Ins$tu$onalize Reliability Improvement

Size: px
Start display at page:

Download "Ins$tu$onalize Reliability Improvement"

Transcription

1 Ins$tu$onalize Reliability Improvement Jason Ballen$ne ARMS Reliability Produced by: Supported by:

2 ABC Group the typical RCM story 12 Global factory loca4ons SAP since 2005, mostly legacy imports RCM project ini4ated in 2007! Targets: o 10% Reduc4on in Maintenance Cost o 5% Availability improvement o Reduc4on in safety incidents Mastering SAP PM 2013

3 ABC Group the typical RCM story 8,000 Cri4cal loca4ons iden4fied for RCM 7 Step Excel based process 24 Month process o Es4mate > 20,000 Labour Hrs Many thousands of tasks developed Mastering SAP PM 2013

4 ABC Group the typical RCM story Some lingering ques4ons post the project. o Will the results actually be implemented? o Project contribu4on to KPI s? o Could the project be turned into a process " The work is not done yet o How could it be made easier i.e. through alignment of SAP & RCM? Mastering SAP PM 2013

5 RCM & SAP- Addi$onal Ques$ons to Answer What results will (can) I get from RCM? What do I need from SAP to do RCM effec4vely? How do I efficiently update SAP with the results? How do I turn a RCM project into a process? Mastering SAP PM 2013

6 Group Experience 1. Who has used RCM to develop their opera4ons maintenance tac4cs? 2. Are the results implemented? RCM=SAP 3. Who has a living system? Mastering SAP PM 2013

7 In excess of 60% of RCM studies are never implemented! Source: Reliability Web Survey

8 RCM Defined What is the objec-ve of RCM Studies? Iden4fy appropriate maintenance tac4cs and other strategies to mi4gate the risk of asset failures Mastering SAP PM 2013

9 RCM & SAP for Success What can I expect from my RCM efforts?

10 RCM & SAP for Success Pareto Predictions Task Interval Optimisation SHARE

11 RCM & SAP for Success Task Interval Optimisation SHARE

12 RCM & SAP for Success Pareto Predictions SHARE

13 RCM & SAP for Success 471 Dump Truck Maintenance Cost Profile ZAR 5,000 ZAR 4,500 ZAR 4,000 ZAR 3,500 ZAR 3,000 ZAR 2,500 ZAR 2,000 ZAR 1,500 ZAR 1,000 ZAR 500 ZAR 0 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Planned Spares (ZAR,000) Correc4ve Spares (ZAR,000) 2,553 3,617 3,728 3,770 3,552 3,757 3,724 3,722 3,650 3,504 Labour (ZAR,000) Total Maintenance Cost (ZAR,000) 3,204 4,320 4,437 4,489 4,248 4,488 4,438 4,426 4,359 4,207 SHARE

14 RCM Defined when is this project finally done?... Mastering SAP PM 2013

15 RCM Defined.RCM should be a process, not a project! o We make assump4ons (that s what engineers do!) o Changes in Assets (modifica4ons/ acquisi4ons) o New inspec4on technologies and methods (Think P- F Curve) o Skills development may impact failure characteris4cs & P- F o Defect Elimina4on Programs (RCA) o Opera4ng context changes (e.g. changes impac4ng equipment life) o New failure modes come to the fore o Consequence of failure (Down4me cost) changes over 4me should we change our strategies? Mastering SAP PM 2013

16 RCM Defined The argument is made. RCM should be a process, not a project! Mastering SAP PM 2013

17 Elements of RCM & SAP Success Mastering SAP PM 2013

18 RCM & SAP for Success Define overall success:» Jus4fied tac4cs. A transparent & well understood maintenance strategy!» Defined alignment points for SAP & RCM» Plaporm for con4nuous improvement (Process vs. Project)» Educated people Mastering SAP PM 2013

19 RCM & SAP for Success

20 RCM & SAP for Success RCM SAP Hierarchy & Loca4ons Maintainable Items Failure modes Failure Characteris4cs Hierarchy & Func. Loca4ons Equipment/ Object Part Symptoms & Cause Details (Catalogues) Failure/ W.O. History Object Parts Consequence Effect PM01 Details Redesign Preventa4ve Maintenance Plans, Items, Task Lists Resources (Labour & Spares) Mastering SAP PM 2013

21 Cooling Water Pump FMEA Pump Provide cooling water to the process at xx rpm Contain Cooling water No Cooling Water Cooling water leak Bracket Damaged Bracket Corroded Pump Body worn through No cooling No cooling No cooling Water leak Shaft Gland worn No cooling Water leak

22 Cooling Water Pump FMEA Pump SAP Functional location/equipment Provide cooling water to the process at xx rpm No Cooling Water Bracket Damaged No cooling Bracket Corroded No cooling Contain Cooling water Cooling water leak Pump Body worn through No cooling Water leak SAP Problem Code Shaft Gland worn No cooling Water leak SAP Object Part / Cause Code SAP Effect

23 SAP Maintenance Plans Maintenance Plan Maintenance Maintenance Maintenance Plan Maintenance Plan Plan Item Task List Task Task List Task List Operation List Document

24 Task Alignment RCM Task Group Task SAP Plan Item Task List Opera4on Docs

25 Maintenance Items Mul4ple Maintenance Items per single Maintenance Plan Split on (??) o Maintenance Interval o Volume of work Maintenance Maintenance Maintenance Plan o Resource Maintenance Plan Plan Item o Equipment

