1 GAIL (India) Limited (A Govt. of India Undertaking) CHAINSA-JHAJJAR-BAMNOULI PIPELINE PROJECT BID DOCUMENT FOR USM AND METERING SKID CORRIGENDUM 1 (BID DOCUMENT NO.: 11/0230/JPK/GAIL/07-R0) LIMITED INTERNATIONAL COMPETITIVE BIDDING Issued by
2 GAIL (India) Limited CHAINSA JHAJJAR PIPELINE PROJECT CORRIGENDUM A CORRIGENDUM 1 PS AKA PKS REV. DATE DESCRIPTION PREP CHKD APPD 1
3 Document Name: Volume I of II COMMERCIAL S.No. Page No. No. Section Subject Addition/Deletion/ Modification IFB A (vi) & B (iii) ITB C (Indian Bidder - v & Foreign Bidder - vi) ITB Bid Document No. Evaluation and Comparison of Bids Evaluation and Comparison of Bids E Tender No. Shall be read as Fifteen (15) shall be read as Twenty (20) Fifteen (15) shall be read as Twenty (20) Document Name: Volume II of II TECHNICAL Document Number: Rev. B Stamped Page no Description of Equipment and/or Services ITEM NO. DESCRIPTION QTY 1 LOCATION: DISPATCH STATION AT CHAINSA 3 Nos. of Ultrasonic Gas Flow Meter with upstream & downstream meter runs. Minimum straight lengths and profiler with 10 D US of Profiler + Profiler + 10 D DS of Profiler + meter + 5 D DS of Meter shall be supplied by Bidder (Bidder to use straight lengths + profiler during wet Calibration). Bidder to wet the GAD s/ Piping Details developed by contractor and suggest final upstream/downstream straight length distances. Wet Flow Calibration from accredited flow labs. 1 No. Gas Chromatograph with accessories, tubes, fittings, regulators, valves etc, calibration gas cylinders, Carrier gas cylinders and GSM Modem for remote monitoring as per Technical spec. Supply/Testing of Metering Panel including wiring and fitting of all instruments and accessories including Flow Computer(3 Nos), GC Controller/Display Unit along with Printer, isolators, barriers, repeaters, power supply units, lamps, relays, annunciator etc Pressure & Temperature Transmitters with Thermowell. Interconnecting Special Cables between Flow meter and Metering Control Panel. RS 485 Cable from meters in field to flow computers in control room to be supplied by Bidder. 1 lot CORRIGENDUM I BID DOCUMENT NO. 11/0230/JPK/GAIL/07-R0 REV A SHEET 2 OF 5 2
4 Special Cable (such as RS 485 or any special cable) between GC Field Unit/GC controller and Display Unit in control room to be supplied by Bidder. Serial Interface Cable (such as RS 485/ RS 232 cable) from Flow Computer and GC Display unit to RTU to be supplied by Bidder. Supply of 1 No. Laptop loaded with FC software and GC software for necessary configuration downloading data for FC/GC as and when required along with portable printer, along with suitable cable between Meter/ Gas chromatograph and laptop in safe area/control Room. Tentative distance between field and control room can be taken as 100 meters. Mandatory Spares as per Appendix 8 of Package Unit Instrumentation Supervision of Erection, Testing And Commissioning by Bidder for 20 days. Bidder to quote per diem rates, inclusive of all expenses like travel, boarding, lodging etc. 2 LOCATION: BAMNOULLI TOP (SV- 4) Description of Equipment and/or Services remains unchanged Mandatory Spares as per Appendix 8 of Package Unit Instrumentation Supervision of Erection, Testing And Commissioning by Bidder for 20 days. Bidder to quote per diem rates, inclusive of all expenses like travel, boarding, lodging etc. Document Number: Rev. B Stamped Page No SCOPE OF WORK 3.2 ii) Self Actuated pressure Control Valve (Monitor), FCV and SSV separately as indicated in the P&ID. 3.3 The skid shall be complete in all respects, ready for installation and commissioning at the respective site. There shall be minimum work to be done at site. All field mounted instruments shall be supplied loose to avoid damages of same during transportation of the skid. However, PCV, FCV, Slam Shut, Ultrasonic flow meter, and flow Profiler shall be duly mounted on the skid. The flow computer shall be fully configured and all the necessary data as per data sheet should be recorded in FC to minimise site work. The details regarding installation of metering skid, shall be clearly described in the Installation Manual especially made for metering skid installation and the same shall be submitted while despatching skids to various sites. Stamped Page No Flow profiler shall be provided at the ultrasonic meter inlet to eliminate swirls and cross current setup by the pipe fittings, valves or regulators preceding the meter inlet piping where specified. Flow Profiler shall be according to AGA Report No. 8 & 9. Flow Profiler shall be of suitable design to meet tender CORRIGENDUM I BID DOCUMENT NO. 11/0230/JPK/GAIL/07-R0 REV A SHEET 3 OF 5 3
5 specification. Bidder shall furnish complete details/design of straight length (upstream/downstream) arrived at. Document Number: Rev. B Stamped Page No Each metering stream shall at least include the following equipment: One Pneumatic (Gas over oil Actuated)/manual, inlet double block and bleed integrated isolation valve, (with open/close proximity switches and solenoid valve for remote operation). This valve shall be equipped with a by-pass for line pressurisation. This by-pass shall be composed of one isolation valve and one manually operated globe or plug valve. The CONTRACTOR shall specify the valve stroke time required to avoid unacceptable acceleration torsion in the ultrasonic meters. (Refer P&ID for Metering Skid at Chainsa and Bamnoulli.) Other descriptions remains unchanged. Document Number: Stamped Page No DESCRIPTION OF THE GAS PRESSURE LETDOWN SKID Process data for the gas pressure letdown skid are given in the Process Design Basis. The gas pressure letdown skid shall include the necessary equipment to perform safely the operation for which it is designed. It shall be equipped with, but not limited to (see also the relevant P&ID): One process connection at inlet (600 # according piping classes). Two process connection at outlet (600 # according piping classes). Other descriptions remains unchanged. Document Number: Rev. B Stamped Page No The turndown ratio of each flow meter shall be minimum 1:40. The accuracy of the Ultrasonic flow meter shall be ± 0.3 %(including Lab uncertainty) or better and repeatability shall be better than ±0.1% of reading and accordingly Bidder shall select the no. of paths to meet accuracy requirement and indicate the same in calculations/back-up literature. Other descriptions remains unchanged. Stamped Page No INSPECTION AND TESTING The Ultrasonic meters shall be flow calibrated with natural gas and shall have calibration certificate duly signed by weights and measures authority such as NMI, PTB or other reputed National Standard laboratory of its country of origin such as Trans Canada Calibrations, (TCC) Canada,Colorado Engineering Experiment Station Inc.(CEESI) USA,South West Research Inc. (SWRI) USA. Accuracy with CORRIGENDUM I BID DOCUMENT NO. 11/0230/JPK/GAIL/07-R0 REV A SHEET 4 OF 5 4
6 wet flow calibration shall be demonstrated within ±0.3% for multi path type under flow conditions in the turndown ratio of 1:40. The meter proving system to be used by Bidder shall be traceable to international standards and uncertainty of meter proving system shall be furnished. Gas metering system integration, testing, validation and including third party "wet' calibrations (only for the ultrasonic meters with its associated upstream / downstream meter runs) should be done in flow labs as detailed above Other descriptions remains unchanged. Document Number: Stamped Page No. 273 & 274 PAINTING TABLE DELETED LIST OF ATTACHMENTS S.No. Description Document No. 1. Replies to Bidders Queries N.A. 2. Data Sheet Ball Valve Rev B 3. Piping Material Specification Rev C 4. Data Sheet For Dry Gas Filter Rev A 5. Data Sheet For Slam Shut Valve Rev C (sheet 10 0f 15) 6. Data Sheet For Flow Control Valve Rev A 7. Data Sheet For Pressure Control Valve Rev A 8. Mandatory Spares Rev C (Appendix 8) 9. Creep Relief Valve Rev A 10. P & IDs D Rev 1 (sheet 3 of 3); S Rev 5 (sheet 1,2 of 5); S Rev 1 (sheet 3,4,5 of 5). CORRIGENDUM I BID DOCUMENT NO. 11/0230/JPK/GAIL/07-R0 REV A SHEET 5 OF 5 5
7 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 TECHNICAL DATE: Sr. No Section / No. Scope of supply 1.2 Scope of supply Job Specifica tion for Filtration, Metering and Let down. Point No Scope of supply Job Specifica tion for Filtration, Metering and Let down. Point No Ultrasoni c Flow Meter, Sheet 5 of 13 Tender Doc. Page No. Sheet 3 of 14, Page no. 7 Page no. 32, Sheet 8 of 11 Page no. 32, Sheet 8 of 11 Page 87 Description Bidder s Query Reply/Clarifications Loose supply of three number (3) Flow computers, GC controller/display Unit along with printer, Isolators, barriers and repeaters, power supply units etc required for the system. Flow profiler shall be provided at the ultrasonic meter inlet to eliminate swirls and cross current setup by the pipe fittings, valves or regulators preceding the meter inlet piping where specified. Flow Profiler shall be according to AGA Report No. 8 & 9. Flow Profiler shall be a bundle of SS 316 tubes. Vendor shall Furnish complete details/design of straight length (upstream/ downstream) arrived at. Ultrasonic meters shall undergo wet test calibration to accuracy equal to or better than +0.3%. The meter Shall have rangeability of 1:40 for the accuracy mentioned over the entire range. The accuracy of the Ultrasonic flow meter shall be ±0.25% or better & repeatability shall be better than ±0.25% of reading and acc. vendor shall select the no. of We recommend the supply of Flow Computers along with accessories in a control panel and not loose. Please confirm. As per the detail provided in Sheet 6 of 12, Page 51 USM based Metering skid, you have asked for a flow profiler as in between flanges type. This is contradictory to the tender clause on Point No. 3.39, Page no. 32, Sheet 8 of 11. Please confirm the type of flow profiler required. As per the detail provided in Sheet 5 of 13, Page 87, Ultrasonic Flow Meter, rangeability required in USM is 1:20. We understand that the rangeability required is 1:40. Please confirm The accuracy requirement for Ultrasonic meter in all the GAIL tenders is 0.1% and inclusive of lab inaccuracy it is 0.3%. We understand the same is required in this tender also. Vendor to supply metering Panel along with Flow computer, Gas Chromatograph Controller/ display unit with all accessories mounted, completely wired and tested. (Refer Corrigendum 1) Stamped page 2 SS Tube Bundle is to be deleted. Flow Profiler design to meet tender specs to be supplied. (Refer Corrigendum 1) Stamped page 3 Accuracy shall be + 0.3% (including Lab uncertainty), Repeatability shall be + 0.1%, and Rangeability 1:40 Refer S.No. 3 Page 1 of 23 6
