1 Mast Inspection Client: Location: Date: Inspected by: Verified by:
2 Client Location Size Installed by Energy3 Mast Manufacturer Energy3 Anchor Types Inspection Date 29 th May 2009 Inspector Name Weather Conditions at Time of Inspection Clear day with dotted cloud. Temperature C Low winds (~2-3m/s) from a North Easterly Direction (confirmed with hand-held meter) Inspection Criteria Site Access Mast Inclination Anchors Guy Cables Wire Rope Grips Mast Base Plate Mast Base Connections Guy Rope Connections Instrument Enclosure Comments Site accessed through Glen Gynk Station. Track in good condition all the way to mast. Chains not required. Mast was inspected as vertical and checked with a spirit level. Anchors & back-stays (waratahs) in good condition and showed no signs of movement. All guy wires in excellent condition (were replaced November 2008). Guy tensions were checked OK (no adjustments required). All grips present and in good condition. All checked for tightness and are OK. Base plate in excellent condition with no signs of corrosion or movement. All fixings secure and checked for tightness. Bolts free from corrosion. All connection shackles are present and in good condition. Checked for tightness OK. Instrument enclosure is in good condition. Please note that the enclosure is mounted quite high up the mast (approx. 2.5m AGL) a small ladder must be taken to site for access. No signs of water ingress, corrosion or damage. Door seal in good condition. All cable glands present and tight. Back plate is mounted securely and instrument fixings also secure.
3 Telemetry Instruments Modem (Wavecom) functioning OK function tested by dial in from Energy3 office prior to and after inspection. Aerial and mount in good condition. Anemometer and vane both functioning well and in good condition. Real time readings checked against hand held weather-meter (anemometer) and boom alignment/magnetic compass (vane). MOSFET Switch function tested OK. Solar regulator (Kemo model) in good condition output 13.6V. Battery (17Ah) in good condition 13.58V. bracket. Solar panel in excellent condition and functioning well (output 19.46V). Solar panel brackets starting to show some signs of surface corrosion. All other brackets in good condition. All wires terminated with bootlace ferrules and fixed securely (as installed) Aerial cable was loose so this was cable tied back to the mast. Datalogger Clock was different to laptop clock by -6 seconds (see screenshot below). No adjustment made.
4 Site Security Fencing in good condition. Minor repairs made where necessary. No sign of stock intrusion or damage to mast area. Recommended Actions To Mast & Anchors Inspection recommended in 6 months time, no immediate action required. Guy Ropes & Connections Inspection recommended in 6 months time, no immediate action required. Instrumentation Inspection recommended in 6 months time, no immediate action required. Site Security Inspection recommended in 6 months time, no immediate action required.
5 Other N/A Boom Orientation Top View of Mast when erected Magnetic North P2546A Riso Anemometer 355 (Mag) West East Notes: W200P Vector Wind Vane (North point located at 355 ) All orientation measurements are measured relative to Magnetic North. South
6 Mast Schematics Risø 10m W200P Vector Wind 10m 6m radius from base (4 anchor points (2 guys per anchor point) Instrument Location and Serial Numbers Instrument Serial Number Location Vector W200P Wind Vane Unknown 10m AGL RISO P2546A Anemometer Unknown 10m AGL 355 (Mag) Solar Panel Attached to mast 3.5m AGL Aerial N/A Attached to mast 3.5m AGL Campbell CR510 Data logger Attached to mast 2.5m AGL Wavecom Modem Attached to mast 2.5m AGL Solar Regulator Kemo Attached to mast 2.5m AGL SIM card data number Installed in Modem
7 Photos Mast Base Plate in Excellent Condition Typical Guy Point Showing Back Stays
8 Instrument Enclosure in Good Condition View of Boom
9 View up Mast Mast Viewed from a Distance
10 View of Mast from All 4 Quadrants
IS37 10 Metre Instrument Mast Handbook
IS37 10 Metre Instrument Mast Handbook Version 10.1 6 th February 2014 Environdata Australia Pty Ltd 42-44 Percy Street Warwick Queensland 4370 Australia Phone: (07) 4661 4699 Fax: (07) 4661 2485 International
More informationHow to install AEA s 10 meter meteorological tower
How to install AEA s 10 meter meteorological tower Before you start: This guide assumes that you have obtained permission from the land owner, consulted with US Fish & Wildlife Service and obtained approval
