1 Sheshalik Kotzebue N W Baldwin Peninsula Hotham Inlet Project Location Chukchi Sea Russia Kotzebue Barrow Alaska Prudhoe Bay N W Bering Sea Nome Fairbanks Eagle Tok McGrath Glennallen Anchorage Valdez Bethel Cordova Kenai Seward Homer Dillingham Kodiak Gulf of Alaska Canada 1 in = 5 Cold Bay Location: Kateel River Meridian T17N, R18W Section 21, 26, 27, 28, 35, 36 T16N, R18W Section 2, 11, 12, 13 T16N, R17W Section 18, 19, 30, 31 T15N, R17W Section 6 Place Name Project Location Kotzebue DOT & PF Stream River Waterbody Vicinity Construction Project Waterway: Proposed Activity: Wetland fill for roadway Sheet 1 of 43

2 SUMMARY OF PROPOSED IMPACTS TO WETLANDS AND WATERS OF THE U.S. Duration Permanent SUMMARY OF PROJECT IMPACTS Disturbance Wetlands Below OHW Area (Acres) Fill (yd 3 ) Area (Acres) Fill (yd 3 ) way / Embankment , ,000 Culverts Culvert Riprap Bridge Riprap Bridge Piers N/A N/A Permanent Impact Total , ,113 Work Zone N/A N/A Temporary All Vegetative Buffer N/A N/A Bridge Work Zone 0.29 N/A N/A Temporary Impact Total TOTAL , ,113 Air Force %2 Sadie Creek Bridge Kotzebue Kotzebue DOT & PF Impact Summary Construction Project Waterway: Sheet 2 of 43

3 24' way C L Finished Grade Orginal Ground Varies* " 3% 3% " Crushed Aggregate Surface Course Embankment Material Existing Ground 1 Marker (TYP) Typical Section Not to Scale 0 1,200 2,400 feet Approximate Station for Existing Fill Kotzebue Cape Blossom Air Force DOT & PF Reconstruction Detail Construction Project Waterway: Sheet 3 of 43

4 300' ROW 24' way C L Orginal Ground " Varies* 3% 3% Geotextile Separation Finished Grade " Crushed Aggregate Surface Course Embankment Material 1 Marker (TYP) * Embankment height will vary, averaging 8 feet. Embankment height may vary in areas of potential snow drifting or in areas where there is concern of thawing underlying permafrost. Ted Stevens Way Air Force Station KotzebueCape Blossom m iles DOT&PF W in dm ill Construction Detail STATEOFALASKA Departm en toftran sportation an dpublicfacilities 2301Peger Rd.Fairban ks,ak99709 KotzebuetoCapeBlossom Con struction Project Waterway: KotzebueSoun d Proposed Activity: W etlan dfill for roadw ay Jun e2017 Sheet4of43

5 25' 25' INLET APRON EMBANKMENT TOE ROAD SHOULDER 2D CULVERT PIPE ROAD SHOULDER EMBANKMENT TOE OUTLET APRON 3 D INLET D OUTLET 50' B B' 2D 50' 3 D TYPICAL CULVERT APRON DETAIL NOT TO SCALE 25' 25' 3 D 24' 3 D C L INLET D OUTLET INLET APRON 2' THICK RIPRAP EXISTING GROUND CULVERT PIPE CULVERT BEDDING INSULATION BOARD OUTLET APRON 2' THICK RIPRAP SECTION B-B' NOT TO SCALE Air Force "6 36'' Culvert Kotzebue DOT & PF Culvert Detail Construction Project Waterway: Sheet 5 of 43

