Intermediate Angle, 0-25, Drilling detail. Angle 26-50, Baulk Plates, Pole Details. Termination Poles, ABC Details
|
|
- Morgan Watts
- 5 years ago
- Views:
Transcription
1 Part 7 LVABC Overhead Drawing Register Number A1 A2 A3 A4 A5 A6 A8 A9 Description Intermediate Angle, 0-25, Drilling detail Angle 26-50, Baulk Plates, Pole Details Termination Poles, ABC Details Inline Strain, with or without Fusing / Isolation Tee Off Cables Circuit Breaker and Mounting Bracket Standard Fuse and Mounting Bracket Horizon Power Corporation
2 INTERMEDIATE ANGLE 0^ - 25^ DRILLING DETAIL A1
3 STAY BOLTED BAULK BOLTED BAULK 1500 NOTE 2 POLE STRENGTH (kn) SELECTION FOR WIND CATEGORIES A & B (NOTE 8) CATEGORY A POLE HEIGHT 9.5m 11.0m 12.5m LOCATION POLE HEIGHT LOCATION TOWN RURAL TOWN RURAL CATEGORY B 9.5m 11.0m 12.5m STAY REQUIRMENTS FOR ANGLE DEVIATION FOR 4 x 95mm CABLE ANGLE OF DEVIATION (DEG) ANGLE OF DEVIATION (DEG) TERM TERM MEDIUM TENSION MEDIUM TENSION BOLTED BAULKS BOLTED BAULKS STAYED STAYED TIGHT TENSION TIGHT TENSION BOLTED BAULKS STAY REQUIRMENTS FOR ANGLE DEVIATION FOR 4 x 150mm CABLE BOLTED BAULKS TERM STAYED TERM STAYED 2. REFER TO TABLE TO DETERMINE IF BAULK REQUIRED (STOCK No. CZ0388) BAULKS TO BE INSTALLED IN PARALLEL WITH THE HORIZON POWER ALIGNMENT USING U-BOLTS. 3. POLE TOP ARRANGEMENTS (0^ - 25^) ABC 300 AND (26^ - 50^) ABC 301 ARE TO BE USED WITH THE POLE SELECTION. 4. POLE STRENGTH IS FOR A CONDUCTOR WIND LOADING OF 500pa AT 15^. 5. IN CYCLONIC AREAS POLES MUST BE STAYED FOR ANGLES GREATER THAN 10^. 6. FOR POOR SOIL CONDITIONS POLES MUST BE STAYED FOR DEVIATIONS GREATER THAN 5^ 7. ALL STAYS SHOULD BE 19/2.0 SC/GZ G 1320 STRENGTH. 8. POLE STRENGTH REQUIREMENTS FOR A STEEL POLE IN MEDIUM/GOOD SOIL CONDITIONS. ANGLE 26^- 50^ BAULK PLATES POLE DETAILS A2
4 SEE NOTE 2 & 3 ABC EYEBOLT HOLE STAY 4 SEE NOTE 2 2. ABC TAILS TO BE CAPPED/SEALED. 3. WHEN LOOPED BACK ALONG THE LINE THE CABLE TO BE HELD IN PLACE BY SUITABLE CABLE TIES WITH TAPE OVER TERMINATION POLE ABC DETAILS A3
5 () 14 DIAMETER HOLE () 14 DIAMETER HOLES INLINE STRAIN WITH OR WITHOUT FUSING / ISOLATION A4
6 R8 NEUTRAL ABC CLAMP TEE OFF A5
7 SEE NOTE TOP OF POLE R W R3 B ROADSIDE N R () 14 DIAMETER HOLE () 14 DIAMETER HOLES 2. ALWAYS MAKE ALL ABC CONNECTIONS FIRST. 3. CONNECTIONS TO OPEN AERIALS ARE TO BE THE LAST PROCEDURE CARRIED OUT. 4. PHASING OUT BETWEEN THE ABC CONDUCTORS AND THE OPEN AERIALS MUST BE CARRIED OUT BEFORE CONNECTION IS MADE. 5. SPLICE AND PG CLAMP ARE TO BE USED FOR ABC TO BARE AERIAL CONNECTION. 6. DASHED ABC CABLE SHOWS ALTERNATIVE CONNECTIONS FOR AN DIRECT TAP WITHOUT FUSES. TEE OFF LV BARE TO ABC A6
8 FIX TO ABC UNIVERSAL BRACKET CIRCUIT BREAKER COVER C.B. FIXING HOLES CIRCUIT BREAKER MOUNTING BRACKET THREE PHASE CIRCUIT BREAKER SINGLE PHASE CIRCUIT BREAKER 1. IN CYCLONIC AREAS FUSING IS REQUIRED TO CIRCUIT BREAKER, REFER A9 CIRCUIT BREAKER AND MOUNTING BRACKET A8
9 "T" BRACKET SEE NOTE 1 SEE NOTE 1 SEE NOTE 2 1. MOUNTING PLATE CAN BE FITTED IN EITHER POSITION TO SUIT INSTALLATION. 2. A MINIMUM OF 2 BOLTS FITTED DIAGONALLY MUST BE USED STANDARD FUSE AND MOUNTING BRACKET A9
Installation and Training Manual
AirForce1 Tower Kit Installation and Training Manual FuturEnergy Limited Ettington Park Business Centre Stratford upon Avon CV37 8BT +44 (0)1789 451070 Table of Contents Safety Notes... 3 Parts Supplied
More informationAirwalker. Installation and Safety Information. Stretch Products for Dance, Therapy, Education, and Fitness