More informationATOC Meteorological Tower (6 meter-4 level) Guide
ATOC Meteorological Tower (6 meter-4 level) Guide SETUP Outline 1. Siting 2. Components 3. Transportation 4. The Tower 5. The Cables and Data Logger Siting Selecting an appropriate site for the weather
More informationLow Wind High Yields Series
Low Wind High Yields Series Wind Turbines USER S MANUAL Introduction Low Wind High Yields Series rotor blades apply the latest advanced thermoplastic engineering and are manufactured by precision injection
More informationSoma Wind Generators
Soma Wind Generators 13M WINH TOWER INSTALLATION MANUAL ERTIFIED to AS4100 Steel Structures ode AS3995 (1994) Design of Steel Lattice Towers and Masts AS1170.2 (1989) SAA Wind Loading Manufactured by SOMA
More informationABTQ-110 rev 00 (Last review: 28 Aug 12) INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH S RANGE ENCLOSURES IECEx SIR U SERIAL No
ABTQ-110 rev 00 (Last review: 28 Aug 12) INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH S RANGE ENCLOSURES IECEx SIR 05.0046U SERIAL No 20 TYPE SX Ex e II C Gb Ex tb IIIC Db IP6* IECEx SIR
More informationPrice List January SECUROPE Life Line
4, rue des Etangs L-7303 Steinsel email :marketing@fallprotec.com Fax : +352 26 36 08 41 Tel : +352 26 55 09 30 Price List January 2009 SECUROPE Life Line Code N Quantity for 1 system Designation Unit
More informationMSA Latchways Ladder System
Systems overview 1 of 13 Important information Individuals or organisations carrying out the installation of a MSA Latchways ladder fall protection system shall read, understand and follow these instructions
More informationInstallation & Commissioning Report
Installation & Commissioning Report Client: XXXX Site: XXXX City: XXXX Provinces: XXXX Country: XXXX 2 Ge:Net GmbH confirms that all facts in this installation report are written to the best of one's knowledge.
More informationNanortalik A preliminary analysis of the wind measurements rev 1
Nanortalik A preliminary analysis of the wind measurements rev 1 Introduction Note pr 14.08.2009 Tove Risberg, Kjeller Vindteknikk AS A 50 m met mast has been measuring the wind speed at Nanortalik Heliport
More informationX-03 EMERGENCY TOWING ARRANGEMENTS
Guideline No.: X-03(201510) X-03 EMERGENCY TOWING ARRANGEMENTS Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements,
More informationWeather Station Mast Type M2
User Manual Weather Station Mast Type M2 M2-UM-4.0 Delta-T Devices Ltd Notices Copyright All rights reserved. Under the copyright laws, this manual may not be copied, in whole or in part, without the written
More informationQUICK START GUIDE CB-450 DATA BUOY PLATFORM
What s Included (1) Buoy hull with data well, 450 lb buoyancy (1) Buoy tower (3) 10W Solar panels (1) Data well lid (isic-cb or pass-through) (3) Top-side lifting eyes (3) Bottom-side mooring eyes (1)
More information10m-130mm Tubular Tower. Technical Specifications
10m-130mm Tubular Tower Technical Specifications ENALLAKTIKI ENERGIAKI 2006 Y 1 0 m / 1 0 m T U B U L A R T O W E R T E C H N I C A L S P E C S Index 1 Contact Details....3 2 Tubular Meteorological Towers....4
More informationQUICK START GUIDE CB-150 DATA BUOY PLATFORM
What s Included (1) Buoy hull with data well, 150 lb buoyancy (1) Buoy tower (3) 6W Solar panels (1) Data well lid (isic-cb or pass-through) (3) Top-side lifting eyes (3) Bottom-side mooring eyes Common
More informationTRI-POD SETUP. Guidelines for Typical Field Setup. Site Selection
TRI-POD SETUP Guidelines for Typical Field Setup Site Selection Use the following guidelines to help you choose an appropriate site for setting up the Station and protecting against field hazards. When
More informationWIND DATA REPORT. Paxton, MA
WIND DATA REPORT Paxton, MA July 1, 2011 September 30, 2011 Prepared for Massachusetts Clean Energy Center 55 Summer Street, 9th Floor Boston, MA 02110 by Eric Morgan James F. Manwell Anthony F. Ellis
More informationIntermediate Angle, 0-25, Drilling detail. Angle 26-50, Baulk Plates, Pole Details. Termination Poles, ABC Details
Part 7 LVABC Overhead Drawing Register Number A1 A2 A3 A4 A5 A6 A8 A9 Description Intermediate Angle, 0-25, Drilling detail Angle 26-50, Baulk Plates, Pole Details Termination Poles, ABC Details Inline
More informationTD-106-5D TD-106-5D-A Wind Direction Sensor User s Manual
Relied on Worldwide in the Most Extreme Conditions TD-106-5D TD-106-5D-A Wind Direction Sensor User s Manual Texas Electronics, Inc. Dallas, TX 75237 Fax.214.631.4218 4230 Shilling Way Tel.214-631-2490
More informationWe put it all on the line, so you don t have to.