8 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM Ultrasoni c Flow Meter, Sheet 5 of 13 Ultrasoni c Flow Meter, Sheet 5 of 13 datashee t of Control Valves P&ID's Page 87 Page 87 Sheet 1 of 2, Page 239 paths to meet accuracy requirement and indicate the same in calculations/ back-up literature. The accuracy of the Ultrasonic flow meter shall be ±0.25% or better and repeatability shall be better than ±0.25% of reading & accordingly vendor shall select the no. of paths to meet accuracy requirement and indicate the same in calculations/back-up literature. The flow metering system shall consist of Multipath Transit time Ultrasonic flow meters. Details in the datasheet are missing Note 2. All the MOV's above 12"shall be manually operated and hydraulically actuated type The repeatability requirement for this tender is 0.25%. For USM, the repeatability requirement should be more stringent than the accuracy requirement and we suggest the repeatability requirement should be as 0.1% minimum while as most of the reputed manufacturers repeatability is 0.05% of the reading. We highly recommend the use of USM with minimum 4- path. The use of 2-path meter would jeopardise the reliability of the metering system which is cash register for GAIL. Ultimately it s the decision of the customer about the minimum path requirement for USM. But one should keep in mind that the popularity of USM in GAIL is due to the fact that the installed USM meters performance at GAIL is exceeding expectations and all the USM in critical service are 4-path meters only. 1. Please provide the detailed data sheet for flow control valve. 2. Please provide the working philosophy of the same. As per our previous experience, valves below 16" along with pressure balancing system can easily be operated manually. Hydraulic actuation is not necessary for valves below 16". It will unnecessary increase the cost. Kindly confirm the requirement of hydraulic actuator. Accuracy shall be + 0.3% (including Lab uncertainty). Repeatability shall be + 0.1%. Tender Condition prevails. 1. Refer Corrigendum 1 Stamped page 35 to Refer S.No. 19 Refer Corrigendum 1 Stamped page 29 to 30 9 Datashee t of Filter 10 Datashee Filter datasheet is not in the tender. Kindly provide. Kindly provide the velocity limit within the filter vessel. Page 2 of 23 Refer Corrigendum 1 Stamped page 32 to 33 velocity limit within the filter vessel is 2.5 m/sec 7
9 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM t of Filter As per normal industrial practice, velocity inside the filter vessel is limited to 2.5 m/s. Kindly confirm if the same is applicable for this tender. Filter P&ID for Filtration skid specificat ion of Filtration skid Sheet 5 of 10, Page 40 Sheet 5 of 10, Page no. 40 Sheet 5 of 12. page 50 The Quick opening closure shall be equipped with locking device which can be opened only when the vessel is completely depressurized. Alternatively, swing bolts with pin arrangement shall be provided for the closure, if specified in the data sheet. The swing bolts shall be of one piece construction without welding. Hinge pins shall be forged and of the same material as the swing bolts. Typically, the filter is provided with level gauge & transmitter, Manometer & D P transmitter, vent valves (2 manual valves in series, one block valve and one throttling valve) and drain valves (2 manual valves in series, one block valve and one throttling valve). One pneumatically actuated/manual, inlet double block and bleed integrated isolation valve, (with open/close proximity switches & solenoid valve for remote Since both QOC and option of Swing bolt is given in the tender, we recommend to use QOC in place of swing bolt arrangement. Please confirm only QOC is acceptable as per vendor list. Please provide the DP for both clean and dirty condition. We understand that the inlet valve of 16" 600 class should be fitted with Gas Over Oil Actuator (GOOA). Please confirm if our understanding is correct and provide the specifications for GOOA. We understand that Manometer and Level Transmitter is not required. Kindly confirm. Please confirm if we have to provide pneumatically actuated or manual Double Block and Bleed Valve. Page 3 of 23 Only QOEC shall be considered for Filter Vessel closure. DP Clean bar DP Dirty bar Bidder s Understanding is correct. However Valve size is revised to 12. Bidder s Understanding is correct Refer Metering P&ID of Chainsa and Bamnoulli. Stamped page 42 & 46 8
10 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 16 Scope of supply 1.2 Descripti on of equipme nt and or services Location: Dispatch station at Chainsa Sheet 3 of 14, Page no. 7 operation). This valve shall be equipped with a by-pass for line pressurization. This by-pass shall be composed of one isolation valve and one manually operated globe or plug valve. Special Cable (such as RS 485 or any special cable) between GC Field Unit/GC controller and Display Unit in control room to be supplied by metering Vendor. There is no special cable required for our system. However, kindly confirm the scope of supply for the special cable. All Cables to be provided by metering Vendor, including field to Control Room Cables Scope of supply 1.2 Descripti on of equipme nt and or services Location: Dispatch station at Chainsa Ultrasoni c Flow Meter Sheet 3 of 14, Page no. 8 Sheet 9 of 13, Page 91 Supply of all cables, trays, junction boxes, impulse tubing, valves, manifolds within the skid, and all cables from field instruments/ meters/ Gas Chromatograph to control room Meter electronics shall be capable of multiple output signals as follows: a) Frequency pulse output to flow computers configurable for flow rate signals. b) One configurable 4-20 ma analogue output internally powered and galvanically isolated. c) Digital discrete outputs for direction of flow, trouble alarm and output data validation. d) RS-485/422 communication port with MODBUS protocol for Please confirm if all the cables between field and control room are in our scope of supply As USM already has a pulse O/P and Modbus O/P denoting the flow, there is no requirement for 4-20 ma analog O/P. The same is also not mentioned in your data sheet. Kindly confirm your acceptance. Page 4 of 23 Yes. All Cables shall be provided by metering Vendor, including field to Control Room. Vendor to furnish: 1. One RS 485/RS 422 Modbus RTU output. 2. Frequency Pulse output 3. Digital output to show various alarms as mentioned. 9
11 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM Flow Compute r Point no Point no. 6.9 Sheet 10 of 10, Page 105 Sheet 6 of 12, Page no. 51 Sheet 8 of 9, Page no. 113 communicating with the other control system i.e. control room mounted flow computer for meter diagnostics, test and health data. PID control shall be implemented in flow computer. Also independent microprocessor based PID controller shall be supplied. User will select implementation of PID control in flow computer or independent controller. Ultrasonic Gas Check/Custody Transfer Metering System shall be built and integrated only by the original equipment manufacturer of the Ultrasonic Flow Meter, since critical components within the custody transfer metering system should be compatible to ensure Overall System Uncertainty for this critical fiscal transaction purpose. All components within the metering system must be well proven and compatible in the similar application. The vendor shall supply two each prefilled calibration gas cylinders (one for rich and other for semi rich gas) with regulator mechanism. A recognized laboratory must certify the calibration gas. The calibration gas specification must be approved by the purchaser prior to purchase. The calibration gas shall The P&ID control can be incorporated in the flow computer and no separate P&ID controller is required for the same. Kindly confirm. We understand that the authorised agents who quote on behalf of their principals and are using PTR of the principals, they should build, integrate, test (FAT) the system at the principals place to ensure the integrity and reliability of the system. The consumption for calibration gas for GC is very less hence we request you to accept one number of 0.5 m3 capacity cylinders in place of 2.13 m3 calibration gas cylinders. Kindly confirm your acceptance. Page 5 of 23 Yes, Independent PID Controller is required; however the same shall be implemented in Flow Computer also. Normally FCV will be acting as a Active Regulator and will be controlled by Pressure. In the event of flow exceeding preset value the flow controller will override Pressure controller Tender Condition prevails. Tender Conditions prevails 10
