Information for File # MVP LSP

Size: px
Start display at page:

Download "Information for File # MVP LSP"

Transcription

1 Information for File # MVP LSP Applicant: Pennington County Highway Department Corps Contact: Lawrence Puchalski Address: 4111 Technology Drive W, Suite 295, Bemidji, Minnesota Lawrence.S.Puchalski@usace.army.mil Phone: Primary County: Pennington, Minnesota Section: 3 Township: 153 Range: 43W Information Complete On: 19 February 219 Posting Expires On: 1 April 219 Authorization Type: LOP-5-M (A) This application is being reviewed in accordance with the practices for documenting Corps jurisdiction under Sections 9 & 1 of the Rivers and Harbors Act of 1899 and Section 44 of the Clean Water Act identified in Regulatory Guidance Letter 8-2. Project State Aid Project umber: PROJECT DESCRIPTIO AD PURPOSE: Bridge construction, approach grading, intersection reconstruction, lighting and drainage improvements on CSAH 8 in the city of, Minnesota. The purpose of the project is to provide improved access for safe, economical, and practical movement of goods, services, emergency services, and development in the southern part of through intersection improvements at highway 32 and CSAH 17, a new bridge crossing over the Red Lake River, and a new road corridor along CSAH 8 from the red lake river east to CSAH 17. The proposed project will involve the construction of a new, three span bridge over the Red Lake River approximately 1.75 miles south of the city of Thief River Falls, Minnesota. The proposed project would relocate a portion of existing roadway on the west side of the Red Lake River and construct a new portion of roadway on the east side of the Red Lake River. The proposed project is shown on the attached plan sheets. AME, AREA AD TYPES OF WATERS (ICLUDIG WETLADS) SUBJECT TO LOSS: The entire project corridor was surveyed for the presence of wetlands. A total of 11 wetlands were mapped, most of which occur as wetlands within linear ditches along existing roads or within drainage ways. A small amount of rock rip rap fill will be placed within the bed of the Red Lake River, a Section 1 water. The consultant identified approximately 1.8 acres of wet-mesic prairie and shallow marsh type wetlands within road ditches and drainage ways that will be permanently filled and/or excavated for this project. Page 1 of 2

2 Approximately 1.28 acres of naturally occurring floodplain forest and shallow marsh wetlands will be permanently filled and/or excavated for bridge construction. Approximately.13 acres of rip rap will be installed below the ordinary high water mark of the Red Lake River. Approximately.35 acres of the bed of the Red Lake River will be excavated during bridge construction. ALTERATIVES COSIDERED: The applicant considered a no-build alternative and an alternative which would locate the crossing one mile south of the proposed project location. The no-build alternative would completely avoid wetland impacts, but would not meet the need to improve traffic flow and safety in the south end of. The projected wetland impacts for the southern alternative would be of a similar magnitude to the preferred alternative. A detailed traffic study suggested that this alternative would provide less benefit, both in terms of economics and feasibility, than the proposed location. COMPESATORY MITIGATIO: The applicant has proposed to utilize wetland bank credits through the state local road replacement program. Drawings See attached. Page 2 of 2

3 MVP LSP Page 1 of 7

4 MVP LSP Page 2 of 7

5 H:\\JB\3816 Pennington County Hwy\ PennCty ew Bridge and Corridor\CAD\Eng\Wetland Fill_Exc_recover.dwg-Layout1-1/29/219 11:45 AM-(dkayser) W WETLAD 2 FILL - SQ. FT./. AC. T T- X X X X WETLAD 1 FILL SQ. FT./.64 AC. WETLAD 3b FILL SQ. FT./.4 AC. T- WETLAD 3a FILL SQ. FT./.23 AC. WETLAD 4e FILL SQ. FT./.3 AC. WETLAD 4d FILL SQ. FT./.63 AC. CUT SQ. FT./.11 AC. T- X X X WETLAD 4a FILL SQ. FT./.79 AC. WETLAD 4b FILL SQ. FT./.1 AC. WETLAD 4f FILL SQ. FT./.25 AC. MVP LSP Page 3 of 7 Drawn by DJK WETLAD 4g FILL SQ. FT./.3 AC. X X X X X X X X X X X X APPROXIMATE WETLAD FILL APPROXIMATE WETLAD CUT WETLAD BOUDARY WETLAD 4c FILL SQ. FT./.9 AC. CUT SQ. FT./.5 AC. WETLAD IMPACTS PROJECT O of 5 X X X