Airwalker Installation and Safety Information Stretch Products for Dance, Therapy, Education, and Fitness www.dyenamicmovement.com Airwalker is a Registered Trademark of Dye namic Movement Products, Inc.
More informationField Instruction. Stringing new bare conductors above or below live bare overhead conductors
5.10 Stringing, Tensioning and Sagging Conductors/Cables Purpose The purpose of this instruction is for all Horizon Power workers who undertake the stringing and tensioning of bare overhead conductors
More informationSecurity and confidence at height.
A Security and confidence at height. Vertical Systems DISTRIBUTED BY M DBI-SALA Vertical Systems are designed to complement your ability to work while meeting all applicable OSHA and ANSI standards. Vertical
More informationCS10 # Network Safety Performance Objectives (2016)
CS10 #4384287 Network Safety Performance Objectives (2016) Context & Purpose The Horizon Power Network Safety Objectives (2016) (Objective Statement) has been prepared for each of network safety performance
More information3/8" Safety Cable Systems
3/8" Safety Cable Systems Ladder-Mount 3/8" Cable System (No Slider) Kits include appropriate length of aircraft cable, top and bottom support brackets, 12" tensioning turnbuckle, tension spring, and all
More informationPage 1 of 1 04/19/13 SBR
Office of Roadway Engineering - Plan Insert Sheets Number Title Date Number Title Date Number Title Date 201015 Extension of Anchor Bolts 07/20/12 207000 Bikeway Pavement Marking Details 01/18/13 202010
More informationTripod Setup Guide (M-TPx)
Items needed: 1/2 inch wrench, mast level (M-MLA), medium size wire cutters, crescent wrench, all-purpose grease, tape measure, tie wraps, redi-mix cement (optional), shovel (optional), sledge hammer (for
More informationAnchors that can be used for a lifeline in a grain bin. or Ladder do not make good anchors!
Anchors that can be used for a lifeline in a grain bin. or Ladder do not make good anchors! Definitions: Carabiner 1 Webbing attachment hardware with double locking action rated at 4,000 pounds 8 mm Accessory
More informationTVPPA Lineman Apprenticeship Program
Self-Study Modules Unit 1 Unit 2 Unit 3 Unit 4 Lineman Apprenticeship Program Skills Labs Pre-Apprentice Assessment Digger Derrick Training Fundamentals Lab 1 Construction Lab 2 Operations Lab 3 Underground
More informationTRAVSMART permanent single-cable horizontal lifeline system
The Travsmart single-line system provides a smooth travel. It allows the traveler to move freely over the intermediate anchors, minimizing wear and eliminating user assistance. The user s hands remain
More informationTroyer s Gourd Rack 8 unit F R H O P
B E A D I M-N L Vertical Parts F R H O P Horizontal Parts C G J Updated 11/16 Parts List A: Top of Pole B: Bottom of Pole C: 48 Ground Stake D: Top Perch rods 48 long E: Hub F: Rope Winder w/ attached
More informationRAI-M series RUDDER ANGLE INDICATOR SYSTEM
RUDDER ANGLE INDICATOR SYSTEM RAI-M series SEAFIRST ENGINEERING CO 45-16, Ga Um Dong, Chang Won, Kyong Nam Korea Tel : 82 55 267 1645 Fax ; 82 55 266 1646 http://www.seafirst.co.kr GENERAL Seafirst Rudder
More informationVDOT 2016 Road and Bridge Standards Section Traffic Control Devices
CF-1 1301.10 Cabinet Foundation Type A Traffic Signal Equipment CF-2 1301.20 Cabinet Foundation CF-3 1301.30 Cabinet Foundation Type B Traffic Signal Equipment 1301.31 Cabinet Foundation Type B Traffic