6 BEGIN BRIDGE 240'-0" END BRIDGE %%130 Pier 2 %%130 Pier 3 2'-0" 72'-0" 92'-0" 72'-0" 2'-0" Approx. finished groundline at right edge of bridge Datum Elev Riprap, %%130 Brg. Abut. 1 %%130 Brg. Abut. 4 úûúûúûúûúûúû úûúûúûúûúûúûúû úûúûúû úûúûúûúûúûúûúû úûúûúûúûúûúû úúûúûúûúû úûúûúû E F D.H.W. Elev. XX.XX F E Transition Rail, Approx. existing groundline at at %%130 Approx. O.H.W. Approx. O.H.W. 2:1 Toe of Fill, Top of Fill, To Kotzebue BEGIN BRIDGE Sta Elev SADIE CREEK 1 END BRIDGE Sta Elev S29 55'28.6"E 2:1 %%130 To Top of Fill, Toe of Fill, Ted Stevens Way Air Force Bridge Detail Construction Project %2 Sadie Creek Bridge Station Kotzebue DOT & PF Waterway: Sheet 6 of 43

7 Ro ad Ai r F or ce T ed S tev en sw a y A ir Fo rc e R oa d N W Air Force Baldwin Peninsula %2 Sadie Creek Bridge Sheshalik Kotzebue Project Location Noata kriver 1 in = 1.5 Cape Blossom Hotham Inlet Squ Olikatuk irrel River R iley Cha nnel l Chann e Melvin Eschscholtz Bay Elephant Point l Cha nne Noorvik Nazuruk C han nel Baldwin Peninsula Kobuk Rive r Selawik Lake Place Name Project Location Page Index Waterbody N W DOT & PF Kotzebue Cape Blossom Stream River Plan View Construction Project Waterway: Sheet 7 of 43

Miles PROJECT LOCATION EOP, MP STATION BOP, MP 379 STATION

Miles PROJECT LOCATION EOP, MP STATION BOP, MP 379 STATION K avik River Barrow Prudhoe Bay Kotzebue Nome Fairbanks Eagle Tok McGrath Glennallen Bethel Valdez Kenai Dillingham Homer Seward Kodiak Cold Bay Unalaska PROJECT LOCATION Haines Juneau Sitka Ketchikan

More information

PROJECT LOCATION & VICINITY MAP PROJECT LOCATION RAINBOW INDIAN BOP: MP LAT LONG

PROJECT LOCATION & VICINITY MAP PROJECT LOCATION RAINBOW INDIAN BOP: MP LAT LONG ARCTIC OCEAN BARROW KOTZEBUE SOUND KOTZEBUE ALASKA CANADA BERING SEA YUKON RIVER FAIRBANKS BETHEL ANCHORAGE KENAI HAINES PROJECT LOCATION JUNEAU PACIFIC OCEAN KODIAK GULF OF ALASKA McHugh Creek SEWARD

More information

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii. Pacific Ocean Division Navigation Program Overview Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii David Lau Pacific Ocean Division Chief, Civil Works Integration Division January

More information

The Coast Guard has 145 Years of Arctic Service UNCLASSIFIED

The Coast Guard has 145 Years of Arctic Service UNCLASSIFIED The Coast Guard has 145 Years of Arctic Service 1 Operational Challenges Maritime Boundary Line Nome Barrow Great Distances Kodiak-Barrow = 825 NM Dutch Harbor - Barrow = 1167 NM Barrow-North Pole= 1,140

More information

1 HAT and MLLW are referenced to the station datum for each NOAA tide station.

1 HAT and MLLW are referenced to the station datum for each NOAA tide station. TIDAL DATA All data was rounded to the nearest 0.1 foot Location HAT 1 MLLW 1 HTL 2 MHW 2 Vicinity Adak Island 8.6 3.0 5.6 3.5 Anchorage 40.9 6.3 34.7 28.4 Atka 31.8 27.0 4.9 3.2 Barter Island 2.8 2.1

More information

Bering Sea Salmon Bycatch Update North Pacific Fishery Management Council, July 2017

Bering Sea Salmon Bycatch Update North Pacific Fishery Management Council, July 2017 Bering Sea Salmon Bycatch Update North Pacific Fishery Management Council, July 2017 Salmon are caught incidentally in the Bering Sea and Aleutian Islands (BSAI) offshore trawl fisheries, especially in

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

NWP Page 1 Enclosure 1

NWP Page 1 Enclosure 1 Salem-Albany No. 1 Transmission Line Photomaps Sensitive Areas Salem 1 #* 2 3 4 A-Sheet 1 ") Planned Transmission Tower!( BPA Transmission Tower!! BPA Access Road Tract BPA Right-of-Way Corridor County