6 H:\\JB\3816 Pennington County Hwy\ PennCty ew Bridge and Corridor\CAD\Eng\Wetland Fill_Exc_recover.dwg-Layout1 (2)-1/29/219 11:45 AM-(dkayser) T- T- X X WETLAD 4h FILL - SQ. FT./. AC. W T- X X X T- MVP LSP Page 4 of 7 WETLAD 5 FILL - SQ. FT./. AC. WETLAD 4i FILL - SQ. FT./. AC. APPROXIMATE WETLAD FILL APPROXIMATE WETLAD CUT WETLAD BOUDARY WETLAD 6 FILL - 57 SQ. FT./.13 AC. Drawn by DJK WETLAD IMPACTS PROJECT O of 5

7 MVP LSP Page 5 of 7 1 WETLAD 7 PUBLIC WATERS IMPACTS: FILL SQ. FT./.91 AC. CUT SQ. FT./.6 AC. WETLAD 7 TOTAL WETLAD IMPACTS: FILL SQ. FT./.878 AC. CUT SQ. FT./.137 AC. PUBLIC WATERS IMPACTS: FILL SQ. FT./.133 AC. (RIPRAP) CUT SQ. FT./.349 AC. T- TOTAL PUBLIC WATERS IMPACTS FILL - 97 SQ. FT./.224 AC. CUT SQ FT./.49 AC. APPROXIMATE WETLAD FILL APPROXIMATE WETLAD CUT WETLAD BOUDARY PUBLIC WATERS PUBLIC WATERS IMPACT AREA T H:\\JB\3816 Pennington County Hwy\ PennCty ew Bridge and Corridor\CAD\Eng\Wetland Fill_Exc_recover.dwg-Layout1 (3)-2/13/219 9:47 AM-(dkayser) WETLAD 8a FILL SQ. FT./.123 AC. Drawn by DJK WETLAD 8b FILL - 24 SQ. FT./.47 AC. T- WETLAD IMPACTS PROJECT O R T- 3 of 5

8 H:\\JB\3816 Pennington County Hwy\ PennCty ew Bridge and Corridor\CAD\Eng\Wetland Fill_Exc_recover.dwg-Layout1 (4)-1/29/219 11:45 AM-(dkayser) T- T MVP LSP Page 6 of 7 APPROXIMATE WETLAD FILL APPROXIMATE WETLAD CUT WETLAD BOUDARY WETLAD 8c FILL SQ. FT./.355 AC. CUT SQ. FT./.3 AC. WETLAD 8d FILL - SQ. FT./. AC. CUT SQ. FT./.17 AC. Drawn by DJK WETLAD 9 FILL SQ. FT./.5 AC. PROJECT O T- WETLAD IMPACTS 4 of 5 1

9 H:\\JB\3816 Pennington County Hwy\ PennCty ew Bridge and Corridor\CAD\Eng\Wetland Fill_Exc_recover.dwg-Layout1 (5)-1/29/219 11:45 AM-(dkayser) T- T- WETLAD 9 FILL SQ. FT./.5 AC. T- W WETLAD 11a FILL SQ. FT./.63 AC. WETLAD 1 FILL SQ. FT./.6 AC. T- T- T- WETLAD 11b FILL SQ. FT./.17 AC. MVP LSP Page 7 of 7 APPROXIMATE WETLAD FILL APPROXIMATE WETLAD CUT WETLAD BOUDARY Drawn by DJK WETLAD IMPACTS PROJECT O of 5

Information for File # SEW

Information for File # SEW Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street

More information

Information for File #MVP MVM

Information for File #MVP MVM Information for File #MVP-2018-00168-MVM Applicant: City of Lino Lakes Corps Contact: Marissa Merriman Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: Marissa.V.Merriman@usace.army.mil

More information

Public Notice. Corps File No. LRE Date: March 19, 2017 Expires: March 18, 2022

Public Notice. Corps File No. LRE Date: March 19, 2017 Expires: March 18, 2022 US Army Corps of Engineers Detroit District Public Notice Corps File No. LRE-2016-00006-100 Date: March 19, 2017 Expires: March 18, 2022 PUBLIC NOTICE ANNOUNCING REGIONAL CONDITIONS AND WATER QUALITY CERTIFICATIONS

More information

INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA

INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA These regional conditions are in addition to but do not supersede the requirements in the Federal Register (Volume 82 No. 4 of January 6, 2017).