12 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 22 datashee t for USM Sheet 1 of 15, Page no. 221 have a minimum certification accuracy of ±0.2% for components (mole%) greater than 10 % and ±0.5 % for components (mole%) between 1 % to 10% and ±1.0% for components (mole%) below 1%. The calibration shall be traceable to NPL or equivalent (the traceability certificate to be submitted) with 03 years stability. Mixer category shall be PRIMARY. Gas volume per cylinder is approx m3. Material Construction of We understand that the requirement is of low temperature cast steel material. Since the Casting material is having a better physical property with reference to pipe material. Tender Conditions prevails 23 datashee t for Pressure Transmitt er Sheet 3 of 15, Page no. 223 Accuracy 0.04% of Span We understand that the accuracy of 0.04% is only required for metering system and all other PT's will be acceptable for 0.075% accuracy. Please confirm The accuracy of PT installed with USM meter for Custody metering purpose shall be with % accuracy. All other PT s will be acceptable with % accuracy. 24 datashee t for Pressure Relief Valve 7 of 15, Page no. 227 Body and bonnet material mentioned as A 351CF8M We understand that A352 LCB/LCC material should be acceptable in place of A 351CF 8M. Kindly confirm. Tender Conditions prevails datashee t for Creep Relief valve datashee t for SSV and Regulato Datasheet of Creep Relief valve is not available Datasheet of SSV and Regulator are incomplete Please arrange for the same. Please provide the MOC for both. Refer Corrigendum 1 Stamped page 40 & 41 Refer Corrigendum 1 Stamped page 34 Page 6 of 23 11
13 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM r Mandator y Spares Datashee t for Ball Valves & Globe Valves P&ID for Metering skid Sheet 1of 1, Page no. 241 Page no. 249 and SOR Mandays Section 1 of IFB, 3.1 Section I of IFB, 3.3 General Querry E Tender No. Page 6 of 7 Page 7 of 7 Datasheet for valves For Z configuration 3.1 Bid Evaluation Criteria Documents required: Satisfactory work performance cert. for at least 6 months from the end user for item no. 1 & 2 Two Numbers Pilot for FCV has been mentioned, but there is no pilot for FCV. We request you to delete the same. We understand that valve upto 4" size will be provided with wrench operated type, from 6" to 14" Gear operated type and 16" & above HOV or XOV type. Kindly confirm if our understanding is correct. We request you to kindly add Limit switches in the valves for Z configuration enabling the user to see the position in the control room. As per the SOR, we have to provided a lump sum value for supervision of erection, commissioning activity. As the erection is not in Bidders scope, we suggest to make these charges on Mandays basis in place of Lumpsum. 1. Requesting GAIL/JP Kenny to amend this clause as at least one number of supply reference instead of two numbers to establish the PTR. 2. End users will not issue performance letter, hence requesting GAIL/JP Kenny to accept installation/ commissioning report date to establish six months operation of the meter/skid. End User of the Ultrasonic meter/skids does not issue the performance letter as the vendor may use it for their marketing purposes. In this situation, we request GAIL / JP Kenny to waive this condition. Installation report or supply details/po Copies will be produced to establish the supply/ptr. Kindly accept the same. Whether Indian Bidder can quote in Indian rupees based on Global PTR available for Ultrasonic Meters and skids E-Tender Please confirm which one is appearing Correct E-Tender No. Page 7 of 23 Refer Corrigendum I Stamped page 39 Refer Corrigendum I Stamped page 29 to 30 Yes Vendor to provide limit Switches(open/close) for Z configuration Valves and wire them to panel for indication Evaluation shall be made on 20 days. Per diem rate shall be quoted for 20 days, payment shall be made on actual number of days spent. Tender Conditions prevails Tender conditions prevails Indian Bidder can quote in INR. Refer Corregendum I Stamped page 2 12
14 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 35 S No 172 to of USM specification MR for USM and Metering Skid Page 13 of 14 Page 5 of 13 and Page 1 of 15 Page 5 of 13 in the bid document 1. Tender Doc IFB mentioned: List of recommended vendors for Gas Chromatograph given in tender are 4 Nos only namely DANIEL, RMG, Instromet and ABB. Specification for Ultrasonic Flow Meter, and Data Sheet of US Meter, Meter body shall be made of carbon steel as per data sheets. As per USM data sheets body material of US Meter required is low temperature carbon steel. Specification Ultrasonic Meter, for Flow The accuracy of the US flow Meter shall be +/-0.25% and accordingly the vendor shall select the no. of paths to meet the accuracy requirement and indicate the same in calculations/back up literature Out of this list, 3 vendors namely Daniel, Instromet and RMG are our direct competitors for US meter/metering skid and do not quote to us. Hence we are left with only 1 vendor namely ABB to source/ get offer for GC. We strongly request you to include SIEMENS name in the GC list. Siemens GC model SITRANS is approved by PTB for natural gas online GC for custody transfer applications. We are attaching PTB certificate and reference list of supplies in support of same We strongly feel low temperature cerbon steel is not required for GAIL's process/ambient conditions. In very recent tender GAIL thru EIL has gone in for ASTM A 216 Gr WCB as the body material. We request you to accept the same. Attached is the extract of the tender specification indicating body material as ASTM A 216 Gr WCB. The same is suitable for Natural gas applications and for GAIL's filed requirements. Please clarify that the accuracy requirement of +/- 0.25% is the overall accuracy including the lab uncertainty or is it the uncertainty of the US Meter alone. Please note that from past field experience, to achieve an overall uncertainty of 0.25% or better, the UFM should have minimum 4 paths (4 sets of transducers). If a meter has a total uncertainty of 0.25% in lab calibration, this will translate to a total uncertainty of greater than 0.3% under operating in situ field conditions. This statement is in line with AGA 9 latest clause 9.1, S No 2 on Page 8 of 23 Tender conditions prevails Tender conditions prevails Accuracy shall be + 0.3% (including Lab uncertainty). Repeatability shall be + 0.1%. Other specifications as per Tender requirement. 13
15 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 38 Note No Page 1 of 15 Page 5 of 13 Page 6 of 12 Data Sheet of US Meter, Doc No Number of paths to be decided by manufacturer to meet overall specified accuracy requirements as per AGA 9 guidelines. Specification for Ultrasonic Flow Meter, (Doc No ) All flanges shall be weld neck, raised face and shall meet ANSI B 16.5 Specification for USM based Metering Skid, (Doc No ) Ultrasonic meters with a minimum length of 10D upstream + profiler + 10 upstream + meter + 5D downstream meter run shall be supplied. page 32 and clause 9.3. Moreover as per tender the loss of one path should not degrade the accuracy of measurement of the US Meter by more than +/0.1%. This is practically achievable only when the number of paths is 3 or more so that during loss of one path, you have minimum 2 working paths all the time. In view of all the above we request you to reconsider the minimum paths required for highly accurate custody transfer /reconciliation US Meter for a long accurate performance. As per latest AGA 9 guidelines (April 2007) the accuracy requirements for large meters (>12") is +/- 0.7% and for small meters (<12", it is +/- 1%). ( No and 5.1.2, page 17 & 18 of AGA)Please clarify which accuracy requirements are to be followed while deciding number of paths of the US Meter to be offered. There are cases in which the full meter body including the flanges is a single casting. In such cases, it is not possible to offer weld neck flanges. Kindly confirm your acceptance. Please note that SICK Maihak Gas Ultrasonic Meter is approved for custody transfer of Natural Gas with 5D upstream meter run, PTB approved profiler plate and 3D downstream meter run. This configuration has been approved by PIGSAR, PTB which is reputed lab approved by German Weights and Measures. Attached is the relevant page of the type approval certificate to this effect Pls refer configuration No 2 given on 3rd page in the attached file. We request you to accept the same for best performance results as Page 9 of 23 Accuracy shall be + 0.3% (including Lab uncertainty) If the meter and flange are casted as a single piece, requirement of Weld neck Flanges may be deferred. Tender Conditions prevails 14
16 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 individual case of SICK Maihak Meters Page 4 of 4 Section III B, SCC- Goods, Delivery Schedule The FOT site schedule is 7 months Since scope involves wet calibration of big size meters and supply of GC, we request you to review the delivery period and make it 8 months FOT site. Pls confirm Tender Conditions prevails MR for USM & Metering Skid Page 3 of 14 Loose supply of three number (3) Flow computers, GC controller / Display Unit along with printer, Isolators, barriers & repeaters, power supply units etc required for the system. Refer S.No (ii) 3.3 Job Spec for filtration, metering & let down Page 5 of 11 Job Spec for filtration, metering & let down Page 6 of 11 Two self actuated pressure control valve(s) with integral slam shut as indicated in respective P & ID s. The skid shall be complete in all respects, ready for installation and commissioning at the respective site. There shall be minimum work to be done at site. All field mounted instruments shall be supplied loose to avoid damages of same during transportation of the skid. However, PCVs with integral slam shut, ultrasonic flow meter, flow straightner, control valve shall be duly mounted on the skid. The flow computer shall be fully configured and all the necessary data as per data sheet should be recorded in FC to minimize site work. The details regarding Page 10 of 23 Self actuated Pressure control Valve(monitor), FCV and SSV separately as indicated in respective P & ID s. Refer Corrigendum 1 Stamped page No. 3 15
17 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 installation of metering skid, shall be clearly described in the Installation Manual especially made for metering skid installation and the same shall be submitted while dispatching skids to various sites Job Spec for filtration, metering & let down Page 8 of 11 Flow profiler shall be provided at the ultrasonic meter inlet to eliminate swirls and cross current setup by the pipe fittings, valves or regulators preceding the meter inlet piping where specified. Flow Profiler shall be according to AGA Report No. 8 & 9. Flow Profiler shall be a bundle of SS 316 tubes. Vendor shall furnish complete details/design of straight length (upstream/downstrea m) arrived at. Flow profiler shall be provided at the ultrasonic meter inlet to eliminate swirls and cross current setup by the pipe fittings, valves or regulators preceding the meter inlet piping where specified. Flow Profiler shall be according to AGA Report No. 8 & 9. Flow Profiler of suitable design to meet tender specifications. Vendor shall furnish complete details/design of straight length (upstream/downstream) arrived at Ultrasoni c flow meter Page 5 of 13 The turndown ratio of each flow meter shall be minimum 1:20. The accuracy of the Ultrasonic flow meter shall be ±0.25% or better and repeatability shall be better than ±0.25% of reading and accordingly vendor shall select the no. of paths to meet accuracy requirement and indicate the same calculations/back-up literature. in The turndown ratio of each flow meter shall be minimum 1:40. The accuracy of the Ultrasonic flow meter shall be ±0.3% (including Lab uncertainty)or better and repeatability shall be better than ±0.1% of reading and accordingly vendor shall select the no. of paths to meet accuracy requirement and indicate the same in calculations/back-up literature Ultrasoni c flow meter Page 12 of 13 The Ultrasonic meter shall be flow calibrated with NG and shall have calibration certificate duly signed by Page 11 of 23 The Ultrasonic meter shall be flow calibrated with NG and shall have calibration certificate duly signed by weights & measures authority such as NMI, PTB or other reputed 16
18 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 48 MR for USM & Metering Skid, Item no. 1, Bullet no. 4 Descripti on of Equipme nt & Services, weights & measures authority such as NMI, PTB or other reputed National Std laboratory of its country of origin such as Trans Canada Calibrations, (TCC) Canada,Colorado Engg Experiment Station Inc.(CEESI) USA,South West Research Inc. (SWRI) USA. Accuracy with wet flow calibration shall be demonstratd within ±0.25% for multi path type under flow conditions in the turndown ratio of 1:10. The meter proving system to be used by vendor shall be traceable to international stds and uncertainty of meter proving system shall be furnished. Gas metering system integration, testing, validation & including third party "wet' calibrations (only for the ultrasonic meters with its associated upstream / downstream meter runs) should be done in flow labs as detailed above Loose supply of three number (3) Flow computers, GC controller/display Unit along with printer, Isolators, barriers and repeaters, power supply units etc required for the system. Kindly confirm if all this material is to be supplied loose as per Technical Volume Page 7 - MR for USM & Metering Skids OR A complete Metering Control Panel housing all this equipments as per the SOR item no. 1.0 is to be supplied. National Std laboratory of its country of origin such as Trans Canada Calibrations, (TCC) Canada,Colorado Engg Experiment Station Inc.(CEESI) USA,South West Research Inc. (SWRI) USA. Accuracy with wet flow calibration shall be demonstratd within ±0.3% (including Lab uncertainty) for multi path type under flow conditions in the turndown ratio of 1:40. The meter proving system to be used by vendor shall be traceable to international stds and uncertainty of meter proving system shall be furnished. Gas metering system integration, testing, validation & including third party "wet' calibrations (only for the ultrasonic meters with its associated upstream / downstream meter runs) should be done in flow labs as detailed above Refer S.No PRICE SCHEDULE FOR USM & 2 - METERING SKID - Item no ANSI# 600 Ultrasonic Flow Meter (multipath), Meter runs, Field instruments, Flow Page 12 of 23 Refer S.No. 1 17
19 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 computers Metering panel and control 50 MR for USM & Metering Skid, Item no. 1, Bullet no. 8 Descripti on of Equipme nt & Services, Serial Interface Cable (such as RS 485/ RS 232 cable) from Flow Computer and GC Display unit to RTU to be supplied by metering Vendor. Please provide the distance between FC/ GC Display unit and the RTU. The distance between FC/GC Display unit and the RTU will be 30 mts 51 MR for USM & Metering Skid, Descripti on of Equipme nt & Services, Item no. 1, First Para Supervision of erection and hydro test and commissioning by Vendor for 20 days. Vendor to quote per diem rates, inclusive of all expenses like travel, boarding, lodging etc. Please confirm that Supervision of Hyrdotest is not in bidders scope of supply as this activity is not envisaged during the installation of the US Meter runs. Refer Corrigendum 1 Stamped page 3 52 Preamble to Price Schedule for USM & 5 - Metering Skid Pt. 11 Bidder shall furnish charges for supervision of Erection / Testing / Commissioning in the format Terms and Conditions For Supervision of Erection, testing, & Commissioning as Annexure - 1 to SOR per diem rate for 4 days of supervision per item of SOR (Item 1 = 3 sets and Item 2 = 1 No) shall be considered in evaluation. As per MR for USM & Metering Skid, 1.2 Description of Equipment & Services, Item no. 1, Para-1; 20 days of per diem rates for supervision of erection and commissioning is to be quoted, whilst as per the SOR 4- days would be consider. Please confirm the no. of days that will be considered for Price Evaluation Refer S.No. 30 Refer Corrigendum 1 Stamped page 3 53 List of Recomm ended Vendors Flow Vendor Computers Please provide list of recommended vendors for Flow Computers. Daniel, Bristol Babcock, RMG, OMNI and Instromet 54 Gas Composit ion Sources of Gas Supplied and their composition are given below. Particular source may be selected depending upon Please confirm two particular sources, so that the calibration Gas cylinders could be considered accordingly. Or please confirm that we have to supply 4 nos. of Sources of Gas supply shall be RLNG at Dahej and Lean Gas at Vijaipur. Page 13 of 23 18
20 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 requirement. Calibration Gas Cylinders Bullet no. 3 The ultrasonic flow meter with a minimum length of (10 D upstream + profiler + 10 upstream + meter + 5 D downstream straight lengths) shall be supplied by Vendor. This pipe shall fulfill the codes and manufacturer std requirements for such a measuring tube. As per our understanding, in reference to AGA 9 Pt. no. 7.2, For the Wet Calibrated US Meter; the upstream Pipespool may be 1OD after Flow Straightner and 5D downstream Pipe spool. And only in the event the wet calibration is not performed, then the additional 1OD before flow profiler is required. Kindly confirm if it is acceptable to supply the meter run with Flow Profile+1OD Upstream Spool + Meter+5D Downstream spool, entire Metering assembly calibrated at an independent flow calibration facility. OR We request GAIL! JPK kindly also consider! accept that in the event a Ultrasonic Meter Manufacturer having a Valid Type Test Approval from an Internationally Accredited Weights and Measures Body like NMI!PTB!etc. which confirms that the USM has an uncertainty of < +0.3% than maybe USM Meter run with 1OD±Flow Straightner+1OD+Meter +5D could be supplied without Wet Calibration. (The Type Test Approval Certificate alongwith the Test Reports could be presented to GAIL /JPK) Wet Calibration has to be carried out at six points. Flow profiler + 10D downstream + US Meter + 5D are required for Calibration at accredited lab Para 1 In order to provide proper alignment throughout the metering lines, three knock-out dowel pin holes with different diameters shall be drilled in the ultrasonic flow meter flanges and in the corresponding upstream and downstream meter tube flanges. The internal diameter of The Manufacturing process of USM is an OEM standard. It is understood that this requirement is not mandatory as we feel that the process of the USM design/ manufacturing should be left on the OEM. Please confirm our understanding. Page 14 of 23 Bidder s Understanding Correct 19
21 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 the meter tubes shall be identical to the internal diameter of the ultrasonic flow meters Para 3 The circularity of the meter tubes shall comply with ISO requirements. Please provide the standard no. of ISO being referred. Circularity of the meter tubes shall comply with API Ultrasonic Gas Check! Custody Transfer Metering System shall be built and integrated only by the original equipment manufacturer of the Ultrasonic Flow Meter, since critical components within the custody transfer metering system should be compatible to ensure Overall System Uncertainty for this critical fiscal transaction purpose. All components within the metering system must be well proven and compatible in the similar application Ultrasonic Gas Check! Custody Transfer Metering System shall be built and integrated only by the original equipment manufacturer of the Ultrasonic Flow Meter, since critical components within the custody transfer metering system should be compatible to ensure Overall System Uncertainty for this critical fiscal transaction purpose. All components within the metering system must be well proven and compatible in the similar application Tender Condition prevails Each metering line shall be thermally insulated, including the ultrasonic flow meter, and the transmitters shall be installed in a protective enclosure in order to minimize the environmental temperature effects on the overall accuracy of the metering system. 1. It is understood that only the U!S & DIS Pipe spools with the USM is to be insulated and not the entire Metering Line. - Kindly confirm our understanding. 2. Kindly provide detail specifications for the Protective Enclosures for the Transmitters along with the MOC, also confirm if the same has to be with a thermostat controlled heater (Eexd) such that the temperature within the enclosure would be uniform disregard of the changes in the ambient conditions. 1. Bidders understanding is correct 2. Thermostat controlled heater is not required. 3. Protective Enclosures for Transmitters shall be weather proof to IP The ultrasonic flow meters shall be calibrated in an accredited laboratory. 1. It is understood that, that in the event it is not possible 1. Refer S.No. 55 Page 15 of 23 20
22 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 If possible, complete lines shall be checked. If not, the ultrasonic flow meter shall be calibrated with its upstream length. The calibration shall be done on 5 points for each flow meter. Wet calibration of the complete metering run (including 1OD straight run before profiler, flow-profiler, 1OD meter run after profiler, US meter and SD straight run after meter) shall be performed as per AGA9 latest recommendations. to calibrate the entire assembly of 1OD + FS + 1OD + SUM + 5D than in that case, the calibration should be performed with 1 OD+USM. - Please confirm our understanding. 2. It may be noted that it might not be possible to get the entire assembly calibrated as for the 16 Meter the approximate length of the entire assembly would be mm, in that case we would request GAIL / JPK to allows us the calibration of the Meter with Flow Straightner, 1 U/s 1OD spool, USM and the SD Downstream Spool. 2. Tender conditions prevail Para 7 Metering supervisory system is to be provided at Bamnouli and SV 4. It is understood that Bamnouli and SV-4 are one and the same station and only One Metering supervisory is envisaged for the item no. 2 of SOR. One Metering supervisory system is envisaged. Bidder s Understanding is Correct Leak test : After final assembly on skid, all lines shall be pneumatic tested for detection of leaks by the method of soap bubbles Kindly confirm the pressure at which the pneumatic test is to be conducted. Also confirm if the pneumatic test isto be conducted for the 3 nos. of 16 USM Metering System also. Pneumatic Test Pressure shall be 7 bar The gas pressure letdown skid shall include the necessary equipment to perform safely the operation for which it is designed. It shall be equipped with, but not limited to (see also the relevant P&ID): One process connection at inlet (600 # acc piping class) One process connection at outlet (600 # acc piping class) Please confirm the actual requirement for the Process Connections at the PRS skid outlet. Refer Corrigendum 1 Stamped page 4 Page 16 of 23 21
23 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 64 P&l Diagram SV-4 for Dispatch Station at Bamnouli (sheet 2 of 5) One Process Connection of 16 Line size at outlet is indicated on the D/S of PRS. Refer Corrigendum 1 Stamped page 42 to P&l Diagram SV-4 for Letdown Skid at Bamnouli, TOP, SV-4 (sheet 5 of 5) Two Separate Process connections of 12 & 16 with common outlet header of 16 is indicated. Refer Corrigendum 1 Stamped page 42 to Last bullet and first Para One manual actuated inlet double block and bleed integrated isolation valve. This valve shall be equipped with a bypass for line pressurization this by-pass shall be composed of one 2 isolation valve and one manually operated control valve. Please confirm that For the By-pass for line pressurization a Globe/plug valve is envisage for throttling purpose and not a manually operated control valve. Bidder s understanding is Correct contd. One slam shut-off valve, with the following character istics: Last Bullet the setting range shall be: for the maximum set point, 90 to 150% of the maximum outlet pressure; for the minimum set point, 10 to 40% of the maximum outlet pressure. Based on the Setting range indicated for minimum and maximum se-point, It is understood that under pressure cut-off (UPCO) for the SSV is envisaged for this application. AS per standard practice UPCO is not provided for high pressure installations and only OPCO (Over Pressure Cut-off) is provide. Please confirm I clarify the requirement. Both UPCO & OPCO shall be provided Scope Pt. no VDC - Shall be provided at one end for the control panel by client I others. 1. Please confirm that 24 VDC source shall be made available by client! others. 2. Also confirm is any source for 230 VAC UPS supply shall also be available. 3. Also confirm the power source availability for the Chainsa Meter run Panel (if a panel is to be supplied). 24 V DC will be supplied to Vendor. Vendor to convert to other level of Voltages required. Page 17 of 23 22
24 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM Package Unit Instrume ntation 13 Spec. for Panel, subclause 13.8 USM Based Metering Skid 3.4 Metering Supervis ory System Vendor to provide meter supervisory system with desk top computer + HMI software with all cableslfurniture and complete with configuration of all parametersldisplays as per P&lDs, details furnished during detail engineering, The operating system of the Metering Supervisory System shall be window based. The computer system for the supervisory control system shall be industrial type IBM compatible, suitable for continuous operation in the nonair-condition environment. It will be mounted in the control panel Kindly confirm if the Supervisory System has to be a standard Desktop type (as per Instrumentation Package - Control Panel) or that the same has to be industrial type which will be installed in the Control Panel (as per Metering Skid specifications for the Metering Supervisory). Also confirm the type of display required for the same (is the Monitor required to be of Industrial grade or a standard TFT - LCD Monitor is acceptable) Everything monitor(tft/lcd), keyboard, and printer shall be panel mounted. Monitor shall be of Industrial grade Flow Compute r Last Para Printers for GC and EC shall be desktop type and shall be supplied along with required furniture by contractor. In the tender document at several places it is indicated the Printer for the GC & FC shall be mounted in the Control Panel, whilst here it is mentioned otherwise, please confirm the exact requirement. Further it may be noted that the Dot-Matrix Report Printer could be installed in the Control Panel and the LaserJet Report Printer (for GC Reports and Daily reports from the HMI) should be installed on a separate furniture outside for ease of day to day operations. Printer for the GC & FC shall be mounted in the Control Panel. 72 Flow Meter Instrume ntation & Leak test using a known reference gas at the maximum rated pressure of the Please re-confirm that leak test at Max. Rated Pressure i.e barg is to be conducted during the FAT for Leak Test Pressure is 7 bar. Page 18 of 23 23
25 CHAINSA JHAJJAR BAMNOLI PIPELINE PROJECT TENDER FOR FILTERATION & METERING TECHNICAL CORRIGENDUM 1 Control Tests Bullet - 4 meter. the US meters. 73 Ultrasoni c Flow Meter Instrume ntation & Control Tests Last Bullet Transducer replacement test to demonstrate the ability of the transducer extraction/replaceme nt tool under operating pressure conditions. A zero flow verification test shall be repeated to verify the accuracy and performance of the meter after replacement of one or more transducer pairs. It is understood that a type test report for the same has to be submitted and not the actual testing as described under this clause is envisaged. Please confirm our understanding. Bidder s understanding is Correct. 74 Tech Specs for Flow Compute r 9 Ticket Printer Ticket printer to be included by vendor within each flow computer unit for printing the reports Kindly confirm acceptance of one common printer with an automatic changeover switch for the flow computers. It maybe noted that in the event this Printers have to be mounted in the Control Panel than installing 2 or 3 ticket printers within the same control Panel might increase the size of the Panel too. At Chainsa, Single Printer is acceptable. At Bamnoulli, the printer of Meter Supervisory System shall be used to indicate flow values. 75 Tech Specs for Flow Compute r 10 Misc, Pt. b) PID control shall be implemented in flow computer. Also independent microprocessor based PID controller shall be supplied. User will select implementation of PID control in flow computer or independent controller. Please re-confirm that the PID Control is required in the Flow Computer as well as Separate PID controllers for each FCV is to be supplied. Independent PID Controller is required, the same shall be integrated with Metering supervisory system. 76 Chromat ograph - NG Metering Station 5.1; Pt. (vi) Cycle time: Operator assignable (5 minutes max). We would request you to kindly confirm the same as GAIL for applications smaller than this tender requirement is also asked for cycle time of less than 4 minutes whilst here it is mentioned as 5 minutes max. Tender Conditions prevails. Page 19 of 23 24
MAHARASHTRA NATURAL GAS LIMITED
Replies to Queries of the Bidders Date: 01.12.2018 SUB: Replies to queries of the bidders for Tender for annual rate contract for procurement of SRM for CGD Network of MNGL, Pune REF: Bid Document No.
More informationCOMPAFLOW. Compressed Air. Volumetric flow. Gas. Mass flow. Steam. Net volumetric flow. Liquid
Volumetric flow Compressed Air Mass flow Gas Net volumetric flow Steam Liquid Universal compact orifice flow meter combines a compact orifice flow sensor and sotiphicated converter One-piece flow sensor,
More informationONSITE PROVING OF GAS METERS. Daniel J. Rudroff WFMS Inc West Bellfort Sugar Land, Texas. Introduction
ONSITE PROVING OF GAS METERS Daniel J. Rudroff WFMS Inc. 13901 West Bellfort Sugar Land, Texas Introduction With the increased use of Natural Gas as a fuel, and higher natural gas prices buyers and sellers
More informationThe M-Series Eletta Flow Meter High accuracy DP Flow Meter with multiple functions
The M-Series Eletta Flow Meter High accuracy DP Flow Meter with multiple functions Flow Meter with multiple functions for gases and liquids M3 The M-series Flow Meter, with its versatile and user-friendly
More informationOnline data sheet FLOWSIC30 GAS FLOW METERS
Online data sheet A B C D E F H I J K L M N O P Q R S T Ordering information LTRASONIC GAS FLOW METER FOR CTION Type Part no. On request The exact device specifications and performance data of the product
More informationJOB SPECIFICATION FOR ULTRASONIC METER BASED GAS METERING SKIDS PACKAGE OF GAIL
JOB SPECIFICATION FOR ULTRASONIC METER BASED GAS METERING SKIDS PACKAGE OF GAIL 1 CONTENTS 1.0 Introduction 2.0 Codes and Standards 3.0 Area Classification 4.0 Environment Protection 5.0 Scope of Work
More informationPetrofac Client Doc. No JI-DTS-5002 Page 2 of 8 Rev. TABLE OF CONTENTS
M681IDS0003 Petrofac Client Doc.. 100813361JIDTS500 Page of 8 Rev. ALL TABLE OF CONTENTS DESCRIPTION PAGE 1. COVER PAGE 1. TABLE OF CONTENTS 3. 61FCV8006 3 4. 61FCV800 4 5. 61FCV8008 5 6. 61FCV801 6. GENERAL
More informationLPG DRIVER ATTENDED TRANSPORT LOADING
November 1993 Prepared By: Ken A. Steward. P.E. Linco-Electromatic, Inc. 4580 West Wall Street Midland, Texas 78703 LPG DRIVER ATTENDED TRANSPORT LOADING INTRODUCTION The safest and most accurate method
More informationTowards ISO Koos van Helden, B.ASc. International Account Manager Eastern Hemisphere mailto:
Towards ISO 17089-1 Koos van Helden, B.ASc. International Account Manager Eastern Hemisphere mailto: koos.vanhelden@kpnmail.nl Who am I? My name: Koos van Helden International Account Manager Eastern Hemisphere
More informationFlowatch Multiphase Flow Meter
Multiphase Flow Meter Multiphase Flow Meter Key Components Pietro Fiorentini's FLOWATCH is a non-intrusive, non radioactive, in-line multiphase meter for measuring flow rates of oil, water and gas from
More information780S Ultra High Purity Series
Smart Ultra High Purity Thermal Gas Mass Flow Meter Features Measures mass flow directly, no seperate temperature or pressure inputs required Field adjustment of critical flow meter settings via on-board
More informationSouth-Tek Systems - Nitrogen Generation Corrosion Inhibiting System. Designed for: Dry or Preaction Fire Protection Systems (FPS)
South-Tek Systems - Nitrogen Generation Corrosion Inhibiting System Designed for: Dry or Preaction Fire Protection Systems (FPS) 1.0 Description of Work 1.1 The Fire Sprinkler Contractor shall provide
More informationONSITE PROVING OF GAS TURBINE METERS Daniel J. Rudroff Invensys Metering Systems
ONSITE PROVING OF GAS TURBINE METERS Daniel J. Rudroff Invensys Metering Systems 1322 Foxwood, Houston, Texas 77008 INTRODUCTION With the increased use of Natural Gas as a fuel, higher natural gas prices,
More informationULTRASONIC METER FLOW CALIBRATIONS CONSIDERATIONS AND BENIFITS. Joel Clancy
ULTRASONIC METER FLOW CALIBRATIONS CONSIDERATIONS AND BENIFITS Joel Clancy Colorado Engineering Experiment Station, Inc. of Iowa (CEESI Iowa) 2365 240 th Street Garner, Iowa 50438 Introduction Measurement
More informationFor Multi-Parameter Meters see mvx
Design Features VORTEX IN-LINE FLOW METERS For Multi-Parameter Meters see m Principles of Operation n No moving parts to wear or fail. n Electronics can be remotely mounted up to 30.5 m (0 ft). n No fluid
More informationPro-V Multivariable Flowmeter Model M22 In-line Vortex
Pro-V Multivariable Flowmeter Model M22 In-line Vortex Pro-V TM Advantage: Volumetric or mass flow monitoring of most liquids, gases, and steam Multivariable meter delivers mass flow, temperature, pressure,
More informationUNDERSTANDING, ACCELERATED
UNDERSTANDING, ACCELERATED MEASURE FLOW, PRESSURE, AND TEMPERATURE ALL IN ONE INSTRUMENT! Designed for Performance TSI thermal mass flowmeters incorporate a proprietary platinum film sensor design for
More informationDEPARTMENT OF CHEMICAL ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI , INDIA
DEPARTMENT OF CHEMICAL ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY MADRAS CHENNAI 600036, INDIA Ref. No. CHE/17-18/CHE/006/GAIM/RAJN Date: 25 APRIL, 2018 Due date: 9 MAY, 2018 Item: High Pressure Gas Hydrate
More informationFor Multi-Parameter Meters see mvx
VORTEX IN-LINE FLOW METERS Design Features For Multi-Parameter Meters see mvx Principles of Operation VX No moving parts to wear or fail. Electronics can be remotely mounted up to 30.5 m (0 ft). No fluid
More informationX-Flow Mass Flow Controller 授权代理 : 北京品超思瑞科技学院公司
X-Flow Mass Flow Controller 2 Highlights Parker Hannifin Precision Fluidics Division is excited to introduce X-Flow, a new easy to use general purpose mass flow controller for your instrument, lab, or
More informationanalytical bulk flow distance FLOW level pressure temperature industrial communication
analytical bulk flow distance level pressure temperature industrial communication isolv THERMAL MASS METER Measuring Principle Self-heated Sensor Reference Sensor isolv Thermal Mass Flow Meters have two
More informationMass Flowmeters. Mass Flowmeters for Gases
Mass Flowmeters Mass Flowmeters for Gases Fast, Accurate, Low Pressure Drop for critical measurement applications! Flow (Std l/min) Response to a step change in flowrate 300 200 100 4 Milliseconds 63%
More informationULTRASONIC FLOW METER CALIBRATIONS CONSIDERATIONS AND BENIFITS American School of Gas Measurement Technology, September 2007.
ULTRASONIC FLOW METER CALIBRATIONS CONSIDERATIONS AND BENIFITS American School of Gas Measurement Technology, September 2007 Joel Clancy Colorado Engineering Experiment Station, Inc. of Iowa (CEESI Iowa)
More informationNIT LIMITED NO. NC-105-P-SCS-NOCB CYLINDERS & REGULATORS
NIT LIMITED NO. CYLINDERS & REGULATORS NATIONAL INSTITUTE OF SCIENCE EDUCATION & RESEARCH JATNI CAMPUS, P.O.: JATNI, Khurdha-752050 Tender Notice No. NIT Limited NO. Sealed Tenders are invited on behalf
More informationKind Attention: Shri. R.R.Kumar, Addl. General Manager (M.M), PDIL PRE-BID QUERIES. Sl.No Bidder s Query Reference Client / Consultant Reply 1
CLIENT M/s GREEN GAS LIMITED, Lucknow CONSULTANT M/s PROJECTS & DEVELOPMENT INDIA LIMITED, Noida TENDER CITY GAS DISTRIBUTION PROJECT AT LUCKNOW GA for GREEN GAS LIMITED TENDER NO. PNMM/EM089/E/111/NCB
More informationPneumatic high-pressure controller Model CPC7000
Calibration technology Pneumatic high-pressure controller Model CPC7000 WIKA data sheet CT 27.63 Applications Automotive and avionics industry Industry (laboratory, workshop and production) Transmitter
More informationINSTRUCTION MANUAL. FLOW CONTROL DRAWERS MANUAL / PLC CONTROL SERIES Model Version Perma Pure LLC Tel:
PERMA PURE INSTRUCTION MANUAL FLOW CONTROL DRAWERS MANUAL / PLC CONTROL SERIES Model 3300 Version 4.06 Perma Pure LLC Tel: 732-244-0010 P.O. Box 2105, 8 Executive Drive Tel: 800-337-3762 (toll free US)
More informationTEK-THERMAL 1700B. Thermal Mass Flowmeter. FLOW. Technology Solutions
Technology Solutions TEK-THERMAL 1700B Thermal Mass Flowmeter FLOW www.tek-trol.com Flow Level Temperature Pressure Valves Analyzers Accessories TekValSys Introduction Tek-Thermal 1700B Thermal Mass Flowmeters,
More informationBUBBLER CONTROL SYSTEM
BUBBLER CONTROL SYSTEM Description: The HDBCS is a fully automatic bubbler system, which does liquid level measurements in water and wastewater applications. It is a dual air compressor system with, air
More informationThe HumiSys. RH Generator. Operation. Applications. Designed, built, and supported by InstruQuest Inc.
The HumiSys RH Generator Designed, built, and supported by InstruQuest Inc. Versatile Relative Humidity Generation and Multi-Sensor System The new HumiSys with single or dual RH probes capabilities is
More informationCLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.
Page 1 of 7 CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD 1. SCOPE 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. 1.2 The piping system as used herein is
More informationERZ 2000-NG Flow Computer
ERZ 2000-NG Flow Computer With decades of natural gas measurement experience, RMG has developed the ERZ 2000-NG an approved and best-in-class gas flow measurement solution for all areas of gas volume conversion.
More informationHumiSys HF High Flow RH Generator
HumiSys HF High Flow RH Generator Designed, built, and supported by InstruQuest Inc. Versatile Relative Humidity Generation and Multi-Sensor System The HumiSys HF is a high flow version of the previously
More informationFeatures. Main Voltage: Vdc. Input Control Signal: 0-5 Vdc or 4-20 madc (Sourcing) Monitor Output Voltage: 0-5 Vdc or 4-20 madc (Sourcing)
1 X-Flow Mass Flow Controller Flow Range from 0.8 ml/min to 20 l/min Target Markets Laboratory and Process Instrumentation Pharma / Bio-Pharma Equipment Air Quality Monitoring Systems Furnace and Coatings
More informationCompiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.
1. Scope Description of requirements and procedures for compact provers to be used as verification standards. 2. Reference documents Trade Metrology Act SANS1698 3. Policy A. BASIC REQUIREMENTS Compact
More informationCLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)
Page 1 of 10 CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) 1. SCOPE 1.1 To provide definitive requirements for HIGH PRESSURE PNEUMATIC testing of piping systems according to ASME B31.3. This
More informationDual Solenoid Gas Valve Installation
Installation IMPORTANT: These instructions are intended as a guide for qualified personnel installing or servicing FLYNN Gas Products. Carefully follow all instructions in this bulletin and all instructions
More informationTechnical Bulletin, Communicating with Gas Chromatographs
Last Updated: 13- July-2010 TB-080000C Technical Bulletin, Communicating with Gas Chromatographs OMNI FLOW COMPUTERS, INC. 12620 West Airport Boulevard, Suite 100 Sugar Land, Texas 77478 United States
More informationProduct Information. Three in One: Gas Meter Tariff Device Volume Corrector. Ultrasonic Gas Meter ECOSONIC X12
Product Information Three in One: Gas Meter Tariff Device Volume Corrector Ultrasonic Gas Meter ECOSONIC X12 ECOSONIC X12 Values you can count on The Application Fields The ultrasonic gas meters of the
More informationInstallation, operating and maintenance Instructions for Seemag bypass level indicator
Issue: S Date: 05-09-14 Type G35 General information The Seetru bypass magnetic level indicator, abbreviate SEEMAG, serves to show the filling level of fluids in tanks, basins, tubes etc. The Seemag operates
More informationGAS TRANSPORTER S REQUIREMENTS FOR GAS MEASUREMENT SYSTEMS CONNECTED TO THE NATIONAL GRID GAS NETWORK
SPECIFICATION FOR GAS TRANSPORTER S REQUIREMENTS FOR GAS MEASUREMENT SYSTEMS CONNECTED TO THE NATIONAL GRID GAS NETWORK J510 ( Rev 04/06 ) OCTOBER 2005 . CONTENTS Page FOREWORD BRIEF HISTORY iii iii INTRODUCTION
More informationMass Flow Meter (MFM) for Gases
873 Mass Flow Meter (MFM) for Gases Direct flow measurement by MEMS- Technology for nominal flow rates from 1 ml N /min to 8 l N /min (N 2 ) High accuracy Short response time Compact design and digital
More informationTHERMAL MASS FLOW MEASUREMENT FOR GASES
THERMAL MASS MEASUREMENT FOR GASES Make the Wise Choice. Choose Sage Flow Meters. A Commitment to Higher Performance SAGE METERING is a manufacturer of high performance Thermal Mass Flow Meters which measure
More informationFeatures. Description
Features Fast response flow meter ideal for inert gas and liquid mass flow measurement applications Smart electronics permit field adjustment of critical flow meter settings Field validation of flow meter
More informationMultiphase MixMeter. MixMeter specification. System Specification. Introduction
System Specification Multiphase MixMeter Introduction The MixMeter is unique in applying proper homogenization techniques to multiphase measurement. In so doing the MixMeter avoids the requirement for
More informationTH-1800-T TRX-700-CNG Converter
TH-1800-T TRX-700-CNG Converter low detector The CNG fuel gas flowmeter is so accurate as to meet a demand of measuring the CNG directly by making the most use of our well-established mini-thermal flowmeter
More informationBrooks TMF-Zone 1 Models 5816-Ex/5864-Ex
Data Sheet DS-TMF-586Ex-MFC-eng TMF-Zone Brooks TMF-Zone Models 586-Ex/5864-Ex Customer Benefits Assured process accuracy and repeatability Long-term reliability Reduced maintenance CE certified Improved
More informationCHE Well Testing Package/Service:
CHE Well Testing Package/Service: CHE delivers well testing package And services, trailer mounted well testing package and offshore/onshore well testing services with over 10 years experience. Our testing
More informationMeasurement & Analytics Wet gas monitoring
Product guide PG/FLOW/010-EN Measurement & Analytics Wet gas monitoring Economical wet gas metering using non-proprietary correlations Measurement made easy Introduction With many of the most economically
More informationFisher DVI Desuperheater Venturi Inline
Instruction Manual DVI Desuperheater Fisher DVI Desuperheater Venturi Inline Contents Introduction... 1 Scope of Manual... 1 Description... 1 Principle of Operation... 2 Installation... 3 Operating Instructions...
More informationHUMOR 20. High Accuracy Humidity Calibrator. Water T, p1 HUMOR 20 V1.0
High Accuracy Humidity Calibrator The role of humidity calibrations that are accurate, reproducible, and documentable is becoming more and more important. ISO quality guidelines and regulations according
More informationFUEL GAS FIRING CONTROL RJ (Dick) Perry Safety Systems Consultant 6 June 2016
INTRODUCTION Fired equipment such as Heaters and Boilers, normally have to comply with either NFPA 85/86 or API 556 for North America and some other countries which apply such standards, or EN 746-2 for
More informationUltra High Purity Model 780S
Smart Ultra High Purity Thermal Gas Mass Flow Meter Features Measures mass flow directly, no separate temperature or pressure inputs required Built-in flow conditioner which eliminates velocity-profile
More informationBernhard Thomas September EnCal 3000 prochain Energy in Gas with ROI
Bernhard Thomas September 2018 EnCal 3000 prochain Energy in Gas with ROI Agenda 1 Introduction The new EnCal 3000 prochain Technical details Outlook Introduction 2 What we measure and why 3 What we measure
More informationReply to bidder's queries are enclosed herewith as Annexure-I.
CORRIGENDUM #1 for Date:22.05.2018 Owner : GNGPL Sl. No. Description Volume Page No. Clause / Para / Section Amendment / Addition / Modification / Deletion 1 Last date and time for submission of bid I
More informationADDENDUM NO. 1 Tender for Procurement of Catalyst Testing Pilot Plant for Corporate R & D Centre, Greater Noida
ADDENDUM NO. 1 Tender for Procurement of Catalyst Testing Pilot Plant for Corporate R & D Centre, Greater Noida CRFQ Number 1000298594 E-Tender System ID: 34790 1.0 SCOPE OF THIS ADDENDUM 1.1 This Addendum
More informationINTERPLANT STANDARD - STEEL INDUSTRY
INTERPLANT STANDARD - STEEL INDUSTRY IPSS STANDARD MAINTENANCE PRACTICE FOR PNEUMATIC OPERATED SHUT OFF VALVES No Corresponding IS Exists IPSS: 2-07-105-15 Formerly-: (New Standard) 0. Foreword 0.1. Interplant
More informationANL Bubble Chamber Superheated Active Target System
ANL Bubble Chamber Superheated Active Target System N 2 O and C 2 F 6 as Active Fluids B. DiGiovine Physics Division and Bubble Chambers April 2009 First Bubble Chamber Received Full Operation Authorization
More informationCONTROL VALVE TESTING
The optimal functioning of the Control valve not only exists of sufficient body & seat tightness, but more important, the total "performance" of the valve and its controls! For an accurate and reliable
More informationGP1 & GP2. Electropneumatic Regulators FOR PRESSURE CONTROL TO 1,000 PSI
GP1 & GP2 Electropneumatic Regulators FOR PRESSURE CONTROL TO 1, PSI GP1 & GP2 Functional Description The GP series control valve is an electronic pressure regulator designed to precisely control the pressure
More informationGas Pressure Regulator HON 300
Product information serving the gas industry worldwide Applications, characteristics, technical data Applications direct acting gas pressure regulator, for systems in accordance with DVGW working instruction
More informationNatural Gas Conditioning Skids & Equipments
Natural Gas Conditioning Skids & Equipments NATURAL GAS CONDITIONING SKIDS NIRMAL has rich experience of supplying complete package of Natural Gas conditioning skids consisting of emergency shut down,
More informationBHEL/Trichy-14 CCDP SYSTEM DESCRIPTION FOR DOME VALVE:
BHEL/Trichy-14 CCDP SYSTEM DESCRIPTION FOR DOME VALVE: The Dome Valve is a pressure tight, power operated Valve for application in Material Inlet / Vessel Discharge / Line Change over etc. The Valves should
More informationM-06 Nitrogen Generator (Nitrogen Making Machine)
Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains
More informationL 100. Bubble-Tube Level System. Installation, Operation and Maintenance Instructions
L 100 Bubble-Tube Level System Installation, Operation and Maintenance Instructions Figure 1 Contents Section Description Page 1.0 Introduction 2 2.0 Specifications 3 3.0 Installation 3 4.0 Warranty 6
More informationA review of best practices for Selection, Installation, Operation and Maintenance of Gas meters for Flare Applications used for Managing facility
A review of best practices for Selection, Installation, Operation and Maintenance of Gas meters for Flare Applications used for Managing facility mass balance and compliance 1. What, When and Why? 2. Flare
More informationManual of Petroleum Measurement Standards Chapter 6 Metering Assemblies Section 3A Pipeline and Marine
Manual of Petroleum Measurement Standards Chapter 6 Metering Assemblies Section 3A Pipeline and Marine Loading/Unloading Measurement Systems Draft Edition January 2018 Introduction This standard serves
More informationOil and Gas Custody Transfer
Downstream Focus By Emerie Dupuis Daniel Measurement and Control, Emerson Process Management Oil and Gas Custody Transfer When money changes hands, flow measurement accuracy matters. When flow measurement
More informationFAS-W. Features. Applications. Automatic condensation hygrometer
FAS-W HUMIDITY ANALYZER Automatic condensation hygrometer the «FAS-W» Moisture Analyzer automatic condensation hygrometer can measure both the volume fraction of moisture and the dew point temperature
More informationBuilt-in Purge Control Functions
Built-in Purge Control Functions Why clean a sensor? As the velocity sensor was calibrated clean, operating it clean also preserves the best calibration. Any build up of material on a thermal sensor tends
More informationPneumatic high-pressure controller Model CPC7000
Calibration technology Pneumatic high-pressure controller Model CPC7000 WIKA data sheet CT 27.63 Applications Healthcare and avionics industry Industry (laboratory, workshop and production) Transmitter
More informationASX 176 Axial Pressure regulator
ASX 176 Axial Pressure regulator ASX 176 Classification and Area of Application ASX 176 is a downstream pressure regulator, pilot controlled, for medium and high pressure applications. It is particularly
More informationMicro Motion 7812 Fiscal Gas Density Meter
Product Data Sheet PS-001162, Rev. B April 2009 Micro Motion 7812 Fiscal Gas Density Meter Micro Motion density and concentration meters are built to tackle the most demanding process and fiscal applications.
More informationIntegral type Differential pressure flowmeter VNT Series
Integral type Differential pressure flowmeter VNT Series OUTLINE VH series Wafer-Cone differential pressure flowmeter and high precision differential pressure transmitter are integrated into one flowmeter.
More informationThe Discussion of this exercise covers the following points:
Exercise 5-3 Wet Reference Leg EXERCISE OBJECTIVE Learn to measure the level in a vessel using a wet reference leg. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Measuring
More informationValidation of Custody Transfer Metering Skid at Site After Laboratory Proving
flotek.g 2017- Innovative Solutions in Flow Measurement and Control - Oil, Water and Gas August 28-30, 2017, FCRI, Palakkad, Kerala, India Validation of Custody Transfer Metering Skid at Site After Laboratory
More informationHUMOR 20. High-precision Humidity Calibrator HUMOR 20. Operation
High-precision Humidity Calibrator The role of humidity calibrations that are accurate, reproducible, and documentable is becoming more and more important. ISO quality guidelines and regulations according
More informationPiped Air SCBA Refilling System Standard
WALT WHITE Fire Chief 5770 Freeport Blvd., Suite 200 Sacramento, CA 95822-3516 Ph: (916) 808-1300 Fax: (916) 808-1629 www.sacfire.org Piped Air SCBA Refilling System Standard SCOPE: This specification
More informationMASS FLOW SYSTEMS MASS FLOW MEASURING, CONTROLLING AND BLENDING SYSTEMS
MASS FLOW SYSTEMS MASS FLOW MEASURING, CONTROLLING AND BLENDING SYSTEMS Using state-of-the-art measuring and microprocessor technologies, Advanced has assembled a series of systems which can measure mass
More informationFTC130 Transmitter. Operating Manual
Seite 1 von 11 FTC130 Transmitter Fast Thermal Conductivity Analyzer Operating Manual 1.09KD180724CWI1V05 Messkonzept GmbH Seite 2 von 11 1. Intended Use... 3 2. Description... 4 3. Measuring gases and
More information2600T Series Pressure Transmitter Models 264DC Differential and 264HC Gage Level Transmitters. Kent-Taylor
INDUSTRIAL INSTRUMENTS AND CONTROLS SPECIALIST Kent-Taylor 2600T Series Pressure Transmitter Models 264DC Differential and 264HC Gage Level Transmitters Features Include Base accuracy : ±0.075% Span limits
More informationOEM Manual MODEL 2305 ECONOMICAL DIGITAL SINGLE CYLINDER SCALE
OEM Manual MODEL 2305 ECONOMICAL DIGITAL SINGLE CYLINDER SCALE 1 These instructions generally describe the installation, operation, and maintenance of subject equipment. The manufacturer reserves the right
More informationDF-550E PROCESS ANALYSERS APPLICATIONS FEATURES
PROCESS ANALYSERS DF-550E The DF-550E Nano Trace oxygen analyser is a Coulometric sensor based analyser designed to measure oxygen as a contaminant at ultra trace levels in ultra high purity electronic
More informationFLOW COMPONENT TESTING FACILITIES API SAFETY VALVE VALIDATION TESTING
FLOW COMPONENT TESTING FACILITIES API SAFETY VALVE VALIDATION TESTING ID-08-FCTF 1 of 7 Revision 1 API SAFETY VALVE VALIDATION TESTING SOUTHWEST RESEARCH INSTITUTE (SwRI ) FLOW COMPONENT TESTING FACILITIES
More informationINSTALLATION & MAINTENANCE INSTRUCTIONS
DESCRIPTION / IDENTIFICATION The QBX series valve uses Proportion-Air closed loop technology for Pressure control. It gives an output pressure proportional to an electrical command signal input. The QB1X
More informationCAPITAL CONTROLS SERIES NXT3000
CAPITAL CONTROLS SERIES NXT3000 Modular design gas feed system with self contained automatic switchover capability. The Series NXT3000 Gas Feed System is a family of vacuumoperated, solution-feed gas dispensing
More informationDepth/Level. Druck Submersible Pressure Sensors Product Guide. GE Sensing. Applications. Features
Features High accuracy Excellent reliability Robust construction Harsh media compatible High stability Low power/pulsed power operation Applications Bore hole monitoring River level Tank level Tide and
More informationCORI-FLOW PRECISION MASS FLOW METER / CONTROLLER FOR LIQUIDS AND GASES
SENSORS FOR MASS FLOW AND PRESSURE CORI-FLOW PRECISION MASS FLOW METER / CONTROLLER FOR LIQUIDS AND GASES INTRODUCTION Bronkhorst High-Tech BV is the worldwide pioneer in the field of low flow liquid metering
More informationdeltaflowc deltaflowc Venturi or Probe
deltaflowc Mass Flowmeter for Gases - Multivariable with ultra fast dp, p and T-sensors - Compact, accurate and user-friendly - Ideal for OEMs deltaflowc Venturi or Probe Precise mass flow metering deltaflowc
More informationRate of Flow Valve Series 120
SPECIFICATIONS Rate of Flow Valve Series DIMENSIONS The OCV Series 120 Rate of Flow control valve is designed to control or limit flow to a predetermined rate, regardless offl uctuations in downstream
More informationH 2 O Bubble Chamber Superheated Active Target System. Safety and Systems Overview B. DiGiovine
H 2 O Bubble Chamber Superheated Active Target System Safety and Systems Overview B. DiGiovine Physics Division and Bubble Chambers April 2009 First Bubble Chamber Received Full Operation Authorization
More informationAUTOMATIC HOSE TEST UNIT, TYPE SPU
VALVES AND FITTINGS UP TO 14,000 BAR TEST AND CONTROL EQUIPMENT H IGH PRESSURE TECHNOLOGY AUTOMATIC HOSE TEST UNIT, TYPE SPU Pressure range from 1 up to 10,000 bar User-friendly touch panel operation HIGH-PRESSURE
More informationACV-10 Automatic Control Valve
ACV-10 Automatic Control Valve Installation, Operation & Maintenance General: The Archer Instruments ACV-10 is a precision automatic feed rate control valve for use in vacuum systems feeding Chlorine,
More informationCapital Controls Series NXT3000 Modular design gas feed system with self-contained automatic switchover capability.
Capital Controls Series NXT3000 Modular design gas feed system with self-contained automatic switchover capability. The Series NXT3000 Gas Feed System is a family of vacuum-operated, solution-feed gas
More informationCVI Valve Line. Exceeds the industry s highest standards for reliability and performance
CVI Valve Line Exceeds the industry s highest standards for reliability and performance Available in the most standard models with the shortest lead times in the industry Exceptional quality every CVI
More informationPressure and/or Temperature Pilot Operated Steam Regulators Series 2000
Hoffman Specialty Regulators Regulators Pressure and/or Temperature Operated Regulators Series 2000 The Hoffman Specialty Series 2000 consists of main valves, pilot valves, wells and hardware kits. They
More informationSpecification For Water Meters. Pr10068
Specification For Water Meters Pr10068 Documents Details This document is only valid on the day it was printed. Version Review Revision Date issued Reviewed by Approved by Date approved Revision type 0.1
More informationAutocalibration Systems For In Situ Oxygen Analyzers
Product Data Sheet PDS 106-340AC SPS 4000, IMPS 4000, and MPS 3000 January, 1999 Autocalibration Systems For In Situ Oxygen Analyzers Cost-effective autocalibration systems for installations ranging from
More informationAAVANTIKA GAS LIMITED
AAVANTIKA GAS LIMITED (A JOINT VENTURE COMPANY OF GAIL & HPCL) CITY GAS DISTRIBUTION PROJECT IN INDORE BID DOCUMENT FOR PROCUREMENT OF ODOURISING UNIT VOL. II OF II TECHNICAL BID DOCUMENT NO.: AGL/ 090
More informationVehicle-mounted meters, pump supplied
Purpose This inspection procedure outline (IPO) defines the minimum tests which must be performed to ensure that basic volumetric measuring devices comply with the legislation. Application Vehicle-mounted