3M DBI-SALA 8 mm Permanent Horizontal Lifeline Systems We put it all on the line, so you don t have to. Smarter software. Stronger hardware. Easier installation. How do you improve on one of the best permanent
More informationInstruction Manual: VelectriX Foldaway
Instruction Manual: VelectriX Foldaway CONTENTS Safe Riding Recommendations Page 2 Pre-Ride Checklist Page 3 Display and Controls Page 4 Quick Guide to Folding Page 6 Battery Instructions Page 7 Maintenance
More informationSurface exploration drilling
Checklist Surface exploration drilling This checklist is intended to assist employers to identify common hazards and manage risks associated with surface exploration drilling. June 2017 Background In surface
More informationPage 1 of 1 04/19/13 SBR
Office of Roadway Engineering - Plan Insert Sheets Number Title Date Number Title Date Number Title Date 201015 Extension of Anchor Bolts 07/20/12 207000 Bikeway Pavement Marking Details 01/18/13 202010
More informationEssential Rig Tuning Guide The Ins and Outs of tuning your mast.
Essential Rig Tuning Guide The Ins and Outs of tuning your mast. Tuning Your Rig The main goal in tuning your mast is to achieve a spar that s straight. By doing this it will help you gain control of sail
More informationWINCH USER GUIDE WARN 3700 Utility Winch Part Number: 93700
WINCH USER GUIDE WARN 3700 Utility Winch Part Number: 93700 Your safety, and the safety of others, is very important. To help you make informed decisions about safety, we have provided installation and
More informationCSBUOY-DT INSTRUCTION MANUAL
CSBUOY-DT INSTRUCTION MANUAL 5/02 COPYRIGHT (c) 2002 CAMPBELL SCIENTIFIC, INC. This is a blank page. WARRANTY AND ASSISTANCE This equipment is warranted by CAMPBELL SCIENTIFIC (CANADA) CORP. ( CSC ) to
More informationQUICK START GUIDE CB-950 DATA BUOY PLATFORM
What s Included (1) Buoy hull with data well, 950 lb buoyancy (1) Buoy tower (3) 40W Solar panels (1) Data well lid (isic-cb or pass-through) (3) Top-side lifting eyes (3) Bottom-side mooring eyes (1)
More informationLONG TERM SITE WIND DATA QUARTERLY REPORT. Bishop and Clerks
LONG TERM SITE WIND DATA QUARTERLY REPORT Bishop and Clerks April 1, 2012 June 30, 2012 Prepared for Massachusetts Clean Energy Center 55 Summer Street, 9th Floor Boston, MA 02110 by Frederick Letson James
More informationSCAM T.P.E. WATER TREATMENT SYSTEM SWT- AP AUTOMATIC PURGE
SCAM T.P.E. WATER TREATMENT SYSTEM SWT- AP AUTOMATIC PURGE 1 TABLE OF CONTENTS 1. PURPOSE OF SUPPLY... 3 2. SYSTEM FUNCTIONING... 3 3. SYSTEM COMPONENTS... 4 4. BATTERY LIMITATIONS... 6 5. DOCUMENTATION...