26 RCM & SAP for Success Map your Process! & Include points of RCM & SAP alignment! Mastering SAP PM 2013

27 Take an Enterprise Approach Taking an enterprise approach o improves efficiency o supports consistent implementa4on o supports con4nuous improvement

28 The Right Focus The best organisa4ons focus on ins4tu4onalising o Role Defini4on o Competencies o Processes o Standards o Quick Reference Guides (QRG s) o Support o Measurement

29 RCM & SAP for Success Triggers for review " Calendar " Changes in Consequence The New Reality " Pareto " CI Process (Defect Elimina4on)! COMBINATION OF ABOVE Mastering SAP PM 2013

30 Process Map

31 Ins$tu$onalising Successful Implementa4on is the key o Ins4tu4onalising creates the path and supports the processes

32 Key Points 1. RCM should be a CI process, not just a project! 2. Map your process 3. Ensure SAP & RCM alignment 1. Ensures sustainable use 2. Data can become informa4on and advance your tac4cs (think analy4cs!) Mastering SAP PM 2013

33 Conclusion SAP & RCM can help you con=nually improve your maintenance strategies! SHARE

34 Ques$ons Mastering SAP PM 2013

35 Jason Ballen$ne ARMS Reliability Produced by: Supported by:

Reliability Engineering. Module 3. Proactive Techniques - Definitions

Reliability Engineering. Module 3. Proactive Techniques - Definitions Reliability Engineering Module 3 1 Proactive Techniques - Definitions Functional Failure: The inability of an asset to meet a desired standard of performance. Failure Cause: The circumstances during design,

More information

How does Wind affect Coal (Cycling, Emissions and Cost)

How does Wind affect Coal (Cycling, Emissions and Cost) How does Wind affect Coal (Cycling, Emissions and Cost) Outline Analysis of cycling costs Why analyze cycling damage and costs Damage mechanisms of cycling Cycling costs Reducing cycling costs Loca9ng

More information

How to Define Your Systems and Assets to Support Reliability. How to Define Your Failure Reporting Codes to Support Reliability

How to Define Your Systems and Assets to Support Reliability. How to Define Your Failure Reporting Codes to Support Reliability BACKFED RELIABILITY How to Define Your Systems and Assets to Support Reliability How to Define Your Failure Reporting Codes to Support Reliability How to Generate Risk Prioritization Numbers (RPN) from

More information

This report includes:

This report includes: REPORT SUMMARY Page 1 of 15 In addition to this summary, this report includes the following forms: Report Summary al Failure Analysis Failure Categorization (One per ) Maintenance Task Selection (One per

More information

Using Reliability Centred Maintenance (RCM) to determine which automated monitoring systems to install to new and existing equipment

Using Reliability Centred Maintenance (RCM) to determine which automated monitoring systems to install to new and existing equipment Using Reliability Centred Maintenance (RCM) to determine which automated monitoring systems to install to new and existing equipment CHRIS JAMES RELIABILITY MANAGEMENT LTD Cairo, November 2018 The rate

More information

Developing a Regional BRT Network

Developing a Regional BRT Network Developing a Regional BRT Network Elizabeth Deakin University of California, Berkeley for the Rudin Center for Transporta=on symposium CATCHING THE NEXT RIDE: THE POTENTIAL FOR REGIONAL BUS RAPID TRANSIT

More information

Commercial Offshore Supply Vessel (OSV) To Arc8c Capable T- ATS(X) Replacement

Commercial Offshore Supply Vessel (OSV) To Arc8c Capable T- ATS(X) Replacement Conversion Design Project Commercial Offshore Supply Vessel (OSV) To Arc8c Capable T- ATS(X) Replacement 2.704 Projects in Naval Ship Conversion Arthur Anderson Ben Sanfiorenzo David Jurkiewicz Thanks

More information

Param Express. Key Activities Concluded. Watch Out For

Param Express. Key Activities Concluded. Watch Out For Param Express Key Activities Concluded One Workshop conducted form 20 th to 23 rd Feb 2018 at Mumbai, to incorporate the recommendation of reliability expert. Core maintenance work started for next set

More information

18-642: Safety Plan 11/1/ Philip Koopman

18-642: Safety Plan 11/1/ Philip Koopman 18-642: Safety Plan 11/1/2017 Safety Plan: The Big Picture for Safety Anti-Patterns for Safety Plans: It s just a pile of unrelated documents It doesn t address software integrity You don t link to a relevant

More information

Cycling Road Safety Audits

Cycling Road Safety Audits 1 Cycling Road Safety Audits Paul de Leur, PhD, P.Eng. 9th Annual Interna?onal Conference on Urban Traffic Safety, Banff, 2017 2 Presenta?on Outline 1) Cycling as a Viable Transporta?on Alterna?ve 2) Safely

More information

Defining Equipment Reliability

Defining Equipment Reliability 1 Paul Barringer, P.E. Barringer & Associates, Inc. P.O. Box 3985 Defining Equipment Reliability Humble, TX 77347 Phone: 1-281-852-6810 Email: hpaul@barringer1.com http://www.barringer1.com Reliability

More information

NCAA Division I Committee on Infractions: Penalty Consistency

NCAA Division I Committee on Infractions: Penalty Consistency NCAA Division I Committee on Infractions: Penalty Consistency Sport Industry Research Center TEMPLE UNIVERSITY NCAA Division I Commi-ee on Infrac3ons: Penalty Consistency Prepared for NCAA Division I Commi4ee