More information

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering REVETMENTS Ijsseldam, the Netherlands Orson P. Smith, PE, Ph.D. Instructor Purposes and Operational Constraints Purposes Erosion control o o Embankment Toe protection for a seawall, retaining wall or other

More information

Initial Project Assessment DRAFT Technical Memorandum

Initial Project Assessment DRAFT Technical Memorandum Initial Project Assessment DRAFT Technical Memorandum Anchorage Metropolitan Planning Area Prepared for: AMATS/MOA 4700 Elmore Road Anchorage, Alaska 99507 and PTS, Inc. 912 E 15th Avenue, Suite 200 Anchorage,

More information

Kotzebue Harbor Feasibility Study Navigation Improvements at Cape Blossom Kotzebue, Alaska. Appendix G: Correspondence

Kotzebue Harbor Feasibility Study Navigation Improvements at Cape Blossom Kotzebue, Alaska. Appendix G: Correspondence Kotzebue Harbor Feasibility Study Navigation Improvements at Cape Blossom Kotzebue, Alaska Appendix G: Correspondence JOINT BASE ELMENDORF-RICHARDSON, ALASKA 99506-0898 Ms. Judith Bittner State Historic

More information

City of Palmer Action Memorandum No

City of Palmer Action Memorandum No City of Palmer Action Memorandum No. 18-072 Subject: Authorizing the City Manager to Negotiate and Enter into a Contract with Bering Marine Corporation for the Purchase and Delivery of 100 Tons of Road

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7635 CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY JUNE 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

Information for File # SEW

Information for File # SEW Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street

More information

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012

Bridge Design Preliminary Bridge Design Example 1 / 6 Spring 2012 updated 1/27/2012 Bridge Design Preliminary Bridge Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile

More information

PEBBLE PROJECT ENVIRONMENTAL BASELINE DOCUMENT 2004 through CHAPTER 48. POWER Cook Inlet Drainages

PEBBLE PROJECT ENVIRONMENTAL BASELINE DOCUMENT 2004 through CHAPTER 48. POWER Cook Inlet Drainages PEBBLE PROJECT ENVIRONMENTAL BASELINE DOCUMENT 2004 through 2008 CHAPTER 48. POWER Cook Inlet Drainages PREPARED BY: KEVIN WARING & ASSOCIATES POWER COOK INLET DRAINAGES TABLE OF CONTENTS TABLE OF CONTENTS...

More information

PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California

PENNDRAIN.rep. HEC-RAS Version May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California HEC-RAS Version 3.1.3 May 2005 U.S. Army Corp of Engineers Hydrologic Engineering Center 609 Second Street Davis, California X X XXXXXX XXXX XXXX XX XXXX X X X X X X X X X X X X X X X X X X X XXXXXXX XXXX

More information

CE 535, Spring 2002 Preliminary Design Example 1 / 6

CE 535, Spring 2002 Preliminary Design Example 1 / 6 CE 535, Spring 2002 Preliminary Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile

More information

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection

Earthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection TOPIC: COMMON PROBLEMS FOR SMALL DAMS WITH CONCRETE CHANNEL SPILLWAYS The State Dam Safety Program has inspection requirements for state regulated dams. A dam, like any man-made structure, will change

More information

Great Lakes Stream Crossing Inventory Instructions

Great Lakes Stream Crossing Inventory Instructions Great Lakes Stream Crossing Inventory Instructions This document is a guide to completing the Stream Crossing Data Sheet (2/28/11 version). Careful attention to this guidance will ensure consistent crossing

More information

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00) General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS

More information

Culvert Safety Inspection Report

Culvert Safety Inspection Report Culvert Safety Inspection Report Facility Federal Structure ID Inspector Name Agency/Consultant Inspection Date LEGEND Haggerty Rd (South) N/A RL/JF GLEG 1/26/2016 9 New Feature Latitude Longitude Struc