More informationInstallation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning
OWNER'S MANUAL Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System Model # s: 6000, 6001, 6010 Warning You must read and fully understand all instructions, or
More informationTripod Setup Guide (M-TPx)
Items needed: 1/2 inch wrench, mast level (M-MLA), medium size wire cutters, crescent wrench, all-purpose grease, tape measure, tie wraps, redi-mix cement (optional), shovel (optional), sledge hammer (for
More informationUniversal Valve Company Inc
Universal Valve Company Inc 800-223-0741 www.universalvalve.com 1975-FA34 (Air Tower Troubleshooting Manual) Overview This manual has been arranged as a tool for diagnosing, and repairing Free Air Universal
More informationArran LED Floodlight Luminaire
Arran LED Floodlight Luminaire INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS Important: Please read these instructions carefully before installing or maintaining this equipment. Good electrical
More informationJohn Paul (JP) Jones President
John Paul (JP) Jones President of Required Training for Telecommunications Tower Workers in the USA WHAT STANDARDS AND REGULATIONS DO WE TRAIN TO? OSHA CFR 29-1926 & 1910 ANSI 490.1 ANSI Z359 ANSI 10.48
More informationCLIENT NAME: LOCATION: CALM BUOY INSPECTION:
INSPECTOR REVIEWED INSPECTION OF CALM BUOY OVERALL PHOTO REVISION DESCRIPTION: Preliminary / Final Page: 1 TABLE OF CONTENT 1. MANAGEMENT SUMMARY... 3 1.1. SCOPE OF WORK:... 3 1.2. CORRECTIVE ACTIONS...
More informationInstallation and Training Manual
AirForce1 Tower Kit Installation and Training Manual FuturEnergy Limited Ettington Park Business Centre Stratford upon Avon CV37 8BT +44 (0)1789 451070 Table of Contents Safety Notes... 3 Parts Supplied
More informationMaintenance of the Electronic ( EPC ) Pressure Controllers on GCs
Gas flows in all GCs are controlled by Electronic Pressure Controllers ( EPC ). There may be up to 7 EPCs mounted in one GC depending on which combination of injectors and detectors are installed. Each
More informationSerial Number: Lot Number: Purchase Date: General Factors Accepted / Rejected Supportive Details or Comments. Accepted Rejected.
Full Body Harness Harness Model: General Factors / Supportive Details or Comments 1.) Hardware: (includes D-rings, buckles, keepers, and back pads) Inspect for damage, distortion, sharp edges, burrs, cracks
More informationEQUILIBRIUM/CENTER-OF-GRAVITY (honors)
EQUILIBRIUM/CENTER-OF-GRAVITY (honors) 1) Three boys are trying to balance on a seesaw, which consists of a rock, acting as a pivot at the center, and a very light board 3.60 m long. Two boys are already
More informationE-trike Li Assembly Guide
PREPARATION 1. Read this assembly manual BEFORE commencing assembly. 2. Carefully remove all the components and packaged hardware from the shipping boxes. 3. Unpack the contents of the large double box
More informationProject: Consultant : MEP Contractor: PREPARED BY: DORMAN SMITH SWITCHGEAR - DUBAI REVIEWED BY CONSULTANT : Page 1 of 15
PRCEDURES FR RUTINE TESTING F CAPACITR BANKS Consultant : MEP Contractor: Project: PREPARED BY: DRMAN SMITH SWITCHGEAR - DUBAI NAME: REVIEWED BY CNSULTANT : NAME: SIGNATURE: SIGNATURE: Page 1 of 15 Table
More informationInstruction Manual: VelectriX Urban 2.0+
Instruction Manual: VelectriX Urban 2.0+ CONTENTS Safe Riding Recommendations Page 2 Pre-Ride Checklist Page 3 Display and Controls Page 4 Maintenance Page 8 Warranty Page 9 Contact Details Page 10 Service
More informationFoundation Products. Poured In Ground Anchor Bolts E1 - E4. Structural Foundations E5 - E12. Copyright 2016 s Industry Inc. SIE-RA-CMP EN
Foundation Products Poured In Ground Anchor Bolts E1 - E4 Structural Foundations E5 - E12 EA EB Poured in Ground Anchor Bolts Layout SIEMENS Anchor Bolts 131702-4X shown for reference purposes only! Actual
More informationInstruction Manual: VelectriX Urban 2.0
Instruction Manual: VelectriX Urban 2.0 CONTENTS Safe Riding Recommendations Page 2 Pre-Ride Checklist Page 3 Display and Controls Page 4 Maintenance Page 8 Warranty Page 9 Contact Details Page 10 Service
More informationManual PT1000/1500/2000 personnel/material elevator printdate: versie 1.1 INTRODUCTION... 2
INDEX INTRODUCTION... 2 1. DESCRIPTIONS... 3 1.1 INTRODUCTION... 3 1.2 TECHNICAL SPECIFICATIONS... 5 1.3 SAFETY FEATURES... 8 2. SAFETY REGULATIONS... 9 2.1 GENERAL... 9 2.2 REGULATIONS... 9 2.2.1 MOUNTING...
More informationCB-150 Data Buoy Quick Start Guide
CB-150 Data Buoy Quick Start Guide The NexSens CB-150 Data Buoy is designed for deployment in lakes, rivers, coastal waters, harbors, estuaries and other freshwater or marine environments. The floating
More informationHOBO Station Tri-pod Setup Guide
HOBO Station Tri-pod Setup Guide Part #: MAN-TRIPOD Doc #: D-12317-A Contact Information For support, please contact the company that you bought the product from: Onset Computer Corporation or an Onset
More informationMANITOWOC MODEL TON CAPACITY
LIFTING CHARTS - Crawler Cranes ANITOWOC ODEL - TON CAPACITY BOO RIGGING GUIDE ODEL # HEAVY LIFT BOO Table of Contents General... Assist Crane Requirements... Accessing Parts... Installation and Removal
More informationGEN20AD-GEN20AL-GEN18AN
AD-- Parts List 02-August-16 This parts list is current as of the above revision date. See http://www.rheempartslists.net/92-42800-ad--.pdf for the current revision. Standby Generators Table of Contents
More informationDG Prospector TM Owner s Manual and Installation Guide 3-CMLT-1414 Rev B
DG Prospector TM Owner s Manual and Installation Guide 3-CMLT-1414 Rev B Assembly Installation Maintenance 2014 XZERES Corp All Rights Reserved XZERES Wind Congratulations on your purchase and welcome
More informationInstruction Manual: VelectriX Ascent 29 MTB
Instruction Manual: VelectriX Ascent 29 MTB CONTENTS Safe Riding Recommendations Page 2 Pre-Ride Checklist Page 3 Display and Controls Page 4 Maintenance Page 8 Warranty Page 9 Contact Details Page 10
More informationOperating instructions Safety Rope Emergency Stop Switches ZB0052 / ZB0053 ZB0072 / ZB0073
Operating instructions Safety Rope Emergency Stop Switches UK ZB0052 / ZB0053 ZB0072 / ZB0073 7390878 / 02 03 / 2011 Contents 1 Safety instructions...3 2 Installation / set-up...4 2.1 Applications...4
More informationPARAVION TECHNOLOGY, INC AIRWAY AVENUE FT. COLLINS, COLORADO 80524
PARAVION TECHNOLOGY, INC. 2001 AIRWAY AVENUE FT. COLLINS, COLORADO 80524 INSTRUCTIONS FOR CONTINUED AIRWORTHINESS 407LS-100 INSTALLATION BELL 407 HELICOPTERS Cover THIS PAGE INTENTIONALLY LEFT BLANK Page
More informationGV Standard X-Vent. Setup, Commissioning & Installation Guide
GV Standard X-Vent Setup, Commissioning & Installation Guide Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings.
More informationSite Summary. Wind Resource Summary. Wind Resource Assessment For King Cove Date Last Modified: 8/6/2013 By: Rich Stromberg & Holly Ganser
Site Summary Wind Resource Assessment For King Cove Date Last Modified: 8/6/2013 By: Rich Stromberg & Holly Ganser Station ID: 2857 Latitude: 55 7 45.8 N Longitude: 162 16 10.6 W Tower Type: 30 m NRG Tall
More informationWIND CLIPPER KTS ILLUM SCALE INC DEC CLIPPER WIND SYSTEM
CLIPPER WIND KTS ILLUM SCALE DEC INC CLIPPER WIND SYSTEM TABLE OF CONTENTS INTRODUCTION PRE-TEST OF INSTRUMENT INSTALLING THE MASTHEAD SENSOR UNIT INSTALLING THE DISPLAY NORMAL OPERATION CHANGING THE
More informationSafewaze FS983 Cable Safety Climb System Ladder Mount Instructions
Safewaze FS983 Cable Safety Climb System Ladder Mount Instructions Ladder Mount Cable Safe Climb System B) Head Assembly with Cable A) Upright Mast C) Cable Standoff E) Cable Clamps D) Base Anchor Bracket
More informationSOP GEN-007X Crane and Winch Operations
Page 1 of 7 SOP GEN-007X 1.0 Introduction 2.0 Responsibility 3.0 References 4.0 Training and Qualifications 5.0 Operational Inspections 6.0 Maintenance and Load Tests 7.0 Cranes 8.0 Winches 9.0 Mobile
More information8012, 8018 & ,000 LB. CAPACITY HOOK-TYPE CABLE SHEAVES
OPERATION, SERVICE AND PARTS INSTRUCTION MANUAL 80, 808 & 804 8,000 LB. CAPACITY HOOK-TYPE CABLE SHEAVES Read and understand this material before operating or servicing this sheave. Failure to understand
More information20', 15', AND 12' BALL STOPS ASSEMBLY INSTRUCTIONS
20'-0" 15'-0" 1 739020 739020A 20' BALL STOP; STRAIGHT POLE 739015 739015A 15' BALL STOP; STRAIGHT POLE 739012 739012A 12' BALL STOP; STRAIGHT POLE Read all of the instructions before beginning. Make sure
More informationLONG TERM SITE WIND DATA ANNUAL REPORT. Paxton, MA
LONG TERM SITE WIND DATA ANNUAL REPORT Paxton, MA July 1, 2012 June 30, 2013 Prepared for Massachusetts Clean Energy Center Summer Street, 9th Floor Boston, MA 021 by Dylan D. Chase James F. Manwell Anthony
More informationFlamco Flamco-Fill STA Flamco-Fill STM
STA STM Typ STA 5936 Typ STM 5937 GB Installation and operating instructions 1999, 2 Contents GB UK Limited P.O. Box 9, Washway Lane, St. Helens, Merseyside WA10 6FE United Kingdom Telephone: 01744 744744
More informationPaper Tiger Catamaran International Association MEASUREMENT FORM
Paper Tiger Catamaran International Association MEASUREMENT FORM Amended June 2000: July 2002: April 2012 Name of boat: Sail No: Owner s name: Owner s address: Postcode: Phone: (H) (B) (Mob.) Email: Owner
More informationDG Prospector OWNER S MANUAL AND INSTALLATION GUIDE. Assembly Installation Maintenance Southwest Windpower, Inc. All Rights Reserved
TM DG Prospector OWNER S MANUAL AND INSTALLATION GUIDE Assembly Installation Maintenance 2012 Southwest Windpower, Inc. All Rights Reserved Southwest Windpower Congratulations on your purchase and welcome
More informationTV-114 TV-114-A Wind Speed Sensor User s Manual
Relied on Worldwide in the Most Extreme Conditions TV-114 TV-114-A Wind Speed Sensor User s Manual Texas Electronics, Inc. Dallas, TX 75237 Fax.214.631.4218 4230 Shilling Way Tel.214-631-2490 www.texaselectronics.com
More informationTelescopic winch handle Speedfriend"
Winch handles, jib furlers JIB FURLERS - WINCH HANDLES - SPREADER COVERS 57 Floating winch handles Floating universal size winch handles Fitted with "Lock In" winch system; universal size for any winch;
More informationUniversal Valve Company Inc
1975-FA34 (Air Tower Troubleshooting Manual) Overview This manual has been arranged as a tool for diagnosing, and repairing Universal Air Towers Please read closely to identify the components that are
More informationTechnical Bulletin. Parts and Service News. LPG Lock-Off valve replacement procedures for 4.2 Liter Ford V6
Equipment Affected Technical Bulletin LPG Lock-Off valve replacement procedures for 4.2 Liter Ford V6 Ford 4.2L V-6 powered tractors with LPG fuel systems. Part Description Discrepancy Fuel Pressure Lock-off
More informationInstruction Manual: VelectriX Ascent+ 29 MTB
Instruction Manual: VelectriX Ascent+ 29 MTB CONTENTS Safe Riding Recommendations Page 2 Pre-Ride Checklist Page 3 Display and Controls Page 4 Maintenance Page 8 Warranty Page 9 Contact Details Page 10
More informationOEM Manual. MODEL ½ Digit DRUM SCALE
OEM Manual MODEL 4020-3 ½ Digit DRUM SCALE Scaletron Industries, Ltd. Bedminster Industrial Park 53 Apple Tree Lane P.O. Box 365 Plumsteadville, PA 18949 USA Toll Free: 1-800-257-5911 (USA & Canada) Phone:
More informationTOWER INSTALLATION MANUAL For A.R.E. Guyed Pipe Towers Short Towers 43, 64 and 85 feet tall
TOWER INSTALLATION MANUAL For A.R.E. Guyed Pipe Towers Short Towers 43, 64 and 85 feet tall Contents 1) Introduction...2 2) Site Selection and Preparation...2 3) Tools List...3 4) Parts List...4 5) Tower
More informationLONG TERM SITE WIND DATA ANNUAL REPORT. Bishop & Clerks
LONG TERM SITE WIND DATA ANNUAL REPORT Bishop & Clerks July 1, 2012 June 30, 2013 Prepared for Massachusetts Clean Energy Center 55 Summer Street, 9th Floor Boston, MA 02110 by Frederick Letson James F.
More informationWIND DATA REPORT. Vinalhaven
WIND DATA REPORT Vinalhaven January - December, 2003 Prepared for Fox Islands Electric Cooperative by Anthony L. Rogers May 12, 2004 Report template version 1.1 Renewable Energy Research Laboratory 160
More informationINTERNATIONAL SUNFISH CLASS ORGANIZATION CLASS RULES
INTERNATIONAL SUNFISH CLASS ORGANIZATION November 2017 CLASS RULES 1. GENERAL The design and development of the Sunfish sailboat was directed to the creation of a one-design class where the true test is
More informationRoughneck TM Mesh Slings
Roughneck TM Slings ROUGHNECK WIRE MESH SLINGS Widely used in metalworking shops and steel warehouses where loads are abrasive, hot or tend to cut web slings Features and Benefits Promotes Safety Steel
More informationWellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada
Installation and Operation Guide Nanometrics Inc. Kanata, Ontario Canada 2001 2005 Nanometrics Inc. All Rights Reserved. Installation and Operation Guide The information in this document has been carefully
More informationC&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.
C&G 2395 Exam Paper June 2013 Section A-All questions carry equal marks. Answer all three questions. Show all calculations. 1. The electrical installation in an industrial unit is scheduled for a periodic
More informationOPERATING and MAINTENANCE INSTRUCTIONS MAXIS 3K Puller (M3K-M)
OPERATING and MAINTENANCE INSTRUCTIONS MAXIS 3K Puller (M3K-M) 04/17 (M3K-M) READ AND UNDERSTAND ALL OF THE INSTRUCTIONS AND SAFETY INFORMATION IN THIS MANUAL BEFORE OPERATING OR SERVICING THIS TOOL TABLE
More informationS/Y MORSKI ZEKAN TECHNICAL INFORMATION
S/Y MORSKI ZEKAN TECHNICAL INFORMATION Cabins: 3 Toilets: 1 Max. Persons: 8 (6+2) LOA: 11,35 m Beam: 3,80 m Draft: 1,95 m Engine: Volvo 28HP Water tanks: 360 L Fuel tank: 150 L Anchor windlass Speed and
More informationRESCUE LIFTING DEVICE RUP 503-[...] AT 053-[...] xx
EN 1496:2006 / B Reference number: RESCUE LIFTING DEVICE RUP 503-[...] AT 053-[...] xx DESIGNATED USE The rescue lifting device RUP 503-[...] series is a component of rescue system. Using this device the
More informationMechanical Wind Recorder
THE WORLD OF WEATHER DATA - THE WORLD OF WEATHER DATA - THE WORLD OF WEATHER DATA Instruction for Use 021186/11/06 Mechanical Wind Recorder 4.3900.20.000 ADOLF THIES GmbH & Co. KG Hauptstraße 76 37083
More informationLogger Users Manual Etesian Technologies
i Logger Users Manual 0906 Etesian Technologies www.etesian-tech.com Table of Contents Introduction 1 Theory of Operation 1 Setting Up the Sensor 2 Connecting the Receiver/Logger 3 Outputs 5 Appendix A
More informationCobham Mast Systems. Cobham Mast Systems is the leading manufacturer and supplier of lightweight telescopic composite masts
Cobham Mast Systems Cobham Mast Systems is the leading manufacturer and supplier of lightweight telescopic composite masts The most important thing we build is trust TELESCOPIC MAST SYSTEMS The lightweight
More informationNOVALYNX CORPORATION MODEL WEATHER STATION INSTRUCTION MANUAL
NOVALYNX CORPORATION MODEL 100-1950 WEATHER STATION INSTRUCTION MANUAL Receiving and Unpacking Carefully unpack all components and compare to packing list. Notify NovaLynx Corporation immediately concerning
More informationDraw-wire system SZG165
Draw-wire system SZG165 www.wachendorff-automation.com Wachendorff Automation... systems and encoders Complete systems Industrial rugged encoders to suit your application Standard range and customer versions
More informationRAI-M series RUDDER ANGLE INDICATOR SYSTEM
RUDDER ANGLE INDICATOR SYSTEM RAI-M series SEAFIRST ENGINEERING CO 45-16, Ga Um Dong, Chang Won, Kyong Nam Korea Tel : 82 55 267 1645 Fax ; 82 55 266 1646 http://www.seafirst.co.kr GENERAL Seafirst Rudder
More informationDeploying the TCM-1 Tilt Current Meter in an Inverted (Hanging) Orientation By: Nick Lowell, Founder & President
Lowell Instruments Application Note #TCMA Deploying the TCM-1 Tilt Current Meter in an Inverted (Hanging) Orientation By: Nick Lowell, Founder & President 1 Introduction The TCM-1 Tilt Current Meter (TCM)
More informationPool Inspection. Your Street San Diego, California Prepared for: Your Name Prepared by: Priority Inspection Service
Pool Inspection Your Street San Diego, California 92106 Prepared for: Your Name Prepared by: Page 1 of 10 Table of Contents Standards of Practice 2 Definitions 3 General Information 3 General Pool Information
More informationHeavy Equipment & Rigging Specialist Training
Heavy Equipment & Rigging Specialist Training Module 1 Unit 4: Intro to Rigging May08 1 Key Points Review of Exercise Goals Discuss Rigging Components Language of Crane Signals Review Anchor Installation
More information2018 INSPECTION REPORT
2018 INSPECTION REPORT Compiled For Queensland University of Technology KELVIN GROVE CAMPUS INTRODUCTION Height Dynamics is an innovative height safety company that provides a diverse range of products
More informationMagnetic level switch type MR783 Instruction Manual
Magnetic level switch Magnetic level switch type MR783 1. DESCRIPTION page 3 1.1 Operation page 3 1.2 Application page 3 1.3 Description page 3 2. SPECIFICATIONS page 3 2.1 Service Conditions page 4 2.2
More informationPX3005. Rangeable Industrial Pressure Transmitter M-5721/1018
PX3005 Rangeable Industrial Pressure Transmitter INTRUCTION HEET -5721/1018 hop online at omega.com e-mail: info@omega.com For latest product manuals: omegamanual.info ! Pressure / differential pressure
More informationCrane & Rigging Brain Teasers
Crane & Rigging Brain Teasers Host: Mike Parnell President/CEO, ITI ASME B30 Vice Chair (Cranes & Rigging) ASME P30 Chair (Lift Planning) The views expressed in this presentation are that of ITI and are
More informationREPLACING THE AFT RUDDER CABLES
REPLACING THE AFT RUDDER CABLES Note: You must have the assistance of a qualified Aircraft Mechanic to perform this procedure. A logbook entry with the mechanics signature is required. Please read these
More informationPressure Transmitters 36 F-27839
Pressure Transmitters 36 F-27839 SPD310/SPD360 Air Differential schneider-electric.com 37 SPD310/SPD360 SPD310/SPD360 differential pressure transmitters are intended for use in air handling systems for
More informationL230 LED 40 Watt Searchlight
User Instruction & Installation Manual L230 LED 40 Watt Searchlight Product Reference Number: A6158 12/24v DECK A6159 12/24v CABIN Manufacturer s details: Francis Searchlights Ltd Union Road, Bolton Lancashire,
More informationOverspeed governors (113 OG Моment 250 MR, 114 OG Moment 250 A3, 115 OG Moment 250 MRL, 119 OG Moment 250 MRL/1)
Overspeed governors (113 OG Моment 250 MR, 114 OG Moment 250 A3, 115 OG Moment 250 MRL, 119 OG Moment 250 MRL/1) Instructions for installation and operation 113 OG Моment 250 MR 115 OG Moment 250 MRL Overspeed
More informationOPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP40BC BARGE CONNECTOR WINCH
W. W. Patterson Company 3 Riversea Road Pittsburgh, PA 15233 Phone: 800-322-2018 FAX: 412-322-2785 OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP40BC BARGE CONNECTOR WINCH Please fill in the following blanks
More informationROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW
ROCKDALE COUNTY NEW SWIMMING POOL PLAN REVIEW Pool Name: Address: Contractor: Phone: Number of Pools Applied for: The following is a list of facility requirements for opening a public pool. Read each requirement
More informationINTERPLANT STANDARD - STEEL INDUSTRY
INTERPLANT STANDARD - STEEL INDUSTRY IPSS STANDARD MAINTENANCE PRACTICE FOR PNEUMATIC OPERATED SHUT OFF VALVES No Corresponding IS Exists IPSS: 2-07-105-15 Formerly-: (New Standard) 0. Foreword 0.1. Interplant
More information