More information

Param Express. Param Sankalp December Newsletter winners. Key Activities Concluded. Watch Out For

Param Express. Param Sankalp December Newsletter winners. Key Activities Concluded. Watch Out For Param Express Param Sankalp December Newsletter winners Key Activities Concluded Based on RCM expert input Refinements incorporation is in progress for 1 st set of 10 equipment s. Notification generated

More information

Gas Compressor Operation and Control

Gas Compressor Operation and Control Training Title Gas Compressor Operation and Control Training Duration 5 days Training Venue and Dates Gas Compressor Operation and Control 5 7 11 October, 2018 $4,000 Dubai, UAE Trainings will be conducted

More information

The Path to LUBRICATION EXCELLENCE

The Path to LUBRICATION EXCELLENCE The Path to LUBRICATION EXCELLENCE TABLE OF CONTENTS CHAPTER 3 Traditional Time-Based Lubrication CHAPTER 1 When Bearings Fail Prematurely CHAPTER 2 The Challenge For Maintenance Professionals CHAPTER

More information

Summary of 2017 Alvin Debriefs. 4 cruises, 4 debriefs, 4 PCARs

Summary of 2017 Alvin Debriefs. 4 cruises, 4 debriefs, 4 PCARs Summary of 2017 Alvin Debriefs 4 cruises, 4 debriefs, 4 PCARs Alvin Debrief Highlights Overall, PIs were pleased with the performance and capabili=es of the Alvin, with most of the objec=ves accomplished.

More information

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart Technical Standards and Legislation: Risk Based Inspection Presenter: Pierre Swart Agenda Change in Legislation. Where RBI fits in. Application to implement RBI. RBI concepts. Elements of an RBI analysis.

More information

Main- McVay Transit Study

Main- McVay Transit Study Main- McVay Transit Study Stakeholder Advisory Commi3ee Mee5ng #2 May 27, 2014 A collabora)ve study between Main- McVay Transit Study Stakeholder Advisory Commi3ee Mee5ng #2 May 27, 2014 WELCOME Agenda

More information

Evalua&on of three as- built aligo op&cal levers at LHO: PR3, HAM2, ITMY. Cheryl Vorvick Op&cal Lever Acceptance Review LHO 6/6/2013 T v1

Evalua&on of three as- built aligo op&cal levers at LHO: PR3, HAM2, ITMY. Cheryl Vorvick Op&cal Lever Acceptance Review LHO 6/6/2013 T v1 Evalua&on of three as- built aligo op&cal levers at LHO: PR3, HAM2, ITMY Cheryl Vorvick Op&cal Lever Acceptance Review LHO 6/6/2013 Four Main Areas of Concern: Poin&ng Noise Contamina&on Safety 18 specific

More information

Analysis of Instrumentation Failure Data

Analysis of Instrumentation Failure Data Analysis of Instrumentation Failure Data A structured approach Standards Certification Education & Training Publishing Conferences & Exhibits Matthew F. (Matt) Murphy Senior Consultant, DuPont Engineering

More information

CONTENTS. The consultant team for this study included: 292 Design Group Ballard*King and Associates RJM Construc!on Reengineered

CONTENTS. The consultant team for this study included: 292 Design Group Ballard*King and Associates RJM Construc!on Reengineered Family Aquatic Center Study Brooklyn Park, Minnesota May 23, 2018 DRAFT CONTENTS Statement of Purpose & Scope of Work Execuve Summary ES1 Process 1 Demographic & Market Analysis 2 Concept Opons Overview

More information

Hya$sville Volunteer Fire Department Training. Swi$ Water Rescue Module

Hya$sville Volunteer Fire Department Training. Swi$ Water Rescue Module Hya$sville Volunteer Fire Department Training Swi$ Water Rescue Module Swi9 Water Terms Upstream Upstream is back towards the direc9on current/flow Downstream Downstream is the direc9on the current/flow

More information

RELIABILITY-CENTERED MAINTENANCE (RCM) EVALUATION IN THE INDUSTRY APPLICATION, CASE STUDY: FERTILIZER COMPANY, INDONESIA

RELIABILITY-CENTERED MAINTENANCE (RCM) EVALUATION IN THE INDUSTRY APPLICATION, CASE STUDY: FERTILIZER COMPANY, INDONESIA RELIABILITY-CENTERED MAINTENANCE (RCM) EVALUATION IN THE INDUSTRY APPLICATION, CASE STUDY: FERTILIZER COMPANY, INDONESIA Rahayu Khasanah Department of Industrial Engineering, Institute of Science and Technology

More information

Milso& Customer Outage Alerts. A look at how to keep customers informed during outage situa:ons

Milso& Customer Outage Alerts. A look at how to keep customers informed during outage situa:ons Milso& Customer Outage Alerts A look at how to keep customers informed during outage situa:ons Con:nuing Growth with Milso& IVR & OMS Milso& Customer Outage Alerts 1. OMS Auto Alerts Proac:ve and fully

More information

Incidence of concussion over five seasons in a ski resort in Japan

Incidence of concussion over five seasons in a ski resort in Japan The 35th SITEMSH congress 2016 Session 5 Severe injuries Incidence of concussion over five seasons in a ski resort in Japan Nobuaki Moriyama, Yukio Urabe, Noriaki Maeda Graduate School of Biomedical and