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO

JANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO JANUARY 2017 STUDY UPDATE Logan City, Cache Co., CMPO Purpose of the presentation To provide an update on the status of the Study To present the Study Purpose and Need To present the results of Level 1

More information

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54) LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54) INTRODUCTIONS * Pipeline 1041 Application Coordinator Todd Blomstrom Public Works Director Mark Peterson County Engineer Terry Gilbert Community Development

More information

Preliminary Engineering Study

Preliminary Engineering Study Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Union Pacific Railroad

Union Pacific Railroad Input Questions: 404/401 Pre Application Meeting, December 18, 2013, Portland, Oregon 1. What is the project purpose and need? The purpose of the project is to improve the efficiency and average velocity

More information

Inspector MUST Sign and Date Each Inspection

Inspector MUST Sign and Date Each Inspection Work Area: Applicant: Mercer County Department of Transportation - Highways Division Application and Permit for Road Work in Mercer County, New Jersey NO. East Windsor Ewing Hamilton Hopewell Lawrence

More information

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on

More information

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective Moving Together Conference Complete Streets from the MassDOT District 5 Perspective Timothy Kochan, Transportation Planner and Bicycle/ Pedestrian Coordinator District 5 Office Taunton S Overview of District

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Weymouth - Abington Route 18 Widening and Reconstruction Project File No Weymouth - Abington Route 18 Widening and Reconstruction Project File No. 601630 PROJECT LOCATION Project Limit Previously Completed Signalized Intersections (Typical) Route 18 Widening Bridge No. W-32-013

More information

Hennepin County Transportation Department

Hennepin County Transportation Department Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation

More information

City of Hanover TRANSPORTATION STUDY

City of Hanover TRANSPORTATION STUDY City of Hanover TRANSPORTATION STUDY AUGUST 2006 Prepared by: WSB & Associates, Inc. 701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 (763) 541-4800 (763) 541-1700 (Fax) City of Hanover Transportation

More information

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019

ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 09/25/2018 DRAFT FEMA Region I PA H&H Study ADDENDA B Hydrologic and Hydraulic (H&H) Study Guidance 2019 Region I Federal Emergency Management Agency (FEMA) Public Assistance Hydrologic and Hydraulic (H&H)

More information

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Sponsor St Peters Project No. RB19-000022 Project Type Other TOTAL FUNDING Total County Sponsor Federal $1,177,251.00 $238,179.00 $59,546.00 $879,526.00

More information

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013 IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013 INTRODUCTION This web page provides information on the Iowa Highway 58 (IA 58) Corridor Improvement Study in Cedar Falls,

More information

STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 De MINIMIS WRITE-UP FOR PM For parks, recreation areas, wildlife or waterfowl refuges Page 1 of 3

STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 De MINIMIS WRITE-UP FOR PM For parks, recreation areas, wildlife or waterfowl refuges Page 1 of 3 SECTION 4(f) STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 For parks, recreation areas, wildlife or waterfowl refuges Page 1 of 3 The Safe, Accountable, Flexible, Efficient Transportation Equity Act:

More information

FY Candidate Sidewalk Projects. Sidewalk Advisory Committee

FY Candidate Sidewalk Projects. Sidewalk Advisory Committee FY 16-17 Candidate Sidewalk Projects Sidewalk Advisory Committee Sidewalk Advisory Committee FY 16-17 Candidate Sidewalk Projects While a sidewalk request may be limited to part of a roadway, the initial

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

RIDGE ROAD EXTENSION - PHASE I AND II (FROM RIDGE ROAD I DECUBELLIS ROAD I MOON LAKE ROAD INTERSECTION TO US 41)

RIDGE ROAD EXTENSION - PHASE I AND II (FROM RIDGE ROAD I DECUBELLIS ROAD I MOON LAKE ROAD INTERSECTION TO US 41) RIDGE ROAD EXTENSION - PHASE I AND II (FROM RIDGE ROAD I DECUBELLIS ROAD I MOON LAKE ROAD INTERSECTION TO US 41) ARMY CORPS OF ENGINEERS PERMIT APPLICATION SAJ-2011-00551 (IP-TEH) PASCO COUNTY ADDITIONAL

