of a plasticizer retarder admixture (0.8 to 1.12 kg/m 3 ). - There is a reduction of VB time up to 40% for the same water content, or a reduction of circa 10% of water content for the same VB time. - There is an increase of VB density. - There is an increase of the mix efficiency. - For the same consistency and compressive strength, the cementitious content can be reduced (15 to 30% ).

41 Use of powdered aggregate in Elk Creek Dam (USA) The use of fines (in particular limestone powder) is generally very beneficial in the RCC and allows to lower the amount of cementitious materials.

42 RECENT TRENDS IN RCC CONSTRUCTION (1) The use of conveyors: the main advantages are the possible high rate of construction and the non pollution of the RCC layers. This use is now almost generalised for the very large dams. The Sloped Layer Method (SLM): this method is at present more and more applied when the volume of RCC to be placed on each layer is large compared with the capacity of the batching plant. The bedding-mix: used generally in particular cases (cold joints between the RCC layers, medium and low paste RCC, etc). The Grout Enriched RCC (GEV-RCC): more and more used for the upstream and downstream faces of the dam and between the RCC and the CVC structures or between the RCC and the foundation. Give very good results, if correctly applied. To obtain a good result, it is necessary that the grout (cement+water or mortar) is poured at the base and/or in the middle of the new layer (or in a small trench dug in this layer), before its vibration by the needles. This technique is valid even with low cementitious RCC (Chraibi 2010).

43 RECENT TRENDS IN RCC CONSTRUCTION (2) The cooling of RCC: for low and medium high dams (<100 m) : use of low heat cement and fly ash if not too expensive, pre-cooling of the aggregates by air, water spraying of the layers, induced intermediate vertical joints (see photo of the upstream face of Nam Theun 2 dam) to prevent crack extension,for high dams (>100 m) : same precautions, plus an ice cooling plant and an internal cooling of the dam, if necessary. The use of geomembrane: can be an interesting solution when the function of watertightness is separated from the mechanics and the stability functions. For example for the low paste RCC (without fly ash) gravity dams, or for FSHD and CSG dams with very low cement contents. Some designers prefer to adopt a gemembrane protected by precast concrete panels for the upstream face of the dam.

44 Rialp RCC Dam (Spain) Transportation of RCC by conveyor and swinger : quick placement and clean layer surface!

45 Some recent Chinese construction techniques for RCC dams

46 Sommaire Summary Use of Geomembrane Balambano Dam (Indonesia)

47 Sommaire Summary Use of Geomembrane For the Balambano dam the total leakage through the dam is virtually zero (some seepage appeared through the foundation and the abutments) : the geomembrane was thus very efficient for the dam watertightness.

48 Sommaire Overtopping protection of Summary embankment dam by RCC : Brownwood Country Club Dam (USA) Initially 6 m high earth dam First earth dam in USA to receive RCC overtopping protection (1984) Initial Flood = 74 m 3 /s Revised Flood (PMF)= 330 m 3 /s Overtopped 6 times since its construction with no damage Volume of RCC = m 3 placed in 2 days 1/3 of the cost for increasing spillway capacity by traditional method

49 Two Vietnamese RCC Dams Dinh Binh Dam Son LA HPP

50 Dinh Binh Dam Cementitious content of RCC (per m 3 ) Cat RCC 150 RCC 200 Cement (kg) Fly Ash (kg) Sand (kg) A.0.5x2 (kg) A.2x4 (kg) A.4x6 (kg) Water (l) TM-20 (l) P-96 (l)

51 Materials CONCRETE MIX Units Cement Flyash Total kg/m 3 VND kg/m 3 VND VND 1x2, OK6-8M150, coarse aggregate M150, coarse aggregate 2x4, OK6-8 M150, coarse aggregate 4x6, OK6-8 m m m RCC MIX RCC MIX, M200 m RCC MIX, M150 m The RCC material costs (2007) are almost the same than the conventional concrete material costs due to : the high percentage of cementitious materials, the similar treatment of aggregates.

52 Comments about the Dinh Binh RCC The RCC cost of Dinh Binh dam (as other RCC dams in Vietnam) is high compared with CVC. Why and how to lower it? Not optimal design: the design must optimize the cross-section of the dam, and avoid as much as possible openings in the RCC. It is unecessary to design several costly watertight barriers in the dam body. The most important is to select an adapted RCC material, to optimize consequently the design and to have a good control during the RCC placement. High fly ash cost: use fly ash only if there is a thermal powerplant near the site. Too high content of cementitious materials : avoid to normalize a minimum RCC strength (for example RCC150 or RCC200), as for the CVC! Adjust this minimum value according to the results of each optimization (materials/analysis) of the design. The strengths of the RCC are too large compared to the required strengths. The watertightness of the dam and its durability can be obtained by other cheaper alternatives. The cost of the cementitious material must be lower than 30% of the total cost of the RCC material, it is here almost equal to 50%! Low rate of construction: improve the organization of the works, adopt as much as possible a continuous placement. Poor construction equipment: for dams with large volume (> 1 to 2 millions of m 3 ), select the RCC transportation by conveyor belt. Is the RCC always the most economical alternative? The advantages of the RCC technique are not conclusive for low and medium dams, with large openings, built for flood control.

53 Son La Dam Mix Proportions per m 3 : Cement PCB 40 = 60 kg/ m 3, Pulverized Fly Ash = 160 kg/ m 3 Comment: The required high tensile strength to resist to the design earthquake loadings is linked to the shape of the cross section of the dam.