More information

Determining Occurrence in FMEA Using Hazard Function

Determining Occurrence in FMEA Using Hazard Function Determining Occurrence in FMEA Using Hazard Function Hazem J. Smadi Abstract FMEA has been used for several years and proved its efficiency for system s risk analysis due to failures. Risk priority number

More information

RCM GUIDE RELIABILITY-CENTERED MAINTENANCE GUIDE

RCM GUIDE RELIABILITY-CENTERED MAINTENANCE GUIDE RCM GUIDE RELIABILITY-CENTERED MAINTENANCE GUIDE For Facilities and Collateral Equipment DRAFT National Aeronautics and Space Administration FINAL September 2008 TABLE OF CONTENTS 1.0 Preface...1-1 1.1

More information

Floatplane Safety and Risk Management. Aus7n G. Watson, P.E. CFI April 13, 2013

Floatplane Safety and Risk Management. Aus7n G. Watson, P.E. CFI April 13, 2013 Floatplane Safety and Risk Management Aus7n G. Watson, P.E. CFI April 13, 2013 Risk Management Refresher Four Basic Principles of Risk Management 1. Accept no unnecessary risk 2. Make risk decisions at

More information

Summary of AUV Sentry Debriefs 6 Cruises, 6 Debriefs and 4 PCARs

Summary of AUV Sentry Debriefs 6 Cruises, 6 Debriefs and 4 PCARs Summary of 2016 AUV Sentry Debriefs 6 Cruises, 6 Debriefs and 4 PCARs Sentry late 2015 & 2016 PCARs (4 cruises, 6 PIs) objectives 6 6 5 7.2 pre-cruise 7.0 science party.7 vehicle 6 7 7 7.7 safety.7 EL.

More information

Life Extension of Mobile Offshore Units

Life Extension of Mobile Offshore Units Life Extension of Mobile Offshore Units Operation of classified aging units Sigmund Røine DNV Mobile Offshore Units in Operation Presentation content MOU integrity during operation Survey Principles for

More information

Curves GL-599 R1. Series A-C Hz

Curves GL-599 R1. Series A-C Hz Curves GL-599 R1 Series A-C 8100 60 Hz Horizontal Split Case Base Mounted Double Suction Pump Performance Curves TABLE OF CONTENTS Useful Pump Formulas 2 Full Hydraulic Range Curves 3 3500 RPM Pump Curves

More information

Promotion, Education, and Marketing of an Expanded VCU Bike Share Program

Promotion, Education, and Marketing of an Expanded VCU Bike Share Program Virginia Commonwealth University VCU Scholars Compass L. Douglas Wilder School of Government and Public Affairs Publications L. Douglas Wilder School of Government and Public Affairs 2015 Promotion, Education,

More information

DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WILLIAM A. MOFFEIT BUILDING BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND,

DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WILLIAM A. MOFFEIT BUILDING BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND, - DEPARTMENT OF THE NAVY NAVAL AIR SYSTEMS COMMAND RADM WILLIAM A. MOFFEIT BUILDING 47123 BUSE ROAD, BLDG 2272 PATUXENT RIVER, MARYLAND, 20670-1547 NAVAIRINST 4790.20C AIR-6.0 NA VAIR INSTRUCTION 4790.20C

More information

FIRE PROTECTION. In fact, hydraulic modeling allows for infinite what if scenarios including:

FIRE PROTECTION. In fact, hydraulic modeling allows for infinite what if scenarios including: By Phil Smith, Project Manager and Chen-Hsiang Su, PE, Senior Consultant, Lincolnshire, IL, JENSEN HUGHES A hydraulic model is a computer program configured to simulate flows for a hydraulic system. The

More information

Sharing practice: OEM prescribed maintenance. Peter Kohler / Andy Webb

Sharing practice: OEM prescribed maintenance. Peter Kohler / Andy Webb Sharing practice: OEM prescribed maintenance Peter Kohler / Andy Webb Overview 1. OEM introduction 2. OEM maintenance: pros and cons 3. OEM maintenance: key message 4. Tools to help 5. Example 6. Takeaway

More information

Developing a Portwide Asset Management Program

Developing a Portwide Asset Management Program Developing a Portwide Asset Management Program American Association of Port Authorities Marine Terminal Management Training Program September 17, 2015 Colin Chung, PhD President, Kayuga Solution Asset

More information

THE DELIVERY OF GAS SUPPLY

THE DELIVERY OF GAS SUPPLY GAS ASSIST INJECTION MOLDING THE DELIVERY OF GAS SUPPLY April 2010 www.bauerptg.com THE DELIVERY OF GAS SUPPLY Gas assist requires a source of high-pressure nitrogen gas that can be controlled and delivered

More information

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities The planning and policy context Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities THE PLANNING AND POLICY CONTEXT Providing

More information

P3: Pressure Pipe Principles. Carl Thunem, EHS Audit Manager Encana Services Company, Ltd.