More information

Friends of the Detroit River Habitat Restoration Project Update

Friends of the Detroit River Habitat Restoration Project Update Friends of the Detroit River Habitat Restoration Project Update 11 Beneficial Use Impairments (BUIs) were originally identified to be associated with the Detroit River: 1. Restrictions on fish and wildlife

More information

Proposed Economic Development Sports Project for Southern Dallas. Dallas City Council Meeting December 5, 2012

Proposed Economic Development Sports Project for Southern Dallas. Dallas City Council Meeting December 5, 2012 : : Proposed Economic Development Sports Project for Southern Dallas Dallas City Council Meeting December 5, 2012 Overview The City s Grow South initiative focuses on addressing economic development within

More information

Appendix J: Q1-Highway 35 Route Construction Plan

Appendix J: Q1-Highway 35 Route Construction Plan PSC REF#:150055 Wisconsin CPCN Appendix J Appendix J: Q1-Highway 35 Route Construction Plan Public Service Commission of Wisconsin RECEIVED: 06/29/11, 8:51:24 AM Hampton Rochester La Crosse 345 kv Transmission

More information

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer Colerain Avenue Roadway Improvements Sponsored by Hamilton County Engineer Participants Lead Agency: Hamilton County Engineer Review and Approval: Ohio Department of Transportation Design Engineer: Edwards

More information

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017 WELCOME FM 2818 (Harvey Mitchell Parkway) Open House Tuesday, Nov. 14, 2017 Why am I here? Review the planned improvements Provide comments on the proposed project The environmental review, consultation,

More information

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS March 2, 2011 FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS STANLEY STORM DRAINAGE IMPROVEMENTS, 151sT TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS DESCRIPTION: This report relates

More information

Theodore Roosevelt Expressway (TRE) study was completed in Conducted Public meetings Analyzed traffic Provided good information

Theodore Roosevelt Expressway (TRE) study was completed in Conducted Public meetings Analyzed traffic Provided good information Theodore Roosevelt Expressway (TRE) study was completed in 2010. Conducted Public meetings Analyzed traffic Provided good information 2 All routes in oil producing counties have increased traffic. 3 Super

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Route 47 (North Main Street) Reconstruction

Route 47 (North Main Street) Reconstruction TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

SNCC Demographic Trends

SNCC Demographic Trends Employment Population SNCC Demographic Trends In 1970 the SNCC population was 10,040, accounting for roughly 3% of the County population In 2015, SNCC grew to 60,567 people, roughly 11% of the County population

More information

SECTION 3 STREET DESIGN

SECTION 3 STREET DESIGN 3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed

More information

Demo ID SAFETEA-LU # Approp DIST Bill_Description

Demo ID SAFETEA-LU # Approp DIST Bill_Description MN101 27 House M Construction and right-of-way acquisition for interchange at TH 65 and TH 242 in Blaine, MN MN102 37 House 1 Construction of Gitchi-Gami State Trail from Cascade River to Grand Marais

More information

Central Jersey Transportation Forum. March 2007

Central Jersey Transportation Forum. March 2007 Central Jersey Transportation Forum March 2007 Feasibility Analysis of BRT on Dinky Right of Way from Princeton Station to Alexander Rd. in West Windsor (west of Rt. 1) Study spurred by Princeton University's

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Access Management Standards

Access Management Standards Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

Site Improvements

Site Improvements Sections Included In This Standard: 1.1 Bicycle Facilities 1.2 Guardrails 1.3 Parking Bumpers 1.4 Traffic Signage 1.5 Traffic Signals 1.6 Traffic Impact Studies 1.7 Vision Triangle 1.8 Bus Stop Shelters

More information

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge

More information

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT. Existing 10' sidepath Existing 10' sidepath MATCH LINE. Project Number: 310. Drawing Number: 1/1

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT. Existing 10' sidepath Existing 10' sidepath MATCH LINE. Project Number: 310. Drawing Number: 1/1 Existing 10' sidepath Existing 10' sidepath otes: : One signpost with two signs (one facing north, one facing south). Attach to existing light pole 3.04 Existing s ew road edge ew lane lines (yellow) ew

More information

Reams Road RCA Study. Board of County Commissioners Public Hearing

Reams Road RCA Study. Board of County Commissioners Public Hearing Reams Road RCA Study Board of County Commissioners Public Hearing April 24, 2018 Presentation Overview Study Overview Existing Conditions Development of Alternatives Preferred Alternative Public Involvement

More information

Beacon Lakes NW 122nd Ave

Beacon Lakes NW 122nd Ave ¹ Site Location Document Path: M:\Projects\2015 Projects\2015-0062-001 Beacon Lakes CDDNW 122nd Avenue\4_figures and drawings\gis\figure 1 - Location Map.mxd Site Location Approximate Site Boundary (±11.00

More information

31st Street Corridor Study Iowa Street to County Route 1057

31st Street Corridor Study Iowa Street to County Route 1057 Iowa Street to County Route 1057 January 28, 2003 Prepared for: City of Lawrence, Kansas Douglas County, Kansas Prepared by: TranSystems Corporation 2400 Pershing Road, Suite 400 Kansas City, MO 64108

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

Somerville Community Path Feasibility Study

Somerville Community Path Feasibility Study Somerville Community Path Feasibility Study Prepared for: City of Somerville, Massachusetts Strategic Planning and Community Development July 14, 2006 Prepared by: VOLLMER Table of Contents Section 1.0

More information

MnPASS System Today and the Future

MnPASS System Today and the Future MnPASS System Today and the Future April 2010 By Nick Thompson Minnesota Department of Transportation Topics Minnesota s Current and Future MnPASS High Occupancy Toll Systems Overview of the MnPASS System

More information

Bolton, CT. January 7, 2016

Bolton, CT. January 7, 2016 BOLTON GREENWAY EXTENSION Preliminary Design Bolton, CT January 7, 2016 Tonight s Agenda Introduction Project Overview Review of Previous Meeting Progress since Last Meeting Review of significant impacts/issues

More information

Great Lakes Stream Crossing Inventory Instructions

Great Lakes Stream Crossing Inventory Instructions Great Lakes Stream Crossing Inventory Instructions This document is a guide to completing the Stream Crossing Data Sheet (2/28/11 version). Careful attention to this guidance will ensure consistent crossing

More information

NWP Page 1 Enclosure 1

NWP Page 1 Enclosure 1 Salem-Albany No. 1 Transmission Line Photomaps Sensitive Areas Salem 1 #* 2 3 4 A-Sheet 1 ") Planned Transmission Tower!( BPA Transmission Tower!! BPA Access Road Tract BPA Right-of-Way Corridor County

More information

Programmatic Categorical Exclusion Update Question & Answers

Programmatic Categorical Exclusion Update Question & Answers Office of Environmental Stewardship 395 John Ireland Blvd St. Paul, MN 55155 Programmatic Categorical Exclusion Update Question & Answers Date: October 2017 OPTIONAL District/Division Nam This FAQ document

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

Itasca County ATV Policy/Ordinance Public Input Meeting. February 6, 2017 Marcell Family Center February 8, 2017 Itasca County Courthouse

Itasca County ATV Policy/Ordinance Public Input Meeting. February 6, 2017 Marcell Family Center February 8, 2017 Itasca County Courthouse Itasca County ATV Policy/Ordinance Public Input Meeting February 6, 2017 Marcell Family Center February 8, 2017 Itasca County Courthouse Meeting Format Meeting Format 1. Introductions 2. Presentation Itasca

More information

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017 EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

Puget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL

Puget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL Restore America s Estuaries Conference 2012 Tampa, FL presented by: Theresa Mitchell, WA Dept. of Fish & Wildlife Nearshore General Investigation Change Analysis: Comparison of historical and current

More information

Appendix I. Catalytic Infrastructure Opinions of Probable Cost

Appendix I. Catalytic Infrastructure Opinions of Probable Cost Appendix I Catalytic Infrastructure Opinions of Probable Cost : 6-Lane Bridge (Major Arterial) LEVEL: Planning LENGTH: Linear Feet DATE: January 205 MAJOR BRIDGE CROSSING AT WILSON CREEK Stonebridge Drive

More information

SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD

SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD FINAL ROUTE AND POND STUDY PROJECT NO. C-9570.10 Prepared for: Pasco County