More information

Kodiak, Alaska Site 1 Wind Resource Report

Kodiak, Alaska Site 1 Wind Resource Report Kodiak, Alaska Site 1 Wind Resource Report Report written by: Douglas Vaught, P.E., V3 Energy LLC, Eagle River, AK Date of report: March 16, 2007 Photo by Doug Vaught, V3 Energy LLC Summary Information

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 07542 CSAH NO. 9 OVER THE BLUE EARTH RIVER DISTRICT 7 - BLUE EARTH COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58506 CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

The Emerging Arctic. A New Maritime Frontier

The Emerging Arctic. A New Maritime Frontier The Emerging Arctic A New Maritime Frontier Agenda Changes in the Arctic Coast Guard in the Arctic Coast Guard Missions Arctic Operations Summer 2008 Summer Sea Ice Retreat Barrow Boundary Claims 1) North

More information

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan Assessment of Baseline Geomorphic Features at Proposed Stream Crossings On The Proposed County Road 595 Marquette County, Michigan Prepared for: Kennecott Eagle Minerals Company Marquette, Michigan Prepared

More information

Tips for Using & Printing Spreadsheets

Tips for Using & Printing Spreadsheets Key to Spreadsheets Spreadsheet # Type Description/Purpose a Development & Construction in Waterways b Debits Development & Construction in Other Aquatic Areas c Indirect Impacts to Waterways from Development

More information

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

BARRIER OFFSET 0 A 6 6 A 12 12 A 26 A 26 3A OR 4A L OR S * ** L OR S L OR S ACCEPTABLE (TCB) TYPES AND ANCHORING DETAILS BASED ON UNDERLYING SURFACE TYPE AND BARRIER OFFSET FROM DROP-OFF BARRIER OFFSET UNDERLYING SURFACE 0" A 6" 6" A 12" 12" A 26" A 26" TCB TYPE DETAIL TCB TYPE

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7149 CSAH NO. 101 OVER THE MINNESOTA RIVER DISTRICT 8 - REDWOOD COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC.

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

SNOW SURVEY SCHEDULE Speel River X X X X. *No site visit scheduled for Long Lake in winter unless repairs needed.

SNOW SURVEY SCHEDULE Speel River X X X X. *No site visit scheduled for Long Lake in winter unless repairs needed. Alaska Electric Light and Power Juneau, Alaska SNOW COURSE MAR 1 APR 1 MAY 1 JUN 1 Speel River X X X X *No site visit scheduled for Long Lake in winter unless repairs needed. Copper Valley Electric Association

More information

Project Completion Abstract Fish Passage Activity ( Engineering Activities)

Project Completion Abstract Fish Passage Activity ( Engineering Activities) Project Completion Abstract Fish Passage Activity ( Engineering Activities) SUBMIT COMPLETED FORM TO DISTRICT MANAGER AND FIA ADMINISTRATOR AFTER PROJECT COMPLETION SECTION A GENERAL INFORMATION Recipient:

More information

Non-Motorized Overpass at SR 5/US1

Non-Motorized Overpass at SR 5/US1 Non-Motorized Overpass at SR 5/US1 And SR 97/SW th Street (Bird Road) Executive Summary March 9, 17 Prepared By: MARLIN Engineering Inc 17 NW th Avenue, Ste. 1 Plantation, FL 33313 P: 35.77.7575 www.marlinengineering.com

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58551 CSAH NO. 41 OVER THE KETTLE RIVER DISTRICT 1 PINE COUNTY JULY 28, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

NANA Regional Corporation Hydrocarbon Exploration Efforts November 20, Lance Miller, Ph.D. VP Natural Resources

NANA Regional Corporation Hydrocarbon Exploration Efforts November 20, Lance Miller, Ph.D. VP Natural Resources NANA Regional Corporation Hydrocarbon Exploration Efforts November 20, 2015 Lance Miller, Ph.D. VP Natural Resources Alaska Kotzebue Basin Hydrocarbon Potential NANA Regional Corporation Kotzebue Basin,