P3: Pressure Pipe Principles. Carl Thunem, EHS Audit Manager Encana Services Company, Ltd. P3: Pressure Pipe Principles Carl Thunem, EHS Audit Manager Encana Services Company, Ltd. Pressure and Piping Project (P3) - Origins The P3 project was developed after a number of critical incidents and

More information

MU043D: Mechanical Seals

MU043D: Mechanical Seals MU043D: Mechanical Seals Jun 26 28, 2018 / Dubai MU043 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: This is an intensive, highly practical and useful five-day course. The participant will

More information

Date Issued: November 2011 Revision Date: December 2012 Review Date: December 2015 Revision #

Date Issued: November 2011 Revision Date: December 2012 Review Date: December 2015 Revision # SUNCOR ENERGY PRODUCTS DISTRIBUTION TERMINAL OPERATING MANUAL STANDARD OPERATING PROCEDURE MAINTENANCE TASKS Date Issued: November 2011 Revision Date: December 2012 Review Date: December 2015 Revision

More information

First Mile, Last Mile: Plans for all Shapes and Sizes. Hannah Lindelof, Principal Planner San Francisco Bay Area Rapid Transit September 18, 2017

First Mile, Last Mile: Plans for all Shapes and Sizes. Hannah Lindelof, Principal Planner San Francisco Bay Area Rapid Transit September 18, 2017 First Mile, Last Mile: Plans for all Shapes and Sizes Hannah Lindelof, Principal Planner San Francisco Bay Area Rapid Transit September 18, 2017 BART Station Access Policy Goals A. Safer, Healthier, Greener.

More information

Simple Time-to-Failure Estimation Techniques for Reliability and Maintenance of Equipment

Simple Time-to-Failure Estimation Techniques for Reliability and Maintenance of Equipment F E A T U R E A R T I C L E Simple Time-to-Failure Estimation Techniques for Reliability and Maintenance of Equipment Key Words: Reliability and maintenance, time-to-failure estimation, reactive maintenance

More information

Introduc)on to Confined Spaces

Introduc)on to Confined Spaces Introduc)on to Confined Spaces Welcome By taking ClickSafety s Confined Spaces online safety course, you will have a beaer understanding of safety regula)ons according to OSHA s standards. Upon successful

More information

RCM Applied to the CH-47 Chinook Heavy Lift Helicopter. For the Warfighter With the Warfighter

RCM Applied to the CH-47 Chinook Heavy Lift Helicopter. For the Warfighter With the Warfighter RCM Applied to the CH-47 Chinook Heavy Lift Helicopter For the Warfighter With the Warfighter Presentation Agenda Application of Reliability Centered Maintenance (RCM) RCM Principles Applied to: Special

More information

Understanding safety life cycles

Understanding safety life cycles Understanding safety life cycles IEC/EN 61508 is the basis for the specification, design, and operation of safety instrumented systems (SIS) Fast Forward: IEC/EN 61508 standards need to be implemented

More information

Business Plan Presentation

Business Plan Presentation 2019 Department of Water Resources Business Plan Presentation Wednesday, August 29, 2018 Mission To Provide Superior Water Services at an Excellent Value Vision To be widely recognized as a leader in the

More information

Alta Planning + Design

Alta Planning + Design Alta Planning + Design Gavin Davidson, MCIP, RPP Principal, Senior Planner Vancouver Kate Whitfield, P.Eng., MCIP, RPP Senior Associate Engineer/Planner Ottawa Ottawa, Ontario, Canada Ottawa Toronto Syracuse

More information

Ingersoll Rand. X-Series System Automation

Ingersoll Rand. X-Series System Automation Ingersoll Rand -Series System Automation Energy Savings on Demand! Ingersoll Rand As much as 20% to 60% of the energy used to operate compressed air systems is wasted. This is primarily due to operating

More information

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT SYDNEY TRAINS SAFETY MANAGEMENT SYSTEM OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT Purpose Scope Process flow This operating procedure supports SMS-07-SP-3067 Manage Safety Change and establishes the

More information

City of Ottawa s Complete Streets Approach to Transportation Projects

City of Ottawa s Complete Streets Approach to Transportation Projects City of Ottawa s Complete Streets Approach to Transportation Projects Presentation to Stakeholders Date: May 5, 2015 Presentation Overview Purpose of the study Proposed definition of Complete Streets for

More information

PRP-Keto EZ Seal Systems:

PRP-Keto EZ Seal Systems: 1.0 Background Discussion PRP-Keto EZ Seal Systems: Many people want the leak free advantages mechanical seals have to offer in clean solutions extended to slurry pump applications. These advantages include:

More information

Model 1: Reasenberg and Jones, Science, 1989

Model 1: Reasenberg and Jones, Science, 1989 Model 1: Reasenberg and Jones, Science, 1989 Probability of earthquakes during an a?ershock sequence as a func@on of @me and magnitude. Same ingredients used in STEP and ETAS Model 2: Agnew and Jones,

More information

The Hubble Space Telescope (HST) Advanced Camera for Surveys Repair (ACS- R)

The Hubble Space Telescope (HST) Advanced Camera for Surveys Repair (ACS- R) The Hubble Space Telescope (HST) Advanced Camera for Surveys Repair (ACS- R) Integra@ng Commercial Products in the Flight SoCware Environment D. Dye, M. Kelly, B. Serrano GSFC Code 441 HST Payload Flight

More information

Pressure Gauge Failure Causes Release

Pressure Gauge Failure Causes Release Pressure Gauge Failure Causes Release Lessons Learned Volume 04 Issue 02 2004 USW Pressure Gauge Failure Causes Release Purpose To conduct a small group lessons learned activity to share information gained

More information

Transportation Assessment

Transportation Assessment Transportation Assessment Midtown Open House February 10, 2018 Overview Midtown in Focus Overview & Purpose of Today Transportation Assessment overview Summary of Transportation work to date Review & Analysis

More information

Big Data Based Maintenance, BDBM--The Main Trend of Smart Maintenance. Li Baowen

Big Data Based Maintenance, BDBM--The Main Trend of Smart Maintenance. Li Baowen Big Data Based Maintenance, BDBM--The Main Trend of Smart Maintenance Li Baowen Future Development of Smart Maintenance Intelligent inspection and monitoring Intelligent lubrication Intelligent information