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

INTERSECTION IMPROVEMENTS

INTERSECTION IMPROVEMENTS MCHENRY COUNTY DIVISION OF TRANSPORTATION SEPTEMBER 2012 RIVER ROAD AT DOWELL ROAD INTERSECTION IMPROVEMENTS INSIDE: Public Meeting #1 Summary 1 Public Meeting #2 Summary 1 Key Issues Raised at Public

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

Town of Orangetown Neighborhood Traffic Calming Program

Town of Orangetown Neighborhood Traffic Calming Program Town of Orangetown Neighborhood Traffic Calming Program Table of Contents I Introduction a. Purpose b. Key to successful projects c. What is Traffic Calming? II III IV V VI VII Definitions Street Classification

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

STANLEY STREET December 19, 2017

STANLEY STREET December 19, 2017 STANLEY STREET December 19, 2017 Welcome Mike Wiza, Mayor Scott Beduhn, Director of Public Works Agenda 1. Introduction 2. Existing Roadway Conditions 3. Current Alternative Improvements 4. Summary of

More information

TRANSPORTATION COMMISSION East 19 th St, Harper to O Connell Thursday, March 29, :00 PM City Commission Room, City Hall, 6 E.

TRANSPORTATION COMMISSION East 19 th St, Harper to O Connell Thursday, March 29, :00 PM City Commission Room, City Hall, 6 E. TRANSPORTATION COMMISSION East 19 th St, Harper to O Connell Thursday, March 29, 2018 6:00 PM City Commission Room, City Hall, 6 E. 6th Street AGENDA Public comment related to the meeting topic will be

More information

Cincinnati Dayton Rd Widening

Cincinnati Dayton Rd Widening Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Roundabout Feasibility Memorandum

Roundabout Feasibility Memorandum Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01

More information

Technical Report Culvert A Hydraulic Analysis

Technical Report Culvert A Hydraulic Analysis DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design

More information

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida Citizens Advisory Committee Meeting March 13, 2018 ETDM NUMBER: 11482 MDX WORK

More information

Building Coastal Resiliency at Plymouth Long Beach

Building Coastal Resiliency at Plymouth Long Beach Building Coastal Resiliency at Plymouth Long Beach Department of Marine and Environmental Affairs March 30, 2017 Introducing Green Infrastructure for Coastal Resiliency Plymouth Long Beach & Warren s Cove

More information

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II) Presentation to the CNRC Board of Directors Regular Meeting March 11, 2015 1 Agenda Preferred Alternate Refinement for University Avenue, 3rd Street, and Beverly Avenue Intersection Improvements validate

More information

DRAFT. Table of Contents. Background

DRAFT. Table of Contents. Background Douglas County Table of Contents Existing Infrastructure 86 Funding 89 Policy and Program Recommendations 90 Infrastructure Recommendations 92 Conclusion 95 Background Home to 4,500 residents and Baker

More information

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project City of RE 4APNOIPF Vh, X` W\ YII PTC ING, CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: From: Agenda Item: Honorable Mayor and City Council Members Ron Rosenthal, Engineering

More information

POLICIES FOR COST PARTICIPATION BETWEEN HENNEPIN COUNTY AND OTHER AGENCIES FOR COOPERATIVE HIGHWAY PROJECTS

POLICIES FOR COST PARTICIPATION BETWEEN HENNEPIN COUNTY AND OTHER AGENCIES FOR COOPERATIVE HIGHWAY PROJECTS HENNEPIN COUNTY PUBLIC WORKS BUSINESS LINE TRANSPORTATION DEPARTMENT POLICIES FOR COST PARTICIPATION BETWEEN HENNEPIN COUNTY AND OTHER AGENCIES FOR COOPERATIVE HIGHWAY PROJECTS AS ADOPTED ON FEBRUARY 7,

More information

Minam Curve. Project Location OR82: Minam Curve Project Wallowa Lake Hwy No. 010 (OR 82) Umatilla. Wallowa

Minam Curve. Project Location OR82: Minam Curve Project Wallowa Lake Hwy No. 010 (OR 82) Umatilla. Wallowa 31.99 29 W AL LO W A LA KE 3 3.98 82 Minam Curve Umatilla Union County: Union USGS Quad: Minam TRS: T1N, R41E, Sections 6 and 7 OREGON EPARTMENT OF TRANSPORTATION 1:24, ISCLAIMER:.25.5.5 X:\Projects\OR82_Minam_Curve_and_Slope_Stabilization_KN\OR82_Minam_Curve_KN1747\Environmental\maps