More informationSpring steel fasteners KWHS-14R. KwikWire. Hanging system
Spring steel fasteners KWHS-14R KwikWire Hanging system KwikWire Hanging System Takes the strain out of hanging with chain The KwikWire Hanging System is a flexible replacement for jack chain and all thread
More informationB-LINE SERIES. Spring steel fasteners KWHS-15. KwikWire. Hanging system
Spring steel fasteners KWHS-5 B-LINE SERIES KwikWire Hanging system KwikWire hanging system. Takes the strain out of hanging with chain Application Photos Applications for the KwikWire Hanging System include:
More informationInstallation Guide Wall Mounted Angled Flagpole
Installation Guide 1.5m - 4m Angled Flagpole Dimensions Flagpole Dimensions Wall Bracket Dimensions 2m Aluminium 76mm Glassfibre 114.3mm angle from vertical 2000mm 250mm 300mm 1715mm Backplate thickness
More informationC&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.
C&G 2395 Exam Paper June 2013 Section A-All questions carry equal marks. Answer all three questions. Show all calculations. 1. The electrical installation in an industrial unit is scheduled for a periodic
More informationInstructions. Follow All Instructions Before Assembling Or Using This Product
Instructions Follow All Instructions Before Assembling Or Using This Product IMPORTANT DO NOT RETURN THIS PRODUCT TO THE RETAIL STORE WHERE PURCHASED. CALL TOLL FREE: (800) 492-9334 WARNING: Improper use
More informationS.R.A. Fully Engineered Product Range
Safety Roof Anchors S.R.A. Fully Engineered Product Range Issue 01.2017 www.safetyroofanchors.com.au S.R.A. Fully Engineered Product Range 400 Series Truss-T-Grip Profile Grip SRA Static Line Ladder Restraint
More informationHARD COPY UNCONTROLLED Ergon Energy Corporation Ltd ABN
CONSTRUCTION DWG No.CONSTRUCTION DWG No. Bollard Construction Codes 5--2- CB - - S CB - - S CB - - U CB - - U CB - - 2S CB - - 2S 00kN Stayed Bollard - Material List 00kN Stayed Bollard - Construction
More informationLessons from (Transmission Line) Failures
Lessons from (Transmission Line) Failures November, 2015 May the lessons be learned from the failures made by other people more often than not! Presented by: Peter Catchpole. P.Eng. The presentation will
More informationGel Drop Seal for FOSC 450 Fiber Optic Splice Enclosure Installation Instructions
Gel Drop Seal for FOSC 450 Fiber Optic Splice Enclosure Installation Instructions TECP-30-215 Issue 1 4/2013 INTRODUCTION The Gel Drop Seal device is for use with FOSC 450 B, B Short, C, and D size closures
More informationHEAVY DUTY H.S. DISCUS CAGE NET POLE NET POLE INSTALLATION
901020 - HEAVY DUTY H.S. DISCUS CAGE NET POLE NET POLE INSTALLATION www.gillathletics.com 800-637-3090 Install the pipe cap (PCAP00158002) at the top of the net pole. Install net pole pulley (73210042)
More informationUses, Certifications, and Standards FASTENERS,KWIK WIRE,Lighting, Ductwork, Cable Tray
3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 BKP10094 SPRG Wire Rope/CLMP Kit Cooper B-Line/Cable Tray Manufacturer Description Weight per unit Product Category Features
More informationSideshift SS230 Installation on a 2006 Bayliner 265SB
The Sideshift SS230 was packaged very well and all parts were clearly labelled and documented. The overall quality seems far more durable than I expected... I was somewhat concerned that the unit may become
More informationMethods of installation of ADSS fiber optic cables
Methods of installation of ADSS fiber optic cables Two main methods recommended by the cable manufacturers: A. Mobile Cable Reel method generally recommended for span < 50 m B. Static Cable Reel method
More informationBoat Boat Loader Fitting Instructions
Aerodynamic & Heavy Duty Roof Rack Systems Australian Made - Australian Owned www.rhinorack.com Boat Boat Loader Fitting Instructions CONTROLLED Balance point 3 Front eye nuts position 3 Transom eye nut
More informationTower Accessories & Hardware
Safety-Climb Cable System for Climbing Ladder These Safety-Climb Cable products clamp to climbing ladder rungs up to 1-1/4" (32 mm) in diameter. The products meet or exceed OSH requirements for climbing
More informationPrintview: End and intermediate plate; 1 mm thick - Item No.:
Printview: End and intermediate plate; mm thick - Item No: 89-2 End and intermediate plate; mm thick Item No: 89-2 End and intermediate plate; mm thick Marking Business data Supplier WAGO Item no 89-2
More informationABTQ-110 rev 00 (Last review: 28 Aug 12) INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH S RANGE ENCLOSURES IECEx SIR U SERIAL No
ABTQ-110 rev 00 (Last review: 28 Aug 12) INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS FOR ABTECH S RANGE ENCLOSURES IECEx SIR 05.0046U SERIAL No 20 TYPE SX Ex e II C Gb Ex tb IIIC Db IP6* IECEx SIR
More informationCopper Bonded Ground Rod / Grounding Rods / Copper Bonded Earth Rod / Earthing rods
Copper Bonded Ground Rod / Grounding Rods / Copper Bonded Earth Rod / Earthing rods Copper bonded earth rods are made from low carbon Steel. Earth Rods are molecularly bonded with 99.9% pure electrolytic
More informationA Basic Guide to Europe Dinghy Rigging
The Basics: A Basic Guide to Europe Dinghy Rigging Use the smallest blocks available for the line size. Most of the blocks on your boat will be micro blocks. Examine all of your rigging and ensure that
More informationQUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift
INSTRUCTIONS Dominator Lake Lift PHONE:251-986-3882 * FAX:251-986-3136 QABLDOMINATORINST.2014 P a g e 1 Quality Aluminum Boat Lifts, INC. Installation Instructions: Dominator Lake Lift Thank you for your
More informationThank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*
PG 1 OF 9 PORTA-DOCK, INC. 74A ABL/APW 1056 & 44A FLB APW 1056 PORTA-LIFT Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step* STEP 1. Separate and group
More informationInfrared Linescanners
Thermal Imaging and Temperature Profiles for Continuous Process Monitoring and Quality Control HD Infrared Linescanners PROCESS & ANALYTICAL INSTRUMENTS Mountings and Accessories LSPHD Mountings and Accessories
More informationI.H.S INSTALLATION INSTRUCTIONS
I.H.S INSTALLATION INSTRUCTIONS TOOLS REQUIRED The following tools will be required for installation of your I.H.S. system. Item Qty Needed 9/16 Open End Wrench 2 3/4 Open End Wrench 1 1/2 Open End Wrench
More informationData sheet Pressure switch type CS December 2001 DKACT.PD.P10.A B1119
Pressure switch type CS December 2001 DKACT.PD.P10.A2.02 520B1119 Introduction Pressure switch type CS is part of the Danfoss pressure control range. All CS pressure switches have a built-in pressure-operated,
More informationDeluxe Gourd Racks I D E G A. Parts List. Shown above are parts for the two-level, Deluxe Gourd Rack (DGR 12V)with 12 arms for vertically hung gourds.
Deluxe Gourd Racks H F K I D E J C G A Shown above are parts for the two-level, Deluxe Gourd Rack (DGR V)with arms for vertically hung gourds. Parts List Code Quantity A B C D E F G H I J 6, or 4 6, or
More informationCOMPFIRE CCFT-FP_550_55_ September 2010 Fin Plate Connection to Circular Concrete-Filled Tube Test Result
Reaction Frame Macalloy Bars Camera 3 Support Beam α Oven Bar Camera 2 Link Bar Camera 1 Tested Connection Jack Bar Electrical Furnace Reaction Frame Load Jack v2_5 April 2011 1 Oven Bar Link Bar View
More information2010 International Snow Science Workshop
HOW TO TURN A KIDS BIKE INTO A BOMB TRAM FOR AVALANCHE CONTROL WORK David Immeker* Heavenly Mountain Resort Professional Ski Patrol, South Lake Tahoe, California ABSTRACT: Bomb trams have been used for
More information44 CE RANGE WATERTIGHT SURFACE-MOUNTING JUNCTION BOXES
WALL BOXES IN GWPLAST 75 - GWT 650 C GWT 650 C TP 85 C WALLS WITH CABLE GLAND - IP44 AND IP55 GW44001 JUNCTION BOXES WITH PLAIN PRESS-ON LID - IP44 - GREY RAL 7035 LxHxD (mm) No. holes / Ø GW 44 001 Ø
More informationTOWER INSPECTION REPORT
3010 S. Hwy 77, Suite 600 Waxahachie, Texas 75165 http://ctctower.com Office: 972/923-9504 Fax: 972/923-9619 TOWER INSPECTION REPORT PREPARED FOR MR. CUSTOMER 1,563 GUYED TOWER NEAR CITY, STATE JANUARY
More informationInstallation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning
OWNER'S MANUAL Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System Model # s: 6000, 6001, 6010 Warning You must read and fully understand all instructions, or
More informationLoopie Sling SP-18(0718)
Loopie Sling SP-18(0718) Loopie Sling A Loopie is an adjustable loop sling. This splice is intended for Static-12, Static-12DS and other suitable 12-strand ropes made with polyester, nylon, polyolefins
More informationVibrating Wire Load Cell (3, 4, 5 And 6 Gauge Cells) User Manual
Vibrating Wire Load Cell (3, 4, 5 And 6 Gauge Cells) User Manual Man 188 1.1.0 06/08/2014 Chris Rasmussen Philip Day Chris Rasmussen Manual No. Revision Date Originator Checked Authorised for Issue User
More informationCable Grip Fitting Procedure General
Cable Grip Fitting Procedure General 1 Ensure the grip is labelled for the correct diameter range and working load limit. (unless otherwise labelled, WLL is one third of the UTS). 2 Always inspect the
More informationMSA Latchways Ladder System
Systems overview 1 of 13 Important information Individuals or organisations carrying out the installation of a MSA Latchways ladder fall protection system shall read, understand and follow these instructions
More informationSoma Wind Generators
Soma Wind Generators 13M WINH TOWER INSTALLATION MANUAL ERTIFIED to AS4100 Steel Structures ode AS3995 (1994) Design of Steel Lattice Towers and Masts AS1170.2 (1989) SAA Wind Loading Manufactured by SOMA
More informationReferences, characteristics. References (1) Complementary characteristics not shown under general characteristics (page 30395/3)
References, characteristics Electromechanical pressure switches For power circuits, type XMP. IP degree of protection Size (87 psi). Adjustable differential, for regulation between thresholds Switches
More informationWALL BRACKETS WALL BRACKETS PDI-179C. PDI-179 Bunting. see diagram next page PDI B-1
PDi-B 500). Bracket has four mounting holes for attachment to reinforcing plates or directly into solid backing in wall. Permanently lubricated oillite pivot bushing. Standard bushing size in 5/8,1/2 is
More informationSconce INSTALLATION INSTRUCTIONS P34022
P34022 1 2016 of 12 KALLISTA THANK YOU FOR CHOOSING KALLISTA We appreciate your commitment to KALLISTA quality products. Please take a moment to review this manual before you install your KALLISTA product.
More informationHALYARD EXITS, CLEATS, CLUTCHES, WINCH PADS, HANDLE POCKET
HALYARD EXITS, CLEATS, CLUTCHES, WINCH PADS, HANDLE POCKET 1(6) General CNC-milled masts Cut out using templates Cut out without using templates Assembly Assembly clutch spinnlock ZS/1214 Check point General
More informationStep 1: Block sand the transom to remove the seam joint. The end result should be a flat transom without a ledge where the seam joint is.
WhiplashGV Instruction Manual Email: Brian@Blazermarine.com Phone: 513-598-1769 Step 1: Block sand the transom to remove the seam joint. The end result should be a flat transom without a ledge where the
More informationVERSA BIKE RACK INSTRUCTIONS
VERSA BIKE RACK INSTRUCTIONS Models #8, 8 Important This rack is designed for use with a or. receiver hitch. The rack is designed to hold a maximum of two bicycles. Do not use it for anything other than
More informationSLIDING RAIL SYSTEM 208-580-1904 www.fishfighterproducts.com FFP sliding Rail system The FFP Sliding Rail system will allow you to easily adjust the location of your rod holders, tackle trays, or just
More informationElectromechanical pressure switches
Presentation Electromechanical pressure switches OsiSense XM For power circuits, type XMP Presentation Pressure switches type XMP are switches for power circuits (direct switching), with an adjustable
More informationDraw-wire system SZG165
Draw-wire system SZG165 www.wachendorff-automation.com Wachendorff Automation... systems and encoders Complete systems Industrial rugged encoders to suit your application Standard range and customer versions
More informationSafety System Installation Guide for ARE Wind Poles
Safety System Installation Guide for ARE Wind Poles V. 1 May 2011 ** Climbing pegs and ladder should be installed before the pole is erected.** A. Install climbing pegs Install climbing pegs (bolt set)
More informationChannel Nuts & Hardware
Channel Nuts Channel nuts are one of the main components of our strut system. It is designed to provide essential gripping power and ease during installation. Channel nuts are press formed, machined and
More informationBKC100 SPRG Clamp For Wire Rope. Dimensions and Weight. Long Description. Manufacturer Information. Taxonomies, Classifications, and Categories
3804 South Street 75964-7263, TX Nacogdoches Phone: 936-569-7941 Fax: 936-560-4685 BKC100 SPRG Clamp For Wire Rope Cooper B-Line/Cable Tray Manufacturer Description Weight per unit Product Category Dimensions
More informationMSA Confined Space Entry Equipment
MSA Confined Space Entry Equipment Because every life has a purpose... MSA Confined Space Entry Equipment MSA XTIRPA Manhole Guard System Use for confined space vertical entry and fall protection when
More informationMasthead Sensor Installation Guide
2315 1/2 Artesia Blvd. Redondo Beach, CA 90278 (310) 320-4349 (310) 320-5026 Fax www.signetmarine.com service@signetmarine.com Masthead Sensor Installation Guide 2.3 Masthead Sensor Installation Continued
More informationS110 Steel Level Panel Installation Instructions
S110 Steel Level Panel Installation Instructions NOTE: Fairway Architectural Railing Solutions will not be held liable for incorrect or unsafe installations by installer. It is the installer s resposibility
More informationB104ZN BLTD 4H 90 L Bracket. Features. Material, Color, and Finish. Dimensions and Weight. Long Description
B104 BLTD 4H 90 L Bracket Cooper B-Line/Cable Tray Catalog Number Manufacturer Description Weight per unit Product Category Features Material Material, Color, and Finish Finish Dimensions and Weight Size
More informationAPPENDIX A. F107 & 380 Lines OYSTER RIVER DURHAM, NH
APPENDIX A F107 & 380 Lines OYSTER RIVER DURHAM, NH 1. The design and proposed construction of this crossing is shown on the attached PSNH Transmission Business Drawing entitled DOUBLE CKT F107 & 380 BETWEEN
More informationMast Inspection. Client: Location: Date: Inspected by: Verified by:
Mast Inspection Client: Location: Date: Inspected by: Verified by: Client Location Size Installed by Energy3 Mast Manufacturer Energy3 Anchor Types Inspection Date 29 th May 2009 Inspector Name Weather
More informationInstructions. Follow All Instructions Before Assembling Or Using This Product
Instructions Follow All Instructions Before Assembling Or Using This Product IMPORTANT DO NOT RETURN THIS PRODUCT TO THE RETAIL STORE WHERE PURCHASED. CALL TOLL FREE: (800) 492-9334 WARNING: Improper use
More informationrondo aluminium components
rondo aluminium components The Rondo Aluminium Ceiling System is an alternative to the Rondo DUO Exposed Grid Ceiling System. Unlike the DUO system, the Aluminium Main Tee to Cross Tee intersection is
More informationXTS-Impact. XTS-Terminal (hold)
XTS-Impact The XTS-Impact is used to support the XTS-Linked system, as a standalone anchorage point and as an anchorage point in horizontal temporary lifeline systems. The anchorage point is tested according
More informationThumb Shifter Plus Thumb Shifter
(English) DM-SL0004-01 Dealer's Manual Thumb Shifter Plus Thumb Shifter Thumb Shifter Plus SL-FT55 SL-TX50 SL-TX30 Thumb Shifter SL-TZ20 IMPORTANT NOTICE This dealer's manual is intended primarily for
More informationPAGE INDEX PAGE # CATALOG NUMBER BUS SUPPORTS B 1 AWSTFR BUS SUPPORTS B 2 AWTTFR BUS SUPPORTS B 3 AWTESR BUS SUPPORTS B 4 AWLI BUS SUPPORTS B 6 AACB
PAGE INDEX ABS ABS (2) ATSBS ABR AIWBS AUAB UAS AABS AAS AL ALS ATCF ATCC CL BTCF RS APT ALC AV ALT ALT (N) ATCF U AWCF AW2CF AWTT AWTT 15 AWTT2 AWST DESCRIPTION MULTI RANGE SINGLE CABLE MULTI RANGE DOUBLE
More informationApplications and Considerations Section 11
11 Applications and Considerations Section 11 www.hubbellpowersystems.com E-mail: hpsliterature@hps.hubbell.com Phone: 573-682-5521 Fax: 573-682-8714 210 North Allen Centralia, MO 65240, USA Copyright
More informationAnchor Component Material Standard Mechanical Properties
SECTION 4.1 PAGE 1 / 5 l description The UCAN sleeve anchor is a light-medium duty anchor ideal for applications in concrete, hollow block and brick. It is a mechanical expansion anchor assembled with
More informationSAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures
SAFETY QUALITY TECHNOLOGY Guidance on Safe Isolation Procedures Introduction Every year, people working on construction sites suffer electric shock and burn injuries some of which, tragically, are fatal.
More informationA variety of other devices can be used with the front dee ring, but please check for suitability.
FULL BODY HARNESS Accredited to: EN 361 Web 45mm water resistant polyester. High tensile steel alloy & stainless/steel. 1.15 kg Rear & front attachment point, rip stitch indicators The TRGH2 harness is
More informationSub-Base Assembly For Type-ML 32 & VR-1 Step Voltage Regulator Single-Phase Liquid-Filled Part # GEK 35171
Transformer Business Department Regulator & Inductive Products Sub-Base Assembly For Type-ML 32 & VR-1 Step Voltage Regulator Single-Phase Liquid-Filled Part # GEK 35171 Last Update 11-19-2013 Tom Dauzat,
More informationBackboard and Rim Owners Manual
REQUIRED TOOLS AND MATERIALS: Two (2) Capable Adults Tape Measure Backboard and Rim Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI 53089 U.S.A. Step Ladder - 8ft. (2.4
More informationWellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada
Installation and Operation Guide Nanometrics Inc. Kanata, Ontario Canada 2001 2005 Nanometrics Inc. All Rights Reserved. Installation and Operation Guide The information in this document has been carefully
More informationWe put it all on the line, so you don t have to.
3M DBI-SALA 8 mm Permanent Horizontal Lifeline Systems We put it all on the line, so you don t have to. Smarter software. Stronger hardware. Easier installation. How do you improve on one of the best permanent
More informationShifting Lever. Dealer's Manual. RAPIDFIRE Plus SL-M2000 SL-M3010 SL-M4010. Thumb Shifter SL-TZ500. ROAD MTB Trekking. City Touring/ Comfort Bike
(English) DM-MDSL001-01 Dealer's Manual ROAD MTB Trekking City Touring/ Comfort Bike URBAN SPORT E-BIKE Shifting Lever RAPIDFIRE Plus SL-M2000 SL-M3010 SL-M4010 Thumb Shifter SL-TZ500 CONTENTS IMPORTANT
More informationsteel wire cable tray system accessories
accessories Marco Cable Management has further enhanced its reputation, by the continued growth in innovative products and supportive accessories. Marco has also invested heavily in new state of the art
More informationInstallation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No
Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Guide Cables No Guide Cables 1 August 4, 2011 Assembly Instructions: (Shown with a 2 board, 12 ft kit) ITEM NO. PART NUMBER DESCRIPTION
More informationMSA Confined Space Entry Equipment
MSA Confined Space Entry Equipment Because every life has a purpose... MSA Confined Space Entry Equipment MSA XTIRPA Manhole Guard System Use for confined space vertical entry and fall protection when
More informationInstallation, Compensation and Maintenance Instructions for. RITCHIE Compasses. Made In U.S.A
Installation, Compensation and Maintenance Instructions for RITCHIE Compasses Made In U.S.A All Magnetic Compasses are vulnerable to magnetic interference, which will produce errors, called deviation.
More informationCheck with local zoning official for property line distance requirements.