More information

IGEM/TD/1. Background, Development, Changes J V Haswell

IGEM/TD/1. Background, Development, Changes J V Haswell IGEM/TD/1 Background, Development, Changes J V Haswell TD/1 Background Development, Changes Technical and Safety Philosophy History of Development Key Code Requirements:- Rou?ng, BPDs Design parameters

More information

EURO. ENVIRONMENTAL Compliance, Protection, Peace of Mind. Occupational Hygiene Safety Consultants

EURO. ENVIRONMENTAL Compliance, Protection, Peace of Mind. Occupational Hygiene Safety Consultants EURO ENVIRONMENTAL Compliance, Protection, Peace of Mind Occupational Hygiene Safety Consultants Water Hygiene (Legionella) Site Name: Site Address: Management Pathway Statutory duty holder Name PosiAon

More information

MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES

MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES Training Title MECHANICAL EQUIPMENTS: COMPRESSORS, PUMPS, SEALS, SPEED DRIVES, CONTROL VALVES & ACTUATORS & SAFETY RELIEF VALVES Training Duration 5 days Training Venue and Dates REF Mechanical Equipments:

More information

Service & Support. Questions and Answers about the Proof Test Interval. Proof Test According to IEC FAQ August Answers for industry.

Service & Support. Questions and Answers about the Proof Test Interval. Proof Test According to IEC FAQ August Answers for industry. Cover sheet Questions and Answers about the Proof Test Interval Proof Test According to IEC 62061 FAQ August 2012 Service & Support Answers for industry. Contents This entry originates from the Siemens

More information

This section provides general information and recommendations required prior to installing, operating or maintaining your KAT Master Hitch.

This section provides general information and recommendations required prior to installing, operating or maintaining your KAT Master Hitch. WBM Parts and Installation Manual for KAT Master Hitch General Information This section provides general information and recommendations required prior to installing, operating or maintaining your KAT

More information

El Camino Real. Dear Transit, You Complete me. Love, The Street. Kevin Connolly Transit Planning Manager, Valley Transportation Authority

El Camino Real. Dear Transit, You Complete me. Love, The Street. Kevin Connolly Transit Planning Manager, Valley Transportation Authority El Camino Real Dear Transit, You Complete me. Love, The Street Kevin Connolly Transit Planning Manager, Valley Transportation Authority November 2012 BUS RAPID TRANSIT El Camino Real Plan/Eng: 2010-2014

More information

DEVELOPING YOUR PREVENTIVE MAINTENANCE PROGRAM

DEVELOPING YOUR PREVENTIVE MAINTENANCE PROGRAM DEVELOPING YOUR PREVENTIVE MAINTENANCE PROGRAM By Owe Forsberg, Senior Consultant You are the new Reliability Engineer in a plant that currently lacks documented procedures to maintain the plant. You have

More information

FACULTY OF SCIENCE AND TECHNOLOGY MASTER'S THESIS. Author: Anders Langeland Sætrevik (signature author)

FACULTY OF SCIENCE AND TECHNOLOGY MASTER'S THESIS. Author: Anders Langeland Sætrevik (signature author) FACULTY OF SCIENCE AND TECHNOLOGY MASTER'S THESIS Study program/specialization:: Risk Management, offshore safety. Spring semester, 2009 Open Author: Anders Langeland Sætrevik (signature author) Instructor:

More information

Sustainable Mobility in Greater Sudbury NeORA Conference September 25, 2012

Sustainable Mobility in Greater Sudbury NeORA Conference September 25, 2012 Sustainable Mobility in Greater Sudbury NeORA Conference September 25, 2012 Presented by: David Shelsted, MBA, P.Eng., Director of Roads & Transportation Services The City s Transportation Network Approximately

More information

Trips: Motoring, Cycling: Social Marke3ng

Trips: Motoring, Cycling: Social Marke3ng Trips: Motoring, Cycling: Transi3on, What Mo3vates People? Infrastructure, Social Marke3ng Data and Images Sources Census Canada City of Vancouver h3p://www40.statcan.ca/l01/cst01/labor42a- eng.htm h3p://vancouver.ca/engsvcs/transport/cycling/

More information

Manifesto for a safe, efficient and sustainable transport in NZ

Manifesto for a safe, efficient and sustainable transport in NZ 8 January 2018 Manifesto for a safe, efficient and sustainable transport in NZ Movement is an alliance of organisations working to achieve a safe, efficient and sustainable transport system that provides

More information

Cycle Isolation Monitoring

Cycle Isolation Monitoring Cycle Isolation Monitoring True North Consulting Greg Alder Santee Cooper Leif Svensen Scientech Symposium 2009 January 14-15, 15, 2009 Clearwater Beach, Florida Introduction Generating plants often suffer

More information

CS 149: Understanding Sta2s2cs Using Baseball

CS 149: Understanding Sta2s2cs Using Baseball CS 149: Understanding Sta2s2cs Using Baseball Outline for today Introduc)ons Go over syllabus The history of sta)s)cs in baseball Baseball sta)s)cs and structured data Introduc2ons About you: Name Preferred

More information

Understanding Economic and Social Macro Waves

Understanding Economic and Social Macro Waves Understanding Economic and Social Macro Waves ANTICIPATION, AGENCY AND COMPLEXITY Workshop in Trento, 6-8 April 2017 The UNESCO Chairs in Anticipatory Systems on Friday 7 th Professor Markku Wilenius Finland

More information

Phase B: Parameter Level Design

Phase B: Parameter Level Design Phase B: Parameter Level Design 1 FMEA A chart describing the ways in which the product may fail, the impact, and what has been done to alleviate any problems. Measure of the inability to achieve overall

More information

Sports Field Safety Presenta2on Amy Sa5erfield, Director of Business Development

Sports Field Safety Presenta2on Amy Sa5erfield, Director of Business Development Sports Field Safety Presenta2on Amy Sa5erfield, Director of Business Development Who Is IEA? A consul2ng company providing trusted health and safety solu2ons Presenta1on Take-Away Goals Understand the

More information

GUIDE TO RUNNING A BIKE SHARE. h o w t o p l a n a n d o p e r a t e a s u c c e s s f u l b i k e s h a r e p r o g r a m

GUIDE TO RUNNING A BIKE SHARE. h o w t o p l a n a n d o p e r a t e a s u c c e s s f u l b i k e s h a r e p r o g r a m GUIDE TO RUNNING A BIKE SHARE h o w t o p l a n a n d o p e r a t e a s u c c e s s f u l b i k e s h a r e p r o g r a m 20150209 The bicycle is the most loved form of transportation. No other machine

More information

EX0-008 exin. Number: EX0-008 Passing Score: 800 Time Limit: 120 min.

EX0-008 exin. Number: EX0-008 Passing Score: 800 Time Limit: 120 min. EX0-008 exin Number: EX0-008 Passing Score: 800 Time Limit: 120 min Exam A QUESTION 1 Which statement describes Release Planning? A. After looking at all the stories in the backlog, the team estimates

More information

CONSIDERATIONS FOR THE USE OF SEA WATER IN FIREFIGHTING. Prepared and Presented by Lenny Naidoo (Chief Fire Officer), Engen Petroleum Company

CONSIDERATIONS FOR THE USE OF SEA WATER IN FIREFIGHTING. Prepared and Presented by Lenny Naidoo (Chief Fire Officer), Engen Petroleum Company CONSIDERATIONS FOR THE USE OF SEA WATER IN FIREFIGHTING Prepared and Presented by Lenny Naidoo (Chief Fire Officer), Engen Petroleum Company Content Introduction Risk Assessment Legal Obligations Planning

More information

Bridging the Gap Using Gas Assisted Plunger Li5 (GAPL) Presented By: Todd Thrash Technical Data Provided By: Rusty Brown, P.E.

Bridging the Gap Using Gas Assisted Plunger Li5 (GAPL) Presented By: Todd Thrash Technical Data Provided By: Rusty Brown, P.E. Bridging the Gap Using Gas Assisted Plunger Li5 (GAPL) Presented By: Todd Thrash Technical Data Provided By: Rusty Brown, P.E. Overview What is GAPL? Advantages of GAPL Produc7on Analysis A technical review

More information

Disc Golf at Battle Point Park. Bainbridge Island Metropolitan Park and Recreation District Board Meeting June 1, :00 pm

Disc Golf at Battle Point Park. Bainbridge Island Metropolitan Park and Recreation District Board Meeting June 1, :00 pm Disc Golf at Battle Point Park Bainbridge Island Metropolitan Park and Recreation District Board Meeting June 1, 2017 6:00 pm 1 Recap of Ac+ons Taken To Date Met with the Board on December 1, 2016 to provide

More information

EASA/FAA Significant Standard Differences (SSD) Technical Implementation Procedures (TIP) - Turbine Engines -

EASA/FAA Significant Standard Differences (SSD) Technical Implementation Procedures (TIP) - Turbine Engines - European Aviation Safety Agency SSD # EASA/FAA Significant Standard Differences (SSD) Technical Implementation Procedures (TIP) - Turbine Engines - TIP Rev SSD Issue & Date Standard Amendment Pairs (1)

More information

CONTRACTOR SAFETY INDUCTION HANDBOOK

CONTRACTOR SAFETY INDUCTION HANDBOOK CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number

More information

Bicycle Power Research and Design Factors

Bicycle Power Research and Design Factors Bicycle Power Research and Design Factors Background Summary: Human powered machinery is a great way to supply energy to a machine where electricity is not readily available or reliable. In designing the

More information

Multi-Modal Transportation Programs

Multi-Modal Transportation Programs Multi-Modal Transportation Programs Supporting the Lawrence Strategic Plan Critical Success Factors: Safe, Healthy and Welcoming Neighborhoods Innovative Infrastructure & Asset Management Effective Governance

More information

ASM.exin

ASM.exin ASM.exin Number: ASM Passing Score: 800 Time Limit: 120 min Exam A QUESTION 1 A Scrum Team suggests to have a project with 3 Sprints of 2 weeks, while the customer suggests 1 Sprint of 6 weeks. What is

More information

Condition Based Maintenance Of Rotating Equipments On OSI PI Platform Refineries/ Petrochem Plants

Condition Based Maintenance Of Rotating Equipments On OSI PI Platform Refineries/ Petrochem Plants Condition Based Maintenance Of Rotating Equipments On OSI PI Platform Refineries/ Petrochem Plants Haridoss Padmanabhan Lead Consultant TABLE OF CONTENTS Introduction...3 Different Maintenance Methodologies...