More information

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM VWP CONSTRUCTION INSPECTION REPORT Inspection Date: August 22, 2016 VWP Permit No. 15-1268 SPGP RO Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM Impacts: PFO PEM PSS POW

More information

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011 OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 13 CULVERTS APRIL 2011 APRIL 2011 Chapter 13 Culverts Table of Contents Foreword.3 13.1 Introduction.. 4 13.2 Policy 6 13.3 Passage

More information

Rabbit Creek Community Council

Rabbit Creek Community Council Rabbit Creek Community Council P.O. Box 112354, Anchorage, AK 99511-2354 Page 1 To: Troy Swanson, Office of the Mayor Christine Chesnut, OMB Budget Analyst Gary Jones, Public Works Dear Staff, May 31,

More information

Stephens Creek Culvert Replacement. CAC April 28, 2010

Stephens Creek Culvert Replacement. CAC April 28, 2010 Stephens Creek Culvert Replacement CAC April 28, 2010 1 Top of Bank Willamette Moorage Park Existing Culverts 50 ft Greenway Setback 200 ft Greenway Setback Existing Macadam Bay Access Stephens Creek Existing

More information

3.7 River Navigation Affected Environment

3.7 River Navigation Affected Environment 3 Affected Environment and Environmental Consequences 3.7 River Navigation 3.7.1 Affected Environment Sterling Highway MP 45 60 Project Final EIS The Kenai River is approximately 82 river miles long in

More information

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00) General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND

More information

Bridge Failures in Alberta

Bridge Failures in Alberta Introduction Bridge Failures in Alberta Bridges are inspected for three primary reasons safety of bridge system maintenance of bridges management of bridge system Inventory or management of the system

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB)

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO B WABASHA STREET SOUTH BOUND (MASA 235 SB) UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 62555B WABASHA STREET SOUTH BOUND (MASA 235 SB) OVER THE MISSISSIPPI RIVER CITY OF ST. PAUL OCTOBER 31, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Lynnwood Link Extension. Shoreline & Seattle Open House

Lynnwood Link Extension. Shoreline & Seattle Open House Lynnwood Link Extension Shoreline & Seattle Open House Presentation Overview Introductions Project description and schedule Construction preview Station design & updates Permits Open house guide Current

More information

Union Pacific Railroad

Union Pacific Railroad Input Questions: 404/401 Pre Application Meeting, December 18, 2013, Portland, Oregon 1. What is the project purpose and need? The purpose of the project is to improve the efficiency and average velocity

More information

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS INSTRUMENT APPROACH PROCEDURE CHARTS IFR ALTERNATE AIRPORT MINIMUMS

NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS INSTRUMENT APPROACH PROCEDURE CHARTS IFR ALTERNATE AIRPORT MINIMUMS M1 INSTRUMENT APPROACH PROCEDURE CHARTS IFR ALTERNATE AIRPORT MINIMUMS Standard alternate minimums for non-precision approaches and approaches with vertical guidance [NDB, VOR, LOC, TACAN, LDA, SDF, VOR/DME,

More information

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD 4-3-21-4 W5M and 1-4-21-4 W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between

More information

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low

More information

SNOW SURVEY SCHEDULE Speel River X X X X. *No site visit scheduled for Long Lake in winter unless repairs needed.

SNOW SURVEY SCHEDULE Speel River X X X X. *No site visit scheduled for Long Lake in winter unless repairs needed. Alaska Electric Light and Power Juneau, Alaska SNOW COURSE MAR 1 APR 1 MAY 1 JUN 1 Speel River *No site visit scheduled for Long Lake in winter unless repairs needed. Copper Valley Electric Association

More information

NAVIGABLE WATERS OF THE UNITED STATES WITHIN THE SEVENTEENTH COAST GUARD DISTRICT

NAVIGABLE WATERS OF THE UNITED STATES WITHIN THE SEVENTEENTH COAST GUARD DISTRICT The Coast Guard makes navigability determinations regarding specific waterways or portions of waterways in order to determine its jurisdiction on those waterways. These navigability determinations are