54 Son La : The penstocks and the powerhouse In this part of the dam, the RCC is used only in the bottom and, not easiliy, in the upper part, downstream the intake. The placement of the RCC cannot be continuous on the dam. The commissioning of the power house cannot be done before the end of construction of the dam.

55 Son La RCC sequence and rate of placement The placement of the RCC is very discontinuous with peak near m 3 /day (costly construction equipment) and many weeks without placement. 11-Jan Jan-08 8-Feb Feb-08 7-Mar Mar-08 4-Apr Apr-08 2-May May May Jun Jun Jul Jul-08 8-Aug Aug-08 5-Sep Sep-08 3-Oct Oct Oct Nov Nov Dec Dec-08 9-Jan Jan-09 6-Feb Feb-09 6-Mar Mar-09 3-Apr Apr-09 1-May May May Jun Jun Jul Jul-09 7-Aug Aug-09 4-Sep Sep-09 2-Oct Oct Oct Nov Nov Dec Dec-09 7-Jan Jan-10 4-Feb Feb-10 4-Mar Mar-10 1-Apr Apr Apr-10 in Hundreds Volume, m Son La Hydropower Project Daily RCC Production from 11 January April 10 Total Volume of RCC Produced Accumulated Volume Maximum Daily Production to Date m Accu. Volume, m 3 Date

56 Sinking of the truck in the RCC Too much paste and water in the RCC. Sufficient water content is required for good bond between the layers but too much water (bleeding and laitance) is detrimental. Avoid as much as possible the use of trucks on the RCC layers. Use as possible conveyor belt and swinger.

57 Comparison Long Tan/Son La RCC Dams Long Tan Son La Volume of the dam : 6.6 hm 3 First concrete placement : November 2003 Volume of the dam : 4.6 hm 3 First concrete placement : April 2007 End of concrete placement : November 2007 End of concrete placement : August 2010 Duration of dam construction : 48 months ( m 3 /month) Duration of construction : 40 months ( m 3 /month) Commission of the 3 first units : May 2007 Commission of the first unit : December 2010 Delay between the concrete dam placement and commission of the 3 first units : 3.5 years Delay between the concrete dam dam placement and commission of the first unit : 3 years

58 The Son La Design 1. The fly ash contents a high percentage of L.o.I and it is far from the site. It has to be transported by trucks on roads frequently cut by landslides during the rainy season. It is expensive and depends on an unique Vietnamese provider (Pha Lai powerplant). 2. The most economical alternative is to reduce as much as possible the quantity of fly ash. Is it possible and how to do? By giving a batter of 0.15 to 0.20 to the upstream face, instead of vertical, it will be possible to reduce the maximal tensile strength (at maybe 0.3 to 0.5 MPa). With this last value of the tensile strength, the max required compressive strength of the RCC can be reduced to 15 MPa. This value of RCC compressive strength (at 365 days) can probably be obtained with only 130 kg of cement* per m 3 (and some 7% milled fines) without fly ash, or with 100 kg/ m 3 of cement and 50 kg/ m 3 of flyash (total=150 kg/ m 3 compared with 220 kg/ m 3 used). * This relative high percentage is due to a rather low grade cement (PCB 30 or 40), with then a relative high cost for the transportation. The volume of the dam will be a little higher but, as the unit cost of the RCC is lower, the total cost of the dam will certainly decrease. - To improve the watertightness, the upstream face of the dam could be enriched in cement and fly ash by the GEV-RCC method or by CVC. A light reinforcement mesh can be put, if necessary. - Even with 130 kg of cement per m 3, the cooling of the RCC will not pose more problems than the present situation, provided the vertical joints are correctly implemented.

59 Conclusion about some Vietnamese RCC dams An optimal RCC dam should not be a traditional gravity dam in which the conventional concrete is simply replaced by RCC. The studies of the RCC materials should be carried out before the design and the analysis of the structure (and not the opposite as in many Vietnamese projects!), as they depend on the most available and economical materials which can be obtained on the site. The most economical solution is not always the minimum dam volume with a large amount of fly ash whenever this material is not available near the site. The conception of a RCC dam must be flexible and must be optimized among all the possible RCC alternatives (different cross section, RCC composition, RCC zoning, separation of mechanical and watertight functions, etc). Don t adopt the same cross section and the same RCC for all the sites!

60 A particular type of RCC dam: The Face Symmetrical Hardfill Dam (FSHD) and Cofferdam A new shape : fit with incompetent or low resistance foundation A cheap material : hardfill low cost aggregates natural alluviums mug from excavation soft rock low cement content Untreated natural alluviums Rio Grande dam in Peru

61 100 m 100 m AVANTAGES OF SYMMETRICAL PROFILE - low and uniform vertical stress repartition - little change in the vertical stress with reservoir filling, - no tension at the dam heel, - uniform and reduced shear stress at the base with the seismic load - small influence of uplift forces improved stability conditions in case of earthquake and large overtopping 1 C A 2 1 D 1 Ful 1 2B 2C Empty u d (MPa) (MPa) A 0.7 = 0.36 = 24 kn / m 3 = = 23 kn / m PG C r itical r esultant For ear thquake 0.2 g FSHD C=2.40 Critical resultant For earthquake0.2g E m pt y 1 A = 1.39 B = 1.41 D B C = 1.15 Full D = u d Uplift U plift

62 Some examples of FSHD and FSH cofferdams: - Cidere and Oyuk FSHD in Turkey - Koudiat Acerdoune FSHD in Algeria - Saf Saf FSHD and FSH cofferdam in Algeria

63 CINDERE DAM (Turkey) 2002 Sommaire Summary H = 107 m L = m V = m 3 (RCC = m 3, CVC = m 3 ) Q (Peak Flood) = m 3 /s Foundation : Micaschist E s = 2.75 to 3.70 GPa R cs = 3.3 to 15.3 MPa Seismicity OBE = 0.20g MCE = 0.40g RCC cementitious materials : 50 kg/ m 3 P.C + 20 kg/ m 3 F.A R c = 6 MPa (180 days) Covered geomembrane upstream

64 OYUK Dam (Turkey) 2007 H = 100 m L = 212 m Q (Peak Flood 1/10 000) = 530 m 3 /s Foundation : Gneiss and micaschist Seismicity : OBE = 0.24g MCE = 0.40g Cementitious materials : 50 kg/m 3 P.C kg/m 3 F.A R c = 6 MPa (90 days)

65 Koudiat Acerdoune (Algeria), H = 121 m, Crest Length = 493 m A high RCC dam located in a seismic area with low grade aggregates and with very bad foundation (schist and marl) with important rock slides during the construction. This dam was designed and constructed by French consultants and contractors.

66 Koudiat Acerdoun : Composition and characteristics of RCC Initial design Final design Quantity of RCC m m 3 Cement content 77 kg/m kg/m 3 Fly Ash content 87 kg/m 3 0 Limestone filler content kg/m 3 Required compressive strength 19 MPa at 90 days 11 MPa at 90 days Max temperature 25 C 25 C Choice of a FSHD cross-section to adapt the design to the very low quality of the foundation and of the aggregates, with a reduction of Rc. Replacement of the costly fly ash by a limestone filler ground in situ.

67 Diversion works for the Saf Saf FSHD (Algeria) Low protection against flood during the construction The Q 10-year flood = 890 m 3 /s, but the capacity of the diversion canal is only 150 m 3 /s (annual flood). - In October 2008, a peak discharge flood of 500 m 3 /s overloaded the canal capacity and the dam was overtopped with a 1.5 m overflow depth, the base of the dam (3 m) was under construction. - No damage resulted from this flood (no erosion of the crest, the U/S and D/S faces of the dam). The works could start again after a 2 weeks cleaning period.

68 Failure of the Cua Dat CFRD (Vietnam) during the construction To minimize the cost of the diversion structures, it was admitted to divert the flow during the wet season of 2007 by only one tunnel (D=9 m) in place of 2 tunnels (D= 11 m) of the initial design, with a possible overtopping of the main dam 25 m higher than the river bed. Unfortunately an extreme flood (8000 m 3 /s), much higher than expected (5300 m 3 /s), destroyed the gabion protection, the cofferdam and a part of the dam during the construction (but without serious damage downstream).

69 Observation about FSHD for dam and cofferdam 1. A FSHD is particularly interesting for the sites with weak foundation, high floods (often difficult to estimate precisely) and in seismic area. A FSHD can be overflowed without serious damage during the construction permitting significant savings in diversion works. FSHD may be consequently an interesting alternative to CFRD for the sites with high floods and highly weathered rocks in foundation. For this reason several FSHD are presently under construction in Morocco in place of the traditional CFRD alternatives (Mr. Chraibi). 2. FSHD (or CSG) cofferdams - as demonstrated by their very good resistance to large overflows - seem to be the best solution in case of overtopped structures, even they may be a little more expensive than an embankment. 3. The failure of the Cua Dat CFRD must not lead to rule out the method of diversion with overtopped structures - which allows generally important cost and delay savings - but to adopt an adequate mode of protection of the downstream slope of the embankment and, if necessary, of its toe and abutments. It is probable that, if the downstream slope of this dam were protected by a downstream FSHD in place of the gabions, the main dam and the RCC would have resisted to the flood or be only superficially damaged.

70

5th International Symposium on RCC Dams General Introduction

5th International Symposium on RCC Dams General Introduction OVERVIEW OF THE DESIGN, CONSTRUCTION, MATERIALS AND INNOVATIVE INSTRUMENTATION FOR ROLLER COMPACTED CONCRETE DAMS By Engr. Ch. Foad Hussain 1 Introduction to the Author Engr. Chaudhry Foad Hussain has

More information

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title: Watana Project, Briefing document on RCC considerations SuWa 109 Author(s)

More information

UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS

UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS UPDATE OF ICOLD BULLETIN 126 ON RCC DAMS Shaw QHW 1 1, Director: ARQ (PTY) Ltd, +27 12 348 6669, Fax,quentin@arq.co.za Abstract: The original 2003 ICOLD Bulletin 126 on Roller Compacted Concrete dams proved

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Design and Construction of Cerro Del Águila Gravity Dam in Peru

Design and Construction of Cerro Del Águila Gravity Dam in Peru Design and Construction of Cerro Del Águila Gravity Dam in Peru Sayah S. M. 1, Bianco V. 2, Ravelli M. 1, and Bonanni S. 2 1, Lombardi Engineering Limited, 6648 Minusio, Switzerland, selim.sayah@lombardi.ch

More information

Unique Challenges Influencing the Design and Construction Of Three Recent Australian RCC Dams

Unique Challenges Influencing the Design and Construction Of Three Recent Australian RCC Dams Unique Challenges Influencing the Design and Construction Of Three Recent Australian RCC Dams R. Herweynen Principal Consultant Civil, Entura, Australia richard.herweynen@entura.com.au T. Griggs Senior

More information

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October 2012

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October 2012 6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, 23 25 October 2012 HRB WALDBÄRENBURG: FIRST RCC DAM EXPERIENCE IN GERMANY Birgit LANGE LTV, Dam Authority of Saxony, Germany

More information

Reinforced Soil Retaining Walls-Design and Construction

Reinforced Soil Retaining Walls-Design and Construction Lecture 32 Reinforced Soil Retaining Walls-Design and Construction Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Example calculation An 8 m high

More information

Water Storage for Agriculture

Water Storage for Agriculture Water Storage for Agriculture Ted van der Gulik, P.Eng. Partnership for Water Sustainability in BC Water Storage Options Dam! usually constructed within a watercourse! must follow the dam safety regulation!

More information

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October Invited Lecture

6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, October Invited Lecture 6 TH INTERNATIONAL SYMPOSIUM ON ROLLER COMPACTED CONCRETE (RCC) DAMS Zaragoza, 23 25 October 2012 Invited Lecture INNOVATIONS OF SIGNIFICANCE AND THEIR DEVELOPMENT ON SOME RECENT RCC DAMS Brian A. FORBES

More information

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision J.Linortner & R.Faber Pöyry Energy GmbH, Turkey-Austria E.Üzücek & T.Dinçergök General Directorate of State Hydraulic

More information

Effect of Moisture Content of Wet Fly Ash on Basic Properties of Mortar and Concrete

Effect of Moisture Content of Wet Fly Ash on Basic Properties of Mortar and Concrete Fourth International Conference on Sustainable Construction Materials and Technologies http://www.claisse.info/proceedings.htm SCMT4 Las Vegas, USA, August 7-11, 216 Effect of Moisture Content of Wet Fly

More information

MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK)

MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK) COMPREHENSIVE REHABILITATION / REPAIR OF MANERI DAM IN DIST. UTTARKASHI MANERI DAM D/S VIEW Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK) sandysinghal14@hotmail.com ABSTRACT Severe

More information

Design of Spillway Upgrades

Design of Spillway Upgrades USACE Dam Safety Program Design of Spillway Upgrades Sal Todaro, P.E. Senior Hydraulic Structures Engineer U.S. Army Corps of Engineers Risk Management Center 1 Presentation Overview 1. USACE (RMC) approach

More information

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN Elsa Alves *, Felix Hernando and Rafael Chacón * Laboratório Nacional de Engenharia Civil (LNEC) Av. do Brasil, 101, 1700-066 Lisboa, Portugal

More information

LESSONS LEARNED AT THE TAUM SAUK REBUILD. Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT INTRODUCTION

LESSONS LEARNED AT THE TAUM SAUK REBUILD. Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT INTRODUCTION LESSONS LEARNED AT THE TAUM SAUK REBUILD Paul C. Rizzo, Ph.D., P.E. 1 Carl Rizzo 2 John Bowen 3 ABSTRACT The Authors served in key roles for the design and rebuild of the Dam for the Taum Sauk Rebuild

More information

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection TOPIC: COMMON PROBLEMS FOR SMALL DAMS WITH CONCRETE CHANNEL SPILLWAYS The State Dam Safety Program has inspection requirements for state regulated dams. A dam, like any man-made structure, will change

More information

Components of a Barrage

Components of a Barrage Components of a Barrage Definition The only difference between a weir and a barrage is of gates, that is the flow in barrage is regulated by gates and that in weirs, by its crest height. Barrages are costlier

More information

Supplementary cementitious Materials

Supplementary cementitious Materials Supplementary cementitious Materials Karen Scrivener WORKING DOCUMENT Most promising approach reducing the clinker factor CO 2 Process optimisation clinker factor Clinker Gypsum Cement SCMs Supplementary

More information

UNIT-I SOIL EXPLORATION

UNIT-I SOIL EXPLORATION SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : Geotechnical Engineering - II (16CE127) Year & Sem: III-B.Tech & II-Sem

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

FACING SYSTEMS FOR ROLLER-COMPACTED CONCRETE DAMS &SPILLWAYS. Prepared by Gannett Fleming, Inc.

FACING SYSTEMS FOR ROLLER-COMPACTED CONCRETE DAMS &SPILLWAYS. Prepared by Gannett Fleming, Inc. FACING SYSTEMS FOR ROLLER-COMPACTED CONCRETE DAMS &SPILLWAYS Prepared by Gannett Fleming, Inc. P O R T L A N D C E M E N T A S S O C I A T I O N Facing Systems for Roller-Compacted Concrete Dams & Spillways

More information

HISTORY OF CONSTRUCTION

HISTORY OF CONSTRUCTION HISTORY OF CONSTRUCTION CFR 257.73(c)(1) West Boiler Slag Pond Clifty Creek Plant Madison, Indiana October, 2016 Prepared for: Indiana Kentucky Electric Corporation Prepared by: American Electric Power

More information

Huntington District. For More Information Contact (304)

Huntington District. For More Information Contact (304) Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation

More information

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES (These notes are guidelines only and must not be included in the Contract Documents). 1. SCOPE These Notes are guidelines

More information

INFLUENCE OF FLY ASH IN STRENGTH CHARACTERISTICS OF COHESIVE SOILS

INFLUENCE OF FLY ASH IN STRENGTH CHARACTERISTICS OF COHESIVE SOILS International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 6, November-December 2016, pp. 67 72, Article ID: IJCIET_07_06_008 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=7&itype=6

More information

Effective Mixing Method for Stability of Air Content in Fresh Mortar of Self-Compacting Concrete in terms of Air Diameter

Effective Mixing Method for Stability of Air Content in Fresh Mortar of Self-Compacting Concrete in terms of Air Diameter ORIGINAL ARTICLE Effective Mixing Method for Stability of Air Content in Fresh Mortar of Self-Compacting Concrete in terms of Air Diameter Sovannsathya RATH*, Masahiro OUCHI** *Kochi University of Technology

More information

Chutes Part 2: Synthetic linings

Chutes Part 2: Synthetic linings s Part 2: Synthetic linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] s can

More information

Paper USSD Annual Meeting June 24-28, 2002 DESIGN OF THE RCC PORTION OF THE SALUDA DAM REMEDIATION PROJECT

Paper USSD Annual Meeting June 24-28, 2002 DESIGN OF THE RCC PORTION OF THE SALUDA DAM REMEDIATION PROJECT DESIGN OF THE RCC PORTION OF THE SALUDA DAM REMEDIATION PROJECT By Paul C. Rizzo * William Argentieri ** Jeffrey M. Bair * Kristina Massey ** Harold Moxley ** ABSTRACT Saluda Dam, part of the FERC regulated

More information

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010.

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010. BChydro CD FOR GEf\lE IONS B-2 Joanna Sofield Chief Regulatory Officer Phone: (604) 623-4046 Fax: (604) 623-4407 bchydroregulatorygroup@bchydro.com January 19, 2010 Ms. Erica M. Hamilton Commission Secretary

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation

TYPES OF FOUNDATION. Superstructure. Substructure. Foundation TYPES OF FOUNDATION Introduction: The lowest artificially built part of a structure which transmits the load of the structure to the soil lying underneath is called foundation. The supporting part of a

More information

Influence of Fly Ash Content on Compaction Characteristics of Fly Ash Clay Mixture

Influence of Fly Ash Content on Compaction Characteristics of Fly Ash Clay Mixture Jordan Journal of Civil Engineering, Volume, No. 1, 16 Influence of Fly Ash Content on Compaction Characteristics of Fly Ash Clay Mixture Ashis Kumar Bera 1)* and Sayan Kundu 2) 1) Associate Professor

More information

Sulphur Market Outlook

Sulphur Market Outlook Sulphur Market Outlook Meena Chauhan Head of Sulphur and Sulphuric Acid Integer Research The Fertilizer Institute Outlook and Technology conference Fort Lauderdale, Florida Founded in 2002, Integer Research

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun Jul

More information

Construction Dewatering

Construction Dewatering Construction Dewatering Introduction The control of groundwater is one of the most common and complicated problems encountered on a construction site. Construction dewatering can become a costly issue

More information

Historic dam failures and recent incidents. Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman

Historic dam failures and recent incidents. Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman Historic dam failures and recent incidents Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman 1 Agenda 1. Dams in all their beauty 2. Hazards associated with dams

More information

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER

+)) Lower Churchill Project RIPRAP DESIGN FOR WIND-GENERATED WAVES SNC LAVALIN. SLI Document No HER +)) SNC LAVALIN Lower Churchill Project RIPRAP DESIGN FOR SLI Document No. 505573-3001-4HER-0011-00 Nalcor Reference No. MFA-SN-CD-0000-CV-RP-0006-01 Rev. 81 Date: 07 -Dec-2012 Prepared by: Checked by:

More information

Innovative spillways. PK-weirs. Franska exempel 10/04/2018. Speaker : A. Chapuis,

Innovative spillways. PK-weirs. Franska exempel 10/04/2018. Speaker : A. Chapuis, Innovative spillways PK-weirs. Franska exempel 10/04/2018 Speaker : A. Chapuis, Member of CFBR - French Committee on Dams and Reservoirs Member of CFBR technical mirror group of ICOLD Committee C Hydraulic

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION Abstract Lonie I * Tailings and Dams, GHD Brisbane, QLD, Australia Queensland Alumina Limited operates

More information

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No October 17, 2016 Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop 100406 San Antonio, Texas 78296 Project No. 0352436 Subject: Compilation of Construction History Calaveras Power Station San

More information

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report Lower Coquitlam River Project Water Use Plan Temperature Monitoring Lower Coquitlam River Project Year 2 Report COQMON#6 Temperature Monitoring Study Lower Coquitlam River Study Period: Year 2-2007 Report

More information

A simplified design method for plunge pools scour control downstream of large dam spillways, and its applications

A simplified design method for plunge pools scour control downstream of large dam spillways, and its applications 6 th International Congress on Scour & Erosion ICSE 6 - Paris - August 2012 A simplified design method for plunge pools scour control downstream of large dam spillways, and its applications Dr Etienne

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

VSL MINING & TUNNELING SYSTEMS VSL. mining and tunneling

VSL MINING & TUNNELING SYSTEMS VSL. mining and tunneling VSL MINING & TUNNELING SYSTEMS VSL mining and tunneling VSL Mining & Tunneling Bolt systems VSL offers three type of bolting system for the mining & Tunnelling industry VSL-S Solid Threaded bolts. Continuous

More information

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II) Presentation to the CNRC Board of Directors Regular Meeting March 11, 2015 1 Agenda Preferred Alternate Refinement for University Avenue, 3rd Street, and Beverly Avenue Intersection Improvements validate

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS 5.1 Introduction Using surcharging as the sole soil consolidation mean can take a long time to reach the desired soil settlement. Soil consolidation using prefabricated

More information

SOFRASAR TUNNEL PRODUCTS CONNECTING ALL COMPONENTS

SOFRASAR TUNNEL PRODUCTS CONNECTING ALL COMPONENTS www.optimas.com SOFRASAR TUNNEL PRODUCTS CONNECTING ALL COMPONENTS CONTENTS DOWEL SYSTEM SOF-FIX AXIS 110 PG. 06 DOWEL SYSTEMS 04 BOLTING SYSTEMS 08 GROUT LIFT SOCKETS 11 CENTERING DOWELS AND SHEAR DOWELS