RESIDENTIAL POOL PLAN SUBMITTAL GUIDELINES The following guidelines are intended to assist municipal residents with the permit acquisition process with regard to pools, spas and hot tubs for single family
More informationResidential Garage Door WARNING
Residential Garage Door INFORMATION EZ-SET TORSION S TORSION S EXTENSION S Improper Installation or Door Position Can Result in Serious Injury or Death. Read and understand all instructions before you
More informationJourneyman Team Events
Journeyman Team Events Journeyman Team Rules Journeymen Teams Journeymen teams for the Florida Lineman Competition are comprised of three participants: 1. At least one of the climbers must be a Lineman
More informationGrounding reel VDV & VDV-3416
Grounding reel VDV-2930-14 & VDV-3416 http://www.vdv-reels.com/ 1 Introduction The hand rewind VAN DER VEER Earth Bonding Reels (models VDV-028, VDV-032, VDV-036 and VDV-040) are used when transferring
More informationTOWER INSTALLATION MANUAL For A.R.E. Guyed Pipe Towers Short Towers 43, 64 and 85 feet tall
TOWER INSTALLATION MANUAL For A.R.E. Guyed Pipe Towers Short Towers 43, 64 and 85 feet tall Contents 1) Introduction...2 2) Site Selection and Preparation...2 3) Tools List...3 4) Parts List...4 5) Tower
More informationLimit switches OsiSense XC Special For material handling applications, type XC1 AC
Presentation For material handling applications, type XC C b XC C with slow break contacts v With head for linear movement () 00_ 00_ 000_ Page / 00_ 00_ XCC XCC Page / XCC XCC / General characteristics
More informationJET SWIM ELEGANCE 70 INSTALLATION AND USER GUIDE
JET SWIM ELEGANCE 70 INSTALLATION AND USER GUIDE i Read the instructions 1. Installation mounting By purchaising the ELEGANCE device, you obtained a high-quality product that will help you to enjoy the
More informationBALL STOP INSTALLTION GUIDE
BALL STOP INSTALLTION GUIDE GROUND SLEEVE INSTALLATION: 1. Locate the exact location of the ground sleeve. NOTE: Maximum recommended pole spacing is 20 feet on center. 2. Excavate the pole footing; refer
More informationFewer parts. Fast installs. ANSI Compliant. 3M DBI-SALA Lad-Saf Flexible Cable Vertical Safety Systems
Fewer parts. Fast installs. ANSI Compliant. 3M DBI-SALA Lad-Saf Flexible Cable Vertical Safety Systems 3M DBI-SALA Lad-Saf Flexible Cable Vertical Safety Systems Adding or upgrading your vertical safety
More informationFewer parts. Fast installs. ANSI Compliant. 3M DBI-SALA Lad-Saf Flexible Cable Vertical Safety Systems
Fewer parts. Fast installs. ANSI Compliant. 3M DBI-SALA Lad-Saf Flexible Cable Vertical Safety Systems 3M DBI-SALA Lad-Saf Flexible Cable Vertical Safety Systems Adding or upgrading your vertical safety
More informationHeavy Equipment & Rigging Specialist Training
Heavy Equipment & Rigging Specialist Training Module 1 Unit 4: Intro to Rigging May08 1 Key Points Review of Exercise Goals Discuss Rigging Components Language of Crane Signals Review Anchor Installation
More informationCOOPER POWER SERIES. D-73P3 bypass switches installation instructions. Switches MN008005EN. Effective April 2016 Supersedes S June 2013
Switches MN008005EN Effective April 2016 Supersedes S328-120-1 June 2013 D-73P3 bypass switches installation instructions COOPER POWER SERIES DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY The information,
More informationCLEANROOM GEL GRID CEILING SYSTEM PRODUCT DATA Division
5023 HAZEL JONES ROAD, BOSSIER CITY, LA 71111 888.315.1561 800.877.8746 FAX SALES@GORDONCLEANROOM.COM GORDONCLEANROOM.COM AN EMPLOYEE OWNED COMPANY CLEANROOM GEL GRID CEILING SYSTEM PRODUCT DATA Division
More informationSTAKING TRAFFIC CONTROL SIGNAL SYSTEMS
Locating the components of a traffic control signal is not an exact science; many factors influence the location of the components. These factors include: lane widths, radii, pedestrian curb ramp requirements,
More informationThe accuracy and safety of the connected measuring devices are directly regulated. of the introduced current transformers.
Product family Current transformers Current transformers (CTs) are introduced where it is difficult to access a direct measuring ot network current. Current transformer transforms the high network current
More information