More information

Road Safety Management for Pedestrians and Bicyclists

Road Safety Management for Pedestrians and Bicyclists Caltrans Transportation Planning Speaker Series September 28, 2015 Bike and Pedestrian Issues in Transportation Planning: Road Safety Management for Pedestrians and Bicyclists Offer Grembek Co-Director,

More information

Measuring and Communicating Mobility:

Measuring and Communicating Mobility: Measuring and Communicating Mobility: The District Mobility Project Stephanie Dock, District Department of Transportation TRB Transportation Issues in Major Cities Committee May 2, 2017 Deconstructing

More information

CAADP Implementation and Achievement of Outcomes. Sam Benin, IFPRI

CAADP Implementation and Achievement of Outcomes. Sam Benin, IFPRI CAADP Implementation and Achievement of Outcomes Sam Benin, IFPRI Introduction and Objectives Last 2 days: learned about significant growth and poverty reduc7on in Africa in recent decades Ques6on: how

More information

KUBOTA DIESEL RIDE-ON MOWER GR1600-II

KUBOTA DIESEL RIDE-ON MOWER GR1600-II KUBOTA DIESEL RIDE-ON MOWER GR1600-II With top of the range features, yet simple to use, the GR1600-II makes mowing easy and rewarding. Make your lawn look as beautiful as your home. Get a professional

More information

2015 Business Plan September 2014

2015 Business Plan September 2014 2015 Business Plan September 2014 Mission To Provide Superior Water Services at an Excellent Value To Provide Superior Water Services at an Excellent Value Highly Performing Staff Well Maintained Assets

More information

Swimming Tasmania Strategic Plan ST Strategic Plan Final

Swimming Tasmania Strategic Plan ST Strategic Plan Final 1 Our Vision: Swimming will be one of the premier aquatic sports in Tasmania, demonstrated through growing participation, outstanding performances and commercial sustainability. Purpose: The purpose of

More information

WBM Installation Manual KAT Master Hitch

WBM Installation Manual KAT Master Hitch WBM Installation Manual KAT Master Hitch General Information This section provides general information and recommendations required prior to installing, operating or maintaining your KAT Master Hitch.

More information

Eliminating Dropped Objects at the Worksite

Eliminating Dropped Objects at the Worksite Eliminating Dropped Objects at the Worksite Allen Smith, DROPS GLOBAL Eliminating Dropped Objects at the Worksite Allen Smith, DROPS GLOBAL ABOUT DROPS: dropsonline.org Oil & Gas Industry Workgroup focused

More information

Reliability & Maintenance Consultancy Firm Presents. This course will let you Think Differently on how you do maintenance

Reliability & Maintenance Consultancy Firm Presents. This course will let you Think Differently on how you do maintenance Reliability & Consultancy Firm Presents This course will let you Think Differently on how you do maintenance One of the underlying assumptions of maintenance theory has always been that there is a fundamental

More information

Transformer Reliability

Transformer Reliability Transformer Reliability A prac'cal approach to achieving life expectancy Garth Cuthbert Nov 2015 Transformer Reliability 3 x 1000 kva OFW 1ph 11,000 800 Volts In service since 1915 What contributes to

More information

DATA ITEM DESCRIPTION Title: Failure Modes, Effects, and Criticality Analysis Report

DATA ITEM DESCRIPTION Title: Failure Modes, Effects, and Criticality Analysis Report DATA ITEM DESCRIPTION Title: Failure Modes, Effects, and Criticality Analysis Report Number: Approval Date: 20160106 AMSC Number: N9616 Limitation: No DTIC Applicable: Yes GIDEP Applicable: Yes Defense

More information

Active Transportation Infrastructure Investment A Business Case

Active Transportation Infrastructure Investment A Business Case Active Transportation Infrastructure Investment A Business Case In 2016, the Real Estate Foundation awarded the Capital Regional District a $50,000 grant for Shifting Gears: Land Use Change through Active

More information

INTRODUCTION AND METHODS OF CMAP SOFTWARE BY IPC-ENG

INTRODUCTION AND METHODS OF CMAP SOFTWARE BY IPC-ENG INTRODUCTION AND METHODS OF CMAP SOFTWARE BY IPC-ENG What is Cmap? CMAP is a software designed to perform easily and quickly centrifugal compressors performance evaluations. CMAP provides all quantitative

More information

The Team Trifecta 3 Keys to a Highly Effec6ve Team

The Team Trifecta 3 Keys to a Highly Effec6ve Team The Trifecta: 3 Keys to Highly Effec7ve The Trifecta 3 Keys to a Highly Effec6ve September 11, 2014 Kristin J. Arnold, MBA, CMC, CPF, CSP 2014 All Rights Reserved Tel: 480.502.2100 or 800.589.4733 Fax:

More information

The RCM Analyst - Beyond RCM

The RCM Analyst - Beyond RCM The RCM Analyst - Beyond RCM darylm@strategic-advantages.com About the Author: Daryl Mather was originally trained in RCM in 1991, after which he was involved in the application of the method through a

More information

ANNUAL RELIABILITY AND POWER QUALITY REPORT for the year ended 30 June 2017

ANNUAL RELIABILITY AND POWER QUALITY REPORT for the year ended 30 June 2017 ELECTRICITY INDUSTRY (NETWORK QUALITY AND RELIABILITY OF SUPPLY) CODE 2005 ANNUAL RELIABILITY AND POWER QUALITY REPORT for the year ended 30 June 2017 SEPTEMBER 2017 Page 1 of 81 Contents 1 Purpose...

More information