More information

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM Akshay Haldankar 1, Mahesh Bhadra 2, Rahul Harad 3, Darpan Kapre 4, Dipali Patil 5 1,2,3,4 Under graduate,dept. of Civil Engineering, DRIEMS Neral. 5Assistant

More information

To Enhance the Engineering Properties of Clay Bricks with use of Fly Ash

To Enhance the Engineering Properties of Clay Bricks with use of Fly Ash To Enhance the Engineering Properties of Clay with use of Fly DEVENDRA B. GARUD M.E. Student, S.S.V.P.S s. B.S.D.C.O.E, Dhule PROF. S.S.BACHHAV Civil Engineering Department, S.S.V.P.S s. B.S.D.C.O.E, Dhule

More information

OECS Regional Engineering Workshop September 29 October 3, 2014

OECS Regional Engineering Workshop September 29 October 3, 2014 B E A C H E S. M A R I N A S. D E S I G N. C O N S T R U C T I O N. OECS Regional Engineering Workshop September 29 October 3, 2014 Coastal Erosion and Sea Defense: Introduction to Coastal/Marine Structures

More information

Displacement-based calculation method on soil-pile interaction of PHC pipe-piles

Displacement-based calculation method on soil-pile interaction of PHC pipe-piles Seattle, WA Displacement-based calculation method on soil-pile interaction of PHC pipe-piles Dr. Huang Fuyun Fuzhou University 31 st May, 217 Outline Background ing introduction ing results Simple calculation

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

19.1 Problem: Maximum Discharge

19.1 Problem: Maximum Discharge 19.1 Problem: Maximum Discharge In partially full channel having an equilateral triangular cross section, the rate of discharge is Q = KAR/3 in which K is a constant, A flow area, R is the hydraulic mean

More information

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Module - 4 Hydraulic Jumps Lecture - 1 Rapidly Varied Flow- Introduction Welcome

More information

SCI/IAT/IHT Seminar Cases for and against hot mix road surfacings

SCI/IAT/IHT Seminar Cases for and against hot mix road surfacings SCI/IAT/IHT Seminar Cases for and against hot mix road surfacings Overview, Insert the including title of your less common presentation options here Presented Presented by by Dr Name Cliff Here Nicholls

More information

DG AGRI DASHBOARD: CITRUS FRUIT Last update:

DG AGRI DASHBOARD: CITRUS FRUIT Last update: 14 000 12 000 10 000 8 000 6 000 4 000 2 000 0 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Small citrus (group mandarines): clementines, satsumas

More information

Olympic Agenda th IOC Session. 5-6 February 2014

Olympic Agenda th IOC Session. 5-6 February 2014 Olympic Agenda 2020 126 th IOC Session 5-6 February 2014 Five clusters of ideas The uniqueness of the Olympic Games Athletes: at the heart of the Olympic Movement Olympism in action: keep Olympism alive

More information

Large-scale Field Test

Large-scale Field Test Vaskinn 1 Large-scale Field Test Kjetil Arne Vaskinn kav@trh.statkraftgroner.no Statkraft Grøner AS SUMMARY The objective the controlled failure of large-scale embankment is to monitor and record the failure

More information

Foreign overnights in the Nordic countries 2015

Foreign overnights in the Nordic countries 2015 Foreign overnights in the Nordic countries 2015 Sources: Statistics Statistics Statistics Statistics July 2016 VISIT FINLAND STATISTICS Contents Foreign overnights in the Nordic countries.4 Overnights

More information

2017/18 Soybean Outlook

2017/18 Soybean Outlook 217/18 Soybean Outlook 217 Ag Econ In service Training Dr. S. Aaron Smith, Assistant Professor, Department of Agricultural and Resource Economics, University of Tennessee https://ag.tennessee.edu/arec/pages/cropeconomics.aspx

More information

SALUDA DAM MIX DESIGN PROGRAM INTRODUCTION

SALUDA DAM MIX DESIGN PROGRAM INTRODUCTION Page 1 of 17 SALUDA DAM MIX DESIGN PROGRAM By Paul C. Rizzo Luis Ruiz Gaekel* John P. Osterle* INTRODUCTION Saluda Dam is owned and operated by South Carolina Electric & Gas Company (SCE&G) and is located

More information

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY FLOW RELEASES DOWNSTREAM OF THE LESOTHO HIGHLANDS WATER PROJECT (LHWP) STRUCTURES (April 2003 to September 2003) TOWER ON MALIBAMATŠO RIVER @ KAO MARCH 2004 OPERATIONS,

More information

REMEDIATION OF SALUDA DAM RCC AND ROCKFILL DAMS. Abstract

REMEDIATION OF SALUDA DAM RCC AND ROCKFILL DAMS. Abstract REMEDIATION OF SALUDA DAM RCC AND ROCKFILL DAMS Paul C. Rizzo 1, Scott Newhouse 2, Jeff Bair 3 Abstract Saluda Dam, part of the FERC regulated Saluda Hydroelectric Project located near Columbia, South

More information

NUMERICAL AND PHYSICAL MODELING

NUMERICAL AND PHYSICAL MODELING POINTE DU BOIS GENERATING STATION SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING Kara Hurtig, Northwest Hydraulic Consultants, North Vancouver, BC, Canada David S. Brown, KGS Group, Winnipeg,

More information

ENTUCKY RANSPORTATION C ENTER. College of Engineering

ENTUCKY RANSPORTATION C ENTER. College of Engineering Research Report KTC-05-34/SPR-297-05-1I T K ENTUCKY RANSPORTATION C ENTER College of Engineering USE OF ULTRA-LIGHTWEIGHT GEOFOAM TO REDUCE STRESSES IN HIGHWAY CULVERT EXTENSIONS Our Mission We provide

More information

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST

HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST HCMTCB MATERIALS SAMPLING & TESTING PERFORMANCE CHECKLIST Release Date: January 7, 2014 Sampling Coarse Aggregate PERFORMANCE CHECKLIST AASHTO T-2 Sampling of Aggregates Sampling From A Stockpile 1 When

More information

SOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM

SOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM 18 th Southeast Asian Geotechnical & Inaugural AGSSEA Conference 29-31 May 213, Singapore Leung, Goh & Shen (eds) SOIL IMPROVEMENT BY VACUUM PRELOADING FOR A POWER PLANT PROJECT IN VIETNAM GOUW TJIE-LIONG

More information

Notice of Intent to Close Inactive CCR Surface Impoundments

Notice of Intent to Close Inactive CCR Surface Impoundments Notice of Intent to Close Inactive CCR Surface Impoundments Virginia Electric and Power Company Possum Point Power Station Coal Combustion Residual Surface Impoundments A, B, C, D, and E Dumfries, Virginia

More information

Cubzac-les-Ponts Experimental Embankments on Soft Clay

Cubzac-les-Ponts Experimental Embankments on Soft Clay Cubzac-les-Ponts Experimental Embankments on Soft Clay GEO-SLOPE International Ltd. www.geo-slope.com 1, 7 - th Ave SW, Calgary, AB, Canada TP T Main: +1 3 9 Fax: +1 3 39 Introduction In the 197 s, a series

More information

Fly Ash Utilisation in Odisha

Fly Ash Utilisation in Odisha Fly Ash Utilisation in Odisha Fly Ash Utilisation Conference, Delhi 15 th, March, 2018 Dr. D.K. Behera Sr. Env. Scientist State Pollution Control Board, Odisha Bhubaneswar Setting up of Fly Ash Resource

More information

Hydrological Condition Report including the issues of High Flow Fluctuation in Chiang Saen

Hydrological Condition Report including the issues of High Flow Fluctuation in Chiang Saen Hydrological Condition Report including the issues of High Flow Fluctuation in Chiang Saen Technical Symposium for ESCIR and MRC on Social Impact Assessment in River Basin Management Sothea KHEM, HENG

More information

Exercise (3): Open Channel Flow Rapidly Varied Flow

Exercise (3): Open Channel Flow Rapidly Varied Flow Exercise (3): Open Channel Flow Rapidly Varied Flow 1) A hydraulic jump exists in a trapezoidal channel having a bed width of 7 m and side slope of 1:1. The flowing discharge is 25 m 3 /sec. Construct

More information

SHEAR PERFORMANCE OF RC FOOTING BEAMS BY CAP-TIE SYSTEM USING WELDED STIRRUPS

SHEAR PERFORMANCE OF RC FOOTING BEAMS BY CAP-TIE SYSTEM USING WELDED STIRRUPS The 7th International Conference of Asian Concrete Federation SUSTAINABLE CONCRETE FOR NOW AND THE FUTURE 3 Oct 2 Nov, 216, Hanoi, Vietnam www.acf216.vn SHEAR PERFORMANCE OF RC FOOTING BEAMS BY CAP-TIE

More information

Global Containerboard Outlook

Global Containerboard Outlook Global Containerboard Outlook European Conference March 2018 Gleb Sinavskis Economist, European Paper Packaging Copyright 2018 RISI, Inc. Proprietary Information Gleb Sinavskis Economist, European Paper

More information

Dams as Systems. Pat Regan Federal Energy Regulatory Commission (FERC)

Dams as Systems. Pat Regan Federal Energy Regulatory Commission (FERC) Dams as Systems Pat Regan Federal Energy Regulatory Commission (FERC) FERC >2,500 jurisdictional dams 770 feet to 0.5 feet high Five Regions Atlanta, Chicago, New York, Portland, San Francisco ~120 staff

More information

AMEC010570_0001. Via . Mt. Polley Mine Tailings Facility Optimization Potential- Follow Up from Dam Safety Review 1.

AMEC010570_0001. Via  . Mt. Polley Mine Tailings Facility Optimization Potential- Follow Up from Dam Safety Review 1. { TIME\@ "d MMMM yyyy" } AMEC Project Number VM00448 Via EMAIL Imperial Metals Corporation 200-580 Hornby Street Vancouver, B.C. V6C 3B6 Attention: Mr. Ron Martel Environmental Superintendent Reference:

More information

Development of TEU Type Mega Container Carrier

Development of TEU Type Mega Container Carrier Development of 8 700 TEU Type Mega Container Carrier SAKAGUCHI Katsunori : P. E. Jp, Manager, Ship & Offshore Basic Design Department, IHI Marine United Inc. TOYODA Masanobu : P. E, Jp, Ship & Offshore

More information

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT

PRELIMINARY RISK ASSESSMENT RIDM PROJECT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT PRELIMINARY RISK ASSESSMENT FOR A DAM WITH A VEGETATION- LINED SPILLWAY AND FERC PILOT RIDM PROJECT MAY 3, 2018 DAVID S. BOWLES AND LOREN R. ANDERSON RAC ENGINEERS AND ECONOMISTS, LLC AND UTAH STATE UNIVERSITY

More information

Civil Application Solutions

Civil Application Solutions Civil Application Solutions Features - Chiseled Cutting Edges - Increased Surface Area - Lateral Direction Guide Ribs Benefits - Faster Installation and Penetrates Harder Soils - Quicker Loading, Stronger

More information

Justification for Rainbow Trout stocking reduction in Lake Taneycomo. Shane Bush Fisheries Management Biologist Missouri Department of Conservation

Justification for Rainbow Trout stocking reduction in Lake Taneycomo. Shane Bush Fisheries Management Biologist Missouri Department of Conservation Justification for Rainbow Trout stocking reduction in Lake Taneycomo Shane Bush Fisheries Management Biologist Missouri Department of Conservation December 14, 2017 Lake Taneycomo was formed by the construction

More information

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR PROJECT OVERVIEW PROJECT AREA FISH AND AQUATIC HABITAT COLLABORATIVE EFFORT (FAHCE) Fish Habitat Restoration Plan Project Area PROJECT OVERVIEW DOCUMENTS A Settlement Agreement Regarding Water Rights of

More information

EFFECT OF FLY ASH GRADATION ON WORKABILITY, STRENGTH AND DURABILITY OF PORTLAND CEMENT FLY ASH MORTARS

EFFECT OF FLY ASH GRADATION ON WORKABILITY, STRENGTH AND DURABILITY OF PORTLAND CEMENT FLY ASH MORTARS EFFECT OF FLY ASH GRADATION ON WORKABILITY, STRENGTH AND DURABILITY OF PORTLAND CEMENT FLY ASH MORTARS Xian P. Liu, Pei M. Wang and Jie Sun Key Laboratory of Advanced Civil Engineering Materials (Tongji

More information

INTERNATIONAL SKATING UNION

INTERNATIONAL SKATING UNION INTERNATIONAL SKATING UNION Communication No. 2128 SHORT TRACK SPEED SKATING PADDING MEASURES TO INCREASE SAFETY FOR SKATERS (This Communication will replace ISU Communication No. 1726, as of June 1, 2018)

More information

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy OTC-24699-MS Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy Copyright 2014, Offshore Technology Conference This paper was prepared for presentation

More information

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application HEC 26 Aquatic Organism Passage Design Manual Evolution & Application Sven Leon, P.E., Hydraulics Engineer Federal Highway Administration 2015 Alaska Fish Passage Meeting October 13 14, 2015 VTRC, Juneau,

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2019 LIBERTY UTILITIES Empire District Prepared by: Rachel

More information

WYDOT CONCRETE MIX DESIGN PROCEDURE

WYDOT CONCRETE MIX DESIGN PROCEDURE WYDOT CONCRETE MIX DESIGN PROCEDURE Scope: This procedure documents the requirements for obtaining a concrete mix design or referencing an approved mix design from the WYDOT Materials Program, and the

More information

Annex E Bridge Pier Protection Plan

Annex E Bridge Pier Protection Plan Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central

More information

Coquitlam/Buntzen Project Water Use Plan

Coquitlam/Buntzen Project Water Use Plan Coquitlam/Buntzen Project Water Use Plan Temperature Monitoring Lower Coquitlam River Project Year 3 Report Reference: COQMON#6 Study Period: March 2008 April 2009 Report Date: April 2009 Trow Associates

More information

Thermal Profiling the Reflow Process

Thermal Profiling the Reflow Process Thermal Profiling the Reflow Process The Nomadics TCProfile system is a cost-effective instrument to measure the temperature characteristics of any process where the thermal profile is important to the

More information

GUIDANCE FOR THE CREATION OF ARTIFICIAL SETTS

GUIDANCE FOR THE CREATION OF ARTIFICIAL SETTS GUIDANCE FOR THE CREATION OF ARTIFICIAL SETTS INTRODUCTION The flow diagram of the badger Policy Guidance Note describes the circumstances under which it may be necessary to construct an artificial badger

More information

Understanding the Impacts of Culvert Performance on Stream Health

Understanding the Impacts of Culvert Performance on Stream Health Understanding the Impacts of Culvert Performance on Stream Health Kristin Thomas Aquatic Ecologist Michigan Trout Unlimited Transportation and the Environment Conference 12/5/2018 Importance of adequately

More information

COST EFFECTIVE STRUCTURAL FORMS FOR SWIMMING POOLS

COST EFFECTIVE STRUCTURAL FORMS FOR SWIMMING POOLS COST EFFECTIVE STRUCTURAL FORMS FOR SWIMMING POOLS Technical paper that was awarded the second place at the "Water Related Infrastructure" competition 2000/2001 Sponsored by St. Anthony's Industries Group

More information

IBRACON CONCREBOL 2014

IBRACON CONCREBOL 2014 1/10 IBRACON CONCREBOL 2014 1 OBJECTIVE 1.1 This contest intends to test the competitors ability to develop construction methods and the production of lightweight homogeneous concrete with optimized strength

More information

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION STRUCTURE S-65 This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated, vertical lift gates, and a reinforced concrete lock structure with two pairs of

More information

australian cement industry Statistics 2012

australian cement industry Statistics 2012 australian cement industry Statistics 2012 2 introduction In 2012 the Australian cement industry recorded a turnover of A$2.15 billion and directly employed over 1700 people, many of whom are based in

More information

PRO-ROD TM COILED ROD. Reduce Maintenance Increase Production Enhance Profit

PRO-ROD TM COILED ROD. Reduce Maintenance Increase Production Enhance Profit PRO-ROD TM COILED ROD Reduce Maintenance Increase Production Enhance Profit DOVER ARTIFICIAL LIFT Elevating the Potential of Artificial Lift Production. Dover Artificial Lift, part of Dover Energy, offers

More information