More information

Chum Salmon and Maintaining a Healthy Habitat in the Hotham Inlet Estuary. Margy Norton, Ember Eck, Meryl Ferguson, Qaulluq Henry, Chris Foster

Chum Salmon and Maintaining a Healthy Habitat in the Hotham Inlet Estuary. Margy Norton, Ember Eck, Meryl Ferguson, Qaulluq Henry, Chris Foster Chum Salmon and Maintaining a Healthy Habitat in the Hotham Inlet Estuary Margy Norton, Ember Eck, Meryl Ferguson, Qaulluq Henry, Chris Foster The Kobuk Lakers Kotzebue Middle/High School P.O. Box 264

More information

Draw a picture of a water source. Don t forget to include yourself in the picture!

Draw a picture of a water source. Don t forget to include yourself in the picture! Name Date Draw a picture of a water source. Don t forget to include yourself in the picture! My water source is Students describe the characteristics of a water source: stream, river, lake, pond, ocean,

More information

DATE: October 20, Planning Commission. Beth McKibben, Planner Community Development Department FILE NO.: CSP

DATE: October 20, Planning Commission. Beth McKibben, Planner Community Development Department FILE NO.: CSP DATE: October 20, 2014 TO: FROM: Planning Commission Beth McKibben, Planner Community Development Department FILE NO.: CSP2014 0017 PROPOSAL: Local consistency review of DOT&PF project to remove and replace

More information

GENERAL LEGEND 12"CMP

GENERAL LEGEND 12CMP PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (13-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS Trench Backfill Utility Trench Paving Backfill and Embedment TB 1 HDPE, SRHDPE & PVC Storm Drain Pipe Only (Nonrigid) Bedding and Backfill TB2 Deep Cut

More information

Hospital Link Project Project Update November 2017

Hospital Link Project Project Update November 2017 Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8

Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Seventeenth Statewide Conference on Local Bridges Culvert Design An Overview of the NYS Highway Design Manual Chapter 8 Tuesday, October 25, 2011 Training Session: Culvert Design, Analysis - talk 2 Presented

More information

ST. MARY S COUNTY DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION MANUAL OF DESIGN AND CONSTRUCTION STANDARDS TABLE OF CONTENTS

ST. MARY S COUNTY DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION MANUAL OF DESIGN AND CONSTRUCTION STANDARDS TABLE OF CONTENTS ST. MARY S COUNTY DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION MANUAL OF DESIGN AND CONSTRUCTION STANDARDS TABLE OF CONTENTS STANDARD NUMBER TITLE R/1-R/5..... RURAL PUBLIC ROAD I....RURAL PUBLIC ROAD

More information

SECTION VII ROADWAY AND SITE IMPROVEMENTS

SECTION VII ROADWAY AND SITE IMPROVEMENTS SECTION VII ROADWAY AND SITE IMPROVEMENTS TOC-VII.1 of 4 TABLE OF CONTENTS ROADWAY AND SITE IMPROVEMENTS No. Title I-1 Alley Intersection (Commercial Areas) I-2 Valley Gutter For 90 Intersection I-3 Typical

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

Information for File # MVP LSP

Information for File # MVP LSP Information for File # MVP- 218-2671-LSP Applicant: Pennington County Highway Department Corps Contact: Lawrence Puchalski Address: 4111 Technology Drive W, Suite 295, Bemidji, Minnesota 5661 E-Mail: Lawrence.S.Puchalski@usace.army.mil

More information

2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 52 over CALDWELL BROOK. Date of Inspection: Equipment Used: 06/04/2016. County Highway Agency

2016 UNDERWATER BRIDGE INSPECTION REPORT. CR 52 over CALDWELL BROOK. Date of Inspection: Equipment Used: 06/04/2016. County Highway Agency 2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 91725 CR 52 over CALDWELL BROOK DISTRICT: District 1 COUNTY: Koochiching CITY/TOWNSHIP: T - 151 R - 27 STATE: Minnesota Date of Inspection: Equipment Used:

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 133 OVER A DITCH ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7780 CSAH 133 OVER A DITCH ST. LOUIS COUNTY SEPTEMBER 27, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration. HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application HEC 26 Aquatic Organism Passage Design Manual Evolution & Application Sven Leon, P.E., Hydraulics Engineer Federal Highway Administration 2015 Alaska Fish Passage Meeting October 13 14, 2015 VTRC, Juneau,

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY OCTOBER 22, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

2016 UNDERWATER BRIDGE INSPECTION REPORT. 81(ENCHANTED LANE) over CHANNEL. Date of Inspection: Equipment Used: 09/07/2016

2016 UNDERWATER BRIDGE INSPECTION REPORT. 81(ENCHANTED LANE) over CHANNEL. Date of Inspection: Equipment Used: 09/07/2016 2016 UNDERWATER BRIDGE INSPECTION REPORT BRIDGE # 27A34 81(ENCHANTED LANE) over CHANNEL DISTRICT: Metro COUNTY: Hennepin CITY/TOWNSHIP: Shorewood STATE: Minnesota Date of Inspection: Equipment Used: 09/07/2016

More information

Simulating Streams Through Culverts in Mat-Su, Alaska

Simulating Streams Through Culverts in Mat-Su, Alaska Simulating Streams Through Culverts in Mat-Su, Alaska Project Managers Bill Rice, P.E., USFWS Hydrologist Mary Price, USFWS Fishery Biologist The Team Approach US Fish and Wildlife Service Bill Rice, P.E.,

More information

Fish Passage Planning and Design

Fish Passage Planning and Design Fish Passage Planning and Design Culvert Fishway Planning and Design Guidelines Part I Design Drawings for Fishway Projects Ross Kapitzke James Cook University School of Engineering and Physical Sciences

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

Alaska s Economy: Then and Now

Alaska s Economy: Then and Now Alaska s Economy: Then and Now, PhD Institute of Social and Economic Research University of Alaska Anchorage 10/11/2017 Outline General Overview 1 General Overview Alaska s Economy and Demographics:Then

More information

Thought the number of households in their community that met their harvest needs were: Between 26-50% Survey Results 2017

Thought the number of households in their community that met their harvest needs were: Between 26-50% Survey Results 2017 People who filled out this survey: Participated in harvest activities: More than the average household About the same as other households Less than other households Not sure Ranked these 10 factors as

More information

Existing conditions of each bridge and repair plan are presented in Table

Existing conditions of each bridge and repair plan are presented in Table 2.2.2.5 Drainage Structure (1) Bridge Along the concerned section of this project road, there are 4 constructed bridges. The carriageway widths of existing bridges are designed to fit with existing road

More information

DRAFT EIS - CONCEPTUAL DESIGN I-5 ALTERNATIVE APRIL 2015 SHEET KEY

DRAFT EIS - CONCEPTUAL DESIGN I-5 ALTERNATIVE APRIL 2015 SHEET KEY SHEET KEY 99 SOUND TRANSIT FEDERAL WAY LINK EXTENSION Sheet No. Drawing No. Sheet Title 94 I5-A00-GX00 COVER SHEET 95 I5-A00-GX01 SHEET INDEX 96 I5-A00-GX02 SHEET INDEX KEYMAP 97 I5-A1-PP01 TRACK PLAN

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 02545 CR NO. 116 OVER THE RUM RIVER METRO DISTRICT - ANOKA COUNTY SEPTEMBER 9, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS

More information

WATER OBSTRUCTION AND ENCROACHMENT PERMIT

WATER OBSTRUCTION AND ENCROACHMENT PERMIT ," /.@ Permit No. E36-813 Commonwealth of Pennsylvania Department of Environmental Protection Southcentral Regional Office Watershed Management Program Permitting and Technical Services Section WATER OBSTRUCTION

More information

Osceola County Expressway Authority. Alternatives Public Meeting

Osceola County Expressway Authority. Alternatives Public Meeting Osceola County Expressway Authority Alternatives Public Meeting Alternatives Public Meeting Alternatives Public Meeting Wheelchair-Accessible Walkway this Way Wheelchair-Accessible Walkway this Way Contact