More information

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017 Proposed FUL-SR 66 Relocation on to CR 24 Presentation to Archbold Village Council April 17, 2017 Robert J. Seaman, P.E., P.S. Village Engineer Andrew J. Langenderfer, P.E. Sr. Project Manager Agenda Stakeholders

More information

APPENDIX A. GIS ANALYSIS FOR THE MRT

APPENDIX A. GIS ANALYSIS FOR THE MRT APPENDIX A. GIS ANALYSIS FOR THE MRT The Iowa Mississippi River Trail plan was created through a data-driven analysis using geographic information systems. GIS integrates map images with relevant data,

More information

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities Approved: Policy: 20-004(P) Responsible Office: Planning Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities I. POLICY STATEMENT: This policy

More information

Introduction to Roadway Design

Introduction to Roadway Design Chapter Introduction to Roadway Design 1 This chapter lays the foundation for the Roadway Design course. You examine the roadway design workflow and the completed drawing files and review the project scope,

More information

Chapter 2: Alternatives

Chapter 2: Alternatives Chapter 2: Alternatives 2.1 Introduction This chapter describes the alternatives that were considered for meeting the purpose of the State Route (S.R.) 30 Project as described in Section 1.2.1, Purpose

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

CTH M Reconstruction

CTH M Reconstruction CTH M Reconstruction ID 5992 09 81 City of Madison, South Pleasant View Road (Cross Country Road Prairie Hill Road) CTH M Dane County Public Information Meeting Thursday, May 24, 2012 6 p.m. to 8 p.m.

More information

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study DRAFT Technical Memorandum #6 Cost and Benefit Evaluation Methodology August 2016 Prepared for: FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT

More information

SIDEWALK ASSESSMENT PHASE TWO

SIDEWALK ASSESSMENT PHASE TWO 2013 SIDEWALK ASSESSMENT PHASE TWO Table of Contents Lake of the Ozarks Council of Local Governments Sidewalk Assessment Phase TWO Criteria... 1 Communities Included In Sidewalk Assessment Phase TWO...

More information

What s New!!! Blackstone River Bikeway Fact Sheet: April 2004

What s New!!! Blackstone River Bikeway Fact Sheet: April 2004 What s New!!! Blackstone River Bikeway Fact Sheet: April 2004 Construction / Design Update: * Worcester/Millbury, MA: One mile completed with another mile within the Rt. 20 contract currently under construction.

More information

GUIDESTAR. Local ITS Wayne H. Sandberg Washington County Engineer Deputy Public Works Director

GUIDESTAR. Local ITS Wayne H. Sandberg Washington County Engineer Deputy Public Works Director GUIDESTAR Local ITS Wayne H. Sandberg Washington County Engineer Deputy Public Works Director About Washington County County Seat: Stillwater Eastern Metro County Borders Wisconsin St. Croix and Mississippi

More information

Charlesgate. World Series Path

Charlesgate. World Series Path Tonight s 8 Greenway Designs Commonwealth Ave. Route 9 Crossing Charlesgate Dartmouth St. World Series Path Summer St / L St Arborway 2008 Charlesgate Connection Northeastern University s Civil Engineering

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112) Project Area Map 6 COUNTY 112 COUNTY Preliminary Design of Wayzata Boulevard Improvements(CSAH 112) Public Open House Open House To Do List: Sign in Visit with Hennepin County staff and design team Learn

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax

ROAD OCCUPANCY PERMIT APPLICATION # Damascus Township, 60 Conklin Hill Road, Damascus, PA Tel Fax Instructions: For a driveway access permit, fill in sections 1, 2, 3 and 4, and the appropriate drawings and sign. For a Utility access, fill in sections 1, 2, 3 and 5, and figures 1 and 3. Prepare a detailed

More information

Final Sidewalk Feasibility Study

Final Sidewalk Feasibility Study Garfield Drive From Anastasia Drive to Elizabeth Place City of South Daytona July 23, 2009 Final Sidewalk Feasibility Study Prepared for: Prepared by: Final Sidewalk Feasibility Study Garfield Drive 2

More information

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Trans-Canada Highway 1 RW Bruhn Bridge Replacement Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the

More information