More information

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS Project Name: SAWS Water Job No.: CSJ No. (if applicable): Date: AWS Consultant: PROJECT INFORMATION N/A Yes No Joint Bid (COSA/TxDOT) N/A Yes

More information

Duke Street (Route 236) Over I Bridge Plan & Elevation

Duke Street (Route 236) Over I Bridge Plan & Elevation Duke Street (Route 236) Over I-395 - ridge Plan & Elevation ity of Alexandria Exist. sign structure supports on bridge fascia to be removed in 395 express lanes project Abutment A Sta. 102+03.02 E 41-1"

More information

Information for File #MVP MVM

Information for File #MVP MVM Information for File #MVP-2018-00168-MVM Applicant: City of Lino Lakes Corps Contact: Marissa Merriman Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: Marissa.V.Merriman@usace.army.mil

More information

Management Regulations for the

Management Regulations for the SUBSISTENCE Management Regulations for the HARVEST of FISH and SHELLFISH on Federal Public Lands and Waters in Alaska 2015 Student Art Contest Winner: Reilly M, 9, Ketchikan Effective 1 April 2015-31 March

More information

SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing

SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing REPORT To the Honorable Mayor and City Council From the City Manager October 1, 2018 SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing RECOMMENDATION

More information

Legend. Lower Swatara Township DAUPHIN COUNTY. 1 inch = 100 feet 02/2017. Fairview Township YORK COUNTY

Legend. Lower Swatara Township DAUPHIN COUNTY. 1 inch = 100 feet 02/2017. Fairview Township YORK COUNTY , Bore, HDD, Bore, HDD 3 33 3 YO-5 33 YO- 3 3 3 33 33 3 3 3 33 BB 3 Fairview Township YORK COUNTY 3 3 3 3 9 5 inch = feet Sheet of /7 Base Map; SPLP -, Roads from NRCS Geospatial Data Giveaway, -Year Floodplain

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Wildlife Introduction

Wildlife Introduction Wildlife Introduction The wildlife section of this chapter is divided into sections for various habitats and groups of species. Old growth, snags and downed wood, and riparian areas are unique habitats

More information

DRAFT EIS CONCEPTUAL DESIGN SR 99 ALTERNATIVE APRIL 2015 SHEET KEY

DRAFT EIS CONCEPTUAL DESIGN SR 99 ALTERNATIVE APRIL 2015 SHEET KEY DRAFT EIS CONCEPTUAL DESIGN SHEET KEY 99 Sheet No. Drawing No. Sheet Title KENT/DES MOINES HC CAMPUS STATION OPTION 50 SR99-F00-GX02 SHEET INDEX KEYMAP 1 SR99-A00-GX00 COVER SHEET 51 SR99-F1-PP03 TRACK

More information

Freshwater Fish Assessment

Freshwater Fish Assessment Alaska Department of Transportation & Public Facilities Seward Highway MP 7-9 6-7 Freshwater Fish Assessment March 14, 8 Prepared by HDR Alaska C Street, Suite 3 Anchorage, Alaska 993 Project Number: BR-BH-NH-OA3

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

American Railway Engineering and Maintenance of Way Association Letter Ballot. Draft

American Railway Engineering and Maintenance of Way Association Letter Ballot. Draft American Railway Engineering and Maintenance of Way Association Letter Ballot 1. Committee and Subcommittee: Committee 5 Track Subcommittee 9 Road Crossings 2. Letter Ballot Number: 05-17-16 3. Assignment:

More information

Wind Resource Assessment for NOME (ANVIL MOUNTAIN), ALASKA Date last modified: 5/22/06 Compiled by: Cliff Dolchok

Wind Resource Assessment for NOME (ANVIL MOUNTAIN), ALASKA Date last modified: 5/22/06 Compiled by: Cliff Dolchok 813 W. Northern Lights Blvd. Anchorage, AK 99503 Phone: 907-269-3000 Fax: 907-269-3044 www.akenergyauthority.org SITE SUMMARY Wind Resource Assessment for NOME (ANVIL MOUNTAIN), ALASKA Date last modified: